Docket
EL26-72-000
Item
E-11
Reporter cite
195 FERC ¶ 61,215
Region
Six New England states
Respondents
ISO-NE + 16 Participating Transmission Owners
Length
115 pages

Read the order PDF (committed copy) Official source on ferc.gov ↗

What is unique to ISO-NE

ISO-NE is the small-system, big-load case. FERC flags a system peaking at only ‘30,000 MW’ with significant transmission constraints, and a ‘CELT load forecast’ that generally excludes proposed data centers, so a single large customer can move the regional needle. E-11 turns that into concrete planning questions: how Schedule 22/23 cluster studies, Pool Transmission Facilities at ‘69 kV’ and above, and the Monthly Regional Network Load behind-the-meter-netting rules should change, and whether to import PJM’s MW-threshold remedy for that netting.

What FERC presses ISO-NE on

Quoted directives, with page cites

Each quotation below is verbatim from the committed order text and links to the page it appears on. A test asserts every one of them against the extracted source.

  1. Application / study process P 5

    “the application process, study procedures, and ongoing operational requirements that apply to Eligible Customers seeking transmission service on behalf of large loads”
  2. Alternative transmission technologies P 75

    “require the evaluation of alternative transmission technologies in transmission service request studies, using models that are capable of evaluating the transmission system”
  3. Cost-recovery agreement P 6

    “a pro forma cost recovery agreement between ISO-NE, the relevant transmission owner, and Eligible Customer … to mitigate the risk of cost shifting”
  4. BTMG netting P 60

    “it allows load with BTMG to net its BTMG against its load for purposes of calculating Regional Network Service charges”
  5. Proximate-generation service P 7

    “the rates, terms, and conditions of service applicable to interconnection customers serving electrically proximate large load or co-located load”

Region-specific findings

What the public comment record says about ISO-NE

6 of the RM26-4 record's public comments name-check ISO-NE specifically (2 support · 0 oppose · 0 mixed · 4 neutral). That's a floor, not a full count: only about 40% of the corpus carries a region tag at all, so a comment that discusses ISO-NE without the audit pass catching a region-specific mention won't appear here.

See all 6 comments about ISO-NE →

Section IV briefing questions

This order poses its briefing questions at page 74 of the committed PDF: open at § IV. The questions are templated across the six show cause orders; the full set, and what the public record says on each, is in the comment record.

Respondents named in the order

Central Maine Power Company · The Connecticut Light and Power Company · Fitchburg Gas and Electric Light Company · Green Mountain Power Corporation · Maine Electric Power Company · The Narragansett Electric Company · New England Power Company · New Hampshire Transmission, LLC · NSTAR Electric Company · Public Service Company of New Hampshire · The United Illuminating Company · Unitil Energy Systems, Inc. · Vermont Electric Cooperative, Inc. · Vermont Electric Power Company, Inc. · Vermont Transco LLC · Versant Power

The other dockets

E-7 PJM · E-8 MISO · E-9 SPP · E-10 CAISO · E-12 NYISO · E-2 PJM

Return to the full briefing: the timeline, the five reform categories, the procedural clock, and the 273-comment RM26-4 record.