| BirminghamAL | Moratorium / pause | Superseded | 2026-03 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesThe City of Birmingham enacted a temporary pause on accepting and approving new/expanding data-center applications (proposed as a 270-day moratorium in December 2025), giving the city time to develop zoning and land-use guardrails. It was later superseded by permanent data-center zoning regulations the city adopted (its 'datacenters' page confirms updated zoning rules are in place). | Source |
| Pulaski CountyAR | Moratorium / pause | Rejected | 2026-06 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesPulaski County proposed moratorium on data center development. Measure failed to gain sufficient county commission support. | Source |
| Imperial CountyCA | Moratorium / pause | In force | 2026-06 | Residents cited energy and water consumption and environmental/public-health impacts.What it doesThe Imperial County Board of Supervisors voted 5-0 on June 16, 2026 to adopt an immediate 45-day urgency interim moratorium under California Government Code §65858, pausing approval and permitting of new and pending data center facilities in unincorporated areas; it may be renewed for up to 10 months and 15 days while a 19-member advisory committee develops zoning and building recommendations by January 2027. Residents cited energy and water consumption and environmental/public-health impacts. A developer (Sebastian Rucci) indicated intent to challenge the ordinance in court. | Source |
| IndioCA | Moratorium / pause | Expired | 2026-06 | —What it doesIndio City Council unanimously passed a 45-day emergency data-center moratorium on June 3, 2026, though no data-center proposals were active at the time. The Planning Commission has since recommended an outright ban; the Council is weighing extension versus a permanent ban. | Source |
| Monterey ParkCA | Permanent ordinance | In force | 2026-06 | Measure NDC's own findings cite water use, drinking-water resources and utility-rate impacts alongside power demand.What it doesMonterey Park voters approved Measure NDC on June 2, 2026 with 86.4% in favor, a permanent, voter-only-repealable ban on data center development — the first voter-approved data center ban in the US. | Source |
| Boulder CountyCO | Moratorium / pause | In force | 2026-06 | Commissioners cited the environmental footprint of data centers, particularly their electricity and water demands.What it doesBoulder County commissioners unanimously declared a moratorium of up to 6 months at their June 2, 2026 business meeting, pausing new land-use applications for both data centers and detention facilities in unincorporated Boulder County while staff draft Land Use Code amendments specific to each. | Source |
| BroomfieldCO | Moratorium / pause | In force | 2026-07 | Broomfield City Council unanimously passed Ordinance 2313 on second reading July 7, 2026: an 18-month pause on new or expanded data center facilities with a projected load of 10 MW or more, halting land-use applications, site plans, and building permits while the city drafts permanent zoning and water-use rules.What it doesBroomfield City Council unanimously passed Ordinance 2313 on second reading July 7, 2026: an 18-month pause on new or expanded data center facilities with a projected load of 10 MW or more, halting land-use applications, site plans, and building permits while the city drafts permanent zoning and water-use rules. Broomfield joins Longmont, Fort Collins, Boulder, and Larimer County in the Boulder Valley / Northern Colorado wave of pauses. | Source |
| DenverCO | Moratorium / pause | In force | 2026-05 | Denver City Council enacted a 1-year moratorium on May 18, 2026, pausing all new data center facility permits and zoning approvals while the city conducts comprehensive zoning, energy, and water impact assessments. Triggered by: (1) Colorado River Compact water-sharing pressures and acute shortages in the South Platte...What it doesDenver City Council enacted a 1-year moratorium on May 18, 2026, pausing all new data center facility permits and zoning approvals while the city conducts comprehensive zoning, energy, and water impact assessments. Triggered by: (1) Colorado River Compact water-sharing pressures and acute shortages in the South Platte watershed (Denver's primary source); (2) strains on the Rocky Mountain Power grid during peak summer demand; (3) city's Climate Action Plan goals — Council concerns that unmanaged data center growth could undermine 2040 carbon-neutrality targets. Moratorium covers all facilities, no MW threshold specified. Denver's Office of Energy & Environmental Planning charged with 12-month review of: data center energy consumption projections, renewable energy allocation, water recycling standards, and zoning district revisions. Supported by local environmental groups (Colorado Environmental Law Center, Sierra Club Rocky Mountain Group), labor unions (IBEW Local 68), and water conservation coalitions. Denver International Airport and downtown development interests opposed. Council vote: 11-2 in favor (only two pro-development votes). Industry framed as 'anti-growth'; proponents framed as 'resource stewardship.' | Source |
| Jefferson CountyCO | Moratorium / pause | In force | 2026-05 | —What it doesJefferson County's Board of County Commissioners voted Tuesday, May 19, 2026 to impose a 10-month moratorium on new data center development in the county, running through March 2027 while staff develop land-use regulations specific to the industry. | Source |
| Larimer CountyCO | Moratorium / pause | In force | 2026-01 | County materials list water consumption among the 'most significant impacts' the pause is meant to study, alongside power usage and siting; a public survey drew 94% opposition to any data-center construction in the county (larimer.gov).What it doesLarimer County's Board of County Commissioners adopted a resolution on January 27, 2026 pausing new land-use applications for data center facilities in unincorporated Larimer County, then extended it on February 9, 2026 through August 25, 2026 to give staff time to draft permanent regulations; a public survey drew 94% opposition to any data center construction in the county. | Source |
| LochbuieCO | Moratorium / pause | In force | 2026-07 | Town board members and roughly 20 residents cited Colorado's active drought and one of its warmest, driest winters on record as the water-scarcity rationale for a pre-emptive pause; no developer had yet approached the town.What it doesLochbuie's Town Board voted 6-1 on July 21, 2026 to pass a five-year moratorium on data-center facility applications — the longest active data-center pause in Colorado. Proactive measure (Mayor Jamie Jeffery said no developer had approached the town), passed amid statewide drought conditions. Found via an Aug. 10, 2026 Colorado moratorium roundup (KUNC/Colorado Newsline), not present in the DCCB moratoriums.json mirror. | Source |
| LongmontCO | Permanent ordinance | In force | 2026-06 | Longmont City Council passed Ordinance 2026-34 on a 6-1 vote June 9, 2026: data centers with 100 MW or more of projected or contracted peak demand (at opening or through phased expansion) are permanently banned as a land use, while smaller facilities in Primary Employment zones remain permitted subject to new...What it doesLongmont City Council passed Ordinance 2026-34 on a 6-1 vote June 9, 2026: data centers with 100 MW or more of projected or contracted peak demand (at opening or through phased expansion) are permanently banned as a land use, while smaller facilities in Primary Employment zones remain permitted subject to new energy-efficiency, water, cooling, noise, and lighting standards. | Source |
| MonumentCO | Moratorium / pause | In force | 2026-07 | —What it doesMonument's town council voted Monday, July 20, 2026 to place a proactive 6-month ban on new data center applications — no project has yet been proposed in town, but officials wanted rules in place before one arrives. Monument is the first municipality in El Paso County to adopt a data center moratorium, following Woodland Park's ordinance days earlier. | Source |
| Woodland ParkCO | Moratorium / pause | In force | 2026-07 | —What it doesWoodland Park City Council passed an ordinance at its July 16, 2026 meeting imposing an 18-month moratorium on the submission, acceptance, processing, and approval of data center applications, giving the city time to study county-level rules and draft its own zoning use standards. | Source |
| Citrus CountyFL | Moratorium / pause | In force | 2026-05 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesCitrus County (Nature Coast, Florida) approved a 12-month moratorium on data center development in May 2026. A county planning panel also recommended rejecting a pending data center rezoning application. Part of the broader wave of Central/North Florida county actions on data center proliferation, enacted before Florida's SB484 framework clarified the 1-year maximum moratorium pathway. | Source |
| Clay CountyFL | Moratorium / pause | In force | 2026-06 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesClay County (northeast Florida, near Jacksonville) commissioners approved a one-year moratorium on data center facilities on June 24, 2026, halting all rezoning, permit approvals, and site plan applications related to data centers while county staff conducts impact research. Part of the wave of Florida county moratoriums enacted in late June 2026. | Source |
| Hernando CountyFL | Moratorium / pause | Proposed | 2026-07 | Triggered by resident concerns about data center energy and water impacts.What it doesHernando County (west Florida) commissioners unanimously approved a proposed 12-month moratorium on new data center applications at first reading June 24, 2026, with final adoption scheduled for the same July 14, 2026 meeting at which neighboring Pasco County finalized its own moratorium. Two secondary sources (a July 1 opinion column and a July 27 op-ed) describe the moratorium as already adopted, but neither is a neutral news report confirming the vote, so status is left as proposed pending a cleaner source. Triggered by resident concerns about data center energy and water impacts. Part of the broader wave of Central/North Florida county moratoriums under the 1-year pathway created by Florida SB484. | Source |
| Jackson CountyFL | Permanent ordinance | In force | 2026-06 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesJackson County (Florida Panhandle) Board of Commissioners enacted a permanent ban on new data centers in unincorporated portions of the county on June 15, 2026. The action began as a temporary moratorium, but commissioners voted to amend the ordinance into a permanent prohibition — making it one of the strongest data center restrictions in Florida. Jackson County's permanent ban appears to conflict with Florida SB484 (signed May 7, 2026), which restricts local governments from permanently banning data centers. The legal status of the ban may be subject to challenge. | Source |
| Lake CountyFL | Moratorium / pause | Proposed | 2026-07 | Led by Commissioner Anthony Sabatini, who cited 12 data center applications filed in Florida in the past year and concerns about water usage and electricity grid impacts.What it doesLake County (central Florida) commissioners proposed a 12-month moratorium on new data center development on June 24, 2026, with a final adoption vote scheduled within two weeks. Led by Commissioner Anthony Sabatini, who cited 12 data center applications filed in Florida in the past year and concerns about water usage and electricity grid impacts. Sabatini framed the moratorium as necessary because Florida's SB484 (signed May 7) restricts outright permanent bans, leaving moratoria of up to one year as the available tool. Status re-check 2026-07-26: the commission unanimously agreed to pursue an ordinance, but no ordinance has been drafted and no adoption vote has been scheduled. This is a direction to staff, not yet a moratorium. | Source |
| Pasco CountyFL | Moratorium / pause | In force | 2026-07 | Following resident concerns about energy and water impacts.What it doesPasco County (west-central Florida) commissioners passed the first reading of a one-year moratorium on large-scale data center development on June 12, 2026, then adopted it on final vote July 14, 2026, with a 2.5 MW threshold (reduced from an originally proposed 10 MW). Following resident concerns about energy and water impacts. Part of a broader wave of Central/North Florida county moratoriums enacted in mid-2026. Florida's SB484 (signed May 7) restricts permanent bans but allows moratoria of up to one year, which is why multiple Florida counties moved in concert. | Source |
| Sarasota CountyFL | Moratorium / pause | In force | 2026-07 | —What it doesSarasota County (southwest Florida) commissioners voted 5-0 on July 9, 2026 to stop accepting or reviewing data center applications for one year, after the county was approached by a company interested in a Cattleman Road property. No formal applications had been received; the pause gives staff time to evaluate how data centers fit the zoning code before any are considered. Part of the broader wave of Florida county moratoriums enacted under the 1-year pathway created by Florida SB484. | Source |
| Taylor CountyFL | Moratorium / pause | Rejected | 2026-07 | —What it doesOn July 6, 2026 the Taylor County (Florida) Commission declined to adopt a proposed data center moratorium — recommended by Commissioner Pam Feagle to run through December 31 — with the motion failing for lack of support after Commissioner Michael Newman said he lacked sufficient information to back the policy. Commissioners agreed to hold a data center workshop on August 25, 2026. | Source |
| ZephyrhillsFL | Moratorium / pause | In force | 2026-06 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesZephyrhills City Council (in Pasco County, FL) enacted a one-year moratorium on data center development on June 22, 2026, pausing all applications to the planning department. Coordinated with the Pasco County action enacted June 12. Part of the wave of Central/North Florida local moratoriums following the Florida SB484 framework. | Source |
| Athens-Clarke CountyGA | Moratorium / pause | Superseded | 2025-12 | Replacement ordinance mandates closed-loop air-conditioning cooling ('which uses less water than other systems') and reporting on water and energy consumption.What it doesAthens-Clarke County commissioners adopted a temporary data-center moratorium on Dec. 2, 2025 (set to expire March 6, 2026), citing unresolved questions about resource demand and neighborhood impacts; extended it March 3, 2026. Commissioners then voted unanimously around April 7-8, 2026 to lift the moratorium and replace it with permanent regulations restricting new data centers to heavy-industrial zoning and requiring closed-loop cooling. | Source |
| DeKalb CountyGA | Moratorium / pause | In force | 2026-06 | Commissioners cited noise near homes and parks, grid reliability, stormwater and drinking-water impacts, and the concentration of industrial burdens on historically overburdened communities.What it doesDeKalb County's moratorium blocks new licenses and permits for data centers (including expansions) while the county drafts zoning rules that would restrict facilities to industrial areas and require a special land-use permit in most cases, with defined categories up to 500,000+ sq ft campuses. Commissioners cited noise near homes and parks, grid reliability, stormwater and drinking-water impacts, and the concentration of industrial burdens on historically overburdened communities. | Source |
| FayettevilleGA | Permanent ordinance | In force | 2026-03 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesThe City of Fayetteville adopted Ordinance 26-O-12, and as of March 5, 2026 new data centers are prohibited in every city zoning district — a permanent zoning prohibition that replaced an earlier temporary data-center moratorium. Fayetteville is home to a QTS hyperscale campus that broke ground in 2023. | Source |
| AsburyIA | Moratorium / pause | In force | 2026-07 | —What it doesAsbury City Council unanimously approved a 180-day data-center freeze, effective immediately, to evaluate the impacts of data centers on land, infrastructure, and the environment. | Source |
| Council BluffsIA | Moratorium / pause | Rejected | 2026-07 | Members cited economic-development concerns and said zoning issues could be handled through new regulations and a wastewater-management plan rather than a pause.What it doesOn June 16, 2026 the Council Bluffs City Council unanimously rejected a proposed year-long moratorium on new data-center projects. Members cited economic-development concerns and said zoning issues could be handled through new regulations and a wastewater-management plan rather than a pause. | Source |
| Dubuque CountyIA | Moratorium / pause | In force | 2026-05 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesMoratorium on data center development in Dubuque County, Iowa. | Source |
| Linn CountyIA | Moratorium / pause | In force | 2026-07 | The Linn County Board of Supervisors voted 2-1 on July 1, 2026 to enact an 18-month moratorium on new data center development in unincorporated Linn County — passed despite a data center ordinance the same board approved in February 2026 — to revise the ordinance around residents' concerns over water, power, and costs...What it doesThe Linn County Board of Supervisors voted 2-1 on July 1, 2026 to enact an 18-month moratorium on new data center development in unincorporated Linn County — passed despite a data center ordinance the same board approved in February 2026 — to revise the ordinance around residents' concerns over water, power, and costs and to provide transparency. Supervisors Meisheid and Running-Marquardt voted yes; Scheetz opposed, warning it could push projects toward less-regulated jurisdictions. | Source |
| BoiseID | Moratorium / pause | In force | 2026-05 | One-year moratorium on data center development in Boise while the city reviews energy and water impacts.What it doesOne-year moratorium on data center development in Boise while the city reviews energy and water impacts. | Source |
| Bloomington and NormalIL | Moratorium / pause | In force | 2026-05 | —What it doesJoint moratorium on data center development in Bloomington and Normal, Illinois. | Source |
| Boone CountyIN | Moratorium / pause | In force | 2026-06 | —What it doesThe Boone County Board of Commissioners unanimously enacted a one-year moratorium pausing the filing, processing, review, and acceptance of applications for new data center facilities in unincorporated areas, effective June 16, 2026 through June 15, 2027. Officials noted neither the 2009 Comprehensive Plan nor the 1998 Zoning Ordinance contemplated modern data center development and its impacts on land use, infrastructure, utilities, agriculture, and rural character. | Source |
| IndianapolisIN | Resolution | In force | 2024-10 | —What it doesIndianapolis-Marion County Council passed non-binding resolution expressing opposition to large, unrestricted data center development without community input and environmental safeguards. | Source |
| IndianapolisIN | Moratorium / pause | In force | 2026-07 | Adopted on condition that the city study water and electricity impacts, alongside campus size and noise, before new applications resume.What it doesA binding data-center moratorium — distinct from the non-binding 2024 council resolution — advanced 10-3 out of the Metropolitan & Economic Development Committee on July 13, 2026, passed the City-County Council 23-1 on August 10, and was finalized 6-0 by the Metropolitan Development Commission on August 19. It bars new data-center approvals in Marion County through December 31, 2027, exempting three already-approved projects (DC Blox, Metrobloks, Sabey). A companion special-use zoning class (SU-47) for data centers is advancing alongside it. | Source |
| Marshall CountyIN | Permanent ordinance | In force | 2026-04 | —What it doesMarshall County commissioners voted on April 20, 2026 to permanently ban data centers countywide — described as the first permanent data center ban in Indiana, not a temporary moratorium. Commissioners cited unresolved safety and environmental concerns, including the risk of a hazardous-materials ('HAZMAT') site; companion restrictions on solar and battery storage were advanced the same session. Enacted (permanent ban). | Source |
| New AlbanyIN | Moratorium / pause | In force | 2026-07 | —What it doesNew Albany, Indiana (across the Ohio River from Louisville, KY) City Council unanimously enacted a one-year moratorium on new data center development at its July 16, 2026 meeting, following Mayor Jeff Gahan's June 9 call for a pause and a Plan Commission recommendation. The ordinance blocks new data centers — single buildings or multi-building campuses — exceeding 100,000 sq ft while the city studies impacts on infrastructure, utilities, environment, and noise and updates its zoning ordinance. City leaders cited the $800M Meta data center under construction in neighboring Jeffersonville as an example of the scale the city wants to plan ahead of. | Source |
| Harvey CountyKS | Moratorium / pause | In force | 2026-01 | Officials cited power and water concerns raised by nearby communities (Andale, Colwich).What it doesThe Harvey County Commission unanimously enacted a moratorium on January 13, 2026 halting construction of data centers in unincorporated Harvey County through 2028, to give planning, zoning and environmental staff time to develop regulations; the commission may rescind or extend it at any time. Officials cited power and water concerns raised by nearby communities (Andale, Colwich). No data center application had been filed at the time. | Source |
| Cave CityKY | Moratorium / pause | In force | 2026-05 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesCave City (Barren County, KY) council enacted a 12-month moratorium on data center construction and expansion on May 21, 2026, by a 4-1 vote. Councilmember Denny Doyle cast the lone dissenting vote. Motivated by community concerns about a proposed large-scale data center and its impacts on local resources. Following enactment, Kentucky Industrial Alliance LLC filed a lawsuit against the City of Cave City, the city council, and the Barren County planning commission — making Cave City's moratorium one of the first in the country to face legal challenge from a developer. | Source |
| LexingtonKY | Moratorium / pause | In force | 2026-06 | —What it doesLexington-Fayette Urban County Council unanimously passed a moratorium on new data center approvals on June 9, 2026, pausing all permits, development plan acceptances, and zone changes related to data centers until October 31, 2026. Triggered by DartPoints Operating Company's $29M acquisition of the former Lexmark data center on New Circle Road, with plans to expand to 20–70 MW. Mayor Linda Gorton backed the measure, citing concerns that data centers 'do not produce many jobs and have the potential to increase utility costs on local residents.' The council simultaneously launched a Zoning Ordinance Text Amendment process to develop modern data center regulations, with a Planning Commission public hearing expected in late July and Council recommendations in August. | Source |
| New OrleansLA | Moratorium / pause | In force | 2026-01 | —What it doesOn January 28, 2026 the New Orleans City Council adopted Motion M-26-63 (with companion study motion M-26-62), directing the City Planning Commission to create a temporary Data Center Interim Zoning District that pauses occupational licenses and approvals for data centers, server farms and cryptocurrency-mining facilities citywide for one year. It followed a proposed AI data center in New Orleans East. | Source |
| GreenfieldMA | Moratorium / pause | Proposed | 2026-07 | —What it doesA Greenfield city councilor is proposing a one-year data-center moratorium as an ordinance (rather than a slower zoning amendment). No data centers have been proposed in Greenfield yet — a proactive measure, not a response to a pending project. | Source |
| BaltimoreMD | Moratorium / pause | In force | 2026-05 | Baltimore enacted a moratorium on data centers exceeding 10 MW (May 2026) due to concerns about grid strain on aging infrastructure, water demands during drought, and lack of community input. Baltimore explores requirements for energy audits, water conservation plans, and community benefit agreements.What it doesBaltimore enacted a moratorium on data centers exceeding 10 MW (May 2026) due to concerns about grid strain on aging infrastructure, water demands during drought, and lack of community input. Supported by environmental groups and residents. Reflects growing municipal scrutiny of data center siting without environmental review. Baltimore explores requirements for energy audits, water conservation plans, and community benefit agreements. City working with utilities to assess grid capacity constraints. | Source |
| Montgomery CountyMD | Moratorium / pause | In force | 2026-07 | Cited concerns: Potomac River protection, ratepayer/electric-bill impact, noise, water use, and the absence of an existing zoning definition for data centers; a state-level study is due to the Governor and General Assembly by September 1, 2026.What it doesThe Montgomery County Council voted 11-0 on July 28, 2026 to adopt an 18-month moratorium (Expedited Bill 19-26) barring the Department of Permitting Services from issuing new data center permits, alongside a companion Zoning Text Amendment (ZTA 26-01) establishing a data-center definition and limitations in the zoning code. Cited concerns: Potomac River protection, ratepayer/electric-bill impact, noise, water use, and the absence of an existing zoning definition for data centers; a state-level study is due to the Governor and General Assembly by September 1, 2026. The 18-month term was a compromise between an initial 6-month proposal (Councilmember Evan Glass) and a 2-year proposal (Councilmembers Will Jawando and Kristin Mink), and follows an interim 6-month moratorium County Executive Marc Elrich had already imposed by executive order in June 2026. Existing, already-operating data centers are exempt. Atmosphere's proposed Dickerson data center (a former coal-plant site) is among the affected pending proposals. | Source |
| Prince George's CountyMD | Moratorium / pause | In force | 2026-07 | Council members cited unanswered questions about water, health, environmental, and utility impacts.What it doesThe Prince George's County Council approved a resolution on July 7, 2026 establishing a moratorium of up to two years on new hyperscale data center development, barring the planning department from considering or approving applications until the Council enacts regulatory legislation (or adopts a zoning framework). Council members cited unanswered questions about water, health, environmental, and utility impacts. Council Member Tim Adams voted against and three members abstained. | Source |
| Washington CountyMD | Moratorium / pause | In force | 2026-06 | The Washington County (Maryland) Board of County Commissioners voted 4-1 on June 30, 2026 to adopt a one-year moratorium on data center applications and development, to study impacts on utility infrastructure, water, noise, and environmental risks. Concerns cited: high energy consumption straining utilities, noise...What it doesThe Washington County (Maryland) Board of County Commissioners voted 4-1 on June 30, 2026 to adopt a one-year moratorium on data center applications and development, to study impacts on utility infrastructure, water, noise, and environmental risks. Commissioners Wagner, Leatherman, Cline, and Barr voted yes; Commissioner Neil Parrott opposed. Concerns cited: high energy consumption straining utilities, noise from cooling systems and backup generators, substantial water use, hazardous materials and e-waste, and rural/agricultural land-use compatibility. | Source |
| BangorME | Moratorium / pause | In force | 2026-04 | On April 13, 2026 the Bangor City Council voted unanimously to place a 180-day moratorium on data center development, citing sudden development pressure and the lack of any policy framework for infrastructure demands such as water and electricity.What it doesOn April 13, 2026 the Bangor City Council voted unanimously to place a 180-day moratorium on data center development, citing sudden development pressure and the lack of any policy framework for infrastructure demands such as water and electricity. | Source |
| LansingMI | Moratorium / pause | In force | 2026-07 | —What it doesLansing City Council passed a six-month data-center moratorium (7-1) to allow time to develop data-center-specific zoning regulations, following the April 2026 withdrawal of an AI firm's downtown data-center proposal. | Source |
| Meridian Township, Ingham CountyMI | Moratorium / pause | In force | 2024-11 | —What it doesMeridian Township approved moratorium on data center development until comprehensive plan amendments addressing data center impacts are completed. | Source |
| Orion Township, Oakland CountyMI | Moratorium / pause | In force | 2026-06 | The Orion Township (Oakland County, Michigan) Board of Trustees voted 7-0 on June 17, 2026 to enact a six-month moratorium on new data center development while it drafts zoning amendments, its current ordinance not addressing modern data centers; concerns cited include water and power usage.What it doesThe Orion Township (Oakland County, Michigan) Board of Trustees voted 7-0 on June 17, 2026 to enact a six-month moratorium on new data center development while it drafts zoning amendments, its current ordinance not addressing modern data centers; concerns cited include water and power usage. The board may extend it by resolution; it is not a ban. Enacted. NOTE: township-level jurisdiction typed as 'city' to match the dataset's existing convention for municipal (sub-county) jurisdictions (see meridian-township-mi, washington-township-macomb-mi). | Source |
| Sterling HeightsMI | Moratorium / pause | In force | 2026-02 | —What it doesOn February 4, 2026 the Sterling Heights City Council (Michigan's fourth-largest city) unanimously passed a one-year moratorium on data center site requests, to allow time to study electricity impacts, resource use and noise near residential areas and to modernize 1978-era zoning. | Source |
| Washington Township, Macomb CountyMI | Moratorium / pause | In force | 2024-03 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesWashington Township board approved moratorium on large data center facilities to protect natural resources and community character. | Source |
| EaganMN | Moratorium / pause | In force | 2026-02 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesOn February 17, 2026 the Eagan City Council unanimously passed an interim ordinance barring any new data center within 500 feet of residences or using more than 20 MW of electricity, through February 17, 2027 — believed to be the first Minnesota city to enact a size/proximity-based data-center moratorium. Eagan Capital, LLC sued on June 15, 2026 seeking to void it, arguing the city lacks authority to regulate electricity use. The ordinance is under legal challenge. | Source |
| MankatoMN | Moratorium / pause | In force | 2026-07 | Mankato City Council passed a one-year moratorium on data centers and other high-impact utility consumers, citing agricultural, water-depletion, and health/climate concerns, plus transparency concerns about companies declining to sign public NDAs.What it doesMankato City Council passed a one-year moratorium on data centers and other high-impact utility consumers, citing agricultural, water-depletion, and health/climate concerns, plus transparency concerns about companies declining to sign public NDAs. | Source |
| MinneapolisMN | Moratorium / pause | In force | 2026-05 | —What it doesMinneapolis enacted a 6-month moratorium (May 2026) on new data center permits while assessing grid impact and environmental justice concerns. Triggered by proposed data centers in neighborhoods with existing industrial burden. Supported by environmental justice groups, residents, and climate advocates. City planning to establish equity guidelines ensuring DCs don't concentrate in low-income communities. Explores renewable energy mandates and community benefit agreements for future projects. | Source |
| St. CharlesMO | Moratorium / pause | Superseded | 2025-08 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesOn August 22, 2025 the St. Charles City Council approved a one-year moratorium pausing data-center zoning-change applications and building permits, following public opposition to a proposed 440-acre project ('Project Cumulus') that the developer (CRG) later withdrew. All ten council members co-sponsored the measure. | Source |
| St. Charles CountyMO | Moratorium / pause | In force | 2026-07 | Charles County Council unanimously approved a six-month moratorium on data-center development exceeding 100,000 sq ft or drawing more than 5 MW, to study impacts on health, water access, energy bills, and quality of life.What it doesSt. Charles County Council unanimously approved a six-month moratorium on data-center development exceeding 100,000 sq ft or drawing more than 5 MW, to study impacts on health, water access, energy bills, and quality of life. Distinct from the City of St. Charles's own moratorium. | Source |
| JacksonMS | Moratorium / pause | In force | 2026-07 | —What it doesJackson City Council passed a moratorium (5-2) on special use permits, conditional use permits, zoning map amendments, and building permits for data centers, effective 30 days after passage. Airport-adjacent land is exempted. | Source |
| CharlotteNC | Moratorium / pause | In force | 2026-06 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesThe Charlotte City Council unanimously approved a 150-day moratorium on new data centers on June 8, 2026, described in coverage as the largest US city to pause data-center development. Already-approved projects are exempt, and staff will use the pause to draft new regulations. | Source |
| Surry CountyNC | Moratorium / pause | In force | 2026-07 | —What it doesSurry County commissioners unanimously approved a two-year moratorium on new data center development on July 21, 2026, giving the county time to research impacts via a steering committee that will visit operating data centers and consult power providers and environmental officials before new zoning standards are set. | Source |
| Lincoln CountyNE | Moratorium / pause | Rejected | 2026-07 | On July 13, 2026 the Lincoln County (Nebraska) Board of Commissioners voted 3-2 against a proposed data center moratorium after lengthy public debate over water and power. Opponents worried data centers would compete with agriculture for scarce water (including the proposed Perkins County Canal) and electricity; the...What it doesOn July 13, 2026 the Lincoln County (Nebraska) Board of Commissioners voted 3-2 against a proposed data center moratorium after lengthy public debate over water and power. Commissioners Hewgley, Bruns, and Woodruff voted against; Weems and Wuehler voted for. Opponents worried data centers would compete with agriculture for scarce water (including the proposed Perkins County Canal) and electricity; the Planning Commission continued drafting local regulations. | Source |
| Santa Fe CountyNM | Moratorium / pause | In force | 2026-06 | Commissioners cited large water and electricity use, serious risk to the water supply, groundwater impacts, grid reliability, noise from cooling systems, and backup diesel generators.What it doesThe Santa Fe County Board of County Commissioners voted unanimously on June 30, 2026 to adopt an 18-month moratorium on data center development — extended from a proposed 12 months — with the regulatory threshold lowered from 100 MW to 1 MW. Commissioners cited large water and electricity use, serious risk to the water supply, groundwater impacts, grid reliability, noise from cooling systems, and backup diesel generators. | Source |
| Socorro CountyNM | Moratorium / pause | In force | 2026-05 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesOne-year moratorium on data centers and related infrastructure projects in Socorro County, New Mexico. | Source |
| HendersonNV | Moratorium / pause | Rejected | 2026-07 | Proposal was driven in part by Lake Mead water-level concerns in the Las Vegas metro; Council opted for individually negotiated development agreements over a blanket pause (Review-Journal, Nevada Independent).What it doesHenderson, Nevada (pop. ~330K, Las Vegas suburb) introduced Bill No. 3927 at City Council: a 180-day ban on conditional use permit applications for new data centers. The Council rejected the moratorium at its July 21, 2026 meeting, opting instead for city staff to draft stricter development regulations and require individually negotiated development agreements for future data center projects. Distinct from a Las Vegas city or Clark County action — no county-level moratorium has been enacted. | Source |
| HendersonNV | Moratorium / pause | Rejected | 2026-07 | Same underlying Lake Mead water-level concern as henderson-nv-2026-06 (same Bill No. 3927); see that record's water_angle.What it doesHenderson, NV officials are considering a 180-day pause on new data-center permit approvals amid Lake Mead water-level concerns. A vote is scheduled at the City Council's July 21, 2026 regular meeting; not yet enacted. | Source |
| RenoNV | Moratorium / pause | In force | 2026-05 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesFirst Nevada local government to pause new data center development. Temporary pause status as of May 2026. | Source |
| ClevelandOH | Moratorium / pause | In force | 2026-07 | —What it doesCleveland City Council approved a three-month moratorium on new standalone data-center construction and expansions by a 14-1 vote on July 15, 2026, after shortening an original one-year proposal. Applies only to standalone data-center buildings, not server rooms in multi-tenant or mixed-use properties; gives City Hall time to craft zoning rules, with council able to extend past the three months. | Source |
| Oklahoma CityOK | Moratorium / pause | In force | 2026-04 | —What it doesOn April 21, 2026 the Oklahoma City Council unanimously approved an emergency moratorium halting new applications and rezoning/permits for data-center construction or expansion through December 31, 2026, while staff evaluate concerns and possible code changes. Two pending rezoning cases are exempt; a May 2026 amendment allowed data centers up to 75 MW to apply. | Source |
| Oklahoma CountyOK | Moratorium / pause | In force | 2026-04 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesMoratorium on new data center development in Oklahoma County pending energy infrastructure assessment. | Source |
| TulsaOK | Moratorium / pause | In force | 2026-03 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesThe Tulsa City Council unanimously approved a temporary halt on new data center construction (through December 31, 2026), pausing processing and approval of new data-center building permits while the city studies how such facilities are classified for zoning. Councilor Laura Bellis led the effort; Project Anthem phases 1-2 are exempt. | Source |
| PhiladelphiaPA | Moratorium / pause | In force | 2026-05 | —What it doesOne-year moratorium on data center development permits pending infrastructure impact review. | Source |
| SmithfieldRI | Permanent ordinance | In force | 2026-05 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesPermanent outright ban on data center development in Smithfield, Rhode Island. | Source |
| Chesterfield CountySC | Moratorium / pause | In force | 2026-05 | —What it doesChesterfield County Council (South Carolina) unanimously passed a data center moratorium running through January 1, 2028, after a unanimous first reading in April 2026 and unanimous second reading in early May 2026. Proposed by Code Enforcement Director Derrick Outten and Councilman Donald Kirkley. The county had no prior ordinance or code definition for data centers. Cited concerns: high electricity consumption raising residential rates, noise complaints, and limited job creation relative to facility size. No data centers currently operate in the county. Sourcing note: the Progressive Journal (primary source) places the unanimous second reading in early May 2026; a later Go Laurens roundup describes the Chesterfield ordinance as enacted in early June 2026. The May date from the primary source is used here; the discrepancy is unresolved and the enacted_date should be re-checked against the county council minutes. | Source |
| Colleton CountySC | Moratorium / pause | Proposed | 2026-07 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesColleton County Council (South Carolina) unanimously approved first reading on May 4, 2026 of an ordinance imposing a 6-month moratorium on special exceptions, conditional-use approvals, and other land-use/development approvals for data centers, giving officials time to revise the land-use code. Follows a proposed ~1 GW data center (Thomas & Hutton / Eagle Rock Partners) on 850 acres of Weyerhaeuser timberland near the environmentally sensitive ACE Basin, south of Walterboro, that drew opposition from seven state legislators and hundreds of residents at a public hearing. Two more readings are required under South Carolina's three-reading ordinance process; no second-reading date set as of this record. | Source |
| Greenwood CountySC | Moratorium / pause | Proposed | 2026-07 | —What it doesGreenwood County Council (South Carolina) introduced Ordinance 2026-25 on first reading June 19, 2026, proposing a 12-month moratorium on new data center and related-infrastructure approvals so the county can study zoning, noise, setback, heat, and energy-demand standards. Sponsored by Councilmembers Mark Allison and Cathy Miller and Vice Chairman Dayne Pruitt. Second reading and public hearing set for July 7, 2026. The county Planning Commission had separately recommended denying a related data center text amendment (Ordinance 2026-19) and suggested a longer 24-month pause. | Source |
| Newberry CountySC | Moratorium / pause | In force | 2026-06 | Residents packed a public hearing at the county opera house citing water-supply strain, electric-rate increases, and continuous industrial noise.What it doesNewberry County Council (South Carolina) voted unanimously on June 3, 2026 to reject an ordinance that would have let a developer purchase county-owned land in the Mid-Carolina Commerce Park (Prosperity, SC) for a potential data center — reversing course after passing the first two readings — then enacted a one-year moratorium on new data center permits. Residents packed a public hearing at the county opera house citing water-supply strain, electric-rate increases, and continuous industrial noise. | Source |
| Spartanburg CountySC | Moratorium / pause | Proposed | 2026-07 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesSpartanburg County Council (South Carolina) approved the first reading of a 12-month data center moratorium on June 22, 2026, with no dissenting votes. Two additional readings are required before full enactment. Council immediately invoked the pending ordinance doctrine, allowing the county to halt new data center permit applications after first reading — the protective effect begins at first reading even before final passage. Triggered by a company filing a land development permit for a data center at 300 Jones Road without local tax incentives. A separate state bill (SC H.5526) proposing a statewide data center moratorium is also before the legislature. | Source |
| Austin CountyTX | Moratorium / pause | In force | 2026-07 | County will weigh water supply as one siting factor (with proximity to sensitive land uses, road access, and environmental impact) when defining where energy-development zones may locate; not cited as the moratorium's primary driver.What it doesAustin County commissioners unanimously enacted a countywide moratorium on new AI data centers and battery energy storage systems on July 28, 2026, following a July 13 public hearing that drew 100+ residents. Not an outright ban — gives the county time to evaluate impacts before defining where such facilities may locate. Found via the Part 1 sweep (MultiState, 2026-08-19), not present in the DCCB moratoriums.json mirror. | Source |
| Fort WorthTX | Moratorium / pause | Proposed | 2026-08 | Resolution's stated purpose includes evaluating the water impacts of data center facilities, alongside noise and land-use compatibility.What it doesFort Worth City Council voted unanimously on Aug. 11, 2026 to take first steps toward a 90-day data-center construction moratorium: created the Fort Worth Data Center & Infrastructure Commission (a review panel with community representatives) and adopted an ordinance requiring new data-center applications to show PUC/ERCOT grid-interconnection approval. The moratorium itself needs further public hearings before formal adoption; it would exempt projects already in the pipeline and, if adopted, would take effect in 2027. | Source |
| Hill CountyTX | Moratorium / pause | Superseded | 2024-04 | —What it doesHill County enacted moratorium on new data center facilities. Moratorium is currently under legal challenge by development interests. | Source |
| Hood CountyTX | Moratorium / pause | Rejected | 2026-07 | Supporters had cited risks to water supply (up to ~1 million gallons/day at full buildout for the proposed Comanche Circle project), energy demand, air quality, wildlife, and quality of life.What it doesOn February 10, 2026 the Hood County (Texas) Commissioners Court voted 3-2 to reject a proposed six-month moratorium on new data center/industrial development, after State Senator Paul Bettencourt sent a letter (to the Attorney General) asserting Texas counties lack the authority to impose moratoriums. Supporters had cited risks to water supply (up to ~1 million gallons/day at full buildout for the proposed Comanche Circle project), energy demand, air quality, wildlife, and quality of life. | Source |
| Iron CountyUT | Moratorium / pause | In force | 2026-06 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesMoratorium on data center development in Iron County, Utah. | Source |
| LeesburgVA | Moratorium / pause | In force | 2026-05 | —What it doesLeesburg halts new data center permits while conducting electrical grid capacity and reliability study. | Source |
| SeattleWA | Moratorium / pause | In force | 2026-06 | —What it doesCouncil Bill 121214 passed unanimously (9-0) on June 9, 2026, placing a temporary freeze on new data-center siting (facilities with power capacity over 20 megavolt-amperes). Took effect immediately under its emergency designation. Companion Resolution 32204 establishes a policy-study framework; a public hearing is required within 60 days. | Source |
| SpokaneWA | Moratorium / pause | In force | 2026-06 | On June 22, 2026 the Spokane City Council approved a one-year emergency moratorium on new large data centers (those exceeding 25 megavolt-amperes) by a 6-1 vote, citing energy and water consumption concerns and the need for a regulatory framework.What it doesOn June 22, 2026 the Spokane City Council approved a one-year emergency moratorium on new large data centers (those exceeding 25 megavolt-amperes) by a 6-1 vote, citing energy and water consumption concerns and the need for a regulatory framework. | Source |
| MadisonWI | Moratorium / pause | In force | 2026-01 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it doesOn January 13, 2026 the Madison Common Council approved a temporary moratorium on issuing zoning approvals for new data centers larger than 10,000 square feet (where the data center is the primary use), lasting up to one year while the city develops zoning standards. | Source |
| Manitowoc CountyWI | Moratorium / pause | In force | 2026-06 | Water is tagged among this jurisdiction's stated reasons in source data; the source summary does not itemize a specific water impact.What it does18-month moratorium on data center development in Manitowoc County, Wisconsin. | Source |
| Oneida CountyWI | Moratorium / pause | Proposed | 2026-08 | Concerns cited: water and electricity consumption, noise, and potential pollution.What it doesThe Oneida County (Wisconsin) Planning and Development Committee unanimously passed an interim data center moratorium ordinance amendment that would bar the county from accepting, processing, or approving new data center developments for at least one year while it develops regulations. It still requires full County Board approval, expected on the August 2026 agenda; it excludes un-zoned towns and the City of Rhinelander. Concerns cited: water and electricity consumption, noise, and potential pollution. | Source |
| CheyenneWY | Moratorium / pause | Rejected | 2026-05 | —What it doesCity council rejected a proposed 12-month moratorium on data center facility permits 8-1 on May 26, 2026; sponsor Mark Moody cast the lone yes vote. The proposal would have paused permits pending an infrastructure assessment. | Source |
| GilroyCA | Moratorium / pause | In force | 2026-09 | The council's stated study topics for the pause lead with water use and cooling technology, alongside electricity demand, noise, aesthetics and backup-generator emissions.What it doesGilroy City Council unanimously adopted an immediately effective 45-day urgency moratorium on new data-center applications and entitlements on September 14, 2026, while staff write citywide siting standards. It covers a possible second Amazon project still at pre-application stage but not Amazon's already approved facility; California law allows extensions up to a two-year total, none recorded yet. Added directly from the city's notice (not present in the DCCB moratoriums.json mirror). | Source |