{"document":{"slug":"answer-er27-484-epsa-comment-period","title":"EPSA supports ISO-NE’s request for a 24-day comment period","issued":"2026-11-13","accession":"20261113-5086","docket":"ER27-484-000","group":"ISO-NE filings","filer":"Electric Power Supply Association","kind":"answer","file":"sources/originals/20261113-5086_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261113-5086","sha256":"fa30051227de554981ec07322605f13d6c7ad96502b65a5480a6d9bb6def5661","pages":4,"tokens":631,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":319,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n)  \n., \n \n \n \n \n \n) \n \n  \nISO New England, Inc, et al. \n \n) \n \nDocket No. ER27-484-000 \n \n \n \n \n \n \n)  \n \n \n \n \n \n \n) \n \n \nANSWER OF THE ELECTRIC POWER SUPPLY ASSOCIATION \n IN SUPPORT OF ISO-NE REQUEST FOR EXTENDED COMMENT PERIOD  \n \n \nPursuant to the November 13, 2026 filing1 from ISO New England, Inc. (“ISO-NE” \nor “the ISO”), the New England Power Pool Participants Committee, the Participating \nTransmission Owners Administrative Committee, on behalf of the Participating \nTransmission Owners (“PTOs”) and a number of PTOs2 in the above-captioned docket, \nthe Electric Power Supply Association (“EPSA”)3 respectfully submits this answer in \nsupport of the ISO-NE’s request for a short extension of the comment period on the \nISO’s proposed Tariff revisions related to the integration of large loads to its \n \n1  \nISO New England, Inc. et al., Revisions Related to the Integration of Large Loads to the \nTransmission System, Docket No. ER27-484-000 (November 13, 2026). \n2  \nThese PTOs include: Central Maine Power Company; Connecticut Transmission Municipal \nElectric Energy Cooperative; Eversource Energy Service Company on behalf of The Connecticut Light \nand Power Company, Public Service Company of New Hampshire and NSTAR Electric Company; \nFitchburg Gas and Electric Light Company; Green Mountain Power Corporation; The Narragansett \nElectric Company d/b/a Rhode Island Energy; New England Power Company d/b/a National Grid; New \nHampshire Transmission, LLC; The United Illuminating Company; Unitil Energy Systems, Inc.; Vermont \nElectric Cooperative, Inc.; Vermont Transco LLC; and Versant Power. \n3  \nEPSA is the national trade association representing competitive power suppliers in the U.S. \nEPSA members provide reliable and competitively priced electricity from environmentally responsible \nfacilities using a diverse mix of fuels and technologies. EPSA seeks to bring the benefits of competition to \nall power customers. This pleading represents the position of EPSA as an organization but not \nnecessarily the views of any particular member with respect to any issue. EPSA filed a doc-less motion to \nintervene in this proceeding on November 13, 2026."},{"page":2,"startToken":319,"endToken":534,"text":"2 \ntransmission system. EPSA respectfully requests that the Commission extend the \ndeadline for submitting comments to December 7, 2026, as requested by ISO-NE. \nI. ANSWER \nAs noted by the ISO, given the breadth of this filing with Tariff Revisions, as well \nas the upcoming holiday, an extension of the comment period in the instant docket to 24 \ndays, or until December 7, 2026, would help to ensure that interested parties have \nample time to review and develop comments on the filing, particularly multiple member \norganizations like trade associations and NGOs (“Non-Governmental Organizations”).4 \nEPSA therefore agrees with ISO-NE and respectfully requests that the Commission \ngrant this request. The short extension would have the added benefit of aligning the \ncomment period with the other expected large loads filings that will be filed with the \nCommission on November 16, which would allow stakeholders to take a holistic look at \nthese critical proceedings, benefiting the respective records in these multiple \nproceedings.  \nII. CONCLUSION \nWHEREFORE, EPSA respectfully requests that the Commission grant ISO-NE’s \nrequest to extend the comment period in this proceeding, so that comments would be \ndue on December 7, 2026. \n \n4  \nISO New England, Inc. et al, Revisions Related to the Integration of Large Loads to the \nTransmission System, Docket No. ER27-484-000, (November 13, 2026), p. 93."},{"page":3,"startToken":534,"endToken":579,"text":"3 \nRespectfully submitted, \nELECTRIC POWER SUPPLY ASSOCIATION \nBy: \n _/s/ Nancy Bagot__________________ \nNancy Bagot \nSenior Vice President \nBill Zuretti \nDirector, Regulatory Affairs & Counsel \nElectric Power Supply Association \n1401 New York Ave, NW, Suite 950 \nWashington, DC  20005 \n(202) 628-8200 \nNancyB@epsa.org \n \nDated: November 13, 2026"},{"page":4,"startToken":579,"endToken":631,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this day served the foregoing document on each person \ndesignated on the official service list compiled by the Secretary of the Federal Energy \nRegulatory Commission in this proceeding. \nDated at Washington, DC, this 13th day of November, 2026. \n  /s/ Bill Zuretti \n \n \nBill Zuretti"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":162,"startToken":0,"endToken":342},{"p":2,"at":162,"title":"I. ANSWER","method":"printed heading","endPage":2,"endAt":1041,"startToken":342,"endToken":477},{"p":2,"at":1041,"title":"II. CONCLUSION","method":"printed heading","endPage":4,"endAt":0,"startToken":477,"endToken":579},{"p":4,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":4,"endAt":335,"startToken":579,"endToken":631}]}
