{"document":{"slug":"filing-er27-517-nyiso-large-loads","title":"NYISO files large-load integration procedures and market rules under section 205","issued":"2026-11-16","accession":"20261116-5282","docket":"ER27-517-000","group":"NYISO filings","filer":"New York Independent System Operator, Inc.","kind":"filing","file":"sources/originals/20261116-5282_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5282","sha256":"e613db4b957ab1140ad166915a4429846f592cba8bc7dad98b222c1270e5f347","pages":130,"tokens":65616,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":430,"text":"10 Krey Boulevard, Rensselaer, NY 12144 \nPh: 518.356.6000  |  Fax: 518.356.8899 \n \nWebsite: www.nyiso.com   |   LinkedIn: NYISO   |   Twitter: @NewYorkISO \n \nNovember 16, 2026 \nSubmitted Electronically \nHonorable Debbie-Anne A. Reese, Esq. \nSecretary \nFederal Energy Regulatory Commission \n888 First Street N.E. \nWashington, D.C. 20426 \nRe:   New York Independent System Operator, Inc., Proposed Tariff Revisions to \nEstablish New Large Load Integration Procedures and Related Market \nParticipation Provisions, Request to Hold Show Cause Proceedings in Continued \nAbeyance, and Request for One-Week Extension of the Comment Period, Docket \nNo. ER27-___-000  \nDear Secretary Reese, \nIn accordance with Section 205 of the Federal Power Act (“FPA”)1 and Part 35 of the \nCommission’s regulations,2 the New York Independent System Operator, Inc. (“NYISO”) \nsubmits proposed revisions to its Open-Access Transmission Tariff (“OATT”) and Market \nAdministration and Control Area Services Tariff (“Services Tariff”).3  The proposed revisions \nestablish new Large Load Integration Procedures (“LLIP”) and related market participation \nprovisions.  They are intended to fully satisfy the concerns raised by the Commission in its \nOrder Instituting Proceeding Under Section 206 of the Federal Power Act (“Show Cause \nOrder”)4 to the extent that they involve issues that are within the scope of the NYISO’s tariff \nfiling authority.5   \nThe proposals in this filing are designed to account for issues and conditions in the \nNYISO region.  They build on the NYISO’s recently adopted Standard Interconnection \nProcedures and on various NYISO-specific independent entity variations that are foundational to \nthe interconnection process in New York and that bring many benefits.  They also: (i) address the \nunprecedented near-term resource adequacy challenges, driven in large part by an expected \ninflux of large loads, that the NYISO now faces; (ii) leverage the NYISO’s existing “financial” \ntransmission reservation service model to maximize the benefits to flexible large loads and other \ncustomers; and (iii) contain various mechanisms to protect customers.    \n \nThe NYISO’s proposals recognize that NYISO is a single-state entity whose operational \nboundaries coincide with the retail rate and resource adequacy jurisdiction of the New York State \n \n1 16 U.S.C. § 824d. \n2 18 C.F.R. § 35. \n3 Capitalized terms that are not otherwise defined in this filing or in the proposed tariff revisions shall have \nthe meaning specified in the NYISO’s OATT or its Services Tariff. \n4 N.Y. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,216, at PP 3, 38 (2026) (“Show Cause Order”). \n5 Consistent with Paragraph 41 of the Show Cause Order, this transmittal letter explains how the NYISO’s \nspecific proposals in this filing are responsive to the Show Cause Order’s various preliminary findings and \ndirectives."},{"page":2,"startToken":430,"endToken":914,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 2 \n \n \nPublic Service Commission (“NYPSC”).  The NYPSC has separately launched a proceeding to \naddress state-jurisdictional interconnection reforms that are likely to influence the evolution of \nCommission-jurisdictional large load rules in New York.6   \n \n \nThe NYISO’s proposal incorporates a compromise approach to resource adequacy \nrequirements, the State Exempt Load Project exception, that is intended to reconcile the \nNYISO’s reliability responsibilities with the NYPSC’s resource adequacy authority in a manner \nthat is consistent with cooperative federalism principles.7  More generally, the NYISO has \ncarefully considered and sought to adhere to the Commission’s guidance on large load \njurisdictional issues and to respect both federal and state authority while still producing a \nproposal that effectively meets the NYISO region’s needs. \n \nParts II and III of this transmittal letter describe the NYISO’s proposed new LLIP and \nexplain its benefits.  Among other things, Parts II and III: (i) describe the NYISO’s proposed \ndefinition of “Large Load,” which reflects minor changes to the Show Cause Order’s noted \nversion to reflect NYISO’s circumstances; (ii) incorporate clear and detailed large load \ninterconnection rules into the NYISO OATT; (iii) introduce transition rules that balance the \ntimely implementation of the new procedures while avoiding disruptions to existing commercial \narrangements that have achieved reasonable progress; (iv) promote timely Large Load \ninterconnections; (v) provide for new types of Commission-jurisdictional transmission services, \ni.e, “Firm Withdrawal Service” and “Non-Firm Withdrawal Service”, that reflect the unique \ncharacteristics of both the NYISO’s transmission model and of co-located Large Loads, Large \nLoad with behind the meter generation, and flexible Large Loads that are able to limit their use \nof the system; (vi) delineate the division of responsibilities between the NYISO and \ntransmission-owning utilities under the LLIP; (vii) include detailed application and readiness \nrequirements to deter speculative projects that could unduly shift costs onto existing customers; \n(viii) establish a Large Load Integration Study Process; (ix) address the identification and cost \nallocation of upgrades; and (x) describe how alternative transmission technologies will be \nconsidered.   \nPart IV of this transmittal letter describes the various new market participation provisions \nthat the NYISO is proposing to account for the proliferation of Large Loads and to support its \nLarge Load reforms.  These proposals include revised and new market rules to govern: (i) Large \nLoads eligible to be served via Firm Withdrawal Service, (ii) Large Loads or portions thereof \nand an “Associated Resource(s)” that enter into a “Co-Located Arrangement” or “Partner \nResource Arrangement” so that the Large Load may be served via some amount of Firm \nWithdrawal Service; (iii) Large Loads or portions thereof served via Non-Firm Withdrawal \nService and/or are designated Zero Withdrawal Service Loads; (iv) the co-location of Large \nLoads with Supply.   \n \n6  See Proceeding on Motion of the Commission to Address Interconnection Reforms for Large Load, Order \nInstituting Proceeding and Soliciting Comments, NYPSC Case No. 26-E-0045 (Feb. 12, 2026). \n7 See Part II.G.ii."},{"page":3,"startToken":914,"endToken":1492,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 3 \n \n \nWithin this framework, the NYISO would, among other things: (i) establish a rule under \nwhich Non-Firm Withdrawal Service would be curtailed when the applicable nodal Locational-\nBased Marginal Price (“LBMP”) for a Large Load reaches $200 MW/h; (ii) explain how \ndifferent categories of Large Loads will interact with the NYISO’s capacity market Demand Side \nResource rules; (iii) subject all Large Loads to fees and charges on a gross load basis; (iv) adopt \na System Reliability Benefit Fee applicable to Large Loads served by some amount of Non-Firm \nWithdrawal Service to allocate costs to them that are roughly commensurate with the benefits \nthey receive from ICAP Resources and the value of the reliability services that they provide; (v) \napply certain data reporting requirements to all Large Loads; (vi) introduce a new Co-Located \nand Limited Load Configuration market participation model; (vii) use Associated Resource rules \ntied to NYISO Capacity Regions in lieu of the Show Cause Order’s “electrically proximate \nresource;” (viii) address the extent to which Demand Side Resources and Aggregations may \nbecome Associated Resources; (ix) enhance the NYISO’s DER and Aggregation participation \nmodel rules; (x) sunset the NYISO’s existing BTM:NG Resource program; and (xi) update the \nexisting “buyer-side” capacity market power mitigation measures to reflect new issues presented \nby Large Loads and emerging resource adequacy challenges in New York.    \nPart V explains why the NYISO is not proposing to adopt the three new transmission \nservices that the Commission established in the PJM Co-Location Order8 and provides additional \ninformation regarding the benefits of the NYISO’s established financial transmission reservation \nmodel and new Withdrawal Services.    \nNew York’s Commission-jurisdictional transmission-owning utilities are concurrently \nmaking separate FPA Section 205 filings to address Show Cause Order matters that fall under \ntheir reserved filing rights.  As discussed in Part VI of this transmittal letter, the traditional New \nYork Transmission Owners (“NYTOs”)9 are making a contemporaneous FPA Section 205 filing \nthat will propose various tariff revisions to the NYISO OATT, principally to Rate Schedule 5, \nand add several new pro forma agreements to the NYISO OATT.  Among other things the \nNYTOs will submit a new two-party pro forma cost recovery agreement to address the cost-\nshifting issues discussed in the Show Cause Order.  The non-incumbent transmission owners \n(“NTOs”)10 that were subject to the Show Cause Order will be making concurrent Section 205 \nfilings to address matters that implicate their reserved filing rights and that reflect the structural \ndifferences between them and the NYTOs.  The NYISO believes that its Section 205 filing, in \ncombination with the NYTO’s and NTOs’, will address all of the issues raised by the Show \nCause Order.11   \n \n8 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025). \n9 The NYTOs include Central Hudson Gas & Electric Corporation; Consolidated Edison Company of New \nYork, Inc.; New York State Electric & Gas Corporation; Niagara Mohawk Power Corp.; Orange and Rockland \nUtilities, Inc.; and Rochester Gas and Electric Corporation.   \n10 The NTOs include LS Power Grid New York Corporation I (“LS Power NY”) and New York Transco \nLLC. \n11 See Show Cause Order at P 38 (requiring the NYISO, NYTOs, and NTOs to collectively address issues \nconcerning, “(a) the application process, study procedures, and ongoing operational requirements that apply to \nEligible Customers seeking transmission service on behalf of large loads; (b) additional transparency concerning the \nNetwork Upgrade costs to provide transmission service to Eligible Customers on behalf of large loads, a pro forma"},{"page":4,"startToken":1492,"endToken":1993,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 4 \n \n \nPart VII explains that the Commission should determine that this filing is just, \nreasonable, and not unduly discriminatory and issue an order accepting it under the FPA Section \n205 standard of review without requiring any modifications or additional procedures.  At the \nsame time, the NYISO consents to the Commission’s exercise of its authority to modify or sever \nany element of the NYISO’s proposed tariff revisions to the maximum extent permitted by law.   \nAs noted below in Part VIII, the NYISO’s proposal has evolved substantially in response \nto extensive stakeholder feedback.  The NYISO’s proposed tariff revisions received the super-\nmajority stakeholder approval required under the NYISO’s shared governance model to \nauthorize its submission under FPA Section 205.    \nPart IX below explains that the NYISO is requesting a February 1, 2027 effective date for \nthe LLIP-related tariff provisions described in Parts II and III, June 1, 2028 for the Large Load \nmarket participation provisions set forth in Part IV, and May 1, 2029 for the sunsetting of the \nexisting BTM:NG Resource program which is described in Part IV.I.       \nConsistent with the  August 14, 2026 letter order (“Abeyance Order”)12 in the Show \nCause Order proceeding, the NYISO respectfully requests in Part X below that the Commission \nhold the Section 206 proceedings initiated by the Show Cause Order in continued abeyance \npending action on this filing.  If the Commission accepts this filing it should also issue an order \nterminating the Show Cause Order proceeding with respect to the NYISO.13   \nFinally, the NYISO asks that the Commission briefly extend the comment period on this \nfiling from the standard twenty-one days to twenty-eight days. As noted in Part XI a modest \nextension would provide interested parties with additional time to address the numerous, \ncomplex, and consequential issues implicated by the NYISO’s proposals and by the Show Cause \nOrder.  A one-week extension would also accommodate the Thanksgiving holiday and should \nnot hinder the Commission’s review because the NYISO’s earliest requested effective date is \nmore than two weeks after the end of the standard sixty-day notice period.     \n \n \n \n \n \ncost recovery agreement between NYISO, the relevant transmission owner and Eligible Customer taking \ntransmission service on behalf of the large load to mitigate the risk of cost shifting among transmission customers, \nand a mechanism to ensure such payments are appropriately credited towards transmission owners’ transmission \nrevenue requirements consistent with the Commission’s cost-of-service regulations;  (c) the rates, terms, and \nconditions of service that apply to co-location arrangements;  (d) transmission services that reflect Eligible \nCustomers taking transmission service on behalf of co-located loads, load with behind the meter generation, and \nflexible large loads that are willing and able to limit their use of the transmission system under certain conditions; \nand (e) the rates, terms, and conditions of service applicable to interconnection customers serving electrically \nproximate large load or co-located load.”). \n12 N.Y. Indep. Sys. Operator, Inc.,196 FERC ¶ 61,130 (2026) (“Abeyance Order”).  \n13 See Abeyance Order at P 12."},{"page":5,"startToken":1993,"endToken":2233,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 5 \n \n \nTABLE OF CONTENTS \nI. \nDOCUMENTS SUBMITTED.............................................................................................. 9 \nII. The NYISO’s Proposed Tariff Revisions to Establish and Implement Large Load \nIntegration Procedures ............................................................................................................... 10 \nA. \nLarge Load ........................................................................................................................ 10 \nB. \nProposed New Transmission Services for Large Loads ................................................... 11 \nC. \nLarge Load Integration Procedures ................................................................................... 13 \ni. \nKey Elements of the Large Load Integration Procedures ............................................. 13 \nii. \nOverview of Large Load Integration Procedures .......................................................... 18 \nD. \nScope and Effective Date of Large Load Integration Procedures ..................................... 21 \ni. \nApplication of Large Load Integration Procedures ...................................................... 21 \nii. \nEffective Date of Large Load Integration Procedures and Transition Requirements ... 22 \niii. \nPre-Application Reports............................................................................................ 25 \nE. \nLarge Load Integration Study Process Start Date and Timeframe ................................... 26 \ni. \nLarge Load Integration Study Process Start Date ......................................................... 26 \nii. \nLarge Load Integration Study Process Timeframe and Process Overlap ..................... 27 \nF. \nLarge Load Integration Request ........................................................................................ 28 \ni. \nApplication Process and Timeframe Requirements for Submission of Large Load \nIntegration Request ............................................................................................................... 29 \nii. \nSubmission Requirements for Large Load Integration Requests ................................. 30 \niii. \nReview and Validation of Large Load Integration Requests .................................... 33 \niv. \nStudy Agreement ...................................................................................................... 35 \nv. \nQueue Position .............................................................................................................. 35 \nvi. \nModifications ............................................................................................................ 36 \nvii. \nWithdrawal ................................................................................................................ 39 \nG. \nAssessment of Reliability Impacts and Determination of Withdrawal Service ................ 40 \ni. \nDetermination of Withdrawal Service .......................................................................... 40 \nii. \nResource Adequacy Impact Standard ........................................................................... 43 \niii. \nTransmission Security Standard ............................................................................... 48 \nH. \nInitial Study Phase ............................................................................................................ 49 \ni. \nOverview of New Study Process .................................................................................. 50 \nii. \nInitial Study Phase Overview ........................................................................................ 52 \niii. \nResource Adequacy and Modeling Period ................................................................ 52"},{"page":6,"startToken":2233,"endToken":2481,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 6 \n \n \niv. \nRAMP Part 1 Process................................................................................................ 53 \nv. \nSIS Entry Decision Period ............................................................................................ 56 \nvi. \nRAMP Part 2 Process................................................................................................ 56 \nvii. \nSystem Impact Study ................................................................................................ 57 \nviii. \nALI Entry Decision Period ....................................................................................... 59 \nI. \nAssessment of Load Integration (“ALI”) and Facilities Study ......................................... 61 \ni. \nAssessment of Load Integration.................................................................................... 61 \nii. \nFacilities Study.............................................................................................................. 63 \niii. \nConclusion of Large Load Integration Study Process .............................................. 67 \nJ. \nAffected Systems .............................................................................................................. 67 \ni. \nCoordination with Affected Systems within the New York Control Area ................... 67 \nii. \nCoordination with External Affected Systems ............................................................. 68 \niii. \nStudy of Impacts to New York State Transmission System of an Affected System \nEligible Customer’s Proposed Interconnection to Another Region’s Transmission System 69 \nIII. Post-Study Requirements ................................................................................................... 72 \ni. \nPost-Study Agreements ................................................................................................. 72 \nii. \nTransmission Service Agreement for Firm and Non-Firm Withdrawal Service for \nLarge Loads .......................................................................................................................... 73 \niii. \nLarge Load Performance, Protection and Control, and Monitoring Requirements .. 75 \niv. \nStatus of Large Load Project and Associated Network Upgrades ............................ 77 \nB. \nAdditional Requirements .................................................................................................. 78 \ni. \nStudy Cost Allocation, Invoicing, and Deposit Requirements ..................................... 78 \nii. \nConfidentiality Requirements ....................................................................................... 80 \niii. \nDispute Resolution Requirements............................................................................. 81 \niv. \nThird Party Conducting Studies ................................................................................ 81 \nv. \nAdditional Requirements .............................................................................................. 81 \nIV. The NYISO’s Proposed Tariff Revisions to Establish New Market Participation \nProvisions Applicable to Large Loads ...................................................................................... 82 \nA. \nOverview of Key Market Design Elements ...................................................................... 82 \nB. \nMarket Rules Applicable to Full Withdrawal Service and Limited Withdrawal Service \nLoads ......................................................................................................................................... 85 \ni. \nFirm Withdrawal Service Loads ................................................................................... 86 \nii. \nLimited Withdrawal Service Loads .............................................................................. 86 \nC. \nProposed Large Load Operating Requirements ................................................................ 98"},{"page":7,"startToken":2481,"endToken":2782,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 7 \n \n \nD. \nAdditional CLLC Rules .................................................................................................... 99 \ni. \nOverview and Eligibility ............................................................................................... 99 \nii. \nCLLC-Specific Definitions ........................................................................................... 99 \niii. \nCLLC-Specific Metering and Telemetry Requirements ......................................... 101 \niv. \nCLLC-Specific Energy Market Rules ..................................................................... 101 \nv. \nCLLC-Specific Capacity Market Rules ...................................................................... 103 \nvi. \nCLLC-Specific Settlement Rules ............................................................................ 104 \nE. \nDeviation Charges for CLLCs that Fail to Follow NYISO’s Dispatch Instructions ...... 105 \ni. \nOverwithdrawal MW x Max (MPRCDAM, MPRCRT) x Length of Interval in seconds \n3600 seconds ....................................................................................................................... 105 \nii. \nUnderwithdrawal MW x Max (MPRCDAM, MPRCRT) x Length of Interval in seconds \n3600 seconds ....................................................................................................................... 105 \nF. \nThe Associated Resource Arrangements and the Capacity Region Construct ............... 106 \nG. \nDSR/Aggregation Rules.................................................................................................. 109 \nH. \nDER Modeling Improvements and Baseline Enhancements .......................................... 111 \nI. \nSunsetting the NYISO’s BTM:NG Resource Program .................................................. 112 \nJ. \nProposed Revisions to the NYISO’s Market Power Mitigation Measures ..................... 113 \ni. \nRevisions to the “Buyer-Side” Capacity Market Power Mitigation Measures ........... 113 \nii. \nAdditional Market Power Mitigation Measures Changes for CLLCs ........................ 116 \nV. \nThe NYISO's Proposals Build on the NYISO's Established Transmission Model and \nMarket Structures and Do Not Need to Incorporate the PJM Co-Location Order's \nTranmission Services ................................................................................................................ 116 \nA. \nThe NYISO’s Financial Transmission Service Model Enables the NYISO to Maximize \nthe Use of the Transmission System Efficiently and to Support Flexible Service for Large \nLoads ....................................................................................................................................... 117 \nB. \nThe NYISO’s Financial Reservation Model Promotes Economic Efficiency in the Use of \nthe Transmission System and Resources ................................................................................ 119 \nC. \nThere Is No Need for the NYISO to Adopt the Transmission Services Established by the \nPJM Co-Location Order .......................................................................................................... 121 \nVI. The NYTOs and the NTOs Are addressing certain show cause order issues in  \nSeparate FPA Section 205 Filings ............................................................................................ 124 \nVII. The FPA Section 205 Standard of Review and Severability ......................................... 125 \nVIII. \nStakeholder Approval ........................................................................................... 126 \nIX. Requested Effective Dates ................................................................................................ 127 \nX. \nRequest to Continue Abeyance of Show Cause Proceedings ........................................ 127"},{"page":8,"startToken":2782,"endToken":2809,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 8 \n \n \nXI. Request for Extended Comment Period ......................................................................... 128 \nXII. Communications and Correspondence ........................................................................... 129 \nXIII. \nService .................................................................................................................... 129 \nXIV. \nConclusion ............................................................................................................. 130"},{"page":9,"startToken":2809,"endToken":3134,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 9 \n \n \nI. \nDOCUMENTS SUBMITTED \nThe NYISO submits the following with this filing letter: \n1. Affidavit of Thinh T. Nguyen (“Nguyen Affidavit”) (Attachment I); \n2. Affidavit of Zachary T. Smith (“Smith Affidavit”) (Attachment II); \n3. Affidavit of James Ross Altman (“Altman Affidavit”) (Attachment III); \n4. Affidavit of Jonathan Newton (“Newton Affidavit”) (Attachment IV); \n5. Affidavit of Dr. Scott M. Harvey (“Harvey Affidavit”) (Attachment V); \n6. NYISO Large Load Integration Study Process (“LLISP”) Overview Figure \n(Attachment VI); \n7. Large Load Integration Study Process Cycle Figure (Attachment VII); \n8. A clean version of the NYISO OATT Attachment LL sections containing the \nproposed tariff revisions with an effective date of February 1, 2027 (Attachment \nVIII); \n9. A blacklined version of the NYISO OATT Attachment LL sections containing the \nproposed tariff revisions with an effective date of February 1, 2027 (Attachment IX); \n10. A clean version of the NYISO Services Tariff sections containing the proposed tariff \nrevisions with an effective date of February 1, 2027 (Attachment X); \n11. A blacklined version of the NYISO Services Tariff containing the proposed tariff \nrevisions with an effective date of February 1, 2027 (Attachment XI); \n12. A clean version of the remainder of the NYISO OATT sections containing the \nproposed tariff revisions with an effective date of February 1, 2027 (Attachment XII); \n13. A blacklined version of the remainder of the NYISO OATT sections containing the \nproposed tariff revisions with an effective date of February 1, 2027 (Attachment \nXIII); \n14. A clean version of the NYISO Services Tariff sections containing the proposed tariff \nrevisions with an effective date of June 1, 2028 (Attachment XIV); \n15. A blacklined version of the NYISO Services Tariff sections containing the proposed \ntariff revisions with an effective date of June 1, 2028 (Attachment XV); \n16. A clean version of the remainder of the NYISO OATT sections containing the \nproposed tariff revisions with an effective date of June 1, 2028 (Attachment XVI);"},{"page":10,"startToken":3134,"endToken":3649,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 10 \n \n \n17. A blacklined version of the remainder of the NYISO OATT sections containing the \nproposed tariff revisions with an effective date of June 1, 2028 (Attachment XVII). \nII. \nTHE NYISO’S PROPOSED TARIFF REVISIONS TO ESTABLISH AND \nIMPLEMENT LARGE LOAD INTEGRATION PROCEDURES \nA. \nLarge Load \nIn the Show Cause Order, the Commission found that it would be reasonable to define a \nlarge load as “a new commercial or industrial customer, located at a single site behind one or \nmore points of interconnection, and that has a peak load of 50 MW or greater and interconnects \nto the transmission system at a voltage level of greater than 69 kV, and is not part of a co-\nlocation arrangement.”14  The Commission stated that an “appropriate definition, including a \nload size and interconnection voltage threshold, should be based on the characteristics of \nNYISO’s transmission system.”15 \nThe NYISO proposes to adopt the Commission’s definition of Large Load with certain \nvariations described below.  In particular, the NYISO proposes to define Large Load for its \nOATT and Services Tariff as follows: \nLarge Load shall mean a commercial or industrial Load located at a single site or \nin close proximity, behind one or more Points of Interconnection, that has a peak \nLoad of 50 MW or greater connected to the New York State Transmission \nSystem, which is subject to and has completed the applicable requirements of the \nLarge Load Integration Procedures in Attachment LL of the ISO OATT.  For \npurposes of this definition, Load shall be considered to be located “in close \nproximity” if it: (i) is located within 2 miles and 2 electrical buses and (ii) is \nelectrically located in the same Capacity Region.16 \nFirst, the NYISO proposes to provide that the Load may be located either at a single site \nor in close proximity.  As indicated in the definition, the NYISO proposes to define “in close \nproximity” to mean that the Load is both: (i) located within 2 miles and 2 electrical buses and (ii) \nis electrically located in the same Capacity Region.  Load projects could be spread across a \ngeographic area that necessitate more than one Point of Interconnection (e.g., data center \ncampus) and should be addressed as a single project in assessing their system impacts.  The \nrequirement for both 2 miles and 2 buses constitutes a reasonable basis for defining close \nproximity based on the different topography across the New York State Transmission System, \nas: (i) there are parts of the system in which 2 buses are located many miles away from each \nother (e.g. upstate New York), and (ii) additionally, there are parts of the system in which \nnumerous buses can be located within 2 miles (e.g. New York City).  In addition, it is necessary \nthat a single Large Load be located within a single Capacity Region for purposes of the \n \n14 Show Cause Order at P 64. \n15 Id. \n16 Proposed OATT Attach. LL § 44.1 (definition of Large Load), 44.3.1.1; Services Tariff § 2.12 (definition \nof Large Load)"},{"page":11,"startToken":3649,"endToken":4188,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 11 \n \n \nassessment of the reliability impacts of the Large Load, including accounting for any Associated \nResources. \nSecond, the NYISO proposes not to exclude load that is part of a co-location arrangement \nas in the Commission’s definition.  The NYISO proposes to establish specific requirements \nconcerning Co-Located Arrangements as described in Part IV.D. \nFinally, for purposes of the transition requirements for load projects currently \nparticipating in the NYISO’s existing load interconnection process, the NYISO proposes to \nclarify that the requirements applicable to Large Loads in its tariffs apply to those load projects \nthat were subject to and completed the requirements in the Large Load Integration Procedures.   \nB. \nProposed New Transmission Services for Large Loads \nThe NYISO’s proposed rules for the participation of Large Loads in the ISO \nAdministered Markets vary depending on a Large Load’s Withdrawal Service(s)17 \nclassification(s) as determined in the LLIP.18  Depending on the results of the LLIP, a Large \nLoad may be eligible to receive Firm Withdrawal Service19 and/or Non-Firm Withdrawal \nService20 and/or to be a Zero Withdrawal Service Load.21  \nThe new Firm and Non-Firm Withdrawal Services are described in new Section 3A of the \nNYISO OATT.  They are new forms of Commission-jurisdictional Transmission Service with \nterms and conditions that reflect the unique operational and reliability challenges that providing \ntransmission service to Large Loads presents to the NYISO system.  These challenges are \ndescribed in the Altman Affidavit.  In addition, as described in Part V below and in the Harvey \nAffidavit the design of new Firm and Non-Firm Withdrawal Services is consistent with the \nNYISO’s existing financial reservation transmission service model.  The creation of the new \nWithdrawal Services is responsive to the Show Cause Order’s preliminary finding that the \nNYISO’s tariff appears to be unjust and unreasonable because it does not include transmission \nservices for Eligible Customers taking transmission service on behalf of Eligible Load, or on \n \n17 See proposed Services Tariff § 2.23. \n18 All Large Loads that are subject to the Large Load Integration Procedures as described in Part II.D.i must \ncomplete the procedures set forth in Attachment LL of the OATT and meet the requirements, as applicable, to \nreceive Transmission Service under the OATT.  See proposed Services Tariff § 4.1.6. \n19 “Firm Withdrawal Service” shall be defined as “Transmission Service offered to a Large Load, or a \nportion thereof, that does not cause adverse impacts to resource adequacy and/or transmission security.”  See \nproposed OATT Attach. LL § 44.1 (definition of Firm Withdrawal Service). \n20 “Non-Firm Withdrawal Service” shall be defined as “Transmission Service subject to dispatch \nprocedures offered to a dispatchable Large Load, or a portion thereof, that causes adverse impacts to resource \nadequacy and/or transmission security.”  See proposed OATT Attach. LL § 44.1 (definition of Non-Firm \nWithdrawal Service).  The NYISO would also revise the definition of “Transmission Service” in existing OATT \n§1.20 to account for and to reference the creation of the new “Withdrawal Services.” \n21 A “Zero Withdrawal Service Load” shall be defined as “[a] Large Load or portion thereof that is not \nauthorized under the ISO OATT to withdraw Energy from the NYS Transmission System.”  See proposed Services \nTariff § 2.26."},{"page":12,"startToken":4188,"endToken":4690,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 12 \n \n \nbehalf of flexible large loads that are willing and able to limit their use of the transmission \nsystem under certain conditions.22   \nFor convenience, this transmittal letter sometimes refers informally to the NYISO \nproviding Firm or Non-Firm Withdrawal Service “to” Large Loads or to Large Loads “taking” or \n“receiving” them.  Such references are meant to encompass instances where a Transmission \nCustomer is taking the services on a Large Load’s behalf in which a Large Load is acting as its \nown Load-Serving Entity.  They should not be construed as indicating that Firm or Non-Firm \nWithdrawal Services are not Commission-jurisdictional forms of transmission service.     \nFirm Withdrawal Service would be available to Large Loads that are determined, through \nthe LLIP, not to cause adverse impacts or violations to resource adequacy or transmission \nsecurity or which adverse impacts or violations are mitigated as described in Part II.G.i.23   \nA Large Load, or any portion thereof, taking Firm Withdrawal Service will be able to use \nthe transmission system to serve its load in a price-agnostic manner and will be treated in the \nsame manner as other customers taking firm Transmission Service, including with respect to \ncurtailment priority.  Firm Withdrawal Service will be subject to NYISO emergency operating \nprocedures, and Large Loads taking such service may be required to curtail for reliability needs \nconsistent with the priority treatment that load resources receive today.24  All requests for Firm \nWithdrawal Service will have the same reservation priority, and Firm Withdrawal Service will \nhave the same priority as Firm Point-to-Point Transmission Service.  Firm Withdrawal Service \nwill have priority over Non-Firm Withdrawal Service.25 \nNon-Firm Withdrawal Service would be made available to dispatchable Large Loads that \nare deemed to cause violations or adverse impacts to resource adequacy and/or transmission \nsecurity, which violations or adverse impacts are not mitigated as described in Part II.G.i.26  \nLarge Loads taking Non-Firm Withdrawal Service will be eligible to withdraw Energy from the \ntransmission system, subject to a bid cap and other necessary requirements.27  As described in \nPart IV.B.ii.b, the NYISO proposes to use a mandatory bid cap of $200/MWh as the mechanism \nto curtail Non-Firm Large Loads to avoid adverse impacts to the system.  Non-Firm Withdrawal \nService will be subject to NYISO dispatch and emergency operating procedures.28  \nZero Withdrawal Service Loads will be either (a) a Limited Withdrawal Service Load in \na Co-Located and Limited Load Configuration (“CLLC”), or (b) a Co-Located Located Load in a \nCo-Located Local Generator Configuration (“CLGC”).  Zero Withdrawal Service Loads will be \nLarge Loads that have not requested Withdrawal Service rights and will not be authorized to \nwithdraw Energy from the NYS Transmission System.  As described in Part IV.B.ii.e, a Zero \n \n22 Show Cause Order at PP 109, 112. \n23 Proposed OATT § 1.6. \n24 Id. § 3A.1.1. \n25 Id. § 3A.3. \n26 Id. § 1.14. \n27 Id. § 3A.1.2. \n28 Id. § 3A.1.2."},{"page":13,"startToken":4690,"endToken":5149,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 13 \n \n \nWithdrawal Service Load will not participate in the markets but will still be subject to certain \nrequirements if participating under the CLLC model. \nC. \nLarge Load Integration Procedures \nIn the Show Cause Order, the Commission found that, notwithstanding the NYISO’s \nexisting load interconnection requirements, the NYISO’s existing OATT appears to be unjust \nand unreasonable because it does not include provisions that address with sufficient clarity and \nconsistency the study process for the provision of transmission service to Eligible Customers on \nbehalf of large loads, including the unique operational characteristics of large loads.29   \nThe NYISO proposes to establish new Large Load Integration Procedures, which will be \nlocated in Attachment LL to the OATT.30  The procedures include clear and detailed \nrequirements pursuant to which: (i) an Eligible Customer may submit a Large Load Integration \nRequest for the evaluation of the proposed interconnection of a Large Load Project to the New \nYork State Transmission System and (ii) the NYISO and Transmission Owners, as applicable, \nwill evaluate the proposed interconnection, identify any Attachment Facilities and Network \nUpgrades required for the reliable interconnection of such project and their estimated costs and \nschedule, and determine the project’s Firm Withdrawal Service or Non-Firm Withdrawal Service \namounts or, if requested, its eligibility to proceed as a Zero Withdrawal Service Load. \nThe NYISO highlights in Part II.C.i key elements of its proposed Large Load Integration \nProcedures.  The NYISO then provides a high-level overview of the new procedures in Part \nII.C.ii and in the figure in Attachment VI.  Finally, the NYISO describes the new procedures in \ndetail in Parts II.D through III, including demonstrating that the procedures are just and \nreasonable and address the findings of the Show Cause Order in light of the NYISO’s distinct \nplanning framework and market structure, its role as a single-state independent system operator \n(“ISO”), and other New York-specific conditions.  The proposed procedures are supported by the \naffidavit of Thinh T. Nguyen, NYISO Senior Manager of Interconnection Projects (“Nguyen \nAffidavit”). \ni. \nKey Elements of the Large Load Integration Procedures \na) \nClear and Detailed Procedures  \nThe NYISO proposes in this filing to establish new Large Load Integration Procedures as \ndescribed in detail in Parts II.D through III that set forth clear and detailed tariff requirements \nconcerning the application for and the study of the proposed interconnection of Large Load \nProjects.  The NYISO proposes that these new procedures replace its existing load \ninterconnection requirements set forth in Sections 3.9 and 4.5 of the OATT, subject to certain \ntransition requirements.  \nb) \nEffective Date and Transition Process \n \n29 Show Cause Order at PP 3, 46. \n30 See proposed OATT Attach. LL § 44.1 (definition of Large Load Integration Procedures)."},{"page":14,"startToken":5149,"endToken":5757,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 14 \n \n \nThe NYISO proposes that the Large Load Integration Procedures have an effective date \nof February 1, 2027, as described in Parts II.D.ii and IX.  The NYISO also proposes to establish \ntransition rules that balance timely implementing the new requirements adopted in response to \nShow Cause Order with minimizing disruptions to those projects that have already completed or \nprogressed to certain defined milestones in the NYISO’s existing load interconnection process.  \nAs described in Part II.D.ii, the NYISO proposes to establish two transition groups – Transition \nGroup A and Transition Group B – for projects that meet the definition of Large Load and satisfy \ncertain tariff-prescribed milestones and requirements.  Projects in Transition Group A must have \nadvanced at least as far as the facilities study stage under the existing rules by a tariff-prescribed \ndeadline and can elect to complete the load interconnection process under the NYISO’s existing \nrules.  Projects in Transition Group B must have advanced at least as far as the completion of the \nsystem impact study by a tariff-prescribed deadline and can elect to enter the first Large Load \nIntegration Study Process under the new Attachment LL rules, which transition process will not \nrequire the performance of a System Impact Study.  Finally, the NYISO proposes additional \ntransition rules to facilitate the completion of certain ongoing system impact studies for \ninformation purposes as described in Part II.D.ii.  \nThe NYISO’s proposed transition framework—under which it seeks to balance parties’ \nexpectations based on their relative progress against the proposal’s benefits and the need for \nadministrable deadlines—is supported by ample precedent. Market participants do not have a \nreasonable expectation that market rules will remain unchanged.31 To the contrary, the \nCommission has stated that “there is always risk that tariffs and regulations can change, which is \na risk that market participants take in a competitive market.”32 Consequently, where, as here, \nrevisions in a Section 205 proposal are filed prospectively, such revisions do not implicate the \nfiled rate doctrine or rule against retroactive ratemaking.33 Rather, the Commission balances any \nsettled expectations against the benefits of the proposal, and has accepted the revisions where the \nbenefits outweigh such expectations.34 As discussed in greater detail below, the NYISO’s \nproposal reasonably accounts for parties’ expectations by establishing transition rules based on \neach project’s relative stage of development, demonstrated commercial readiness, and size.35 \nThis is consistent with the Commission’s directive to reasonably consider existing commercial \narrangements while drawing clear, administrable lines for the proposal’s effectiveness. \nc) \nTimeframe of Large Load Integration Procedures  \nThe NYISO proposes a timeframe for the performance of the Large Load Integration \nStudy Process of between one year and six months and two years, including a 90-day period for \nthe performance of the System Impact Study, as described in Part II.E.ii  The overall duration \ndepends on when a Large Load Project satisfies the application requirements for entry into the \n \n31 See ISO New England Inc., 190 FERC ¶ 61,063 at P 35 (2025). \n32 PJM Interconnection, LLC, 189 FERC ¶ 61,095 at P 72 (2024); see also PJM Interconnection, LLC, 190 \nFERC ¶ 61,084 at P 191 (2025) (“[I]interconnection customers are not entitled to any particular rules or processes as \nof the date they submit an interconnection request. Neither the interconnection process, specifically, nor the tariff, \ngenerally, is fixed in time at the point that a customer submits an interconnection request.”). \n33 See PJM Interconnection, LLC, 190 FERC ¶ 61,084 at PP 189-93. \n34 See ISO New England, LLC, 190 FERC ¶ 61,063 at P 34. \n35 See Part II.D.ii."},{"page":15,"startToken":5757,"endToken":6237,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 15 \n \n \nstudy.  The timeframe constitutes a just and reasonable period of time for the NYISO, \nTransmission Owners, and Eligible Customers to perform their respective responsibilities under \nthe proposed Large Load Integration Study Process as described in Part II.E.ii.  These \nresponsibilities include performing preliminary analyses and assessing the feasibility of proposed \ninterconnections, studying the proposed interconnection of the Group of projects participating in \nthe study, including their impacts on the resource adequacy and transmission security of the \ntransmission system, identifying any Attachment Facilities and Network Upgrades required for \nthe reliable interconnection of such project, including determining and allocating the cost \nestimates for such facilities, and determining the project’s Firm Withdrawal Service or Non-Firm \nWithdrawal Service amounts or, if requested, its eligibility to proceed as a Zero Withdrawal \nService Load.   \nd) \nRole of Transmission Owners \nThe NYISO proposes to allocate the scope of responsibilities in the Large Load \nIntegration Procedures between itself and the Transmission Owners as detailed in this filing \nletter.  The proposed allocation is similar to the allocation of responsibilities in the NYISO’s \nexisting load interconnection procedures.  It accounts for the NYISO’s and Transmission \nOwners’ respective planning responsibilities, system knowledge, and access to underlying \ncriteria and data.  The parallel division of work will also allow the NYISO and the Transmission \nOwners, working in parallel, to meet the proposed study timeframes and minimize inefficient \nand duplicative analyses. \ne) \nAssessment of Reliability Impacts and Determinations of \nWithdrawal Service \nThe NYISO proposes that the interconnection of Large Loads must not adversely impact \nresource adequacy or transmission security.  To assess the impacts of Large Loads on the \nreliability of the New York State Transmission System, the NYISO proposes to establish a \nResource Adequacy Impact Standard as described in Part II.G.ii and a Transmission Security \nStandard as described in Part II.G.iii.  The NYISO and Transmission Owners, as applicable, will \napply these standards in evaluating the impacts of the proposed interconnection of Large Load \nProjects. \nThe NYISO proposes to perform these evaluations for purposes of calculating a Large \nLoad Project’s amount of Firm Withdrawal Service and Non-Firm Withdrawal Service and, if \nrequested, its eligibility to be classified as a Zero Withdrawal Service Load.  In making this \ndetermination, the NYISO will account for available actions to mitigate any adverse reliability \nimpacts as described in Part II.G.i.  In particular, a Large Load Project may mitigate its adverse \nimpacts to resource adequacy by associating with new supply – an Associated Resource – or by \ntaking sufficient Non-Firm Withdrawal Service.  Further, a Large Load Project may mitigate its \nadverse impacts on transmission security by agreeing to proceed with Network Upgrades that \naddress the violation or by taking sufficient Non-Firm Withdrawal Service.  For certain \ntransmission security violations that can only be resolved with Network Upgrades, the Large \nLoad Project will be required to proceed with Network Upgrades."},{"page":16,"startToken":6237,"endToken":6773,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 16 \n \n \nf) \nState Exempt Large Load Projects \nAfter considering comments expressed by the New York State Department of Public \nService (“NYDPS”) staff during the stakeholder process, the NYISO is proposing tariff language \nunder which it would not include Large Load Projects identified by the NYDPS in the standard \napplication of the NYISO’s Resource Adequacy Impact Standard.36  Such “State Exempt Large \nLoad Projects” would instead be eligible to receive Firm Withdrawal Service so long as their \ncollective impact did not cause a resource adequacy violation.37  This topic is discussed further in \nPart II.G.ii below and in the Altman Affidavit.  \n \ng) \nApplication Process and Readiness Requirements \nThe NYISO proposes to establish in Attachment LL detailed application requirements for \na Large Load Project to participate in and advance through the Large Load Integration Study \nProcess.  This includes requirements for the Eligible Customer to submit a Large Load \nIntegration Request, a non-refundable Application Fee, a Study Deposit, and additional \ninformation and requirements as described in Part II.F.ii  The NYISO must review and confirm \nthe customer’s satisfaction of these requirements for the Large Load Project to proceed in the \nprocess.  In addition, the NYISO proposes to establish readiness requirements for Large Load \nProjects.  This includes Site Control requirements that must be satisfied with the Large Load \nIntegration Request as described in Part II.F.ii.d and a Readiness Deposit that must be provided \nfor the project to enter the Assessment of Load Integration as described in Part II.H.viii.  The \ninclusion of Study Deposits, Site Control requirements, and Readiness Deposits will assist in \ndeterring speculative or duplicative submissions as contemplated by the Show Cause Order.38 \nh) \nStudy Process \nThe NYISO proposes to establish a Large Load Study Integration Process in the Large \nLoad Integration Procedures that establishes clear and consistent requirements for the evaluation \nof proposed interconnections of Large Load Projects to the New York State Transmission \nSystem.  The NYISO proposes that this process include an Initial Study Phase as described in \nPart II.H.  This phase includes a Resource Adequacy and Modeling Period and a System Impact \nStudy, in which the NYISO and Transmission Owners, as applicable, will perform an initial \nassessment of the proposed interconnection of a Group of Large Load Projects.  This will include \napplying the Resource Adequacy Impact Standard and Transmission Security Standard to assess \nthe impacts of the Large Load Projects on the New York State Transmission System and \nevaluating whether the proposed interconnection of each Large Load Project is Physically \nInfeasible.  This study phase will provide Eligible Customers with an initial determination of \nAttachment Facilities and Network Upgrades with preliminary estimates of the costs and \nschedule for constructing these facilities, along with a preliminary determination of each Large \n \n36 The NYISO’s stakeholders voted to approve the addition of these new provisions at the October 28th \nManagement Committee meeting.  \n37 The exclusion of State Exempt Large Load Projects only applies to the standard application of the \nResource Adequacy Impact Standard.  Identified State Exempt Large Load Projects are still subject to the \nTransmission Security Standard discussed further in Part II.G.iii below. \n38 Show Cause Order at P 62."},{"page":17,"startToken":6773,"endToken":7285,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 17 \n \n \nLoad Project’s amount of Firm Withdrawal Service and Non-Firm Withdrawal Service and, if \nrequested, its eligibility to be classified as a Zero Withdrawal Service Load. \nFor Large Load Projects that elect to proceed in the study based on the results of the \nInitial Study Phase, the NYISO proposes to perform an Assessment of Load Integration as \ndescribed in Part II.I.i that will evaluate the remaining projects applying the Resource Adequacy \nImpact Standard and Transmission Security Standard.  The NYISO will identify any violations \nor adverse impacts on the Bulk Electric System and, if more than one project in the Group \ncontributes to a violation, then the NYISO will provide the Transmission Owner with the \nprojects’ respective contributions to the identified violation.   \nIn parallel with this analysis, the applicable Transmission Owners will perform Facilities \nStudies for the remaining Large Load Projects as described in Part II.I.ii to: (i) identify any \nviolations or adverse impacts on the non-Bulk Electric System and the Large Load Projects’ \nrespective contributions to such violations and adverse impacts, (ii) develop Network Upgrades \nto mitigate identified violations, (iii) develop the estimated cost and schedule to construct the \nNetwork Upgrades, (iv) allocate the cost responsibility of Network Upgrades among Large Load \nProjects in the Group based on their respective contributions to the violation or adverse impact, \n(v) identify the Attachment Facilities required to reliably interconnect the Large Load Projects, \nand (vi) develop the estimated costs and schedule to construct the facilities.  Following the \nperformance of these analyses, the NYISO will post on its website a summary of each Large \nLoad Project’s required Network Upgrades, including their estimated costs, and each Large Load \nProject’s final amount of Firm Withdrawal Service and Non-Firm Withdrawal Service and, if \nrequested, its eligibility to be classified as a Zero Withdrawal Service Load. \nFinally, as described in Part II.J, the NYISO proposes to establish study requirements: (i) \nto address the impact of Large Load Projects in New York on Affected Systems in New York \nand on neighboring planning regions, and (ii) to address the impacts in New York of load \nprojects connecting to neighboring regions. \ni) \nIdentification and Cost Allocation of Upgrades \nThe NYISO proposes that each Large Load Project participating in the Large Load \nIntegration Study Process will be responsible for the costs of the Attachment Facilities and \nNetwork Upgrades identified for the safe and reliable interconnection of the project, which costs \nwill be allocated by the Transmission Owner in the Facilities Study.  As described in Part II.I.ii, \nat the conclusion of the Facilities Study, an Eligible Customer that intends for its project to \nproceed must accept the cost allocation for its Large Load Project’s required Attachment \nFacilities and Network Upgrades and provide the applicable Transmission Owner(s) with \nsecurity to cover its allocated costs.  The Transmission Owners will address in their separate \nSection 205 filing(s) the projects’ cost responsibility for the required facilities as set forth in the \nappropriate agreements (e.g., cost recovery agreement, interconnection agreement, security \nagreement)."},{"page":18,"startToken":7285,"endToken":7668,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 18 \n \n \nj) \nAlternative Transmission Technologies \nAs described in Part II.I.ii.b, the NYISO proposes that the Transmission Owner, in \nidentifying Network Upgrades in the Facilities Study, consider whether an alternative \ntransmission technology could reasonably be implemented to address the identified violation or \nconstraint and determine whether the above technologies should be used consistent with Good \nUtility Practice, Applicable Reliability Requirements, and Applicable Laws and Regulations, \nincluding providing an explanation of the results for each technology.  The alternative \ntransmission technologies include static synchronous compensators, static VAR compensators, \nadvanced power flow control devices, transmission switching, synchronous condensers, voltage \nsource converters, advanced conductors, and tower lifting. \nk) \nTransmission Services Agreement  \nAs described in Part III.ii, the NYISO proposes to establish requirements for the Eligible \nCustomer and the Large Load Project (if the Large Load Project is not its own Eligible Customer \nor Load Serving Entity) to enter into a Transmission Service Agreement with the NYISO for the \nLarge Load Project and proposes a pro forma Transmission Service Agreement.39   \nl) \nOperational Requirements \nAs described in Part III.iii, the NYISO proposes to establish performance, protection and \ncontrol, and operating requirements for Large Load Projects.  Further, the NYISO proposes to \nestablish a process as described in Part III.iii by which a project may request an exemption from \ncertain of these requirements. \nm) \nAdoption of Requirements from Standard Interconnection \nProcedures \nThe NYISO proposes to include in the new Large Load Integration Procedures certain \nprocess steps and requirements currently used in its Standard Interconnection Procedures for \ngenerating facilities.  For example, as described in Part II.H.iv, the NYISO proposes to provide \nfor the Transmission Owner to assess in the Initial Study Phase whether a project may not \ninterconnect due to physical infeasibility, so that such projects can withdraw without incurring or \ncausing significant costs, time, and resources.  In addition, the NYISO proposes to use the same \nor similar requirements as those included in its Standard Interconnection Procedures or \nelsewhere in its tariffs for study cost allocation, invoicing and payment requirements, \nconfidentiality, dispute resolution, and other standard administrative provisions, which \nrequirements have previously been accepted by the Commission as just and reasonable. \nii. \nOverview of Large Load Integration Procedures  \n \n39 Proposed OATT Attach. LL § 44.14.2."},{"page":19,"startToken":7668,"endToken":8240,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 19 \n \n \nThe Large Load Integration Procedures are summarized as follows, which requirements \nare described in detail in Parts II.D through III below, and are illustrated in the overview figure \nprovided in Attachment VI. \nThe procedures establish that an entity may request at any time information concerning \nthe proposed interconnection of a Large Load by requesting a Pre-Application Report as \ndescribed in Part II.D.iii below. \nThe procedures further establish the requirements for the recurring Large Load \nIntegration Study Process as described in Parts II.E through II.J below.  To enter a particular \nstudy process cycle, an Eligible Customer may submit a Large Load Integration Request for its \nLarge Load Project at any time, including an Application Fee, the Study Deposit 1, information \nregarding any Associated Resources, a demonstration of Site Control, and all other required \ninformation and materials as described in Part II.F.ii.  The Eligible Customer must timely cure \nany deficiencies identified by the NYISO, Connecting Transmission Owner, or Affected \nTransmission Owner.  If the Eligible Customer submits a valid Large Load Integration Request \nand executes a Large Load Integration Study Agreement, the Large Load Project will be \nincluded in the next available Group for participation in the study cycle.  \nThe Large Load Integration Study Process will commence with the Initial Study Phase, \nwhich will be performed in two successive rounds – Initial Study Round 1 and Initial Study \nRound 2 – as described in Part II.H.ii.  The Initial Study Round 1 will evaluate Large Load \nProjects that satisfied the requirements to enter the study cycle prior to the deadline to enter \nGroup 1, and the Initial Study Round 2 will evaluate Large Load Projects that satisfied the \nrequirements to enter the study cycle after the deadline to enter Group 1, but prior to the deadline \nto enter Group 2. \nEach round of the Initial Study Phase will include both the Resource Adequacy and \nModeling Period (“RAMP”) and the System Impact Study (“SIS”).  The RAMP, as described in \nPart II.H.iii will include the following components: (i) the RAMP Part 1 Process, (ii) the SIS \nEntry Decision Period, and (iii) the RAMP Part 2 Process.  For the RAMP Part 1 Process, the \nNYISO will preliminarily develop the base case for the System Impact Study, and the \nConnecting Transmission Owners will prepare preliminary one-line diagrams that identify the \nAttachment Facilities for the Large Load Projects.  The Connecting Transmission Owner will \nalso conduct a Physical Infeasibility Screening of the proposed interconnections of the Large \nLoad Projects. Finally, the NYISO will perform a Resource Adequacy Evaluation to assess the \nLarge Load Projects using the Resource Adequacy Impact Standard.  At the conclusion of the \nRAMP Part 1 Process, the NYISO will commence the SIS Entry Decision Period in which an \nEligible Customer will elect for its Large Load Project either to proceed to the System Impact \nStudy or to withdraw from the Load Queue.  The NYISO will then conduct the RAMP Part 2 \nProcess to update the base case for the System Impact Study, to develop the scope of the System \nImpact Study, and to conduct a Scoping Meeting with the Eligible Customers with Large Load \nProjects in the Group that elected to proceed to the System Impact Study. \nThe NYISO will then perform the System Impact Study in coordination with the \nConnecting Transmission Owners and Affected Transmission Owners as described in Part"},{"page":20,"startToken":8240,"endToken":8856,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 20 \n \n \nII.H.vii.  The System Impact Study will assess the Large Load Projects using the Transmission \nSecurity Standard.  The Connecting Transmission Owner and Affected Transmission Owner will \npreliminarily determine the Attachment Facilities and the Network Upgrades required for the \nLarge Load Project, along with non-binding cost estimates for such facilities, including such \nfacilities necessary for the Large Load Project to be eligible as a Zero Withdrawal Service Load, \nif requested.  The NYISO will preliminarily determine the amount of Firm Withdrawal Service \nor Non-Firm Withdrawal Service for the Large Load Projects and, if requested, whether the \nLarge Load Project is eligible to be a Zero Withdrawal Service Load.  The System Impact Study \nresults will be subject to stakeholder review and comment and must be approved by the \nstakeholder Operating Committee.  Following the completion of the draft System Impact Study \nReport for Group 1 for the Initial Study Round 1, the NYISO will commence the Initial Study \nRound 2 for Group 2, which will be performed in accordance with the same requirements as for \nGroup 1. \nAfter the completion of the Initial Study Round 2 for Group 2, the NYISO will \ncommence the ALI Entry Decision Period as described in Part II.H.viii.  For this decision period, \nan Eligible Customer for a Large Load Project that participated in either the Initial Study Round \n1 or the Initial Study Round 2 of the Initial Study Phase will either: (i) elect for its Large Load \nProject to proceed to the Assessment of Load Integration and submit to the NYISO its Study \nDeposit 2 and Readiness Deposit or (ii) withdraw its Large Load Project from the Load Queue. \nThe NYISO will then commence the Assessment of Load Integration (“ALI”) as \ndescribed in Part II.I.i for the Group of Large Load Projects that elected to proceed, while the \nConnecting Transmission Owners and any Affected Transmission Owners will commence in \nparallel the Facilities Studies for the Large Load Project(s) as described in Part II.I.ii.  For the \nALI Part 1 Study, the NYISO will (i) evaluate the impact on the Bulk Electric System of the \nproposed interconnection of the Large Load Projects using the Resource Adequacy Impact \nStandard and the Transmission Security Standard, (ii) identify any violations or adverse impacts \ncaused by one or more of the Large Load Projects, (iii) if more than one project contributes to a \nviolation or adverse impact, identify and provide to the Transmission Owners the projects’ \nrespective contributions to the identified violation, and (iv) update the amounts of Firm \nWithdrawal Service and Non-Firm Withdrawal Service for each Large Load Project.  During the \nFacilities Study, each Connecting Transmission Owner and Affected Transmission Owner will \ndetermine and cost allocate the Attachment Facilities and Local Network Upgrades and Non-\nLocal Network Upgrades to mitigate violations identified by the Connecting Transmission \nOwner or Affected Transmission Owner on the non-Bulk Electric System, including facilities \nnecessary for the Large Load Project to be eligible as a Zero Withdrawal Service Load, if \nrequested.  Where more than one Large Load Project contributes to a violation on the non-Bulk \nElectric System, the Transmission Owner will determine the projects’ respective contributions.   \nFollowing the ALI Part 1 Study and the NYISO’s identification of any violations on the \nBulk Electric System and projects’ respective contributions to the violations, each Connecting \nTransmission Owner and Affected Transmission Owner will determine the Non-Local Network \nUpgrades to mitigate violations identified by the NYISO on the Bulk Electric System and the \ncost allocation of each shared upgrade based on the projects’ respective contribution to the \nviolations provided by the NYISO for the Bulk Electric System or identified to the Transmission"},{"page":21,"startToken":8856,"endToken":9405,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 21 \n \n \nOwner for the non-Bulk Electric System.  The NYISO will then confirm in the ALI Part 2 Study \nthe Non-Local Network Upgrades identified by the Transmission Owner, will designate the final \namounts of Firm Withdrawal Service and Non-Firm Withdrawal Service for each Large Load \nProject, and will confirm eligibility to be classified as a Zero Withdrawal Service Load, if \nrequested.  To proceed with its Large Load Project, the Eligible Customer must accept its cost \nallocation for Attachment Facilities and Network Upgrades required for its project and post \nrelated security to the applicable Transmission Owner(s).  Following the NYISO’s completion of \nthe Assessment of Load Integration and the Transmission Owners’ provision of the final results \nof the Facilities Study, the NYISO will post on its website a summary of: (i) the Network \nUpgrades identified for each Large Load Project and their estimated costs and (ii) each Large \nLoad Project’s final amount of Firm Withdrawal Service and Non-Firm Withdrawal Service and \nits eligibility to be classified as Zero Withdrawal Service Load. \nFollowing the completion of the Large Load Integration Study Process cycle, the Eligible \nCustomer of a Large Load Project must enter into a security agreement, cost recovery agreement, \ninterconnection agreement and any construction agreements with, as applicable, the Connecting \nTransmission Owner and any Affected Transmission Owners and Affected System Operators as \ndescribed in Part III.i.  In addition, the Eligible Customer must enter into a Transmission Service \nAgreement with the NYISO and the Large Load (if the Large Load is not its own Transmission \nCustomer or Load Serving Entity) concerning its amounts of Firm Withdrawal Service and Non-\nFirm Withdrawal Service as described in Part III.ii. \nD. \nScope and Effective Date of Large Load Integration Procedures \ni. \nApplication of Large Load Integration Procedures  \nThe NYISO proposes that the Large Load Integration Procedures apply: (i) to proposed \ninterconnections of a Large Load Project to the New York State Transmission System and (ii) to \nproposals to make a Material Modification to an existing load or a Large Load Project \ninterconnected or seeking to interconnect to the New York State Transmission System.40  The \nNYISO proposes to define a Large Load Project consistent with its definition of Large Load, as \ndescribed in Part II.A.41   \n \nThe NYISO proposes to carve out of the Large Load Integration Procedures load projects \nthat are public safety facilities and providers of essential services (e.g., emergency medical \nservices, first responder facilities, or public water supply and treatment facilities), station service, \nand Critical Electric System Infrastructure Loads.42  These facilities provide essential public-\nsafety or basic public-health services for which delays or service limitations could create \nsignificant public welfare consequences.  These projects will still be subject to the applicable \nTransmission Owner’s load interconnection procedures, including any requirements concerning \nsafe and reliable service.  In addition, the NYISO proposes that the procedures not apply to a \n \n40 Proposed OATT Attach. LL §§ 44.1 (definition of Large Load Integration Procedures), 44.3.1.1.  The \nrequirements for modifications are described in Part II.F.vi. \n41 Proposed OATT Attach. LL §§ 44.1 (definition of Large Load Project), 44.3.1.1.  Large Load Projects \ninclude Computational Large Loads and Non-Computational Large Loads. \n42 Proposed OATT Attach. LL § 44.3.1.2."},{"page":22,"startToken":9405,"endToken":9898,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 22 \n \n \ncommercial or industrial Load proposing to connect or connecting to the Long Island \nTransmission District system at a voltage of 69 kV and below.43  This exclusion accounts for the \nLong Island Power Authority’s responsibilities concerning the Long Island Transmission District \nand is consistent with the Commission’s proposal that large loads include load interconnecting to \nthe transmission system at a voltage level of greater than 69 kV. \nA load project that is not subject to the Large Load Integration Procedures will be subject \nto the load interconnection procedures of the Transmission Owner to which system it is seeking \nto interconnect.44  In addition, the new procedures will not apply to the evaluation of the \ninterconnection of Associated Resources.45  Such resources will instead be assessed in the \napplicable generation interconnection procedures or, for non-generation projects, the applicable \nrequirements for registering the resource. \nii. \nEffective Date of Large Load Integration Procedures and Transition \nRequirements \nIn the Show Cause Order, the Commission recognized that different large loads are \ncurrently at different stages of existing interconnection processes and that large loads and \nEligible Customers taking transmission service on behalf of large loads are negotiating, entering \ninto, and/or have executed various agreements related to interconnecting to the transmission \nsystem and/or the provision of transmission service.46  Accordingly, the Commission indicated \nthat any tariff revisions should “(a) propose a reasonable implementation period to ensure \nminimal disruption to such existing commercial arrangements, and (b) allow a reasonable \namount of time to finalize ongoing agreements that are nearing completion as of the date such \nTariff provisions are filed with the Commission.”47  Further, the Commission indicated that \n“[s]uch proposed Tariff revisions should include a reasonable effective date that accommodates \nsuch considerations regarding these existing commercial arrangements.”48 \nThe NYISO proposes that the Large Load Integration Procedures become effective on \nFebruary 1, 2027 as described in Part IX.49  Upon this effective date, the NYISO’s existing load \ninterconnection rules in Sections 3.9 and 4.5 of the NYISO OATT will no longer apply and the \nexisting load projects in the NYISO’s Queue will be withdrawn, except as otherwise provided in \nthe transition rules described below.50   \nAs described below and in the Nguyen Affidavit, the NYISO proposes to establish \ntransition rules for existing load projects in its Queue that reasonably balance the timely \nimplementation of the new requirements adopted in response to Show Cause Order with \n \n43 Id. § 44.3.1.3. \n44 Id. § 44.3.1.4. \n45 Id. § 44.3.1.4. \n46 Show Cause Order at P 5. \n47 Id. \n48 Id. \n49 Proposed OATT Attach. LL § 44.2.1. \n50 Proposed OATT §§ 3.9, 4.5.8, Attach. LL §§ 44.2.1, 44.4.  The projects that remain in the Queue will be \nsubject to requirements in the new Attachment LL, except as otherwise indicated in the transition rules.  Id. § \n44.4.1.6."},{"page":23,"startToken":9898,"endToken":10504,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 23 \n \n \nminimizing disruptions to existing projects that have already completed or progressed to certain \ndefined milestones in the NYISO’s existing load interconnection process.51 \nFirst, the NYISO proposes to retain the Queue Position of a load project in its Queue that, \nas of the effective date of the new procedures, has completed the study process required by \nSection 3.9 of the OATT, but has not yet entered service.52  These load projects have or are in the \nprocess of entering into the applicable interconnection agreements and commercial \narrangements.    \nSecond, the NYISO proposes to establish a transition group – Transition Group A – for \nload projects that currently have a Queue Position, satisfy the definition of a Large Load Project, \nand have met certain milestones and requirements that demonstrate substantial progress in the \nexisting interconnection process in Section 3.9 of the OATT.53  These projects have already \nprogressed to at least the facilities study stage of the existing process and have provided evidence \nof their readiness to proceed.  Moreover, as described in the Affidavit of James Ross Altman, \nSenior Manager, Reliability Planning for the NYISO (“Altman Affidavit”), the resource \nadequacy impacts for these projects have already been studied in the NYISO’s biennial \nreliability assessment, which is pending approval with the NYISO’s Board of Directors, and such \nimpacts will be managed through the Reliability Planning Process.54  Accordingly, the NYISO \nproposes that these projects may elect to complete the facilities study and proceed in accordance \nwith the existing requirements in Section 3.9 of the OATT.55 \nIn particular, to proceed in Transition Group A, an existing load project that satisfies the \ndefinition of a Large Load Project must satisfy or have satisfied all of the following \nrequirements: (i) has submitted an interconnection request before June 18, 2026, (ii) has received \nOperating Committee approval of the scope of its system impact study before June 18, 2026, (iii) \nhas received Operating Committee approval of the report of its system impact study before \nMarch 1, 2027, (iv) has one or more qualifying agreements before November 16, 2026,56 (v) has \nan ongoing or completed facilities study with a Connecting Transmission Owner and any \nAffected Transmission Owner before November 16, 2026, or a facilities study is not required for \nits load project, and (vi) has posted security or made a milestone payment to the Connecting \nTransmission Owner and any Affected Transmission Owner by March 1, 2027.57  A load project \nthat elects to proceed in Transition Group A to complete its evaluation in accordance with the \n \n51 Nguyen Affidavit at PP 28-32. \n52 Proposed OATT Attach. LL § 44.4.1.1.  There are not currently any existing load projects participating in \nthe OATT Section 4.5 load interconnection process. \n53 Id. § 44.1 (definition of Transition Group A). \n54 See Altman Affidavit at P 19. \n55 Proposed OATT Attach. LL § 44.4.1.2.   \n56 A qualifying agreement includes one of the following: (i) a study work agreement (not including the \nstudy agreement for the system impact study), (ii) a support services agreement, (iii) a transaction form, (iv) a \nmaster services agreement, (v) a cost reimbursement agreement, (vi) a facility study agreement, (vii) an \ninterconnection agreement, (viii) a development agreement, (ix) an engineering, procurement and construction \nagreement, or (x) a security agreement.  Id. § 44.4.1.2.1. \n57 Id. § 44.4.1.2.  To proceed in Transition Group A, the load project must have satisfied requirements (i), \n(ii), (iv), and (v) at the time of the effective date of the new procedures and requirements (iii) and (vi) by March 1, \n2027.  Id."},{"page":24,"startToken":10504,"endToken":11136,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 24 \n \n \nexisting requirements in Section 3.9 of the OATT will be responsible for mitigating any \ntransmission security violations.58  That is, such load project that is assessed under the existing \ntariff rules will be eligible for transmission service consistent with the NYISO’s existing tariff \nrequirements and will not be eligible to obtain Non-Firm Withdrawal Service or to be classified \nas a Zero Withdrawal Service Load.  The project may elect to instead enter Transition Group B if \nit wants to obtain such alternative Withdrawal Service under the new tariff rules. \nThird, the NYISO proposes to establish a transition group – Transition Group B – for \nload projects that currently have a Queue Position, satisfy the definition of a Large Load Project, \nand have met certain milestones in the existing interconnection process in Section 3.9 of the \nOATT, but are not as far advanced in the existing process as projects eligible to participate in \nTransition Group A.59  These projects have already progressed to at least the conclusion of their \nsystem impact study in the existing tariff process and have provided evidence of their readiness \nto proceed.  The Transition Group B projects would be eligible to participate in the first Large \nLoad Integration Study Process – i.e., the Transition Large Load Integration Study Process.60   \nIn particular, to proceed in Transition Group B, an existing load project that satisfies the \ndefinition of a Large Load Project must satisfy or have satisfied all of the following \nrequirements: (i) has submitted an interconnection request before June 18, 2026, (ii) has received \nOperating Committee approval of the scope of its system impact study before November 16, \n2026, (iii) has received Operating Committee approval of the report of its system impact study \nbefore June 1, 2027, (iv) has one or more fully executed qualifying agreements before June 1, \n2027,61 and (v) does not satisfy the requirements to enter Transition Group A or has satisfied \nthese requirement but provides notice to the NYISO of its election to enter Transition Group B \ninstead to be eligible to obtain Non-Firm Withdrawal Service or, if requested, be eligible to be \nclassified as Zero Withdrawal Service Load.62   \nA load project that elects to proceed in Transition Group B may participate in the \nTransition Large Load Integration Study Process.  To do so, it must submit a Large Load \nIntegration Request as part of the transition process and will receive a new Load Queue Position.  \nThe transition process will be largely consistent with the NYISO’s proposed standard Large \nLoad Integration Study Process, except that the transition process will not include a System \nImpact Study (or the related requirements for developing such study) as the Transition Group B \nprojects would have already been subject to a system impact study under the Section 3.9 \nrequirements.63     \n \n58 Proposed OATT Attach. LL § 44.4.1.2.   \n59 Id. §§ 44.1 (definition of Transition Group B), 44.4.1.3. \n60 Id. § 44.4.1.3. \n61 See footnote 56 above. \n62 Proposed OATT Attach. LL § 44.4.1.3.  To proceed in Transition Group B, the load project must have \nsatisfied requirements (i) and (ii) at the time of the effective date of the new procedures and requirements (iii), (iv),  \nand (v) by June 1, 2027.  Id. \n63 Id. § 44.4.1.3.1.  As the Transition Group B projects were previously assessed in a system impact study, \nan Eligible Customer for such project may not make certain modifications when it submits a Large Load Integration \nRequest for the project to participate in the transition process.  In particular, the Eligible Customer may not make: (i) \nany increase in the peak, gross load amount (i.e., MW or MVAR), or (ii) a change to the Point of Interconnection"},{"page":25,"startToken":11136,"endToken":11709,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 25 \n \n \nFinally, the NYISO proposes that it will proceed to complete a system impact study \nunder Section 3.9 of the OATT for information purposes for a load project if, prior to the \neffective date of the Large Load Integration Procedures: (i) an Eligible Customer has submitted \nan interconnection request for a load project that is smaller than 50 MW and (ii) the NYISO has \ncommenced the system impact study for the project.64  The NYISO would retain the load project \nin the Queue for the duration of the system impact study and would withdraw the project from \nthe Queue upon the delivery of the study report to the Eligible Customer or termination of the \nstudy.  As the projects are smaller than 50 MW, they will not be eligible to proceed in the \nNYISO’s new process, but the Eligible Customer may complete the system impact study to \nobtain additional information concerning the proposed interconnection, which may benefit the \nassessment of the load project in the applicable Transmission Owner’s load interconnection \nprocedures. \nIf an existing load project in the NYISO’s Queue does not satisfy one of the above \ntransition requirements, the NYISO will withdraw it from the Queue following the effective date \nof the new Large Load Integration Procedures.65  If the withdrawn project satisfies the \nrequirements to participate in the new procedures, the Eligible Customer may reapply to \nparticipate in the new Large Load Integration Study Process by submitting a Large Load \nIntegration Request in accordance with the rules described below.66  If the withdrawn project \ndoes not satisfy the new requirements for participation in the Large Load Integration Study \nProcess, it must be evaluated in accordance with the applicable Transmission Owner’s load \ninterconnection procedures.67 \niii. \nPre-Application Reports \nThe NYISO proposes to establish a process in the Large Load Integration Procedures by \nwhich an entity may request a Pre-Application Report for information regarding the proposed \ninterconnection of a load project consistent with the definition of Large Load at a particular point \non the New York State Transmission System.68  The proposed process is based on and consistent \nwith the Pre-Application Report process in the NYISO’s Standard Interconnection Procedures in \nAttachment HH of the OATT.69  It creates a mechanism by which a prospective Eligible \nCustomer may obtain information based on readily available data concerning potential Points of \nInterconnection to enhance its ability to develop a Large Load Integration Request for a Large \nLoad Project.  Based on the NYISO’s experience in its Standard Interconnection Procedures as \n \nthat has not been agreed upon by the Connecting Transmission Owner prior to submission of the Large Load \nIntegration Request.  Id. § 44.4.1.3.2.  An Eligible Customer seeking to make such changes may submit the project \nanew for a subsequent Large Load Integration Study Process. \n64 Id. § 44.4.1.4. \n65 Id. § 44.4.1.5. \n66 Proposed OATT Attach. LL § 44.4.1.5. \n67 Id. \n68 Proposed OATT Attach. LL §§ 44.1 (definitions of Pre-Application Report and Pre-Application Request \nForm), 44.5. \n69 OATT Attach. HH § 40.4.2.  The Attachment HH process was based on the pre-application report \nprocess that the Commission incorporated into the pro forma Small Generator Interconnection Process in its Order \nNo. 792.  See Small Generator Interconnection Agreements and Procedures, Order No. 792, 145 FERC ¶ 61,159, at \nPP 28-82 (2013), clarified, Order No. 792-A, 146 FERC ¶ 61,214 (2014)."},{"page":26,"startToken":11709,"endToken":12251,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 26 \n \n \ndescribed in the Nguyen Affidavit, the Pre-Application Report process has improved the \napplications submitted by Interconnection Customers, reducing deficiencies in the initial \nsubmissions and identifying early in the process potential issues with Points of Interconnection \nand whether the interconnection is subject to the NYISO’s procedures.70 \nThe NYISO proposes that an entity be able to request at any time a Pre-Application \nReport by submitting: (i) a Pre-Application Request Form in the form set forth in Appendix 2 to \nAttachment LL to request information for a single Point of Interconnection and (ii) a non-\nrefundable pre-application fee of $5,000.71  Upon the NYISO’s receipt of the completed form \nand application fee, the NYISO will provide the information to the applicable Transmission \nOwner within 5 Business Days.72  Once the Transmission Owner confirms within 5 Business \nDays that it is the appropriate Connecting Transmission Owner for the Point of Interconnection \nand identifies any Affected Transmission Owners to the extent known at that time, it will \ncoordinate with the requesting entity and any Affected Transmission Owner for a pre-application \nscoping meeting.73  Within 25 Business Days of this scoping meeting, the Connecting \nTransmission Owner will complete, in coordination with any Affected Transmission Owner(s), \nand return the Pre-Application Report.74  \nThe Pre-Application Report will be in the form set forth in Appendix 2 to Attachment LL \nas completed using readily available data to the extent available.75  This pre-application process \nis not a mandatory step for an Eligible Customer to proceed into the Large Load Integration \nProcess and is solely for information purposes and is non-binding.76  The Eligible Customer will \nbe informed if the proposed interconnection is not subject to the Large Load Integration \nProcedures, and the information report will be completed to the extent possible.77 \nE. \nLarge Load Integration Study Process Start Date and Timeframe \ni. \nLarge Load Integration Study Process Start Date  \nThe NYISO proposes to commence the Transition Large Load Integration Study Process, \nwhich is applicable to participants in Transition Group B, on June 1, 2027.78  The NYISO \nproposes to then commence the first regular Large Load Integration Study Process on July 1, \n \n70 Nguyen Affidavit at P 18. \n71 Proposed OATT Attach. LL § 44.5.1.1.  The entity may submit additional request forms and fees to \nrequest information about additional Points of Interconnection.  Id.  The application fee will be divided 25% to the \nNYISO and 75% to the Connecting Transmission Owner.  Id. § 44.5.1.2. \n72 Proposed OATT Attach. LL § 44.5.1.2. If the Transmission Owner is not the appropriate Connecting \nTransmission Owner, the NYISO will provide the form to the appropriate Connecting Transmission Owner within 5 \nBusiness Days.  Id. § 44.5.1.3. \n73 Id. The requesting entity will be required to execute any confidentiality or non-disclosure agreement \nrequired by the applicable Transmission Owner for the disclosure of information concerning its system. Id. \n74 Proposed OATT Attach. LL § 44.5.1.3.  \n75 Id. § 44.5.1.4. \n76 Id. §§ 44.5.1.4 and 44.5.1.5. \n77 Id. § 44.5.1.4. \n78 Id. §§ 44.1 (definition of Transition Large Load Integration Study Process Start Date), 44.6.1.1."},{"page":27,"startToken":12251,"endToken":12939,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 27 \n \n \n2027.79  The NYISO will commence each subsequent Large Load Integration Study Process on \nthe latter of: (i) one year after the start date of the previous Large Load Integration Study \nProcess, or (ii) the first Calendar Day of the next month following the completion of the most \nrecent ongoing or completed Assessment of Load Integration and Facilities Study.80  The \nproposed mechanism for establishing the start date will allow for an end-to-end process whereby \nthe Assessment of Load Integration must be completed for the Group of Large Load Projects \nparticipating in each study cycle, including the determination of their cost allocation and \nprovision of security, prior to the commencement of the next Assessment of Load Integration.  \nThis will ensure greater certainty concerning process results and reduce potential issues that can \narise from the overlapping study work. \nii. \nLarge Load Integration Study Process Timeframe and Process Overlap \nThe NYISO proposes a timeframe of between approximately one year and six months \nand two years for the performance of the Large Load Integration Study Process cycle, which \nincludes a 90-day time period to perform the System Impact Study.  The overall process \ntimeframe for a particular Large Load Project will depend on when the Eligible Customer has \nsatisfied the application requirements for its project to enter the study cycle.  The time period \nincludes the two rounds of the Initial Study Phase for the study cycle, which require \napproximately six months each, and then the performance of the Assessment of Load Integration \nand Facilities Study, which are performed in parallel and require approximately one year.81  The \nproposed timeframe is illustrated in the figure provided in Attachment VII. \nThe NYISO acknowledges that the proposed timeframe is longer than the process \nduration contemplated by the Show Cause Order.82  However, the timeframe constitutes a just \nand reasonable period of time in light of the scope of the Large Load Integration Study Process \nand ensures that the NYISO, Transmission Owners, and Eligible Customers are able to perform \ntheir respective responsibilities under this process.  As detailed in the Nguyen Affidavit, the \n \n79 Id. §§ 44.1 (definition of Large Load Integration Study Process Start Date), 44.6.1.2.  The duration of the \nInitial Study Phase for the Transition Large Load Integration Study Process will be shorter than for a subsequent \nprocess because there will not be a System Impact Study for the transition process.  Accordingly, the NYISO is able \nto commence the first regular Large Load Integration Study Process a month following the start of the transition \nprocess.  The NYISO will complete the Assessment of Load Integration for the Transition Large Load Integration \nStudy Process prior to the commencement of the Assessment of Load Integration for the subsequent Large Load \nIntegration Study Process. \n80 Proposed OATT Attach. LL § 44.6.1.2. \n81 If a Large Load Project enters in the second round of the Initial Study Phase (i.e., Initial Study Round 2), \nthe overall process duration for its project would be approximately one year and six months. \n82 The Show Cause Order proposes a process duration of 60 to 90 calendar days, resulting in a study that \nincludes any Direct Assignment Facilities and Network Upgrades necessary to accommodate the transmission \nservice request as well as a non-binding good-faith estimate of the cost and the time to construct such facilities.  \nShow Cause Order at P 69.  However, the Commission did not detail in the Show Cause Order the scope of the \nstudy work that permitted that duration.  The Commission did reference Southwest Power Pool’s (“SPP”) 90-day \ntimeframe for its High Impact Large Load (“HILL”) process as an example of the 90-day duration.  However, the \nSPP study is an individual study with non-binding results.  SPP has noted that cluster studies may be needed if the \nvolume of large loads becomes large and that such cluster studies will take longer than 90 days, including to address \nthe impacts of customers withdrawing.  Comments of Southwest Power Pool, Inc., Interconnection of Large Loads to \nthe Interstate Transmission System, FERC Docket No. RM26-4-000 at 18 (Nov. 21, 2025) (“SPP Comments”)."},{"page":28,"startToken":12939,"endToken":13454,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 28 \n \n \nNYISO developed the timeframes for the different study elements, in coordination with the \nTransmission Owners, based on their extensive experience in performing similar administrative \nand study work in the existing load interconnection procedures, their performance of comparable \nstudy work and process steps in the NYISO’s Standard Interconnection Procedures for generator \ninterconnections, and reasonable estimates of the time required to address new process elements \nrequired to account for the analyses contemplated by the Show Cause Order and process \nenhancements detailed in this filing.83  \nThe timeframes also account for sufficient time for Eligible Customers to participate in a \nscoping meeting, to review and comment on study results in the different study phases, and to \nmake informed business decisions on whether to proceed with their projects to subsequent study \nphases.  In addition, this timeframe will provide opportunities for stakeholder review and input in \nthe process.  Finally, while the grouping of Large Load Projects into consolidated studies will \nprovide for a more efficient overall process that improves the identification of upgrades across \nthe interconnecting projects than through the performance of overlapping individual studies, \nassessing projects on a group basis increases the complexity in preparing the studies and the \ntechnical analyses with a resulting increase on the time required to perform the studies.  This \nincludes the time required to account for the impacts of projects withdrawing from a Group \nduring the study process or at one of the decision points. \nThe NYISO also proposes that the performance of a given Large Load Integration Study \nProcess overlap with the performance of elements of the prior Transition Large Load Integration \nStudy Process or Large Load Integration Study Process.84  In particular, the NYISO proposes to \nperform the two rounds of the Initial Study Phase of a given Large Load Integration Study \nProcess cycle in parallel with the performance of the Assessment of Load Integration and \nFacilities Study stages of the prior study cycle.  This will enable the NYISO to commence the \nassessment of additional load projects approximately every six months while completing the \nstudy work for the prior study cycle. \nThe NYISO proposes to establish in Attachment LL certain tariff-prescribed timeframes \nfor elements of the Large Load Integration Study Process as described throughout this filing.  If \nthe NYISO, Connecting Transmission Owner, Affected Transmission Owner, or Affected \nSystem Operator is unable to complete an individual component of the process in accordance \nwith that component’s timeframe established in Attachment LL, the NYISO proposes that the \nentity responsible for performing that component will complete it as soon as practicable, and the \nNYISO will notify Eligible Customers of any anticipated resulting delay in the overall timeframe \nof the study process.85 \nF. \nLarge Load Integration Request \nIn the Show Cause Order, the Commission highlighted the absence of certain process \nelements in the existing load interconnection process in the NYISO’s OATT.  In particular, the \nCommission indicated the absence of: “(i) an application process that accepts Eligible \n \n83 Nguyen Affidavit at P 11-17. \n84 Proposed OATT Attach. LL § 44.6.1.2. \n85 Id. § 44.6.1.3."},{"page":29,"startToken":13454,"endToken":13949,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 29 \n \n \nCustomers’ applications for transmission service on behalf of large loads on a rolling basis, (2) a \nnon-refundable application fee, and sufficient readiness requirements that escalate at distinct \nphases of the study process to deter duplicative or speculative requests for transmission service \n(e.g. meaningful milestones and/or financial commitments); and (3) information and data \nrequirements that Eligible Customers must submit to NYISO and/or the Transmission Owners \nregarding the characteristics of the large load on behalf of which the Eligible Customer is taking \ntransmission service, including disclosure to NYISO of any substantially similar pending \ntransmission service requests on behalf of the same large load customer.” 86  \nThe NYISO proposes to establish an application process, along with fees, deposits, and \ninformation and data requirements for its Large Load Integration Process that address the \nCommission’s findings concerning the existing tariff rules.   \ni. \nApplication Process and Timeframe Requirements for Submission of Large \nLoad Integration Request \nThe NYISO proposes to require that an Eligible Customer submit a Large Load \nIntegration Request and satisfy additional entry requirements for a Large Load Project to enter a \nLarge Load Integration Study Process.87  For purposes of the Transition Large Load Integration \nStudy Process, the NYISO proposes to establish an application window that commences on \nMarch 1, 2027, and concludes on May 31, 2027, during which a project in Transition Group B \nmay satisfy the requirements to enter the study process.88  The NYISO proposes to separately \nbegin accepting Large Load Integration Requests on April 1, 2027, for Large Load Projects that \nintend to enter the first regular Large Load Integration Study Process or subsequent processes.89  \nBeginning on that date, an Eligible Customer may submit a Large Load Integration Request at \nany time.90   \nStarting with its first Large Load Integration Study Process after the transition process, \nthe NYISO proposes to include a Large Load Project with a validated Large Load Integration \nRequest and an executed Large Load Integration Study Agreement into the next available Group \nof projects (i.e., Group 1 or Group 2) that will be evaluated in a Large Load Integration Study \nProcess.91  In particular, the NYISO will include a Large Load Project in Group 1 for the Initial \nStudy Round 1 of a given study process if the project has not yet been included in a Group \nevaluated in a previous Large Load Integration Study Process cycle and has satisfied the \nrequirements to enter a Group prior to the deadline for entering Group 1.92  The NYISO will \ninclude a Large Load Project in Group 2 for the Initial Study Round 2 if the project has satisfied \n \n86 Show Cause Order at P 65. \n87 Proposed OATT Attach. LL § 44.6.2.1. \n88 Id. § 44.4.1.3.1. \n89 Id. §§ 44.6.1.2, 44.6.2.1. \n90 Id. § 44.6.2.1. \n91 Id. § 44.6.2.2. \n92 Id. § 44.6.2.2."},{"page":30,"startToken":13949,"endToken":14420,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 30 \n \n \nthe requirements for entering a Group after the deadline to enter Group 1, but prior to the \ndeadline to enter Group 2.93 \nii. \nSubmission Requirements for Large Load Integration Requests  \nThe NYISO proposes that an Eligible Customer be required to submit the following \ninformation and data, fees, and deposits for purposes of entering the Large Load Integration \nStudy Process. \na) \nRequest Form \nThe Eligible Customer must submit a completed Large Load Integration Request in \naccordance with the form established in Appendix 1 to Attachment LL.94  The standard form \nprovides for the Eligible Customer to submit information required for the evaluation of the Large \nLoad Project in the Large Load Integration Study Process, including information regarding the \nproject’s size, its proposed Point of Interconnection, its association with any Associated \nResources, the expected nature of the load project, modeling and operational data, and evidence \nof its satisfaction of the additional project entry requirements (e.g., Application Fee, Study \nDeposit, Site Control).95  In addition, consistent with the requirements in the NYISO’s \nInterconnection Request form for its Standard Interconnection Procedures,96 the Large Load \nIntegration Request includes an attestation form affirming the accuracy of the submitted \ninformation and Eligible Customer’s responsibility for study costs, including costs incurred prior \nto the full execution of the Large Load Integration Study Agreement. \nThe Show Cause Order identified the lack of requirements in the NYISO’s existing tariffs \nfor an Eligible Customer’s disclosure to the NYISO of any substantially similar pending \ntransmission service requests on behalf of the same large load customer.97  The NYISO proposes \nto clarify as part of the Large Load Integration Request requirements that an Eligible Customer, \nor an Eligible Customer and one of its Affiliates, cannot submit a request for a mutually \nexclusive Large Load Project with a Large Load Project in the Load Queue or with a project for \nwhich a Large Load Integration Request has been submitted and the NYISO is evaluating for \npurposes of validation.98  This is necessary to deter speculative Large Load Integration Requests, \nincluding Eligible Customers proposing multiple variations of proposed interconnections.99  In \naddition, this is required to enable the identification of physically infeasible projects.  The \nNYISO’s proposed approach is consistent with its restriction of the submission of mutually \nexclusive Interconnection Requests in its Standard Interconnection Procedures. \nb) \nApplication Fee \n \n93 Proposed OATT Attach. LL §§ 44.1 (definition of Large Load Integration Request), 44.6.2.2. \n94 Id. § 44.6.3.1. \n95 Id. § 44.16.1. \n96 Id. § 40.25.1. \n97 Show Cause Order at P 65. \n98 Proposed OATT Attach. LL § 44.6.3.1. \n99 Eligible Customers can use the NYISO’s proposed Pre-Application Report process to obtain information \nconcerning alternative Points of Interconnection prior to submitting a Large Load Integration Request."},{"page":31,"startToken":14420,"endToken":14899,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 31 \n \n \nThe Eligible Customer must submit a non-refundable Application Fee in cash in the \namount of $10,000 to account for expenses incurred in assessing the Large Load Integration \nRequest.100  As described in the Nguyen Affidavit, the proposed Application Fee aligns with the \nexpense of assessing applications and is consistent with the Application Fee used in the NYISO’s \nStandard Interconnection Procedures.101    \nc) \nStudy Deposit \nThe Eligible Customer must submit certain Study Deposits for the Large Load Integration \nStudy Process.  As described in Part III.B.i.c, the NYISO proposes to hold the Study Deposit for \nthe duration of the Eligible Customer’s participation in the study process until the settlement of \nthe final invoice and will only draw on such deposit if the Eligible Customer fails to timely pay \nits invoice for study costs.102   \nAs part of its submission of its Large Load Integration Request, an Eligible Customer \nmust submit the first study deposit – Study Deposit 1 – in the following amounts based on the \nsize of its load project and whether the project is participating in the Transition Large Load \nIntegration Study Process or a subsequent Large Load Integration Study Process.103   \nLoad Project Size \nDeposit for Large Load \nIntegration Study Process \nDeposit for Transition \nLarge Load Integration \nStudy Process \nLess than 200 MW \n$100,000 \n$200,000 \nLess than 500 MW and \ngreater than or equal to 200 \nMW \n$150,000 \n$250,000 \nGreater than or equal to 500 \nMW \n$200,000 \n$300,000 \n \nThe deposit amount is higher for participants in the Transition Large Load Integration Study \nProcess as such projects are not subject to a System Impact Study, and instead proceed to the \nmore extensive Assessment of Load Integration following the completion of the Resource \nAdequacy and Modeling Period.  A participant in the Large Load Integration Study Process other \nthan the transition process will be required to submit an additional study deposit – Study Deposit \n2 – to increase its study deposit amount to the higher deposit amount if it elects for its project to \nproceed to the Assessment of Load Integration as described in Part II.H.viii.   \nAs described in the Nguyen Affidavit, the NYISO developed the study deposit amounts \nbased on its experience in conducting its current load interconnection process and similar study \nwork in its Standard Interconnection Procedures.  Under its existing rules, a load project must \n \n100 Proposed OATT Attach. LL §§ 44.1 (definition of Application Fee), 44.6.3.2.  The $10,000 amount will \nbe allocated 75% to the NYISO and 25% to the Connecting Transmission Owner.  Id. \n101 Nguyen Affidavit at P 19; see also OATT Attach. HH § 40.5.5.1.3. \n102 Proposed OATT Attach. LL §§ 44.1 (definition of Study Deposit 1), 44.6.3.3., 44.15.4.3.3. \n103 Id. § 44.6.3.3."},{"page":32,"startToken":14899,"endToken":15480,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 32 \n \n \nprovide a study deposit of $150,000.104  While this reasonably covers the costs of the study work \nfor a system impact study under the current process, the NYISO anticipates that there will be \nincreased study costs going forward due to more complex studies resulting from more MWs \nbeing introduced into the system model.  As described in the Nguyen Affidavit, with system \nmodels more constrained, the study work is more complex requiring more engineering work to \ncomplete and, as a result, additional study costs.105  Consistent with its Study Deposit \nrequirements in its Standard Interconnection Procedures, the NYISO proposes to assess different \nstudy deposit amounts based on project size to account for the more significant impacts of higher \nMW projects.106 \nThese study deposits will not apply to the Facilities Study, which will be addressed \nthrough separate requirements between the Eligible Customer and the applicable Transmission \nOwner(s). \nd) \nReadiness Requirements/ Site Control \nIn the Show Cause Order, the Commission indicated that clear and consistent study \nprocedures could include readiness requirements (i.e. meaningful milestones and/or financial \ncommitments) to help ensure that Eligible Customers’ requests for transmission service on behalf \nof large loads are more viable and more likely to materialize as planned, given that they must \nmeet specific milestones and/or pay costs to proceed.”107   \nThe NYISO proposes two mechanisms for the Eligible Customer to demonstrate the \nreadiness of its project – (i) a demonstration of full Site Control for the Large Load with the \nLarge Load Integration Request108 and (ii) a Readiness Deposit during the ALI Entry Decision \nPeriod, which is described in Part II.H.viii.  As described in the Nguyen Affidavit, an Eligible \nCustomer’s satisfaction of these requirements provides reasonable evidence of meaningful \nprogress and financial commitment in the development of the Large Load Project.109 \nFor purposes of the Site Control requirements, the NYISO proposes to define Site \nControl consistent with its definition in its Standard Interconnection Procedures adopted in \nresponse to Order No. 2023.110  To satisfy the Site Control requirement, the Eligible Customer \n \n104 Nguyen Affidavit at P 21.  In the NYISO’s Standard Interconnection Procedures, the Study Deposit \namount is based on the facility size and ranges from $100,000 for a Facility smaller than 80 MW, to $150,000 for a \nFacility greater than or equal to 80 MW and smaller than 200 MW, to $250,000 for a Facility greater than or equal \nto 200 MW.  See OATT Attach. HH § 40.5.5.1.4. \n105 Nguyen Affidavit at P 22. \n106 Notwithstanding the Study Deposit amounts, the NYISO will allocate study costs to the particular Large \nLoad Project responsible for such costs in accordance with cost causation principles as described in Part III.B.i.a). \nSee Nguyen Affidavit at P 23. \n107 Show Cause Order at P 62. \n108 Proposed OATT Attach. LL § 44.6.3.4. \n109 Nguyen Affidavit at P 25. \n110 Proposed OATT Attach. LL § 44.1 (definition of Site Control).  In particular, Site Control \n“shall mean the necessary land right sufficient to develop, construct, operate, and maintain the Large Load \nProject over a term of at least ten (10) years from the date of the submission of the Large Load Integration \nRequest. Site Control may be demonstrated by documentation establishing: (1) ownership of, a leasehold \ninterest in, or a right to develop a site of sufficient size to construct and operate the Large Load Project; (2)"},{"page":33,"startToken":15480,"endToken":15989,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 33 \n \n \nmust submit: (i) the materials demonstrating Site Control permitted by the NYISO’s procedures, \n(ii) an attestation in a form to be set forth in the NYISO’s procedures from an officer of the \ncompany indicating the amount of acreage required for the Large Load Project and that such \nacreage amount is covered by the submitted Site Control materials, and (iii) a licensed \nprofessional engineer (electrical or civil) signed and stamped site plan that depicts that the Site \nControl provided by the Eligible Customer can support the proposed arrangement of the Large \nLoad Project.111 \ne) \nAdditional Submission Requirements \nThe Eligible Customer must indicate whether it will be using an Associated Resource as \nfurther described in Part II.G.i.a.112  If so, the Eligible Customer must submit to the NYISO an \nAssociated Resource Attestation Form in the form set forth in Appendix 7 to this Attachment \nLL.113  The form must be executed by both representatives of the Large Load Project and the \nAssociated Resource and indicate their intent to enter into, as applicable, a Partner Resource \nArrangement or a Co-Located Arrangement.114 \nIn addition, as  described in Part III.iii, an Eligible Customer for a Non-Computational \nLarge Load may request an exemption from certain performance or protection and control \nrequirements and provide the necessary information for such exemption.115  The Eligible \nCustomer must request such exemption through either its Large Load Integration Request or a \nsubsequent modification request.116 \nFinally, an Eligible Customer must indicate whether it is eligible to be a State Exempt \nLarge Load Project as described in Part II.G.ii.b, in which case it must submit a State Exempt \nLarge Load Project Verification through either its Large Load Integration Request or in the ALI \nEntry Decision Period.117  \n \niii. \nReview and Validation of Large Load Integration Requests \nThe NYISO proposes to establish requirements for the review and validation of Large \nLoad Integration Requests.  These requirements reflect the NYISO’s experience in reviewing \nand validating Interconnection Requests for its Standard Interconnection Procedures.   \n \nan option to purchase or acquire a leasehold site of sufficient size to construct and operate the Large Load \nProject; or (3) any other documentation that clearly demonstrates the right of Eligible Customer to occupy a \nsite of sufficient size to construct and operate the Large Load Project. The term “necessary land right” \nrestricts the use of the site for mutually exclusive projects, but does not restrict multi-use applications of the \nsite in addition to its use for the Large Load Project, such as agriculture, ranching, etc.” \n111 Proposed OATT Attach. LL § 44.6.3.4. \n112 Id. §§ 44.1 (definition of Associated Resource), 44.6.3.5. \n113 Id. §§ 44.1 (definition of Associated Resource Attestation Form), 44.6.3.5. \n114 Id. § 44.6.3.5. \n115 Id. §§ 44.1 (definition of Non-Computational Large Load), 44.6.3.6, 44.14.3.4. \n116 Id. § 44.14.3.4. \n117 Proposed OATT Attach. LL §§ 44.6.3.7, 44.10.4.1."},{"page":34,"startToken":15989,"endToken":16582,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 34 \n \n \nA Large Load Integration Request will not be considered to be a valid request until the \nNYISO has confirmed all of the tariff required items.118  Within 5 Business Days of its receipt of \na Large Load Integration Request submission that includes all of the required items, the NYISO \nwill (i) acknowledge receipt of the request, (ii) confirm receipt of the Application Fee and Study \nDeposit 1, (iii) identify the Connecting Transmission Owner(s) with which the Large Load is \nproposing to connect and any Affected Transmission Owner(s) and Affected Systems that the \nNYISO is aware of, and (iv) make available the information submitted with the Large Load \nIntegration Request and its acknowledgement to the Connecting Transmission Owner(s) and any \nidentified Affected Transmission Owner(s) and Affected Systems.119  Within this same time \nperiod, the Connecting Transmission Owner identified by the NYISO must confirm it is the \nappropriate Connecting Transmission Owner and confirm the appropriate Affected Transmission \nOwner(s) and Affected Systems.120 \nWithin 15 Business Days of the conclusion of the initial 5 Business Day period, the \nNYISO will confirm whether all of the elements of the Large Load Integration Request comply \nwith the tariff requirements and review the provided modeling data and models.121  Within this \nperiod, the NYISO will notify the Eligible Customer whether its Large Load Integration Request \nis valid or includes any deficiencies.122  The Eligible Customer must provide the NYISO with \ninformation required to address a deficiency within 10 Business Days after receipt of such \nnotice.123  Within 10 Business Days of this submission, the NYISO will review and, if it \ndetermines the identified deficiency has not been addressed, will notify the Eligible Customer of \nthe remaining deficiency, which the Eligible Customer must address pursuant to the same \nprocess as the initially identified deficiencies.124  If the NYISO determines that Eligible \nCustomer’s Large Load Integration Request is valid or that the Eligible Customer has addressed \nany deficiencies within the required timeframe, the NYISO will notify the Eligible Customer that \nthe Large Load Integration Request is valid, and such request will proceed as part of the Load \nQueue.125   \nThe NYISO will maintain on its OASIS or publicly accessible portion of its website a list \nof all valid Large Load Integration Requests, including whether a Large Load Project is a State \nExempt Large Load Project.126  If the Eligible Customer fails to submit additional information \n \n118 Id. § 44.6.6.1. \n119 Id. § 44.6.5.1. \n120 Id. § 44.6.5.1. \n121 Id. § 44.6.5.2. \n122 Id. §§ 44.6.5.3, 44.6.6.1.  If the Eligible Customer seeks an exemption from a performance or protection \nand control requirement, the NYISO will notify the Eligible Customer if additional time to evaluate the requested \nexemption is required; provide a timeline for completion of any study conducted by the NYISO and applicable \nTransmission Owner; and notify the Eligible Customer of the determination prior to notifying whether the Large \nLoad Integration Request is valid or includes any deficiencies.  Id.   \n123 Proposed OATT Attach. LL § 44.6.6.2.  The Eligible Customer’s submission will be limited to \naddressing the identified deficiency(ies) and must address all deficiencies identified by the NYISO when submitting \nits attempted cure. Id. \n124 Id.  The NYISO will promptly forward such additional information provided by the Eligible Customer \nto the Connecting Transmission Owner and Affected Transmission Owner. Id. \n125 Proposed OATT Attach. LL § 44.6.6.3.   \n126 Id. § 44.6.9."},{"page":35,"startToken":16582,"endToken":17059,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 35 \n \n \nrequired by the NYISO within the required timeframe or does not satisfy the requirements for a \nvalidated Large Load Integration Request within 90 Calendar Days of the Eligible Customer’s \nsubmission of the Large Load Integration Request, the NYISO will deem the Large Load \nIntegration Request withdrawn without an opportunity to cure.127 \nThe NYISO also proposes to establish requirements to obtain information subsequent to \nthe validation of the Large Load Integration Request.  In particular, if the NYISO, Connecting \nTransmission Owner, or Affected Transmission Owner finds: (i) that the technical data provided \nby Eligible Customer is incomplete or contains errors or (ii) that it requires additional \ninformation from the Eligible Customer to perform its responsibilities required under Attachment \nLL, then such entity will request that Eligible Customer provide such information.128  The \nEligible Customer must then submit such information within five Business Days of the request.  \nIf Eligible Customer fails to do so, its Large Load Integration Request will be deemed withdrawn \nwithout an opportunity to cure.129 \niv. \nStudy Agreement \nThe NYISO proposes to require the Eligible Customer to enter into a study agreement – \nthe Large Load Integration Study Agreement – for the Large Load Integration Study Process \nwith the NYISO, the Connecting Transmission Owner, and any identified Affected Transmission \nOwner(s) or Affected System Owner(s).130  The NYISO proposes to establish a pro forma study \nagreement form in Appendix 6 to Attachment LL.  The form agreement is based on the study \nagreement used for the Cluster Study Process in the NYISO’s Standard Interconnection \nProcedures as modified to address the specific terms and requirements for the Large Load \nIntegration Study Process. \nThe NYISO proposes to tender an executable version of the study agreement as soon as \npracticable after its verification that the Eligible Customer’s Large Load Integration Request is \nvalid.131  Within 10 Calendar Days of the tendering of the agreement, the Eligible Customer, \nConnecting Transmission Owner(s), and any Affected Transmission Owner(s) or Affected \nSystem Operator(s) must execute the study agreement.132  \nv. \nQueue Position \n \n127 Id. § 44.6.6.3.   \n128 Id. § 44.6.8. \n129 Id. § 44.6.8. \n130 Id. §§ 44.1 (definition of Large Load Integration Study Agreement), 44.6.7.1.  A Large Load Project \nmust separately enter into a Facilities Study agreement with the applicable Transmission Owner(s) if it proceeds to a \nFacilities Study. \n131 Proposed OATT Attach. LL § 44.6.7.1. \n132 Id. § 44.6.7.2.  If the NYISO subsequently identifies additional or other Connecting Transmission \nOwner(s), Affected Transmission Owner(s), or Affected System Operator(s) for the Large Load Integration Request, \nthe NYISO will tender as soon as practicable an amended version of the Large Load Integration Study Agreement, \nwhich the parties must execute within 10 Calendar Days.  Id. § 44.6.7.3."},{"page":36,"startToken":17059,"endToken":17600,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 36 \n \n \nThe NYISO proposes to establish a Load Queue for projects participating in the Large \nLoad Integration Study Process.133  The NYISO will assign a Load Queue Position for a Large \nLoad Integration Request based upon the date and time of the NYISO’s receipt of the Eligible \nCustomer’s complete submission of the request.134  If the NYISO validates the Large Load \nIntegration Request, then the request will retain its assigned Load Queue Position based on the \ndate and time the submission was originally filed.135  This is consistent with the NYISO’s Queue \nrequirements in its Standard Interconnection Procedures.136 \nAll Large Load Integration Requests that are a part of a single Group for the Large Load \nIntegration Study Process will be considered equally queued as between the Large Load \nIntegration Requests within the same Group.137  However, a Large Load Integration Request’s \nindividual Load Queue Position will be used to determine priority as between Large Load \nIntegration Requests in the same Group in the event of a Physical Infeasibility determination as \ndescribed in Part II.H.iv.a.138  Large Load Integration Requests that are part of a particular Large \nLoad Integration Study Process will be considered to have a higher Load Queue Position than \nrequests that are part of a subsequent study process.139  \nvi. \nModifications \nThe NYISO proposes to establish requirements in the Large Load Integration Procedures \nfor an Eligible Customer to request that the NYISO evaluate whether the Eligible Customer’s \nproposed modification to its existing load interconnected to or proposing to interconnect to the \nNew York State Transmission System or to its Large Load Project is permitted or is a Material \nModification.140  If the NYISO determines pursuant to this process that a proposed modification \nis a Material Modification, the Eligible Customer may either withdraw the proposed \nmodification request or submit a new Large Load Integration Request in a subsequent Large \nLoad Integration Study Process to be studied for such modification.141 \na) \nModification Review Process \nThe NYISO proposes modification procedures based on the modification requirements in \nits Standard Interconnection Procedures.  To request a modification, an Eligible Customer must \nsubmit to the NYISO: (i) a Load Modification Request in the form of Appendix 3 to this \n \n133 Id. § 44.1 (definition of Load Queue). \n134 Id. §§ 44.1 (definition of Load Queue Position), 44.7.1.1. \n135 Proposed OATT Attach. LL § 44.7.1.1.  An Eligible Customer may transfer its Load Queue Position for \nits Large Load Integration Request to another entity only if: (i) the acquiring entity acquires the specific Large Load \nProject identified in the Large Load Integration Request, (ii) the Point of Interconnection does not change, (iii) the \nacquiring entity demonstrates Site Control for the Large Load Project, (iv) the transferring Eligible Customer is up-\nto-date on payments to the NYISO, and (v) the acquiring entity submits any deposits required for its Large Load \nIntegration Request under Attachment LL.  Id. § 44.7.1.3. \n136 OATT Attach. HH § 40.6.1.1. \n137 Proposed OATT Attach. LL § 44.7.1.2. \n138 Id. § 44.7.1.2. \n139 Id. § 44.7.1.2. \n140 Id. § 44.7.2.1. \n141 Id. § 44.7.2.1."},{"page":37,"startToken":17600,"endToken":18160,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 37 \n \n \nAttachment LL, (ii) a study deposit in cash in the amount of $10,000, and (iii) any required \nsupporting information or documentation.142  Upon its receipt of the request, the NYISO will \ncommence and perform any necessary additional studies as soon as practicable, but in no event \nwill the NYISO commence such studies later than 30 Calendar Days after receiving the complete \nrequest.143  For purposes of these studies, the NYISO may assess the modified load or Large \nLoad Project using the Resource Adequacy Impact Standard and the Transmission Security \nStandard described in Part II.G.144  In response to Eligible Customer’s request, the NYISO will \nevaluate, with input from, as applicable, the Connecting Transmission Owner, Affected \nTransmission Owner, and Affected System Owner, the proposed modification, including \nperforming any studies to determine whether it deems the requested modification material based \non the nature of the modification.145  For purposes of this determination, the NYISO may \nconsider, as further detailed in its procedures, whether the proposed modification would result in \na material difference in the defining electrical characteristics of the existing load or the Large \nLoad Project in a manner that is adverse to system reliability or that will have a material impact \non the cost or timing of any Large Load Integration Request with an equal or lower Load Queue \nPosition.146 \nThe NYISO will inform the Eligible Customer in writing of whether the requested \nmodification would constitute a Material Modification and whether the modification would \nresult in a change to the load project’s Firm Withdrawal Service or Non-Firm Withdrawal \nService.147  The Eligible Customer will retain its Load Queue Position if its requested \nmodification is determined not to be a Material Modification.148 \nb) \nModifications During Large Load Integration Study Process  \nWith limited exceptions described below, the NYISO proposes that an Eligible Customer \nnot be permitted to request a modification to the information provided in its validated Large \nLoad Integration Request for its Large Load Project until the completion of, as applicable, the \nTransition Large Load Integration Study Process or Large Load Integration Study Process and \nthe Facilities Study in which the Large Load Project is participating, which modification would \nconstitute a Material Modification.149  As described in the Nguyen Affidavit, this is because such \nmodifications would require updated models which may require updates to base cases and \nauxiliary study files and therefore would delay the performance of the study adversely impacting \nall study participants.150  Once the study is completed, an Eligible Customer may again request \n \n142 Id. § 44.7.2.2.  The proposed modification must be accompanied by any resulting updates to the models \nincluded in such requests to the extent required in the Load Modification Request.  Id. \n143 Proposed OATT Attach. LL § 44.7.2.3.  Any additional studies resulting from such modification will be \ndone at Eligible Customer’s cost.  Id. \n144 Id. § 44.7.2.3. \n145 Id. § 44.7.2.4. \n146 Id. §§ 44.1 (definition of Material Modification), 44.7.2.4. \n147 Proposed OATT Attach. LL § 44.7.2.4. \n148 Id. § 44.7.2.2. \n149 Id. § 44.7.2.2.  This is consistent with the NYISO’s Standard Interconnection Procedure which prohibit \nmodifications during the study process with limited exceptions.  OATT Attach. HH § 40.6.3. \n150 Nguyen Affidavit at P 37."},{"page":38,"startToken":18160,"endToken":18695,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 38 \n \n \nthe NYISO’s review of proposed modifications to determine whether they are permitted under \nthe Large Load Integration Procedures and are not material. \nThe NYISO proposes the following limited exceptions to this restriction on modifications \nduring the Large Load Integration Study Process.  The Eligible Customer may request a \nmodification for its Large Load Project: (i) to reduce the project size in the SIS Entry Decision \nPeriod or the ALI Entry Decision Period, provided that the project with the reduced size \ncontinues to satisfy the definition of Large Load Project, (ii) to modify the Point of \nInterconnection for the project to address Physical Infeasibility in the SIS Entry Decision Period \nor in the ALI Entry Decision Period, provided that the modification is agreed upon with the \nConnecting Transmission Owner and does not modify the electrical characteristics of the project, \nor (iii) to include or change the Associated Resource(s) that satisfy the Associated Resource \nrequirements in the ALI Entry Decision Period.151  This set of modifications will provide \nEligible Customers with a limited opportunity to modify their projects in response to preliminary \ninput in the Initial Study Phase.  The permitted modifications will generally reduce or lessen the \nseverity of the reliability issues identified for the project, which minimizes the potential impact \nof such modifications on other projects participating in the study. \nc) \nMaterial Modifications  \nNotwithstanding the modification review process, the NYISO proposes that the following \nmodifications will be considered a Material Modification and require the submission of a Large \nLoad Integration Request under the Large Load Integration Procedures.152 \nFirst, the NYISO proposes to establish certain requirements concerning modifications to \nexisting loads that are already integrated into the transmission system.  Large existing loads in \nNew York are primarily traditional manufacturing load that have been managed for years with a \ngood understanding of their potential reliability impacts.  Accordingly, the NYISO proposes to \nonly evaluate modifications to existing load in the Large Load Integration Procedures if a \nmodification has the potential for significant impacts to the Bulk Electric System.  For an \nexisting load that is in service prior to June 18, 2026, the NYISO proposes that an increase in the \npeak, gross load amount by 50 MW or greater compared to the baseline MW value (as reported \nby the Connecting Transmission Owner) will be a Material Modification and require study in the \nLarge Load Integration Study Process.  If, however, such existing load proposes to change its \nload type and thus its operational characteristics (e.g., changing from a manufacturer to a data \ncenter), the NYISO proposes that a smaller increase in the peak, gross load amount by 10 MW or \ngreater compared to the baseline MW value (as reported by the Connecting Transmission \nOwner) would constitute a Material Modification so that the NYISO can assess the reliability \nimpacts of this change. \nSecond, for load projects participating in Transition Group A and for subsequent Large \nLoad Projects participating in the Transition Large Load Integration Study Process or a Large \nLoad Integration Study Process, the NYISO proposes that an increase in the peak, gross load \n \n151 Proposed OATT Attach. LL § 44.7.2.2.1. \n152 Id. § 44.7.2.1.1."},{"page":39,"startToken":18695,"endToken":19272,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 39 \n \n \namount by 10 MW or greater compared to the baseline MW value will constitute a Material \nModification.153  The Large Load Project is permitted to increase its size less than 10 MW \nwithout such modification being a Material Modification.  However, this 10 MW amount is \ndetermined on a cumulative basis.  For example, if a 100 MW load seeks to increase its size by 5 \nMW, such modification will not be a Material Modification.  If, however, the Large Load seeks a \nsecond 5 MW increase that brings its cumulative increase from the initial 100 MW to 110 MW, \nthis second increase would constitute a Material Modification.  \nFinally, the NYISO proposes that any change to the Point of Interconnection for an \nexisting load or a Large Load Project is a Material Modification, except as permitted during the \nSIS Entry Decision Period or ALI Entry Decision Period as described above. \nvii. \nWithdrawal \nThe NYISO proposes to establish withdrawal requirements for the Large Load \nIntegration Procedures.154  In particular, an Eligible Customer may withdraw its Large Load \nIntegration Request at any time by submitting written notice of such withdrawal to the \nNYISO.155  Further, if an Eligible Customer fails to adhere to all requirements of these Large \nLoad Integration Procedures, the NYISO will deem the Large Load Integration Request to be \nwithdrawn and shall provide written notice to the Eligible Customer of the withdrawal and an \nexplanation of the reasons for such withdrawal.156 \nThe NYISO proposes that the Eligible Customer have a cure period of 15 Business Days \nin which to either respond with information or actions that cures the deficiency or to notify the \nNYISO of its intent to pursue Dispute Resolution.157  The NYISO, however, proposes that \ncertain time-critical deadlines will not be eligible for a cure period.158  This will reduce the \npotential for study delays that adversely impact all Large Load Projects participating in the \nstudy.  This is consistent with the withdrawal requirements in the NYISO’s Standard \nInterconnection Procedures.159   \nThe withdrawal of a Large Load Project will result in the loss of the Eligible Customer’s \nLoad Queue Position.160  An Eligible Customer that withdraws or is deemed to have withdrawn \n \n153 The “baseline MW value” will be determined as set forth in the NYISO’s procedures. \n154 Proposed OATT Attach. LL § 44.7.3. \n155 Id. § 44.7.3.1. \n156 Id. § 44.7.3.1. \n157 Id. § 44.7.3.1. \n158 The time critical deadlines include (i) the deadline for an Eligible Customer to cure a deficiency in its \nLarge Load Integration Request identified by the NYISO; (ii) the deadline for an Eligible Customer to cure a \ndeficiency in its submission of information; (iii) the deadline for the SIS Entry Decision Period; (iv) the deadline for \nthe ALI Entry Decision Period; and (v) the deadline for the Eligible Customer to satisfy a milestone demonstrating \nthat it accepts its cost responsibility for Network Upgrades and Attachment Facilities in accordance with the \nrequirements established by the applicable Transmission Owner. \n159 OATT Attach. HH § 40.6.4.1. \n160 Proposed OATT Attach. LL §§ 44.7.3.2, 44.7.3.3.  If the Eligible Customer disputes the withdrawal and \nloss of its Load Queue Position, then during Dispute Resolution, the Eligible Customer’s Large Load Integration \nRequest is eliminated from the Load Queue until such time that the outcome of Dispute Resolution would restore its \nLoad Queue Position.  Id."},{"page":40,"startToken":19272,"endToken":19772,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 40 \n \n \nits Large Load Integration Request is responsible for paying the NYISO, Connecting \nTransmission Owner, and Affected Transmission Owner all costs that they prudently incurred \nwith respect to that Large Load Integration Request prior to the receipt of the notice described \nabove.161  The NYISO will conduct a final reconciliation of Eligible Customer’s costs and for \nreturning or cancelling deposits.162  In the event of a withdrawal, the NYISO, Connecting \nTransmission Owner, and Affected Transmission Owner, as applicable, subject to non-disclosure \narrangements, will provide, at Eligible Customer’s request, supporting documentation, \nworkpapers, and databases or data that the NYISO and Connecting Transmission Owner \ndeveloped in the preparation of the applicable study conducted up to the date of withdrawal of \nthe Large Load Integration Request.163 \nG. \nAssessment of Reliability Impacts and Determination of Withdrawal Service \ni. \nDetermination of Withdrawal Service  \nThe NYISO proposes to determine the amounts of Firm Withdrawal Service and Non-\nFirm Withdrawal Service for each Large Load Project and, if requested, to determine eligibility \nto be classified as Zero Withdrawal Service Load, based on both the resource adequacy and \ntransmission security impacts of the project and available actions to mitigate any adverse \nreliability impacts.164  This approach ensures the reliability of the New York State Transmission \nsystem and that Large Loads will be responsible for the costs associated with mitigating any \nadverse impacts to system reliability resulting from their interconnection.  \nFor purposes of assessing the reliability impacts of the proposed interconnection of a \nLarge Load Project, the NYISO proposes to establish a Resource Adequacy Impact Standard (as \ndescribed in Part II.G.ii) and a Transmission Security Standard (as described in Part \nII.G.iii).  The NYISO proposes that the analyses be applied to ensure that New York State \nTransmission System facilities are sufficient to reliably serve existing load and meet load growth \nand changes in load patterns in compliance with Applicable Reliability Requirements.165  These \nrequirements include  New York State Reliability Council (“NYSRC”) Reliability Rules, \nNortheast Power Coordinating Council (“NPCC”) Basic Design and Operating Criteria, North \nAmerican Electric Reliability Corporation (“NERC”) Planning Standards, NYISO rules, \npractices and procedures, and the applicable Transmission Owner criteria included in FERC \nForm No. 715.166  These Applicable Reliability Requirements are consistent with the NYISO’s \nrequirements for its Standard Interconnection Procedures.167  The NYISO and Transmission \nOwners, as applicable, will apply the Resource Adequacy Impact Standard and Transmission \n \n161 Proposed OATT Attach. LL § 44.7.3.2. \n162 Id. § 44.7.3.3.   \n163 Id. § 44.7.3.4.  The Eligible Customer must pay all monies due to the NYISO, Connecting Transmission \nOwner, and Affected Transmission Owner before it is allowed to obtain any Large Load Integration Study Process \ndata or results.  Id. § 44.7.3.2.   \n164 Proposed OATT Attach. LL §§ 44.8, 44.8.3.1. \n165 Proposed OATT Attach. LL § 44.8. \n166 Id. §§ 44.1 (definition of Applicable Reliability Requirements), 44.8. \n167 OATT Attach. HH § 40.12.1.2."},{"page":41,"startToken":19772,"endToken":20126,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 41 \n \n \nSecurity Standard in line with these Applicable Reliability Requirements in the appropriate \nstudies in the Large Load Integration Study Process as described below. \nIf there are no adverse impacts or violations, as applicable, identified in accordance with \nthe Resource Adequacy Impact Standard or Transmission Security Standard as described below, \nthe Large Load Project may proceed with Firm Withdrawal Service.   \na) \nAddressing Adverse Impacts Under Resource Adequacy Impact \nStandard \nIf an adverse impact is identified under the Resource Adequacy Impact Standard, a Large \nLoad Project may mitigate the adverse impacts through its association with an Associated \nResource and remain eligible for Firm Withdrawal Service.168  In such case, the Large Load \nProject will obtain Non-Firm Withdrawal Service until a Large Load Bilateral Transaction with \nan Associated Resource, as part of a Co-Located Resource Arrangement or Partner Resource \nArrangement, is initially certified.169  Alternatively, the Large Load Project may elect to proceed \nwith Non-Firm Withdrawal Service (in full or part) without proposing an association with  an \nAssociated Resource.   \nThese Withdrawal Service alternatives are illustrated in the following figure:  \nAdverse Impact Under \nResource Adequacy Impact \nStandard  \nEligible Withdrawal Service  \nNo \nFirm \nYes (with an Associated Resource \nthat fully mitigates adverse \nimpact) \nFirm* \nYes (with an Associated Resource \nthat partially mitigates adverse \nimpact) \nPartial Firm* and partial Non-Firm \nYes (without an Associated \nResource) \nNon-Firm \n* Non-Firm until Large Load Bilateral Transaction with an Associated \nResource is initially certified \n \nA Large Load may enter into an arrangement with an Associated Resource for the Large \nLoad to obtain an amount of Firm Withdrawal Service – including a Partner Resource \nArrangement with a Partner Resource and a Co-Located Arrangement with a Co-Located \nResource.  For a Resource to be eligible to be an Associated Resource, the Resource: (i) must \ncomplete the interconnection study process and obtain sufficient Capacity Resource \nInterconnection Service rights, except if the Partner Resource is a Demand Side Resource, (ii) \nmust be a proposed project that does not yet meet the inclusion rules for the Reliability Planning \n \n168 Proposed OATT Attach. LL § 44.8.3.3. \n169 Id. § 44.8.3.3."},{"page":42,"startToken":20126,"endToken":20611,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 42 \n \n \nProcess at the time the Large Load Integration Request is validated, (iii) is a new Installed \nCapacity Supplier, and (iv) is not another Large Load participating in the ISO-Administered \nWholesale Markets as a Demand Side Resource that has obtained Firm Withdrawal Service \nthrough a Partner Resource Arrangement or Co-Located Arrangement.170  In addition, for a Co-\nLocated Arrangement, the Resource must be co-located behind the same Point of Interconnection \nas the given Large Load.171  Further, for a Partner Resource Arrangement, the Resource must be \nlocated in the same Capacity Region as the given Large Load.172  \nFor all arrangements between a Large Load and an Associated Resource, the \narrangements must satisfy all applicable requirements for a term of 15 years and have a Large \nLoad Bilateral Transaction in place for the full term.173  If the Associated Resource exits the \nNYISO administered markets or the arrangement otherwise fails to comply with applicable \nrequirements prior to the end of the 15-year term, then the Large Load ceases to be eligible for \nthe amount of Firm Withdrawal Service that depends on the arrangement with the Associated \nResource, as further detailed under the proposed provisions in the Services Tariff and the \nOATT.174  The Associated Resource eligibility and ongoing requirements are further discussed \nbelow in Part IV.F. \nb) \nAddressing Violations Under Transmission Security Standard \nIf a violation is identified under the Transmission Security Standard, a Large Load \nProject may either take Non-Firm Withdrawal Service or may proceed with Network Upgrades \nthat mitigate the violation.175  In such case, the Large Load Project will obtain Non-Firm \nWithdrawal Service until the Network Upgrades are complete and in service, after which the \nLarge Load Project will obtain Firm Withdrawal Service.176  Notwithstanding the impact on \nWithdrawal Service, certain transmission security violations cannot be mitigated by the project \ntaking Non-Firm Withdrawal Service and require Network Upgrades (as described in Part II.G.iii \nbelow).  For these upgrades that are necessary for the project to obtain Non-Firm Withdrawal \nService or, if requested, to be eligible to be classified as a Zero Withdrawal Service Load, the \nLarge Load Project may not enter service until such Network Upgrades are complete and in \nservice or the NYISO and applicable Transmission Owner determine that such reliability impacts \ncan be managed through normal operating procedures until the Network Upgrades are \ncomplete.177  These Withdrawal Service alternatives are illustrated in the following figure:  \nViolation Under Transmission \nSecurity Standard  \nEligible Withdrawal Service  \nNo  \nFirm  \n \n170 Id. § 44.6.4.1, 44.6.4.2. \n171 Id. § 44.6.4.1. \n172 Id. § 44.6.4.2. \n173 Id. § 44.6.4.3. \n174 See, e.g., id. § 44.6.4.3; Services Tariff § 4.1.12 & 5.18. \n175 Proposed OATT Attach. LL § 44.8.3.3. \n176 Id. § 44.8.3.3. \n177 Id. § 44.8.3.3."},{"page":43,"startToken":20611,"endToken":21053,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 43 \n \n \nYes (without proceeding with \nNetwork Upgrades required for Firm \nService)*  \nNon-Firm  \nYes (with Network Upgrades \nrequired for Firm Service)*  \nFirm (once Network Upgrades enter \nservice)  \n* The Large Load Project must proceed with the construction of those \nNetwork Upgrades that are necessary, notwithstanding Non-Firm \nWithdrawal Service, to resolve certain transmission security issues. \n \nc) \nWithdrawal Service Based on Results Under Both Resource \nAdequacy Impact Standard and Transmission Security Standard \nThe NYISO’s final determination concerning Withdrawal Service will be based on both \nthe results of the analyses using the Resource Adequacy Impact Standard and the Transmission \nSecurity Standard and any mitigation actions concerning adverse impacts or violations identified \nbased on either of these standards.  For example, a Large Load Project for which there are no \nadverse impacts on resource adequacy may still be limited to Non-Firm Withdrawal Service if \nthere are transmission security violations that are not mitigated in the manner described above.    \nd) \nLIPA Exception Regarding Non-Firm Withdrawal Service \nThe NYISO proposes to include in its Withdrawal Service requirements, to the extent \naccepted by the Commission, the following exception requested by the Long Island Power \nAuthority concerning the application of Non-Firm Withdrawal Service for projects \ninterconnecting in the Long Island Transmission District.  In particular, Non-Firm Withdrawal \nService and the procedures for studying Non-Firm Withdrawal Service under the Large Load \nIntegration Procedures for the Long Island Transmission District will only apply if dispatch \nprocedures applicable to serving a Large Load on a non-firm basis have been adopted by the \nBoard of Trustees for the Long Island Power Authority in accordance with Article 5, Title 1-A of \nthe New York Public Authorities Law.178  The Long Island Power Authority requested this \nexception based on its status as a non-jurisdictional utility under the Federal Power Act and will \nprovide its more detailed justification for this proposed exception in a separate filing. \nii. \nResource Adequacy Impact Standard  \nThe NYISO proposes to establish a Resource Adequacy Impact Standard to evaluate the \nimpact of each Large Load Project on the resource adequacy of the New York Control Area \nusing probabilistic evaluations consistent with the Applicable Reliability Requirements, \nincluding the NYSRC Reliability Rules.179  This analysis will enable the NYISO to determine \nwhether the Large Load Project proposing to interconnect to the New York State Transmission \nSystem: (i) is eligible to obtain Firm Withdrawal Service or (ii) due to the resource adequacy \nimpacts, may either proceed with such service with an Associated Resource or is only eligible to \n \n178 Proposed OATT Attach. LL § 44.8.3.1.1. \n179 Id. §§ 44.1 (definition of Resource Adequacy Impact Standard), 44.8.1.1."},{"page":44,"startToken":21053,"endToken":21552,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 44 \n \n \nobtain Non-Firm Withdrawal Service.  This places responsibility for the Large Load Project’s \nimpacts to the transmission system with the Large Load. \nThe NYISO proposes to apply this Resource Adequacy Impact Standard in the Resource \nAdequacy Evaluation performed during the RAMP Part 1 Process as described in Part \nII.H.iv.b.180  The NYISO will then perform this assessment anew in the Assessment of Load \nIntegration as described in Part II.I.i and at any point thereafter as part of a review of a Large \nLoad Project’s requested modification as described in Part II.F.vi, in each case if the Large Load \nProject modifies its load or includes or modifies any Associated Resources.181 \nFor purposes of this assessment, the NYISO proposes to use the most recent resource \nadequacy model from the Reliability Planning Process, as updated in accordance with the \nNYISO’s procedures.182  The NYISO will test a Large Load together with any Associated \nResource(s), with the assumption that the Associated Resource(s) will obtain Capacity Resource \nInterconnection Service.183  The NYISO will consider the operating characteristics of the Large \nLoad Project and any Associated Resource(s) as part of this evaluation.184 \nThe amounts of Firm Withdrawal Service and Non-Firm Withdrawal Service determined \nusing the Resource Adequacy Impact Standard will be subject to change based on: (i) the \ndeterminations using the Transmission Security Standard as described below and (ii) available \nactions to mitigate any adverse reliability impacts as described above.185 \na) \nResource Adequacy Impact Standard Except for State Exempt Large \nLoad Projects  \nThe NYISO proposes to apply the Resource Adequacy Impact Standard differently \ndepending on whether or not a Large Load Project is identified by the NYDPS as a State Exempt \nLarge Load Project as described below.  The NYISO proposes to apply the Resource Adequacy \nImpact Standard in the manner described: (i) in this Part II.G.ii.a for Large Load Projects that are \nnot identified as State Exempt Large Load Projects and (ii) in Part II.G.ii.b for State Exempt \nLarge Load Projects. \n \nThe NYISO proposes to apply the Resource Adequacy Impact Standard in the following \nmanner to determine the amount of Non-Firm Withdrawal Service and Firm Withdrawal Service \nthat the Large Load Project is eligible for based on resource adequacy impacts to the New York \nControl Area.186  The NYISO will evaluate a Large Load Project for years 1 through 10 of the \nstudy to determine the extent that the project degrades resource adequacy in consideration of any \noffset by an Associated Resource.187  If the Large Load Project degrades resource adequacy by \n \n180 Id. § 44.8.1.2.   \n181 Id. § 44.8.1.2.   \n182 Id. § 44.8.1.3.   \n183 Proposed OATT Attach. LL § 44.8.1.3.   \n184 Id. § 44.8.1.3.   \n185 Id. § 44.8.1.6. \n186 Id. §§ 44.8.1.1, 44.8.1.4. \n187 Id. § 44.8.1.4.1."},{"page":45,"startToken":21552,"endToken":22051,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 45 \n \n \n25 MW or less, the Large Load Project will be eligible for Firm Withdrawal Service in its full \nrequested amount, provided that it completes any identified Network Upgrades to address any \nviolations of the Transmission Security Standard.188  If the Large Load Project degrades resource \nadequacy by greater than 25 MW, the Large Load Project will be eligible for a partial amount of \nFirm Withdrawal Service.189  The NYISO will determine the partial amount based on how much \nof the Withdrawal Service must be Non-Firm Withdrawal Service to bring the Loss of Load \nExpectation to the pre-project level.190 \nAs described in the Altman Affidavit, the Resource Adequacy Impact Standard is just and \nreasonable because it provides a clear requirement for the integration of Large Load Projects to \nnot adversely impact NYCA resource adequacy and, thus, reliability.191  The use of the Resource \nAdequacy Impact Standard is particularly important when the NYISO faces statewide resource \ndeficiencies, which it has recently identified beginning in 2033 in its current longer-term \nreliability planning assessment.192  In applying the 25 MW impact threshold, the NYISO will \nemploy a probabilistic evaluation comparable to those used in evaluating resource adequacy \nunder the rules established by NYSRC and calculate the Large Load Project’s MW impact.193  \nThe proposed methodology that the NYISO will use to calculate the 25 MW impact threshold is \nalso reasonable and consistent with the NYISO’s longstanding consideration of similar impacts \nwhen studying proposed interconnections to the New York State Transmission System.194  Using \na threshold, as opposed to a precise calculation, provides a reasonable tolerance commensurate \nwith the degree of precision in the models and avoids potentially subjecting Large Load Projects \nto adverse findings based on the modeling that are immaterial to a project’s impact to \nreliability.195 \n \nb) \nResource Adequacy Impact Standard for State Exempt Large Load \nProjects \nThe NYISO proposes to establish a category of Large Load Projects – State Exempt \nLarge Load Projects – that will be subject to an alternative Resource Adequacy Impact Standard.  \nThe NYISO proposes that the NYDPS may identify a Large Load Project as a State Exempt \nLarge Load Project through an exemption process adopted by the NYPSC in its ongoing large \nload interconnection proceedings.196  The Eligible Customer must provide this verification as \npart of either the project’s submission of its Large Load Integration Request or during the ALI \nEntry Decision Period.197   \n \n \n188 Id. § 44.8.1.4.1.1. \n189 Proposed OATT Attach. LL § 44.8.1.4.1.2. \n190 Id. § 44.8.1.4.1.2. \n191 Altman Affidavit at P 21. \n192 Id. at PP 10-18. \n193 Id. at P 24. \n194 Id. at P 25. \n195 Id. at P 26. \n196 See Proceeding on Motion of the Commission to Address Interconnection Reforms for Large Load, \nOrder Instituting Proceeding and Soliciting Comments, NYPSC Case No. 26-E-0045 (Feb. 12, 2026). \n197 Proposed OATT Attach. LL §§ 44.6.3.7, 44.10.4.2."},{"page":46,"startToken":22051,"endToken":22642,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 46 \n \n \nFor State Exempt Large Load Projects, the NYISO will apply the Resource Adequacy \nImpact Standard to evaluate the collective impact of the State Exempt Large Load Projects \nwithin a Group to determine their eligibility for Firm Withdrawal Service.198 \n \nThe NYISO will perform this evaluation as follows.  If the collective impact of the State \nExempt Large Load Projects within a Group does not violate the resource adequacy criterion \ncontained in the NYSRC Reliability Rules for years 1 through 5 of the study, then those projects \nwill be eligible for Firm Withdrawal Service in their full requested amounts.199  The NYISO \nproposes to use the resource adequacy criterion contained in NYSRC Reliability Rules as it \ncaptures the applicable standard for New York for ensuring that there are adequate resources to \nmaintain system reliability.200 \n \nFor purposes of the preliminary Resource Adequacy Evaluation performed during the \nInitial Study Phase, the NYISO will report the results of the evaluation for informational \npurposes if the collective impact of the State Exempt Large Load Projects within a Group \nviolates the resource adequacy criterion contained in the NYSRC Reliability Rules for years 1 \nthrough 5 of the study.201 \n \nFor purposes of the NYISO’s subsequent analyses applying the Resource Adequacy \nImpact Standard in the Assessment of Load Integration, the NYISO proposes to perform the \nfollowing more detailed assessment.  If, during the evaluation, the collective impact of the State \nExempt Large Load Projects within a Group violates the resource adequacy criterion contained \nin the NYSRC Reliability Rules for years 1 through 5 of the study, the NYISO will notify the \nEligible Customers, NYDPS, and applicable Transmission Owners of the results.202  Within 60 \nCalendar Days of the NYISO providing this notice to NYDPS, an authorized representative of \nNYDPS may inform the NYISO that it is revoking the State Exempt Large Load Project \nVerification(s) for one or more of the Large Load Projects in the Group.  If the State Exempt \nLarge Load Project Verification(s) remain valid, such Large Load Project(s) will continue as \nState Exempt Large Load Project(s).  In such case, the NYISO will re-evaluate whether the \nremaining State Exempt Large Load Projects violate the resource adequacy criterion contained in \nthe NYSRC Reliability Rules for years 1 through 5 of the study.  If the collective impact of the \nremaining State Exempt Large Load Projects does not violate the resource adequacy criterion \ncontained in the NYSRC Reliability Rules, then those projects will be eligible for Firm \nWithdrawal Service in their full requested MW amounts.  If, however: (i) NYDPS revokes any of \nthe State Exempt Large Load Project Verifications for the Large Load Projects in the Group or \n(ii) the collective impact of the remaining State Exempt Large Load Projects violates the \nresource adequacy criterion contained in the NYSRC Reliability Rules, then those projects will \n \n198 Id. § 44.8.1.5; see Altman Affidavit at P 32. \n199 Proposed OATT Attach. LL § 44.8.1.5.1.  The Resource Adequacy Impact Standard uses the acceptable \nreliability level in the NYCA as set forth in the NYSRC’s Resource Adequacy Reliability Rules, which is based on \nthe evaluation “that the loss of load expectation (LOLE) of disconnecting firm load due to resources deficiencies \nshall be, on average, no more than 0.1 loss of load Event-Days per year.”  Altman Affidavit at PP 8-9, 35. \n200 See Altman Affidavit at PP 8-9, 35, 38. \n201 Proposed OATT Attach. LL § 44.8.1.5.2. \n202 Id. § 44.8.1.5.3."},{"page":47,"startToken":22642,"endToken":23183,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 47 \n \n \nno longer be eligible to be State Exempt Large Load Projects and must be evaluated in the \nmanner described in Part II.G.ii.a above.” \n \nc) \nThe State Exempt Large Load Projects Proposal Is Consistent with \nCooperative Federalism \nThe NYPSC stated in the Show Cause Order proceeding that the FPA gives it the  \nprimary role in ensuring the adequacy of generation resources in New York, and that it intends to \nexercise its authority with respect to large load resource adequacy.203 Meanwhile, the \nCommission has jurisdiction over resource adequacy issues to the extent that they affect \nwholesale electricity market, interstate transmission, or bulk power system reliability matters.204  \nThe Commission’s interest in these types of resource adequacy issues is reflected in the Show \nCause Order, including its informational report directive and its suggestion that the NYISO take \nother steps to address resource adequacy challenges.205  And the NYISO itself has resource \nadequacy responsibilities under applicable NERC, NPCC, and NYSRC requirements and its \nCommission-jurisdictional tariffs.   \n \nThus, resource adequacy implicates both federal and state jurisdiction.  Consistent with \nthe Show Cause Order,206 the NYISO has designed the State Exempt Large Load Projects \nproposal to respect cooperative federalism.  As the Altman Affidavit explains,207 the NYISO \nneeds to consider the resource adequacy implications of Firm Withdrawal Service awards in \norder to fulfill its reliability obligations.  The NYISO is not seeking to displace New York State’s \nresource adequacy authority or “targeting” state-jurisdictional activity.208  The NYISO is simply \naccounting for resource adequacy implications when deciding whether to make Commission-\njurisdictional transmission service available to Commission-jurisdictional Transmission \nCustomers.  At the same time, the NYISO’s proposal would preserve state authority by enabling \nthe NYDPS to determine that certain Large Loads should be allowed to receive firm service even \nif they would otherwise individually exceed the NYISO’s Resource Adequacy Impact Standard.  \nMaking this treatment unavailable to the extent that State Exempt Large Load Projects would \ncollectively cause a resource adequacy violation is not an impermissible intrusion into state \njurisdiction.  It is a reasonable safeguard to ensure that federal reliability requirements are \nmaintained. \n \n \n203 See Notice of Intervention and Preliminary Comment of the New York State Public Service \nCommission, Docket No. EL26-69-000 (July 9, 2026) (“NYPSC Preliminary Comments”) at 3-5. \n204 See, e.g., Conn. Dept. of Pub. Util. Control v. FERC, 569 F.3d 477, 485 (D.C. Cir. 2009) (distinguishing \nbetween  “direct regulation of generation facilities” — which is beyond the Commission’s reach — and \ndetermination of the installed capacity requirement, which directly “affects rates within the Commission’s \njurisdiction.”) \n205 See Show Cause Order at P 128.  \n206 See id. at P 76 (“Indeed, the Commission’s objective in this proceeding is to respect the cooperative \nfederalism approach established under the FPA”); NYPSC Preliminary Comments at 4-5 (acknowledging this \nstatement and the Commission’s commitment to cooperative federalism.)  \n207 Altman Affidavit at PP 8-10, 37-38. \n208 In FERC v. Elec. Power Supply Ass’n, 577 U.S. 260, 264 (2016) (“EPSA”) and ONEOK, Inc. v. Learjet, \nInc., 575 U.S. 373, 385 (2015), the Supreme Court was clear that whether a particular rule “targeted” federal or state \nmatters was a key factor in determining whether the rule was within the Commission’s jurisdiction."},{"page":48,"startToken":23183,"endToken":23725,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 48 \n \n \n \nThe NYISO’s balanced approach is permissible under the FPA.  The Supreme Court has \nclearly established that “the wholesale and retail markets in electricity…are not hermetically \nsealed from each other.”209  There is room for reasonable compromise210 in areas where federal \nand state jurisdiction overlap.  In this case, the proposed Resource Adequacy Impact Standard is \ncritical to the NYISO’s ability to serve Large Loads. The State Exempt Large Load Project \nproposal, therefore, represents a program of cooperative federalism and recognizes New York \nState’s role regarding resource adequacy without encroaching upon federal jurisdiction over \nwholesale electricity rates and transmission service.  \n \niii. \nTransmission Security Standard \nThe NYISO proposes to establish a Transmission Security Standard to evaluate the \nimpact of each Large Load Project on the transmission security of the New York Control Area as \ndescribed below and in the Nguyen Affidavit.211  The NYISO proposes that the Transmission \nSecurity Standard be applied to assess the reliability impacts of the proposed interconnection of \nthe proposed Large Load Project and determine the amount of Firm Withdrawal Service and \nNon-Firm Withdrawal Service that the Large Load Project is eligible for and, if requested, \nwhether the Large Load Project, or any portion, is eligible to be classified as a Zero Withdrawal \nService Load based on transmission security impacts.212  The amounts of Firm Withdrawal \nService and Non-Firm Withdrawal Service determined using the Transmission Security Standard \nwill be subject to modification based on: (i) the determinations using the Resource Adequacy \nImpact Standard and (ii) available actions to mitigate any adverse reliability impacts, as \ndescribed above.213 \nThe NYISO proposes that this assessment be used in the System Impact Study.214  In \naddition, the NYISO proposes that this assessment then be performed: (i) anew in the \nAssessment of Load Integration and (ii) at any point thereafter as part of a review of a Large \nLoad Project’s requested modification if the Large Load Project modifies its load or includes or \nmodifies a Co-Located Resource(s).215  For purposes of this assessment, the NYISO proposes \nthat the year 5 cases of the most recent quarterly Short-Term Assessment of Reliability \n(“STAR”) base case in the Short-Term Reliability Process be used to evaluate the impact of each \nLarge Load Project on the transmission security of the New York Control Area.216  The Large \nLoad will be tested together with any Associated Resource, as applicable, and the operating \n \n209 EPSA, 577 U.S. at 281. \n210 The NYDPS staff reviewed the NYISO’s proposal and stated that it did not object to it prior to the \nOctober 28, 2026, vote of the NYISO’s stakeholder Management Committee to approve this filing.  The NYISO \nacknowledges that NYDPS staff reserved its right to raise issues in this proceeding.  See Adam Evans (DPS) \nStatement at October 28 NYISO Management Committee; available at: https://www.nyiso.com/documents/20142/\n59483202/Adam%20Evans%20DPS%20Statement.pdf. \n211 Proposed OATT Attach. LL §§ 44.1 (definition of Transmission Security Standard), 44.8.2.1; Nguyen \nAffidavit at PP 33-36. \n212 Proposed OATT Attach. LL § 44.8.2.4. \n213 Proposed OATT Attach. LL § 44.8.2.5. \n214 Id. § 44.8.2.2.   \n215 Id. § 44.8.2.2.   \n216 Id. § 44.8.2.3."},{"page":49,"startToken":23725,"endToken":24217,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 49 \n \n \ncharacteristics of the Large Load Project and any Associated Resources will be considered as \npart of the evaluation.217 \nThe NYISO proposes to perform short-circuit/fault duty, steady state (thermal and \nvoltage) and stability analyses to evaluate the transmission security impacts for the Group of \nLarge Load Projects on the Bulk Electric System and to identify any violations in Applicable \nReliability Requirements.218  The NYISO will also determine if the Group of Large Load \nProjects degrades interface transfer capability by greater than 25 MW.219  If the NYISO \nidentifies a violation or a degradation of greater than 25 MW, the impacted Transmission Owner \nwill be responsible for identifying a Network Upgrade to mitigate that violation or \ndegradation.220  In addition, consistent with the Show Cause Order, the NYISO proposes to \nperform, as applicable, electromagnetic transient screening of the proposed Large Load \nProject.221 \nThe NYISO proposes that the applicable Transmission Owner perform the steady state \n(thermal and voltage) and short-circuit/fault duty analyses of the non-Bulk Electric System and \nits distribution system and identify any violations.222  The applicable Transmission Owner may \nperform bus flow analysis of the Bulk Electric System and non-Bulk Electric System.223  If a \nTransmission Owner identifies a violation, the impacted Transmission Owner will be responsible \nfor identifying a Network Upgrade to mitigate the violation.224 \nThe NYISO or Transmission Owner, as applicable, will calculate each Large Load \nProject’s impact on the observed transmission security violation as set forth in the NYISO’s \nprocedures or the Transmission Owner’s procedures.225  For each identified violation, the \nNYISO or the Transmission Owner, as applicable, will identify if the violation can be resolved \nby the Large Load Project receiving Non-Firm Withdrawal Service for some or all of the \nproject’s size as described in the NYISO’s procedures.226  If a violation cannot be resolved by \nreceiving Non-Firm Withdrawal Service or the Large Load Project is seeking to be eligible to be \nclassified as a Zero Withdrawal Service Load, the violation must be addressed by one or more \nNetwork Upgrades.  Violations that cannot be resolved through receiving Non-Firm Withdrawal \nService include any potential adverse reliability impact that degrades system reliability or results \nin noncompliance with the NERC, NPCC, or NYSRC reliability standards and that cannot be \nmanaged through the normal operating procedures of the NYISO and/or Transmission Owner.227 \nH. \nInitial Study Phase \n \n217 Id. § 44.8.2.3. \n218 Id. § 44.8.2.4.1. \n219 Proposed OATT Attach. LL § 44.8.2.4.1. \n220 Id. § 44.8.2.4.1. \n221 Show Cause Order at P 66; proposed OATT Attach. LL § 44.8.2.4.2. \n222 Proposed OATT Attach. LL § 44.8.2.4.3. \n223 Id. § 44.8.2.4.3. \n224 Id. § 44.8.2.4.3. \n225 Id. § 44.8.2.4.4. \n226 Id. § 44.8.2.4.5. \n227 Id. § 44.8.2.4.5."},{"page":50,"startToken":24217,"endToken":24761,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 50 \n \n \ni. \nOverview of New Study Process \nIn the Show Cause Order, the Commission indicated that the NYISO’s tariff appears to \nlack sufficiently clear and consistent provisions establishing a study process for evaluating the \nprovision of transmission service to Eligible Customers on behalf of large loads that considers \nthe unique characteristics and impacts of large loads on the transmission system, including \nidentifying the Direct Assignment Facilities and Network Upgrades necessary to provide such \nservice reliably and providing a non-binding good-faith estimate of the cost and the time to \nconstruct such facilities.228  The Commission further indicated that the NYISO’s tariff may not \nclearly and consistently require the NYISO or the Transmission Owners to conduct studies that \nevaluate the transmission system’s ability to withstand risks observed from analyzed large load \nbehavior created by the large load at the point of interconnection, or any other necessary \nsupplemental studies to evaluate the impact of providing transmission service to Eligible \nCustomers on behalf of large loads.229 \nThe NYISO’s existing load interconnection procedures in Sections 3.9 and 4.5 of the \nOATT provide for it, in cooperation with the applicable Transmission Owner, to perform \ntechnical studies to determine whether the proposed interconnection may degrade system \nreliability or adversely affect the operation of the NYS Power System.230  The NYISO proposes \nto establish in place of these requirements a new Large Load Integration Study Process in \nAttachment LL of the OATT.  This process will include detailed, clear and consistent \nrequirements for the evaluation of the impacts of the proposed interconnection of Large Load \nProjects in a manner that accounts for the unique operational characteristic of Large Loads, \nincluding identifying any Attachment Facilities or Network Upgrades required for the reliable \ninterconnection of the Large Load and determining the type and amount of Withdrawal Service \nfor the Large Load Project.   \nIn particular, the NYISO proposes an Initial Study Phase as described in this Part II.H in \nwhich the NYISO and Transmission Owners will perform certain initial analyses of the proposed \ninterconnection and a System Impact Study.  These collectively will provide a Large Load \nProject with a preliminary assessment of the feasibility of its proposed interconnection and \npotential Attachment Facilities and Network Upgrades, including preliminary estimates of the \ncosts and time to construct such facilities.  If an Eligible Customer elects to proceed with its \nLarge Load Project, the NYISO will then perform an Assessment of Load Integration as \ndescribed in Part II.I.i in parallel with the Transmission Owner’s performance of a Facilities \nStudy as described in Part II.I.ii to identify both the required Attachment Facilities and Network \nUpgrades and to establish the final determination of Withdrawal Service that the project is \neligible to obtain. \n \n228 Show Cause Order at PP 66, 69. \n229 Id. at P 66.  The Show Cause Order recognized the Transmission Owners may be partially responsible \nfor conducting the studies that evaluate whether a large load may be interconnected to the transmission system and \nserved by the Eligible Customer and that determine whether Network Upgrades are necessary to provide \ntransmission service.  Id. at 58. \n230 OATT §§ 3.9.1, 3.9.2; NYISO Manual 23, Transmission Expansion and Interconnection Manual § 3.5 \n(Issued: February 2025)."},{"page":51,"startToken":24761,"endToken":25344,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 51 \n \n \nThe NYISO proposes to perform the Large Load Integration Study Process on a clustered \nbasis for a Group of Large Load Projects that have satisfied the application requirements \ndescribed in Part II.F to enter the next available Group, rather than performing such study \nthrough serial, individual studies.231  As with the NYISO’s Cluster Study Process in its Standard \nInterconnection Procedures, which evaluates a cluster of Cluster Study Projects, it is just and \nreasonable for the NYISO to perform the Large Load Integration Study Process on a clustered \nbasis.  As the Commission found in Order No. 2023 in adopting a cluster study process for \ngenerator interconnection requests, a group study increases efficiencies as the transmission \nprovider can perform larger interconnection studies encompassing many proposed facilities, \nrather than individual studies for each customer.232  As described in the Nguyen Affidavit, a \ngrouped study permits the NYISO and the Transmission Owners to evaluate the collective \nreliability effects of Large Load additions and to identify coordinated upgrades, rather than \nconducting overlapping serial studies that could produce duplicative or inconsistent solutions.233  \nAlthough the addition of multiple projects and larger aggregate MW quantities increases the \ntechnical complexity of the study, the grouped approach provides a more comprehensive basis \nfor assigning responsibility for shared impacts and allocating the costs of common Network \nUpgrades. \nThe NYISO proposes that the study work in the Large Load Integration Study Process \nwill be allocated between the NYISO and the Transmission Owners as detailed in this filing \nletter and as described in the Nguyen Affidavit.234  This approach reasonably allocates the study \nwork to the entity with the relevant system knowledge, planning responsibility, and access to the \nunderlying criteria and data.  The parallel division of work will also allow the NYISO and the \nTransmission Owners, working in parallel, to meet the proposed study timeframes and minimize \ninefficient and duplicative analyses.  The NYISO will perform the evaluation of the impacts of \nthe proposed interconnections of Large Load Projects on the Bulk Electric System portion of the \nNew York State Transmission System and identify any violations and adverse impacts on the \nBulk Electric System caused by the project.  In particular, the NYISO will evaluate impacts on \nthe Bulk Electric System to provide a consistent statewide assessment of bulk-system reliability \nand interregional effects.  If more than one project contributes to the violation, then the NYISO \nwill provide the Transmission Owners with the projects’ respective contributions to the identified \nviolations to facilitate the allocation of upgrade costs. \nThe applicable Transmission Owners will perform parallel evaluations for the impacts of \nthe Large Load Projects to the non-Bulk Electric System.  Transmission Owners will evaluate \nimpacts on their non-Bulk Electric System and distribution facilities because they maintain the \ndetailed models, equipment information, local planning criteria, operating procedures, and design \nstandards needed to identify localized impacts and develop practicable upgrades.  Each \nTransmission Owner will be responsible for identifying: (i) violations on the non-Bulk Electric \n \n231 See proposed OATT Attach. LL § 44.1 (definition of Group).  The NYISO also proposes to provide that \nthe Transmission Owner may perform a Facility Study on a grouped basis.  Id. § 44.12.1.3. \n232 Improvements to Generator Interconnection Procs. & Agreements, Order No. 2023, 184 FERC ¶ 61,054 \nat P 177 (“Order No. 2023”), order on reh’g, 185 FERC ¶ 61,063 (2023), order on reh’g, 186 FERC ¶ 61,199, \nerrata notice, 188 FERC ¶ 61,134 (2024). \n233 Nguyen Affidavit at P 7. \n234 Id. at PP 8-10."},{"page":52,"startToken":25344,"endToken":25914,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 52 \n \n \nSystem, including local transmission and distribution systems, (ii) the Network Upgrades to \naddress violations on both the Bulk Electric System and non-Bulk Electric System (subject to \nconsultation with the NYISO), (iii) cost estimates and time to construct the Network Upgrades, \n(iv) the allocation of costs among the Large Load Projects participating in the study process, \nbased on the NYISO’s and Transmission Owner’s determinations of each project’s respective \ncontribution to the identified violations, (v) Attachment Facilities, and (vi) estimates of the costs \nand time to construct the Attachment Facilities.     \nii. \nInitial Study Phase Overview \nThe NYISO proposes to commence the Large Load Integration Study Process with an \nInitial Study Phase.235  This phase will consist of (i) the Resource Adequacy and Modeling \nPeriod as described in Part II.H.iii and (ii) the System Impact Study as described in Part \nII.H.vii.236  The NYISO proposes to perform up to two successive, independent rounds of the \nInitial Study Phase for each Large Load Integration Study Process cycle, which rounds will be \nreferred to as Initial Study Round 1 and Initial Study Round 2.237  Performing two rounds will \nincrease the number of Large Load Projects that may proceed to be evaluated in the Assessment \nof Load Integration for a given study cycle once that assessment is completed for the prior cycle.  \nFor Initial Study Round 1, the Resource Adequacy and Modeling Period and the System Impact \nStudy will be performed for the Large Load Projects in Group 1, and for Initial Study Round 2, \nthe Resource Adequacy and Modeling Period and the System Impact Study will be performed for \nthe Large Load Projects in Group 2.238  The NYISO proposes to commence the Initial Study \nPhase and the Initial Study Round 1 on the Large Load Integration Study Process Start Date, \nwhich is described in Part II.E.i.239  Following the completion of the draft System Impact Study \nReport for Group 1 in the Initial Study Round 1, the NYISO will commence the Initial Study \nRound 2.240 \nNotwithstanding the above, for the Transition Large Load Integration Study Process, the \nNYISO proposes that the Initial Study Phase be performed in a single round for the Group of \nentities in Transition Group B that satisfied the requirements to enter the transition study.  The \nInitial Study Phase for the transition process will only include certain elements of the Resource \nAdequacy and Modeling Period as the participants in the transition process were already \nevaluated in a system impact study and will not be subject to a new System Impact Study under \nthe Attachment LL rules.  The Resource Adequacy and Modeling Period for the Transition Large \nLoad Integration Study Process will commence on the Transition Large Load Integration Study \nProcess Start Date, which is described in Part II.E.i above.241 \niii. \nResource Adequacy and Modeling Period \n \n235 See proposed OATT Attach. LL § 44.1 (definition of Initial Study Phase). \n236 Proposed OATT Attach. LL § 44.9.1.1. \n237 Id. §§ 44.1 (definitions of Initial Study Round 1 and Initial Study Round 2), 44.9.1.1. \n238 Id. §§ 44.1 (definitions of Group 1 and Group 2), 44.9.1.2. 44.9.1.3. \n239 Id. §§ 44.9.1.2, 44.9.2.1. \n240 Id. §§ 44.9.1.3, 44.9.2.1. \n241 Id. § 44.9.2.1."},{"page":53,"startToken":25914,"endToken":26440,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 53 \n \n \nThe NYISO proposes that the Resource Adequacy and Modeling Period consist of the \nfollowing three components: (i) the RAMP Part 1 Process as described in Part II.H.iv, (ii) the \nSIS Entry Decision Period as described in Part II.H.v, and (iii) the RAMP Part 2 Process as \ndescribed in Part II.H.vi.242  The NYISO proposes that the scheduled duration of the Resource \nAdequacy and Modeling Period for each round in the Large Load Integration Study Process be a \n90 Calendar Day period between the start date and the NYISO’s presentation of the scope of the \nSystem Impact Study to stakeholders.243  For the Transition Large Load Integration Study \nProcess for which there is no System Impact Study related work, the NYISO proposes a shorter \nperiod of 60 Calendar Day between the start date and the ALI Entry Decision Period.244 \niv. \nRAMP Part 1 Process  \nThe NYISO proposes that the RAMP Part 1 Process include the following elements to \ndevelop information for the System Impact Study and provide the Eligible Customer with initial \ninformation concerning its proposed interconnection.245  In particular, the NYISO will develop \nthe base case for the System Impact Study and will perform a Resource Adequacy Evaluation for \neach Large Load Project.  In addition, the Connecting Transmission Owner will determine \npreliminary Attachment Facilities for each Large Load Project, and the Connecting Transmission \nOwner and any Affected Transmission Owners will perform a Physical Infeasibility \nScreening.246  The NYISO proposes that the RAMP Part 1 Process have a scheduled duration of \n60 Calendar Days.247 \na) \nTransmission Owner Responsibilities in the RAMP Part 1 Process \nThe NYISO proposes to establish a Physical Infeasibility Screening in the Large Load \nIntegration Study Process by which the Connecting Transmission Owner and any Affected \nTransmission Owner will review the proposed interconnection of each Large Load Project to \nassess whether the proposed Point of Interconnection is Physically Infeasible.248  This process \nstep is consistent with the Physical Infeasibility Screening requirements for the Cluster Study \nProcess in the NYISO’s Standard Interconnection Procedures.  It serves to catch early in the \nstudy process, when possible, those projects that will not be able to interconnect due to physical \ninfeasibility, so that such projects can withdraw without incurring or causing significant costs, \ntime, and resources.  The NYISO and Transmission Owners have successfully applied this \nprocess in the NYISO’s Cluster Study Process to facilitate either the modification of Points of \nInterconnection, where permitted, or the withdrawal of projects that would not otherwise have \nbeen able to interconnect at their requested Point of Interconnection.249   \n \n242 Proposed OATT Attach. LL § 44.1 (definition of Resource Adequacy and Modeling Period). \n243 Id. § 44.9.2.2. \n244 Id. § 44.9.2.3. \n245 Id. § 44.1 (definition of RAMP Part 1 Process). \n246 Id. § 44.9.3. \n247 Id. § 44.9.2. \n248 Proposed OATT Attach. LL § 44.9.3.4. \n249 As described above, the NYISO is proposing to include a Pre-Application Report process to assist \nEligible Customers in obtaining information about potential Points of Interconnection prior to submitting Large \nLoad Integration Requests."},{"page":54,"startToken":26440,"endToken":27004,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 54 \n \n \nThe NYISO proposes to define Physically Infeasible in Attachment LL consistent with its \ndefinition in the Standard Interconnection Procedures in Attachment HH.250  In particular, a \nLarge Load Integration Request will be Physically Infeasible if: \n(1) the substation for the selected Point of Interconnection (i) does not have any \navailable bus positions and (ii) (a) is not expandable electrically or within the \nexisting substation footprint, and (b) the Transmission Owner has determined that \nadjacent usable vacant land is not available, or \n(2) proposals by Eligible Customer are inconsistent with Good Utility Practice or \nApplicable Reliability Requirements; or \n(3) a viable tie line cable route(s) cannot be established from either the Point of \nChange of Ownership to the Point of Interconnection or, where these points are \nthe same, a viable route cannot be established within or from the fence line; or \n(4) the project capacity exceeds the ratings of equipment at the substation selected \nfor the Point of Interconnection, replacement equipment that would be adequately \nrated for the project capacity is not commercially available from an approved \nsupplier and within applicable specifications set by the Transmission Owner, and \nan alternative upgrade is not physically feasible (e.g., higher voltage Point of \nInterconnection substation);251 or \n(5) an Attachment Facility or Local Network Upgrade required for the Large Load \nProject to reliably interconnect is Physically Infeasible.252 \nWithin 45 Calendar Days of the commencement of the RAMP Part 1 Process, the Connecting \nTransmission Owner or Affected Transmission Owner will provide the NYISO with its written \nassessment of the results of the Physical Infeasibility Screening.253  If, as a result of the Physical \nInfeasibility Screening or at any time in the Large Load Integration Study Process, the NYISO \ndetermines, in consultation with the Connecting Transmission Owner or Affected Transmission \nOwner, that the proposed interconnection of a Large Load Project is Physically Infeasible, then \nthe NYISO will notify the Eligible Customer that the proposed interconnection of its Large Load \nProject is Physically Infeasible and will withdraw the Large Load Integration Request for the \nLarge Load Project.254  However, in such circumstances, the Eligible Customer may modify its \n \n250  OATT Attach. HH § 40.7.3.2. \n251  Proposed OATT Attach. LL § 44.9.3.4.2.  For purposes of this definition, “commercially available” \nequipment shall mean equipment manufactured by an approved supplier of a particular Connecting Transmission \nOwner and/or Affected Transmission Owner(s) and conforming with engineering specifications and procedures of \nthe Connecting Transmission Owner and/or Affected Transmission Owner(s).  Id. \n252 Proposed OATT Attach. LL § 44.9.3.4.2. \n253 Id. §§ 44.9.3, 44.9.3.4.1.  The Physical Infeasibility requirements: (i) do not establish on behalf of the \nLarge Load Project any rights or title to a Transmission Owner’s real property and (ii) do not create an obligation on \na Transmission Owner to transfer, convey or use its real property rights on behalf of the Large Load Project or to \nacquire on behalf of the Large Load Project through eminent domain or otherwise any real property. Id. § 44.9.3.4.2. \n254 Proposed OATT Attach. LL §§ 44.9.3.4.3, 44.10.4.2.  If: (i) more than one Large Load Integration \nRequest in a Group proposes to interconnect at the same Point of Interconnection on the New York State"},{"page":55,"startToken":27004,"endToken":27562,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 55 \n \n \nLarge Load Integration Request in the SIS Entry Decision Period or ALI Entry Decision Period \nto indicate a new Point of Interconnection if such modification is agreed upon by the Connecting \nTransmission Owner and does not modify the electrical characteristics of the Large Load \nProject.255 \nWithin the same 45 Calendar Day period, the Connecting Transmission Owner will also \nbe responsible for developing a one-line diagram with a preliminarily determination of \nAttachment Facilities for each Large Load Project in the Group, unless the Large Load Project is \ndetermined to be Physically Infeasible.256  \nb) \nNYISO Responsibilities in RAMP Part 1 Process \nThe NYISO proposes as part of the RAMP Part 1 Process to establish the Pre-Project \nBase Case for purposes of the short-circuit/fault duty, steady state (thermal and voltage) and \nstability analyses for the System Impact Study.257  For this base case, the NYISO will use the \nmost recent quarterly Short-Term Assessment of Reliability in its Short-Term Reliability Process \nestablished in Attachment FF of the NYISO OATT.258  As it is updated quarterly, the STAR base \ncase represents an up-to-date set of planning cases for assessing reliability impacts.  The NYISO \nwill then update the base case in the RAMP Part 2 Process to account for those Large Load \nProjects that elect in the SIS Entry Decision Period to enter the System Impact Study as \ndescribed in Part II.H.vi.    \nThe NYISO will also conduct a Resource Adequacy Evaluation of each Large Load \nProject to evaluate the adverse impact of the interconnection of the Large Load Project and any \nAssociated Resource identified in the Large Load Integration Request for the project on the \nresource adequacy of the New York Control Area.259  For this evaluation, the NYISO will apply \nthe Resource Adequacy Impact Standard as described in Part II.G.ii to determine the preliminary \namount of Firm Withdrawal Service and Non-Firm Withdrawal Service for the Large Load \nProject. \nWithin 15 Calendar Days from the NYISO’s receipt of the results of the Physical \nInfeasibility Screening from all of the identified Connecting Transmission Owners and Affected \nTransmission Owners, the NYISO will issue a summary report with the results of the Resource \n \nTransmission System and (ii) all of the Large Load Integration Requests proposing to interconnect at that location \nare not able in the aggregate to interconnect due to a Physical Infeasibility, then a Large Load Integration Request \nwith a Load Queue Position with a higher designated priority shall have priority over a Large Load Integration \nRequest with a Load Queue Position with a lower designated priority (including as between Large Load Integration \nRequests within the same Group) for access to that Point of Interconnection for purposes of Physical Infeasibility \ndeterminations.  Id. § 44.9.3.4.4. \n255 Proposed OATT Attach. LL §§ 44.9.3.4.3, 44.9.4.4. \n256 Id. §§ 44.9.3, 44.9.3.3. \n257 Id. §§ 44.1 (definition of Pre-Project Base Case), 44.9.3.1.  The NYISO will also commence the \ndevelopment of the Post-Project Base Case for purpose of short-circuit/fault duty, steady state (thermal and voltage) \nand stability analyses for the System Impact Study, which will be updated in the RAMP Part 2 Process.  Id. \n258 Proposed OATT Attach. LL § 44.9.3.1. \n259 Id. § 44.9.3.2."},{"page":56,"startToken":27562,"endToken":28088,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 56 \n \n \nAdequacy Evaluation of each Large Load Project and the results of the Physical Infeasibility \nScreening.260 \nv. \nSIS Entry Decision Period \nThe NYISO proposes to establish an SIS Entry Decision Period in which an Eligible \nCustomer may assess the information determined in the RAMP Part 1 Process and elect whether \nits Large Load Project will proceed to be evaluated in a System Impact Study or be withdrawn \nfrom the Load Queue.261  The SIS Entry Decision Period will be a seven Calendar Day period, \nwhich period will commence 61 Calendar Days after the commencement of the RAMP Part 1 \nProcess.262 \nFor a Large Load Project to be included in the System Impact Study, the Eligible \nCustomer must notify the NYISO of its election for the project to proceed to the study during the \nSIS Entry Decision Period.263  If the Eligible Customer does not make such election, then the \nNYISO will withdraw the project from the Load Queue without an opportunity to cure.264 \nDuring the SIS Entry Decision Period, the Eligible Customer may propose two types of \nmodifications to its proposed Large Load Project to account for input obtained in the RAMP Part \n1 Process.  First, the Eligible Customer may reduce the size (i.e., MW) of its Large Load Project \nfrom the size included in the Large Load Integration Request provided that the project with the \nreduced size continues to satisfy the definition of a Large Load Project.265  Second, the Eligible \nCustomer may modify the Point of Interconnection included in its Large Load Integration \nRequest to address Physical Infeasibility if such modification is agreed upon by the Connecting \nTransmission Owner and does not modify the electrical characteristics of the Large Load \nProject.266 \nvi. \nRAMP Part 2 Process \nThe NYISO proposes to establish a RAMP Part 2 Process prior to the System Impact \nStudy to update materials based on the results of the SIS Entry Decision Period and to meet with \nthe projects that elected to proceed to the System Impact Study.267  The scheduled duration of the \nRamp Part 2 Process will be 23 Calendar Days.268 \n \n260 Id. § 44.9.3. \n261 Id. § 44.1 (definition of SIS Entry Decision Period). \n262 Id. § 44.9.4.1. \n263 Id. § 44.9.4.2.   \n264 Proposed OATT Attach. LL § 44.9.4.5. \n265 Id. § 44.9.4.3. \n266 Id. § 44.9.4.4.  To implement the modification, the Eligible Customer must submit the change to the \nPoint of Interconnection using the Load Modification Form.  A change in the Point of Interconnection will result in \na change to the priority designation of the Load Queue Position assigned to the Large Load Integration Request \nbased on the date and time of the NYISO’s receipt of the Eligible Customer’s submission of the completed Load \nModification Request form. Id.  This is consistent with the NYISO’s treatment of changes to Points of \nInterconnection in its Standard Interconnection Procedures.  See OATT Attach. HH § 40.7.2.3. \n267 Proposed OATT Attach. LL § 44.1 (definition of RAMP Part 2 Process). \n268 Id. § 44.9.2.2."},{"page":57,"startToken":28088,"endToken":28710,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 57 \n \n \nFirst, the NYISO proposes to update the Post-Project Base Case for the power flow, \nstability, short-circuit, and transfer studies for the System Impact Study by adding the Large \nLoad Projects that satisfied the requirements to proceed to the System Impact Study.269  The \nNYISO may also update the assumptions in the base cases used in the System Impact Study in \naccordance with its procedures.  The NYISO will also develop the scope of the System Impact \nStudy, provide the scope to the impacted Connecting Transmission Owner(s) and any identified \nAffected Transmission Owner(s) and Affected System Operator(s) for their review, and then \nfinalize the study scope.270  The NYISO will submit the draft scope of the System Impact Study \nto its stakeholder Transmission Planning Advisory Subcommittee (“TPAS”) for review and \ncomment.271 \nSecond, the NYISO proposes to hold a group Scoping Meeting for all Eligible Customers \nincluded in the Group which Large Load Projects satisfied the requirements to proceed to the \nSystem Impact Study, along with the Connecting Transmission Owners and any Affected \nTransmission Owner(s).272  The purpose of the Scoping Meeting will be to reinforce the roles \nand responsibilities of all parties in the System Impact Study and to discuss the study scope for \nthe System Impact Study, the schedule, and the work plan.273  The NYISO, Connecting \nTransmission Owner, Affected Transmission Owner(s), and Eligible Customer will bring to the \nmeeting personnel and other resources as may be reasonably required to accomplish the purpose \nof the meeting in the time allocated for the meeting.274  The duration of the meeting will be \nsufficient to accomplish its purpose.275  \nvii. \nSystem Impact Study  \nThe NYISO proposes to perform, in coordination with Connecting Transmission \nOwner(s) and Affected Transmission Owner(s), a System Impact Study for the Group of Large \nLoad Projects for that Large Load Integration Study Process that satisfied the requirements in the \nSIS Entry Decision Period to participate in the study.276  As described below, the study will \nevaluate any potential transmission security issues for the proposed interconnection of a Large \n \n269 Id. §§ 44.1 (definition of Post Project Base Case), 44.9.5.1. \n270 Id. § 44.9.5.1. \n271 Id. § 44.9.5.3. \n272 Id. §§ 44.1 (definition of Scoping Meeting), 44.9.5.2.  The Scoping Meeting will take place no later than \n15 Business Days following the close of the SIS Entry Decision Period.  In setting the date, the NYISO will consult \nwith the Connecting Transmission Owners and Affected Transmission Owners on the review of the draft scope, with \nthe Scoping Meeting to take place no later than 15 Business Days.  The NYISO will provide notice of the Scoping \nMeeting to the contact list of the Large Load Projects that satisfied the requirements in the SIS Entry Decision \nPeriod to proceed to the System Impact Study and to the applicable Connecting Transmission Owners, Affected \nTransmission Owners, and Affected System Operators.  Id.  Before holding a Scoping Meeting with an Affiliate of a \nConnecting Transmission Owner and that Connecting Transmission Owner, the NYISO will post on its OASIS an \nadvance notice of its intent to do so.  Id. \n273 Proposed OATT Attach. LL § 44.9.5.2.   \n274 Id. § 44.9.5.2.  If the Scoping Meeting consists of more than one Eligible Customer, the Eligible \nCustomer must provide an executed non-disclosure agreement to the NYISO that provides for confidentiality of \ncommercially sensitive information identified in the Scoping Meeting pertaining to any other Eligible Customers \nprior to the start of the Scoping Meeting to participate.  Id. \n275 Proposed OATT Attach. LL § 44.9.5.2.   \n276 Id. § 41.1 (definition of System Impact Study)."},{"page":58,"startToken":28710,"endToken":29243,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 58 \n \n \nLoad Project, will preliminarily identify and cost estimate any required Network Upgrades, and \nwill preliminarily determine the Withdrawal Service for which the project is eligible.  There will \nnot, however, be a System Impact Study for the Transition Large Load Integration Study \nProcess, as the NYISO already performed a system impact study for the projects participating in \nthe transition process pursuant to its existing load interconnection rules in Section 3.9 of the \nOATT.277  The System Impact Study will be performed over a 90-Calendar Day period between \nthe start of the study and the NYISO and Transmission Owners’ provision of the draft System \nImpact Study report to Eligible Customers for their review.278 \na) \nPerformance of System Impact Study  \nThe NYISO proposes that the System Impact Study be performed on a combined basis \nfor the Group of Large Load Projects that satisfied the requirements to proceed to the study.279  \nThe performance of the System Impact Study will be divided between the NYISO and the \napplicable Transmission Owner(s), with the NYISO performing analyses for the Bulk Electric \nSystem, and the applicable Transmission Owner performing analyses on the non-Bulk Electric \nSystem. \nIn particular, the NYISO will perform short-circuit/fault duty, steady state (thermal and \nvoltage) and stability analyses for the Bulk Electric System pursuant to the scope of the System \nImpact Study and the Transmission Security Standard.280  The NYISO will provide the study \nresults to the applicable Transmission Owner(s) within 45 Calendar Days from the \ncommencement of the System Impact Study.281  The applicable Transmission Owner(s) will \nperform these analyses for the non-Bulk Electric System and may perform bus flow analysis on \nthe Bulk Electric System and non-Bulk Electric System.282  The applicable Transmission \nOwner(s) will provide the results of its analyses to the NYISO within 30 Calendar Days from the \nNYISO’s provision of the Bulk Electric System results.283   \nWithin the same 30-Calendar Day period the impacted Connecting Transmission \nOwner(s) and Affected Transmission Owner(s) will preliminarily identify Network Upgrades \nrequired to mitigate any transmission security impacts resulting from the proposed \ninterconnection of the Large Load Project(s).284  The applicable Transmission Owner will \nprovide preliminary, non-binding estimates of the costs and the time to construct the Network \nUpgrades.285  In addition, the applicable Transmission Owner will provide any updates to the \n \n277 Id. § 44.10.1.1.3. \n278 Id. § 44.10.1.1.1.  The NYISO will notify stakeholders within 5 Business Days of the start date of the \nstudy the scope of the study and the list of Large Load Projects participating in the study.  Id. § 44.10.1.1.2. \n279 Proposed OATT Attach. LL § 44.10.2.1. \n280 Id. § 44.10.2.2. \n281 Id. § 44.10.2.2. \n282 Id. § 44.10.2.2.  Certain Transmission Owners may perform bus flow and certain other analyses for both \nthe Bulk Electric System and the non-Bulk Electric System for purposes of evaluating the capabilities of the \nAttachment Facilities.    \n283 Proposed OATT Attach. LL § 44.10.2.2. \n284 Id. §§ 44.10.2.3, 44.10.2.5. \n285 Id. § 44.10.2.3."},{"page":59,"startToken":29243,"endToken":29715,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 59 \n \n \nAttachment Facilities preliminarily identified in the RAMP Part 1 Process and a preliminary, \nnon-binding estimate of the costs and time to construct the Attachment Facilities.286 \nFinally, the NYISO will determine preliminary amounts of Firm Withdrawal Service and \nNon-Firm Withdrawal Service for each Large Load Project and, if requested, whether any \nportion of a Large Load Project is eligible to be classified as a Zero Withdrawal Service Load.287 \nb) \nReview of System Impact Study Report \nThe NYISO proposes that it will provide, in coordination with the Connecting \nTransmission Owner(s) and Affected Transmission Owner(s), the draft System Impact Study \nReport to the Eligible Customer(s) which Large Load Project(s) are in the Group studied in the \nSystem Impact Study within 90 Calendar Days of the commencement of the study.288  The \nNYISO and applicable Transmission Owner(s) may then meet with the Eligible Customer(s) to \ndiscuss the study results.289  The Eligible Customers may provide comments for the NYISO’s \nand Transmission Owners’ consideration on the draft report.290  The NYISO will then submit the \nfinal System Impact Study Report to the TPAS for review and comment and to the stakeholder \nOperating Committee (“OC”) for its approval.291  Following this approval, the NYISO will post \nthe final System Impact Study Report on its password-protected website.292 \nviii. \nALI Entry Decision Period \nThe NYISO proposes to establish an ALI Entry Decision Period in which an Eligible \nCustomer may assess the information determined in the Initial Study Process and elect whether \nits Large Load Project will proceed to be evaluated in the Assessment of Load Integration and \nFacilities Study or be withdrawn from the Load Queue.293  The ALI Entry Decision Period will \napply to all Large Load Projects that were included in either Group 1 or Group 2 in the Initial \nStudy Phase of that Large Load Integration Study Process cycle (or in the Group for the \nTransition Large Load Integration Study Process) and were not determined to be Physically \nInfeasible.294 \nThe ALI Entry Decision Period will commence for the Transition Large Load Integration \nStudy Process following the conclusion of the Resource Adequacy and Modeling Period.295  For \nsubsequent Large Load Integration Study Processes, the ALI Entry Decision Period will \ncommence following the Operating Committee’s approval of the System Impact Study Report \n \n286 Id. § 44.10.2.4. \n287 Id. § 44.10.2.2. \n288 Id. §§ 44.1 (definition of System Impact Study Report), 44.10.3.1. \n289 Proposed OATT Attach. LL § 44.10.3.1. \n290 Id. § 44.10.3.1. \n291 Id. § 44.10.3.2. \n292 Id. § 44.10.3.2. \n293 Id. § 44.1 (definition of ALI Entry Decision Period), \n294 Id. § 44.10.4.1. \n295 Proposed OATT Attach. LL § 44.10.4.1."},{"page":60,"startToken":29715,"endToken":30355,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 60 \n \n \nfor Group 2 at the conclusion of the Initial Study Round 2 for the Initial Study Phase of that \nstudy cycle.296  The ALI Entry Decision Period will be a seven Calendar Day period.297 \nThe NYISO proposes that the Eligible Customer must satisfy the following requirements \nduring the ALI Entry Decision Period for its Large Load Project to be included in the \nAssessment of Load Integration and Facilities Study.298  If the Eligible Customer does not satisfy \nthese requirements, then the NYISO will withdraw the project from the Load Queue without an \nopportunity to cure.299 \nFirst, the NYISO proposes that the Eligible Customer must notify the NYISO of its \nelection for its Large Load Project to proceed to the Assessment of Load Integration.300  Second, \nthe NYISO proposes that the Eligible Customer must also satisfy a readiness requirement to \nproceed.  In particular, the Eligible Customer must submit a Readiness Deposit for its Large \nLoad Project, which will evidence its commercial readiness to proceed.301  The NYISO proposes \nto calculate the Readiness Deposit as $4,000 per MW based on the Large Load Project’s peak \nMW amount.302  As described in the Nguyen Affidavit, this is consistent with the per MW \namount for the Readiness Deposit 1 required in the NYISO’s Standard Interconnection \nProcedures previously accepted by the Commission.303 \nThird, except for participants in the Transition Large Load Integration Study Process, the \nEligible Customer must submit to the NYISO the Study Deposit 2 to account for the additional \nstudy work for the Assessment of Load Integration.304  The Study Deposit 2 will be the \nincremental difference between the Study Deposit 1 amount that the Eligible Customer \npreviously submitted for the Large Load Project and the following amount based on the size of \nthe Large Load Project: (i) $200,000 for a Large Load Project less than 200 MW, (ii) $250,000 \nfor a Large Load Project that is both less than 500 MW and greater than or equal to 200 MW, \nand (iii) $300,000 for a Large Load Project that is 500 MW or greater.305  The Study Deposit 1 \namount for the Large Load Project and the incremental difference submitted by the Eligible \nCustomer for the ALI Entry Decision Period will, in total, constitute the Study Deposit 2 for the \n \n296 Id. § 44.10.4.1.  The ALI Entry Decision Period for Group 1 may commence as soon as practicable but \nno sooner than the completion of the Facilities Study conducted by the Transmission Owner(s) for the previous \ncycle (i) if there are no validated Large Load Integration Requests seeking to participate in Group 2 following the \ndeadline to enter Group 2, or (ii) after the withdrawal of the last validated Large Load Integration Request in Group \n2 if all validated Large Load Integration Requests in Group 2 have withdrawn prior to completion of the System \nImpact Study for Group 2.  Id. \n297 Proposed OATT Attach. LL § 44.10.4.1. \n298 Id. § 44.10.4.2.  The Eligible Customer’s participation in a Facilities Study is also subject to it satisfying \nthe Transmission Owner’s requirements for such study.  Id. \n299 Id. § 44.10.4.4. \n300 Id. § 44.10.4.2.   \n301 Id. § 44.10.4.2.   \n302 Proposed OATT Attach. LL §§ 44.1 (definition of Readiness Deposit), 44.10.4.2.   \n303 Nguyen Affidavit at P 26; see also OATT Attach. HH § 40.7.5.3. \n304 Proposed OATT Attach. LL §§ 44.1 (definition of Study Deposit 2), 44.10.4.2.  As described above, an \nEligible Customer for a Large Load Project in the Transition Large Load Integration Study Process will be required \nto submit this higher deposit amount with its Large Load Integration Request.   \n305 Proposed OATT Attach. LL § 44.10.4.2."},{"page":61,"startToken":30355,"endToken":30912,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 61 \n \n \nLarge Load Project and replace the Study Deposit 1 for the project.306  The NYISO will hold the \nStudy Deposit 2 amount for the duration of Eligible Customer’s participation in the Large Load \nIntegration Study Process, subject to the deposit requirements described in Part III.B.i.c.307 \nFinally, the Eligible Customer may indicate, if it did not do so with its Large Load \nIntegration Request, whether its Large Load Project is eligible to be a State Exempt Large Load \nProject.308  In such case, the Eligible Customer must also submit a State Exempt Large Load \nProject Verification.  \nDuring the ALI Entry Decision Period, the Eligible Customer may propose three types of \nmodifications to its proposed Large Load Project to account for input obtained in the Initial \nStudy Phase.  First, the Eligible Customer may reduce the size (i.e., MW) of its Large Load \nProject from the size included in the Large Load Integration Request or from a previous \nreduction of the project size during the SIS Entry Decision Period.309  Second, the Eligible \nCustomer may modify the Point of Interconnection included in its Large Load Integration \nRequest for its Large Load Project to address Physical Infeasibility if such modification is agreed \nupon by the Connecting Transmission Owner and does not modify the electrical characteristics \nof the Large Load Project.310  Finally, the Eligible Customer may include or change the \nAssociated Resources, including Partner Resources and Co-Located Resources, that satisfy the \ntariff requirements for an Associated Resource.311 \nI. \nAssessment of Load Integration (“ALI”) and Facilities Study \ni. \nAssessment of Load Integration \nThe NYISO proposes to perform an Assessment of Load Integration by which it will \nupdate its analyses of the remaining Group of Large Load Projects in the Large Load Integration \nStudy Process that satisfied the requirements to proceed in the ALI Entry Decision Period.312  \nThe Assessment of Load Integration will consist of two parts – the ALI Part 1 Study and the ALI \nPart 2 Study as described below.313  The NYISO will perform the Assessment of Load \nIntegration in parallel and in coordination with the Transmission Owners’ performance of \nFacilities Studies for these projects.314  As described below, the NYISO will provide the \nTransmission Owners with updated information from the Assessment of Load Integration of the \n \n306 Id. § 44.10.4.2.   \n307 Id. § 44.10.4.2.   \n308 Id. § 44.10.4.2.   \n309 Id. § 44.10.4.3. \n310 Id. § 44.10.4.3.  The Eligible Customer must submit to the NYISO any requested change to the Point of \nInterconnection through a Load Modification Request.  In such case, the NYISO will modify the priority designation \nfor the Load Queue Position assigned to the Large Load Integration Request based on the date and time of the \nNYISO’s receipt of the completed Load Modification Request form.  The NYISO will notify the Connecting \nTransmission Owner and Affected Transmission Owner of this change when notifying the Eligible Customer of its \nmodified Load Queue Position.  Id. \n311 Proposed OATT Attach. LL § 44.10.4.3. \n312 See proposed OATT Attach. LL § 44.1 (definition of Assessment of Load Integration). \n313 Proposed OATT Attach. LL §§ 44.1 (definitions of ALI Part 1 Study and ALI Part 2 Study), 44.11.1.4. \n314 Id. § 44.11.1.3."},{"page":62,"startToken":30912,"endToken":31422,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 62 \n \n \nLarge Load Project’s proposed interconnection to facilitate the Transmission Owners’ \nidentification and cost allocation of Network Upgrades in the Facilities Study. \nThe Assessment of Load Integration will have a scheduled duration of one year.  It will \ncommence following the latter of: (i) the completion of the ALI Entry Decision Period or (ii) the \ncompletion of the Assessment of Load Integration and Facilities Study for the previous \nTransition Large Load Integration Study Process or Large Load Integration Study Process.315 \na) \nBase Case for Assessment of Load Integration  \nThe NYISO proposes to use for the base cases of the Assessment of Load Integration, as \napplicable, the base cases described in Parts II.G.ii and II.G.iii above for the performance of the \nResource Adequacy Impact Standard and Transmission Security Standard.316  The NYISO \nproposes that it may update the assumptions in these base cases, including any updates received \nfrom Connecting Transmission Owners and Affected Transmission Owners on the Large Load \nProjects and associated Network Upgrades that have been studied in a previous cycle of the \nLarge Load Integration Study Process, in accordance with the NYISO’s procedures.317  Within 5 \nBusiness Days following the completion of the ALI Entry Decision Period, the Connecting \nTransmission Owners and Affected Transmission Owners will provide any updates for the \nNYISO to review and incorporate in the assumptions in the base cases.318  In addition, the \nNYISO will develop the scope of the ALI Part 1 Study, which it will provide to the impacted \nConnecting Transmission Owners and Affected Transmission Owners for their review.319  The \nNYISO will also provide the base cases that it will use for the Assessment of Load Integration to \nthe impacted Connecting Transmission Owners and Affected Transmission Owners.320 \nb) \nALI Part 1 Study \nThe NYISO proposes for the ALI Part 1 Study that it will evaluate the impact on the Bulk \nElectric System of the proposed interconnection of the Large Load Projects that satisfied the \nrequirements to enter the Assessment of Load Integration.321  For this evaluation, the NYISO \nwill use: (i) the Resource Adequacy Impact Standard, as applicable, for the individual Large \nLoad Projects (except for State Exempt Large Load Projects) and for the collective group of any \nState Exempt Large Load Projects and (ii) the Transmission Security Standard for the Group of \nLarge Load Projects, including confirming each Large Load Project’s contribution to any \nobserved transmission security violations.322 \nWithin 150 Calendar Days from the end of the ALI Entry Decision Period, the NYISO \nwill provide the applicable Transmission Owners with any transmission security violations \nidentified in the ALI Part 1 Study for use by the Transmission Owner in the Facilities Study to \n \n315 Id. §§ 44.11.1.1, 44.11.1.2. \n316 Id. § 44.11.1.5. \n317 Id. § 44.11.1.5. \n318 Id. § 44.11.1.5. \n319 Proposed OATT Attach. LL § 44.11.1.5. \n320 Id. § 44.11.1.5. \n321 Id. § 44.11.2.1. \n322 Id. § 44.11.2.1."},{"page":63,"startToken":31422,"endToken":31904,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 63 \n \n \ndesign Network Upgrades to mitigate the violations.323  The NYISO will also provide the \napplicable Transmission Owners with each Large Load Project’s contribution to the identified \nviolations for use by the Transmission Owner in the Facilities Study to allocate the costs of \nNetwork Upgrades among the Large Load Projects.324 \nBased on the evaluations in the ALI Part 1 Study, the NYISO will update the amount of \nFirm Withdrawal Service and Non-Firm Withdrawal Service for each Large Load Project and, if \nrequested, whether any portion of a Large Load Project is eligible to be classified as a Zero \nWithdrawal Service Load.325  The NYISO will provide the draft study results to Eligible \nCustomers and Transmission Owners for their review.326  This will include: (i) the violations \nidentified in the ALI Part 1 Study, (ii) the Large Load Project’s contribution percentages to the \nidentified violations, (iii) the amount of Firm Withdrawal Service and Non-Firm Withdrawal \nService for each Large Load Project; and (iv) if requested, whether any portion of the Large \nLoad Project is eligible to be classified as a Zero Withdrawal Service Load.327   \nThe NYISO will also perform sensitivities based on its engineering judgment to identify \nhow the violations and contribution percentages determined in ALI Part 1 could change if one or \nmore Large Load Projects withdraw, elect to obtain Non-Firm Withdrawal Service in lieu of \nNetwork Upgrades, or fail to accept its cost allocation and post security in accordance with the \nFacilities Study requirements.328  The NYISO will provide the Transmission Owners with the \nresults of any sensitivities performed by the NYISO in ALI Part 1 for use by the Transmission \nOwner in the Facilities Study.329 \nc) \nALI Part 2 Study \nFor the ALI Part 2 Study, the NYISO will review and confirm that the Non-Local \nNetwork Upgrades designed by Transmission Owners in the Facilities Studies resolve the \nviolation(s) identified in the ALI Part 1 Study and do not result in new violations.330  If a \nTransmission Owner in a Facilities Study identifies the need for an additional Non-Local \nNetwork Upgrade or a Local Network Upgrade that the Transmission Owner believes impacts \nthe Bulk Electric System, the NYISO will review and confirm that such Network Upgrade does \nnot result in new violations on the Bulk Electric System.  The NYISO will notify the applicable \nTransmission Owner of the NYISO’s review within 30 Calendar Days of the NYISO’s receipt of \nthe upgrade identified by the Transmission Owner.331 \nii. \nFacilities Study \n \n323 Id. § 44.11.2.2. \n324 Id. § 44.11.2.2. \n325 Proposed OATT Attach. LL § 44.11.2.3. \n326 Id. § 44.11.2.4. \n327 Id. § 44.11.2.4. \n328 Id. § 44.11.2.5. \n329 Id. § 44.11.2.5. \n330 Id. § 44.11.3.1. \n331 Proposed OATT Attach. LL § 44.11.3.1."},{"page":64,"startToken":31904,"endToken":32402,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 64 \n \n \nThe NYISO proposes that the Facilities Studies for a Large Load Project be performed, \nas applicable, by the Connecting Transmission Owner to which system the project proposes to \ninterconnect and any Affected Transmission Owner which system is impacted by the project.332  \nConsistent with the NYISO’s existing load interconnection process and the NYISO’s other \ninterconnection procedures, the Transmission Owner is responsible for determining the required \nAttachment Facilities and Network Upgrades for its system and estimating the costs and \nschedule for constructing such facilities.333  As described below, in the Facilities Study, the \nTransmission Owner will further determine the Attachment Facilities and Network Upgrades \nrequired for the reliable interconnection of the Large Load Project, identify the estimated costs \nand schedule to construct these facilities, and allocate the cost of the facilities among the \napplicable Large Load Projects.  The Transmission Owner will commence the Facilities Study \nfor a Large Load Project no later than the NYISO’s commencement of the Assessment of Load \nIntegration for the project.334 \nThe Transmission Owner will tender the Eligible Customer a Facilities Study \nagreement.335  In the agreement, the Eligible Customer must agree to reimburse the Transmission \nOwner(s) for performing the required Facilities Study and provide the study deposit required by \nthe Transmission Owner.336  The Eligible Customer must execute a Facilities Study agreement, \ncomply with any requirements of the Transmission Owner(s), and return the agreement to the \nTransmission Owner(s).337  The Transmission Owners will include the pro forma Facilities Study \nagreement in their separate Section 205 filing(s). \na) \nPerformance of Facilities Study \nThe Connecting Transmission Owner will coordinate with any Affected Transmission \nOwners and Affected System Operators concerning the performance of the Facilities Studies.338 \nThe applicable Transmission Owner may group Large Load Projects as appropriate for the \nperformance of the Facility Study.339 \nThe Connecting Transmission Owner and Affected Transmission Owner will design the \nAttachment Facilities and Local Network Upgrades required to reliably interconnect the Large \nLoad Project with the New York State Transmission System in accordance with Applicable \nReliability Requirements, Applicable Laws and Regulations, and Good Utility Practice.340  The \n \n332 See proposed OATT Attach. LL § 44.1 (definition of Facilities Study). \n333 For the NYISO’s Cluster Study Process and Transmission Interconnection Procedures, the NYISO \ncoordinates with the Transmission Owner concerning the identification of non-local upgrades and the Transmission \nOwner designs the upgrades and determines the estimate of the costs and the schedule for constructing such \nupgrades. \n334 Proposed OATT Attach. LL § 44.12.1.1. \n335 Id. § 44.12.1.2. \n336 Id. § 44.12.1.2. \n337 Id. § 44.12.1.2. \n338 Id. § 44.12.1.3. \n339 Id. § 44.12.1.3. \n340 Proposed OATT Attach. LL § 44.12.1.4.  Local Network Upgrades include Network Upgrades \nnecessary to physically interconnect a proposed Large Load Project to the Connecting Transmission Owner’s \ntransmission system, consistent with applicable interconnection and system protection design.  Id. § 44.1 (definition"},{"page":65,"startToken":32402,"endToken":32947,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 65 \n \n \nConnecting Transmission Owner and Affected Transmission Owner will provide an estimate of \nthe cost of the Attachment Facilities and Local Network Upgrades, along with a schedule \nshowing the estimated time required to complete the engineering and design, procurement, \nconstruction, installation, and commissioning phases for the required Attachment Facilities and \nLocal Network Upgrades.341 \nEach Connecting Transmission Owner and Affected Transmission Owner will also assess \nthe impact of the proposed interconnection of the Large Load Project on the non-Bulk Electric \nSystem and the distribution system using the Transmission Security Standard.342  As necessary, \nthe Connecting Transmission Owner and Affected Transmission Owner may perform additional \nanalyses, including, but not limited to, bus flow analysis for the Bulk Electric System and the \nnon-Bulk Electric System affected by the proposed interconnection of the Large Load Project.  \nThe Connecting Transmission Owner and Affected Transmission Owner will design Non-Local \nNetwork Upgrades to resolve violations on the non-Bulk Electric System or distribution system \nor violations related to bus flow analysis on the Bulk Electric System and will provide a good \nfaith cost estimate for such upgrades, along with a preliminary schedule showing the estimated \ntime required to complete the engineering and design, procurement, construction, installation, \nand commissioning phases for the required Non-Local Network Upgrades for their respective \nfacilities.343 \nFinally, following the NYISO’s completion of the ALI Part 1 Study, the Connecting \nTransmission Owner and Affected Transmission Owner will design Non-Local Network \nUpgrades required to address violations on the Bulk Electric System identified in the ALI Part 1 \nStudy.344  The Connecting Transmission Owner and Affected Transmission Owner will provide a \ngood faith cost estimate for such upgrades, along with a preliminary schedule showing the \nestimated time required to complete the engineering and design, procurement, construction, \ninstallation, and commissioning phases for the required Non-Local Network Upgrades.345  The \nTransmission Owner will provide the Non-Local Network Upgrades to the NYISO for its review \nin the ALI Part 2 Study within 120 Calendar Days of the NYISO providing any transmission \nsecurity violations identified in the ALI Part 1 Study.346  The NYISO and Transmission Owner \nwill coordinate to confirm: (i) whether the Non-Local Network Upgrades fully resolve the \n \nof Local Network Upgrades).  They include any electrical facilities required to make the physical connection (e.g., a \nnew ring bus for a line connection or facilities required to create a new bay for a substation connection).  Id.  They \nalso include any system protection or communication facilities that may be required for protection of the Connecting \nTransmission Owner’s and/or Affected Transmission Owner’s transmission facility (line or substation) involved in \nthe interconnection.  Id. \n341 Proposed OATT Attach. LL § 44.12.1.4. \n342 Id. § 44.12.1.5. \n343 Id. § 44.12.1.5. \n344 Id. § 44.12.1.6.  Non-Local Network Upgrades include Network Upgrades required to mitigate any \nadverse reliability impact(s) of the Large Load Project(s) identified through analysis such as power flow, short \ncircuit, or stability (e.g., replacement of a circuit breaker at a nearby substation that becomes overdutied as a result \nof the Large Load Project(s)).  Id. § 44.1 (definition of Non-Local Network Upgrades).   \n345 Proposed OATT Attach. LL § 44.12.1.6. \n346 Id. § 44.12.1.6."},{"page":66,"startToken":32947,"endToken":33416,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 66 \n \n \nidentified violations on the Bulk Electric System or create additional violations and (ii) whether \nfurther refinement in the determination of any Non-Local Network Upgrades is required.347 \nb) \nConsideration of Alternative Transmission Technologies \nIn the Show Cause Order, the Commission directed the NYISO to propose tariff revisions \nto require (1) the evaluation of alternative transmission technologies as potential solutions to \naccommodate an Eligible Customer’s request for transmission service on behalf of a large load, \nand (2) if alternative transmission technologies are not identified, to include in the study report a \nsufficiently clear demonstration of why alternative transmission technologies are not feasible or \nwould not result in lower costs or a faster timeline for accommodating the transmission service \nrequest.348 \nThe NYISO proposes that the Transmission Owner consider in identifying the Network \nUpgrades in the Facilities Study the use of static synchronous compensators, static VAR \ncompensators, advanced power flow control devices, transmission switching, synchronous \ncondensers, voltage source converters, advanced conductors, and tower lifting.349  The \nTransmission Owner will consider each alternative transmission technology that could \nreasonably be implemented to address the identified violation or constraint and determine \nwhether the above technologies should be used, consistent with Good Utility Practice, \nApplicable Reliability Requirements, and Applicable Laws and Regulations.350  The \nTransmission Owner will provide an explanation of the results for each technology.351 \nc) \nCompletion of Facilities Study \nAt the conclusion of the Facilities Study, the Connecting Transmission Owner and \nAffected Transmission Owner will require the Large Load Project to accept the cost allocation of \nany required Attachment Facilities and Network Upgrades and to post security to cover the \nallocated cost, consistent with the terms of the Transmission Owner’s cost recovery agreement \nand security agreement.352  If the Large Load Project does not satisfy a milestone demonstrating \nits acceptance of its cost responsibility for Network Upgrades and Attachment Facilities in \naccordance with the requirements established by the applicable Transmission Owner within 14 \nCalendar Days of the completion of the Facilities Study, the applicable Transmission Owner will \nnotify the NYISO, and the NYISO will withdraw the Large Load Project from the Load \nQueue.353 \nThe Connecting Transmission Owner and Affected Transmission Owner will inform the \nNYISO of the results of the Facilities Study, including: (i) any Network Upgrades identified for \neach Large Load Project and their estimated cost and time to construct and enter service, and (ii) \n \n347 Id. § 44.12.1.6. \n348 Show Cause Order at PP 67-68.  Alternatively, the Show Cause Order permitted the NYISO to explain \nwhether its tariffs remained just and reasonable without these revisions. \n349 Proposed OATT Attach. LL § 44.12.1.7. \n350 Id. § 44.12.1.7. \n351 Id. § 44.12.1.7. \n352 Id. § 44.12.1.8. \n353 Id. § 44.12.1.8."},{"page":67,"startToken":33416,"endToken":33858,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 67 \n \n \nwhether the Eligible Customer for the Large Load Project accepted its cost allocation for any \nNetwork Upgrades and posted the related security.354 \niii. \nConclusion of Large Load Integration Study Process \nIn the Show Cause Order, the Commission indicated that the NYISO’s current tariff \nappears unjust and unreasonable because it does not require the provision of data on NYISO’s \nwebsite in a single location and in an easily accessible format that is searchable and allows users \nto filter the data that identifies the Network Upgrades that are needed to accommodate requests \nfor transmission service by Eligible Customers on behalf of large loads, and the costs of those \nNetwork Upgrades.355   \nThe NYISO proposes to provide details on its website concerning the results of the Large \nLoad Integration Study Process following its completion of the Assessment of Load Integration \nand the Transmission Owners’ provision to the NYISO of the final results of the Facilities \nStudies.  In particular, the NYISO will notify stakeholders of the completion of the Large Load \nIntegration Study Process for the Group of Large Load Projects.  The NYISO will post on its \nwebsite a summary in an easily accessible format that is searchable and allows users to filter the \ndata that provides: (i) each Large Load Project’s final amount of Firm Withdrawal Service and \nNon-Firm Withdrawal Service and, if requested, its eligibility to be classified as a Zero \nWithdrawal Service Load, (ii) the Network Upgrades identified for each Large Load Project as \nprovided by the Connecting Transmission Owner and/or Affected Transmission Owner, and (iii) \nthe cost of the Network Upgrades.356   \nThe NYISO proposes that after its final reconciliation of the Eligible Customer’s costs \nincurred in the Large Load Integration Study Process and Eligible Customer’s payment of all \ninvoices, the NYISO will proceed with the return and cancellation process for the Study Deposit \nand Readiness Deposit as described in Part III.B.i.c.357 \nJ. \nAffected Systems \nThe NYISO proposes tariff revisions in Attachment LL to address how Affected System \nimpacts of load interconnections will be assessed within the New York Control Area and how \nthe NYISO will coordinate with neighboring regions – External Affected Systems – concerning \nthe impacts of load interconnections. \ni. \nCoordination with Affected Systems within the New York Control Area \nThe NYISO proposes to coordinate the conduct of any studies required to determine the \nimpact of the Large Load Integration Request on Affected Systems within the New York Control \n \n354 Id. § 44.12.1.9. \n355 Show Cause Order at P 82. \n356 Proposed OATT Attach. LL § 44.11.4.1. \n357 Id. § 44.11.4.1."},{"page":68,"startToken":33858,"endToken":34475,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 68 \n \n \nArea with Affected System Operators, as soon as they are identified.358  The NYISO will include \nthose results on Affected System Operators’ and Affected Transmission Owners’ systems in the \nLarge Load Integration Study Process within the time frame specified in the Large Load \nIntegration Procedures.359   The NYISO will invite such Affected System Operators to all \nmeetings held with the Eligible Customer as required by the Large Load Integration \nProcedures.360  The Eligible Customer must cooperate with the NYISO in all matters related to \nthe conduct of studies and the determination of modifications to Affected Systems.361  An \nAffected System Operator, the NYISO, and Connecting Transmission Owner with whom \ninterconnection has been requested will cooperate with each other in all matters related to the \ntype and/or conduct of studies and the determination of modifications to Affected Systems.362 \nii. \nCoordination with External Affected Systems \nThe NYISO proposes to establish requirements concerning how it will coordinate with its \nneighboring regions – External Affected Systems – concerning the coordination and study of the \nimpacts of load projects proposing to interconnect in New York or in a neighboring region.363  \nThe NYISO’s proposal to establish separate requirements for coordination with External \nAffected Systems is consistent with its approach in its Standard Interconnection Procedures. \nFor  Large Load Projects proposing to interconnect in the NYISO’s region, the NYISO \nproposes to identify potential impacts on External Affected Systems during the Resource \nAdequacy and Modeling Period once the Large Load Projects participating in the Group for the \nLarge Load Integration Study Process have been confirmed.364  At the time of initial notification, \nthe NYISO will provide an impacted Eligible Customer with a list of potential Affected Systems, \nalong with relevant contact information for such systems.365  The NYISO will coordinate the \nconduct of any studies required to determine the impact of the Large Load Integration Request \non External Affected Systems with External Affected System Operators.366 Eligible Customer \nwill cooperate with the NYISO and External Affected System Operator in all matters related to \n \n358 Id. § 44.13.1.1.  The Affected System Operator can be identified by its own accord, by the Connecting \nTransmission Owner, by the NYISO, or by members of the NYISO’s Operating Committee or Transmission \nPlanning Advisory Subcommittee of the NYISO’s Operating Committee.  Id. \n359 Proposed OATT Attach. LL § 44.13.1.2.  For identified Affected Transmission Owner(s) of facilities \nthat are electrically adjacent to the Point of Interconnection and that have design criteria, operational criteria, or \nother local planning criteria applicable to either (1) the substation to which the Eligible Customer proposes to \ninterconnect; or (2) the substation that will be required to be built to accommodate the interconnection, the NYISO \nwill provide such Affected Transmission Owner(s) with the opportunity to review and provide comments on all \nstudy scopes, study reports and drafts thereof for the project, and will be included on communications regarding the \nproject and meetings discussing the project or any of its studies, where such communications or meetings involve \nthe NYISO, Eligible Customer, and Connecting Transmission Owner.  Id. § 44.13.1.3. \n360 Proposed OATT Attach. LL § 44.13.1.2. \n361 Id. § 44.13.1.2. \n362 Id. § 44.13.1.2. \n363 Id. § 44.1 (definitions of External Affected System and External Affected System Operator). \n364 Id. § 44.13.2.1.  If the NYISO subsequently identifies additional or changes to potential impacts on an \nExternal Affected System during the performance of the Large Load Integration Study Process, the NYISO will \nnotify the External Affected System Operator of the impacts.  Id. \n365 Proposed OATT Attach. LL § 44.13.2.2. \n366 Id. § 44.13.2.3."},{"page":69,"startToken":34475,"endToken":34992,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 69 \n \n \nthe conduct of studies and the determination of modifications to the External Affected \nSystems.367  Any work on or impacting the External Affected System that is required for the \nreliable interconnection of the Large Load Project must be completed prior to the Large Load \nProject entering service.368  However, the Eligible Customer may coordinate with the NYISO, \napplicable Transmission Owner(s), and External Affected System Operator concerning any \nlimited operation, including any related studies, prior to the required work on the External \nAffected System being completed.369 \niii. \nStudy of Impacts to New York State Transmission System of an Affected \nSystem Eligible Customer’s Proposed Interconnection to Another Region’s \nTransmission System \nThe NYISO proposes to establish its responsibilities when it receives notification that a \ncustomer in another region – an Affected System Eligible Customer – is proposing to \ninterconnect a load project to another region’s transmission system that may impact the New \nYork State Transmission System.370  In such case, the NYISO will cooperate with the other \nregion in all matters related to the conduct of studies and the determination of modifications to \nthe New York State Transmission System.371 \na) \nResponse to Notification  \nWhen the NYISO receives initial notification based on the applicable interconnection \nstudy or restudy in another region that an Affected System Eligible Customer’s proposed \ninterconnection of a load project to another region’s transmission system may impact the New \nYork State Transmission System, the NYISO must respond in writing within 20 Business Days \nwhether it intends to conduct an Affected System Load Study.372  By 15 Business Days after the \nNYISO responds with its affirmative intent to conduct an Affected System Load Study, the \nNYISO will share with Affected System Eligible Customer(s) and its host region a non-binding \ngood faith estimate of the cost and the schedule to complete the Affected System Load Study.373 \nb) \nAffected System Load Queue Position  \n \n367 Id. § 44.13.2.3. \n368 Id. § 44.13.2.3. \n369 Id. § 44.13.2.3. \n370 Id. § 44.1 (definition of Affected System Eligible Customer). \n371 Proposed OATT Attach. LL § 44.13.3.1. \n372 Proposed OATT Attach. LL § 44.13.3.1.1.1.  Within 5 Business Days of receipt of notification of a \nrestudy of the applicable interconnection study in another region, the NYISO will send written notification to \nAffected System Eligible Customer(s) involved in the restudy and the host transmission provider that the NYISO \nintends to delay a planned or in-progress Affected System Load Study until after completion of the restudy.  If the \nNYISO decides to delay the Affected System Load Study, it is not required to meet its obligations concerning the \nAffected System Load Study until the time that it receives notification from the host transmission provider that the \nrestudy is complete. If the NYISO decides to move forward with its Affected System Load Study despite the \nrestudy, then it must meet all of the tariff requirements for the study.  Id. § 44.13.3.1.1.2. \n373 Proposed OATT Attach. LL § 44.13.3.1.1.1."},{"page":70,"startToken":34992,"endToken":35553,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 70 \n \n \nThe NYISO proposes to assign an Affected System Load Queue Position to Affected \nSystem Eligible Customer(s) that require(s) an Affected System Load Study.374  The Affected \nSystem Load Queue Position will be assigned based upon the date of execution of the Affected \nSystem Load Study Agreement.375  The NYISO will study the Affected System Eligible \nCustomer(s) that are all interconnecting in a particular region in a consolidated Group, and all \nAffected System Eligible Customers studied in the same Group will be equally queued.376  For \nAffected System Eligible Customers that are equally queued, the Affected System Load Queue \nPosition will have no bearing on the assignment of Affected System Network Upgrades \nidentified in the applicable Affected System Load Study.377  The NYISO proposes that the costs \nof the Affected System Network Upgrades be allocated among the Affected System Eligible \nCustomers in accordance with the requirements in Attachment P to the ISO OATT as described \nbelow.378 \nc) \nAffected System Load Study Agreement \nThe NYISO proposes to provide to Affected System Eligible Customer(s) an Affected \nSystem Load Study Agreement or a Multiparty Affected System Load Study Agreement, as \napplicable, within 10 Business Days of the NYISO sharing the schedule for the Affected System \nLoad Study, unless otherwise agreed upon.379  The NYISO proposes to establish these form study \nagreements in Appendices 4 and 5 of Attachment LL.  The study agreements are consistent with \nthe agreements used in the NYISO’s Standard Interconnection Procedures.  The NYISO will \ninvoice the Affected System Eligible Customer(s) for the actual cost of the Affected System \nLoad Study, and the NYISO will notify Affected System Eligible Customer’s host region of any \nfailure to pay.380 \nThe Affected System Eligible Customer(s) must execute, as applicable, the Affected \nSystem Load Study Agreement or Multiparty Affected System Load Study Agreement, deliver \nthe executed agreement to the NYISO, and provide the study deposit in the amount of $100,000 \nwithin 10 Business Days of receipt.381  If the Affected System Eligible Customer does not \nprovide all required technical data when it delivers the study agreement, the NYISO will notify \nthe deficient Affected System Eligible Customer, as well as its host region, of the technical data \ndeficiency within 10 Business Days of the receipt of the executed study agreement.382  The \ndeficient Affected System Eligible Customer must cure the technical data deficiency within 10 \n \n374 Id. §§ 44.1 (definition of Affected System Load Queue Position), 44.13.3.1.2. \n375 Id. § 44.13.3.1.2. \n376 Id. § 44.13.3.1.2. \n377 Id. § 44.13.3.1.2. \n378 Id. § 44.13.3.1.2. \n379 Proposed OATT Attach. LL §§ 44.1 (definitions of Affected System Load Study Agreement and \nMultiparty Affected System Load Study Agreement), 44.13.3.1.3. \n380 Proposed OATT Attach. LL § 44.13.3.1.3. \n381 Id. § 44.13.3.1.4.  If the NYISO notifies Affected System Eligible Customer(s) that it will delay the \nAffected System Load Study due to a re-study in the host region, Affected System Eligible Customer(s) are neither \nrequired to execute and return the previously tendered study agreement, nor provide the Affected System Load \nStudy deposit for the previously tendered study agreement.  Id. \n382 Proposed OATT Attach. LL § 44.13.3.1.4."},{"page":71,"startToken":35553,"endToken":36081,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 71 \n \n \nBusiness Days of receipt of the notice.383  This deficiency does not include failure to deliver the \nexecuted study agreement or the deposit for study agreement.384  If Affected System Eligible \nCustomer does not cure the technical data deficiency within the cure period or fails to execute \nthe study agreement or provide the deposit, the Affected System Eligible Customer will lose its \nAffected System Load Queue Position.385 \nd) \nScope of Affected System Load Study \nFor the Affected System Load Study, the NYISO proposes to use the most recent of the \nbase case of the latest in time Assessment of Load Integration or Short-Term Reliability Process \nthat is available at the time of the commencement of the Affected System Load Study.386  The \nNYISO will coordinate with the Affected System Eligible Customer(s)’ host region as necessary \nto align to the extent possible the network system modeling between the regions for purposes of \nthe Affected System Load Study.387 \nThe NYISO will identify and notify any Transmission Owners whose systems are \npotentially impacted by the Affected System Eligible Customer’s load project.388  The NYISO \nand the identified Transmission Owners will develop the scope of the Affected System Load \nStudy.389  The NYISO will hold a scoping meeting among the NYISO, the Affected System \nEligible Customer(s) with load projects participating in the Group for the Affected System Load \nStudy, and the impacted Transmission Owner(s).390  The NYISO will conduct the Affected \nSystem Load Study for a group of load projects and shall use existing studies to the extent \npracticable, when multiple Affected System Eligible Customers that are part of a single group \nmay cause the need for Affected System Network Upgrades.391  The Affected System Load \nStudy will commence upon agreement between the NYISO and Transmission Owner(s) \nconcerning the scope of the study.392 \nThe NYISO will evaluate the impact that Affected System Eligible Customer’s proposed \ninterconnection of a load project to another region’s transmission system will have on the \nreliability of the Bulk Electric System portion of the New York State Transmission System using \nthe Transmission Security Standard.393  The Transmission Owner(s) will evaluate the impact of \nthe interconnection of the Affected System Eligible Customer’s load project on the non-Bulk \nElectric System using the Transmission Security Standard.394  If adverse impacts to reliability are \nidentified, the NYISO, in coordination with the Transmission Owner, will identify potential \nAffected System Network Upgrades, to the extent not Physically Infeasible, and the \n \n383 Id. § 44.13.3.1.4.   \n384 Id. § 44.13.3.1.4.   \n385 Id. § 44.13.3.1.4.   \n386 Id. § 44.13.3.1.5.1. \n387 Id. § 44.13.3.1.5.1. \n388 Proposed OATT Attach. LL § 44.13.3.1.5.2. \n389 Id. § 44.13.3.1.5.2. \n390 Id. § 44.13.3.1.5.2. \n391 Id. §§ 44.1 (definition of Affected System Load Study), 44.13.3.1.5.2. \n392 Id. § 44.13.3.1.5.2. \n393 Id. § 44.13.3.1.5.3. \n394 Proposed OATT Attach. LL § 44.13.3.1.5.3."},{"page":72,"startToken":36081,"endToken":36569,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 72 \n \n \nTransmission Owner will provide a preliminary indication of the cost and length of time required \nor the Affected System Network Upgrades.395  The NYISO, in coordination with the \nTransmission Owner(s), will develop an Affected System Load Study Report summarizing the \nresults of the Affected System Load Study and will provide the report to the Affected System \nEligible Customer(s) and its host region.396  Within 10 Business Days of providing the Affected \nSystem Load Study Report to Affected System Eligible Customer(s), the NYISO, Affected \nSystem Eligible Customer(s), and Affected Transmission Owner or Affected System Operator \nwill meet as permitted by schedule or availability of the parties to discuss the results of the \nAffected System Load Study.397  Upon request, the NYISO will provide Affected System \nEligible Customer(s) with all supporting documentation, workpapers and relevant power flow, \nshort circuit and stability databases for the Affected System Load Study, subject to \nconfidentiality arrangements.398 \ne) \nEvaluation of Affected System Network Upgrades \nThe NYISO proposes to establish requirements for the circumstance in which an Affected \nSystem Load Study identifies that Affected System Network Upgrades are required to mitigate \nadverse impacts to reliability of an Affected System Eligible Customer’s load project.  In such \ncase, the NYISO proposes that the Affected System Eligible Customer must submit a \nTransmission Interconnection Application in accordance with the requirements in the NYISO’s \nTransmission Interconnection Procedures in Attachment P to the OATT for the evaluation of the \nidentified Affected System Network Upgrades.399  This is consistent with the NYISO’s current \npractice for addressing impacts in New York of load projects proposing to interconnect in \nneighboring regions.   \nThe Affected System Network Upgrades may proceed directly to be evaluated in the \nFacilities Study in the Transmission Interconnection Procedures.400  The Affected System \nEligible Customer must satisfy the requirements in Attachment P of the ISO OATT concerning \nthe Affected System Network Upgrades, including accepting the Affected System Eligible \nCustomer’s cost allocation identified in Attachment P and paying cash or posting Security for the \nallocated amount.401  The Affected Transmission Owner or Affected System Operator must enter \ninto a construction agreement with the Affected System Eligible Customer for the construction \nof the Affected System Network Upgrades.402 \nIII. \nPOST-STUDY REQUIREMENTS   \ni. \nPost-Study Agreements  \n \n395 Id. §§ 44.1 (definition of Affected System Network Upgrade), 44.13.3.1.5.3. \n396 Id. §§ 44.1 (definition of Affected System Load Study Report), 44.13.3.1.5.3.  The NYISO will not have \nan obligation to study impacts of Affected System Eligible Customers of which it is not notified.  Id. \n397 Proposed OATT Attach. LL § 44.13.3.1.5.3. \n398 Id. § 44.13.3.1.5.3. \n399 Id. § 44.13.3.1.5.4. \n400 Id. § 44.13.3.1.5.4. \n401 Id. § 44.13.3.1.5.4. \n402 Id. § 44.13.3.1.5.4."},{"page":73,"startToken":36569,"endToken":37042,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 73 \n \n \nThe NYISO proposes that following the completion of the Facilities Study the Eligible \nCustomer for the Large Load Project may elect to continue with the proposed interconnection of \nits Large Load Project by (i) entering into an interconnection agreement with the Transmission \nOwner for which system the Eligible Customer proposed to interconnect its Large Load Project \nand (ii), as applicable, entering into construction agreement(s) for Network Upgrades with any \nTransmission Owner(s) or Affected System Operator(s) for which system a Network Upgrade is \nrequired in connection with the Large Load Project.403 The agreements must identify any \nrequired Attachment Facilities and Network Upgrades and specify the Large Load Project’s cost \nresponsibility for such facilities consistent with the terms of the applicable Transmission \nOwner’s cost recovery agreement and security agreement.404  The NYISO proposes that these \nagreements remain two-party agreements between the Transmission Owner and the Large Load \nProject consistent with the longstanding practice under its existing load interconnection \nrequirements.  The Transmission Owner is responsible for determining the Attachment Facilities \nand Network Upgrades required for the safe and reliable interconnection of the Large Load \nProject, estimating and allocating the costs of these facilities, and owns and/or operates the \nsystem impacted by the interconnection, while the Large Load Project is responsible for paying \nfor the expense of the required facilities and for coordinating with the Transmission Owner \nconcerning the construction of the facilities.  As discussed in Part VI below, the NYISO \nanticipates that the Transmission Owners will include two-party security, cost recovery, and \ninterconnection agreements in their concurrent FPA Section 205 filing.  \nii. \nTransmission Service Agreement for Firm and Non-Firm Withdrawal \nService for Large Loads \nIn the Show Cause Order, the Commission preliminarily found the NYISO’s tariff to be \nunjust and unreasonable because it lacks pro forma provisions in a transmission service \nagreement between NYISO and the transmission customer taking transmission service on behalf \nof a large load to memorialize operational requirements for transmission customers taking \ntransmission service on behalf of large loads (e.g., equipment requirements, data requirements, \nremote disconnect capability).405   \nThe NYISO proposes to establish in its OATT requirements for entering into a \nTransmission Service Agreement and the proposed pro forma Transmission Service Agreement. \na) \nProcess for Entering into Transmission Service Agreement \nThe NYISO proposes to require the Eligible Customer and the Large Load (if the Large \nLoad is not its own Eligible Customer or Load Serving Entity) to enter into a Transmission \nService Agreement with the NYISO.406  The NYISO will offer the standard form Transmission \nService Agreement to an Eligible Customer when it submits a Completed Application, and the \n \n403 Proposed OATT Attach. LL § 44.14.1. \n404 Id. § 44.14.1. \n405 Show Cause Order at PP 63, 71. \n406 Proposed OATT Attach. LL § 44.14.2."},{"page":74,"startToken":37042,"endToken":37513,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 74 \n \n \nEligible Customer and, if applicable, the Large Load will be required to enter into the \nTransmission Service Agreement in order to receive Withdrawal Service.407 \nb) \nPro Forma Transmission Service Agreement  \nThe NYISO proposes to establish a new, pro forma Transmission Service Agreement for \nLarge Loads obtaining Firm Withdrawal Service or Non-Firm Withdrawal Service.  The new \nagreement will be located in Attachment B to the OATT.408 \nThe NYISO proposes to establish certain general requirements in the Transmission \nService Agreement.409  In particular, the Transmission Service Agreement establishes that the \nNYISO agrees to provide, and the Transmission Customer agrees to pay, for Firm Withdrawal \nService and/or Non-Firm Withdrawal Service in accordance with the Withdrawal Service \nrequirements in the OATT, other Transmission Owner rate schedules, and the terms of the \nTransmission Service Agreement.410  The agreement specifies that the Transmission Customer’s \neligibility to take such service on behalf of Large Load will be determined in accordance with the \nLarge Load Integration Procedures in Attachment LL and other applicable requirements in the \nOATT and Services Tariff.411  The agreement provides that such Withdrawal Service is subject \nto adjustment in accordance with the Large Load Integration Procedures in Attachment LL, the \nrequirements in the Services Tariff, and the NYISO’s procedures.412 \nThe agreement provides that the Withdrawal Service provided under the agreement will \ncommence on the latest of: (1) the requested service commencement date, (2) the date \nconstruction of any Attachment Facilities and/or Network Upgrades are completed, (3) the date \nthat all of the applicable preconditions for obtaining the requested Withdrawal Service set forth \nin the tariffs are satisfied, or (4) any such date the Withdrawal Service is permitted to commence \nby the Commission.413 \nThe NYISO also proposes to include additional requirements in the Transmission Service \nAgreement that are specific to the Firm Withdrawal Service and/or the Non-Firm Withdrawal \nService for the Large Load.   \nFor purposes of Firm Withdrawal Service, the NYISO proposes to require that the \nTransmission Customer and Large Load comply with all applicable requirements in the OATT \n \n407 Proposed OATT § 3A.4.  An executed Transmission Service Agreement that contains the information \nrequired under the tariff will be filed with the Commission, if required, in compliance with the applicable \nCommission regulations.  Id. \n408  The new form replaces the existing service agreement placeholder form in Attachment B (OATT \nSection 8), which was for Non-Firm Point to Point Transmission Service, which service, as indicated in that \nplaceholder form, is not available in the NYISO-administered markets. \n409 Proposed Transmission Service Agreement §§ 1.0 – 8.0.  The terms of the OATT and Services Tariff are \nincorporated into the Transmission Service Agreement. Id. § 7.0. \n410 Proposed Transmission Service Agreement § 3.0. \n411 Id. § 4.0. \n412 Id. § 4.0. \n413 Id. § 5.0."},{"page":75,"startToken":37513,"endToken":38037,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 75 \n \n \nand Services Tariff concerning Firm Withdrawal Service.414  This includes the Transmission \nCustomer’s compliance with the requirements in the Services Tariff concerning Co-Located and \nLimited Load Configurations, Partner Resource Arrangements, and Co-Located Arrangements. \nThis also includes the Large Load’s compliance with the requirements for load modifications and \nincreases and the requirements concerning the performance, protection and control, and \nmonitoring requirements set forth in Attachment LL of the OATT. \nFor purposes of Non-Firm Withdrawal Service, the NYISO proposes to require that the \nTransmission Customer and Large Load comply with all applicable requirements in the OATT \nand Services Tariff concerning Non-Firm Withdrawal Service.415  This includes the \nTransmission Customer’s compliance with the requirement in the Service Tariff concerning Co-\nLocated and Limited Load Configurations and the bid cap and other bid restrictions.  This also \nincludes the Large Load’s compliance with the requirements for load modifications and increases \nand the requirements concerning the performance, protection and control, and monitoring \nrequirements set forth in Attachment LL of the OATT.  In addition, the agreement provides for \nthe Large Load’s agreement to be subject to the Non-Firm Withdrawal Service Bid Cap, \napplicable bidding requirements, and all other related requirements set forth in the NYISO’s \ntariffs.  Finally, the agreement provides for the Large Load’s agreement to be subject to and to \ncomply with additional curtailment requirements and any other requirements specifically \napplicable to Large Loads as set forth in the NYISO’s tariffs. \niii. \nLarge Load Performance, Protection and Control, and Monitoring \nRequirements \nIn the Show Cause Order, the Commission preliminarily found the NYISO’s tariff to be \nunjust and unreasonable because it lacks provisions that address ongoing operational \nrequirements for transmission customers serving large loads necessary to ensure reliable \noperation of the transmission system.416  The NYISO proposes to establish operational \nrequirements for Large Load in its tariffs as described below and in the Nguyen Affidavit.417  In \nparticular, the NYISO proposes that a Large Load that was subject to the Large Load Integration \nProcedures must comply with Applicable Reliability Standards, including providing to the \nNYISO and applicable Transmission Owner(s) all information that they may reasonably require \nto comply with Applicable Laws and Regulations and Applicable Reliability Standards.418  In \naddition, the NYISO proposes that the Large Load must satisfy performance, protection and \ncontrol, and monitoring requirements described below that will be included in the OATT and \nfurther detailed in the NYISO’s procedures, unless the NYISO agrees to an exemption to a \nrequirement.419  The NYISO proposes to explicitly require in the Transmission Service \n \n414 Id. §§ 9.0 - 10.0. \n415 Id. §§ 11.0 – 14.0.  \n416 Show Cause Order at P 63. \n417 Nguyen Affidavit at PP 38-41. \n418 Proposed OATT Attach. LL § 44.14.3.  The NYISO proposes to define Applicable Reliability Standards \nfor Attachment LL as “the requirements and guidelines of the Applicable Reliability Councils, and the Transmission \nDistrict to which the Large Load is directly interconnected, as those requirements and guidelines are amended and \nmodified and in effect from time to time.”  Id. § 44.1 (definition of Applicable Reliability Standards). \n419 Proposed OATT Attach. LL § 44.14.3."},{"page":76,"startToken":38037,"endToken":38542,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 76 \n \n \nAgreement that the Large Load must comply with these performance, protection and control, and \nmonitoring requirements.420 \nThe NYISO proposes performance, protection and control, and operating requirements as \ndetailed below that address the Commission’s findings in the Show Cause Order (which \nrequirements identified with an asterisk are eligible for an exemption as described below).   \nFirst, the Commission found that the NYISO’s existing tariff does not specify the ramp \nrate or ride-through requirements with which the transmission customer taking transmission \nservice on behalf of the large load must comply.421  The NYISO proposes to include in \nAttachment LL that a Large Load must satisfy the following categories of performance \nrequirements, which will be detailed in the NYISO’s procedures: (i) active power ramp rate*, (ii) \nactive power recovery*, (iii) high and low voltage ride through*, (iv) high and low frequency \nride through*, (v) multi-disturbance ride through*, (vi) stable operation, (vii) torsional and \ncontroller interaction, (viii) cycling, (ix) reactive power capability requirement*, and (x) voltage \nphase jump*.422   \nSecond, the Commission found that the NYISO’s existing tariff does not: (i) specify that \ntransmission customer enable the NYISO to remotely disconnect large loads when necessary to \nmaintain reliability of the transmission system, with the costs of such equipment directly \nassigned to the transmission customer, as well as the terms and conditions under which NYISO \nmay remotely disconnect the large load (e.g., emergency conditions, so that transmission \nequipment is not harmed) or (ii) require necessary control technologies and/or protection systems \nthat may be necessary to limit a transmission customer’s withdrawals from the transmission \nsystem as appropriate.423  The NYISO proposes to include in Attachment LL that a Large Load \nmust satisfy the following protection and control requirements: (i) remote disconnect ability by \nthe Connecting Transmission Owner, (ii) active-power variation monitoring relays,* and (iii) \ninjection and withdrawal limits for co-located facilities implemented with appropriate \ncontrols.424 \nFinally, the Commission identified that the NYISO’s existing tariff does not specify that: \n(i) transmission customer provide hourly forecasts, telemetry data, and other data to ensure \nsufficient visibility or specify requirements for maintaining communication channels between \nNYISO and the transmission customer on behalf of the large load, or (ii) that the transmission \nowner install, and transmission customer pay for, equipment to enable the NYISO to monitor \nlarge loads for impacts of, for example, fast-ramping load that may impact the transmission \nsystem too quickly to be captured by conventional data acquisition systems (e.g., the need for \nphasor measurement units or similar equipment).425  The NYISO proposes to include in \nAttachment LL that a Large Load must possess the following minimum telemetry requirements \nto ensure sufficient visibility concerning the Large Load: (i) phase 1 analog metering, (ii) \n \n420 Proposed OATT Attach. B §§ 10.0, 12.0. \n421 Show Cause Order at P 63. \n422 Proposed OATT Attach. LL § 44.14.3.1. \n423 Show Cause Order at P 63. \n424 Proposed OATT Attach. LL § 44.14.3.2. \n425 Show Cause Order at P 70."},{"page":77,"startToken":38542,"endToken":39093,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 77 \n \n \nrevenue grade metering, (iii) SCADA MW/MVAR metering, (iv) digital fault recorder (“DFR”), \n(v) phasor measurement unit (“PMU”) installations, (vi) sequence of event recorder (“SER”), \nand (vii) dynamic disturbance recorder (“DDR”).426  The communications equipment will \nfacilitate the provision of the data to the NYISO identified in the Show Cause Order, with the \nexception of load forecast data, which reporting requirements will be addressed in accordance \nwith updated NYISO procedures. \nThe NYISO proposes that an Eligible Customer for a Large Load that is a Non-\nComputational Large Load may request that the NYISO grant an exemption from a performance \nor a protection and control requirement that is eligible for exemption.427  The operational \ncharacteristics of Non-Computational Large Loads, such as traditional manufacturing facilities, \nare driven by the physical attributes of the load and may not be able to meet certain of the \nperformance or protection and control requirements (e.g., ramp rates that do not align with a \nreasonable operation of the facility). \nThe Eligible Customer for a Non-Computational Large Load may request the exemption \nas part of its Large Load Integration Request or through a modification request.428  To request an \nexemption, the Eligible Customer must identify the requirement for which it is requesting an \nexemption, provide justification for why the requirement cannot be met, and propose an \nalternative to the requirement.429  If the request is part of a modification request, the Eligible \nCustomer must also provide technical rationale to support that the proposed alternative would \nnot adversely impact the reliability of the New York State Transmission System.430 The NYISO \nor the applicable Transmission Owner may perform studies, at Eligible Customer’s expense, to \ndetermine if the proposed alternative is permissible. The NYISO will not grant an exemption if it \nis determined to create reliability concerns or a reliability violation.431 \niv. \nStatus of Large Load Project and Associated Network Upgrades \nThe NYISO proposes to establish monitoring requirements for Large Load Projects and \nassociated Network Upgrades that are consistent with the monitoring rules in its Standard \nInterconnection Procedures.432  In particular, at: (i) the completion of the first calendar quarter \nafter the NYISO’s posting of the final results of the Assessment of Load Integration and (ii) the \nconclusion of each subsequent calendar quarter, the Eligible Customer or Transmission \nCustomer, as applicable, for the Large Load Project and its respective Connecting Transmission \nOwner(s) and any Affected Transmission Owner(s) must report on the status of the Large Load \n \n426 Proposed OATT Attach. LL § 44.14.3.3. \n427 Id. § 44.14.3.4.  A Non-Computational Large Load is a Large Load Project that does not meet the \ndefinition of a Computational Large Load.  The NYISO proposes to define Computational Large Load as “a Large \nLoad Project that primarily consists of information technology infrastructure used for: (i) creating, executing, and \ndelivering software applications and services, (ii) artificial intelligence training, development, and delivery, (iii) \ncryptocurrency mining, or (iv) other computational activities at a data center.”  Id. § 44.1 (definitions of \nComputational Large Load and Non-Computational Large Load). \n428 Proposed OATT Attach. LL § 44.14.3.4. \n429 Id. § 44.14.3.4. \n430 Id. § 44.14.3.4. \n431 Id. § 44.14.3.4. \n432 See OATT Attach. HH § 40.11.6."},{"page":78,"startToken":39093,"endToken":39602,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 78 \n \n \nProject and any associated Network Upgrades, including the progress of the milestones in the \napplicable interconnection or construction agreement(s) in a format consistent with, and \nincluding the content required by, the NYISO’s procedures.433 \nB. \nAdditional Requirements \ni. \nStudy Cost Allocation, Invoicing, and Deposit Requirements  \nThe NYISO proposes to establish tariff requirements that describe the Eligible \nCustomer’s cost responsibilities for the study work in the Large Load Integration Procedures, the \ninvoicing and payment requirements for these study costs, and the rules for the use and refund of \ndeposits provided under these procedures.434  These requirements are based on the similar \nrequirements in the NYISO’s Standard Interconnection Procedures.435 \na) \nStudy Cost Responsibility and Allocation of Study Costs \nThe NYISO proposes that it will charge, and the Eligible Customer will pay, the actual \ncosts of the study work incurred by the NYISO and Transmission Owner for the Large Load \nIntegration Study Process, after the Eligible Customer has submitted its Large Load Integration \nRequest.436  The NYISO proposes to allocate the costs of the Large Load Integration Study \nProcess among the Eligible Customers for their projects participating in the process so that the \nEligible Customer is only responsible for the costs associated with the study of its particular \nproject.  In particular, each Eligible Customer must pay an equal share of the Large Load \nIntegration Study Process costs except for the study of Attachment Facilities, which are specific \nto each project.437  For Attachment Facilities, the Eligible Customer must pay the actual costs of \nstudying the Attachment Facilities for its own project(s).438  If more than one Large Load Project \ncontributes to the need for particular Attachment Facilities, those Large Load Projects will share \nequally in the cost to study those Attachment Facilities.439 \nFor an Affected System Load Study, the NYISO proposes that it will charge, and the \nAffected System Eligible Customer will pay, the actual costs of the study work of that study.440  \nThe NYISO proposes to allocate such costs among Affected System Eligible Customers \nparticipating in the Affected System Load Study, so that each project participating in the study \nmust pay an equal share of the study costs required for the identification of the need for any \nAffected System Network Upgrades.441  If more than one project contributes to the need for \n \n433 Proposed OATT Attach. LL § 44.14.4. \n434 Id. § 44.15.4. \n435  See OATT Attach. HH § 40.24.3 \n436 Proposed OATT Attach. LL § 44.15.4.1.1.  For purposes of the Facilities Study that is conducted by a \nTransmission Owner, the applicable Transmission Owner will charge and the Eligible Customer will pay the actual \ncosts of the study work incurred by the Transmission Owner for that study.  Id. § 44.15.4.1.2. \n437 Proposed OATT Attach. LL § 44.15.4.2.1. \n438 Id. § 44.15.4.2.1. \n439 Id. § 44.15.4.2.1. \n440 Id. § 44.15.4.1.1. \n441 Id. § 44.15.4.2.3."},{"page":79,"startToken":39602,"endToken":40147,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 79 \n \n \nparticular Affected System Network Upgrades, those projects will share equally in the cost to \nstudy the Affected System Network Upgrades.442 \nFinally, for requested modifications to load facilities and projects, the NYISO proposes \nthat it will charge, and the entity that submitted a Load Modification Request will pay, the actual \ncosts of the NYISO’s review and any required studies for the Load Modification Request. \nThe NYISO’s proposed approach allocates study costs in accordance with cost causation \nprinciples to the particular entities responsible for such costs in place of a more general \nallocation of costs. \nb) \nInvoicing and Payment Requirements  \nThe NYISO proposes to invoice an Eligible Customer on a monthly basis for study \ncosts.443  A monthly invoicing approach is consistent with how the NYISO invoices customers in \nits other interconnection process and provides transparency to customers of their study costs \nthroughout the study process and timely reimbursement of costs incurred by the NYISO. \nThe Eligible Customer must pay the invoiced amount to the NYISO within thirty 30 \nCalendar Days of the NYISO’s issuance of the invoice.444  Except as otherwise provided in the \nbilling dispute rules, if the Eligible Customer does not pay its invoice within this period, it will \nbe subject to withdrawal and will be assessed interest on any unpaid invoiced amounts calculated \nin accordance with section 35.19a(a)(2) of FERC’s regulations.445  To dispute an invoiced \namount, an Eligible Customer must (i) timely pay any undisputed amounts to the NYISO and (ii) \npay into an independent escrow account the portion of the invoice in dispute, pending resolution \nof such dispute.446  If the Eligible Customer fails to meet these two requirements, then neither the \nNYISO nor Transmission Owner is obligated to perform or continue to perform any study work \non behalf of the Eligible Customer’s Large Load Integration Request, Load Modification \nRequest, or Affected System Load Study.447  A billing dispute will be addressed through the \ndispute resolution procedures set forth for the Large Load Integration Procedures as described in \nPart III.B.i.b.448  Within thirty 30 Calendar Days after resolution of the dispute, the Eligible \nCustomer will pay the NYISO any amounts due with interest actually earned on such amounts.449 \nAny invoices for the Transition Large Load Integration Study Process, the Large Load \nIntegration Study Process, any study resulting from a Load Modification Request, or an Affected \nSystem Load Study must be submitted to the NYISO within 60 days of completion of the subject \nstudy and must include a detailed and itemized accounting of the incurred cost of the applicable \n \n442 Id. § 44.15.4.2.3. \n443 Id § 44.15.4.3.1.  For purposes of the invoicing and payment provisions requirements, the Eligible \nCustomer includes: (i) the Eligible Customer that submits a Large Load Integration Request, (ii) the entity that \nsubmits a Large Load Modification Request, or (iii) an Affected System Eligible Customer.  Id. \n444 Proposed OATT Attach. LL § 44.15.4.3.2. \n445 Id § 44.15.4.3.2. \n446 Id § 44.15.4.3.5. \n447 Id §§ 44.15.4.3.5, 44.15.4.3.6. \n448 Id § 44.15.4.3.5. \n449 Id § 44.15.4.3.5."},{"page":80,"startToken":40147,"endToken":40651,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 80 \n \n \nstudy work.450  After the conclusion of the applicable study or if, prior to the conclusion of the \nprocess, the Eligible Customer withdraws its applicable request or the request is withdrawn by \nthe NYISO from the Load Queue, the NYISO will issue a final invoice to Eligible Customer, \nwhich Eligible Customer must pay within the 30 Calendar Day period.451 \nc) \nRequirements Applicable to Fees and Deposits \nThe NYISO proposes to permit entities to provide their required deposits (e.g., Study \nDeposits, Readiness Deposits) for the Large Load Integration Study Process in the form of cash, \na letter of credit, or a surety bond, while they must satisfy any fees using cash (e.g., the \napplication fee).452  \nThe NYISO proposes to clarify in Attachment LL its requirements for accepting cash, \nletters of credit, or surety bonds for deposits.453  These requirements are consistent with the \nNYISO’s existing credit requirements under its tariffs applicable to Market Participants and its \nrequirements for fees and deposits in its Standard Interconnection Procedures.454 \nThe NYISO also proposes to specify how it will hold and apply such deposits, refund any \ncash deposits, and/or provide authorization to the entity that provided the deposit to request that \nthe issuing entity cancel a letter of credit or surety bond.455  In particular, the NYISO will hold \ndeposits provided by an Eligible Customer until settlement of the final invoices.  If an Eligible \nCustomer has not paid all invoices, the NYISO will recover any unpaid costs from Eligible \nCustomer’s deposits. After the NYISO has recovered all unpaid costs, if any, from Eligible \nCustomer’s deposits, the NYISO will (i) refund to the Eligible Customer any remaining \nrefundable cash portion of its deposits, and (ii) provide written authorization for Eligible \nCustomer to request that the bank cancel any remaining letter of credit or surety bond provided \nas a deposit. \nThese invoicing, payment, and deposit rules do not apply to the Facilities Study or to the \nrequirements under the Facilities Study agreement, security agreement, cost recovery agreement, \nor interconnection agreement that the Transmission Owners will submit in their separate Section \n205 filing(s). \nii. \nConfidentiality Requirements  \nThe NYISO proposes to include in its Large Load Integration Procedures requirements \nconcerning the treatment of Confidential Information exchanged by the parties during the \nadministration of the procedures.456  In particular, the NYISO proposes to use the same \n \n450 Proposed OATT Attach. LL § 44.15.4.3.4. \n451 Id § 44.15.4.3.4. \n452 The forms of deposits are for deposits submitted to the NYISO and do not apply to any deposits or \nsecurity provided to a Transmission Owner in connection with the Facilities Study, which deposit or security is held \nby the Transmission Owner. \n453 Proposed OATT Attach. LL § 44.15.3. \n454 See Services Tariff Attach. K §§ 26.6.1.1, 26.6.1.2; OATT Attach. HH § 40.2.4. \n455 Proposed OATT Attach. LL § 44.15.4.3.3. \n456 Id. § 44.15.1."},{"page":81,"startToken":40651,"endToken":41092,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 81 \n \n \nconfidentiality approach that is included in its Standard Interconnection Procedures in \nAttachment HH of the OATT.457  \niii. \nDispute Resolution Requirements  \nThe NYISO proposes to establish that a party may address a dispute that arises out of or \nin connection with the Large Load Integration Procedures or their performance in accordance \nwith its standard dispute resolution procedures set forth in Article 11 of the NYISO’s Services \nTariff.458  Pursuant to these procedures, parties first attempt to resolve a dispute through informal \ndiscussions.459  If the dispute is not resolved, the parties may agree to proceed with non-binding \nmediation or arbitration as further detailed in Article 11, or may commence legal proceedings \nbefore the Commission or a court of competent jurisdiction.460 \niv. \nThird Party Conducting Studies \nThe NYISO proposes to establish requirements for the use of third parties to conduct \nstudy work under the Large Load Integration Procedures that is generally consistent with the \nsimilar requirements for its Standard Interconnection Procedures.461  In particular, the NYISO \nproposes that the NYISO, a Transmission Owner, or an Affected System Operator may use a \nTransmission Owner or other third party to perform its respective obligations under the Large \nLoad Integration Procedures.462  The NYISO proposes that the use of a third party be limited to \nsituations where the NYISO determines that doing so will help maintain or accelerate the study \nprocess.463  Such third-party consultants must comply with the relevant NYISO OATT, \nprocedures, and protocols as would apply if the NYISO were to conduct the study process and \nmust use the information provided to it solely for purposes of performing such services and for \nno other purposes.464 \nv. \nAdditional Requirements  \nThe NYISO proposes to include in the Large Load Integration Procedures certain process \nrequirements concerning data requirements, limitations of liability, and reserved rights that are \nbased on related requirements in its Standard Interconnection Procedures in Attachment HH of \nthe OATT, which requirements the Commission has previously accepted as just and reasonable. \n \n457 See OATT Attach. HH § 40.24.1.  The confidentiality requirements in the Standard Interconnection \nProcedures were based on the requirements in the Commission’s pro forma Large Generator Interconnection \nProcedures. \n458 Proposed OATT Attach. LL § 44.15.6. \n459 Services Tariff § 11.3. \n460 Id. § 11.4. \n461 See OATT Attach. HH § 40.24.4.  The NYISO’s proposed requirements align with these requirements, \nexcept that it does not include the reference from Section 40.24.4 to the subcontractors provision in the Standard \nInterconnection Agreement. \n462 Proposed OATT Attach. LL § 44.15.5. \n463 Id. § 44.15.5. \n464 Id. § 44.15.5."},{"page":82,"startToken":41092,"endToken":41585,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 82 \n \n \nFirst, the NYISO proposes to establish that Eligible Customers must provide the NYISO \nwith all data necessary to make the determinations contemplated by the rules in the Large Load \nIntegration Procedures and the NYISO’s procedures.465  In addition, the NYISO proposes to \nrequire that the NYISO or Transmission Owner, as applicable, provide power flow, short circuit, \nand stability databases, including all underlying assumptions and contingency lists, to the \nEligible Customer upon request.466 \nSecond, the NYISO proposes to clarify that all obligations of the NYISO or a \nTransmission Owner pursuant to the Large Load Integration Procedures in Attachment LL of the \nOATT are services or associated with services under the NYISO’s OATT and subject to the \nlimitation of liability requirements contained in the body of the OATT.467 \nThird, the NYISO proposes to clarify that nothing in the Large Load Integration \nProcedures restricts the rights of any person under the NYISO’s OATT or the right of any person \nto file a complaint with the Federal Energy Regulatory Commission under the relevant \nprovisions of the Federal Power Act or under the Independent System Operator Agreement, \nIndependent System Operator/Transmission Owner Agreement, or an Operating Agreement with \nthe NYISO.468 \nFinally, the NYISO proposes to clarify that any Connecting Transmission Owner’s or \nAffected Transmission Owner’s implementation and construction of Network Upgrades will be \nin accordance with the NYISO’s OATT, Commission-approved ISO Related Agreements, the \nFederal Power Act and Commission precedent, and, therefore, will be subject to the Connecting \nTransmission Owner’s or Affected Transmission Owner’s right to recover, pursuant to \nappropriate financial arrangements contained in agreements or Commission-approved tariffs, all \nreasonably incurred costs, plus a reasonable return on investment.469 \nIV. \nTHE NYISO’S PROPOSED TARIFF REVISIONS TO ESTABLISH NEW \nMARKET PARTICIPATION PROVISIONS APPLICABLE TO LARGE LOADS \nA. \nOverview of Key Market Design Elements \nThe NYISO proposes market participation rules for (1) Large Loads eligible to take Firm \nWithdrawal Service (referred to herein as “Full Withdrawal Service Loads”); (2) Large Loads or \n \n465 Id. § 44.3.3; cf. OATT Attach. HH § 40.2.9. \n466 Proposed OATT Attach. LL § 44.3.2; cf. OATT Attach. HH § 40.2.6.  The parties must treat \nConfidential Information in accordance with the confidentiality requirements for the Large Load Integration \nProcedures, and the NYISO and Connecting Transmission Owner may require that Eligible Customers and \npassword-protected website users sign a non-disclosure agreement before the release of Confidential Information or \nCritical Energy Infrastructure Information in the base case data.  Id. \n467 Proposed OATT Attach. LL § 44.3.4; cf. OATT Attach. HH § 40.2.10. \n468 Proposed OATT Attach. LL § 44.3.5; cf. OATT Attach. HH § 40.2.11. \n469 Proposed OATT Attach. LL § 44.3.6; cf. OATT Attach. HH § 40.9.8.7.  ISO Related Agreements is \ndefined as “[c]ollectively, the ISO Agreement, the NYSRC Agreement, the ISO/NYSRC Agreement, the ISO/TO \nAgreement, and Operating Agreements.”  OATT § 1.9."},{"page":83,"startToken":41585,"endToken":42348,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 83 \n \n \nportions thereof and an Associated Resource(s)470 that enter into a Co-Located Arrangement471 or \nPartner Resource Arrangement472 in order to allow the Large Load to take some amount of Firm \nWithdrawal Service; (3) Large Loads or portions thereof taking Non-Firm Withdrawal Service \nand/or are designated Zero Withdrawal Service Loads, which are known collectively as “Limited \nWithdrawal Service Loads”; and (4) the co-location of Large Loads with generation.473   \nFull Withdrawal Service Loads are Large Loads that do not adversely impact resource \nadequacy and/or transmission security or have appropriately mitigated such impacts and are \ndeemed eligible for full Firm Withdrawal Service, as determined in the LLIP.  Such a Large \nLoad may use the NYS Transmission System and participate in the markets in the same way as \nother existing Firm service Load that currently participates in the ISO Administered Markets. \nConsistent with existing Load bidding rules, a Transmission Customer serving a Large Load \ntaking only Firm Withdrawal Service shall not be required to, but may, submit Day-Ahead Bids \nfor the Large Load.474  \nA Large Load that is seeking Firm Withdrawal Service and has been identified in the \nLLIP as causing impermissible adverse impacts on resource adequacy may pair with a new \nInstalled Capacity Supplier through a (1) a Co-Located Arrangement with an Associated \n \n470 An “Associated Resource” shall be defined as “[a] Co-Located Resource or Partner Resource that may \nmitigate some or all of a Large Load’s adverse impacts to resource adequacy and/or transmission security identified \nin the LLIP set forth in Attachment LL of the ISO OATT, which allows the respective Co-Located Load or Large \nLoad to take some amount of Firm Withdrawal Service.”  See Services Tariff § 2.1.  An Associated Resource must \nbe (a) a proposed project that does not yet meet the inclusion rules for the Reliability Planning Process at the time \nthe Large Load Integration Request is validated in accordance with Section 44.6.5 of Attachment LL of the ISO \nOATT; (b) a new Installed Capacity Supplier; and (c) otherwise satisfy the applicable requirements set forth in \nSection 44.6.4 of Attachment LL of the ISO OATT.  See id. \n471 A “Co-Located Arrangement” shall be defined as “[a]n agreement between a Co-Located Load and a \nCo-Located Resource(s) for the purpose of enabling the Co-Located Load to take some amount of Firm Withdrawal \nService, consistent with Section 4.1.12 of the ISO Services Tariff and Attachment B of the ISO OATT.  The Co-\nLocated Resource(s) and the associated Co-Located Load must be behind the same Point of Interconnection and \nmust jointly submit an attestation in accordance with Section 44.6.3.5 of Attachment LL of the ISO OATT.  A Co-\nLocated Arrangement may be between: (1) a Co-Located Load taking solely Firm Withdrawal Service and a Co-\nLocated Resource or (2) a Co-Located Load and Co-Located Resource in a CLLC. The Co-Located Arrangement \nshall have a required minimum duration of fifteen (15) years, starting the first day of the Obligation Procurement \nPeriod for which the UCAP equivalent of ICAP documented in the Large Load Bilateral Transaction is initially \ncertified, in accordance with ISO Services Tariff Sections 5.11.2 and 5.13.1 and ISO Procedures.” See Services \nTariff § 2.3. \n472 A “Partner Resource Arrangement” shall be defined as “[a]n agreement between Partner Resource(s) \nand a Large Load that are electrically located in the same Capacity Region for the purpose of enabling the Large \nLoad to take Firm Withdrawal Service, consistent with Section 4.1.12 of the ISO Services Tariff and Attachment B \nof the ISO OATT. The Partner Resource(s) and the Large Load must jointly submit an attestation in accordance with \nSection 44.6.3.5 of Attachment LL of the ISO OATT. The Partner Resource Arrangement shall have a required \nminimum duration of fifteen (15) years, starting the first day of the Obligation Procurement Period for which the \nUCAP equivalent of ICAP documented in the applicable Large Load Bilateral Transaction is initially certified, in \naccordance with Sections 5.11.2 and 5.13.1 of the ISO Services Tariff and ISO Procedures.”  See Services Tarif § \n2.16. \n473 A “Limited Withdrawal Service Load” is a “Large Load taking any amount of Non-Firm Withdrawal \nService and/or is a Zero Withdrawal Service Load in a CLLC.  A Zero Withdrawal Service Load in a CLGC is not a \nLimited Withdrawal Service Load.” See Services Tariff § 2.12 \n474 See proposed Services Tariff § 4.2.1.9."},{"page":84,"startToken":42348,"endToken":43004,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 84 \n \n \nResource(s) or (2) a Partner Resource Arrangement with an Associated Resource(s) in order to \nbe eligible to receive some amount of Firm Withdrawal Service. A Co-Located Arrangement is \nan agreement between a Co-Located Load475 and a Co-Located Resource(s)476 that are connected \nbehind the same Point of Interconnection for the purpose of enabling the Load to take some \namount of Firm Withdrawal Service.477 A Partner Resource Arrangement is an agreement \nbetween Partner Resource(s) 478 and a Large Load that are electrically located in the same \nCapacity Region for the purpose of enabling the Large Load to take Firm Withdrawal Service.479   \nAmong other requirements, an Associated Resource must be a new Installed Capacity \nSupplier.480  Note that, if an existing Installed Capacity Supplier that has retired, its Capacity \nResource Interconnection Service (“CRIS”) rights have expired, and chooses to re-enter the ISO \nAdministered Markets by proceeding back through the Standard Interconnection Procedures \nthrough which it must obtain new CRIS rights, it shall be considered a new Installed Capacity \nSupplier481 that may participate as an Associated Resource, with caveats for Aggregations and \nDemand Side Resources.482 These arrangements shall have a required duration of a fifteen (15) \nyear term, as further discussed below in Part IV.F.483   \nLimited Withdrawal Service Loads, whether participating as standalone Non-Firm \nWithdrawal Service Load or in a co-located configuration or is partially a Zero Withdrawal \nService Load, will be required to utilize the NYISO’s newly proposed Co-Located and Limited \nLoad Configuration (“CLLC”) participation model. A CLLC shall participate in the NYISO-\nadministered Energy markets as a single Resource and must follow the ISO’s dispatch \n \n475 A “Co-Located Load” shall be defined as “[a] Large Load connected behind the same Point of \nInterconnection as a Co-Located Resource.”  See Services Tariff § 2.3.   \n476 A “Co-Located Resource” shall be “[a] Resource connected behind the same Point of Interconnection as \na Co-Located Load.”  See Services Tariff § 2.3.  A Co-Located Resource may include an Energy Limited Resource; \nan Energy Storage Resource; a Generator without a PURPA contract(s); a Hybrid Storage Resource; an Intermittent \nPower Resource; a Limited Control Run of River Hydro Resource; and a Demand Side Resource that is participating \nas a standalone Distributed Energy Resource.  See id.  An Aggregation is not a Co-Located Resource.  A Co-\nLocated Local Generator is not a Co-Located Resource.  \n477 See proposed Services Tariff § 4.1.12; proposed OATT Attach. B. \n478 A “Partner Resource” shall be “[a] Resource that has been identified by an Eligible Customer, and \nconfirmed by the Resource developer, to be associated with a Large Load, which is electrically located in the same \nCapacity Region, that may mitigate some or all of its adverse impacts to resource adequacy and/or transmission \nsecurity identified in the LLIP set forth in Attachment LL of the ISO OATT and is not connected to the same Point \nof Interconnection as the Large Load in the applicable Partner Resource Arrangement.”  See Services Tariff § 2.16.  \nPartner Resources may include an Aggregation, or an Energy Limited Resource, Energy Storage Resource, \nGenerator without a PURPA contract(s), Hybrid Storage Resource, Special Case Resource, Intermittent Power \nResource, Limited Control Run of River Hydro Resource, System Resource, or a standalone Demand Side Resource.  \nSee id.  Partner Resources must comply with all applicable market rules contained in Section 5.12 of the Services \nTariff for their respective Resource type.  See id. § 5.12.1. \n479 See proposed Services Tariff § 4.1.12; proposed OATT Attach. B. \n480 See supra note 470. \n481 See Services Tariff § 5.18.6; see OATT § 40.2.3.6. \n482 Note, however, that the retired Installed Capacity Supplier would be required to complete the generator \ninterconnection process in order to enter into an Associated Resource arrangement with a Large Load.  See Part \nII.G.i.a. \n483 See proposed Services Tarif § 4.1.12."},{"page":85,"startToken":43004,"endToken":43548,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 85 \n \n \ninstructions.484  A CLLC shall be required to submit Energy Bids consistent with the Withdrawal \nService(s) being taken by its composite Limited Withdrawal Service Load.485 Any portion of a \nLimited Withdrawal Service Load participating in a CLLC that is taking Non-Firm Withdrawal \nService shall be subject to a nodal $200/MWh maximum Bid Price, which is the main \nmechanism by which NYISO will enforce the mandatory curtailment of these Limited \nWithdrawal Service Loads when doing so is necessary to avoid adverse impacts to resource \nadequacy and/or transmission security.486  \nThe NYISO proposes assessing fees and charges to all Large Loads, regardless of \nWithdrawal Service classification, on a Gross Load 487 basis, consistent with the Commission’s \npreliminary finding that the NYISO’s Tariff may be “unjust and unreasonable because it allows \nload with behind the meter generation to net its behind the meter generation against its load for \npurposes of calculating Transmission Service Charges”488 and expressed concern that the \nNYISO’s Tariff does not appear to include a “mechanism by which an Eligible Customer [] \nwould be charged for ancillary services commensurate with its usage of such services, \nparticularly if such customer did not withdraw energy from the transmission system.”489  In \naddition, a System Reliability Benefit Fee shall be assessed to the LSE taking service on behalf \nof a Large Load associated with the MW of (1) the portion of a Limited Withdrawal Service \nLoad(s) that is not taking Firm Withdrawal Service and/or (2) a Co-Located Local Load(s). \nLastly, the NYISO proposes revisions to the settlement rules to ensure that Large Loads are \nassessed the appropriate charges and fees in a manner that is at least roughly commensurate with \nthe benefits that entity receives and to incorporate the new Gross Load basis construct in \naccordance with the cost causation principle.490   \nFinally, the NYISO proposes to include Associated Resources that have satisfied the \napplicable Partner Resource Arrangement or Co-Located Arrangement requirements under the \ndefinition of “Excluded Facilities” with respect to conduct warranting mitigation and thus, such \nAssociated Resources would be excluded from examination under the NYISO’s buyer-side \ncapacity market power mitigation measures as discussed below in Part IV.J and in the Newton \nAffidavit.491      \nB. \nMarket Rules Applicable to Full Withdrawal Service and Limited Withdrawal \nService Loads \n \n484 See Services Tariff § 2.3. \n485 See proposed Services Tariff § 4.2.1.9.1; see also id. §§ 4.4.1.1, 4.4.1.2, 4.4.2.1. \n486 See proposed Services Tariff § 21.4.7. \n487 “Gross Load” shall be defined at the actual Energy consumption value of a Large Load.  See proposed \nrevision to Services Tariff Section 2.7.  Gross Load shall be measured by separate and direct real-time telemetry and \na revenue quality real-time meter at the Load, not the Point of Interconnection and irrespective of whether or not this \nconsumption was met by withdrawals at the Point of Interconnection, consistent with Section 13 of the ISO Services \nTariff.  See id. \n488 Show Cause Order at P 110. \n489 Id. at P 106. \n490 See proposed revisions to Services Tariff § 7.4.  \n491 See proposed revision to Services Tariff § 23.2.1; see also Jonathan Newton Affidavit."},{"page":86,"startToken":43548,"endToken":44030,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 86 \n \n \ni. \nFirm Withdrawal Service Loads \nLarge Loads that are eligible to receive Firm Withdrawal Service for their full amount of \nLoad are fully represented in the Load forecasts that inform the IRM, LCRs, and ultimately \nICAP auction outcomes, and submit traditional Load bids according to existing Load bidding \nrules, may register as Demand Side Resources (with limitations), and are not eligible to \nparticipate in the NYISO’s proposed CLLC model. \nAs discussed in the attached affidavit of Zachary T. Smith, the NYISO’s Director of \nMarket Solutions (“Smith Affidavit”), it is reasonable for Large Loads or the portions thereof \nthat are receiving Firm Withdrawal Service to be included in the load forecast for the IRM and \nLCRs.492  This inclusion is the foundation of the NYISO’s obligation to provide Firm \nWithdrawal Service continuously and regardless of price, consistent with the way that firm \ntransmission service is provided to existing load resources in the NYISO today.  \nIt is also reasonable for Full Withdrawal Service Large Loads to engage with the markets \nusing the NYISO’s established Load bidding rules.  The Large Load’s LSE may submit Fixed or \nPrice Capped Load bids in the Day-Ahead Market on the Large Load’s behalf or voluntarily \nchoose to be served in real-time at the Real-Time LBMP.  \nThe NYISO is proposing to settle Large Loads with Firm Withdrawal Service for Energy \nin substantially the same manner as existing Loads receiving firm transmission service are settled \nfor Energy today. \nii. \nLimited Withdrawal Service Loads \n“Limited Withdrawal Service Loads” are Large Loads that are taking some amount of  \nNon-Firm Withdrawal Service and/or are, in part or in full, a Zero Withdrawal Service Load. \nThis includes Large Loads that are taking, in part but not in full, some amount of Firm \nWithdrawal Service.  Limited Withdrawal Service Loads are: (i) completely or partially excluded \nfrom the Load forecasts used to establish the IRM and LCRs; (ii) therefore subject to some \namount of the System Reliability Benefits Fee; (iii) submit (negative) Energy withdrawal bids to \nconsume Energy from the grid or, when co-located with supply, a single net Energy bid; (iv) are \nineligible to register as Demand Side Resources; and (v) are required to participate in the \nproposed CLLC participation model. The CLLC participation model is a single unified result that \ncan simultaneously support both the standalone and co-located participation of Limited \nWithdrawal Service Loads. Though the CLLC ruleset is singular, there are specific stipulations \nfor Zero Withdrawal Service Load and NFWS Load contained therein. To the extent that a \nLimited Withdrawal Service Load is also a Co-Located Local Load, it will be modeled as \nbelonging to a Co-Located Local Generator Configuration (“CLGC”) that neither withdraws \nfrom nor injects onto the system. \na) \nExclusion of Limited Withdrawal Service Large Loads from \nCapacity Forecasts and Capacity Markets \n \n492 Zachary T. Smith Affidavit at P 16 (“Smith Affidavit”)."},{"page":87,"startToken":44030,"endToken":44563,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 87 \n \n \nLarge Loads taking Non-Firm Withdrawal Service will be excluded from the Load \nForecasts used in establishing the Installed Reserve Margin and Locational Minimum Installed \nCapacity Requirement.493  Accordingly, the NYISO will not be obligated to serve Large Loads \ntaking Non-Firm Withdrawal Service during peak hours, and such Large Loads will have no right \nto consume Energy during times of peak demand.   Unlike Firm Withdrawal Service, Large \nLoads taking Non-Firm Withdrawal Service will not be eligible to participate in NYISO Demand \nSide Resource programs.494 \nIt is appropriate to exclude Large Loads or the portion thereof that are receiving Non-\nFirm Withdrawal Service or are ZWS Load from capacity-related Load Forecasts because they \ndo not contribute to their LSEs’ minimum ICAP market obligations, and their demand does not \nclear in the ICAP market auctions. No entity will procure ICAP on behalf of these \naforementioned types of Load through the ICAP market auctions, or through other means, like a \nCapacity market bilateral. As a result, these Large Loads are excluded from traditional ICAP \ncharges.   However, these Large Loads still benefit from the stability provided by Capacity \nResources in hours in which the Large Load is eligible to withdraw Energy from the \ntransmission system, despite these Large Loads having not cleared in the ICAP market auction. \nTherefore, the NYISO will require Large Loads or the portions thereof that are taking Non-Firm \nWithdrawal Service or are ZWS Load to pay a System Reliability Benefit Fee as discussed \nbelow in Part IV.B.ii.g.  These requirements help to protect customers by incentivizing these \nLarge Loads to voluntarily take the measures necessary to obtain Full Withdrawal Rights.  \nBecause Large Loads receiving Non-Firm Withdrawal Service are non-firm customers, it \nis appropriate that the NYISO is not obliged to redispatch to continue service to them until the \ncurtailment threshold described in Part IV.B.ii.b below is reached.  It is likewise reasonable that \nsuch Large Loads have no right to consume Energy during such times.  \nb) \nThe Non-Firm Bid Cap and Out-of-Merit Requirements for Limited \nWithdrawal Service Loads \nThe NYISO proposes to add new language to Section 21 (Attachment F) of the Services \nTariff which governs bidding restrictions.  Proposed new Section 21.4.7, “Large Loads \nParticipating in a CLLC” would establish that “[t]he portion of a Large Load participating in a \nCLLC that is taking Non-Firm Withdrawal Service shall be subject to a $200/MWh maximum \nBid Price . . . .”  The proposed tariff provision notes that this “is the mechanism by which these \nLarge Loads are interruptible/curtailed to avoid adverse impacts to the grid.”  By contrast, Large \nLoads with Firm Withdrawal Service will not be subject to the proposed bid cap.  They will be \ncurtailed on the same basis and with the same priority as firm transmission service loads that \nexist in the NYISO today, i.e., only for reliability emergencies per NYISO’s existing emergency \nprocedures.   \nThe NYISO is also proposing to include language in new OATT Section 3A.1.2 to \nestablish that Large Loads taking Non-Firm Withdrawal Service “shall timely respond to ISO or \n \n493 Proposed Services Tariff § 5.11.1. \n494 Proposed OATT § 3A.1.2."},{"page":88,"startToken":44563,"endToken":45111,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 88 \n \n \nTransmission Owner Out-of-Merit instructions, including instructions to reduce withdrawals or \ndisconnect when necessary to maintain system reliability, consistent with ISO Procedures.” \nExplanation of the NYISO’s Proposal \n \nNYISO currently uses Constraint Specific Shortage Pricing (“CSSP”) to represent the \nprice impact that transmission shortages have on LBMPs. The CSSP is supported by a six-step \nTransmission Demand Curve representing transmission shortage prices that increase in tandem \nwith further utilization of a transmission facility’s Constraint Reliability Margin (“CRM”). The \nCRM is a portion of transmission facility transmission capacity that the NYISO has reserved \nbetween a predetermined market limit and the facility’s hard limit, i.e. its line rating, which \nserves to insulate the NYCA transmission system from severe overload risk by allowing \ntransmission scarcity to be reflected in market prices. In times of severe transmission scarcity, \ni.e. when a transmission facility reaches 100% CRM utilization, flows across a transmission \nfacility will near or meet the facility’s line rating and the facility’s Transmission Demand Curve \nwill produce a transmission constraint price of $4,000/MWh.  \nThe NERC Transmission Loading Relief (“TLR”) process is used to filter/sort external \ntransactions for curtailment, based on a transaction’s ability to affect flows across a given \nflowgate.  This process uses an individual transaction quantity-share de minimis threshold of 5% \nwhen determining whether the curtailment of an individual transaction will materially impact \nflows across a given flowgate. The NYISO applied similar materiality logic to the CSSP \nconstruct, specifically to the Transmission Demand Curve, in determining the $200/MWh bid \nprice cap for NFWS Loads. \nThe NYISO will use the 5% materiality threshold used in the NERC TLR process in \ndetermining which NFWS Loads have material impact on flows across a binding transmission \nconstraint, i.e. an NFWS Load that has a minimum Shift Factor of 5% on a transmission \nconstraint will be considered to have material impact on flows across that constraint. As \ndiscussed, when the Transmission Demand Curve binds at 100% CRM utilization, it produces a \nprice of $4,000/MWh on the associated transmission constraint. NYISO believes this is the point \nat which it becomes most appropriate to ensure NFWS Loads that exacerbate this constraint are \ncurtailed. An NFWS Load whose Shift Factor meets the 5% materiality threshold described \nabove would, except in rare cases, receive a nodal price of $200/MWh when the correlated \ntransmission constraint produces a $4,000/MWh price. By aligning the NFWS Load bid cap with \nthis $200/MWh nodal LBMP, NYISO ensures that NFWS Loads that meet the 5% materiality \nthreshold are curtailed automatically by the market optimization when the CRM of a relevant \ntransmission facility is fully utilized, preventing the Large Load from exacerbating the constraint \nfurther and avoiding manual intervention by NYISO Grid Operators.  \nThe proposed bid cap ensures that Non-Firm Withdrawal Service Large Loads will be \ncurtailed in advance of significant transmission security or resource adequacy shortage events.  It \nalso increases the probability that Non-Firm Withdrawal Service Loads that most aggravate a \ngiven transmission constraint, i.e. those with higher Shift Factors on a given constraint, will be \ncurtailed in advance of those that do not.  This results in a natural precipitation of NFWS Load \ncurtailment priority that is grounded directly in reliability and automated by NYISO’s"},{"page":89,"startToken":45111,"endToken":45712,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 89 \n \n \noptimization. It will benefit customers by helping to prevent Large Loads from driving up \nLBMPs and will also help to reduce the likelihood of reliability issues.  \nSome stakeholders have suggested that a single $200/MWh bid cap would be \ninsufficiently flexible and could be too low of a dollar figure especially in times of high winter \nfuel costs.  However as the Smith Affidavit explains, it will not be feasible for the NYISO to \nadopt fuel indexing for the bid cap, or for other potentially relevant market parameters, in the \nnear-term, especially in the expedited timeframe that the Commission has allowed for responses \nto the Show Cause Order.495  Additionally, during the course of the stakeholder sessions, the \nargument has also been made that the $200/MWh Bid cap may be set below the non-firm Large \nLoad's true cost of curtailment and therefore could lead to inefficient pricing signals. However, \nthis is not a persuasive reason to opt for a different non-firm Bid price cap level for several \nreasons, including the fact that the Large Load has voluntarily elected non-firm service, which is \na lower level of service compared to firm service.  \nUse of a bid cap to effectuate the necessary curtailment of non-firm service is an \neffective, fair, and efficient implementing mechanism. Moreover, the claim, that the threshold \nmay be set below the non-firm Load’s true cost of curtailment could be true of all bid cap levels, \nincluding alternative bid caps of $1000/MWh or $2000/MWh.  It is possible that many Limited \nWithdrawal Service Loads would be willing to consume above the $200/MWh threshold. \nHowever, allowing Large Loads to offer in at any level under an alternative Bid cap of \n$1000/MWh or $2000/MWh would lead to distorted outcomes and market signals. First, any \ncurtailments that the NYISO would need to effectuate in order to properly ensure reliability \nwould be required to be handled outside the market software, in an “ad hoc” manner, and could \nresult in there being schedules that are inconsistent with prices. Second, it is possible that many \nof these non-firm loads would remain willing to consume above even $2000/MWh As such, the \nNYISO contends that the $200/MWh Bid Cap proposal is necessary to protect reliability, and is \njust and reasonable.    \nIn order to effectuate this price cap, and to ensure that Large Loads taking NFWS are \nresponding to the $200/MWh nodal LBMP curtailment threshold in Real-Time as mandated by \nthe terms of their Withdrawal Service, NYISO proposes to model these Loads as negative \ngeneration, akin to the way it models the Energy Withdrawal portion of an Energy Storage \nResource (“ESR”). This modeling approach extends to all types of Limited Withdrawal Service \nLoads, i.e. all Loads that participate using the CLLC participation model. This means that, like a \nGenerator, the Market Participant representing a Limited Withdrawal Service Load will need to \nsubmit an 11-point incremental Energy Withdrawal bid to the NYISO’s market optimization in \neach interval in which the Load seeks to consume Energy from the grid. Like an ESR that \nsubmits an Energy Withdrawal Bid, the Large Load’s bids will be evaluated by the optimization, \nand the Load will subsequently be dispatched for discrete amounts of Energy Withdrawals \naccording to the economics of their bids and the physical characteristics of the Load. The Market \nParticipant may, but is not required to, specify multiple $/MWh price points in its Energy \nWithdrawal Bid that represent the NFWS Load’s willingness to pay for Energy at different price \n \n495 See Smith Affidavit at P 25."},{"page":90,"startToken":45712,"endToken":46170,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 90 \n \n \npoints below the $200/MWh NFWS nodal LBMP bid cap. Doing so effectively expands the \nprice sensitivity of the NFWS Load.  \nThe Smith Affidavit emphasizes that the NYISO’s proposed rules and requirements for \nNon-Firm Withdrawal Service Large Loads reflect a “a reasonable, market-based approach that \nis consistent with the NYISO’s broader market design proposal and existing rules and \nframeworks.”496 The newly proposed Non-Firm Withdrawal Service should be found to be just \nand reasonable, as it provides Large Loads with an option to connect to the grid faster and \nwithout the potential delays required to mitigate adverse impacts to resource adequacy and/or \ntransmission security. \n \nThe Harvey Affidavit provides additional support for the market design, operational, and \nreliability advantages of the curtailment proposal.497  Dr. Harvey explains that the NYISO’s \nproposal functions very similarly to the Commission-approved Southwest Power Pool (“SPP”) \nnon-firm service curtailment rules and also appears to be consistent with proposals made in the \nPJM Co-Location Order proceedings.498  At the same time, the NYISO’s proposal is “more \nconcrete and amenable to modeling in unit commitment and interchange scheduling software, as \nwell as real-time dispatch software than the general hierarchy of load shedding articulated by \nPJM or the general criteria in the SPP tariff.”499 In addition, “the NYISO price-based curtailment \nthreshold is also forward looking and could identify the need to reduce non-firm load not just \nimmediately before shedding of firm load is necessary, but identify the need to reduce non-firm \nload in order to help assure that shedding of firm load will not become necessary in future hours \nbecause of the impact of meeting that non-firm load on gas availability or battery state of \ncharge.”500   \n \nDr. Harvey also contends that the NYISO’s proposed use of a price based curtailment \ntrigger would provide greater transparency to Large Loads served via Non-Firm Withdrawal \nService501 and be more consistent with the overall evolution of organized markets away from \nreliance on operator judgment and towards the use of sophisticated modeling tools.502  He \nmaintains that relying on a price-based curtailment rule will reinforce reliability, help to \nmaximize the utilization of the transmission system, and be practically administrable by the \nNYISO. \n \nMoreover, Dr. Harvey supports the NYISO’s selection of a $200/MWh bid price cap \nlevel as “reasonable and appropriate from a number of perspectives” including market pricing \nconsiderations, compatibility with market initiatives that the NYISO may pursue in the future, \nand suitability for the evolving resource mix.503 \n \n \n496 Smith Affidavit at P 24.  \n497 See Harvey Affidavit at Section III.  \n498 Id. at PP 53-57.   \n499 Id. at P 56. \n500 Id.  \n501 Id. at P 58.  \n502 Id. at P 59. \n503 Id. at PP 63-70."},{"page":91,"startToken":46170,"endToken":46700,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 91 \n \n \nThe Curtailment Proposal Is Commission-Jurisdictional \n \nThe NYISO is mindful that there questions may be raised regarding the jurisdictional \nstatus of its curtailment proposal. In particular, the Commission recently rejected substantial \nportions of PJM’s proposal to introduce an “Interim Resource Adequacy Service” (“IRAS”) and \nBring Your Own New Capacity framework in its region.504  PJM defined IRAS as “a load \nreduction service through which New Large Loads reduce load as directed by the applicable \nElectric Distributor[.]”505 Among other determinations, the Commission found that PJM’s \nproposed tariff language appeared to be setting a retail rate because it would have established a \n“compensation rate for IRAS payable to the Eligible New Large Load.”506  Notably, the \nCommission stated that “a non-firm transmission service similar to Non-Firm Contract Demand \ntransmission service, with appropriate adjustments, might be considered as a potential avenue to \nachieve some of the aims of PJM’s proposed IRAS framework.”507 \nBy contrast, the NYISO neither proposes to mandate any load reduction service of the \nkind presented IRAS  or otherwise, nor proposes any form of compensation for such a service. \nRather, the NYISO is proposing to provide Transmission Customers taking service on behalf of \nLarge Loads and Large Loads acting as their own LSEs with a new Commission-jurisdictional \nnon-firm transmission service option with attributes similar to Non-Firm Contract Demand \nservice, with appropriate adjustments,508 which aligns with the Commission’s guidance set forth \nin the IRAS Order. \nUnlike PJM under IRAS, the NYISO would not curtail NITS, or any other form of firm \ntransmission service, to similarly situated firm loads.  Instead, the NYISO is proposing a new \ncategory of service to differently situated loads (i.e., loads voluntarily choosing to be served via  \nNon-Firm Withdrawal Service instead of  Firm Withdrawal Service.)  The possibility of \ncurtailment is a necessary component of Non-Firm Withdrawal Service because it ensures the \nreliability of the NYISO’s wholesale markets and transmission system during elevated demand \nconditions.509 A Large Load receiving Non-Firm Withdrawal Service will have been studied and \nfound to have adverse impacts resource adequacy impacts that it has chosen not to mitigate.  The \nNYISO would not simply be relegating the Large Load to inferior service based on \ncharacteristics that touch on retail jurisdictional domains.  \nAdditionally, a CLLC is not entitled to compensation when it is curtailed under Non-Firm \nWithdrawal Service. Mandatory curtailment of Limited Withdrawal Service Loads when \ncapacity exceeds the nodal $200/MWh price threshold is required to avoid adverse impacts to \nresource adequacy and/or transmission security. The NYISO’s proposed bid cap is a condition to \n \n504 PJM Interconnection, L.L.C., 197 FERC ¶ 61,019 (2026) (“PJM IRAS Order”).  \n505 Id. at P 81. \n506 Id. at P 82. \n507 Id. at P 111. \n508 As is discussed in Part V, below, the NYISO is not proposing to adopt the Non-Firm Contract Demand \nService in the form specified in the PJM Co-Location Order. \n509 Cf. id. P 91 (“Data Center Coalition and Vistra also argue that PJM misread the SPP CHILLS precedent, \nwhich they argue supports offering different services to differently situated loads but not reducing NITS for Electric \nDistributors serving materially identical loads.”)"},{"page":92,"startToken":46700,"endToken":47246,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 92 \n \n \nthe receipt of Commission-jurisdictional non-firm transmission service and is a wholesale market \ndesign mechanism that exists in the wholesale energy space.  The proposed NYISO tariff \nobligation runs to the CLLC (or a Transmission Customer taking service on its behalf) as a \nwholesale market participant, the wholesale market dictates whether the Large Load will be \ncurtailed, and the NYISO does not impose any charge on a retail customer.  The NYISO’s \nproposal falls within the bounds of the Commission’s jurisdiction.  And the NYISO’s proposal \ndoes not impermissibly intrude on state authority 510 \nThe NYISO’s curtailment proposal is much closer to SPP’s Conditional High Impact \nLarge Load Service (“CHILLS”), which the Commission accepted earlier this year,511 than it is \nto IRAS.  SPP proposed CHILLS as a new, non-firm transmission service that would enable high \nimpact large loads to take transmission service prior to having the sufficient designated resources \nor network upgrades in place that are required for long-term, firm service.512 CHILLS is subject \nto curtailment and interruption on a non-discriminatory basis when the transmission system is \nconstrained.513 CHILLS has equal curtailment priority to SPP’s monthly non-firm point-to-point \ntransmission service.514  As noted in Part V, the NYISO does not currently offer any form of \nnon-firm transmission service but Non-Firm Withdrawal Service, like CHILLS and pro forma \nOATT non-firm service, would be curtailed before firm transmission service in NYISO.   \nThe NYISO’s proposal shares many features that the Commission found significant in \naccepting CHILLS. As with CHILLS, the NYISO’s Non-Firm Withdrawal Service is a new non-\nfirm service and curtailment is an integral part of that service priority level. The curtailment \nobligation also is implemented through an objective standard that would be part of the NYISO’s \nCommission-jurisdictional wholesale market framework as opposed to curtailment via a \ndiscretionary directive to a retail customer. There is also no retail compensation mechanism for \ncurtailment.  The CHILLS Order is thus precedent for the NYISO’s Non-Firm Withdrawal \nService curtailment rule being subject to the Commission’s jurisdiction.   \nFinally, as the NYISO noted with respect to the State Exempt Large Load Project \nproposal, courts have found that the intent underlying a regulatory requirement is an important \npart of drawing jurisdictional lines under the FPA’s cooperative federalism framework.  Here \nagain, the NYISO has no intention of interfering with or intruding into New York State \njurisdiction.  The NYISO is instead adapting well-established Commission-jurisdictional rules \nallowing transmission providers to curtail Commission-jurisdictional non-firm services to fit the \nNYISO’s Large Load market participation model.   \n \n510 See Tri-State Generation & Transmission Ass’n, 196 FERC ¶ 61,127, at PP 66–68 (2026) (finding that \nTri-State’s proposal did not intrude upon retail rate regulation where, among other things, it did not establish terms \nor conditions of retail service). \n511 See Sw. Power Pool, Inc., 195 FERC ¶ 61,196 (2026) (“SPP CHILLS Order”).  The Commission found \nthat SPP demonstrated that the terms and conditions for its proposed CHILLS are just and reasonable, specifically \nnoting that the terms and conditions were “substantially similar to those of existing transmission services” and that \nthe differences from those existing transmission services were “narrowly tailored to reflect” the nature and \ncharacteristics of the CHILLS. Id. at P 84. \n512 Id. PP 6–7. \n513 Id. P 10. \n514 Id. P 86."},{"page":93,"startToken":47246,"endToken":47834,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 93 \n \n \nc) \nExcluding Limited Withdrawal Service Loads from Participation as \nDemand Side Resources \nThe NYISO is proposing to exclude Limited Withdrawal Service Loads, i.e., Loads that \nare not fully served via Firm Withdrawal Service, from participation in the ISO Administered \nMarkets as a Demand Side Resource (e.g., Special Case Resource (“SCR”), Emergency Demand \nResponse Program (“EDRP”), Distributed Energy Resource (“DER”) and Aggregations).515  It is \nreasonable to make Large Loads taking NFWS ineligible to receive compensation for demand \nreductions because Large Loads taking this service have voluntarily elected to take a lower level \nof transmission service in order to either avoid paying for Network Upgrades or to avoid \nbringing new ICAP supply to market to mitigate any resource adequacy and/or transmission \nsecurity impacts they may cause, as determined in the LLIP.  Non-Firm Withdrawal Service \nLarge Loads, by definition, are not entitled to consume Energy from the system at any time. \nAccordingly, NFWS Large Loads are not in a position to voluntarily reduce their consumption of \nEnergy from the grid at all, let alone do so during the specific hours in which there would be a \nnet benefit to the system and/or other customers by virtue of their voluntary demand reduction.516 \nIt follows that Large Loads taking NFWS are excluded from the Load forecasts that \ninform the Installed Reserve Margin (“IRM”) and Locational Minimum Installed Capacity \nRequirements (“LCRs”), do not create an ICAP obligation for their LSE and therefore Capacity \nResources are not procured on their behalf through the ICAP auctions.  Large Loads with NFWS \nare not similarly situated to those with Firm Withdrawal Service. \nWhen a Large Load with Firm Withdrawal Service voluntarily registers to participate in \nthe ISO Administered Markets as a Demand Side Resource, it is agreeing to forego its Firm \nWithdrawal Service Rights, i.e. agreeing to voluntarily curtail its Load, in exchange for payment \nwhen the requisite net benefit threshold is met. This payment is justified because the absence of a \nLarge Load making its typical withdrawals from the system via its Firm Withdrawal Service \nduring peak hours reduces NYISO’s net on-peak Capacity obligations and when the net benefits \ntest is met and hence, the overall benefit of the reduced LBMP that results from dispatching such \nFWS Large Loads to reduce their consumption exceeds the cost of dispatching the more \nexpensive generation resources.517  In other words, by qualifying as an ICAP Supplier and \noffering ICAP at auction, a Firm Withdrawal Service Load is reducing the net impact that its \nLoad has on the outcomes of the ICAP market auctions, and reduces its LSE’s net ICAP \nobligations as a result.  \nIn sum, Large Loads with Firm Withdrawal Service may elect to participate as a Demand \nSide Resource in the NYISO markets and thus receive compensation for voluntary demand \nreductions during hours in which there is a net benefit to other customers and the system for \n \n515 See, e.g., proposed Services Tariff § 2.4. \n516 See Demand Response Compensation in Organized Wholesale Energy Markets, Order No. 745, 76 Fed. \nReg. 16,658 (Mar. 24, 2011), FERC Stats. & Regs. ¶ 31,322 (2011) (“Order 745”). “Rather than requiring \ncompensation at LMP in all hours, the Commission requires the use of the net benefits test described herein to \nensure that the overall benefit of the reduced LMP that results from dispatching demand response resources exceeds \nthe cost of dispatching those resources.” Id. at P 150 (emphasis added). \n517 See Order 745 at P 150."},{"page":94,"startToken":47834,"endToken":48346,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 94 \n \n \nthem to do so. Whereas Large Loads with Non-Firm Withdrawal Service have elected to receive \na lower level of transmission service and are not entitled to withdraw, or refrain from \nwithdrawing, in exchange for demand reduction compensation. This justification extends to \nZWS Loads as well, which are Large Loads that lack any right to withdraw from the system, or \nvoluntarily refrain from withdrawing, altogether.  Non-firm Large Loads are far from being \nsimilarly situated to Large Loads with Firm service.  \nd) \nMarket Participation Provisions Applicable to Limited Withdrawal \nService Loads that Receive “Partial” Firm Withdrawal Service  \nAs previously stated, Large Loads taking some amount of Firm Withdrawal Service \nalong with some amount of Non-Firm Withdrawal Service and/or that are partially Zero \nWithdrawal Service Loads, will be classified as Limited Withdrawal Service Load and must \nparticipate under the CLLC participation model. Like with other CLLCs, these “partial” Firm \nWithdrawal Service Large Loads will still be required to submit Energy Bids in the Day-Ahead \nMarket whenever they seek to withdraw from the grid and will need to be dispatchable. It will be \npossible for Market Participants to “preserve” their Firm Withdrawal rights when participating \nunder the CLLC participation model through the structuring of their bids, such that CLLC \nscheduling outcomes honor the Large Load’s right to in part consume Energy from the grid \nregardless of price.518     \ne) \nMarket Rules Applicable to Zero Withdrawal Service Loads \n(“ZWSL”)   \nThe NYISO is proposing to add new language to the Services Tariff to address the \ntreatment of ZWSLs.  The introduction of a defined ZWSL voluntary option and related market \nrules is responsive to the Show Cause Order’s observation that the NYISO’s tariffs did “not \nappear to include a mechanism by which an Eligible Customer, on behalf of Eligible Load, \nwould be charged for ancillary services commensurate with its usage of such services, \nparticularly if such customer did not withdraw energy from the transmission system.”519  The \nZWSL proposal is also compatible and practically implementable within the framework of the \nNYISO’s market design and financial reservation transmission model.    \nThe new ZWSL designation applies to a Large Load or portion thereof that is not \npermitted to physically withdraw Energy from the NYS Transmission System or has requested \nnot to withdraw Energy from the NYS Transmission System and is served exclusively by a Co-\nLocated Resource(s) or Co-Located Local Generator.  The ZWSL designation is only relevant to \nco-located configurations, i.e., Large Load that cannot be served by front-of-the-meter \ngeneration or that a Market Participant has requested not be served by front-of-the-meter \ngeneration. ZWSL are not studied for and do not receive eligibility to receive any Withdrawal \nServices through the LLIP, i.e., do not have a right to withdraw from the grid to serve their Load.   \nZWSL status is similar to the BTM:NG Host Load concept under NYISO’s existing \ndesign, in that ZWSL is Load that exists behind-the-meter and is served exclusively by behind-\n \n518 See Smith Affidavit at P 68. \n519 Show Cause Order at P 106."},{"page":95,"startToken":48346,"endToken":48880,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 95 \n \n \nthe-meter generation, which may or may not offer excess generator capability to the system via \nparticipation in the CLLC participation model.  BTM:NG Host Loads effectively function and \nparticipate in the NYISO markets under this construct today.  \nCo-Located Local Generators are providing service behind the meter to ZWSL and are \nnot requesting, or permitted to inject any Energy onto the system.  They are therefore not \nrequired to obtain Energy Resource Interconnection Service (“ERIS”) or CRIS.  These Co-\nLocated Local Generators may still request ERIS and/or CRIS rights if they are able and willing \nto offer excess operating capacity supply into the market that is not needed to support the ZWSL.    \nA Large Load that is a full ZWSL that is supplied solely by a co-located Generator(s) that \nlacks ERIS/CRIS and exists solely to serve the Zero Withdrawal Service Load are respectively \nreferred to as a Co-Located Local Load and a Co-Located Local Generator.  If the resulting co-\nlocated configuration is interconnected and synchronized to the NYS Transmission System, the \nconfiguration will be classified as a Co-Located Local Generator Configuration (“CLGC”). Such \na configuration does not interface with the NYISO markets but, consistent with the general rule \nfor ZWSL, would be subject to the Gross Load cost allocation methodology described in Part \nIV.B.ii.f and to the System Reliability Benefit Fee described in Part IV.B.ii.g. \nThe ZWSL option may be attractive if it aligns with potential market participant’s \nbusiness objectives or use cases, e.g., if the value of a faster development timeline makes it \nworthwhile for a Large Load to elect to take this option.520  For example, if a Co-Located \nFacility’s Point of Withdrawal is undersized relative to the amount of Load that is seeking to \ninterconnect behind-the-meter, some or all of that Load may choose to classify as ZWSL and be \nserved exclusively by behind-the-meter generation. \nZWS Load is subject to the Gross Load cost allocation methodology described in Part \nIV.B.ii.f as it is, by definition, interconnected and synchronized to the NYS Transmission \nSystem and therefore benefits from the stability provided by Ancillary and Transmission \nServices. ZWS Load is additionally subject to the SRBF discussed in Part IV.B.ii.g. This is \nconsistent with the Show Cause Order’s expressed concern that the NYISO’s Tariff does not \nappear to include a “mechanism by which an Eligible Customer [] would be charged for ancillary \nservices commensurate with its usage of such services, particularly if such customer did not \nwithdraw energy from the transmission system.”521 \nAs such, the NYISO’s proposal to provide a participation framework for Zero \nWithdrawal Service Loads appropriately accommodates the unique operating characteristics of \nthis type of Large Load and is just and reasonable. \nf) \nAllocating Costs to Large Loads on a Gross Load Basis \nThe Show Cause Order preliminarily found that the NYISO’s tariff appears to be unjust \nand unreasonable because it does not address whether or how Eligible Customers taking \ntransmission services on behalf of Eligible Loads will be charged for their use of regulation and \n \n520 Smith Affidavit at P 40. \n521 Show Cause Order at PP 106-107."},{"page":96,"startToken":48880,"endToken":49413,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 96 \n \n \nblack start services, creating a risk that Eligible Load may benefit from these services without \ncontributing to cost recovery for such services.522  In response to the Commission’s concern, and \nto ensure that Eligible Customers taking transmission service on behalf of Eligible Load pay for \nwholesale transmission services that they receive, consistent with the cost causation principle,523 \nthe NYISO proposes to assess fees and charges to all Large Loads on a gross Load basis.524  This \ntreatment will include, but is not limited to, assessment on a Gross Load Basis of Operating \nReserves Charges, Black Start Charges, Voltage Support Service Charges, and Regulation \nService Charges.525  The NYISO would implement this change via proposed amendments to \nOATT Sections 6.2, 6.3, and 6.5.   \nApplying these charges to all Large Loads on a Gross Load basis, regardless of \nWithdrawal Rights, rather than on a Net Load basis, will help to prevent unreasonable cost \nshifting to existing Loads and thus to protect customers.  \ng) \nThe System Reliability Benefit Fee \nThe NYISO proposes to assess a System Reliability Benefit Fee (“SRBF”) under new \nOATT Section 6.24.  The SRBF would be “assessed to an LSE associated with the MW of (a) \nthe portion of a Limited Withdrawal Service Load(s) that is not taking Firm Withdrawal Service \nand/or (b) a Co-Located Local Load(s) that is not included in the applicable LSE’s portion of \nUnforced Capacity Obligation the NYCA Minimum Unforced Capacity Requirement, in \naccordance with Section 5.11.1 of the Services Tariff.” \nThe purpose of the SRBF is to allocate ICAP market costs Limited Withdrawal Service \nLoads, or portions thereof, not taking Firm Withdrawal Service in an amount roughly \ncommensurate to the benefits they receive from ICAP Resources and the value of the reliability \nservice that they provide during periods of low demand.  The SRBF will serve as a cost allocator \nfor these Large Loads, which will benefit from reliable service despite not being required to pay \nICAP market costs.    \nAs discussed in the Smith Affidavit,526 the SRBF will be assessed to the LSE taking \nservice on behalf of a Limited Withdrawal Large Service Load.527  It is not a volumetric charge \nbased on actual Large Load energy withdrawals, Instead, it will be based on the amount of Non-\nFirm Withdrawal Service or Zero Withdrawal Service MW studied and authorized through the \nLLIP.  By tying the SRBF to authorized MW rather than actual MWh, the NYISO will charge \nthese Large Loads for the reliability benefits they receive from the NYISO capacity market. \nWithout the SRBF, these Large Loads would benefit from stable and reliable system operations \nwithout contributing correspondingly to the costs incurred to maintain those operations. The \n \n522 Id. at P 107. \n523 Id. at P 103. \n524 The fact that the NYISO is proposing to adopt a gross load basis assessment under FPA section 205 \nshould not be construed as a concession that the NYISO’s existing tariffs are unjust, unreasonable, or unduly \ndiscriminatory or preferential   \n525 See Proposed OATT §§ 6.2, 6.3, and 6.5. \n526 See Smith Affidavit at PP 46-51. \n527 Proposed OATT § 6.24."},{"page":97,"startToken":49413,"endToken":49784,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 97 \n \n \nSRBF will also create an incentive for Large Loads taking any amount of Non-Firm Withdrawal \nService or Zero Withdrawal Service to acquire full Firm Withdrawal Service rights. \nUnder OATT Section 6.24, the SRBF will be calculated as follows. \nSRBFCm  = (NFWS LoadCm + ZWS LoadCm ) * ((NYCA IRMm ) * (NYCA Capacity Translation \nFactorm)) + NYCA excess %m) * Spot Market Auction Clearing PriceCm  \nWhere: \n𝑆𝑅𝐵𝐹𝐶𝑚 = the System Reliability Benefit Fee assessed to the LSE responsible for \nthe kW associated with the portion of Limited Withdrawal Service Load C that is \nnot taking Firm Withdrawal Service or Co-Located Local Load C for month m;   \n𝑁𝐹𝑊𝑆 𝐿𝑜𝑎𝑑𝐶𝑚  = the amount of kW associated with the portion of a Limited \nWithdrawal Service Load or Co-Located Local Load C taking Non-Firm \nWithdrawal Service supplied by the LSE for month m;    \n𝑍𝑊𝑆 𝐿𝑜𝑎𝑑𝐶𝑚 = the amount of kW associated with the portion of a Limited \nWithdrawal Service Load or Co-Located Local Load C classified as a Zero \nWithdrawal Service Load for month m; \n𝑁𝑌𝐶𝐴 𝐼𝑅𝑀𝑚 = the NYCA Installed Reserve Margin or the NYCA Winter \nInstalled Reserve Margin that is in effect for the NYCA for month m;   \nNYCA Capacity Translation Factorm = the ratio of (i) NYCA Minimum Unforced \nCapacity Requirement for month m; and (ii) NYCA Minimum Installed Capacity \nRequirements in effect for month m;  \nNYCA excess %m = the ratio of (i) the additional UCAP procured in excess of the \nNYCA Minimum Unforced Capacity Requirement as reported in the ICAP Spot \nMarket Auction results for NYCA for month m; and (ii) NYCA Minimum \nUnforced Capacity Requirement as reported in the ICAP Spot Market Auction \nresults for NYCA for month m;   \nSpot Market Auction Clearing PriceCm  = the applicable ICAP Spot Market \nAuction Clearing Price for month m for the Capacity Region in which that \nLimited Withdrawal Service Load or Co-Located Local Load C is electrically \nlocated.   \nAssessing the SRBF on these Large Loads will generate residual rents because these \nLoads do not clear in the ICAP auction and the charges collected from them are not allocated \nthrough any existing process.  The NYISO is proposing a new allocation methodology that will \nassign these residuals to such LSEs based on LSEs’ share of the total NYCA-wide ICAP"},{"page":98,"startToken":49784,"endToken":50269,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 98 \n \n \nobligation.528  This methodology will mitigate LSEs’ Capacity costs as well as, potentially, costs \nto customers.  \nThe SRBF proposal is responsive to the Show Cause Order’s preliminary finding that the \nNYISO’s Tariff appears to be unjust and unreasonable because it “lacks adequate mechanisms to \nmitigate the risk of cost shifting among transmission customers, which may result in unjust and \nunreasonable rates for transmission service.”529 \nC. \nProposed Large Load Operating Requirements \nThe NYISO proposes to revise Sections 3.5.2 and 13 of the Services Tariff to require \nTransmission Customers taking service on behalf of Large Loads to submit the following \ninformation to the NYISO: (i) six-second Real-Time telemetry; (ii) hourly revenue-grade meter \ndata; (iii) Day-Ahead and hourly real-time load forecasts; (iv) PMU data and Phase 1 metering, \nas applicable; (v) separate and direct metering of Load at co-located facilities; and (vi) other \ninformation and data in accordance with ISO Procedures.  Transmission Customers will also be \nrequired to submit all data, telemetry, operating information, and control documentation for \nLarge Loads on a facility-specific basis.530 These requirements ensure that the NYISO has \nnecessary operational visibility into and control over Large Loads, which will result in more \naccurate and reliable market solutions and operator decisions. Having clear operational \nrequirements in place also protects customer interests by minimizing the need for costly out-of-\nmarket actions to account for changes in Large Load behavior.  \nAs discussed in the Smith Affidavit, the NYISO’s proposal will expressly preserve \nConnecting Transmission Owners’ (“CTOs”) authority to remotely disconnect Large Loads \nwhen necessary to maintain reliability of the transmission system.531  It would also allow the \nNYISO to request that a CTO remotely disconnect a Large Load for reliability reasons.  In \naddition, the NYISO and/or CTO may request disconnection of a CLLC or a CLGC to avoid \nimpermissible injections and/or withdrawals.  These actions are expected to be consistent with \nexisting operating and communication procedures that exist today with transmission owners. 532 \nThis proposal is responsive to the Show Cause Order’s directive that the NYISO’s Tariff \nshould include provisions addressing ongoing operational requirements for transmission \ncustomers taking transmission service on behalf of large load.533 The Commission specifically \nhighlighted the absence of provisions requiring transmission customers to provide the NYISO \nhourly forecasts, telemetry data, and other data necessary to ensure sufficient visibility, as well \nas requirements for maintaining communication channels between the NYISO and the \nTransmission Customers on behalf of the large load.534   \n \n528 See proposed Services Tariff § 6.24 (“Residuals created by the System Reliability Benefit Fee shall be \nallocated to LSEs based on their share of the applicable NYCA Minimum Unforced Capacity Requirement.”). \n529 Show Cause Order at P 72. \n530  See Proposed Services Tariff Section 3.5.2. \n531 Smith Affidavit at P 52. \n532 Smith Affidavit at P 52. \n533 Show Cause Order at P 70. \n534 Id."},{"page":99,"startToken":50269,"endToken":50618,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 99 \n \n \nD. \nAdditional CLLC Rules \ni. \nOverview and Eligibility \nAs noted above, the NYISO is proposing to establish and describe a new market \nparticipation model in the Services Tariff for Co-Located Arrangements535—the Co-Located and \nLimited Load Configuration (“CLLC”) framework. \n \nii. \nCLLC-Specific Definitions \nThe NYISO proposes several definitions related to co-location. In particular, the NYISO \nproposes to define CLLC as: \nA configuration that consists of (a) a Co-Located Load that is a \nLimited Withdrawal Service Load participating with one or more \nCo-Located Resources, in accordance with Section 4.1.12 of the \nISO Services Tariff, or (b) a stand-alone Limited Withdrawal \nService Load. All components of the CLLC must be located \nbehind a single Point of Interconnection. A Large Load taking only \nFirm Withdrawal Service may not participate in a CLLC. \nA Co-Located Resource(s) participating in a CLLC may not \nparticipate in the ISO Administered Markets through any other \nparticipation model. A Co-Located Resource that is a Hybrid \nStorage Resource cannot participate in a CLLC.  \nThe CLLC shall participate in the ISO-administered Energy and \nAncillary Services markets as a single Resource that is capable of \nfollowing the ISO’s dispatch instructions. In order to qualify for \nwholesale market participation, a CLLC must be able to inject or \nwithdraw at least 1 MW of Energy to/from the transmission \nsystem. A CLLC will be required to submit Energy Bids consistent \nwith the Withdrawal Service(s) being taken by the Co-Located \nLoad and the manner in which the Market Participant seeks to \nexercise those Withdrawal Service rights within a given real-time \nmarket interval. The Co-Located Resource(s) in a CLLC shall \nparticipate in the ISO-administered Installed Capacity market as a \nsingle ICAP Supplier referred to as a Composite Co-Located \nResource.536 \n \n535 A Co-Located Arrangement is an agreement between a Co-Located Load and a Co-Located Resource(s) \nthat are connected behind the same Point of Interconnection, which is entered into for the purpose of enabling the \nCo-Located Load to take some amount of Firm Withdrawal Service.  \n536 Proposed Services Tariff Section 2.3."},{"page":100,"startToken":50618,"endToken":50992,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 100 \n \n \nThe NYISO also proposes the following CLLC-related definitions:537 \nCo-Located Load: A Large Load connected behind the same \nPoint of Interconnection as a Co-Located Resource. A Co-Located \nLoad may include an ESR in a CLLC in which all withdrawals of \nthe ESR are settled as Load, in accordance with Section 4.1.12.1 of \nthe ISO Services Tariff. \nCo-Located Resource: A Resource connected behind the same \nPoint of Interconnection as a Co-Located Load. A Co-Located \nResource may include an Energy Limited Resource; an Energy \nStorage Resource; a Generator without a PURPA contract(s); a \nHybrid Storage Resource; an Intermittent Power Resource; a \nLimited Control Run of River Hydro Resource; and a Demand \nSide Resource that is participating as a standalone Distributed \nEnergy Resource. A Co-Located Local Generator is not a Co-\nLocated Resource. \nComposite Co-Located Resource: One or more Co-Located \nResource(s) within a CLLC that participates in the ISO-\nadministered Installed Capacity market as a single Installed \nCapacity Supplier. \nWithdrawal Scheduling Limit: The maximum amount of MW \nassociated with a CLLC that is registered as eligible for withdrawal \nscheduling by the NYISO. \nZero Withdrawal Service Load: A Large Load or portion thereof \nthat is not authorized under the ISO OATT to withdraw Energy \nfrom the NYS Transmission System. A Zero Withdrawal Service \nLoad is either (a) a Limited Withdrawal Service Load in a CLLC \nor (b) a Co-Located Local Load in a CLGC. Energy consumption \nby Zero Withdrawal Service Loads shall be metered and included \nin Gross Load. \nThe NYISO proposes to clarify that an ESR, as defined in Services Tariff Section 2.5, \nthat participates in a CLLC shall follow the rules set forth in Section 4.1.12.1 of the Services \nTariff.”538 The NYISO also proposes conforming revisions to the definitions of Resource, \nSupplier, Installed Capacity Supplier, Lower Operating Limit, Minimum Generation Bid and \nMinimum Generation Level, and Station Power to integrate the CLLC. \nThe NYISO’s definition of Co-Located Resource is broad, encompassing Resource types \nsuch as HSR, CSR, and others. This is intentional – the Co-Located Resource definition is \nintended to be applied broadly to contexts external to the CLLC participation model, such as the \n \n537 Id. \n538 Id."},{"page":101,"startToken":50992,"endToken":51456,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 101 \n \n \nCo-Located Arrangement construct. A subset of Co-Located Resources, i.e. Generators that do \nnot utilize other participation models, will be eligible to participate in a CLLC.  For example, \nstorage is a CLLC-eligible technology type, but storage participating in a CLLC will not be able \nto utilize the NYISO’s Energy Storage Resource participation model rules. This is to prevent \nMarket Participants from creating nested Aggregations, such as locating an HSR within a CLLC, \nand to maintain a distinct participation model that can support the integration of Load and \nGeneration into a single co-located facility. \nDemand Side Resources are ineligible to participate in the CLLC participation model by \ndefault. In order to participate in a CLLC, any composite Load would have to be classified as \nLimited Withdrawal Service Load, which disqualifies the Load from qualifying for Demand \nResponse compensation. However, Load flexibility can still be reflected in the CLLC’s net \nEnergy bid, and may be reflected in other aspects of CLLC performance such as DMNC tests. \nThis enables the CLLC Market Participant to utilize Load flexibility in effectuating greater net \ninjections onto the grid, in the event that the CLLC contains enough Generation to effectuate \nsuch an outcome.  \niii. \nCLLC-Specific Metering and Telemetry Requirements \nThe NYISO proposes to revise Services Tariff Sections 13.1 (General Requirements) and \n13.2 (Requirements Pertaining to Customers) to extend the metering and six-second real-time \ntelemetry requirements to (1) CLLCs and (2) Large Loads, including those in a CLLC or a \nCLGC.539  \nThe NYISO proposes a new Section 13.2.7 (Metering Requirements for Co-Located and \nLimited Load Configurations). This section would provide that a CLLC shall be metered by the \nTransmission Owner it is interconnected to or in whose Load Zone it is located, and Energy \ninjections and withdrawals at the Point of Interconnection shall be metered separately and \ndirectly and be submitted to the ISO by the Transmission Owner Meter Authority in separate \nfields such that the ISO is able to separately determine the total Energy injections and \nwithdrawals in each interval.540 The Co-Located Load shall provide real-time telemetry at the \nPoint of Interconnection and the Gross Load at the Large Load nominally every six seconds, in \naccordance with the specifications set forth in ISO Procedures.541  \niv. \nCLLC-Specific Energy Market Rules \nThe NYISO proposes several changes to its Day-Ahead and Real-Time Market rules to \nschedule and dispatch a CLLC as a single Resource and limit its withdrawals to levels consistent \nwith its Withdrawal Service rights. \nThe NYISO proposes to revise Services Tariff Section 4.2.1.1 (General Customer \nForecasting and Bidding Requirements) by adding “Bids to purchase Energy and Bids to supply \n \n539 Services Tariff §§ 13.1, 13.2. \n540 Id. § 13.2.7. \n541 Id."},{"page":102,"startToken":51456,"endToken":51942,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 102 \n \n \nEnergy by CLLCs” to the list of bids required by LSEs and Customers and Transmission \nCustomers submitting Bids in the Day-Ahead Market.542 \nThe NYISO proposes to add a new Section 4.2.1.9 (Large Loads) providing that all Large \nLoads, regardless of Withdrawal Service classification, are subject to a maximum ramp rate limit \nof 20 MW/min, and that the ISO may instruct a Large Load to deviate from this ramp rate limit \nin order to protect reliability. \nThe NYISO proposes to add a new Section 4.2.1.9.1 (Co-Located and Limited Load \nConfigurations) requiring a CLLC to submit Day-Ahead Market Bids using the ISO-Committed \nFlexible, Self-Committed Flexible, or ISO-Committed Fixed Bid modes. A Supplier’s Day-\nAhead Market Bids for a CLLC to withdraw and to inject Energy must be submitted as a single, \ncontinuous bid curve representing the net capability available for scheduling for each hour of the \nDispatch Day.543 Any portion of a Co-Located Load that is taking Non-Firm Withdrawal Service \nmust be included in the net bid curve as an Energy withdrawal and is subject to the $200/MWh \nNon-Firm Withdrawal Service bid cap.544 A CLLC is not required to submit Day-Ahead Market \nBids to withdraw for any hour in which it does not intend to withdraw.545 A CLLC’s Day-Ahead \nMarket Bid must reflect the CLLC’s applicable operating limits.546 The maximum physical Point \nof Injection and Point of Withdrawal limits shall represent the Bid bounds of the CLLC.547 The \nLower Operating Limit shall represent the maximum desired net withdrawal MW and the Upper \nOperating Limit shall reflect the maximum desired net injection MW for which the CLLC may \nreceive a schedule.548 The CLLC may nominate up to three response rates; provided, however, \nthat the Large Load component of a CLLC’s Day-Ahead Market Bids shall be subject to the \nLarge Load ramp rate limit of 20 MW/min. CLLCs are not eligible to provide Operating \nReserves or Regulation Service.549 \nThe NYISO proposes to revise Section 4.2.3 (Security Constrained Unit Commitment) to \nprovide that SCUC will treat CLLCs, like Hybrid Storage Resources, Energy Storage Resources, \nand Aggregations as already committed and available to be scheduled, and proposes conforming \nedits throughout the section.550 \nThe NYISO proposes to revise Section 4.2.6 (Day-Ahead LBMP Market Settlements) to \nprovide that a CLLC scheduled in SCUC to sell Energy will be settled at the product of the Day-\nAhead hourly LBMP at the applicable Generator bus and the hourly Energy schedule.551 The \nrevisions also provide that a CLLC scheduled to purchase Energy will pay the product of the \n \n542 Services Tariff § 4.2.1.1. \n543 Id. § 4.2.1.9.1. \n544 Id. \n545 Id. \n546 Id. \n547 Id. \n548 Id. \n549 Id. \n550 Id. § 4.2.3. \n551 Id. § 4.2.6."},{"page":103,"startToken":51942,"endToken":52368,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 103 \n \n \nDay-Ahead hourly Zonal LBMP for the Load Zone associated with the CLLC and the hourly \nEnergy schedule.552 \nThe NYISO proposes to revise Section 4.4.1.2 (Bids and Other Requests) to require a \nCLLC to submit Real-Time Market Bids using the ISO-Committed Flexible, Self-Committed \nFlexible, or ISO-Committed Fixed Bid modes.553 A Supplier’s Real-Time Bids for CLLCs to \nwithdraw and to inject Energy must be submitted as a single, continuous bid curve representing \nthe net capability available for scheduling in the Real-Time Market for each hour of the Dispatch \nDay, and any portion Co-Located Load that is taking Non-Firm Withdrawal Service shall be \nincluded in the net bid curve as an Energy withdrawal and shall be subject to the $200/MWh \nNon-Firm Withdrawal Service bid cap.554 A CLLC’s Real-Time Bid must reflect the CLLC’s \napplicable operating limits, including upper and lower operating limits and other parameters as \nrequired by ISO Procedures.555 \nThe NYISO proposes to revise Section 4.4.3.1.2 (Maximum Generation Pickup) to \nprovide that RTD-CAM must produce schedules directing all CLLCs taking a portion of Non-\nFirm Withdrawal Service located in a targeted area to fully decrease any withdrawals associated \nwith Non-Firm Withdrawal Service at their emergency response rate.556 \nThe NYISO proposes a new Section 4.1.12.1 in the Services Tariff providing that a \nLimited Withdrawal Service Load participating with one or more Co-Located Resources or a \nstand-alone Limited Withdrawal Service Load must participate in NYISO markets as a CLLC.557 \nUnder this configuration, Large Loads taking solely Firm Withdrawal Service are ineligible to \nparticipate in a CLLC, withdrawals by participating Energy Storage Resources are settled as \nLoad, and any changes to a CLLC’s composition require a material modification evaluation \nunder OATT Attachment LL.558 \nThe NYISO proposes to revise Rate Schedule 3 (Payments for Regulation Service) to \ninclude CLLCs among the Resources that are not eligible to provide Regulation Service.559 \nv. \nCLLC-Specific Capacity Market Rules \nThe NYISO proposes various tariff changes related to CLLC participation in its capacity \nmarket. The NYISO proposes to revise Services Tariff Section 5.12.1 (Installed Capacity \nSupplier Qualification Requirements) by adding Composite Co-Located Resources to the \nResources that may qualify as Installed Capacity Suppliers,560 and would require such Resources \n \n552 Id. \n553 Id. § 4.4.1.2. \n554 Id. \n555 Id. \n556 Id. § 4.4.3.1.2. \n557 Services Tariff § 4.1.12.1. \n558 Id. \n559 Id. § 15.3. \n560 Services Tariff § 5.12.1."},{"page":104,"startToken":52368,"endToken":52832,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 104 \n \n \nto submit Operating Data in the same manner other Installed Capacity Suppliers per a revision to \nSection 5.12.5.1.561  \nThe NYISO proposes a new Section 5.12.6.1.3 (Composite Co-Located Resources) under \nwhich a Composite Co-Located Resource may, consistent with the deliverability requirements in \nAttachment HH of the OATT, qualify for ICAP up to the lesser of the aggregate CRIS of its \nindividual Co-Located Resource(s) and the aggregate DMNC of the Composite Co-Located \nResource, and must comply with Section 5.12.1 and the outage notification requirements of \nSection 5.12.7.562  \nThe NYISO proposes to revise Section 5.12.6.2 (UCAP Calculations), by providing that \nthe Unforced Capacity that a Composite Co-Located Resource is authorized to supply in the \nNYCA will be based on its availability in the Real-Time Market, excluding the hours in any \nmonth that the applicable Composite Co-Located Resource was in an outage state that precluded \nits eligibility to participate in the Installed Capacity market.563 \nThe NYISO proposes a new Section 5.12.7.4 requiring each Composite Co-Located \nResource, on a daily basis and for each hour of the Day-Ahead Market Day, to (i) schedule a \nBilateral Transaction; (ii) Bid the ICAP sold by that Composite Co-Located Resource minus the \nlarger of zero and the minimum of (a) the ICAP MW of Firm Withdrawal Service associated \nwith the given CLLC and (b) the absolute value of the LOL of the given hour; or (iii) notify the \nISO of any outages.564 \nvi. \nCLLC-Specific Settlement Rules \nThe NYISO proposes to revise Services Tariff Section 4.5.2.1 (General Rules for \nSuppliers) to provide that CLLCs are subject to the balancing market settlement rules when \nscheduled to provide or withdraw Energy or when actually providing or withdrawing Energy in \nreal-time.565 A CLLC will pay or be paid for Energy imbalance based on Actual Energy \nInjections and Scheduled Energy Injections at the Generator bus LBMP, and based on Actual \nEnergy Withdrawals and Scheduled Energy Withdrawals at the Zonal LBMP.566 Actual Energy \nWithdrawals for a CLLC will be determined from real-time revenue grade meters and \ntelemetry.567 Energy imbalance will be determined in two parts, with a breakpoint at zero MW of \ninjection or withdrawal, so that all injections are settled at the Generator bus LBMP and all \nwithdrawals are settled at the Zonal LBMP.568 The NYISO proposes conforming revisions to \nSection 4.5.3.1 to provide that a Customer’s Actual Energy Withdrawals for a Large Load will \n \n \n562 Id. § 5.12.6.1.3. \n563 Id. § 5.12.6.2. \n564 Id. § 5.12.7.4. \n565 Services Tariff § 4.5.2.1. \n566 Id. \n567 Id. \n568 Id."},{"page":105,"startToken":52832,"endToken":53255,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 105 \n \n \nbe determined from real-time revenue grade meters and telemetry, and that CLLCs are subject to \nthe withdrawal balancing rules subject to the zero MW breakpoint.569 \nThe NYISO proposes to revise Sections 18.2.1.2 (Attachment C) and 25.2.28 \n(Attachment J) to the Services Tariff to clarify that a CLLC shall not be eligible to receive Day-\nAhead Bid Production Cost Guarantee or Day-Ahead Margin Assurance Payments.570  This is \nreasonable because  CLLCs are unique Resources, treated as Load when net withdrawing and as \nwholesale supply when net injecting.  The NYISO does not currently have any other Resources \nwith such characteristics. It is therefore reasonable for NYISO to wait to gain practical working \nexperience with the new CLLC model before it determines whether CLLCs require make whole \npayments and what form such payments might take.571 \nE. \nDeviation Charges for CLLCs that Fail to Follow NYISO’s Dispatch \nInstructions \nThe NYISO is proposing to add a new Section 15.3B (“Rate Schedule 3-B”) to the \nServices Tariff to assess new deviation charges to  CLLCs that do not follow the NYISO’s \ndispatch instructions/basepoints when net withdrawing from the system. \nUnder Section 15.3B.1 (Overwithdrawal Charges), a CLLC whose Actual Energy \nWithdrawals exceed its scheduled Energy withdrawals over a Real-Time Dispatch interval would \npay an overwithdrawal charge calculated as follows: \ni. \nOverwithdrawal MW x Max (MPRCDAM, MPRCRT) x Length of Interval in \nseconds 3600 seconds572 \nUnder Section 15.3B.2 (Underwithdrawal Charges), a CLLC that withdraws less than its \nscheduled Energy withdrawals minus the tolerance will pay a corresponding underwithdrawal \ncharge calculated as follows: \nii. \nUnderwithdrawal MW x Max (MPRCDAM, MPRCRT) x Length of Interval in \nseconds 3600 seconds573 \nThese charges are a necessary incentive mechanism because CLLCs are dispatchable, \neven when net withdrawing from the system. When a Generator today deviates from its \nbasepoints, such deviations must be corrected for through the dispatch of additional Regulation \ncapacity, which incurs a systemwide cost. Under the existing rules, the additional cost of \ndispatching such Regulation capacity is allocated to the Generators that caused the discrepancy \nvia Generator Overgeneration/Undergeneration charges. A CLLC that deviates from its dispatch \nwhile net withdrawing yields the same end result – NYISO must dispatch additional Regulation \nto compensate for those deviations.  NYISO therefore believes that it is reasonable to assess \n \n569 Id. § 4.5.3.1. \n570 Id. §§ 18.2.1.2, 18.4.2. \n571 See Smith Affidavit at P 79. \n572 Id. § 15.3B.1. \n573 Id."},{"page":106,"startToken":53255,"endToken":53726,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 106 \n \n \nsimilar, but distinct, Overwithdrawal and Underwithdrawal charges to CLLCs in intervals where \nthey are dispatched to withdraw yet fail to follow their withdrawal basepoints.  \nThe CLLC deviation charge that is applied when the CLLC is net withdrawing will have \na tolerance threshold of 5% of the Large Load’s maximum registered withdrawal limit, i.e. the \ntotal amount of Withdrawal Service that the Load was studied for and awarded in the LLIP.  The \ncharge will be assessed using the Regulation clearing price, consistent with existing \nUnder/Overgeneration penalties for Generators. The 5% tolerance applied to the CLLC \nwithdrawal deviation charge is more generous than the 3% tolerance applied to Generator \nOvergeneration/Undergeneration charges, and accommodates stakeholder feedback that some \nLoads, though dispatchable, may not be able to modulate Load as precisely as a Generator can \nmodulate supply. \nCLLCs will be subject to the existing DER Aggregation Overgeneration/Undergeneration \ncharges in market intervals where they are dispatched to net inject onto the system.  The Smith \nAffidavit further addresses the reasonableness of these charges.574 \nThe Commission should accept the NYISO’s proposed deviation charges as within the \nscope of the Commission’s jurisdiction for the same reasons as the NYISO’s proposed \ncurtailment rules for Limited Withdrawal Service Loads, discussed above in Part IV.B.ii.b are \nCommission-jurisdictional.  Namely, the deviation charges are conditions to the receipt of \njurisdictional non-firm transmission service and are wholesale market design mechanisms that \nexist in the wholesale energy space.  They are intended to incentivize CLLCs’ adherence to \nNYISO dispatch/basepoint instructions under NYISO’s Commission-jurisdictional tariffs.  The \nNYISO has no intention to intrude on state jurisdiction.   \n \nIn addition, the SPP CHILLS Order also supports NYISO’s proposed deviation charges. \nCHILLS customers taking transmission service in excess of their CHILLS reserved capacity are \nsubject to SPP-imposed penalties.575 The Commission found this arrangement to be just and \nreasonable because it ensures that CHILLS customers pay for unreserved use of SPP’s \ntransmission system based on the amount and duration of such unreserved use.576 The \nCommission also found that escalating penalties will help deter CHILLS Customers from \nrepeatedly failing to adhere to reserved capacity amounts.577 So too with the NYISO’s proposed \ndeviation charge, which is structured to ensure that customers being served via Non-Firm \nWithdrawal Service adhere to the NYISO’s dispatch instructions and basepoints when net \nwithdrawing. \n \nF. \nThe Associated Resource Arrangements and the Capacity Region Construct \nAs discussed above in Part II.G.ii, a Large Load that is seeking Firm Withdrawal Service \nbut has been identified in the LLIP as causing impermissible adverse resource adequacy impacts \nmay mitigate those impacts, and thus be eligible to receive some or a full amount of Firm \n \n574 See Smith Affidavit at PP 80-82. \n575 SPP CHILLS Order at P 98. \n576 Id. \n577 Id."},{"page":107,"startToken":53726,"endToken":54226,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 107 \n \n \nWithdrawal Service by entering into an Associated Resource arrangement(s).  The NYISO \nwould revise Section 2.1 of the Services Tariff to define an “Associated Resource” as follows: \n[a] Co-Located Resource or Partner Resource that may mitigate some or all of a \nLarge Load’s adverse impacts to resource adequacy and/or transmission security \nidentified in the LLIP set forth in Attachment LL of the ISO OATT, which allows \nthe respective Co-Located Load or Large Load to take some amount of Firm \nWithdrawal Service.”  An Associated Resource must be (a) a proposed project \nthat does not yet meet the inclusion rules for the Reliability Planning Process at \nthe time the Large Load Integration Request is validated in accordance with \nSection 44.6.5 of Attachment LL of the ISO OATT; (b) a new Installed Capacity \nSupplier; and (c) otherwise satisfy the applicable requirements set forth in Section \n44.6.4 of Attachment LL of the ISO OATT.   \nServices Tariff Section 2.3 would be revised to define a “Co-Located Arrangement” as: \nAn agreement between a Co-Located Load and a Co-Located Resource(s) for the \npurpose of enabling the Co-Located Load to take some amount of Firm \nWithdrawal Service, consistent with Section 4.1.12 of the ISO Services Tariff and \nAttachment B of the ISO OATT.  The Co-Located Resource(s) and the associated \nCo-Located Load must be behind the same Point of Interconnection and must \njointly submit an attestation in accordance with Section 44.6.3.5 of Attachment \nLL of the ISO OATT.  A Co-Located Arrangement may be between: (1) a Co-\nLocated Load taking solely Firm Withdrawal Service and a Co-Located Resource \nor (2) a Co-Located Load and Co-Located Resource in a CLLC. The Co-Located \nArrangement shall have a required minimum duration of fifteen (15) years, \nstarting the first day of the Obligation Procurement Period for which the UCAP \nequivalent of ICAP documented in the Large Load Bilateral Transaction is \ninitially certified, in accordance with ISO Services Tariff Sections 5.11.2 and \n5.13.1 and ISO Procedures \nAnd Services Tariff Section 2.16 would define a “Partnered Resource Arrangement” as: \nAn agreement between Partner Resource(s) and a Large Load that are electrically \nlocated in the same Capacity Region for the purpose of enabling the Large Load \nto take Firm Withdrawal Service, consistent with Section 4.1.12 of the ISO \nServices Tariff and Attachment B of the ISO OATT. The Partner Resource(s) and \nthe Large Load must jointly submit an attestation in accordance with Section \n44.6.3.5 of Attachment LL of the ISO OATT. The Partner Resource Arrangement \nshall have a required minimum duration of fifteen (15) years, starting the first day \nof the Obligation Procurement Period for which the UCAP equivalent of ICAP \ndocumented in the applicable Large Load Bilateral Transaction is initially \ncertified, in accordance with Sections 5.11.2 and 5.13.1 of the ISO Services Tariff \nand ISO Procedures."},{"page":108,"startToken":54226,"endToken":54740,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 108 \n \n \nOnce a Large Load enters into a Co-Located or Partner Resource Arrangement with an \nAssociated Resource(s), that Large Load’s eligibility to take the amount of Firm Withdrawal \nService dependent on such arrangement with an Associated Resource becomes contingent on the \ncontinued ICAP market participation of the Associated Resource(s).  If the Associated \nResource(s) that is party to a given Large Load’s Co-Located or Partner Resource Arrangement \nenters into an ICAP Ineligible Forced Outage, Mothball, or Retired status, or otherwise exit the \nICAP markets, the corresponding Large Load will be required to reclassify, in part or in full, as a \nNFWS Load.  \nIf the Large Load’s Associated Resource(s) later exit from one of the aforementioned \nstatuses and resumes ICAP market participation, then the Large Load’s Firm Withdrawal Service \nRights may be restored.  \nThe NYISO proposes to require that all Co-Located and Partner Resource Arrangements \nremain in place for a term of 15 years.578 After the 15-year term expires, the Large Load’s Firm \nWithdrawal Service shall no longer be contingent on the continued ICAP market participation of \nits Associated Resource(s).  \nNYISO’s proposed rules ensure that the ICAP associated with an Associated Resource(s) \nin an arrangement with a Large Load is being made available to the ICAP market by requiring \nthat a Large Load Bilateral Transaction be in place, which is a capacity bilateral, between \nAssociated Resources and the Large Load to whose arrangement they belong. This Large Load \nBilateral Transaction must be in place for each Obligation Procurement Period following the \neffective date of the Large Load’s Co-Located or Partner Resource Arrangement.  \nThis requirement ensures that the ICAP of the Associated Resource(s), which was caused \nto enter the ICAP market as a result of  the Large Load’s need to mitigate its adverse impacts to \nresource adequacy, continues to do so for the required term of the Co-Located or Partner \nResource Arrangement, as further discussed below. Further, as the Smith Affidavit explains, the \nNYISO’s proposed rules will also ensure that Associated Resource(s) are not transient, and \nremain in the ICAP markets for a predetermined, minimum period of time.  \nThe NYISO’s Associated Resource arrangement construct and related rules are \nresponsive to the Commission’s concern expressed in the Show Cause Order that “[w]ithout such \na common and consistent understanding of entities’ responsibilities relevant to co-location \narrangements [] we are concerned that these arrangements may be developed in a manner that is \nitself unjust and unreasonable or that may result in unjust and unreasonable rates for other \ncustomers[,]579 and encouragement for the NYISO to consider “what type of transmission service \nan Eligible Customer will need to take on behalf of the electrically proximate large load or large \nco-located load.”580  \nThe Show Cause Order’s suggested defined terminology of Large Load associating with \n“electrically proximate” supply. i.e., less than two substations away, is not well suited for \n \n578 See Proposed Services Tariff § 4.1.10.3. \n579 Show Cause Order at P 102. \n580 Show Cause Order at P 127 (emphasis added)."},{"page":109,"startToken":54740,"endToken":55343,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 109 \n \n \nimplementation in the NYISO.  Requiring an Associated Resource to be in the same Capacity \nRegion as its associated Large Load is appropriate in light of the NYISO’s specific frameworks. \nThis is because, during the interconnection process, when the deliverability of a new resource to \nbe eligible to supply capacity is evaluated (i.e., the deliverability test is applied to projects \nseeking CRIS), the NYISO looks at the deliverability of the new Resource within the Capacity \nRegion where that Resource is located.  Given that the Associate Resource is addressing the \nresource adequacy impact of the Large Load, it is appropriate to require that the Associated \nResource be within the same Capacity Region as the Large Load in the NYISO . \nAs such, the NYISO is proposing to allow Large Loads to partner or co-locate with \nAssociated Resource(s) that are electrically located in the same Capacity Region as the Large \nLoad.  This construct is more conducive to the way the NYISO’s resource adequacy \nrequirements and ICAP market are structured.  And, as discussed in the Smith Affidavit, utilizing \na Capacity Region construct in place of an electrical proximity approach is better suited to the \nNYISO’s markets and the configuration and topology of the NYS Transmission System.581   \nThe NYISO’s proposed Capacity Region requirement achieves the same objectives as the \nelectrically proximate generation specifications discussed in the  Show Cause Order, including \nits expressed concern that “[i] the absence of Tariff provisions accounting for these operational \ndynamics when an interconnection customer’s generating facility is serving electrically \nproximate large loads or large co-located loads, new shovel-ready generating facilities may face \nunnecessary delays in reaching commercial operation under current generator interconnection \nprocesses and will be unable to serve the immediate demand of new large loads or large co-\nlocated loads.”582  Allowing Large Loads to enter into arrangement with an Associated \nResource(s) in the same Capacity Region, may avoid or lessen unnecessary delays in Large \nLoads properly reaching commercial operation.  Also, of note, in the Show Cause Order the \nCommission stated that it would consider “proposed revisions to this definition that ensure it is \nappropriately tailored to NYISO transmission system.”583   \nG. \nDSR/Aggregation Rules \nUnder proposed OATT Part 3A, Section 3.A.1.1, a Large Load taking Firm Withdrawal \nService is eligible to participate in the NYISO markets via its various Demand Side Resource \nprograms, and is treated the same as other firm Transmission Service customers, including being \nsubject to the same curtailment priority and the NYISO’s emergency operating procedures.584 By \ncontrast, Section 3.A.1.2 and the revised “Demand Side Resource”585 definition in Services \n \n581 Smith Affidavit at P 86. \n582 Show Cause Order at P 121. “Where a generating facility’s output is matched to the demand of the \nelectrically proximate large load or large co-located load or if the generating facility’s output is limited to ensure no \nnew injection, the impacts to the transmission system of interconnecting the generating facility to serve that \nelectrically proximate large load or large co-located load may be limited, thereby potentially reducing the need for \nNetwork Upgrades, which can accelerate the generator interconnection process.” Id. \n583 Show Cause Order at P 120. \n584 Proposed OATT Part 3A § 3.A.1.1. \n585 The NYISO proposes to define “Demand Side Resource” as “A Resource located in the NYCA that: (i) \nis capable of controlling demand by either curtailing its Load or by operating a Local Generator to reduce Load from \nthe NYS Transmission System and/or the distribution system at the direction of the ISO, in a responsive, measurable"},{"page":110,"startToken":55343,"endToken":55999,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 110 \n \n \nTariff Section 2.3 provide that a Large Load taking any amount of Non-Firm Withdrawal \nService, including a Large Load taking a combination of Firm and Non-Firm Withdrawal \nService, is not eligible to participate in NYISO Demand Side Resource programs.586  \nThe NYISO is proposing to allow a Large Load to enter a Partner Resource Arrangement \nor Co-Located Arrangement with an Associated Resource(s)587 to obtain, in part or in full, Firm \nWithdrawal Service, as determined by the Large Load Integration Procedures set forth in \nproposed Attachment LL to the OATT.588 Both arrangements would be subject to a minimum \nduration of fifteen years, starting the first day of the Obligation Procurement Period for which \nthe UCAP equivalent of ICAP documented in the applicable Large Load Bilateral Transaction is \ninitially certified.589 Large Load taking Firm Withdrawal Service that is a party to a Partner \nResource Arrangement and is a Demand Side Resource that is not participating in an \nAggregation cannot serve as the Partner Resource to another Large Load.590 A Large Load taking \nFirm Withdrawal Service that is a party to a Co-Located Arrangement and is a Demand Side \nResource that is participating as a standalone Distributed Energy Resource cannot serve as the \nAssociated Resource to another Large Load.591 Under this framework, the Large Load must \npartner with a “new” DSR; that is, the DSR must have never participated in a NYISO Demand \nResponse Program, and facilities included in DER Aggregations must never have participated in \na NYISO market.  \nBecause the NYISO’s proposed Large Load market rules would allow a Demand Side \nResource to become an Associated Resource and engage with a Partner or Co-Located Resource \nArrangement as well, the NYISO sees a need to prohibit a Large Load that is receiving Full \nWithdrawal Rights through a Co-Located or Partner Resource Arrangement and which registers \nas a DSR from itself serving as the Associated Resource to a second Large Load seeking FWS in \na second Co-Located or Partner Resource Arrangement. NYISO is concerned that the first Large \nLoad’s Associated Resource could exit the ICAP market, causing the first Large Load to \nreclassify as NFWS Load and causing it to lose its ability to participate in the markets as a \nDemand Side Resource. This, in turn, would cause the second Large Load to lose access to its \nAssociated Resource, which was the first Large Load when it was operating as a Demand Side \n \nand verifiable manner within time limits, and (ii) is qualified to participate in competitive Energy, Capacity, \nOperating Reserves or Regulation Service markets, or in the Emergency Demand Response Program pursuant to this \nISO Services Tariff and the ISO Procedures. A Large Load is not eligible to participate in the ISO Administered \nMarkets as a Demand Side Resource if it is a Limited Withdrawal Service Load.” Proposed Services Tariff Section \n2.4.  \n586 Proposed OATT Part 3A § 3.A.1.2. \n587 The NYISO proposes to define “Associated Resource” as “a Co-Located Resource or Partner Resource \nthat may mitigate some or all of a Large Load’s adverse impacts to resource adequacy and/or transmission security \nidentified in the LLIP set forth in Attachment LL of the ISO OATT, which allows the respective Co-Located Load \nor Large Load to take some amount of Firm Withdrawal Service. An Associated Resource must be (a) a proposed \nproject that does not yet meet the inclusion rules for the Reliability Planning Process at the time the Large Load \nIntegration Request is validated in accordance with Section 44.6.5 of Attachment LL of the ISO OATT; (b) a new \nInstalled Capacity Supplier; and (c) otherwise satisfy the applicable requirements set forth in Section 44.6.4 of \nAttachment LL of the ISO OATT.” Proposed Services Tariff Section 2.1; Proposed OATT Section 44.1. \n588 Proposed Services Tariff § 4.1.12. \n589 Id. \n590 Id. \n591 Id."},{"page":111,"startToken":55999,"endToken":56482,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 111 \n \n \nResource. Then, the second Large Load must also reclassify as NFWS Load. Such a mass \nreclassification of Large Loads from FWS to NFWS would also result in these Large Loads \nlosing DSR eligibility, requiring them to withdraw their Demand Response capability from the \nICAP, Energy, and Ancillary Services markets. Without such a prohibition in place, markets may \ninadvertently incentivize the creation of an interdependent web of Large Load FWS eligibilities \n(i.e., “daisy-chaining”) that could pose a risk to reliability and/or market stability.    \nThis proposal responds to the Commission’s directive that the NYISO’s Tariff should \nprovide for transmission services for Eligible Load and flexible large loads that are willing and \nable to limit their withdrawals.592   \nH. \nDER Modeling Improvements and Baseline Enhancements \nThe maximum physical injection capability for a Resource participating in an \nAggregation is 20 MW, but Resources above 20 MW may participate in an Aggregation if the \nNYISO determines sufficient physical protection and control schemes exist to limit the injection \ncapability of the Resource to 20 MW or less.593 \nThe NYISO proposes to prohibit Demand Side Resources whose Demand Response \ncapability exceeds 20 MW from aggregating with other DER Facilities.594 Rather, Demand Side \nResources exceeding 20 MW shall only be permitted to form an Aggregation of one (i.e., they \nshall not be permitted to form an Aggregation with other Distributed Energy Resources).595 \nThese revisions will provide necessary access and transparency into large DSR activity and will \nsupport safe and reliable real-time grid operations. This responds to the Commission’s directive \nin the Show Cause Order that the NYISO should address the lack of provisions addressing \nongoing operational requirements for Transmission Customers taking Transmission Service on \nbehalf of Large Loads in its tariffs.596 \nThese changes are grounded in working experience that NYISO has gained with the \nparticipation model over the past several years. The NYISO has found that, without such \nrestrictions in place, the impacts of large Demand Side Resource dispatch on the transmission \nsystem becomes difficult to model and anticipate, and true impacts become difficult to deduce. \nThe NYISO is concerned that the participation of Large Loads in the DER and Aggregation \nparticipation model as Demand Side Resources will exacerbate these modeling issues. The \nNYISO’s proposed enhancements will give the NYISO grid operators direct insight into the \nactivity of individual, large, Demand Side Resources, making it easier to understand the impacts \nthey are having on the transmission system and how the Demand Side Resource is currently \noperating. \nThese rules have precedent within the DER and Aggregation participation model itself – \nother types of DER Facilities, such as small ESRs, may only participate in the DER and \n \n592 Show Cause Order at P 66. \n593 Services Tariff § 4.1.10.1. \n594 Proposed Services Tariff § 4.1.10.1. \n595 Id. \n596 Show Cause Order at P 70."},{"page":112,"startToken":56482,"endToken":57018,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 112 \n \n \nAggregation participation model if they are less than 20MW in size. The NYISO’s DER and \nAggregation participation model rules made an exception for Demand Side Resources because, \nwith the sunsetting of NYISO’s Demand Side Ancillary Services and Day Ahead Demand \nResponse Programs, dispatchable Demand Side Resources had no other method of participation \nin the NYISO markets. Hence the DER and Aggregation participation model needed to support \nboth standalone and aggregated Demand Side Resource participation use cases. These proposed \nrevisions to the DER and Aggregation participation model do not restrict the model’s ability to \nhandle both use cases. Rather, the revised rules more clearly define boundaries describing which \nDemand Side Resources should participate and therefore be modeled as individual Resources, vs \nthose that may aggregate with other DER Facilities.   \nThe NYISO also proposes to require Demand Side Resources participating in the DER \nParticipation Model to use “Meter Before/Meter After” baselining methodology to measure the \namount of Demand Reduction provided in the first hour of Demand Side Resource dispatch.597  \nThe use of Meter Before/Meter After baselining will enhance the accuracy of the actual load \nreduction measurement.  Following that initial hour,  Aggregators will calculate a new baseline \nusing the current Economic Customer Baseline Load (“ECBL”) methodology, and the ECBL \nmethodology calculation will be used to measure DSR Demand Response for all subsequent \nintervals in the dispatch. This proposal responds to the Commission’s directive in the Show \nCause Order that the NYISO should address the lack of provisions requiring the data necessary \nto ensure sufficient operational visibility nor establishes requirements for maintaining \ncommunication channels between the NYISO and Transmission Customers taking service on \nbehalf of Large Loads.598   \nI. \nSunsetting the NYISO’s BTM:NG Resource Program \nThe Show Cause Order made a preliminary finding that the NYISO’s Tariffs were unjust \nand unreasonable because “they allowed load with behind the meter generation to net its behind \nthe meter generation against its load for purposes of calculating Transmission Service Charges \nfor Host Loads configured in a BTM:NG Resource arrangement.”599  The NYISO acknowledges \nthat its existing BTM:NG Resource program allows for such netting.  The NYISO takes no \nposition at this time on whether this fact renders the existing program unjust and unreasonable. \nBut the NYISO is nevertheless proposing to address the Commission’s concern here.    \nThe “netting” mechanism is an integral component of the BTM:NG Resource program. \nAs such, the NYISO proposes to sunset the program, and transition its existing participants to \nanother participation model.  Because the BTM:NG Resource program has relatively few \nparticipants and no recent enrollees600 it would be unreasonable to commit substantial resources \nto overhauling it in its current form at this time.  This is especially true given the need to \nprioritize work on many other large load reforms, including various others presented in this \nfiling, that are more consequential.  It would therefore be preferable to replace the  BTM:NG \n \n597 Proposed OATT § 24.2. \n598 Show Cause Order at P 70. \n599 Id. at P 110  \n600 Specifically, as of the date of this filing, there are only six active BTM:NG Resources.  No new \nBTM:NG Resources have enrolled in recent years."},{"page":113,"startToken":57018,"endToken":57483,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 113 \n \n \nResource program in the near future with an entirely new model that would address the \nCommission’s netting concern while also providing greater functionality and compatibility with \nthe NYISO’s other Large Load enhancements.  \nAccordingly, the NYISO seeks to sunset its existing BTM:NG program and to develop a \nreplacement framework under which ancillary service, transmission, and other charges would be \nassessed on a Gross Load basis.  The NYISO would implement sunsetting by revising the \ndefinition of Behind-the-Meter Net Generation Resource in Section 2 of the Services Tariff to \nindicate that it will no longer be effective after May 1, 2029.  The NYISO would also end \nenrollment for new BTM:NG Resources as of February 1, 2027 which coincides with the \nproposed effective date of the LLIP and related tariff revisions.601   \nThe NYISO intends to work with the handful of current BTM:NG Resources to create \nindividual transition plans that are suited for them in light of their operational characteristics and \nbusiness models for continued participation in the ISO-administered markets.  As the Smith \nAffidavit notes, it will take time to develop individualized transition plans because the variability \nin BTM:NG Resource characteristics and capabilities makes a one-size fits all approach \nimpractical.602  The NYISO will seek to complete the transition process before the existing \nBTM:NG program sunsets on May 1, 2029.   \nJ. \nProposed Revisions to the NYISO’s Market Power Mitigation Measures  \ni. \nRevisions to the “Buyer-Side” Capacity Market Power Mitigation \nMeasures \nThe NYISO is proposing to revise the definition of “Excluded Facility” in Section 23.2.1 \n(Attachment H) to create two new exclusions from its existing buyer-side capacity market power \nmitigation measures.   \nThe BSM Rules apply to new capacity resources entering the ICAP Auctions in New \nYork City and the Lower Hudson Valley, i.e., the NYISO’s “Mitigated Capacity Zones.”  \nTraditionally, any such resource that did not qualify for an exemption was required to offer its \ncapacity into the Spot Market Auctions at a price at or above the applicable offer floor and to \nthen continue to offer at or above that price until its capacity clears twelve, not necessarily \nconsecutive, monthly Spot Market Auction. \nIn 2022, the Commission accepted a substantial new exclusion from the BSM Rules.603  \nNew capacity resources that were deemed to serve the objectives of New York State’s Climate \nLeadership and Community Protection Act (“CLCPA”) were no longer subject to the BSM Rules \npartly in consideration of New York State’s reserved authority under the F PA to determine its \nresource mix.  The NYISO demonstrated that the CLCPA exclusion was consistent with \n \n601 See Proposed Services Tariff Section 4.2. \n602 Smith Affidavit at P 103. \n603 N.Y. Indep. Sys. Operator, Inc., 179 FERC ¶ 61,102 (2022) (“CLCPA Exclusion Order”)."},{"page":114,"startToken":57483,"endToken":57960,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 114 \n \n \nCommission precedent that market power mitigation rules must balance investor and consumer \ninterests by avoiding both over-mitigation and artificial price suppression.604    \nThe two exclusions that  the NYISO is proposing now are considerably narrower in scope \nthan the CLCPA exclusion.  Both are necessary to update and clarify the BSM Rules to account \nfor issues presented by the influx of new types of Large Loads. And both will reasonably guard \nagainst the risks of over- and under-mitigation.  \nThe NYISO seeks to establish an exclusion for new generation that is co-located with \nLarge Loads or that enters a partnership with Large Loads so that the Large Loads may receive \nFirm Withdrawal Service.  Such generation must also obtain CRI S through the NYISO’s \ninterconnection processes.  The exclusion would recognize that the NYISO has proposed to \nrequire arrangements with generation to address a given Large Loads’ resource adequacy \nimpacts as determined through the LLIP.   \nAs is discussed in the Altman Affidavit, the NYISO currently faces unprecedented near-\nterm resource adequacy challenges.  The purpose of requiring Co-Located/Partnered \nArrangements is to offset the substantial resource adequacy impacts created by new Large Loads.  \nThis is an important policy objective that I believe justifies a new exclusion from the BSM \nRules. Today’s resource adequacy challenges certainly did not exist and were not accounted for \nwhen the BSM Rules were first devised or as they evolved over time. \nIn addition, it is highly unlikely that Large Load projects and Associated Resources \nwould be jointly developed as part of capacity market price suppression schemes. Development \ntimes are much shorter for Large Loads than for generation.  The risk of Large Load projects \nbeing effectively used to cause artificial price suppression is certainly lower than it was for the \nkinds of subsidized generation investments that the BSM Rules, and comparable measures in \nother regions, were originally devised to prevent.  Creating an exclusion for Co-\nLocated/Partnered Generation should therefore not reasonably be expected to result in under-\nmitigation.  \nDuring the NYISO stakeholder process that preceded this filing, some stakeholders \nsuggested that the new exclusion should be modified to include a “right-sizing” limitation, i.e., \nthat it should not apply to the extent that Co-Located/Partnered Generation was materially larger \nthan the associated Large Load.  The Newton Affidavit explains that these hypothetical scenarios \npresented as justifications for right-sizing do not appear to represent realistic mechanisms for the \nexercise of buyer-side market power under current market conditions.  \nFurthermore, many of the resource technology types referenced by stakeholders are \nalready Excluded Facilities on other grounds and thus are not subject to the BSM Rules under the \ncurrently effective tariff.  The NYISO is not proposing to change any of the existing exclusion \nrules in this proceeding.  For the limited resource types that remain subject to the BSM Rules, \n \n604 Id. at P 39."},{"page":115,"startToken":57960,"endToken":58451,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 115 \n \n \nthere does not appear to be a credible near-term market power concern that would necessitate \nadding a right-sizing rule or other restrictions.  \nThe NYISO also seeks to introduce an exclusion for any proposed supply-side solution \nresponding to a reliability need identified by the NYISO in a STAR or RNA that is found to be a \nviable and sufficient response to that need. \nIn the past the Commission sometimes rejected reliability-based exceptions to capacity \nmarket power mitigation rules. But circumstances have changed greatly in recent years.  This \nincludes rapid growth across new types of loads that was not anticipated at the time of the \nCommission’s earlier rulings.  Reliability conditions may not yet be as severe in New York as \nthey are becoming in certain other regions. But the challenges facing the NYISO are serious and \nmust be addressed. \nThe NYISO is proposing that once a capacity resource in a Mitigated Capacity Zone  \nobtains one of the two new exclusions that the exclusion would not be rescinded. This is \nconsistent with how the existing CLCPA exclusion is implemented. \nAlthough it is proposing to add a new exclusion to its tariff, the NYISO would not turn a \nblind eye toward potential buyer-side market power abuses.  As the NYISO stated when it \nproposed the existing exclusion for CLCPA resources, the NYISO “will continue to monitor and \nidentify any relevant market behaviors or developments that could constitute abuses of buyer-\nside market power. If the NYISO were to identify any such exercise of buyer-side market power, \nit would take all appropriate and timely actions to address such abuse and protect against \nunreasonable capacity market outcomes.”605  This could include proposing prospectively \neffective tariff changes that would prevent an inappropriate exclusion from being granted before \nfinal investment decisions are made.  \nSimilarly, with respect to the new exclusion(s) that the NYISO is proposing now, the \nNYISO’s Market Mitigation and Analysis Department  (“MMA”) would continue to monitor the \ncapacity market for potential exercises of buyer-side market power.  MMA will monitor new \ncapacity entry, market outcomes, and other information that could indicate the exercise of buyer-\nside market power.  \nThe interconnection process, stakeholder process, and public visibility associated with \nlarge load infrastructure projects provide significant additional transparency – and time to act if \nrequired.  Projects with the attributes that have concerned some stakeholders, e.g., , an \nAssociated Resource far larger than its associated load, would likely be identified and reviewed \nwell in advance of entering service.  This would give the NYISO, its independent Market \nMonitoring Unit, and stakeholders sufficient time to assess potential concerns and responses, \nincluding potential tariff changes if needed to close loopholes and prevent abuses in individual \ncases.    \n \n605  New York Independent System Operator, Inc., Excluding Certain Resources from the “Buyer-Side” \nCapacity Market Power Mitigation Measures, Adopting a Marginal Capacity Accreditation Market Design, and \nEnhancing Capacity Reference Point Price Translation, Docket No. ER22-772-000 (January 5, 2022) at 25."},{"page":116,"startToken":58451,"endToken":58980,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 116 \n \n \nii. \nAdditional Market Power Mitigation Measures Changes for CLLCs \nThe NYISO also proposes to revise Section 23 of the Services Tariff (Attachment H) to \nclarify the applicability of existing market power mitigation rules to CLLCs.  Revised Section \n23.2.1 (Definitions) provides that, for purposes of Sections 23.2 through 23.4.4, a CLLC that \nincludes a Co-Located Resource or Co-Located Supply will be evaluated as an Electric Facility \nand/or a Generator to identify physical withholding, economic withholding, or uneconomic \nproduction that may warrant mitigation.606 Revised Section 23.3.1.3.2 adds CLLCs to the \nresources for which the NYISO may impose a mitigation measure based on uneconomic \nwithdrawals.607 Revised Section 23.3.1.4.1 provides that a reference level for a CLLC’s Bid to \nprovide or withdraw Energy will be calculated consistent with Sections 23.3.1.4.1.3 or \n23.3.1.4.2.608 Revised Section 23.3.1.4.3 excludes CLLCs from the reference level provision for \nNew Capacity.609 \nThe NYISO’s proposed changes to its market power mitigation measures are not a direct \nresponse to any finding in the Show Cause Order.  But they are just and reasonable revisions to \naccount for the attributes and impacts of Large Loads.  \nV. \nTHE NYISO’S PROPOSALS BUILD ON THE NYISO’S ESTABLISHED \nTRANSMISISON MODEL AND MARKET STRUCTURES AND DO NOT NEED \nTO INCORPORATE THE PJM CO-LOCATION ORDER’S TRANSMISSION \nSERVICES  \nThe Commission has repeatedly determined, the NYISO’s financial reservation based \ntransmission service (“Financial Transmission Service”) rules are consistent with or superior to \nthe Order No. 888 pro forma service offerings.610  For the reasons explained below, the NYISO’s \nexisting Financial Transmission Service model represents the best, the most practically \nimplementable, and the most flexible way for the NYISO to serve Large Loads, including co-\nlocated Large Loads and flexible Large Loads.  In this Part, the NYISO explains why its \nFinancial Transmission Service continues to produce more efficient solutions than the Order No. \n888 pro forma physical transmission service options, and why it should serve as the foundation \nfor the new withdrawal services proposed in this filing.  The NYISO also explains the reasons \n \n606 Services Tariff § 23.2.1. \n607 Id. § 23.3.1.3.2. \n608 Id. § 23.3.1.4. \n609 Id. § 23.3.1.4.3. \n610 See, e.g., N.Y. Indep. Sys. Operator, Inc., 125 FERC ¶ 61,274, at P 13 (2008) (recognizing “that \nNYISO’s proposed deviations from the pro forma OATT reflect the actual market design used by NYISO, and find \nthe deviations to be consistent with or superior to the pro forma OATT” in connection with NYISO’s Order No. \n890-A compliance filing); N.Y. Indep. Sys. Operator, Inc., 123 FERC ¶ 61,134, at P 37 (2008) (same with respect to \nNYISO’s Order No. 890 compliance filing); see also Cent. Hudson Gas & Elec. Corp., 88 FERC ¶ 61,138, 61,382 \n(1999) (concluding that “the Member Systems have complied with the requirement to provide long-term service” \nand finding “that the service offered by the ISO is consistent with or superior to that offered under the pro forma \ntariff.”)"},{"page":117,"startToken":58980,"endToken":59603,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 117 \n \n \nwhy it is not proposing to adopt the PJM Co-Location Order’s611 forms of transmission service in \nresponse to the Show Cause Order.       \nA. \nThe NYISO’s Financial Transmission Service Model Enables the NYISO to \nMaximize the Use of the Transmission System Efficiently and to Support \nFlexible Service for Large Loads  \nThe NYISO does not accept or facilitate reservations of physical transmission service \nwithin the NYCA.  Instead, the NYISO offers “financial reservation” based transmission service \nwhere LBMP energy markets are used to manage congestion and operate bid-based markets.612 \nIn 1999,613 the Commission accepted the NYISO’s proposed Point-to-Point (“PTP”) and \nNetwork Integration Transmission Service (“NITS”) provisions in the OATT, which are \nsubstantially different from the physical based pro forma transmission services, finding the \nNYISO’s variations to be consistent with or superior to the pro forma OATT.614  The \nCommission has repeatedly found the NYISO’s financial reservation model to be just and \nreasonable in various contexts.615  \n \nPhysical transmission rights are different from the NYISO’s Commission-accepted \n“financial” reservation regime that (a) bundles transmission service with Energy purchases and \ndeliveries, and (b) does not provide for Market Participants to reserve and hold transfer \ncapability, but rather makes access to, beneficial use of and the capability of its transmission \nsystem available through scheduling each day in its Day-Ahead and Real-Time Markets.616 \nTransmission service within the NYCA is scheduled “implicitly” when Resources and External \n \n611 PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025). \n612The original 1998 proposal to establish the NYISO provided for a single form of financial reservation- \nbased transmission service.  However, in 1999, the Commission required the NYISO’s sponsors to file an OATT \nthat included two kinds of transmission service but allowed them to propose changes from the pro forma OATT to \nreflect how the financial nature of the NYISO’s model differs from the physical reservation-based transmission \nservice.  See Cent. Hudson Gas & Elec. Corp., 88 FERC ¶ 61,138, 61,382 (1999) (accepting the revised financial \ntransmission reservation model for the NYISO.)  For the reasons explained below, the NYISO’s financial \nreservation system bridges the gap between the traditional “point-to-point” and “network” transmission service \nofferings.  As further detailed herein, the NYISO’s financial transmission service method provides greater flexibility \nto customers than traditional point-to-point and traditional network service do and, consistent with the proposed \nmodifications to accommodate “non-firm” service to Large Loads that are described in this filing, the NYISO’s \nfinancial reservation transmission model can accommodate Large Loads that are not eligible to receive firm \ntransmission service at times when the transmission system is significantly congested or available Energy is limited. \n613 See Cent. Hudson Gas & Elec. Corp., 88 FERC ¶ 61,138, 61,382 (1999). \n614 See N.Y. Indep. Sys. Operator, Inc., 125 FERC ¶ 61,274 (2008) (confirming that NYISO's financial \nreservation model was consistent with or superior to the physical reservation requirements of Order No. 890's pro \nforma OATT.); New York Independent System Operator, Inc., 123 FERC ¶ 61,134 (2008) (stating the same);  Cent. \nHudson Gas & Elec. Corp., 88 FERC ¶ 61,138, 61,382 (1999) (concluding that “the Member Systems have \ncomplied with the requirement to provide long-term service” and finding “that the service offered by the ISO is \nconsistent with or superior to that offered under the pro forma tariff”). \n615 See N.Y. Indep. Sys. Operator, Inc., 125 FERC ¶ 61,274 (2008) (confirming that NYISO's financial \nreservation model was consistent with or superior to the physical reservation requirements of Order No. 890's pro \nforma OATT); N.Y. Indep. Sys. Operator, Inc., 123 FERC ¶ 61,134 (2008) (stating the same). \n616 See Sections 3.1.5 and 3.1.8 of the OATT for information about how transmission service is scheduled \nin the NYCA."},{"page":118,"startToken":59603,"endToken":60240,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 118 \n \n \nTransactions receive Energy schedules from the NYISO, and NYCA Loads are served without \nthe need to formally schedule transmission service.  \n \nThe Financial Transmission Service that customers select and the NYISO has provided \nsince its inception in 2000 most closely resembles an improved, more flexible version of pro \nforma NITS which effectively designates all NYCA Resources  to serve all NYCA Loads with \nadministrative efficiency. The NYISO commits and dispatches all NYCA Resources based on \ntheir economic offers, accounting for congestion on its transmission network, to serve all NYCA \nLoads (plus scheduled Export Transactions) at the least production cost.  The transmission \nservice that customers select, and the NYISO provides, is referred to as Firm Point-to-Point \nTransmission Service.617 As the Commission noted in the Show Cause Order,618 in the twenty-\nsix years since the NYISO commenced operations, it has never “received a formal request from a \ntransmission customer for NITS.” \n \nAn internal Bilateral Transaction provides a financial method for a NYCA Generator to \ncontractually serve a NYCA Load.  The Point of Injection (“POI”) for an internal Bilateral \nTransaction is the Generator Bus where the Energy the Generator produces is made available to \nthe NYISO. The Point of Withdrawal (“POW”) is the Zonal Load Bus for the Load Zone to \nwhich the Generator’s Energy is being financially “delivered.”619  To the extent the participating \nGenerator is producing Energy, the “cost” of obtaining transmission service is limited to paying \nfor transmission congestion and losses between the POI and the POW. If the MWh scheduled in \nthe Bilateral Transaction exceed the source Generator’s output, the additional MWh required to \nserve the scheduled Bilateral Transaction are purchased by the Generator from the LBMP market \nbased on the LBMP at the source Generator’s location.620  Compared to “physical” transmission \nservice, market efficiency is improved by providing “financial” transmission service using \nBilateral Transactions because the scheduling of a Bilateral Transaction does not disrupt the \nNYISO’s economic, least production cost commitment of Resources to serve all NYCA Load \n(plus Export Transactions). Unlike a physical transmission service option, the NYISO’s financial \nscheduling of Bilateral Transactions does not force the commitment of a “source” Generator to \nserve the Load if that Generator is not an efficient source of economic Energy based on the Bid it \nsubmitted. \n \n617 OATT Sections 16.3.1 through 16.3.4.2 address Bilateral Transactions and Wheels Through the NYCA. \nPossibly, customers have only ever requested Firm PTP Service by default given that, under the NYISO’s model, \nPTP service offers all of the benefits of NITS in an administratively efficient manner and thus the two services are \nlargely equivalent; however, it is also possible that customers only select PTP because the limited set of transactions \nthat need Transmission Service to support them (i.e., Bilateral Transactions and Wheel-Through Transactions) are \nreadily scheduled on a point-to-point basis. In any case, for over twenty-six years NITS has never been formally \nrequested or provided in the NYCA. \n618 See N.Y. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,216 at P 20 fn. 69 (2026) (“[The NYISO] has never \nprovided or received a formal request from a transmission customer for NITS.”). \n619 NYCA Generators are paid for the Energy they produce based on the LBMP at their Generator Bus.  \nNYCA Loads pay for the Energy they consume based on the Zonal LBMP calculated for the Load Zone in which \nthe Load is located.   \n620 Energy Imbalance Service for Generators serving Bilateral Transactions is addressed in Rate Schedule 4 \n(Section 6.4) of the OATT.  At times when the “source” Generator for a Bilateral Transaction is not the least cost \nproducer of Energy based on its economic Bids, the LBMP Market will provide the Energy at a lower cost from \nother sources, improving efficiency for all involved."},{"page":119,"startToken":60240,"endToken":60775,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 119 \n \n \n \nIn the two and a half decades since the NYISO commenced operations, Transmission \nCustomers have only ever used the NYISO’s financial based PTP Transmission Service. The \nNITS provided for under the NYISO OATT has never been used.  As OATT Section 4.2.3 \nindicates, the NYISO would need to develop substantial new software functionality in order to \nimplement NITS.  One characteristic of the pro forma version of NITS is the ability of a \nTransmission Customer to schedule service from one or more designated Generators to one or \nmore designated Loads.  The universe of Resources available for economic commitment and \ndispatch by the NYISO is larger and more diverse than an individual Transmission Customer’s \nset of designated network resources under the pro forma OATT.  The financial transmission \nservice that NYISO provides is superior to pro forma NITS because the NYISO dispatches all \navailable Resources based on their economic offers and accounting for the capability of the \ntransmission system, to serve NYCA Load at least production cost.   \n \nCurrently, under the NYISO’s model, non-firm transmission service is not available \nbecause it is not needed within the framework of the NYISO’s Financial Transmission Service \nModel. Initially, the NYISO offered Non-Firm PTP service for internal Transactions, which was \ndescribed as being service for which a Transmission Customer is not willing to pay Congestion \nand was made available on a stand-alone basis for one hour periods.621 The NYISO has not \noffered Non-Firm PTP service for internal Transactions since March 2011.622 Additionally, Non-\nFirm Point-To-Point Transmission Service for External Transactions was eliminated in August \n2014.623 As the Harvey Affidavit notes, the non-firm transmission service option that previously \nexisted under the NYISO OATT was hardly ever used.624  The NYISO’s transmission model \nlends itself to providing Loads with the flexibility to structure its service in a manner that \nreasonably aligns with its operational dynamics, and is made available to Loads on a relatively \nshort timeline.  \nB. \nThe NYISO’s Financial Reservation Model Promotes Economic Efficiency in \nthe Use of the Transmission System and Resources  \nUnder the NYISO’s model, the most economically efficient use of the transmission \nsystem and generation resources is achieved within the context of the LBMP energy markets.625 \nThe NYISO’s congestion management framework promotes efficient use of the transmission \ngrid through the Security Constrained Unit Commitment (“SCUC”) mechanism conducted in the \n \n621 The NYISO’s original Non-Firm Point-to-Point Transmission Services rules were previously found in \nSection 3.2 of the NYISO OATT.  \n622 New York Independent System Operator, Inc., Letter Order, Docket No. ER11-2459-000 (Feb. 10, \n2011); see also NYISO’s Proposed Tariff Clarifications Regarding the Bidding for and Scheduling of Energy in New \nYork’s LBMP Market and the Scheduling of Transmission Service in the New York Control Area, Docket No. ER11-\n2459-000 at p. 15 (December 21, 2010) (“the NYISO proposes to affirmatively indicate that Non-Firm Transmission \nService is unavailable for internal Transactions”).   \n623 New York Independent System Operator, Inc., Letter Order, Docket No. ER14-2623-000 (Oct. 8, 2014) \n624 See Harvey Affidavit at P 23. \n625 As discussed supra, under the NYISO’s approach, the Transmission Customer bears the financial \nresponsibility for the marginal congestion cost associated with its own transactions."},{"page":120,"startToken":60775,"endToken":61251,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 120 \n \n \nDay-Ahead Market (“DAM”) and the Real-Time Commitment (“RTC”) and Real-Time Dispatch \n(“RTD”) conducted in the Real-Time Market (“RTM”).  \nWhile PJM also administers co-optimized day-ahead and real-time energy and ancillary \nservices markets and its transmission model involves Financial Transmission Rights somewhat \nakin to the NYISO’s TCCs, the NYISO’s transmission model is materially different from PJM’s \nbecause the NYISO’s financial reservation-based model does not involve any physical \nreservations for transmission service. \nThrough the NYISO’s DAM and RTM software, internal New York generation resources \ncompete, including with External Transactions, to be economically awarded an Energy schedule, \nwhich includes the necessary transmission service and ramp schedule. Additionally, the NYISO \ncontinuously redispatches the grid on a security-constrained, least-cost basis in order to \nmaximize the efficient use of the system. As such, the total production cost to serve Load is \nminimized by the NYISO’s SCUC, RTC and RTD, which provides significant savings to Loads \ncompared to a dispatch that matches Generator output to the demand of a specific sub-set of \nLoads.  \nNYISO’s market constructs, specifically the Transmission Congestion Contract market, \nalso provides a pathway to manage congestion cost (i.e., the Transmission Usage Charge \nassociated with firm transmission) for instances where ex-ante price certainty is valuable. TCCs \nprovide a voluntary financial hedge against Day-Ahead congestion costs without conferring a \nphysical scheduling priority or altering the NYISO’s security-constrained dispatch. This \nseparation permits customers to obtain greater cost certainty while preserving efficient, \nnondiscriminatory access to transmission capability for all market participants.  \nThe financial reservation model also accommodates materially different Large Load \noperating characteristics without creating administratively defined transmission priorities. A \nLarge Load that can reduce withdrawals during constrained conditions may express that \nflexibility through its scheduling parameters and applicable operational requirements, while a \nLarge Load that requires uninterrupted withdrawals (and whose interconnection supports such \nun-interrupted withdrawals) remains exposed to the costs associated with that service. The model \ntherefore preserves a direct relationship between the service a customer values, the flexibility it \nprovides, and the congestion costs it causes, rather than socializing those costs or embedding \nthem in a new class of physical transmission rights. This supports efficient customer decisions \nregarding location, consumption, onsite supply, contractual hedging, and willingness to curtail. \nThe model is also adaptable as system conditions and Large Load consumption change \nover time. Financial schedules and locational settlements can reflect the actual hourly—and, in \nreal time, interval-specific—effects of a Large Load’s withdrawals, avoiding the need to \nestablish a static physical reservation based on forecasts that may prove inaccurate or operating \nassumptions that may later change. That adaptability is especially valuable for Large Loads \nwhose development timelines, utilization levels, and operating profiles may be uncertain. It \nreduces the risk that scarce transmission capability will be stranded or inefficiently reserved, \nprotects other customers from subsidizing uneconomic uses of the system, and permits Large"},{"page":121,"startToken":61251,"endToken":61708,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 121 \n \n \nLoads to obtain service commensurate with their demonstrated needs and willingness to bear the \nresulting costs. \nImportantly, the financial reservation model does not substitute congestion pricing for the \nrecovery of Large Load-specific interconnection or upgrade costs. Rather, it preserves efficient \nsystem operations while allowing separate, targeted tariff provisions to address cost \nresponsibility, readiness, and reliability concerns without converting those protections into \nphysical scheduling preferences that could distort dispatch or strand transmission capability. \nAs such, the NYISO’s financial reservation system is beneficial because it enables the \nNYISO to efficiently use the full capability of the transmission system to arrive at a least \nproduction cost solution to serve NYCA Load using available Resources.626 All desired uses of \nthe transmission system are scheduled to the extent that customers are willing to pay congestion \ncharges. \nC. \nThere Is No Need for the NYISO to Adopt the Transmission Services \nEstablished by the PJM Co-Location Order \nThe Show Cause Order made a preliminary finding that: \nNYISO’s Tariff appears to be unjust and unreasonable because it does not include \ntransmission services that reflect Eligible Customers taking transmission service \non behalf of Eligible Load that are willing and able to limit their use of the \ntransmission system under certain conditions.  NYISO should explain whether the \nTariff remains just and reasonable without the transmission services described by \nthe Commission in the PJM Co-Location Order, with regional variation as \nappropriate, being available to Eligible Customers taking transmission service on \nbehalf of Eligible Load, or propose appropriate Tariff revisions.  Specifically, \nNYISO should explain whether the Tariff remains just and reasonable without (1) \nan interim non-firm network transmission service while Network Upgrades are \nbeing constructed (i.e., interim NITS) and (2) permanent firm and non-firm \ncontract demand transmission services (transmission service up to a specified \nMW quantity, i.e., the contract level, on a firm or non-firm basis).627   \nThe NYISO is not proposing to adopt the three transmission services described in the \nPJM Co-Location Order (the “PJM Co-Location Order Services”).   \nThe NYISO notes that the Commission issued a Show Cause Order for the California \nIndependent System Operator Corporation (“CAISO Show Cause Order”) at the same time as the \n \n626 See Regional Transmission Organizations, Order No. 2000, 65 Fed. Reg. 809 (Jan. 6, 2000), FERC \nStats. & Regs. ¶ 31,089 at pg. 31,126 (2000) (holding that systems based on locational prices and financial rights \n“provide a sound framework for efficient congestion management”), order on reh'g, Order No. 2000-A, 65 Fed. \nReg. 12,088 (Feb. 25, 2000), FERC Stats. & Regs. ¶ 31,092 (2000), aff'd, Public Utility District No. 1 of Snohomish \nCounty, Washington v. FERC, 272 F.3d 607 (D.C. Cir. 2001). \n627 Show Cause Order at P 109."},{"page":122,"startToken":61708,"endToken":62267,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 122 \n \n \nit did for the NYISO.628  The CAISO Show Cause Order recognized that the “CAISO does not \noffer traditional Order No. 888 network and point-to-point transmission services.”629  It invited \nCAISO to “explain whether, given that CAISO does not offer the transmission services required \nby Order No. 888, CAISO’s existing transmission service framework addresses the concerns \ndescribed herein, or explain what specific changes to its existing transmission service framework \nwould effectively provide the same range of transmission service options for flexible large loads \nas in the PJM Co-Location Order.”630   \nThe Show Cause Order acknowledges in passing that the NYISO also provides non-\ntraditional transmission services.631  But the Commission did not expressly invite the  NYISO to \njustify its “existing transmission service framework” as it did the CAISO.  Nevertheless, the \nCommission should recognize that the NYISO’s financial transmission model is functionally the \nsame the CAISO’s.  As discussed above and in the Harvey Affidavit, the NYISO, like the \nCAISO, does not offer “traditional Order No. 888 network and point-to-point transmission \nservices,” does not make physical long-term transmission capacity reservations available, and \n“does not provide a formal application process for transmission service.”632  The Commission \nshould therefore be every bit as open to the NYISO’s transmission service proposals in this filing \nas it has indicated it will be to alternatives offered by the CAISO.633  \n \nDr. Scott Harvey, a leading expert on the NYISO’s and CAISO’s transmission models, \nmarket designs, and market software confirms the close similarities between the NYISO’s and \nCAISO’s transmission regimes.634  Dr. Harvey emphasizes that, “NYISO’s existing firm service \nand proposed new firm and non-firm withdrawal services address the need for tariff provisions \ncovering large loads that are able to curtail use of the transmission system when needed to avoid \nadverse reliability and market impacts.”635  Dr. Harvey also states that “the NYISO’s proposed \nFirm Withdrawal Service/Non-Firm Withdrawal Service framework is a reasonable and efficient \napproach to serving large loads able to curtail load in real-time based on system conditions that is \ncompatible with and an effective application of the established NYISO financial reservation \nmodel based on financial transmission rights and economic bids and security constrained \neconomic dispatch.”636  Dr. Harvey sees, “no need for the NYISO to adopt interim non-firm \nNITS or contract demand services that were designed with a different region and different tariff \ndesign in mind.  NYISO’s proposed Firm and Non-Firm withdrawal services will bring \n \n628 Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026)(“CAISO Show Cause Order”). \n629 CAISO Show Cause Order at P 101.  \n630Id.  \n631 See, e.g., Show Cause Order at n. 68 (noting that no form of non-firm transmission service is currently \navailable within the NYISO) and n. 69 (recognizing that no customer has ever requested NITS from the NYISO.).  \n632 CAISO Show Cause Order at P 19. \n633 The NYISO understands that the CAISO will likewise propose not to adopt the three PJM Co-Location \nOrder Services and will instead offer comparable alternatives that better fit its transmission and market model.  See \nCAISO Press Release, CAISO Board Advances New Procedures for Connecting Large Loads Quickly and Reliably,  \nhttps://www.caiso.com/about/news/news-releases/caiso-board-advances-new-procedures-for-connecting-large-\nloads-quickly-and-reliably (Oct. 28, 2026). \n634 See Harvey Affidavit at Section II.   \n635 Harvey Affidavit at P 52. \n636 Id. at P 27."},{"page":123,"startToken":62267,"endToken":62791,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 123 \n \n \ncomparable (or greater) benefits and are more compatible with the NYISO’s financial \ntransmission reservation model and existing transmission cost allocation design.”637   \n \nIn addition, Dr. Harvey demonstrates that there are various transmission cost recovery \nand cost allocation differences between the NYISO’s transmission model and those used in other \nregions that would further complicate any effort to implement the PJM Co-Location Order \nServices in the NYISO.  Dr. Harvey emphasizes that the NYISO’s decision not to adopt the PJM \nCo-Location Order Services is “superior to a large load tariff based on interim non-firm NITS \nand firm and non-firm contract demand service because the NYISO approach avoids the need for \na completely unnecessary change in the NYISO’s wholesale transmission cost recovery design \nfrom one based on megawatt hours of withdrawals to one based on megawatt reservations . . .  \n.”638 The Harvey Affidavit provides a detailed review of the relevant distinctions that support his \nconclusion.639 \n \nAs explained above, the NYISO’s currently offers a single form of firm financial \nreservation transmission service that operates as an improved, more flexible version of pro forma \nNITS that does not subject customers to various restrictions that exist under the physical \nreservation version of NITS.  Moreover, the NITS procedures under the NYISO OATT have \nnever actually been used, even though they are theoretically available.  There is thus no reason to \nintroduce a non-firm interim version of NITS that the Commission envisioned as a bridge to firm \nNITS service when firm NITS service is not actually used in the NYISO.  \n \nSimilarly, the NYISO proposes to offer its new Non-Firm Withdrawal Service as an \noption to allow new Large Loads to connect to the grid faster and without the potential delays \nrequired to mitigate adverse impacts to resource adequacy and/or transmission security.  It is a \nvoluntary Transmission Service option that new Large Loads are permitted to choose provided \nhowever that they comply with the applicable terms and conditions described in Part IV.B.ii \nabove.  Reintroducing a new form of non-firm service, i.e., Non-Firm Withdrawal Service, to the \noptions available in the NYISO is a more than sufficient substitute for interim non-firm NITS \nand the two contract demand services.  \nFurthermore, the NYISO is concerned that attempting to add the PJM Co-Located Order \nServices to the NYISO’s model would be detrimental to the economic efficiencies achieved by \nthe NYISO’s existing market constructs.  The result could be reducing the efficiency of the \nNYISO’s least production cost commitment and dispatch system and to increase the overall cost \nof serving Load in New York, as further explained below.  The NYISO does not believe that this \nwould be a just and reasonable outcome given the lack of a rationale for adopting the PJM Co-\nLocation Order Services in NYISO.  \nDuring the extensive stakeholder process that culminated in this filing, no stakeholder \nargued that the NYISO should adopt any of the three PJM Co-Location Order Services in lieu of \nNYISO’s proposed Withdrawal Services.  The NYISO believes that this fact is further evidence \n \n637 Id.at P 52. \n638 Harvey Affidavit at P 28.  \n639 See Harvey Affidavit at PP 28, 33-49."},{"page":124,"startToken":62791,"endToken":63316,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 124 \n \n \nthat the PJM Co-Location Order Service would serve no useful purpose in the NYISO, no matter \ntheir potential benefits in PJM or other regions.640    \n \nFinally, the NYISO understands that PJM has indicated it could take several years to \nimplement the PJM Co-Location Order Services.  PJM initially proposed a June 1, 2029 \nimplementation date even though the services are native to PJM and were designed to \ncomplement PJM’s established rules and procedures.  By contrast, the NYISO would effectively \nbe starting from scratch and would have to make many more software and tariff changes if it \nwere required to integrate the PJM Co-Location Order Services into its model.  Adopting the \nPJM services would also very likely require the NYISO to take extensive measures to comply \nwith numerous North American Energy Standards Board requirements that do not currently \napply to it.  In short, adapting the PJM Co-Location Order Services to fit the NYISO would all \nbut certainly be more expensive and time-consuming for the NYISO than for PJM.  By contrast, \nNYISO’s proposed Withdrawal Services would provide comparable or greater benefits and do so \nmore quickly, i.e., by the NYISO’s proposed June 1, 2028 effective date for its Large Load \nmarket participation tariff revisions.   \nVI. \nTHE NYTOS AND THE NTOS ARE ADDRESSING CERTAIN SHOW CAUSE \nORDER ISSUES IN  SEPARATE FPA SECTION 205 FILINGS \nThe Show Cause Order recognized that certain large load issues involve matters over \nwhich New York’s transmission-owning jurisdictional utilities retain unilateral Section 205 filing \nrights.641  The Commission gave the transmission owners an opportunity to address those issues \nin their own FPA Section 205 filings.  Subsequently, the Abeyance Order granted both the \nNYTOs and the NTOs additional time to make such filings. \nThe NYISO understands that the NYTOs will make a concurrent filing to address several \nShow Cause Order issues that they assert are subject to their reserved filing rights under the \nISO/TO Agreement.  This will involve a number of revisions to NYISO OATT Section 5 \n(Special Provisions for Retail Access) to address large load-related rate issues that were not \ncontemplated when Section 5 was written.  The NYISO also expects that the NYTOs will \npropose some modifications to proposed Attachment LL and OATT Section 1. The NYTOs may \nmake additional Section 205 filings to address rate and cost recovery matters after the NYPSC \nprovides guidance on state-jurisdictional issues in its ongoing large load proceedings, i.e., Case \nNo. 26-E-0045.  \nThe NYTOs will also propose four new two-party pro forma agreements that would be \nadded to the NYISO OATT.  Specifically: (i) a Network Upgrade Cost Recovery Agreement; (ii) \na Security Agreement; (iii) a Facilities Study Agreement; and (iv) a Large Load Interconnection \nAgreement.  The NYISO would not be a party to any of these arrangements.   \n \n640 For the avoidance of doubt, the NYISO emphasizes that its arguments against implementing the PJM \nCo-Location Order Services in NYISO should not be interpreted as questioning the adoption of those services in \nPJM or other regions that choose to implement them.  The NYISO’s arguments here are only applicable to the \nNYISO region.     \n641 Show Cause Order at P 41."},{"page":125,"startToken":63316,"endToken":63876,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 125 \n \n \nSimilarly, the NYISO understands that the LS Power NY intends to make a Section 205 \nfiling to address its rate and cost recovery issues.  Because LS Power NY is an NTO without \nretail customers the NYISO understands that its filing will principally involve proposed revisions \nto NYISO OATT Schedule 10 (Rate Mechanism for the Recovery of the Regulated Transmission \nFacilities Charge) instead of OATT Section 5  \nThe NYISO is not a signatory to the NYTOs’ or NTOs’ FPA Section 205 filings.  It will \nplay a ministerial role in electronically submitting their filings because they implicate NYISO \ntariffs as the NYISO has done for prior transmission owner rate filings made under their reserved \nrights.  The NYISO  reserves the right to comment on the NYTOs’ and NTOs’ proposals before \nthe Commission.  In particular, the NYISO recognizes that the draft pro forma agreements will \nbe important to resolving the cost-shifting questions raised by the Show Cause Order. And while \nthe Show Cause Order envisioned the NYISO joining a three-party cost recovery agreement it \ndid not foreclose reasonable alternatives.642 \n \nVII. \nTHE FPA SECTION 205 STANDARD OF REVIEW AND SEVERABILITY \nThe Commission has explained that “[u]nder FPA section 205, the Commission is limited \nto considering the filing before it, . . . .”643  Federal courts have similarly noted that “[w]hen \nacting on a public utility’s rate filing under section 205, the Commission undertakes ‘an \nessentially passive and reactive role’ and restricts itself to evaluating the confined proposal.”644  \nCourts have further acknowledged that “FERC has interpreted its authority to review rates under \n[the FPA] as limited to an inquiry into whether the rates proposed by a utility are reasonable—\nand not to extend to determining whether a proposed rate schedule is more or less reasonable \nthan alternative rate designs.”645 The Commission “is not required to choose the best solution, \nonly a reasonable one.”646 \nAdhering to these precedents and principles is especially appropriate in this proceeding.  \nThe NYISO’s proposal addresses a large number of operationally and legally complex questions \nin the context of the resource adequacy challenges facing New York.  This included considering \njurisdictional issues, particularly the NYPSC’s views as a state regulator in the process of \ndevising its own large load interconnection policies.  The NYISO’s proposal also had to be \ndeveloped exceptionally quickly while balancing the interests of many parties in order to obtain \nsuper-majority stakeholder support. The proposal should therefore be judged on whether it \nproduces just, reasonable, not unduly discriminatory, and lawful rules – not on whether it will \nresult in the best imaginable solution in every instance.   \nThe Commission should also assess the NYISO’s proposals in light of the NYISO-\nspecific conditions and circumstances that shaped it.  As Chairman Swett noted in her \nconcurrence to the Show Cause Order, the Commission “has long allowed different regional \n \n642 See Show Cause Order at PP 87-88. \n643 Midcontinent Indep. Sys. Operator, Inc., 164 FERC ¶ 61,069, at P 48 (2018).   \n644 Advanced Energy Mgmt. All. v. FERC, 860 F.3d 656, 662 (D.C. Cir. 2017) (quoting City of Winnfield v. \nFERC, 744 F.2d 871, 875-76 (D.C. Cir. 1984)).   \n645 Cities of Bethany v. FERC, 727 F.2d 1131, 1136 (D.C. Cir. 1984).   \n646 Petal Gas Storage, L.L.C. v. FERC, 496 F.3d 695, 703 (D.C. Cir. 2007)."},{"page":126,"startToken":63876,"endToken":64401,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 126 \n \n \ntransmission organizations to follow different rules, in recognition of regional variations . . . .”647  \nThe NYISO is starting from a different place, with different market, transmission, and \ninterconnection rules that several other ISOs and RTOs.  It should not be a surprise, and is \nentirely reasonable, that NYISO would develop distinctive proposals to address the Show Cause \nOrder’s concerns.  What matters is that the NYISO’s proposals are just, reasonable, and not \nunduly discriminatory on their own merits.  \nEach element of this proposal is just and reasonable. Nevertheless, in the event the \nCommission deems it necessary, and to help facilitate the Commission’s acceptance of this filing \nwithout delay, NYISO provides notice that it consents to the Commission’s exercise of authority \nto modify and/or sever any element of the proposed OATT and Services Tariff language to the \nextent necessary and permitted under FPA section 205 and NRG Power Marketing, LLC v. \nFERC,648 where such modification and/or severance is consistent with the NYISO’s overarching \nobjectives in this filing. While the each of the reforms proposed in this filing is just and \nreasonable and act together to advance important objectives, they may also be considered \nseparately. In particular, the NYISO consents to making any clarifications to its proposed tariff \nrevisions that the Commission considers necessary to confirm that Firm and Non-Firm \nWithdrawal Services are Commission-jurisdictional transmission services.  \nVIII. STAKEHOLDER APPROVAL \nThe NYISO used the additional time provided by the Abeyance Order to conduct an \nexpedited, extensive, and ultimately successful stakeholder process.  The NYISO held numerous \nstakeholder meetings and made presentations describing its evolving proposals on July 23, \nAugust 13, August 20, September 1, September 8, September 14, September 22, October 1, \nOctober 7, and October 14.  As the Smith Affidavit notes, this was not a straightforward effort \nbut an iterative, intense, and thorough process.  The NYISO’s proposals are the product of \ncountless hours of internal coordination amongst NYISO business units and stakeholder \ndeliberations under significant time pressure.  The proposals have evolved and matured \nsubstantially since they were first proposed as a direct result of stakeholder feedback.  \nA near-final version of the NYISO’s proposal was discussed at a joint meeting of the \nNYISO’s Business Issues Committee and Operating Committee on October 21.  Several \nchanges, most notably the addition of the State Exempt Large Load Projects rules, were made in \nresponse to comments presented at joint meeting.  Subsequently, the NYISO’s final proposal was \napproved by the stakeholder Management Committee on October 28 by a 100% vote with \nabstentions.649  The proposal was then approved for filing by the NYISO’s independent Board of \nDirectors on November 16.  \n \n647 Show Cause Order (Swett, Chairman, concurring at n. 6 citing , Cent. Hudson Gas & Elec. Corp. v. \nFERC, 138 F.4th 531, 539 (D.C. Cir. 2025) (internal citations omitted).  \n648 NRG Power Marketing, LLC v. FERC, 862 F.3d 108 (D.C. Cir. 2017). \n649 The Management Committee authorized the NYISO to make incremental tariff revisions after the vote \nsubject to approval by the Management Committee, Business Issues Committee, and Operating Committee chairs.  \nA number of such incremental changes have been incorporated into this filing."},{"page":127,"startToken":64401,"endToken":64905,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 127 \n \n \nThe NYISO notes that the NYTOs’ and NTOs’ reserved filing rights are not subject to \nthe NYISO’s shared governance procedures.  Their expected Section 205 filings therefore did \nnot require stakeholder approval.  The NYTOs made an informational presentation describing \ntheir planned filing at the October 22 meeting of the NYISO’s stakeholder Transmission \nPlanning Advisory Subcommittee.  \nIX. \nREQUESTED EFFECTIVE DATES \nThe NYISO respectfully requests a February 1, 2027 effective date for proposed OATT \nAttachment LL, i.e., the new LLIP, all new defined terms referenced in Attachment LL, Section \n3A of the OATT, all other OATT and Services Tariff revisions directly related to Attachment LL \nthat are discussed in Parts II and III of this transmittal letter, and the BTM:NG sunsetting-related \nrevisions referenced in Part IV.I above.  Because February 1 is less than 120 days after the date \nof this filing there is no need for a demonstration of good cause to support these proposed \neffective dates under Section 35.3 of the Commission’s regulations.  The NYISO expects to be \nready to commence the optional pre-application process described proposed Attachment LL \nSection 44.5 on February 1.   \nThe requested February 1 effective date for the new Large Load Integration Procedures \nalso means that the NYISO’s currently effective large load interconnection procedures in OATT \nSections 3.9 and 4.5 will continue to be in effect for the entirety of the comment period.  This is \nmore than eight months after the issuance of the Show Cause Order which will accommodate \nexisting commercial arrangements. \nThe NYISO is proposing to make its proposed tariff revisions related to its new market \nparticipation provisions for Large Loads, i.e., the revisions described in Part IV (other than Part \nIV.I) of this transmittal letter, effective on June 1, 2028.  There is good cause for allowing these \nprovisions to become effective more than 120 days after this filing.  No Large Loads are \nexpected to have completed the new LLIP, and thus to be able to utilize the new market \nparticipation provisions, until June 1, 2028 at the earliest.    \nFinally, the NYISO’s is proposing to make its revision to Section 2 of the Services Tariff, \nwhich would effectuate the sunsetting of the existing BTM:NG program, effective on May 1, \n2029.  There is good cause for an effective date more than 120 days in the future because it will \nallow time for the handful of existing BTM:NG market participants to transition to alternative \nparticipation models.  \nX. \nREQUEST TO CONTINUE ABEYANCE OF SHOW CAUSE PROCEEDINGS \nThe Abeyance Order stated that, “[i]f  NYISO or Transmission Owners submit an FPA \nsection 205 filing addressing the Commission’s preliminary findings in the Show Cause Order \non or before November 16, 2026, then the obligation of the respondent(s) who have made such \nan FPA section 205 filing to file a response to the Show Cause Order will be suspended, and this \nproceeding will continue to be held in abeyance pending further Commission directive in this"},{"page":128,"startToken":64905,"endToken":65233,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 128 \n \n \nproceeding.”650  The NYISO therefore requests that the Commission continue to hold the \nproceedings in Docket No. EL26-69-000, and the NYISO’s obligation to submit an answer to the \nShow Cause Order, in abeyance, pending Commission action on this filing. \nIn addition, the NYISO requests that if the Commission were to require the NYISO to \nmake additional tariff revisions before accepting the NYISO’s proposals under FPA Section 205 \nthat it hold the Show Cause proceedings in further abeyance for a reasonable time to give the \nNYISO an opportunity to prepare the necessary filing.    \nXI. \nREQUEST FOR EXTENDED COMMENT PERIOD \nThe NYISO respectfully requests that the Commission extend the standard 21-day \ncomment period for FPA section 205 filings by one week.  The Commission has often granted \nextended comment periods for major filings that encompass numerous complex issues and tariff \nrevisions that are likely to have substantial economic and reliability implications.  At the same \ntime, the NYISO recognizes the importance of the issues addressed by this filing and \nunderstands the Commission’s desire to address large load issues rapidly.  The NYISO is \nmindful that the Commission has denied extension requests in certain recent involving large load \nmatters.651  Accordingly, the NYISO submits that a brief one-week extension to the standard \nperiod so that comments would be due on December 14 instead of December 7 is reasonable \ngiven the number, complexity, and importance of the  proposals included in this filing.  Such an \nextension would also make a reasonable allowance for the comment period encompassing the \nThanksgiving holiday. Because the earliest effective date requested in this filing is February 1, \n2027, i.e., two weeks beyond the default sixty-day period, a one-week extension would leave the \nCommission with slightly more time to review this filing than if the standard comment and \nnotice periods applied.     \n \n \n \n \n \n \n \n \n \n650 Abeyance Order at P 11.  \n651 See, e.g., Notice Denying Extension of Time, Docket No. ER26-3515-000 (Sept. 2, 2026)."},{"page":129,"startToken":65233,"endToken":65467,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 129 \n \n \nXII. \nCOMMUNICATIONS AND CORRESPONDENCE \nAll communications and service with regard to this filing should be directed to: \nRobert E. Fernandez, Executive Vice President, \nChief Compliance Officer & General Counsel \nKaren Georgenson Gach, Deputy General \nCounsel \nBrian R. Hodgdon, Senior Attorney \nKimberly Loan Osborne, Senior Attorney I \nRaquel M. Parks, Attorney II \nNew York Independent System Operator, Inc. \n10 Krey Boulevard \nRensselaer, NY 12144 \nTel:  (518) 356-6000 \nFax: (518) 356-4702 \nrfernandez@nyiso.com \nkgach@nyiso,com \nbhodgdon@nyiso.com \nkosborne@nyiso.com \nrparks@nyiso.com \n \n*Ted J. Murphy \nNathan R. Menard \nHunton Andrews Kurth LLP \n2200 Pennsylvania Avenue, NW \nWashington, D.C. 20037 \nTel: (202) 955-1500 \nFax: (202) 778-2201 \ntmurphy@hunton.com \nnmenard@hunton.com \n \n*Michael J. Messonnier Jr. \nHunton Andrews Kurth LLP \n951 East Byrd Street \nRichmond, VA 23219 \nTel: (804) 788-8200 \nFax: (804) 344-7999 \nmmessonnier@hunton.com \n \nMackinlee Rogers \nHunton Andrews Kurth LLP \n1445 Ross Avenue \nDallas, TX 75202 \nTel: (214) 979-3000 \nFax: (214) 880-0011 \nrogersm@hunton.com \nXIII. SERVICE \nThe NYISO will send an electronic link to this filing to the official representative of each \nof its customers, to each participant on its stakeholder committees, to the New York Public \nService Commission, and to the New Jersey Board of Public Utilities.  In addition, a complete \ncopy of the documents included with this filing will be posted on the NYISO’s website at \nwww.nyiso.com."},{"page":130,"startToken":65467,"endToken":65616,"text":"Hon. Debbie-Anne A. Reese  \n \n \nNovember 16, 2026 \nPage 130 \n \n \nXIV. CONCLUSION \nWherefore, the NYISO respectfully requests that the Commission accept the revisions \nproposed in this filing as just, reasonable, and not unduly discriminatory without requiring any \nmodifications or initiating additional procedures.  The Commission should continue to hold the \nproceedings initiated by the Show Cause Order in abeyance while it reviews this filing and \nshould ultimately determine that that this filing satisfies all Show Cause Order directives that fall \nwithin the scope of the NYISO’s responsibilities and FPA Section 205 filing rights.   \n \nRespectfully submitted,  \n \n/s/  Kimberly Loan Osborne  \n \nKimberly Loan Osborne \nBrian R. Hodgdon \nRaquel M. Parks \n \n/s/  Ted J. Murphy  \nTed J. Murphy  \nMichael J. Messonnier, Jr.  \nHunton Andrews Kurth LLP  \n \nCounsel for the New York Independent System \nOperator, Inc.  \n \n \n \ncc: \nJanel Burdick \n \nJames Dawson \n \nJignasa Gadani \n \nLeanne Khammal \n \nJaime Knepper \n \nTravis LaHue  \n \nDavid Morenoff \n \nJason Rhee \n \nDouglas Roe"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":5,"endAt":63,"startToken":0,"endToken":2002},{"p":5,"at":63,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":5,"endAt":203,"startToken":2002,"endToken":2009},{"p":5,"at":203,"title":"II. The NYISO’s Proposed Tariff Revisions to Establish and Implement Large Load","method":"printed heading","endPage":6,"endAt":3088,"startToken":2009,"endToken":2423},{"p":6,"at":3088,"title":"IV. The NYISO’s Proposed Tariff Revisions to Establish New Market Participation","method":"printed heading","endPage":6,"endAt":3415,"startToken":2423,"endToken":2448},{"p":6,"at":3415,"title":"B. Market Rules Applicable to Full Withdrawal Service and Limited Withdrawal Service","method":"printed heading","endPage":7,"endAt":2155,"startToken":2448,"endToken":2638},{"p":7,"at":2155,"title":"V. The NYISO's Proposals Build on the NYISO's Established Transmission Model and","method":"printed heading","endPage":7,"endAt":2455,"startToken":2638,"endToken":2665},{"p":7,"at":2455,"title":"A. The NYISO’s Financial Transmission Service Model Enables the NYISO to Maximize","method":"printed heading","endPage":7,"endAt":2776,"startToken":2665,"endToken":2693},{"p":7,"at":2776,"title":"B. The NYISO’s Financial Reservation Model Promotes Economic Efficiency in the Use of","method":"printed heading","endPage":7,"endAt":2988,"startToken":2693,"endToken":2712},{"p":7,"at":2988,"title":"C. There Is No Need for the NYISO to Adopt the Transmission Services Established by the","method":"printed heading","endPage":7,"endAt":3212,"startToken":2712,"endToken":2732},{"p":7,"at":3212,"title":"VI. The NYTOs and the NTOs Are addressing certain show cause order issues in","method":"printed heading","endPage":9,"endAt":63,"startToken":2732,"endToken":2818},{"p":9,"at":63,"title":"I. DOCUMENTS SUBMITTED","method":"PDF bookmark","endPage":10,"endAt":234,"startToken":2818,"endToken":3170},{"p":10,"at":234,"title":"II. The NYISO’s Proposed Tariff Revisions to Establish and Implement Large Load Integration Procedures","method":"PDF bookmark","endPage":10,"endAt":340,"startToken":3170,"endToken":3184},{"p":10,"at":340,"title":"A. Large Load","method":"PDF bookmark","endPage":11,"endAt":789,"startToken":3184,"endToken":3762},{"p":11,"at":789,"title":"B. Proposed New Transmission Services for Large Loads","method":"PDF bookmark","endPage":13,"endAt":215,"startToken":3762,"endToken":4722},{"p":13,"at":215,"title":"C. Large Load Integration Procedures","method":"PDF bookmark","endPage":13,"endAt":2297,"startToken":4722,"endToken":5031},{"p":13,"at":2297,"title":"i. Key Elements of the Large Load Integration Procedures","method":"PDF bookmark","endPage":13,"endAt":2356,"startToken":5031,"endToken":5040},{"p":13,"at":2356,"title":"a) Clear and Detailed Procedures","method":"PDF bookmark","endPage":13,"endAt":2880,"startToken":5040,"endToken":5121},{"p":13,"at":2880,"title":"b) Effective Date and Transition Process","method":"PDF bookmark","endPage":14,"endAt":2878,"startToken":5121,"endToken":5574},{"p":14,"at":2878,"title":"c) Timeframe of Large Load Integration Procedures","method":"PDF bookmark","endPage":15,"endAt":1024,"startToken":5574,"endToken":5895},{"p":15,"at":1024,"title":"d) Role of Transmission Owners","method":"PDF bookmark","endPage":15,"endAt":1726,"startToken":5895,"endToken":5993},{"p":15,"at":1726,"title":"e) Assessment of Reliability Impacts and Determinations of Withdrawal Service","method":"PDF bookmark","endPage":16,"endAt":64,"startToken":5993,"endToken":6246},{"p":16,"at":64,"title":"f) State Exempt Large Load Projects","method":"PDF bookmark","endPage":16,"endAt":712,"startToken":6246,"endToken":6347},{"p":16,"at":712,"title":"g) Application Process and Readiness Requirements","method":"PDF bookmark","endPage":16,"endAt":1883,"startToken":6347,"endToken":6524},{"p":16,"at":1883,"title":"h) Study Process","method":"PDF bookmark","endPage":17,"endAt":2389,"startToken":6524,"endToken":7136},{"p":17,"at":2389,"title":"i) Identification and Cost Allocation of Upgrades","method":"PDF bookmark","endPage":18,"endAt":64,"startToken":7136,"endToken":7294},{"p":18,"at":64,"title":"j) Alternative Transmission Technologies","method":"PDF bookmark","endPage":18,"endAt":896,"startToken":7294,"endToken":7398},{"p":18,"at":896,"title":"k) Transmission Services Agreement","method":"PDF bookmark","endPage":18,"endAt":1299,"startToken":7398,"endToken":7462},{"p":18,"at":1299,"title":"l) Operational Requirements","method":"PDF bookmark","endPage":18,"endAt":1645,"startToken":7462,"endToken":7514},{"p":18,"at":1645,"title":"m) Adoption of Requirements from Standard Interconnection Procedures","method":"PDF bookmark","endPage":18,"endAt":2637,"startToken":7514,"endToken":7653},{"p":18,"at":2637,"title":"ii. Overview of Large Load Integration Procedures","method":"PDF bookmark","endPage":21,"endAt":1872,"startToken":7653,"endToken":9140},{"p":21,"at":1872,"title":"D. Scope and Effective Date of Large Load Integration Procedures","method":"PDF bookmark","endPage":21,"endAt":1939,"startToken":9140,"endToken":9150},{"p":21,"at":1939,"title":"i. Application of Large Load Integration Procedures","method":"PDF bookmark","endPage":22,"endAt":1026,"startToken":9150,"endToken":9556},{"p":22,"at":1026,"title":"ii. Effective Date of Large Load Integration Procedures and Transition Requirements","method":"PDF bookmark","endPage":25,"endAt":1856,"startToken":9556,"endToken":11430},{"p":25,"at":1856,"title":"iii. Pre-Application Reports","method":"PDF bookmark","endPage":26,"endAt":2018,"startToken":11430,"endToken":12014},{"p":26,"at":2018,"title":"E. Large Load Integration Study Process Start Date and Timeframe","method":"PDF bookmark","endPage":26,"endAt":2085,"startToken":12014,"endToken":12024},{"p":26,"at":2085,"title":"i. Large Load Integration Study Process Start Date","method":"PDF bookmark","endPage":27,"endAt":950,"startToken":12024,"endToken":12397},{"p":27,"at":950,"title":"ii. Large Load Integration Study Process Timeframe and Process Overlap","method":"PDF bookmark","endPage":28,"endAt":3046,"startToken":12397,"endToken":13389},{"p":28,"at":3046,"title":"F. Large Load Integration Request","method":"PDF bookmark","endPage":29,"endAt":1051,"startToken":13389,"endToken":13602},{"p":29,"at":1051,"title":"i. Application Process and Timeframe Requirements for Submission of Large Load Integration Request","method":"PDF bookmark","endPage":30,"endAt":187,"startToken":13602,"endToken":13981},{"p":30,"at":187,"title":"ii. Submission Requirements for Large Load Integration Requests","method":"PDF bookmark","endPage":30,"endAt":446,"startToken":13981,"endToken":14018},{"p":30,"at":446,"title":"a) Request Form","method":"PDF bookmark","endPage":30,"endAt":2672,"startToken":14018,"endToken":14341},{"p":30,"at":2672,"title":"b) Application Fee","method":"PDF bookmark","endPage":31,"endAt":478,"startToken":14341,"endToken":14491},{"p":31,"at":478,"title":"c) Study Deposit","method":"PDF bookmark","endPage":32,"endAt":1024,"startToken":14491,"endToken":15056},{"p":32,"at":1024,"title":"d) Readiness Requirements/ Site Control","method":"PDF bookmark","endPage":33,"endAt":649,"startToken":15056,"endToken":15582},{"p":33,"at":649,"title":"e) Additional Submission Requirements","method":"PDF bookmark","endPage":33,"endAt":1911,"startToken":15582,"endToken":15783},{"p":33,"at":1911,"title":"iii. Review and Validation of Large Load Integration Requests","method":"PDF bookmark","endPage":35,"endAt":1195,"startToken":15783,"endToken":16758},{"p":35,"at":1195,"title":"iv. Study Agreement","method":"PDF bookmark","endPage":35,"endAt":2298,"startToken":16758,"endToken":16926},{"p":35,"at":2298,"title":"v. Queue Position","method":"PDF bookmark","endPage":36,"endAt":1394,"startToken":16926,"endToken":17282},{"p":36,"at":1394,"title":"vi. Modifications","method":"PDF bookmark","endPage":36,"endAt":2131,"startToken":17282,"endToken":17392},{"p":36,"at":2131,"title":"a) Modification Review Process","method":"PDF bookmark","endPage":37,"endAt":1902,"startToken":17392,"endToken":17893},{"p":37,"at":1902,"title":"b) Modifications During Large Load Integration Study Process","method":"PDF bookmark","endPage":38,"endAt":1517,"startToken":17893,"endToken":18388},{"p":38,"at":1517,"title":"c) Material Modifications","method":"PDF bookmark","endPage":39,"endAt":945,"startToken":18388,"endToken":18851},{"p":39,"at":945,"title":"vii. Withdrawal","method":"PDF bookmark","endPage":40,"endAt":926,"startToken":18851,"endToken":19404},{"p":40,"at":926,"title":"G. Assessment of Reliability Impacts and Determination of Withdrawal Service","method":"PDF bookmark","endPage":40,"endAt":1005,"startToken":19404,"endToken":19414},{"p":40,"at":1005,"title":"i. Determination of Withdrawal Service","method":"PDF bookmark","endPage":41,"endAt":484,"startToken":19414,"endToken":19840},{"p":41,"at":484,"title":"a) Addressing Adverse Impacts Under Resource Adequacy Impact Standard","method":"PDF bookmark","endPage":42,"endAt":1441,"startToken":19840,"endToken":20351},{"p":42,"at":1441,"title":"b) Addressing Violations Under Transmission Security Standard","method":"PDF bookmark","endPage":43,"endAt":462,"startToken":20351,"endToken":20671},{"p":43,"at":462,"title":"c) Withdrawal Service Based on Results Under Both Resource Adequacy Impact Standard and Transmission Security Standard","method":"PDF bookmark","endPage":43,"endAt":1150,"startToken":20671,"endToken":20770},{"p":43,"at":1150,"title":"d) LIPA Exception Regarding Non-Firm Withdrawal Service","method":"PDF bookmark","endPage":43,"endAt":2212,"startToken":20770,"endToken":20926},{"p":43,"at":2212,"title":"ii. Resource Adequacy Impact Standard","method":"PDF bookmark","endPage":44,"endAt":1626,"startToken":20926,"endToken":21308},{"p":44,"at":1626,"title":"a) Resource Adequacy Impact Standard Except for State Exempt Large Load Projects","method":"PDF bookmark","endPage":45,"endAt":2001,"startToken":21308,"endToken":21856},{"p":45,"at":2001,"title":"b) Resource Adequacy Impact Standard for State Exempt Large Load Projects","method":"PDF bookmark","endPage":47,"endAt":201,"startToken":21856,"endToken":22677},{"p":47,"at":201,"title":"c) The State Exempt Large Load Projects Proposal Is Consistent with Cooperative Federalism","method":"PDF bookmark","endPage":48,"endAt":775,"startToken":22677,"endToken":23291},{"p":48,"at":775,"title":"iii. Transmission Security Standard","method":"PDF bookmark","endPage":49,"endAt":2654,"startToken":23291,"endToken":24122},{"p":49,"at":2654,"title":"H. Initial Study Phase","method":"PDF bookmark","endPage":50,"endAt":64,"startToken":24122,"endToken":24226},{"p":50,"at":64,"title":"i. Overview of New Study Process","method":"PDF bookmark","endPage":52,"endAt":691,"startToken":24226,"endToken":25441},{"p":52,"at":691,"title":"ii. Initial Study Phase Overview","method":"PDF bookmark","endPage":52,"endAt":2955,"startToken":25441,"endToken":25822},{"p":52,"at":2955,"title":"iii. Resource Adequacy and Modeling Period","method":"PDF bookmark","endPage":53,"endAt":892,"startToken":25822,"endToken":26068},{"p":53,"at":892,"title":"iv. RAMP Part 1 Process","method":"PDF bookmark","endPage":53,"endAt":1671,"startToken":26068,"endToken":26184},{"p":53,"at":1671,"title":"a) Transmission Owner Responsibilities in the RAMP Part 1 Process","method":"PDF bookmark","endPage":55,"endAt":674,"startToken":26184,"endToken":27106},{"p":55,"at":674,"title":"b) NYISO Responsibilities in RAMP Part 1 Process","method":"PDF bookmark","endPage":56,"endAt":173,"startToken":27106,"endToken":27587},{"p":56,"at":173,"title":"v. SIS Entry Decision Period","method":"PDF bookmark","endPage":56,"endAt":1798,"startToken":27587,"endToken":27858},{"p":56,"at":1798,"title":"vi. RAMP Part 2 Process","method":"PDF bookmark","endPage":57,"endAt":1775,"startToken":27858,"endToken":28369},{"p":57,"at":1775,"title":"vii. System Impact Study","method":"PDF bookmark","endPage":58,"endAt":791,"startToken":28369,"endToken":28832},{"p":58,"at":791,"title":"a) Performance of System Impact Study","method":"PDF bookmark","endPage":59,"endAt":519,"startToken":28832,"endToken":29321},{"p":59,"at":519,"title":"b) Review of System Impact Study Report","method":"PDF bookmark","endPage":59,"endAt":1453,"startToken":29321,"endToken":29471},{"p":59,"at":1453,"title":"viii. ALI Entry Decision Period","method":"PDF bookmark","endPage":61,"endAt":1631,"startToken":29471,"endToken":30613},{"p":61,"at":1631,"title":"i. Assessment of Load Integration","method":"PDF bookmark","endPage":62,"endAt":600,"startToken":30613,"endToken":31000},{"p":62,"at":600,"title":"a) Base Case for Assessment of Load Integration","method":"PDF bookmark","endPage":62,"endAt":1930,"startToken":31000,"endToken":31210},{"p":62,"at":1930,"title":"b) ALI Part 1 Study","method":"PDF bookmark","endPage":63,"endAt":1818,"startToken":31210,"endToken":31710},{"p":63,"at":1818,"title":"c) ALI Part 2 Study","method":"PDF bookmark","endPage":63,"endAt":2617,"startToken":31710,"endToken":31841},{"p":63,"at":2617,"title":"ii. Facilities Study","method":"PDF bookmark","endPage":64,"endAt":1814,"startToken":31841,"endToken":32168},{"p":64,"at":1814,"title":"a) Performance of Facilities Study","method":"PDF bookmark","endPage":66,"endAt":255,"startToken":32168,"endToken":32983},{"p":66,"at":255,"title":"b) Consideration of Alternative Transmission Technologies","method":"PDF bookmark","endPage":66,"endAt":1692,"startToken":32983,"endToken":33177},{"p":66,"at":1692,"title":"c) Completion of Facilities Study","method":"PDF bookmark","endPage":67,"endAt":213,"startToken":33177,"endToken":33448},{"p":67,"at":213,"title":"iii. Conclusion of Large Load Integration Study Process","method":"PDF bookmark","endPage":67,"endAt":2084,"startToken":33448,"endToken":33743},{"p":67,"at":2084,"title":"J. Affected Systems","method":"PDF bookmark","endPage":67,"endAt":2415,"startToken":33743,"endToken":33790},{"p":67,"at":2415,"title":"i. Coordination with Affected Systems within the New York Control Area","method":"PDF bookmark","endPage":68,"endAt":977,"startToken":33790,"endToken":34006},{"p":68,"at":977,"title":"ii. Coordination with External Affected Systems","method":"PDF bookmark","endPage":69,"endAt":651,"startToken":34006,"endToken":34571},{"p":69,"at":651,"title":"iii. Study of Impacts to New York State Transmission System of an Affected System Eligible Customer’s Proposed Interconnection to Another Region’s Transmission System","method":"PDF bookmark","endPage":69,"endAt":1325,"startToken":34571,"endToken":34671},{"p":69,"at":1325,"title":"a) Response to Notification","method":"PDF bookmark","endPage":69,"endAt":2093,"startToken":34671,"endToken":34790},{"p":69,"at":2093,"title":"b) Affected System Load Queue Position","method":"PDF bookmark","endPage":70,"endAt":1073,"startToken":34790,"endToken":35160},{"p":70,"at":1073,"title":"c) Affected System Load Study Agreement","method":"PDF bookmark","endPage":71,"endAt":494,"startToken":35160,"endToken":35630},{"p":71,"at":494,"title":"d) Scope of Affected System Load Study","method":"PDF bookmark","endPage":72,"endAt":1098,"startToken":35630,"endToken":36246},{"p":72,"at":1098,"title":"e) Evaluation of Affected System Network Upgrades","method":"PDF bookmark","endPage":72,"endAt":2593,"startToken":36246,"endToken":36457},{"p":72,"at":2593,"title":"III. Post-Study Requirements","method":"PDF bookmark","endPage":72,"endAt":2626,"startToken":36457,"endToken":36460},{"p":72,"at":2626,"title":"i. Post-Study Agreements","method":"PDF bookmark","endPage":73,"endAt":1903,"startToken":36460,"endToken":36841},{"p":73,"at":1903,"title":"ii. Transmission Service Agreement for Firm and Non-Firm Withdrawal Service for Large Loads","method":"PDF bookmark","endPage":73,"endAt":2660,"startToken":36841,"endToken":36946},{"p":73,"at":2660,"title":"a) Process for Entering into Transmission Service Agreement","method":"PDF bookmark","endPage":74,"endAt":228,"startToken":36946,"endToken":37076},{"p":74,"at":228,"title":"b) Pro Forma Transmission Service Agreement","method":"PDF bookmark","endPage":75,"endAt":1749,"startToken":37076,"endToken":37757},{"p":75,"at":1749,"title":"iii. Large Load Performance, Protection and Control, and Monitoring Requirements","method":"PDF bookmark","endPage":77,"endAt":2071,"startToken":37757,"endToken":38854},{"p":77,"at":2071,"title":"iv. Status of Large Load Project and Associated Network Upgrades","method":"PDF bookmark","endPage":78,"endAt":311,"startToken":38854,"endToken":39137},{"p":78,"at":311,"title":"B. Additional Requirements","method":"PDF bookmark","endPage":78,"endAt":340,"startToken":39137,"endToken":39140},{"p":78,"at":340,"title":"i. Study Cost Allocation, Invoicing, and Deposit Requirements","method":"PDF bookmark","endPage":78,"endAt":843,"startToken":39140,"endToken":39211},{"p":78,"at":843,"title":"a) Study Cost Responsibility and Allocation of Study Costs","method":"PDF bookmark","endPage":79,"endAt":689,"startToken":39211,"endToken":39705},{"p":79,"at":689,"title":"b) Invoicing and Payment Requirements","method":"PDF bookmark","endPage":80,"endAt":423,"startToken":39705,"endToken":40216},{"p":80,"at":423,"title":"c) Requirements Applicable to Fees and Deposits","method":"PDF bookmark","endPage":80,"endAt":2305,"startToken":40216,"endToken":40508},{"p":80,"at":2305,"title":"ii. Confidentiality Requirements","method":"PDF bookmark","endPage":81,"endAt":185,"startToken":40508,"endToken":40677},{"p":81,"at":185,"title":"iii. Dispute Resolution Requirements","method":"PDF bookmark","endPage":81,"endAt":867,"startToken":40677,"endToken":40781},{"p":81,"at":867,"title":"iv. Third Party Conducting Studies","method":"PDF bookmark","endPage":81,"endAt":1855,"startToken":40781,"endToken":40935},{"p":81,"at":1855,"title":"v. Additional Requirements","method":"PDF bookmark","endPage":82,"endAt":1967,"startToken":40935,"endToken":41378},{"p":82,"at":1967,"title":"IV. The NYISO’s Proposed Tariff Revisions to Establish New Market Participation Provisions Applicable to Large Loads","method":"PDF bookmark","endPage":82,"endAt":2087,"startToken":41378,"endToken":41394},{"p":82,"at":2087,"title":"A. Overview of Key Market Design Elements","method":"PDF bookmark","endPage":85,"endAt":2462,"startToken":41394,"endToken":43382},{"p":85,"at":2462,"title":"B. Market Rules Applicable to Full Withdrawal Service and Limited Withdrawal Service Loads","method":"PDF bookmark","endPage":86,"endAt":64,"startToken":43382,"endToken":43557},{"p":86,"at":64,"title":"i. Firm Withdrawal Service Loads","method":"PDF bookmark","endPage":86,"endAt":1586,"startToken":43557,"endToken":43796},{"p":86,"at":1586,"title":"ii. Limited Withdrawal Service Loads","method":"PDF bookmark","endPage":86,"endAt":2949,"startToken":43796,"endToken":44006},{"p":86,"at":2949,"title":"a) Exclusion of Limited Withdrawal Service Large Loads from Capacity Forecasts and Capacity Markets","method":"PDF bookmark","endPage":87,"endAt":2177,"startToken":44006,"endToken":44368},{"p":87,"at":2177,"title":"b) The Non-Firm Bid Cap and Out-of-Merit Requirements for Limited Withdrawal Service Loads","method":"PDF bookmark","endPage":93,"endAt":64,"startToken":44368,"endToken":47255},{"p":93,"at":64,"title":"c) Excluding Limited Withdrawal Service Loads from Participation as Demand Side Resources","method":"PDF bookmark","endPage":94,"endAt":578,"startToken":47255,"endToken":47922},{"p":94,"at":578,"title":"d) Market Participation Provisions Applicable to Limited Withdrawal Service Loads that Receive “Partial” Firm Withdrawal Service","method":"PDF bookmark","endPage":94,"endAt":1558,"startToken":47922,"endToken":48068},{"p":94,"at":1558,"title":"e) Market Rules Applicable to Zero Withdrawal Service Loads (“ZWSL”)","method":"PDF bookmark","endPage":95,"endAt":2948,"startToken":48068,"endToken":48813},{"p":95,"at":2948,"title":"f) Allocating Costs to Large Loads on a Gross Load Basis","method":"PDF bookmark","endPage":96,"endAt":1095,"startToken":48813,"endToken":49053},{"p":96,"at":1095,"title":"g) The System Reliability Benefit Fee","method":"PDF bookmark","endPage":98,"endAt":510,"startToken":49053,"endToken":49858},{"p":98,"at":510,"title":"C. Proposed Large Load Operating Requirements","method":"PDF bookmark","endPage":99,"endAt":64,"startToken":49858,"endToken":50278},{"p":99,"at":64,"title":"D. Additional CLLC Rules","method":"PDF bookmark","endPage":99,"endAt":91,"startToken":50278,"endToken":50282},{"p":99,"at":91,"title":"i. Overview and Eligibility","method":"PDF bookmark","endPage":99,"endAt":344,"startToken":50282,"endToken":50317},{"p":99,"at":344,"title":"ii. CLLC-Specific Definitions","method":"PDF bookmark","endPage":101,"endAt":1349,"startToken":50317,"endToken":51197},{"p":101,"at":1349,"title":"iii. CLLC-Specific Metering and Telemetry Requirements","method":"PDF bookmark","endPage":101,"endAt":2488,"startToken":51197,"endToken":51375},{"p":101,"at":2488,"title":"iv. CLLC-Specific Energy Market Rules","method":"PDF bookmark","endPage":103,"endAt":2112,"startToken":51375,"endToken":52274},{"p":103,"at":2112,"title":"v. CLLC-Specific Capacity Market Rules","method":"PDF bookmark","endPage":104,"endAt":1565,"startToken":52274,"endToken":52632},{"p":104,"at":1565,"title":"vi. CLLC-Specific Settlement Rules","method":"PDF bookmark","endPage":105,"endAt":922,"startToken":52632,"endToken":52980},{"p":105,"at":922,"title":"E. Deviation Charges for CLLCs that Fail to Follow NYISO’s Dispatch Instructions","method":"PDF bookmark","endPage":105,"endAt":1471,"startToken":52980,"endToken":53063},{"p":105,"at":1471,"title":"i. Overwithdrawal MW x Max (MPRCDAM, MPRCRT) x Length of Interval in seconds 3600 seconds","method":"PDF bookmark","endPage":105,"endAt":1775,"startToken":53063,"endToken":53107},{"p":105,"at":1775,"title":"ii. Underwithdrawal MW x Max (MPRCDAM, MPRCRT) x Length of Interval in seconds 3600 seconds","method":"PDF bookmark","endPage":106,"endAt":2746,"startToken":53107,"endToken":53650},{"p":106,"at":2746,"title":"F. The Associated Resource Arrangements and the Capacity Region Construct","method":"PDF bookmark","endPage":109,"endAt":2435,"startToken":53650,"endToken":55104},{"p":109,"at":2435,"title":"G. DSR/Aggregation Rules","method":"PDF bookmark","endPage":111,"endAt":842,"startToken":55104,"endToken":56125},{"p":111,"at":842,"title":"H. DER Modeling Improvements and Baseline Enhancements","method":"PDF bookmark","endPage":112,"endAt":1978,"startToken":56125,"endToken":56768},{"p":112,"at":1978,"title":"I. Sunsetting the NYISO’s BTM:NG Resource Program","method":"PDF bookmark","endPage":113,"endAt":1507,"startToken":56768,"endToken":57248},{"p":113,"at":1507,"title":"J. Proposed Revisions to the NYISO’s Market Power Mitigation Measures","method":"PDF bookmark","endPage":113,"endAt":1580,"startToken":57248,"endToken":57258},{"p":113,"at":1580,"title":"i. Revisions to the “Buyer-Side” Capacity Market Power Mitigation Measures","method":"PDF bookmark","endPage":116,"endAt":65,"startToken":57258,"endToken":58460},{"p":116,"at":65,"title":"ii. Additional Market Power Mitigation Measures Changes for CLLCs","method":"PDF bookmark","endPage":116,"endAt":1308,"startToken":58460,"endToken":58672},{"p":116,"at":1308,"title":"V. THE NYISO’S PROPOSALS BUILD ON THE NYISO’S ESTABLISHED TRANSMISISON MODEL AND MARKET STRUCTURES AND DO NOT NEED TO INCORPORATE THE PJM CO-LOCATION ORDER’S TRANSMISSION SERVICES","method":"PDF bookmark","endPage":117,"endAt":204,"startToken":58672,"endToken":59011},{"p":117,"at":204,"title":"A. The NYISO’s Financial Transmission Service Model Enables the NYISO to Maximize the Use of the Transmission System Efficiently and to Support Flexible Service for Large Loads","method":"PDF bookmark","endPage":119,"endAt":2169,"startToken":59011,"endToken":60569},{"p":119,"at":2169,"title":"B. The NYISO’s Financial Reservation Model Promotes Economic Efficiency in the Use of the Transmission System and Resources","method":"PDF bookmark","endPage":121,"endAt":1033,"startToken":60569,"endToken":61392},{"p":121,"at":1033,"title":"C. There Is No Need for the NYISO to Adopt the Transmission Services Established by the PJM Co-Location Order","method":"PDF bookmark","endPage":124,"endAt":1352,"startToken":61392,"endToken":63002},{"p":124,"at":1352,"title":"VI. the NYTOs and the NTOs Are addressing certain show cause order issues in Separate FPA Section 205 Filings","method":"PDF bookmark","endPage":125,"endAt":1188,"startToken":63002,"endToken":63501},{"p":125,"at":1188,"title":"VII. The FPA Section 205 Standard of Review and Severability","method":"PDF bookmark","endPage":126,"endAt":1583,"startToken":63501,"endToken":64108},{"p":126,"at":1583,"title":"VIII. Stakeholder Approval","method":"PDF bookmark","endPage":127,"endAt":457,"startToken":64108,"endToken":64464},{"p":127,"at":457,"title":"IX. Requested Effective Dates","method":"PDF bookmark","endPage":127,"endAt":2619,"startToken":64464,"endToken":64819},{"p":127,"at":2619,"title":"X. Request to Continue Abeyance of Show Cause Proceedings","method":"PDF bookmark","endPage":128,"endAt":654,"startToken":64819,"endToken":65006},{"p":128,"at":654,"title":"XI. Request for Extended Comment Period","method":"PDF bookmark","endPage":129,"endAt":65,"startToken":65006,"endToken":65242},{"p":129,"at":65,"title":"XII. Communications and Correspondence","method":"PDF bookmark","endPage":129,"endAt":1166,"startToken":65242,"endToken":65400},{"p":129,"at":1166,"title":"XIII. Service","method":"PDF bookmark","endPage":130,"endAt":65,"startToken":65400,"endToken":65476},{"p":130,"at":65,"title":"XIV. Conclusion","method":"PDF bookmark","endPage":130,"endAt":1078,"startToken":65476,"endToken":65616}]}