{"document":{"slug":"filing-er27-520-pjm-tos-large-loads","title":"PJM Transmission Owners file tariff revisions for service to co-located and large loads under section 205","issued":"2026-11-16","accession":"20261116-5300","docket":"ER27-520-000","group":"PJM filings","filer":"PJM Transmission Owners (filed by PECO Energy Company and PJM)","kind":"filing","file":"sources/originals/20261116-5300_01.pdf","url":"https://www.pjm.com/-/media/DotCom/documents/ferc/filings/2026/20261116-er27-520-000.pdf","sha256":"13a9774395aacc74eb8ece2aa111029e886faabeb1a1494fe5c81f1d246c917b","pages":336,"tokens":121986,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":389,"text":"Suite 500 East \n1301 K Street NW \nWashington, D.C.  20005-3317 \nNovember 16, 2026 \nHonorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, D.C. 20426 \nRe: \nExelon Corporation, et al., Docket No. ER27-520-000 \nProposed Revisions to the PJM Open Access Transmission Tariff Addressing \nTransmission Service, Cost Allocation, and Cost Recovery for Large Loads \nand Co-Located Loads \nDear Secretary Reese: \nPursuant to section 205 of the Federal Power Act (“FPA”)1 and Part 35 of the \nCommission’s regulations,2 the PJM Transmission Owners,3 acting through the Consolidated \nTransmission Owners Agreement,4 submit for filing revisions to the PJM Interconnection, L.L.C. \n(“PJM”) Open Access Transmission Tariff (“Tariff”).5   \nAs discussed below, and supported by the Direct Joint Testimony of Peter Blazunas and \nHanhan Hammer, the proposed Tariff revisions establish rates, cost allocation, cost recovery \nmechanisms, financial protections, revenue-crediting requirements, and transparency measures \nassociated with transmission service to be taken by Eligible Customers6 on behalf of Co-Located \nLoads and Large Loads.7  These revisions are both responsive to and consistent with the \npreliminary findings made by the Commission in its June 18, 2026 Order Instituting Proceeding \n1\n16 U.S.C. § 824d. \n2\n18 C.F.R. Part 35. \n3\nThe PJM Transmission Owners also may be referred to herein as “Transmission Owners.” \n4  \nConsolidated Transmission Owners Agreement, FERC Rate Schedule No. 42, § 7.3.  These revisions were \napproved by the PJM Transmission Owners Agreement Administrative Committee on November 12, 2026. \n5\nPursuant to Order No. 714, this filing is submitted electronically by PJM on behalf of the PJM Transmission \nOwners as part of an XML filing package conforming to the Commission’s regulations.  PJM makes this submission \nin its capacity as administrator of the Tariff and to retain administrative control over the electronic Tariff. \nAccordingly, the PJM Transmission Owners have requested that PJM submit the proposed Tariff revisions through \nthe Commission’s eTariff system as part of PJM’s electronic Intra-PJM Tariff. \n6\nCapitalized terms not otherwise defined herein have the meanings set forth in the Tariff, the PJM \nTransmission Owners’ proposed Tariff revisions and pro forma Cost Recovery Agreement filed herein, or in the \nproposed Tariff revisions included in PJM’s companion section 205 filing. \n7 \nDirect Joint Testimony of Peter Blazunas and Hanhan Hammer, Exhibit No. PTO-0001 (“Blazunas and \nHammer Direct Joint Testimony”)."},{"page":2,"startToken":389,"endToken":874,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 2 \n \n \n \n \nUnder Section 206 of the Federal Power Act in Docket No. EL26-67-000 (“Show Cause Order”),8 \nand also comply with the Commission’s June 18, 2026 Order on Rehearing, Clarification, \nCompliance Filing and Paper Hearing in Docket Nos. EL25-49, et al. (“Co-Located Load Paper \nHearing Order”).9  Additionally, the proposed tariff revisions have been designed to be consistent \nwith PJM’s responsive section 205 filings establishing provisions for: (1) a new Fast Energization \nProcess for generation interconnection and Large Load-related transmission service requests; (2) \nco-location and behind-the-meter generation; and (3) ride-through.   \n \nThis filing consists of several key elements.  With respect to each of these components, the \nPJM Transmission Owners have carefully considered and accounted for the need for ratepayer \nprotections, Large Load and generation customer cost certainty and commercial stability, and cost \ntransparency.  The PJM Transmission Owners’ proposal achieves a just and reasonable balance by \nprotecting everyday customers from unfairly bearing the significant transmission-related costs \nnecessary to connect and serve new Large Load and generation customers.  At the same time, it \npromotes speed-to-power, which is critical to supporting the accelerating pace of Artificial \nIntelligence, the growth of domestic manufacturing, and other information technology \ndevelopments.  The elements are as follows: \n \n1. A pro forma Cost Recovery Agreement and related implementing Tariff provisions.  \nThe pro forma Cost Recovery Agreement (“CRA”) and related Tariff provisions are \ndesigned to address the Commission’s concerns that the Tariff lacks an adequate \nmechanism to mitigate the risk of cost shifting among transmission customers.  \nConsistent with the Show Cause Order, the pro forma CRA will require Eligible \nCustomers taking service on behalf of Large Load customers to make a minimum \ncontribution towards transmission owners’ revenue requirements, along with a \nshortfall payment and crediting mechanism and financial security obligations, to \nensure that each customer’s minimum commitment is satisfied over the term of the \nCRA.  The PJM Transmission Owners’ proposal also appropriately recognizes, \nconsistent with the Commission’s acknowledgement,10 that voluntary cost recovery \nagreements and other ratepayer protection mechanisms have been, and continue to be, \nutilized at the retail and wholesale level by utilities within PJM.  Therefore, the PJM \nTransmission Owners’ proposal makes clear that PJM Transmission Owners may \ncontinue to utilize existing and  new consumer protection arrangements, as alternatives \nto the pro forma CRA, so long as those arrangements result in comparable protections \nand are accepted for filing by the Commission. \n \n \n8  \nPJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at PP 35, 41-101 (2026), errata notice, 196 FERC ¶ 61,122 \n(2026). \n9  \nPJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026).  The PJM Transmission Owners will be \nsubmitting a letter in Docket Nos. EL25-49, et al. notifying the parties to that proceeding that the tariff revisions \nbeing submitted in this filing also satisfy the PJM Transmission Owners’ compliance obligations from the Co-\nLocated Load Paper Hearing Order. \n10  \nShow Cause Order at P 69."},{"page":3,"startToken":874,"endToken":1379,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 3 \n \n \n \n \n2. Rates for Transmission Services Available to Large Loads and Co-Located Loads.  \nThe PJM Transmission Owners’ proposal contains rates for the new services the \nCommission has required to be made available to Eligible Customers taking service \non behalf of Co-Located Loads and that the Commission preliminarily found should \nalso be extended to certain Large Loads.  These include Firm Contract Demand \nTransmission Service (“FCDS”), Non-Firm Contract Demand Transmission Service \n(“NFCDS”), and Interim Network Integration Transmission Service (“Interim NITS”).  \nThe rates for these services are largely identical to those proposed by the PJM \nTransmission Owners and approved by the Commission in the Co-Located Load Paper \nHearing Order, with the modifications required by the Commission in that Order.  The \nPJM Transmission Owners have also included, consistent with the Co-Located Load \nPaper Hearing Order, financial penalties for unreserved use by Eligible Customers \ntaking one of the new transmission services on behalf of Co-Located Loads or Large \nLoads.      \n \n3. Cost Allocation and Recovery of Upgrades Necessary to Provide Interconnection and \nTransmission Service.  The PJM Transmission Owners are proposing a methodology \nfor allocating and recovering the costs of transmission upgrades, referred to as \nInterconnection Reliability Reinforcements (“IRRs”), resulting from PJM’s proposed \nFast Energization Process.11  The allocation methodology is based on a modified \nversion of PJM’s existing proportional impact allocation methodology for customers \nin its New Service Request process.  Cost responsibility will be assigned to those \nZones containing Large Loads being studied for transmission service in the PJM Fast \nEnergization process. Those costs will be recovered through a combination of firm \ntransmission service rates to customers in the Zones where the IRRs are located, along \nwith a new Interconnection Reliability Reinforcement Charge assessed to Zones based \non the calculated impact of the Large Loads within the Zones.  As it pertains to the \nproportional impact-driven share of costs attributable to Co-Located Loads and Large \nLoads, this allocation methodology will apply to each portfolio of IRRs identified \nthrough PJM’s Fast Energization Process for 15 years.12  After that 15-year period, the \nremaining costs of the IRRs will be subject to regional allocation using the then-current \nSchedule 12 methodology that applies to Regional Transmission Expansion Plan \n(“RTEP”) reliability projects.  The proportional impact-driven share of costs \nattributable to generators in the Fast Energization Process will be recovered through a \nfee billed and collected by PJM over a 15-year period and credited back to customers \nin the Zones that are allocated IRR costs. \n \n \n11  \nPJM’s proposed Fast Energization Process is an annual process that evaluates both generator interconnection \nand Large Load transmission service requests through a single cluster study, resulting in a consolidated portfolio of \nIRRs needed to provide interconnection and transmission service to the cluster of generator and Large Load-related \nservice requests. \n12  \nReferences throughout this filing to the “portfolio” are those projects (e.g., upgrades, transmission \nreinforcements) identified by PJM that will be required to accommodate both generators seeking interconnection and \nEligible Customers seeking transmission service on behalf of Large Loads in each study cycle."},{"page":4,"startToken":1379,"endToken":1805,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 4 \n \n \n \n \n4. Transparency and Customer Protection Commitments.  In addition to the basic cost \nallocation and rate design features of the PJM Transmission Owners’ proposal, the \nPJM Transmission Owners are committing to make, on compliance, necessary changes \nto their formula rate templates to: (1) provide transparency to state regulators and other \ninterested parties regarding the costs of transmission facilities being constructed by \neach Transmission Owner to provide transmission service to Large Loads; and (2) \nadopt a mechanism designed to protect wholesale transmission customers not \nregulated at the retail level (municipals, cooperatives, and other applicable load-\nserving entities) from having to bear excessive large-load-related transmission upgrade \ncosts.     \n \nEach of these elements is designed to align with the Fast Energization proposal being \nsubmitted by PJM on the same date as this filing.  Based on information provided to stakeholders,13 \nPJM is proposing an approach that would process and study requests for both generator \ninterconnection and transmission service on behalf of Large Loads in a single annual cluster, \nresulting in a portfolio of IRRs necessary to accommodate the aggregate of interconnection and \ntransmission service requests in each cluster cycle.  Although each of the elements of the \nTransmission Owners’ proposal is designed to work in tandem with PJM’s proposed Fast \nEnergization Process, the essential elements are independently just and reasonable, and \nimportantly, satisfy the Commission’s preliminary findings in the Show Cause Order.  In other \nwords, regardless of how the Commission acts on PJM’s filing, the Commission can and should \ndetermine that the key aspects of the PJM Transmission Owners’ proposal, as discussed below, \nare just and reasonable and should be accepted.  This remains the case even if certain incremental \nchanges are required on compliance to ensure compatibility with the determinations the \nCommission makes regarding the planning and study process for generator interconnection and \ntransmission service customers.   \n \n \n \n \n \n13  \nPJM Interconnection, L.L.C., Co-Located Load Order Workshop Meeting Materials, Item 02 (Nov. 11, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/cllsco/2026/20261112/20261112-\nitem-02---raa-revisions-schedule-8-november-11-draft--redline.pdf \n(RAA \nSchedule \n8 \nrevisions); \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/cllsco/2026/20261112/20261112-item-02---\ntariff-revisions-part-i-definitions-november-11-draft---redline.pdf (Tariff, Part I revisions); https://www.pjm.com/-\n/media/DotCom/committees-groups/workshops/cllsco/2026/20261112/20261112-item-02---tariff-revisions-part-iii-\nnits-november-11-draft---redline.pdf (Tariff, Part III revisions); https://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20261112/20261112-item-02---tariff-revisions-part-viii-november-11-draft--\nredline.pdf \n(Tariff, \nPart \nVIII \nrevisions); \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20261112/20261112-item-02---tariff-revisions-part-xi-new-transmission-services-\nnovember-11-draft---redline.pdf (Tariff, Part XI revisions)."},{"page":5,"startToken":1805,"endToken":2301,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 5 \n \n \n \n \nI. \nEXECUTIVE SUMMARY \nThe proposed Tariff revisions contained in this filing establish rates, cost allocation, cost \nrecovery mechanisms, financial protections, revenue-crediting requirements, and transparency \nmeasures associated with transmission service to be taken on behalf of Co-Located Loads and \nLarge Loads.  These revisions are responsive to and consistent with both the preliminary findings \nmade by the Commission in its June 18, 2026 Show Cause Order as well as the Commission’s Co-\nLocated Load Paper Hearing Order issued on the same date.  The proposed Tariff revisions are \ndesigned to work in tandem with PJM’s section 205 filing submitted on the same date, which \nproposes a Fast Energization Process that combines both generator interconnection and \ntransmission service requests made on behalf of Co-Located Loads and Large Loads into a single \nannual cluster process.  The process would result in a consolidated portfolio of IRRs needed to \nprovide interconnection and transmission service to the cluster of generator and Large Load-\nrelated service requests.  However, the key elements of the PJM Transmission Owners’ proposal \nare independently just and reasonable and fully address both the Commission’s preliminary \nfindings in the Show Cause Order and the policies underlying those findings.   \n \nThe Commission has explained that the integration of significant new Large Loads is an \nurgent challenge requiring a timely, orderly, and nondiscriminatory path to transmission service \nthat preserves reliability and affordability.14  The PJM Transmission Owners’ proposal reflects the \nneed for prompt action and meets the Commission’s objective to provide ratepayer protections, as \nidentified in the Show Cause Order.  The PJM Transmission Owners’ proposed revisions therefore \nstrike a practical balance.  Namely, they provide sufficient terms to ensure that Large Loads and \nother responsible entities bear their share of the costs and revenue risks associated with their \nrequests, thereby protecting other customers, without imposing unnecessary complexity or \nunpredictability that could jeopardize speed to power by impeding efficient planning. \nConsistent with the Commission’s findings that it was not seeking to alter or call into \nquestion existing cost allocation methods for transmission upgrades,15 existing zonal NITS and \nformula rate structures remain the starting point for recovering applicable transmission revenue \nrequirements, including transmission upgrades necessary to facilitate transmission service \nrequested by Eligible Customers on behalf of Large Loads.  The PJM Transmission Owners’ \nproposed Tariff revisions supplement those structures with measures addressing distinct risks \nassociated with Large Load integration, including secured commitments associated with the \nrequested transmission service, potential shortfalls in or loss of anticipated firm service revenues, \nunreserved transmission use, and potential double recovery.  For instance, and as explained further \nherein, the PJM Transmission Owners’ proposal includes: \n1. An obligation on Large Loads to enter into a pro forma CRA, or comparable alternative \nagreement, to ensure the Large Load Customer’s committed contribution toward the \napplicable Transmission Owner’s transmission revenue requirement and to require the \nLarge Load Customer to provide Credit Support securing the associated payment \n \n14  \nShow Cause Order at PP 1-7, 35-39. \n15  \nId. at P 81."},{"page":6,"startToken":2301,"endToken":2803,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 6 \n \n \n \n \nobligations.  The pro forma CRA includes applicable shortfall and termination \npayments to reduce the revenue requirement that would otherwise need to be recovered \nfrom other transmission customers if the Large Load fails to take the committed level \nof transmission service, along with requirements to provide and maintain robust \nfinancial security.  The PJM Transmission Owners propose to require Large Loads to \nenter into CRAs, or comparable agreements prior to entering PJM’s Fast Energization \nProcess to ensure a significant financial commitment on the part of the Large Load \nCustomer and thereby deter speculative or duplicative transmission service requests.  \nAny amounts collected from the Large Load Customer as a result of terminating the \nCRA prior to the commencement of service will first go towards defraying any costs \nassociated with transmission development that is no longer needed, with any remaining \namounts credited against the Transmission Owner’s revenue requirement.  Any \ntermination amount collected from the Large Load Customer after service commences \nwill be entirely credited against the Transmission Owner’s revenue requirement, solely \nto the benefit of other customers.  These mechanisms mitigate the risks of potential cost \nshifts to other transmission customers.    \n2. A methodology to allocate the costs of the portfolio of transmission upgrades, known \nas Interconnection Reliability Reinforcements, identified by PJM in its Fast \nEnergization Process as needed to accommodate the generator interconnection and \ntransmission service requests in each annual cycle.  This methodology will allocate cost \nresponsibility among PJM Zones – and only those zones with Large Loads studied \nwithin an annual cycle – in a manner roughly commensurate with benefits by utilizing \nmodeled electrical impacts on identified constraints.  This approach is consistent with \nthe proportional impact methodology approved by the Commission and currently used \nby PJM to allocate costs associated with its current generator interconnection process.  \nThis methodology will also determine the proportional impact associated with \ngenerators seeking interconnection through the Fast Energization Process annual cycle, \nwhich will be recovered through a fee assessed over a 15-year period.  The PJM \nTransmission Owners are also proposing that all IRRs be allocated to Zones containing \nLarge Load-related transmission requests for 15 years, after which point the remaining \ncosts will be allocated using the then-current general regional cost allocation \nmethodology.  This approach balances a recognition of the initial Large Load-related \ndrivers of IRRs, with the fact that changes in system conditions, use and topology will \nresult in a broader set of beneficiaries over time. \n \n3. A commitment to include in their transmission owner-specific formula rates, on \ncompliance, additional measures to protect municipal utilities, cooperatives, and other \ndirect wholesale customers from bearing an excessive share of Large Load-related \nzonal costs.  The PJM Transmission Owners are also committing to include in their \nformula rates cost information regarding transmission upgrades needed to provide \nservice to Large Loads.  This information will address both the transparency concerns \nidentified by the Commission in the Show Cause Order, as well as provide state \nauthorities with information relevant to any further allocation of those costs at the retail \nlevel."},{"page":7,"startToken":2803,"endToken":3239,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 7 \n \n \n \n \n \n4. Extending the rate design elements associated with the new transmission services \nrequired by the Commission in the Co-Located Load Paper Hearing Order to \nencompass the ability of Large Loads to take these new transmission services, which \nthe PJM Transmission Owners understand PJM will be proposing in its own section \n205 filing.  The rate design also includes appropriate crediting provisions for the new \ntransmission services required by the Commission to ensure that non-firm transmission \nrevenues are used to offset rates paid by firm transmission customers.  Moreover, the \nPJM Transmission Owners’ proposal includes financial penalties for unreserved use of \nthe transmission system that will apply to transmission service being taken on behalf \nof both Co-Located Load and Large Loads.  These penalties will work in coordination \nwith PJM’s operational consequences both to ensure the reliable operation of the \nsystem and protect other transmission ratepayers from unfairly subsidizing customers \nthat fail to abide by their contractual limits.   \n \nII. \nBACKGROUND \nA. \nPJM Transmission Owner Filing Rights \nAs the Commission has noted, the PJM Transmission Owners have exclusive and unilateral \nrights regarding the cost allocation provisions of Schedule 12 of the Tariff.16  The PJM \nTransmission Owners relied on those same authorities in their February 23, 2026 paper hearing \nbrief in explaining their rights and obligations under the Consolidated Transmission Owners \nAgreement to develop and file the rates for the new transmission services that the Commission has \nrequired for Co-Located and Large Loads.17  The Show Cause Order recognized the PJM \nTransmission Owners may submit this filing proposing revisions to the Tariff pursuant to their \napplicable FPA section 205 filing rights.18  \nB. \nProcedural Background \n1. \nCo-Located Load Orders and Remaining Compliance Obligations. \nOn February 20, 2025, the Commission instituted a proceeding under section 206 of the \nFPA based on its preliminary concern that the Tariff did not address with sufficient clarity or \nconsistency the rates, terms, and conditions applicable to co-location arrangements.19  \n \n16  \nSee Neptune Regional Transmission System, LLC and Long Island Power Auth. v. PJM Interconnection, \nL.L.C., 175 FERC ¶ 61,247 at P 47 (2021), and PPL Electric Utils. Corp., 177 FERC ¶ 61,123 at PP 34, 36 (2021); \nsee also Tariff, Part I, Section 9.1(a). \n17  \nSee Initial Brief and Joint Responses of the Indicated PJM Transmission Owners to Paper Hearing Questions \nat 3 & nn.7-9, Docket Nos. EL25-49, et al. (filed Feb. 23, 2026) (“PJM Transmission Owners Initial Paper Hearing \nBrief”). \n18  \nSee Show Cause Order at P 38. \n19  \nPJM Interconnection, L.L.C., 190 FERC ¶ 61,115 at PP 1-5 (2025)."},{"page":8,"startToken":3239,"endToken":3741,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 8 \n \n \n \n \nOn December 18, 2025, the Commission found the Tariff to be unjust and unreasonable \nand established a framework under which an Eligible Customer taking transmission service on \nbehalf of Co-Located Load must take: (1) NITS, including interim non-firm service pending \ncompletion of the Network Upgrades required for permanent NITS; (2) FCDS; or (3) NFCDS.  \nThe Commission also established a paper hearing to determine the just and reasonable rates, terms, \nand conditions for those services.20 \nThe PJM Transmission Owners submitted an initial brief on February 23, 2026, a response \nto PJM’s initial brief on March 25, 2026, and a reply brief on April 24, 2026, addressing the rates \nand related measures applicable to the new services.21  On June 18, 2026, the Commission resolved \nthe paper hearing issues and directed further compliance filings by PJM and the PJM Transmission \nOwners.  Among other matters, the Commission addressed the rate treatment for FCDS, NFCDS, \nand Interim NITS and the imposition of financial penalties for unreserved transmission use.22  \nNotably, the Commission accepted the PJM Transmission Owners’ proposals with respect to the \nrates for FCDS and Interim NITS, as well as financial penalties for unreserved use.  The \nCommission, however, required the PJM Transmission Owners to adopt a lower minimum rate or \ndiscount for NFCDS below the Firm Contract Demand rate.   \nOn August 17, 2026, PJM and the PJM Transmission Owners submitted partial compliance \nfilings implementing Interim NITS.23  The PJM Transmission Owners’ filing established the \nInterim NITS rate and made related conforming Tariff revisions.24  The present filing implements \nthe PJM Transmission Owners’ remaining compliance obligations associated with the Co-Located \nLoad Paper Hearing Order and makes the revisions to the August 17, 2026 filing required to \nintegrate the remaining new services and their application to eligible Large Loads.25 \n \n \n \n20  \nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217 at PP 2, 160, 193-220 (2025) (“December 18 Show Cause \nOrder”). \n21  \nPJM Transmission Owners Initial Paper Hearing Brief; Joint Response of the Indicated PJM Transmission \nOwners, Docket Nos. EL25-49, et al. (filed Mar. 25, 2026); PJM Transmission Owners Reply Brief, Docket Nos. \nEL25-49, et al. (filed Apr. 24, 2026) (“PJM Transmission Owners Reply Brief”). \n22  \nCo-Located Load Paper Hearing Order at PP 398-412, 517, 529. \n23  \nPJM Transmission Owners Partial Compliance Filing, Docket No. ER26-3537-000 (filed Aug. 17, 2026) \n(“PJM Transmission Owners August 17 Compliance Filing” or “August 17 Compliance Filing”); PJM Compliance \nFiling, Docket No. ER26-1479-002 (filed Aug. 17, 2026) (“PJM August 17 Compliance Filing”). \n24  \nBecause PJM’s companion filing modifies the effective date of certain Tariff provisions that were included \nin PJM’s August 17 Compliance Filing, the PJM Transmission Owners intend to withdraw their August 17 \nCompliance Filing.  Accordingly, the PJM Transmission Owners are including in this section 205 filing the \ncorresponding Tariff revisions previously submitted with the August 17 Compliance Filing, except for the definition \nof “Co-Located Gross Demand,” which is no longer necessary. \n25  \nSee infra Section II.B.1 and 2."},{"page":9,"startToken":3741,"endToken":4147,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 9 \n \n \n \n \n2. \nLarge Load Show Cause Order and Section 205 Proposal. \nOn June 18, 2026, the Commission instituted a separate section 206 proceeding concerning \nthe integration of Large Loads in PJM. The Commission preliminarily identified concerns \nregarding: \n1. The application, study, and continuing operational requirements applicable to Eligible \nCustomers seeking transmission service on behalf of Large Loads; \n2. Transparency concerning the Network Upgrade costs associated with that service, a \npro forma CRA to mitigate cost shifting risks, and a mechanism to ensure CRA \npayments are credited toward the revenue requirement consistent with the \nCommission’s cost-of-service regulations; \n3. Transmission-service options for flexible Large Loads; and \n4. The rates, terms, and conditions applicable to generation serving electrically proximate \nLarge Load or Co-Located Load.26 \n3. \nAbeyance Request. \nThe Commission expressly contemplated that PJM and the PJM Transmission Owners \ncould address some or all of the concerns identified in the Show Cause Order through affirmative \nsection 205 filings covering matters within their respective filing rights.27  On August 14, 2026, \nthe Commission granted the PJM Transmission Owners’ requested abeyance to permit the PJM \nTransmission Owners to develop one or more section 205 filings.28  The Commission explained \nthat the anticipated PJM Transmission Owner filings would address matters including rates for the \nnew transmission services, pro forma CRAs, and financial penalties.  It also provided that a \nrespondent’s submission of a section 205 filing by November 16, 2026, would suspend that \nrespondent’s obligation to answer the Show Cause Order pending further Commission action.29  \nThe PJM Transmission Owners submit the present filing following that section 205 path.  \nThe proposed Tariff revisions address the Commission’s preliminary findings, and the PJM \nTransmission Owners therefore request that the Commission accept the revisions under section \n205 and, as appropriate, resolve, terminate, or continue to hold in abeyance the corresponding \naspects of the pending section 206 proceeding.  Specifically, the pro forma CRA, the application \nof the new transmission-service rates and financial penalties to eligible Large Loads, and the \nproposed transparency and customer protection measures address the Show Cause Order’s \npreliminary findings within the PJM Transmission Owners’ applicable rate design and cost \nallocation filing rights.  The filing also establishes the cost allocation and cost recovery treatment \n \n26  \nShow Cause Order at PP 35, 41-101. \n27  \nId. at PP 38-39. \n28  \nPJM Interconnection, L.L.C., 196 FERC ¶ 61,129 at P 9 (2026). \n29  \nId. at PP 5, 10."},{"page":10,"startToken":4147,"endToken":4607,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 10 \n \n \n \n \nfor the portfolio of transmission reinforcements identified through PJM’s separately proposed Fast \nEnergization Process. \nIII. \nDISCUSSION \nA. \nPro Forma Cost Recovery Agreement and Related Tariff Provisions \n \nThe PJM Transmission Owners’ proposed pro forma CRA addresses the Show Cause \nOrder’s preliminary findings that the PJM tariff should include an agreement requiring a minimum \ncontribution towards a transmission owner’s revenue requirement to protect against cost shifting \nif a Large Load does not go into service or ends up taking less transmission service than \nanticipated.30  As further detailed in the Blazunas and Hammer Direct Joint Testimony and below, \nthe pro forma CRA accomplishes this through imposing on Large Load Customers a financially \nsecured minimum transmission-revenue contribution commitment associated with the amount of \nfirm transmission service requested from PJM on behalf of a Large Load.31  The CRA is executed \nafter completion of the applicable Transmission Owner’s retail interconnection study process and \nbefore the Eligible Customer proceeds through PJM’s applicable transmission-service process. \nThe Large Load Customer must identify and reflect in the CRA its: (i) anticipated load demand, \n(ii) proposed schedule for ramping up such demand, if any, and (iii) anticipated dates for each \nstage of service.  Together with the corresponding amount and type of firm transmission service \nthat an Eligible Customer intends to request on the Large Load Customer’s behalf, this information \nforms the Large Load’s initial financial commitment and credit support obligations while the \ncustomer’s transmission service request is processed and studied by PJM. \nFollowing completion of PJM’s transmission study and service process, the CRA will be \nupdated to reflect any necessary modifications to the load ramp and the dates on which each \nscheduled level of service will become effective, based on the outcome of the PJM study process. \nThe resulting information determines the Large Load’s “Firm Load Commitment,” which serves \nas the benchmark for the CRA’s ongoing financial protections.  No less than annually, beginning \nwhen the Large Load takes service, the applicable Transmission Owner will calculate the \nminimum transmission-revenue contribution associated with the Firm Load Commitment, referred \nto as the Committed Revenue Contribution.  The Transmission Owner will compare that amount \nwith qualifying revenues attributable to firm transmission service actually taken to serve the Large \nLoad, referred to as the Actual Revenue Contribution.  If the Actual Revenue Contribution is less \nthan the Committed Revenue Contribution for such a period (referred to as a “Measurement \nPeriod”) the Large Load Customer pays only the difference, referred to as the Shortfall Amount. \nCredit support secures the Large Load Customer’s obligations to pay any Shortfall Amount, and \nthe CRA’s early- and partial-termination provisions protect the applicable portion of the remaining \n \n30  \nShow Cause Order at PP 80-81.  \n31  \nBlazunas and Hammer Direct Joint Testimony at 32-37."},{"page":11,"startToken":4607,"endToken":5028,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 11 \n \n \n \n \nprojected revenue contribution if the transmission request or commitment is withdrawn, or the \nLarge Load is abandoned or terminated, or its capacity is permanently reduced. \n1. \nThe Pro Forma Cost Recovery Agreement and Related Tariff \nProvisions Balance the Timely Integration of Large Loads With \nProtection Against Cost Shifting. \nThe Commission preliminarily found that the Tariff may be unjust and unreasonable \nbecause it lacks adequate mechanisms to mitigate the risk of cost shifting when transmission \nfacilities are developed to serve a Large Load that does not materialize or ultimately takes less \ntransmission service than anticipated.32  In those circumstances, anticipated transmission revenues \nmay not be realized, leaving other transmission customers to bear a greater share of the applicable \ntransmission costs.  The Commission, therefore, preliminarily found that the Tariff should include \na pro forma CRA requiring a minimum contribution toward the relevant Transmission Owner’s \ntransmission revenue requirement.33 \nThe Commission identified several features  such a agreements should contain.34  The \nminimum contribution should be based on the level of jurisdictional transmission service, \nmeasured in MW, requested on behalf of the Large Load.35  The agreement should also include \nCredit Support or other financial security sufficient to secure the required payment obligations.36  \nPayments made under the agreement should be credited toward the applicable Transmission \nOwner’s transmission revenue requirement in accordance with the Commission’s cost-of-service \nregulations, with their formula rate treatment identified in an appropriate workpaper.37 \nThe Transmission Owners’ proposed CRA adopts those core elements and incorporates \nthem into an integrated mechanism that operates over the term of the agreement, which will be a \nminimum of ten years, with the specific term to be negotiated between the applicable Transmission \nOwner and counterparties.   \nThe proposal, which includes both minimum revenue contribution and financial security \nassurances, while providing flexibility to tailor certain aspects of the CRA to the individual \nTransmission Owner and customer parties, is intended to provide necessary ratepayer protections \nwhile promoting timely Large Load integration.  The PJM Transmission Owners recognize the \nneed to facilitate speed-to-power for Large Load growth, particularly data centers and other \ncomputational loads driving AI advances and other key technologies.  They have therefore \nestablished a CRA framework under which projects can advance while their final service quantities \nand timing are determined through the applicable study and service processes.  At the same time, \n \n32  \nShow Cause Order at PP 77-81. \n33  \nId. at P 81. \n34  \nId. at PP 82-84. \n35  \nId. at P 83. \n36  \nId. \n37  \nId. at P 84."},{"page":12,"startToken":5028,"endToken":5477,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 12 \n \n \n \n \nas the Commission pointed out, existing transmission customers should not be required to absorb \nthe revenue consequences of speculative or insufficiently developed projects.  Such projects may  \nprompt study, planning, engineering, procurement, or construction activity but do not proceed as \nrepresented.38 \nThe CRA balances those interests by requiring a Large Load Customer to make a \nmeaningful, financially-secured commitment after completing the applicable Transmission \nOwner’s retail interconnection study process and before proceeding through PJM’s Fast \nEnergization Process.  That requirement helps distinguish projects prepared to proceed from less-\ndeveloped requests before additional PJM and Transmission Owner resources are devoted to them.  \nThis approach recognizes and addresses the Commission’s concern that speculative or duplicative \nrequests may delay the study process, distort forecasts, result in unnecessary transmission buildout, \nand shift costs when the anticipated load does not materialize. The Commission identified \nmeaningful milestones and financial commitments as potential readiness measures that can help \nensure that Large Load-related transmissions service requests are more viable and more likely to \nproceed as planned.39  The CRA incorporates both measures by tying the Large Load Customer’s \ncommitment to defined project milestones and corresponding financial obligations. \nThe pro forma CRA included with this filing will not be the exclusive or presumptive \nvehicle for protecting against cost shifting among customers.  Under the PJM Transmission \nOwners’ proposal, Transmission Owners will be permitted to choose between utilizing the pro \nforma CRA or entering into a separate agreement.  Any such separate  agreement, in conjunction \nwith applicable federal and state regulatory requirements, must result in minimum transmission \nservice and credit standards, or comparable protections, as determined by the Commission.40  This \nflexibility is a key aspect of, and is not severable from, the PJM Transmission Owners’ pro forma \nCRA proposal.  As discussed further below, the PJM Transmission Owners’ proposal also provides \ntransparency to state regulators and other interested parties regarding the costs of transmission \nfacilities being constructed by the Transmission Owner to provide transmission service on behalf \nof Large Loads.  This transparency will provide state commissions and other retail regulators \naccess to information to assist them in allocating some amount of transmission rate costs \nspecifically to Large Load classes of customers within their jurisdictions, if desired.  Several PJM \nTransmission Owners also have existing Large Load cost-recovery or ratepayer-protection \nmechanisms already approved by their respective state commissions.  These provisions \nappropriately recognize, as the Commission acknowledged in the Show Cause Order,41 that cost \nrecovery agreements and other ratepayer protection mechanisms have been, and continue to be, \n \n38  \nId. at P 81.  \n39  \nId. at PP 56-57, 59. \n40  \nProposed Tariff, Part VIII, Subpart N, section 441(a)(ii). \n41  \nShow Cause Order at P 69."},{"page":13,"startToken":5477,"endToken":5947,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 13 \n \n \n \n \nutilized at the retail and wholesale levels by utilities within PJM to provide commensurate \nprotections against shifting costs to other customers.42  \n2. \nThe CRA Assigns Distinct Responsibilities to the Transmission Owner, \nLarge Load Customer, and Eligible Customer. \nThe Commission’s preliminary finding contemplated a pro forma CRA among PJM, the \nrelevant Transmission Owner, and the Eligible Customer taking transmission service on behalf of \nthe Large Load, with the Eligible Customer responsible for the minimum contribution and \nassociated financial security.43  However, the Commission also acknowledged in the Show Cause \nOrder that Transmission Owners have filed agreements under which minimum contributions to \nCommission-jurisdictional transmission revenue requirements are guaranteed directly by Large \nLoad Customers, rather than by an Eligible Customer taking transmission service on the Large \nLoad Customer’s behalf.44  In order to best account for each entity’s distinct roles in PJM and align \nfinancial responsibility with control over the risk addressed by the pro forma CRA, the CRA \nproposed herein is structured as a three-party agreement between the applicable Transmission \nOwner, the underlying Large Load (referred to in the CRA as the “Large Load Customer”), and \nthe Eligible Customer taking service on behalf of the Large Load Customer.45 \nThe CRA assigns each Party the obligations corresponding to its role.  The Large Load \nCustomer owns, operates, leases, or otherwise controls the Large Load Facilities and therefore \nbears the CRA’s payment and Credit Support obligations.  Those obligations include: (i) providing \nand maintaining Credit Support;46 (ii) paying any Shortfall Amount, Early Termination Amount, \nor Partial Termination Amount;47 (iii) supplying information concerning the Large Load Facilities \nand project status;48 and (iv) remaining responsible for those obligations regardless of a dispute \nwith the Eligible Customer.49  The Eligible Customer remains the transmission customer. It \nrequests and takes Firm Transmission Service50 under the Tariff on behalf of the Large Load \nCustomer, pursues the applicable PJM process, and provides or authorizes access to the service, \nbilling, settlement, and allocation information necessary to calculate and verify amounts under the \nCRA.51  The Eligible Customer is not responsible for the Large Load Customer’s payment or \n \n42  \nSeveral Transmission Owners in PJM have processes already established and approved by their state \ncommissions.   \n43  \nShow Cause Order at PP 77, 80-83. \n44  \nId. at P 82. \n45  \nProposed Tariff, Part VIII, Subpart N, section 441(a)(i). \n46  \nProposed pro forma CRA, Part IX, Subpart P at Article 6.  \n47  \nId. at Article 5.3, 9. \n48  \nId. at Articles 5.6, 13.3, 14.1. \n49  \nId. at Article 15. \n50  \n“Firm Transmission Service” is a new proposed definition that encompasses Network Integration \nTransmission Service, Firm Point-to-Point Transmission Service, and Firm Contract Demand Transmission Service. \n51  \nProposed pro forma CRA, Part IX, Subpart P at Article 5.6."},{"page":14,"startToken":5947,"endToken":6454,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 14 \n \n \n \n \nCredit Support obligations.  The Transmission Owner calculates the Committed Revenue \nContribution, Actual Revenue Contribution, Shortfall Amount, Credit Support Requirement, and \nany applicable termination amount; issues invoices; receives and administers Credit Support; \nperforms required reconciliations; and accounts for and credits collected amounts through its \napplicable Commission-jurisdictional rate.  The Eligible Customer is responsible for information-\nsharing and administrative functions necessary to implement the CRA, such as providing the \nTransmission Owner billing, settlement, load and allocation information needed to identify \ntransmission rate revenues associated with the Large Load Customer.52 \nPJM is not a party to the CRA and does not hold or administer CRA Credit Support.  The \nCRA supplements the underlying transmission-service arrangements but does not itself authorize \ntransmission service, determine the amount of service available, or independently require \nconstruction of transmission facilities.  Those matters remain governed by the Tariff, PJM’s study \nand service processes, the applicable transmission-service agreement, and other relevant \nagreements. \nThe proposed pro forma CRA’s assignment of direct payment and Credit Support \nobligations to the Large Load Customer, rather than the Eligible Customer, and its exclusion of \nPJM as a contractual counterparty are just and reasonable and consistent with the cooperative \njurisdictional responsibilities of the Commission and the states contemplated by the FPA.  This \nallocation of obligations more closely aligns financial responsibility with control over the risk \naddressed by the CRA.  The anticipated transmission revenue contribution depends principally on \nwhether the Large Load project proceeds, achieves the required readiness, begins taking service at \nthe committed level, and continues operating during the CRA term.  The Large Load Customer, \nas the entity that owns, operates, leases, or otherwise controls the Large Load Facilities, is best \npositioned to control those related decisions and circumstances.  The Eligible Customer, by \ncontrast, may be an intermediary or unaffiliated load-serving entity that requests and takes \ntransmission service on the Large Load Customer’s behalf but does not control the Large Load \nCustomer’s construction, financing, readiness, demand, or ongoing operation.   \nRequiring the Eligible Customer to secure the Large Load Customer’s revenue \ncommitment could therefore place the financial exposure on an entity that does not control whether \nthe underlying Large Load Customer develops and operates its project as represented and, at a \nminimum, would require in many cases the implementation and administration of duplicative and \noverlapping financial obligations.  For instance, if the Eligible Customer is an electric distribution \ncompany, it would need to have in place and maintain appropriate additional agreements to ensure \nthat any obligations imposed on it would be assigned to the relevant Large Load, and impose \nadequate security to cover those subsidiary obligations.  This structure could be extremely costly \n(costs that would ultimately be borne by all ratepayers) and, burdensome to administer, particularly \nfor those companies acting as Eligible Customers on behalf of multiple Large Loads.  The proposed \npro forma CRA instead gives the Transmission Owner direct recourse to the real party in interest, \nnamely, the load entity whose interconnection drives the need for the protections underlying the \n \n52  \nId. at Article 5.6."},{"page":15,"startToken":6454,"endToken":6926,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 15 \n \n \n \n \nCRA, while preserving the Eligible Customer’s responsibility for the transmission-service, \ninformation-sharing, and administrative functions necessary to implement the arrangement. \nThis structure is consistent with and respects the jurisdictional boundaries between the \nCommission and state regulators.  The CRA does not eliminate or diminish the requirement that \ntransmission service be taken by an Eligible Customer, or otherwise serve to grant, provide or \notherwise convey transmission service under the Tariff.53  Nor does it establish or govern any \nterms and conditions of retail service.  Rather, the CRA provides a payment and credit support \nmechanism to ensure that the Large Load Customer’s committed transmission-revenue \ncontribution is satisfied.  It is the Large Load Customer whose decision to develop and operate the \nLarge Load drives the need for the FERC-jurisdictional transmission service requested on its \nbehalf, and whose commitments inform the amount of service and associated costs.  It is therefore \nappropriate, and jurisdictionally sound, to place the financial risks addressed by the CRA on the \nLarge Load directly.  \nThis approach accords with the Show Cause Order and Commission precedent.  As noted \nabove, the Commission recognized existing agreements under which Large Load Customers \ndirectly guarantee minimum contributions to Transmission Owners’ Commission-jurisdictional \ntransmission revenue requirements.  It requested briefing on whether those agreements could \nsatisfy the contemplated CRA requirement where they provide comparable or greater protection, \nincluding by avoiding duplicative Credit Support and transaction costs.54  The Commission has \nlikewise accepted Commission-jurisdictional agreements under which individual Large Load \nCustomers directly assumed financial commitments associated with anticipated transmission \nrevenues, even though those customers did not themselves take transmission service under the \nTariff.55   \n3. \nThe CRA Establishes and Maintains the Service Commitment on \nWhich its Financial Protections are Based. \nThe CRA identifies the Large Load Customer’s anticipated load demand, proposed load \nramp, and anticipated timing for each stage of service, upon which the Large Load Customer’s \nfinancial commitment will be based.56  As part of each Transmission Owner’s or affiliate’s retail \nload interconnection process, the Large Load customer will identify the amount of load it \nanticipates adding to the system along with any ramping schedule for bringing that load online \nover a defined period.  Following completion of the applicable Transmission Owner’s load \ninterconnection study process, the Parties execute the CRA based on the amount of transmission \nservice that the Eligible Customer will request from PJM on behalf of the Large Load Customer \nin order to accommodate its anticipated demand, including any associated ramping schedule.  \nExhibit A to the CRA records that preliminary information, together with the corresponding \n \n53  \nId. at Article 11.3. \n54  \nShow Cause Order at P 82. \n55  \nSee, e.g., Commonwealth Edison Co., 194 FERC ¶ 61,109 (2026); Commonwealth Edison Co., 194 FERC ¶ \n61,183 (2026). \n56  \nProposed pro forma CRA, Part IX, Subpart P at Article 3.1."},{"page":16,"startToken":6926,"endToken":7448,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 16 \n \n \n \n \namount and type of Firm Transmission Service that the Eligible Customer intends to request on \nthe Large Load Customer’s behalf (the “Initial Load Commitment”), the dates upon which service \nis estimated to begin, and any expected ramp to the project’s full requested load.57  The Initial \nLoad Commitment is backed by Credit Support while the PJM transmission service study process \nis pending.  \nExecution of the CRA and provision of the required Credit Support are conditions to \nproceeding through the applicable PJM process.58  This financial commitment provides assurance \nthat the project is real, deters speculative requests, and protects other transmission customers if the \nEligible Customer, on behalf of the Large Load Customer, withdraws or abandons the request, the \nLarge Load Customer elects to reduce the amount requested, or the Eligible Customer refuses to \nexecute the resulting Final PJM Agreement. \nFollowing completion of the PJM process, the Eligible Customer enters into the Final PJM \nAgreement, which identifies the Firm Transmission Service to be taken on behalf of the Large \nLoad Customer.  The Transmission Owner will then update the CRA to reflect the outcome of the \nPJM process.59  If the Final PJM Agreement determines that Firm Transmission Service will not \nbe available in order to accommodate a Large Load’s load ramp schedule as reflected in the Initial \nLoad Commitment, because necessary IRRs will not be in service at the required times, the CRA \nwill be updated accordingly.  The resulting new schedule for bringing the Large Load’s load online \nbecomes the “Firm Load Commitment.”  A change to the timing or interim levels of the load ramp \nbased on PJM’s determination of when the requested Firm Transmission Service can feasibly be \nprovided does not trigger any financial liability for the Large Load Customer.60  By contrast, if the \nLarge Load Customer elects to reduce the final amount of Firm Transmission Service requested \non its behalf during the PJM process (e.g., by reducing the overall size of its facility), that \ncustomer-elected reduction is subject to the CRA’s partial-termination provisions and payment by \nthe Large Load Customer of a portion of the expected revenues associated with the Firm \nTransmission Service that would have been taken to serve its full originally committed load \namount (the “Partial Termination Amount”).61   \nThis approach balances the interests of the Large Load Customer and transmission \ncustomers.  The Large Load Customer is not charged a termination amount merely because PJM \ndetermines that the requested schedule for obtaining firm transmission service based on its planned \nload ramp is not feasible given the necessary IRRs and their anticipated in-service dates.  At the \nsame time, if the Eligible Customer, on behalf of the Large Load Customer, withdraws or abandons \nthe Firm Transmission Service request during the PJM process, or refuses to execute the resulting \nFinal PJM Agreement, the withdrawal, abandonment, or refusal constitutes an early termination \n \n57  \nId. at Article 3.1. \n58  \nProposed Tariff, Part VIII, Subpart N, section 441(d).  \n59  \nProposed pro forma CRA, Part IX, Subpart P at Article 3.2. \n60  \nId. at Article 3.2. \n61  \nId. at Article 9."},{"page":17,"startToken":7448,"endToken":7967,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 17 \n \n \n \n \nand requires the Large Load Customer to pay the applicable Early Termination Amount.62  A \ncustomer-elected reduction in the amount requested constitutes a partial termination and requires \npayment of the applicable Partial Termination Amount.63  This appropriately requires the Large \nLoad Customer to make a tangible financial commitment as part of its completion of the \nTransmission Owner’s retail interconnection process, and before entering the PJM process.  Doing \nso discourages speculative and potentially duplicative study requests that would clog the PJM \nprocess.  It also promotes the efficient use of PJM and Transmission Owner study and planning \nresources by requiring the Large Load Customer to assume the financial consequences of \nwithdrawing, abandoning, or voluntarily reducing the request after those processes have begun.  \nTo be clear, the CRA does not assign the Large Load Customer the costs of particular IRRs \nor a project-specific share of the IRR portfolio. The CRA and Schedule 12, which as discussed \nbelow establishes the cost allocation for IRRs, serve distinct functions: Schedule 12 governs the \nallocation and recovery of the revenue requirements associated with IRRs, while the CRA \nestablishes the minimum Firm Transmission Service-related revenue contribution associated with \nthe Large Load Customer’s commitment.64 \n4. \nCredit Support Gives Financial Substance to the Large Load \nCustomer’s Commitment. \nAs discussed above, the proposed pro forma CRA commits the Large Load Customer to a \ntransmission-revenue contribution and related payment obligations based on the level of \ntransmission service.  To ensure that obligation, the Commission identified credit support as an \nimportant component of the contemplated cost recovery agreement.65  To implement that \nrequirement, the CRA requires the Large Load Customer to provide Credit Support shortly after \nthe Parties execute the agreement.66  Under proposed Tariff, Part VIII, Subpart N, section 441, \nexecution of a CRA, or a qualifying alternative agreement, and provision of the required security \nare conditions to proceeding through the applicable PJM Fast Energization Cycle and obtaining \nFirm Transmission Service.67 \nThis sequencing gives financial weight to the Large Load Customer’s preliminary \ncommitment before additional studies are performed by PJM and development activity occurs.  \n \n62  \nBlazunas and Hammer Direct Joint Testimony at 39-40. \n63  \nSee infra Section III.A.5 below, which discusses the parameters of partial and early termination, and the \nassociated financial consequences to a Large Load Customer based on when and the circumstances under which it \nterminates the CRA.  See also Blazunas and Hammer Direct Joint Testimony at 39-40. \n64  \nAs discussed below, the PJM Transmission Owners are committing to provide cost information regarding \nIRRs in their formula rate templates which will: (1) allow PJM to allocate and invoice the charge to recover the costs \nof IRRs, (2) assist in satisfying the Commission’s findings in the Show Cause Order regarding enhanced transparency, \nand (3) assist state commissions and other retail regulators if they choose to allocate the costs of IRRs recovered \nthrough transmission rates to Large Load customers at the retail level. \n65  \nShow Cause Order at P 83. \n66  \nBlazunas and Hammer Direct Joint Testimony at 37. \n67  \nProposed Tariff, Part VIII, Subpart N, section 441(a)."},{"page":18,"startToken":7967,"endToken":8491,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 18 \n \n \n \n \nThe CRA helps cement those Large Load Customers that are prepared to assume the financial \nconsequences of their requested service, while giving customers advance notice through the pro \nforma CRA of the obligations required to proceed.  The initial Credit Support Requirement is based \non the service amount and timing reflected in the CRA at execution.  More specifically, the Initial \nCredit Support Requirement equals the aggregate projected charges associated with 100 percent \nof the Initial Load Commitment over the CRA term.68  Following execution of the Final PJM \nAgreement, the Transmission Owner recalculates the requirement using 100 percent of the \nprojected charges associated with the updated Firm Load Commitment and remaining Service \nDates.69   \nAs discussed in the Blazunas and Hammer Direct Joint Testimony, over the term of the \nCRA, the Large Load Customer’s credit support requirement is adjusted to reflect its obligations \nas those remaining obligations evolve.70  As each Measurement Period is completed, the revenues \nattributable to service for the Large Load Customer and any resulting Shortfall Amount are \ndetermined.71  Once the Large Load Customer has satisfied the obligations for that period, the \namounts of those obligations are subtracted from the Credit Support calculation.72  The secured \namount therefore declines as the underlying exposure is resolved rather than remaining fixed at its \ninitial level throughout the CRA term.  Projected future transmission-service revenues do not \nreduce Credit Support before those revenues are realized.  The Credit Support protects against the \nfailure of those anticipated revenues to materialize, which would be detrimental to other customers.  \nThe Credit Support remains as collateral unless and until it is applied to an amount actually due.  \nA draw made only to preserve the value of an expiring or nonconforming letter of credit does not \nitself constitute payment or revenue.  A draw for nonpayment is limited to the amount due and \nunpaid.73   \n5. \nEarly and Partial Termination Payments Protect the Commitment if \nthe Project Exits or the Firm Load Commitment is Reduced. \nAs further discussed in the Blazunas and Hammer Direct Joint Testimony, Credit Support \nsecures the Large Load Customer’s obligations, including amounts payable if the project \nterminates or the Large Load Customer elects to reduce permanently the amount of Firm \nTransmission Service requested on its behalf or, after execution of the Final PJM Agreement, the \nFirm Load Commitment before the end of the CRA term.74  Before execution of the Final PJM \nAgreement, withdrawal or abandonment of the Firm Transmission Service request, refusal to \n \n68  \nSee proposed pro forma CRA, Part IX, Subpart P at Exhibit C; see also Blazunas and Hammer Direct Joint \nTestimony at 37. \n69  \nSee proposed pro forma CRA, Part IX, Subpart P at Exhibit C; see also Blazunas and Hammer Direct Joint \nTestimony at 37. \n70  \nBlazunas and Hammer Direct Joint Testimony at 38-39. \n71  \nProposed pro forma CRA, Part IX, Subpart P at Article 5. \n72  \nBlazunas and Hammer Direct Joint Testimony at 37-39. \n73  \nProposed pro forma CRA, Part IX, Subpart P at Article 6.6. \n74  \nId. at Article 9 and Exhibit D; Blazunas and Hammer Direct Joint Testimony at 39-40."},{"page":19,"startToken":8491,"endToken":8967,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 19 \n \n \n \n \nexecute the resulting agreement, or a reduction in the requested service may trigger an Early \nTermination Amount or Partial Termination Amount.75   \nAfter execution of the Final PJM Agreement, voluntary termination, permanent reduction \nof the Firm Load Commitment, abandonment or cessation of the project, specified readiness \nfailures, or an uncured default may trigger the corresponding payment obligation.76  A \nmodification to the timing or interim levels of the load ramp resulting from PJM’s determination \nof when the requested Firm Transmission Service can feasibly be provided does not constitute a \nPartial Termination.  Failure to achieve the readiness necessary to take the applicable Firm \nTransmission Service within the period specified in the CRA may constitute a Partial Termination \nor, following the initial Service Date, support termination based on project abandonment or \ncessation.77  The Early Termination Amount protects a specified portion of the revenue \ncontribution projected for the remainder of the CRA term: \nEarly Termination Amount = (Applicable Termination Percentage × Present \nValue of Remaining Projected Committed Revenue Contributions) − \nApplicable Credits \nThe Applicable Termination Percentage increases as the project advances.78  Under the \ncurrent proposal, the percentage is 25 percent before execution of the Final PJM Agreement, 50 \npercent during the first 180 days after execution, 75 percent thereafter until the first Service Date, \nand 100 percent on and after the first Service Date.79  This graduated increase in financial \nobligations gives the initial commitment economic substance, while recognizing that early-stage \nwithdrawal or change in load commitment is likely to have fewer detrimental impacts on other \ncustomers and the overall efficiency of the process, as compared to terminations that occur after \nthe end of PJM’s process and closer to the Large Load’s planned in-service date.80  It also reflects \nthe increasing reliance that may be placed on the Large Load Customer and its anticipated revenue \ncontribution as Transmission Owners undertake engineering, procurement, construction, and other \ndevelopment activities with respect to the IRRs needed to serve the Large Load Customer and \nother customers in the applicable PJM study cluster. \nThe termination provisions serve an important project-readiness function. They are \nappropriately not limited to the recovery of costs that can be traced to particular transmission \nfacilities or stranded investments.  By requiring a Large Load Customer to commit to a meaningful \nfinancial stake as the project advances, the termination provisions also discourage speculative or \ninsufficiently developed requests from entering and remaining in the transmission service process. \nThis structure advances the Commission’s objective of using meaningful financial commitments \n \n75  \nProposed pro forma CRA, Part IX, Subpart P at Article 9.1. \n76  \nId. at Article 9. \n77  \nId. at Articles 9.2, 9.3. \n78  \nSee Blazunas and Hammer Direct Joint Testimony at 40-42. \n79  \nProposed pro forma CRA, Part IX, Subpart P at Exhibit D. \n80  \nBlazunas and Hammer Direct Joint Testimony at 41-42."},{"page":20,"startToken":8967,"endToken":9374,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 20 \n \n \n \n \nto improve the viability of Large Load-related transmission service requests and reduce the \npotential for speculative requests to consume study and planning resources or distort transmission \nplanning assumptions.  It also reduces the potential that speculative requests will adversely affect \nother Large Load-related transmission service requests and their ability to receive service in a \ntimely manner.81 \nPayment of a Partial Termination Amount applies only to the portion of the commitment \npermanently reduced.82  Amounts already received or applied to the same prospective exposure, \nincluding qualifying Credit Support proceeds and identifiable replacement-load revenues, reduce \nthe termination amount.  The termination obligations are therefore protective rather than punitive: \nthey are tied to the remaining projected revenue contribution, adjusted according to the Large Load \nCustomer’s stage in the process, and reduced by amounts already recovered or otherwise \nattributable to the same exposure. \nAs discussed in Section 10 below, proposed CRA section 9.12 and proposed Tariff, Part \nVIII, Subpart N, section 441(e) govern the application and distribution of termination amounts \ncollected before the first Service Date. \n6. \nService Dates Determine When the Periodic Revenue Commitment \nBegins. \nIf the Large Load Customer proceeds, each portion of the recurring revenue commitment \nbegins on the corresponding Service Date identified in CRA, Exhibit A.  For an authorized load \nramp included in the CRA, the Committed Revenue Contribution increases as the scheduled stages \nof the Firm Load Commitment become effective.  The CRA also accounts for circumstances in \nwhich Firm Transmission Service cannot begin because necessary transmission facilities have not \nbeen completed.83  If the delay is not caused by the Large Load Customer’s or Eligible Customer’s \nfailure or lack of reasonable diligence, the affected Service Date and corresponding contribution \nare extended until the service becomes available.84  If a qualifying transmission-facility delay \nreaches the threshold specified in the CRA, the Large Load Customer may accept revising the \ntiming to ramp up its load or terminate under the CRA’s limited delay provision.85  The qualifying \ndelay period is excluded when determining the applicable termination milestone so that the Large \nLoad Customer does not move into a higher termination percentage solely because of a delay it \ndid not cause. \n \n \n81  \nShow Cause Order at P 56.  \n82  \nProposed pro forma CRA, Part IX, Subpart P at Exhibit D, Section 5. \n83  \nId. at Article 5.5. \n84  \nId. at Article 5.5. \n85  \nId. at Article 9.6."},{"page":21,"startToken":9374,"endToken":9785,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 21 \n \n \n \n \n7. \nThe CRA Establishes a Minimum Revenue Contribution Based on the \nFirm Load Commitment. \nThe Early and Partial Termination Amounts discussed above address the remaining \nprojected revenue exposure if the Large Load Customer exits or permanently reduces its Firm \nLoad Commitment.  By contrast, if the Large Load Customer proceeds, the Committed Revenue \nContribution defines the minimum periodic transmission-revenue contribution required under the \nCRA once the applicable Service Dates begin.86  Beginning on the applicable Service Dates, the \nTransmission Owner determines the revenues that would be associated with Firm Transmission \nService corresponding to the Firm Load Commitment and applies the Minimum Commitment \nPercentage specified in Exhibit A.  The resulting amount is the Committed Revenue Contribution: \nCommitted Revenue Contribution = Minimum Commitment Percentage × \nFull Firm Transmission Service Benchmark87 \nThe Minimum Commitment Percentage may vary between 80 and 100 percent, and may \nchange over the CRA term under a schedule identified in Exhibit A.88  As discussed in the Joint \nBlazunas and Hammer Direct Joint Testimony, the proposed Minimum Commitment Percentage \nis reasonable because it establishes “a meaningful minimum revenue commitment while allowing \nindividual Transmission Owners to require a higher commitment where appropriate based on their \nparticular circumstances.”89  Together with the authorized load ramp and applicable Service Dates, \nthis flexibility allows the Committed Revenue Contribution to reflect the Large Load’s individual \ncircumstances, including its expected progression and the timing of the associated transmission-\nrevenue exposure.  This structure implements the Commission’s preliminary view that the \nminimum contribution should be related to the MW level of jurisdictional transmission service \nrequested on behalf of the Large Load, while accommodating the request’s progression toward full \nservice.90 \n8. \nThe CRA Recognizes Revenues Actually Produced as a Result of the \nTransmission Service Provided. \nThe Committed Revenue Contribution establishes the minimum periodic contribution \nrequired under the CRA.91  For each Measurement Period, the Transmission Owner compares that \namount with the Actual Revenue Contribution, which consists of the qualifying revenues \nattributable to Firm Transmission Service actually taken by the Eligible Customer to serve the \nLarge Load Customer.92  The Committed Revenue Contribution and the revenues credited against \n \n86  \nId. at Article 5.1. \n87  \nBlazunas and Hammer Direct Joint Testimony at 37-38. \n88  \nId. at 35-37. \n89  \nId. at 36-37. \n90  \nShow Cause Order at P 83. \n91  \nBlazunas and Hammer Direct Joint Testimony at 35-36. \n92  \nProposed pro forma CRA, Part IX, Subpart P at Article 5.2 and Exhibit B."},{"page":22,"startToken":9785,"endToken":10190,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 22 \n \n \n \n \nit are calculated using corresponding categories of transmission charges.93  This ensures a \nconsistent comparison and gives the Large Load Customer credit for all qualifying revenues \ncorresponding to the charges included in that calculation. \nBecause the Eligible Customer takes the underlying transmission service, it must provide \nor authorize access to the billing, settlement, load, and allocation information needed to identify \nthe revenues attributable to the Large Load Customer.94  That information-sharing obligation \nallows the Transmission Owner to administer the CRA while preserving the Large Load \nCustomer’s separate responsibility for the financial obligations.  The CRA also accommodates \nexisting retail arrangements.  To the extent the Large Load Customer makes separate payments \nthrough a retail tariff or other retail mechanism that reflect the assignment of Firm Transmission \nService or related costs to the Large Load Customer, those payments are taken into account in \ndetermining the Actual Revenue Contribution, insofar as doing so does not shift costs to other \nEligible Customers taking service in the Transmission Owner’s Zone.95  This treatment recognizes \nqualifying retail payments without permitting the associated transmission costs to be shifted to \nother customers. \n9. \nUnder the CRA, the Large Load Customer Pays Only the Resulting \nShortfall. \nAt the end of each Measurement Period, the Transmission Owner compares the qualifying \nrevenues attributable to the Large Load Facilities with the Committed Revenue Contribution: \nShortfall Amount = Committed Revenue Contribution − Actual Revenue \nContribution \nIf recognized revenues equal or exceed the committed amount, no Shortfall Amount is due \nunder the CRA.96  If recognized revenues are lower, the Large Load Customer pays only the \ndifference.97  The Shortfall Amount is therefore a true-up of the agreed minimum contribution, not \na second charge for the same Firm Transmission Service.  The Eligible Customer continues to pay \nthe charges imposed under the Tariff for service actually taken, and the qualifying revenues \nproduced by that service are credited against the Committed Revenue Contribution before any \nCRA payment is calculated.  \nThis mechanism protects other transmission customers by ensuring receipt of the minimum \ncontribution associated with the Large Load commitment.98  The Large Load Customer receives \n \n93  \nId. at Article 5.1. \n94  \nId. at Article 5.6. \n95  \nId. at Article 5.2. \n96  \nId. at Article 5.3. \n97  \nSee proposed pro forma CRA, Part IX, Subpart P at Article 7; see also Blazunas and Hammer Direct Joint \nTestimony at 32-34. \n98  \nId. at 35-36."},{"page":23,"startToken":10190,"endToken":10709,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 23 \n \n \n \n \ncredit for the qualifying revenues actually produced by service to its facilities and does not pay \nboth ordinary transmission-service charges and a duplicative CRA payment for the same \ncontribution. Although the mechanism is principally intended to protect other transmission \ncustomers from cost shifting, the CRA includes procedural and substantive safeguards to ensure \nthat the Large Load Customer pays no more than the amount properly due.  The Transmission \nOwner must support any invoiced Shortfall Amount, and the Large Load Customer may review \nand dispute the calculation.99  Payment and Credit Support obligations remain in effect during the \ndispute, but any overpayment or excess draw must be returned after the dispute is resolved. \n10. \nPre-Service Date Termination Amounts are Shared Among Affected \nTransmission Owners, and Collected Amounts are Credited Without \nDuplicate Recovery. \nThe Commission stated that CRA payments should reduce the applicable Transmission \nOwner’s transmission revenue requirement consistent with the Commission’s cost-of-service \nregulations and contemplated a formula rate workpaper showing that treatment.100  Consistent with \nthat guidance, collected Shortfall Amounts reduce the applicable transmission revenue \nrequirement and remain subject to the Transmission Owner’s formula rate protocols and \nCommission review.101  Credit Support remains collateral unless and until it is applied to an \namount due. \nCRA section 9.12 provides that, if an Early Termination Amount or Partial Termination \nAmount is payable before the first Service Date, the collected amount is first applied to Project \nDevelopment Costs in accordance with proposed Tariff, Part VIII, Subpart N, section 441(e).  This \ntreatment recognizes that facilities needed to serve a Large Load may be cancelled or otherwise \nabandoned as a result of Early or Partial Termination by one or more Large Load Customers.  \nMoreover, because multiple Transmission Owners may be affected by such IRR cancellations or \nabandonments resulting from the termination of a Large Load Customer, Early or Partial \nTermination by a Large Load Customer could result in the cancellation of projects not only by the \nTransmission Owner that is the signatory to the applicable CRA, but also by other Transmission \nOwners within PJM.   \nProposed Tariff, Part VIII, Subpart N, section 441(e) addresses this situation by providing \na mechanism for the distribution of  Partial and Early Termination Amounts among the contracting \nTransmission Owner and other eligible Transmission Owners based on their respective pro rata \nshares of the applicable Eligible Costs, if any, which are derived from costs reported on the \napplicable Transmission Owner’s FERC Form 1.102  This sharing mechanism prevents the entire \n \n99  \nProposed pro forma CRA, Part IX, Subpart P at Articles 7.4, 7.5. \n100  \nShow Cause Order at P 84. \n101  \nProposed pro forma CRA, Part IX, Subpart P at Article 7.6. \n102  \nEligible Costs are defined as all expenditures, costs, and cancellation fees incurred or due to commitments \nmade by the third-party Transmission Owner to engineer, design, procure, construct, own, operate, maintain, and \nservice the Interconnection Reliability Reinforcements needed to serve the Eligible Customer taking transmission \nservice on behalf of the Eligible Load or Large Load, but which will no longer be constructed, which (a) are incurred"},{"page":24,"startToken":10709,"endToken":11226,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 24 \n \n \n \n \npayment from remaining with the contracting Transmission Owner while other affected \nTransmission Zones continue to bear costs associated with IRRs no longer needed.  Any amount \nremaining after the application of Termination Amounts to Eligible Costs of the applicable \nTransmission Owner is credited to the contracting Transmission Owner’s transmission revenue \nrequirement to the benefit of other customers in the Zone.  If termination occurs on or after the \nfirst Service Date, the applicable termination amount is credited to the Transmission Owner’s \nTransmission Revenue Requirement for the Transmission Zone in which the Eligible Customer \nwould have taken Firm Transmission Service.  The different treatment reflects the change in the \nnature of the protected exposure.  Before the first Service Date, termination may result in Eligible \nCosts associated with the cancellation or abandonment of facilities being constructed by \nTransmission Owners; after service begins, the termination amount solely protects other customers \nin the amount of the remaining prospective revenue contribution under the CRA, which is tied to \nthe contracting Transmission Owner’s zonal transmission revenue requirement.  In neither case do \nTransmission Owners benefit financially from the allocation of Termination Amounts. \nThe CRA and proposed Tariff provisions contain additional protections against double \nrecovery.103 Actual revenues reduce periodic Shortfall Amounts; amounts already applied to the \nsame exposure reduce termination obligations; qualifying retail and replacement-load revenues are \nrecognized where appropriate; and collateral is not treated as revenue until applied.  In addition, a \nTransmission Owner may not seek recovery through an abandoned-plant filing or another \nproceeding for amounts already received through the Tariff, Part VIII, Subpart N, section 441(e) \ndistribution process.  Together, these provisions ensure that CRA recoveries follow the associated \nexposure across affected Transmission Owners without providing duplicative recovery. \n11. \nThe Proposed Pro Forma CRA and Generic Tariff Provisions Provide \na Transparent and Flexible Cost Recovery Framework. \nProposed Tariff, Part VIII, Subpart N, sections 441(c) and (d) establish uniform procedures \nand deadlines for tendering, negotiating, executing, securing, and filing the CRA.  Filing the CRA \nas a pro forma agreement gives Large Load Customers and Eligible Customers advance notice of \nthe commitment, Credit Support, shortfall, termination, crediting, and information-sharing \nobligations that will apply when a Large Load-related transmission service request proceeds \nthrough PJM’s Fast Energization Process, while permitting the project-specific terms \ncontemplated by the form to reflect differences in service, timing, load ramp, and applicable rates. \nAs discussed above, the Tariff also permits existing or separate agreements to satisfy the \nCRA requirement where they provide comparable protection.  Proposed section 441(a)(ii) permits \na separate Commission-accepted agreement that, together with applicable federal and state \nrequirements, establishes minimum Firm Transmission Service and credit standards or other \n \nthrough the end of the calendar year in which notice of termination was received from the contracting Transmission \nOwner, and (b) are included in amounts reported in the Transmission Owner’s FERC Form 1 covering that calendar \nyear.  See proposed Tariff, Part VIII, Subpart N, section 441(e)(ii).  \n103  \nSee Proposed Tariff, Part VIII, Subpart N, section 441(e); see also proposed pro forma CRA, Part IX, \nSubpart P at Exhibit D."},{"page":25,"startToken":11226,"endToken":11696,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 25 \n \n \n \n \ncomparable protections against cost shifting.  Section 441(b) preserves qualifying existing \nagreements, and section 441(e)(v) requires alternative agreements to contain reasonably \ncomparable termination-payment crediting provisions.   \nThe proposal also expressly preserves qualifying existing agreements.104  Where a Large \nLoad, including an anticipated load ramp, is already covered by a qualifying existing agreement, \nthat agreement and the commitments reflected in it need not be replaced by the pro forma CRA \nmerely because the new CRA framework becomes effective.  The grandfathering provision thus \npreserves arrangements and commitments already in place under the existing framework. \n12. \nThe Proposed CRA is Just and Reasonable and Not Unduly \nDiscriminatory or Preferential. \nThe CRA is just and reasonable because it implements the protections identified by the \nCommission while accommodating the practical requirements of Large Load development.105  It \npermits projects to advance through the applicable load interconnection study and transmission \nservice processes while establishing, at appropriate milestones, a defined and financially secured \ncommitment corresponding to the Firm Transmission Service requested on their behalf.  This \nstructure supports the timely integration of viable Large Loads without requiring existing \ntransmission customers to fully bear the revenue consequences if a project does not proceed as \nrepresented or takes less service than anticipated. \nThe CRA also assigns responsibilities according to the parties’ respective roles.  The Large \nLoad Customer assumes the payment and Credit Support obligations associated with the project it \ncontrols.  The Eligible Customer remains responsible for requesting and taking transmission \nservice and providing the information necessary to administer the agreement.  The Transmission \nOwner calculates and reconciles the applicable amounts, administers Credit Support, and credits \ncollected amounts through its Commission-jurisdictional rate.  PJM continues to administer the \ntransmission-service study process.  This allocation places each obligation with the entity best \npositioned to perform it without altering the established responsibilities for authorizing service or \nplanning and constructing transmission facilities. \nThe Large Load Customer’s financial commitment is also adjusted as the project develops. \nBefore completion of PJM’s process, the CRA is based on the Initial Load Commitment and \nsecures the consequences of advancing the request. Following execution of the Final PJM \nAgreement, the commitment is conformed to the amount and timing of Firm Transmission Service \nestablished through PJM’s process.  The Credit Support Requirement is likewise recalculated, but \nit remains based on 100 percent of the projected full-service benchmark for the remaining term \nrather than on the Minimum Commitment Percentage or projected future actual revenues.  If \nservice begins, the Large Load Customer receives credit for qualifying revenues attributable to \nFirm Transmission Service actually taken to serve the Large Load Customer and pays only the \nresulting Shortfall Amount.  If the project exits or is permanently reduced, the applicable \n \n104  \nProposed Tariff, Part VIII, Subpart N, section 441(b). \n105  \nBlazunas and Hammer Direct Joint Testimony at 43."},{"page":26,"startToken":11696,"endToken":12059,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 26 \n \n \n \n \ntermination obligation addresses the remaining prospective exposure based on the stage reached \nby the project and the amounts already recovered. \nThese protections support efficient transmission development while protecting customers \nin the precise fashion the Commission suggested in the Show Cause Order.106  Requiring a defined \ncommitment and Credit Support at identified stages gives PJM and the PJM Transmission Owners \na more reliable basis for devoting study, planning, engineering, procurement, and construction \nresources to Large Load-related transmission service requests.  At the same time, conforming the \ncommitment to PJM’s final service determination, recognizing qualifying actual and retail \nrevenues, reducing Credit Support as obligations are resolved, and preventing duplicate recovery \nprotect the Large Load Customer against obligations exceeding the exposure addressed by the \nCRA.  Although the amount of Credit Support may exceed the periodic or termination amount \nultimately payable because it is calculated using 100 percent of the projected benchmark, Credit \nSupport remains collateral and does not determine or increase the underlying payment obligation. \nThe filed framework is also not unduly discriminatory or preferential.  The pro forma CRA \nestablishes the same core commitment, security, shortfall, termination, crediting, and information-\nsharing requirements for similarly situated Large Loads.  Differences in service quantities, load \nramps, Service Dates, calculation periods, applicable rates, and Credit Support reflect relevant \ndifferences in the service requested, project timing, and the applicable Transmission Owner’s rate \nstructure.  Existing or separate agreements may substitute for the pro forma CRA only where they \nprovide comparable protection against cost shifting, including appropriate service commitments, \nfinancial security, and treatment of termination payments.  \nTaken together, these provisions respond directly to the Commission’s concerns while \nrecognizing the scale and pace of Large Load development in PJM.  They provide a workable \nframework for advancing projects prepared to make and secure the commitments on which \ntransmission planning and investment will rely, while protecting existing transmission customers \nif the anticipated Firm Transmission Service contribution does not materialize.  The resulting \nallocation of obligations is proportionate to the risks addressed, consistent with the parties’ \nrespective roles, and reasonably designed to support both Large Load integration and efficient \ntransmission infrastructure development. \n \n \n \n \n \n106  \nShow Cause Order at PP 81, 83-84."},{"page":27,"startToken":12059,"endToken":12488,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 27 \n \n \n \n \nB. \nTransmission Service Rates and Related Charges for Co-Located Load and \nLarge Load \n1. \nThe Filing Satisfies the Remaining Co-Located Load Rate Compliance \nDirectives. \na. \nTransmission Services. \nThe Co-Located Load Paper Hearing Order found the PJM Transmission Owners’ rate \ntreatment proposals for FCDS and Interim NITS just and reasonable.107  However, the Commission \nrejected the PJM Transmission Owners’ proposed NFCDS maximum rate and required a lower \nmaximum rate or nondiscriminatory discounts supported by transparent calculations.  \nAccordingly, the PJM Transmission Owners’ filing implements the rate treatments already found \njust and reasonable for FCDS and Interim NITS through compliance tariff records,108 and proposes \na revised NFCDS discounted rate methodology and related tariff provisions in compliance with \nthe Commission’s directives.109 \n \nThe Co-Located Load Paper Hearing Order also found the Tariff unjust and unreasonable \nbecause it does not include transmission services that reflect Eligible Customers taking \ntransmission service on behalf of loads with behind-the-meter generation (“BTMG”) that are \nwilling and able to limit their energy withdrawals from the transmission system under certain \nconditions.110  The Commission directed (i) PJM to revise its Tariff to extend the three new \ntransmission services set forth in the December 18 Show Cause Order to Eligible Customers taking \nservice on behalf of load with BTMG that are willing and able to limit their energy withdrawals \nfrom the transmission system under certain conditions, and (ii) the PJM Transmission Owners to \nreflect this change in their compliance filing.111  Accordingly, the PJM Transmission Owners \nacknowledge in this compliance filing the extension of FCDS, NFCDS, and Interim NITS to \nEligible Customers taking service on behalf of load with BTMG (i.e., Eligible Load)112 that \nincludes necessary control technologies and/or protection systems that limit their energy \nwithdrawals from the transmission system under certain conditions. \n \n \n107  \nCo-Located Load Paper Hearing Order at PP 398, 572. \n108  \nId. at PP 398, 400, 401.  As noted above, the PJM Transmission Owners are including with this filing the \ntariff changes from their August 17 Compliance that are still relevant due to the fact that PJM is requesting an earlier \neffective date for those provisions.  The PJM Transmission Owners intend to withdraw the August 17 Compliance \nFiling shortly after the instant filing is made. \n109  \nCo-Located Load Paper Hearing Order at PP 400, 401, 412. \n110  \nId. at P 101. \n111  \nId. at PP 101, 412, 572. \n112  \nPJM defines “Eligible Load” in its Tariff as “Co-Located Load or load connected to Behind the Meter \nGeneration.”  See Tariff, Part I (Definition of Eligible Load)."},{"page":28,"startToken":12488,"endToken":12923,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 28 \n \n \n \n \n2. \nFinancial Penalties for Unreserved Transmission System Use. \nIn the Co-Located Load Paper Hearing Order, the Commission determined that it is just \nand reasonable to impose financial penalties on Eligible Customers in any circumstance where the \ntransmission customer uses a transmission service that it has not reserved.113  The Commission \ndirected the PJM Transmission Owners to effectuate on compliance their proposed penalty \nframework for financial penalties for Eligible Customers taking one of the three new transmission \nservices that withdraw from the transmission system in excess of their contract demand level (i.e., \nfor unreserved use).114  The Commission also noted that, on compliance, the PJM Transmission \nOwners’ unreserved use penalties should be distributed to all non-offending transmission \ncustomers, not just Eligible Customers taking Interim NITS and FCDS, consistent with Order No. \n890.115  Accordingly, the PJM Transmission Owners’ filing implements the financial penalty \nframework the Commission found just and reasonable, including the distribution of revenues \ncollected from financial penalty charges to Eligible Customers taking NFCDS, in addition to firm \ncustomers.116 \nC. \nExtension of Transmission Services and Financial Penalties for Unreserved \nTransmission System use to Eligible Large Load \nIn the Show Cause Order, the Commission asked PJM to explain whether the Tariff \nremains just and reasonable if the three new services for Co-Located Load customers (i.e., Interim \nNITS, FCDS, and NFCDS) are not also made available to Eligible Customers taking service on \nbehalf of flexible and electrically proximate Large Loads.117 \nIn its filing on compliance with the Show Cause Order, PJM is extending the same three \ntransmission services to Eligible Customers taking transmission service on behalf of Large Load \ncustomers, as it offers to Eligible Customers taking transmission service on behalf of Co-Located \nLoad customers in Docket Nos. EL25-49, et al., with substantially the same requirements for \nprotective systems and operational compliance.118   \nConsistent with this approach, the PJM Transmission Owners propose, pursuant to FPA \nsection 205, to apply to Eligible Customers taking these transmission services on behalf of Large \nLoad customers the same corresponding rate and financial penalty frameworks that apply to \nEligible Customers taking transmission service on behalf of Co-Located Load customers, \n \n113  \nCo-Located Load Paper Hearing Order at P 517. \n114  \nId. at PP 517, 529. \n115  \nId. at P 529. \n116  \nId. at PP 517, 529. \n117  \nShow Cause Order at P 87. \n118  \nPJM Interconnection, L.L.C., Co-Located Load Order Workshop Meeting Materials, Item 02 (Nov. 11, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/cllsco/2026/20261112/20261112-\nitem-02---tariff-revisions-part-xi-new-transmission-services-november-11-draft---redline.pdf \n(Tariff \nPart \nXI \nrevisions)."},{"page":29,"startToken":12923,"endToken":13294,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 29 \n \n \n \n \ncontingent on the Commission accepting the underlying services proposed in PJM’s compliance \nfiling.119  Except for the revised NFCDS discounted-rate methodology and adjustments necessary \nto conform to PJM’s final service design, the proposed rates distinguish among customers based \non the transmission service taken, not whether the customer takes that service on behalf of Co-\nLocated Load or another eligible Large Load. \nThe proposed tariff records provided as part of this filing amend Part XI of the Tariff and \nthe applicable rate schedules to address: \n1. \nFCDS, which is intended for the portion of load that will rely on the transmission \nsystem under normal operating conditions and for which Network Upgrades are \nplanned and built;  \n2. \nNFCDS, a limited, supplemental service intended to provide as-available \ntransmission capacity;  \n3. \nInterim NITS, a non-firm service available while Network Upgrades needed to \nprovide full NITS are being constructed; \n4. \nThe treatment of administrative, ancillary-service, redispatch, Schedule 12, and \nother applicable charges; \n \n5. \nRevenue credits associated with NFCDS; and \n \n6. \nFinancial penalties and related revenue credits for unreserved transmission use. \n \n1. \nFirm Contract Demand Transmission Service Rates and Charges. \nThe PJM Transmission Owners’ proposed rates for FCDS are identical to those set forth in \nthe Transmission Owners’ reply brief in Docket Nos. EL25-49-000, et al.120  The rate for FCDS \nwill be calculated in a manner essentially identical to the existing NITS rates, using each applicable \ntransmission owner’s specific methodology for NITS customers.121  Under this approach, Eligible \nCustomers taking FCDS will pay the same base charge per megawatt (“MW”) as NITS customers, \nexcept that unlike NITS customers their demand will be their specified firm contract demand equal \nto the firm contract demand amount (in MW) multiplied by a single zonal rate for both NITS and \nFCDS customers.  The Commission agreed with this approach in the Co-Located Load Paper \nHearing Order, finding it just and reasonable to base the Firm Contract Demand rate on zonal NITS \nrates and underlying NITS revenue requirements because both services provide a similar level of \n \n119  \nBlazunas and Hammer Direct Joint Testimony at 7-8. \n120  \nPJM Transmission Owners Reply Brief at Exhibit No. PTO-0006. \n121  \nPJM Transmission Owners Reply Brief at 18."},{"page":30,"startToken":13294,"endToken":13737,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 30 \n \n \n \n \nfirm transmission service and PJM will plan the transmission system to provide both on a firm \nbasis.122 \n \nFor Zones in which NITS rates are determined pursuant to Attachment H formula rates, \nthe monthly demand charge is calculated as follows:  MDC = FCDTSA × RTZ/12, where MDC is \nthe monthly demand charge, FCDTSA is the Firm Contract Demand Transmission Service \nAmount in MW as specified in the Eligible Customer’s Service Agreement, and RTZ is the \napplicable zonal NITS rate stated in dollars per MW-year.123  For purposes of establishing RTZ \nunder Attachment H, the annual peak of the zone shall include both Network Customer Loads and \nthe FCDS amounts for all Eligible Customers taking FCDS in the zone during the applicable peak \nperiod.124   \nConsistent with the Commission’s findings in the Co-Located Load Paper Hearing Order, \nall ancillary services other than regulation and black start will be charged based on the Eligible \nCustomer’s contract demand, while regulation and black start services will be assessed on a gross \ndemand basis—reflecting the Commission’s determination that all Co-Located Loads rely on those \nservices to be served regardless of the extent to which they withdraw energy from the transmission \nsystem.125  PJM will procure capacity for Firm Contract Demand customers and will plan the \ntransmission system to serve them at their contract demand level.126  Accordingly, capacity-related \ncharges will be based on the customer’s Unforced Capacity Obligation.  Eligible Customers will \nalso be responsible for applicable administrative service charges, redispatch costs under \nAttachment K, and Transmission Enhancement Charges for which they are designated as \nResponsible Customers under Schedule 12.127 \nRevenue credits from NFCDS revenues will be applied each month to offset gross Firm \nContract Demand charges on a pro rata basis, consistent with the crediting mechanisms previously \napproved in PJM’s Tariff.128  FCDS has a minimum one-year term and is subject to PJM’s anti-\ntoggling mechanism—which prohibits, for a period of five years, an Eligible Customer from taking \nNFCDS for any portion of Co-Located Load served by FCDS—and a 42-month termination-notice \nrequirement, consistent with the notice provisions applicable to Network Customers.129 \n \n \n \n122  \nCo-Located Load Paper Hearing Order at P 398. \n123  \nSee proposed Schedule 20. \n124  \nSee id.; see also PJM Transmission Owners Reply Brief, Exhibit No. PTO-0006 at 6. \n125  \nCo-Located Load Paper Hearing Order at PP 399-400. \n126  \nId. at P 250. \n127  \nCo-Located Load Paper Hearing Order at P 401; PJM Transmission Owners Reply Brief, Exhibit No. PTO-\n0006 at 3, 7. \n128  \nPJM Transmission Owners Reply Brief, Exhibit No. PTO-0006 at 6-7. \n129  \nCo-Located Load Paper Hearing Order at P 535."},{"page":31,"startToken":13737,"endToken":14212,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 31 \n \n \n \n \n2. \nNon-Firm Contract Demand Transmission Service Rates and Charges. \nIn the Co-Located Load Paper Hearing Order, the Commission found that the PJM \nTransmission Owners’ original proposal to set the maximum Non-Firm Contract Demand rate \nequal to the Firm Contract Demand rate had not been shown to be just and reasonable,  \nnotwithstanding that it was subject to discount similar to Non-Firm Point-To-Point Service.130   \nThe Commission concluded that Non-Firm Contract Demand should not be subject to the same \nmaximum rate as Firm Contract Demand.131  The Commission further directed the PJM \nTransmission Owners to propose either a lower maximum rate or non-discriminatory discounts, \nwith transparent charge calculations for each individual transmission customer.132 \nIn compliance with the Commission’s directive, and as supported by the Blazunas and \nHammer Direct Joint Testimony, the PJM Transmission Owners are proposing to set the NFCDS \nrate as a discounted rate established as a function of the zonal FCDS rate and the transmission \nsystem load factor for a zone.133  NFCDS customers will take service and pay their reserved \namount of demand based on system availability, and NFCDS will be available for terms ranging \nfrom one hour to one month.134  To ensure against double recovery, all revenues received from \nNFCDS charges will be credited to NITS, Firm Point-To-Point, and FCDS customers based on \ntheir share of the coincident peak load. \nThe rationale for this approach is that the transmission system is built to a peak driven by \nfirm load.  As discussed in the Joint Blazunas and Hammer testimony, the difference between \nzonal annual energy and zonal annual energy at a 100% load factor represents a proxy for the \n“excess capacity” for which non-firm load is not responsible.135  Accordingly, a lower zonal load \nfactor indicates relatively more spare capacity and justifies a higher discount, and vice versa.  A \nsimplified example of this rate calculation for a zone is set forth below in Example 2: \nExample 2 – Discounted Non-Firm Contract Demand Transmission Service Rate \nCalculation \n \n1  The zonal Firm Contract Demand Rate is $90,000/MW-Year \n2  The zonal peak demand is 150,000/MW. \n3  The zonal annual energy is 850,000,000 MWh \n4  The maximum non-firm contract demand equals $90,000/MW-Year x [Line 3 ÷ (Line 2 \nx 8,760 hours)] = $90,000/MW-Year x 64.7% Load Factor ≈ $58,219/MW-Year. \n \n130  \nId. at P 402. \n131  \nId.  \n132  \nId. at PP 404, 412. \n133  \nProposed Tariff, Part XI, Subpart C, Section 715 and Proposed Schedule 21; see also Blazunas and Hammer \nDirect Joint Testimony at 9-10. \n134  \nDaily and hourly rates will be distinguished based on on-peak days (Monday–Friday, except for certain \nholidays) and off-peak days (Saturday and Sunday, including the applicable holidays that fall on a weekday). \n135  \nBlazunas and Hammer Direct Joint Testimony at 10."},{"page":32,"startToken":14212,"endToken":14639,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 32 \n \n \n \n \n5  The discounted NFCD rate has an implied discount of 35.3% relative to the Zonal Firm \nContract Demand Rate (i.e., the Maximum NFCD rate).136 \nThe PJM Transmission Owners’ proposed discounted NFCDS rate is just and reasonable \nand consistent with cost causation principles, as well as the Commission’s directives in the \nDecember 18 Show Cause Order and Co-Located Load Paper Hearing Order because it \nincentivizes efficient use of the transmission system by Eligible Customers seeking to use the \ntransmission system on behalf of Co-Located or Large Load in a more limited manner and aligns \nthe charges for NFCDS with the benefits received.137  This methodology is also transparent and \nnon-discriminatory, as it relies on publicly available PJM zonal data, such as peak loads and net \nenergy figures from PJM’s Long-Term Load Forecast, and applies a consistent calculation across \nall PJM zones.138   \n3. \nInterim Network Integration Transmission Service. \nOn August 17, 2026, the PJM Transmission Owners submitted new and revised Tariff \nrecords in partial compliance with the Commission’s Co-Located Load Order to implement the \nrate for Interim NITS.139  The filing was a companion filing to PJM’s August 17 Compliance Filing \nof the Tariff terms and conditions for Interim NITS.140   \nThe PJM Transmission Owners propose limited modifications to the language contained \nin their August 17 Compliance Filing to account for the provision of this service to Eligible \nCustomers taking service on behalf of Large Load customers,141 as well as to reflect \nimplementation of FCDS and NFCDS. \nInterim NITS is a temporary, non-firm transmission service available to an Eligible \nCustomer that has requested NITS but cannot yet reliably receive it because the Network Upgrades \nnecessary to provide permanent NITS are not yet complete.142  The Commission found that Interim \nNITS is an optional service, available only to the extent PJM determines—in consultation with the \naffected Transmission Owner—that some level of interim service can be reliably provided based \non the results of appropriate studies.143  Once the required Network Upgrades are completed and \nintegrated with the PJM transmission system, the Eligible Customer automatically converts to \n \n136  \nId. at 10 (Table 1). \n137  \nDecember 18 Show Cause Order at PP 199, 214; Co-Located Load Paper Hearing Order at PP 402-407, 412. \n138  \nBlazunas and Hammer Direct Joint Testimony at 10. \n139  \nSee supra note 23. \n140  \nId. \n141  \nSee supra notes 24 & 108; Proposed Tariff, Part XI, Subpart A, Section 706. \n142  \nCo-Located Load Paper Hearing Order at P 248. \n143  \nId. at P 574."},{"page":33,"startToken":14639,"endToken":15124,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 33 \n \n \n \n \nNetwork Customer status and begins taking permanent NITS.  Interim NITS may not be combined \nwith FCDS or NFCDS.144 \nAs with FCDS, the PJM Transmission Owners’ proposed rates for Interim NITS are the \nsame as those applicable to Co-Located Load customers under the PJM Transmission Owners’ \nfilings in Docket Nos. EL25-49, et al.145  The monthly demand charge for Interim NITS is \ncalculated as the Eligible Customer’s measured demand amount in MW multiplied by the \napplicable zonal NITS rate established pursuant to Tariff Section 34.1.146  This is the same rate \nmethodology that applies to permanent NITS customers, consistent with the Commission’s finding \nthat Eligible Customers taking Interim NITS should pay the NITS rate.147  However, because \nInterim NITS is an interruptible service, Eligible Customers taking Interim NITS service on behalf \nof Co-Located Loads or Large Loads would not be assessed generation capacity charges because \ncapacity will not be procured on behalf of Interim NITS customers until such time as Network \nUpgrades are in place to serve them.148 \nInterim NITS customers will be responsible to pay for: (i) applicable administrative service \ncharges under Tariff Schedules 1A, 9, and 10; (ii) ancillary service charges, including regulation \ncharges and black start service charges; and (iii) redispatch costs.149  The PJM Transmission \nOwners are not proposing tariff revisions in this filing to implement these charges and costs \nbecause the Commission directed PJM to incorporate Tariff revisions in its compliance filing \nnecessary to assess them.150  Revenue credits from NFCDS revenues will be applied to offset the \ngross Interim NITS monthly demand charge, consistent with the crediting methodology applicable \nto other firm and non-firm service customers.151 \n4. \nFinancial Penalties for Unreserved Transmission System Use. \nAs discussed above, the PJM Transmission Owners are filing the financial penalty \nframework found just and reasonable by the Commission in the Co-Located Load Paper Hearing \nOrder, with a modification to the penalty revenue distribution, that will apply to Eligible \nCustomers taking one of the new transmission services on behalf of not only Co-Located Loads, \nbut also eligible Large Loads as well.  Under this PJM Transmission Owners’ financial penalty \nframework, an Eligible Customer would be assessed: (i) a base penalty charge for each hour in \n \n144  \nDecember 18 Show Cause Order at P 200. \n145  \nSee PJM Transmission Owners Reply Brief, Exhibit No. PTO-0006 at 1-2. \n146  \nId. at 1. \n147  \nCo-Located Load Paper Hearing Order at P 248. \n148  \nId. at P 248. \n149  \nCo-Located Load Paper Hearing Order at PP 572-573. \n150  \nSee Co-Located Load Paper Hearing Order at P 573; see also PJM Interconnection, L.L.C., Co-Located Load \nOrder Workshop Meeting Materials, Item 02 (Nov. 11, 2026), https://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20261112/20261112-item-02---tariff-revisions-part-xi-new-transmission-services-\nnovember-11-draft---redline.pdf (Tariff Part XI revisions).. \n151  \nPJM Transmission Owners Reply Brief, Exhibit No. PTO-0006 at 1."},{"page":34,"startToken":15124,"endToken":15649,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 34 \n \n \n \n \nwhich the Eligible Customer’s reserved service limit is exceeded at the Point of Interconnection \nduring at least one five-minute interval (an “Exceedance Hour”), and (ii) a penalty ratchet when \nexceedances occur repeatedly.152  Under the penalty ratchet, penalty charges escalate as the \nfrequency of unreserved transmission use increases.153  If more than one Exceedance Hour occurs \non the same day, an additional daily penalty would apply.154  If exceedances occur on multiple \ndays within the same week, an additional weekly penalty would apply.  If exceedances occur in \nmultiple weeks within the same month, an additional monthly penalty would apply.  Finally, if \nexceedances occur in multiple months within the same year, an additional annual penalty would \napply.155  The Commission agreed with PJM Transmission Owners that progressively increasing \nthe consequences of repeated penalties encourages Eligible Customers to manage their usage \nconsistent with their reserved transmission service limit.156 \nConsistent with the Commission’s guidance and Order No. 890,157 the PJM Transmission \nOwners are also modifying Schedule 22 to clarify that revenues collected from daily, weekly, and \nmonthly financial penalty charges will be returned on a monthly basis to all non-offending \ntransmission customers (i.e., FCDS, NFCDS, NITS, and Interim NITS customers) that have not \nbeen penalized during the month as bill credits, based on the Eligible Customer’s pro rata share \nof the Zone’s annual peak load based on the most recent 12-month period ending October 31.  \nRevenues collected from annual penalty charges will be returned on an annual basis to all non-\noffending transmission customers that have not been penalized during the year as bill credit, based \non each Eligible Customer’s pro rata share of the Zone’s annual peak load based on the most \nrecent 12-month period ending October 31. \nD. \nCost Allocation and Recovery for Interconnection Reliability Reinforcements \nPJM’s proposed Fast Energization Process would study qualifying generation  \ninterconnection and Large Load-related transmission service requests together and identify a \nportfolio of transmission upgrades—the IRRs—needed to address the combined system impacts \nof the requests included in each study cycle.  PJM’s proposal necessitates revisions to the Tariff to \nestablish the basis for allocating the costs of the IRRs that PJM identifies in each study cycle.  \nAccordingly, the PJM Transmission Owners propose revisions to Schedule 12 of the Tariff that \nwould allocate the costs of those IRRs on a portfolio basis using modeled electrical impacts of the \ngenerators and Large-Load-related transmission service requests being studied through PJM’s Fast \n \n152  \nId. at 16-17 & Exhibit No. PTO-0006 at 4-16. \n153  \nId. at 17 & Exhibit No. PTO-0006 at 7, 10-16. \n154  \nId., Exhibit No. PTO-0006 at 14. \n155  \nId. at 17 & Exhibit No. PTO-0006 at 12-14. \n156  \nCo-Located Load Paper Hearing Order at P 529. \n157  \nId. at P 529; Preventing Undue Discrimination & Preference in Transmission Serv., Order No. 890, 118 \nFERC ¶ 61,119, at PP 848, 862, order on reh’g, Order No. 890-A, 121 FERC ¶ 61,297 (2007), order on reh’g, Order \nNo. 890-B, 123 FERC ¶ 61,299 (2008), order on reh’g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, \nOrder No. 890-D, 129 FERC ¶ 61,126 (2009)."},{"page":35,"startToken":15649,"endToken":16200,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 35 \n \n \n \n \nEnergization process.158  The IRRs themselves will be included in the transmission rate bases of \nthe Transmission Owners constructing and owning the projects.  A new Interconnection Reliability \nReinforcement Charge will be implemented to recover the costs from transmission customers \nexternal to the Zone(s) in which the IRRs are located, as well as a separate fee to be charged to \ngenerators in each cycle to recover and credit back to load customers amounts representing a fair \ncontribution from those generators to offset the costs of the IRRs.    \nIn balancing the need for a cost allocation methodology that assigns costs in a manner \nroughly commensurate with benefits while also being efficient, practically implementable, and \nprotecting other transmission customers, the PJM Transmission Owners’ proposed cost allocation \napproach is intended and will achieve the same goals as the cost allocation framework the \nCommission recently approved for Southwest Power Pool, Inc. (“SPP”).159  In particular, as with \nSPP’s cost allocation approach, the PJM Transmission Owners’ cost allocation proposal departs \nfrom the traditional “but-for” cost assignment model that links specific transmission upgrades with \nspecific requests for service.  In the case of SPP, the Commission accepted SPP’s GRID-C \nmechanism for allocating a portion of the costs of transmission facilities to prospective generator \ninterconnection customers through fixed per-MW charges that, when collected, are credited back \nagainst load customer cost responsibility.160 \nAlthough employing different mechanisms due in part to the nature of the Fast Energization \nprocess proposed by PJM, which is different than the planning process implemented by SPP,161 \nthe PJM Transmission Owners’ proposal aligns with the same objectives as the SPP cost allocation \nproposal in departing from the traditional “but for” generator interconnection cost allocation \napproach.  Under the proposed Schedule 12 provisions, PJM, as Transmission Provider, will use \npower-flow modeling to calculate the relative contributions of the studied generation and Large \nLoad transmission requests to the aggregate transmission system violations on constrained \nfacilities addressed by the IRRs.  Those calculations will form the basis of the Interconnection \nReliability Reinforcement Charge to Zones with Large Load customers, as well as the separate fee \nrecovered from generators in each study cycle (the “Generator Reliability Reinforcement Fee”).  \nThis aggregate approach is tailored to the output of PJM’s Fast Energization Process.  Because \nPJM plans to study multiple generation interconnection and Large Load transmission service \nrequests together and identify shared reinforcements addressing multiple system violations, \nindividual IRRs will not correspond to individual service requests.162  Such a one-to-one mapping \nwould therefore be technically infeasible.  Thus, it is necessary to have a method for allocating the \n \n158  \nSee Blazunas and Hammer Direct Joint Testimony at 11-12. \n159  \nSw. Power Pool, Inc., 194 FERC ¶ 61,192 at P 52 (2026). \n160  \nId. at PP 88-90 (applying the Commission’s “beneficiary pays” cost-causation principle and finding the \nGRID-C mechanism just and reasonable because it allocates the costs of anticipated network upgrades between \nprospective generator interconnection customers and load in a manner at least roughly commensurate with benefits). \n161  \nThis discussion relates solely to the features of SPP’s cost allocation proposal, and is not intended to draw \nany comparisons between SPP’s Consolidated Planning Process and the PJM Fast Energization Process, or address \nthe merits of PJM’s Fast Energization Process. \n162  \nBlazunas and Hammer Direct Joint Testimony at 12."},{"page":36,"startToken":16200,"endToken":16707,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 36 \n \n \n \n \ncosts of the IRRs that recognizes the integrated and portfolio-based nature of PJM’s proposed Fast \nEnergization Process.163 \nThe resulting allocation maintains a demonstrable relationship between the studied \nrequests’ modeled contributions to the identified system needs.  It uses the causal information \nproduced through PJM’s study process without attributing individual reinforcements to particular \nrequests in recognition of the fact that the study results do not establish that attribution.  This \napproach is consistent with PJM’s existing proportional impact method for allocating costs under \nits New Service Request process, as well as the governing cost allocation standard.  Costs assigned \nto customers must be “roughly commensurate” with the benefits those customers are expected to \nreceive, but it need not calculate those benefits with exact precision.164  The PJM Transmission \nOwners’ proposal satisfies that standard by establishing a connection between the studied requests, \ntheir modeled contributions to the aggregate system violations, and the costs of the shared IRRs \nrequired to address those violations.  It thereby achieves a roughly commensurate cost allocation \nwithout attempting to impose a customer-by-customer or project-by-project cost assignment that \nis inconsistent with PJM’s Fast Energization study process.165  That practical approach achieves \nthe same objectives as accepted by the Commission in its recent acceptance of SPP’s high impact \nlarge load (“HILL”) study process and High Impact Large Load Generation Assessment \n(“HILLGA”) framework.166 \nThe proposed allocation methodology, while complementing PJM’s combined study \napproach, is submitted as an independent FPA section 205 proposal supported on its own merits.  \nThe just and reasonable basis for the proposed Schedule 12 revisions does not depend on \nCommission acceptance of every feature of PJM’s companion filing.  Rather, the methodology is \njust and reasonable and can operate with any accepted study design that identifies a portfolio of \ntransmission solutions and produces the modeled electrical-impact information necessary to \nallocate the resulting costs, regardless of whether that process is confined to Large Load-related \ntransmission service requests or also includes generator interconnection requests. \n1. \nPJM Determines Cost Responsibility for the IRR Portfolio Using \nModeled Electrical Impacts. \nFor each Fast Energization Cycle, PJM will identify the IRRs designated for construction \nand determine, based on the provisions set forth in the instant PJM Transmission Owner proposal, \ncost responsibility for the resulting portfolio.  To determine cost responsibility, PJM will use \npower-flow modeling to calculate the proportional impact of each studied service request to the \naggregate violations on the constrained facilities requiring mitigation through the IRR portfolio.  \nThis approach begins with the calculation by PJM of distribution factors based on the transfer of \nenergy across constrained facilities as identified in the study process.  Proportional impacts for \n \n163  \nSee Midcontinent Indep. Sys. Operator, Inc. 189 FERC ¶ 61, 108 (2024), order on reh’g, 191 FERC ¶ 61,231 \n(2025). \n164  \nSee, e.g., Ill. Com. Comm’n v. FERC, 576 F.3d 470, 476-77 (7th Cir. 2009). \n165  \nSee, e.g., PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 at PP 166-168 (2025). \n166  \nSw. Power Pool, Inc., 194 FERC ¶ 61,031 (2026) (“SPP HILL Order”)."},{"page":37,"startToken":16707,"endToken":17218,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 37 \n \n \n \n \ngenerators and loads are determined by multiplying the associated distribution factors, if they \nexceed the specified threshold, by the MW capacity for generators or amount of Firm Transmission \nService requested by an Eligible Customer on behalf of the applicable Large Load.  For MW \nimpacts that exceed a defined impact threshold, such impacts will be converted to proportional \nMW impacts representing the pro rata share of all impacts on the same constrained facility.  Then \nthe proportional MW impacts are weighted using values as set forth in the PJM Manuals resulting \nin weighted proportional MW impacts.167  As discussed in the Blazunas and Hammer Direct Joint \nTestimony, weighting is important because the same degree of impact is not necessarily \ncomparable between different facilities.168  For instance, a 1 MW impact on a 20-mile, 138 kV \nconstrained facility is of significantly less consequence than a 1 MW impact on a 150 mile, 500 \nkV constrained facility.169  \nThese features make the proposed tariff revisions a practical measure of cost causation.  \nThe methodology keys each share to the megawatts the customer actually requested, excludes \nimmaterial impacts, and counts only impacts that aggravate a violation.  It therefore satisfies the \nCommission’s long-standing requirement that rates “reflect to some degree the costs actually \ncaused by the customer who must pay for them” and that costs be allocated in a manner at least \nroughly commensurate with the benefits the paying entity receives.170  Nor does the methodology \nbreak new ground.  PJM’s Tariff already provides that all New Service Requests that contribute to \nthe need for a Network Upgrade receive cost allocation based on each request’s contribution to the \nreliability violation, in accordance with the PJM Manuals.171  The PJM Transmission Owners’ \nproposal applies that same contribution-based principle, with reasonable modifications to reflect a \nprocess that studies generator interconnection and Large Load transmission service requests \ntogether and produces a single portfolio of projects to accommodate those requests.172 \n2. \nAggregate Impacts are Converted into Zonal Cost Responsibility \nDeterminations, With Generator Costs Recovered Through a Levelized \nFee. \nThe PJM Transmission Owners’ proposed tariff revisions translate aggregate impact values \ninto cost responsibility for the relevant IRRs.  The proportional impacts of Transmission Service \nRequests are combined on a Zonal basis and assigned to the relevant Transmission Owner Zones, \nwith the entire initial cost responsibility allocated among to those Zones based on their relative \n \n167  \nBlazunas and Hammer Direct Joint Testimony at 18-20 (providing a simple example to illustrate the proposed \nproportional impact methodology). \n168  \nId. at 16-17. \n169  \nId. at 16-17.  For short-circuit constraints, allocation turns on each customer’s contributing fault current \nimpact on the circuit breaker’s interrupting rating.  See proposed Schedule 12, Section (f)(2)(B) and Blazunas and \nHammer Direct Joint Testimony at 21-22. \n170  \nSee, e.g., Midwest ISO Transmission Owners v. FERC, 373 F.3d 1361, 1368 (D.C. Cir. 2004); Ill. Com. \nComm’n v. FERC, 576 F.3d 470, 476 (7th Cir. 2009). \n171  \nShow Cause Order at P 22. \n172  \nBlazunas and Hammer Direct Joint Testimony at 17."},{"page":38,"startToken":17218,"endToken":17695,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 38 \n \n \n \n \nweighted impacts.173  The costs associated with the IRRs are included in the rate base of the \nTransmission Owners that will construct and own those facilities.  The allocations to other Zones \nare recovered through the Interconnection Reliability Reinforcement Charge, which is discussed \nfurther below.  The proposed tariff revisions also make these assignments public.  The \nTransmission Provider will complete the cost responsibility analysis before Transmission Service \nAgreements and Generator Interconnection Agreements are executed and before seeking PJM \nBoard approval of the reinforcements through their inclusion in the RTEP, and it will post the \nresulting assignments on the PJM website within 30 days of completing the analysis.174  That \nposting requirement responds to, in part, the Commission’s concern that, without sufficient \ntransparency, stakeholders may lack visibility into the transmission upgrades, and their associated \ncosts, driven by large load additions.175 \nThe portion of reinforcement costs representing the relative contribution of generators in \nthe applicable Fast Energization Process cycle is charged separately to the generators through \nGenerator Reliability Reinforcement Fees.176  The Generator Reliability Reinforcement Fee \ntranslates each generator’s allocated share of reinforcement costs into a levelized payment \nobligation that is collected by PJM and credited to transmission customers in the relevant Zones \nthat have been assigned cost responsibility for the IRRs.177  As explained above, each generator’s \nallocated share is determined using a distribution factor-based methodology comparable to PJM’s \nexisting proportional impact allocation methodology.  Thus, each generator’s base contribution to \nthe overall costs of the applicable portfolio of IRRs is derived using a Commission-endorsed \napproach to determining relative benefits. \nThe assessment of a separate fee to generators is just and reasonable.  The Show Cause \nOrder was explicit that the Commission did not intend to alter or question existing cost allocation \nmethods.178  Consistent with this finding, the PJM Transmission Owners’ proposal preserves the \nfoundational approach of including transmission system enhancements in Transmission Owners’ \nrate bases used to determine rates for transmission service, while providing appropriate ratepayer \nprotections including the CRA and the additional mechanisms discussed below.  In PJM, load pays \nfor transmission service.  However, the PJM Transmission Owners recognize that PJM’s combined \nstudy approach will consider impacts associated with generator interconnection requests, and thus, \na contribution from generators to offset the costs of IRRs is appropriate.  Assessing a separate \ncharge to generators, in the form of the proposed Generator Reliability Reinforcement Fee, \nprovides a means to ensure an appropriate financial contribution from generators, while preserving \n \n173  \nProposed Schedule 12, Sections (f)(2)(C)(2), (f)(4), and (f)(6). \n174  \nId. at Section (f)(2)(D). \n175  \nShow Cause Order at PP 71, 74-76. \n176  \nProposed Schedule 12, Sections (f)(2)(C)(2) and (f)(4). \n177  \nSee id. at Section (f)(6); see also Blazunas and Hammer Direct Joint Testimony at 23-24. \n178  \nShow Cause Order at P 81."},{"page":39,"startToken":17695,"endToken":18164,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 39 \n \n \n \n \nthe rate base treatment of IRRs consistent with longstanding cost allocation and recovery methods \nin PJM.179  \nThe PJM Transmission Owners propose to recover Generator Reliability Reinforcement \nFees in a manner that balances several related goals: (i) maintaining consistency with PJM’s \nproposal to identify IRRs on a portfolio basis, taking into account all applicable generator \ninterconnection and Large Load transmission service requests; (ii) providing an ongoing stream of \ncredits to transmission customers that extends over a significant portion of the expected life of \nmost transmission projects; (iii) recognizing generators’ finite operational lives and particular \nfinancing needs, while avoiding unduly long-term cost responsibility obligations that could \ndiscourage needed generation development in the PJM region; and (iv) providing generators with \nupfront cost certainty and commercially reasonable payment terms that avoid creating \ndisincentives for generators to locate and build in PJM. \nTo balance these considerations, each Generator Interconnection Customer will be \nassessed the applicable Generator Reliability Reinforcement Fee by PJM beginning on the earlier \nof the calendar year in which its facility achieves Commercial Operation or three years after the \nCommercial Operation date specified in its original Generator Interconnection Agreement, and the \nfee will continue for 15 years from that date.180  The Transmission Provider will calculate the fee \non a levelized basis by applying the generator’s allocated percentage of the total portfolio of IRRs \nto the total estimated gross plant of those IRRs and multiplying the resulting amount by a capital \nrecovery factor built from the Annual Carrying Charge Component.181  This Annual Carrying \nCharge Component is the same across all Generator Reliability Reinforcement Fees calculated \nwithin each cycle.  It is calculated based on the Transmission Owners’ Commission-accepted cost \nof capital: specifically, it is the weighted average of the Weighted Average Cost of Capital, drawn \nfrom the Attachment H formula rates of each Transmission Owner with reinforcements in the \napplicable Fast Energization Process study cycle that includes the Generator Interconnection \nCustomer, weighted by that Transmission Owner’s share of the overall IRR portfolio from the \napplicable study cycle.182 \nPJM will invoice one-twelfth of the annual Generator Reliability Reinforcement Fee \nmonthly and credit the amounts collected to Firm Transmission Customers.183  Each Zone will \nreceive credits in proportion to its share of the annual revenue requirement for the reinforcements \nallocated to Firm Transmission Customers, and each Zone’s credits will be distributed among its \nFirm Transmission Customers based on their pro rata share of the Zone’s annual peak load for the \n \n179  \nBlazunas and Hammer Direct Joint Testimony at 23-25. \n180  \nProposed Schedule 12, Section (f)(6)(A). \n181  \nSee proposed Schedule 12, Section (f)(6)(B); see also Blazunas and Hammer Direct Joint Testimony at 23-\n25. \n182  \nProposed Schedule 12, Section (f)(6)(B). \n183  \nId. at Section (f)(6)(C)-(D)."},{"page":40,"startToken":18164,"endToken":18695,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 40 \n \n \n \n \nmost recent 12 months ending October 31, appearing as a reduction to the gross monthly rate for \nFirm Transmission Service.184 \nThis approach achieves a just and reasonable balance among the goals described above. \nFirst, the 15-year recovery period recognizes the portfolio nature of the IRRs while ensuring that \ncredits flow back to transmission customers for a substantial portion of the expected lifespan of a \ntransmission portfolio.185  Tying the commencement of the fee to the generator’s Commercial \nOperation Date, with a reasonable allowance for timing changes, also appropriately accommodates \ndifferences between the timing of generator development and the placement of the associated \ntransmission reinforcements in service.  In some instances, a generator may begin paying the fee \nbefore all transmission facilities in the associated IRR portfolio enter service, providing a relative \nbenefit to transmission customers; in others, the generator may begin making payments after \ncertain transmission facilities have entered service.  Across the portfolio, however, it is reasonable \nto expect these timing differences to roughly balance out. \nThe Commission recently accepted a similarly pragmatic balancing approach in SPP, \nwhere it approved an expedited process for generators serving HILL that relies on standardized \nfinancial requirements rather than attempting to calibrate each requirement precisely to the costs \nor risks attributable to each individual generator.186  The Commission found those requirements \njust and reasonable because, among other things, the more stringent financial commitments and \nother eligibility requirements would encourage commercially ready projects.187  The PJM \nTransmission Owners’ approach is, if anything, more tailored: each Generator Reliability \nReinforcement Fee begins with the generator’s modeled proportional contribution to the violations \naddressed by the applicable IRR portfolio and converts that impact into an administrable, levelized \npayment obligation.  Because the fee will be determined upfront based on the results of the PJM \nsystem impact study, generators will have certainty as to their costs before making a final \ncommitment to move forward and execute an interconnection agreement.  Moreover, by limiting \nthe recovery period to 15 years, rather than extending it over the full expected life of the IRRs, the \nproposal avoids imposing commercially unreasonable payment terms that could render otherwise \nviable generation projects unfinanceable.  That combination of cost certainty and reasonable \npayment terms is particularly appropriate given the well-documented challenges associated with \nattracting and installing adequate generating capacity in PJM.188 \n \n184  \nSee id. at Section (f)(6)(D); see also Blazunas and Hammer Direct Joint Testimony at 23-24. \n185  \nId. at 24-25. \n186  \nSee SPP HILL Order at PP 64-66; see also id. (Rosner, Comm’r, concurring at PP 1, 3) (describing SPP’s \nHILL and HILLGA proposal as “pragmatic” and observing that, although the “mechanics” of SPP’s and PJM’s \napproaches are distinct, “the practical outcome is similar”). \n187  \nSee id. at PP 64-65, 67; see also id. at P 66 n.127 (explaining that, under FPA section 205, SPP “need not \nshow that its proposal is the most just and reasonable among all possible alternatives so long as it demonstrates that \nthe proposal is just and reasonable”) (citing Cities of Bethany v. FERC, 727 F.2d 1131, 1136 (D.C. Cir. 1984)). \n188  \nBlazunas and Hammer Direct Joint Testimony at 24."},{"page":41,"startToken":18695,"endToken":19165,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 41 \n \n \n \n \n3. \nAllocations to Transmission Customers Are Recovered Through a \nDedicated, Formula-Based Charge and Credited to Avoid Double \nRecovery. \nThe PJM Transmission Owners’ proposal establishes the Interconnection Reliability \nReinforcement Charge, which recovers each Transmission Owner’s annual transmission revenue \nrequirement for the reinforcements it constructs and owns.189  The Transmission Provider assesses \nthe charge to Firm Transmission Customers in each Zone based on the cost responsibility \nassignments determined through the proportional impact methodology described above.190  The \ncharge rests on existing, Commission-accepted rates: each Transmission Owner’s revenue \nrequirement for a reinforcement is determined under the formula rate in effect for its NITS and \nFCDS.191  The charge is recalculated annually to reflect revised billing determinants and posted \nby October 31 for the following calendar year, and charges to Point-To-Point customers are \ncalculated monthly under Tariff, Part II, section 25.192  The Transmission Provider collects the \ncharge monthly, in addition to all other transmission charges, and remits the revenues to the \nTransmission Owners that own the relevant IRRs.193  Importantly, application of the \nInterconnection Reliability Reinforcement Charge ensures that IRR costs are allocated only to \nthose Zones containing service requests by an Eligible Customer on behalf of the applicable Large \nLoad in a given cluster.  Zones with no Large Loads in a cluster will not be allocated any IRR \ncosts.  \nAs discussed in the Blazunas and Hammer Direct Joint Testimony, this dedicated charge \napplies for 15 years after a reinforcement enters service.194  Beginning with the next full calendar \nyear after the fifteenth year, the Transmission Provider assigns and recovers the remaining costs \nunder sections (a) through (e) of Schedule 12.195  This transition is reasonable.  It confines cost \nresponsibility to those Zones containing Large Load and generators whose modeled impacts \ncontribute to  the need for reinforcements for a reasonable period that roughly corresponds with \nwhen it would be expected that some generators would be removed from service or otherwise \nretire, as well as the expectation of significant changes to the topology and use of the transmission \nsystem.  This 15-year period is also intended to account for what may be a transition or removal \nof certain Large Load facilities and thus their transmission service requests.  Although these \ntimelines are, of course, inherently uncertain, the PJM Transmission Owners submit that 15 years \nis a reasonable estimate of when these various factors are likely to result in significant broadening \nof benefits to customers throughout PJM, rather than just the customers in the Zones in which \n \n189  \nId. at 25-29. \n190  \nProposed Schedule 12, Section (f)(3). \n191  \nId. at Section (f)(3)(A). \n192  \nProposed Schedule 12, Section (f)(3)(B)-(C). \n193  \nId. at Section (f)(4)(A)-(B). \n194  \nBlazunas and Hammer Direct Joint Testimony at 27-29. \n195  \nProposed Schedule 12, Section (f)(3)."},{"page":42,"startToken":19165,"endToken":19640,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 42 \n \n \n \n \nspecific Large Loads are located.196  This mechanism also accounts for the fact that, after over a \n15-year period, broader dynamics of system use and benefit will evolve as economic patterns shift \nand technology changes, resulting in reliance by, and greater benefits to, loads other than the \noriginal large loads which gave rise to the upgrades.197  These shifts in benefits warrant application \nof the existing Transmission Enhancement Charge cost allocation methodologies, i.e., Solution-\nbased DFAX and, in the case of Regional Facilities, Load Ratio Share.198 \nThe proposal also ensures that no customer pays twice for the same facilities.  Because \neach Transmission Owner’s Firm Transmission Service rates under Attachment H already reflect \nits total cost of providing jurisdictional transmission service, including reinforcement costs, \nrevenues from the Interconnection Reliability Reinforcement Charge are credited to Firm \nTransmission Customers in the Zone, and to Firm Point-To-Point customers delivering into the \nZone, in proportion to their Demand Charges and Reserved Capacity, net of any applicable \nincentives.199  This is precisely the crediting mechanism the Show Cause Order contemplated.200  \nIt also mirrors the Commission’s reasoning in the Co-Located Load Paper Hearing Order, where \nthe Commission explained that revenues from NFCDS will be credited against, and thus offset, \nthe transmission revenue requirement on which firm transmission rates are based.201 \n4. \nTransparency and Direct Wholesale Customer Commitments. \nIn addition to the basic cost allocation and rate design features discussed above, the PJM \nTransmission Owners are committing to make, on compliance, necessary changes to their formula \nrate templates to: (1) provide transparency to state regulators and other interested parties regarding \nthe costs of transmission facilities being constructed by the Transmission Owner to provide \ntransmission service to Large Loads; and (2) adopt a mechanism designed to protect wholesale \ntransmission customers not regulated at the retail level (e.g., municipals, cooperatives, and other \napplicable load-serving entities) from having to bear excessive large-load-related transmission \nupgrade costs.202     \nWith respect to transparency commitments, the Schedule 12 reporting requirements make \nthe portfolio allocation results reviewable.  Following completion of the portfolio analysis, PJM \nwill post the resulting cost responsibility assignments on its website.  Moreover, each applicable \nTransmission Owner also commits to make, within 120 days of a Commission order accepting this \nfiling, a compliance filing to include any necessary additional provisions in its formula rate \ntemplate to identify each transmission project such as IRRs that the Transmission Owner is \nconstructing for purposes of providing transmission service to Large Load, along with a calculation \n \n196  \nId. at 27-29 and Exhibit No. PTO-0003. \n197  \nId. at 28-29 and Exhibit No. PTO-0003. \n198  \nId. at 26-27. \n199  \nProposed Schedule 12, Section (f)(5). \n200  \nShow Cause Order at PP 3, 35. \n201  \nCo-Located Load Paper Hearing Order at P 403. \n202  \nBlazunas and Hammer Direct Joint Testimony at 29-31."},{"page":43,"startToken":19640,"endToken":20187,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 43 \n \n \n \n \nof the annual revenue requirement associated with such projects.203  This information will be \nsubstantially similar to information that the PJM Transmission Owners already provide in their \nformula rate templates with respect to projects planned through PJM’s RTEP that are allocated \nregionally through Transmission Enhancement Charges (“TEC”).  These additions will serve three \npurposes.  First, they will allow PJM to allocate and invoice Interconnection Reliability \nReinforcement Charges, which as discussed above will be the mechanism whereby PJM collects \namounts allocated to Responsible Customers in Zones outside of the Zones in which the IRRs are \nconstructed.  Second, in conjunction with the cost responsibility assignments posted by PJM, they \nwill satisfy the Commission’s preliminary findings in the Show Cause Order with respect to \nproviding transparency regarding the costs associated with transmission upgrades driven by Large \nLoad additions.204  Third, by providing this level of cost transparency, state commissions and other \nretail regulators will have access to information to assist them if they choose to allocate some \namount of transmission rate costs specifically to Large Load customers in their jurisdiction.205  \nAdditionally, each applicable PJM Transmission Owner commits to include in the above-\nreferenced compliance filing a surcharge/crediting mechanism designed to protect direct wholesale \ntransmission customers in its zone, where applicable, from having to bear disproportionate large-\nload-related system upgrade costs.206  These wholesale customers would include municipal \nutilities and electric cooperatives that are not regulated by states and, therefore, cannot be insulated \nby state action against bearing a potentially disproportionate amount of costs associated with \nreinforcements necessary to provide transmission service to Large Load.  The purpose of this \ncommitment, and resulting mechanisms, is to ensure that wholesale customers are protected from \nhaving to bear a share of Large Load-related costs in a situation where there are no Large Loads, \nor relatively fewer Large Loads, in their service areas requesting service in a given PJM study \ncycle.  Where a wholesale customer has Large Load customers that request and are granted \ntransmission service through PJM, this mechanism would result in both credits and surcharges, \nsince the wholesale customer should bear the cost responsibilities of the upgrades that come out \nof a particular cycle at PJM.   \n The PJM Transmission Owners have deliberately avoided specifying a single mechanism \nfor implementing this commitment due to the need for flexibility so that Transmission Owners can \ndesign and propose wholesale customer protection mechanisms that are consistent with their own \nindividual circumstances, including any applicable retail allocation or charge mechanisms.207  One \npotential approach involves a surcharge/credit approach pursuant to which a Transmission Owner \nwould calculate, in addition to its total NITS revenue requirement, a revenue requirement specific \n \n203  \nInformation regarding all transmission projects, including IRRs, Supplemental Projects, and RTEP projects, \nwill continue to be posted and maintained on the project status and cost allocation page of PJM’s website, located at: \nhttps://www.pjm.com/planning/m/project-construction. \n204  \nShow Cause Order at P 66. \n205  \nThis information will be provided by each individual Transmission Owner based on the IRRs it is \nconstructing, which will assist in facilitating retail regulators within multi-Transmission Owner Zones to allocate costs \nrelevant to retail customers within their states.  \n206  \nBlazunas and Hammer Direct Joint Testimony at 29-30. \n207  \nId. at 30-31."},{"page":44,"startToken":20187,"endToken":20683,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 44 \n \n \n \n \nto large load-driven upgrades.  Using that information, a credit would be calculated and provided \nto wholesale transmission customers to the extent they do not have Large Load customers, or \nrelatively fewer Large Load customers, driving the upgrades in a specific cluster, based on their \npro rata share of overall NITS load.  The credit would be funded by the large loads (specifically, \nthe Electric Distribution Company/Load Serving Entity representing those Large Loads) with \nrelatively greater Large Load customers in a cluster through a surcharge to those entities.  \nRegardless, the PJM Transmission Owners commit to include their proposed direct wholesale \ncustomer protection mechanisms in the compliance filings. \n5. \nSchedule 12, Section (f) Produces Just and Reasonable Rates and is \nnot Unduly Discriminatory or Preferential. \nThe proposed tariff revisions in Schedule 12, Section (f) satisfy the just and reasonable \nstandard of FPA section 205 because they align cost responsibility with cost causation and benefits \nat every step.  The Commission identified the central risk in this proceeding as the shifting of large \nload-driven transmission costs onto “other transmission customers that neither caused the need for \nnor benefit commensurately from those Network Upgrades.”208  The Commission further observed \nthat, when Network Upgrade costs are rolled into a Transmission Owner’s revenue requirement, \ntransmission customers other than the Eligible Customer may bear a portion of those costs.209  As \ndiscussed above, the PJM Transmission Owners’ proposal addresses these concerns through a \ncombination of the proportional impact methodology, 15-year cost allocation transition \nmechanism, and the assessment and crediting of the Interconnection Reliability Reinforcement and \nGenerator Reliability Recovery Fees.  These provisions will work in tandem with the proposed \nCRA or similar agreements to protect against the risk of shifting costs to transmission customers \nfor facilities from which they receive no benefit.210 \nThe resulting rates are also cost-based and verifiable.  Every input to the charge and the \nfee, from the revenue requirement to the cost of capital, comes from Transmission Owner formula \nrates already on file with the Commission, and annual recalculation and public posting keep the \ncharges current and transparent.211  The Commission therefore has a clear basis on which to find \nthat proposed Schedule 12, Section (f) yields just and reasonable rates. \nSection (f) appropriately distinguishes between generation and Large Load-related \ntransmission service requests while providing a consistent basis for measuring their respective \ncontributions to the need for IRRs.  Requests included in the same Cycle are evaluated using the \nsame distribution factor-based methodology, thresholds, and weighting rules, ensuring that their \nrelative electrical impacts are measured on a consistent basis.212  That common measurement does \nnot, however, equate generation and Large Load customers for rate design purposes.  Rather, the \n \n208  \nShow Cause Order at P 81. \n209  \nId. at P 61. \n210  \nProposed Schedule 12, Sections (f)(1), (f)(2)(C), (f)(3), (f)(5). \n211  \nId. at Sections (f)(2)(D), (f)(3)(A)-(B). \n212  \nId. at Section (f)(2)(A)-(C)."},{"page":45,"startToken":20683,"endToken":21171,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 45 \n \n \n \n \nproposed tariff provisions assign and recover the resulting costs consistent with longstanding rate \nstructures while accounting for the portfolio nature of IRRs that will be identified in PJM’s Fast \nEnergization Process: IRRs will be rolled into Zonal transmission rates and recovered from \ntransmission customers through the Interconnection Reliability Reinforcement Charge, while \nGenerator Interconnection Customers bear a fair share of IRR costs through the Generator \nReliability Reinforcement Fee.213  The proposal thus distinguishes between generation and load \nwhere their differing circumstances warrant different rate treatment, while applying a consistent \ncost causation methodology to determine their respective contributions to the IRRs. \nSection (f) also resolves a potential source of discrimination the Commission identified in \nthe Co-Located Load Paper Hearing Order.  There, the Commission found that the lack of clear \ntariff provisions led to disparate treatment because Transmission Owners took different approaches \nand created the risk that costs would not be allocated consistent with cost causation principles.214  \nSection (f) adopts a uniform rule applied across the PJM region.  At the same time, Section (f) \nconfines itself to Commission-jurisdictional transmission rates, which the Commission has found \nare directly affected by the costs of upgrades needed to serve Large Loads,215 and it leaves \nundisturbed state ratepayer protections such as state-jurisdictional Large Load tariffs.216 \nFor these reasons, the Commission should find that proposed revisions to Section (f) of \nSchedule 12 are just and reasonable and not unduly discriminatory or preferential and they satisfy \nthe Show Cause Order’s directives regarding cost transparency, mitigation of cost shifting among \ntransmission customers, and the crediting of Large Load payments toward transmission revenue \nrequirements. \nIV. \nEFFECTIVE DATE AND IMPLEMENTATION \nThe PJM Transmission Owners understand that PJM intends to request an effective date of \nMarch 16, 2027 for the proposed revisions to Parts I, III, VI, VII, IX, XI, Attachment F-3, \nAttachment F-3A, Attachment F-4, and certain parts of Part VIII to the Tariff.  For the remaining \nPart VIII revisions associated with the Fast Energization Process, PJM intends to request an \nindeterminate effective date of 12/31/9998, rather than the effective date requested in its August \n17 Compliance Filing (for which PJM requested a March 16, 2027 effective date).  The PJM \nTransmission Owners further understand that PJM intends to request a 60-day comment period for \nits companion filing.   \nAccordingly, given the interrelated nature of the filings, the PJM Transmission Owners \nrequest an effective date of March 16, 2027 for their proposed revisions to Tariff, Part XI and \nSchedules 20, 21, and 22, and an effective date of 12/31/9998 for the proposed pro forma CRA \n(Part IX, Subpart P); Tariff, Part VIII, Subpart N, section 441; and Schedule 12 revisions proposed \n \n213  \nId. at Sections (f)(2)(C)(1)-(2), (f)(4), and (f)(6). \n214  \nCo-Located Load Paper Hearing Order at P 59. \n215  \nShow Cause Order at P 68. \n216  \nId. at n.175."},{"page":46,"startToken":21171,"endToken":21470,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 46 \n \n \n \n \nin this filing.  The PJM Transmission Owners also request that the Commission establish the same \ncomment date for the instant filing that it establishes for PJM’s filing. \nTo the extent that implementation of a particular provision proposed by the PJM \nTransmission Owners depends on a service, process, definition, or study output proposed in PJM’s \ncompanion filing, the PJM Transmission Owners request coordinated implementation of the \ncorresponding provisions.  Such coordination would be limited to provisions that are operational \ndependent on PJM’s proposal and would not affect the independent basis for accepting the \nremaining PJM Transmission Owner provisions under section 205. \nIf the Commission modifies or rejects a provision in PJM’s companion filing on which an \notherwise acceptable PJM Transmission Owner provision depends, the PJM Transmission Owners \nrequest leave to submit any limited conforming revisions necessary to implement the \nCommission’s determinations. \nV. \nADDITIONAL FILING INFORMATION \nA. \nRequest for Waiver. \nTo the extent necessary, the PJM Transmission Owners request waiver of the requirement \nto submit the cost of service data required by 18 C.F.R. § 35.13.  Moreover, the information \nsubmitted with this filing substantially complies with the requirements of Part 35 of the \nCommission’s regulations applicable to filings of this type.  The PJM Transmission Owners \nrequest waiver of any applicable requirement of Part 35 for which a waiver is not specifically \nrequested, as necessary, in order to permit this filing to become effective as proposed. \nB. \nDocuments Submitted With This Filing. \nThe PJM Transmission Owners submit the following materials: \n1. Attachment A: Clean Tariff Records \n2. Attachment B: Marked Tariff Records \n3. Exhibit No. PTO-0001: Direct Joint Testimony of Peter Blazunas and Hanhan Hammer \n4. Exhibit No. PTO-0002: Professional Backgrounds and Experience \n5. Exhibit No. PTO-0003: Support for 15-year Allocation Period"},{"page":47,"startToken":21470,"endToken":21788,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 47 \n \n \n \n \nC. \nCommunications. \nCommunications regarding this filing should be addressed to the following individuals, \nwhose names should be entered on the official service list maintained by the Secretary for this \nproceeding: \nPulin Shah  \nVice President, Transmission \nDevelopment \nEXELON CORPORATION \n2301 Market Street  \nPhiladelphia, PA 19103   \nPulin.Shah@exeloncorp.com \nChair of the Transmission Owners \nAgreement Administrative Committee \n \n \n \nAlejandro Bautista \nAssistant General Counsel \nEXELON CORPORATION \n2301 Market Street \nPhiladelphia, PA 19103  \nAlejandro.Bautista@exeloncorp.com \nMichael Kunselman  \nRichard P. Sparling \nJonathan A. Namazi \nMargaret Smilowitz \nDavis Wright Tremaine LLP \n1301 K Street NW  \nSuite 500 East  \nWashington, DC 20005 \nmichaelkunselman@dwt.com \nricksparling@dwt.com \njonathannamazi@dwt.com \nmargaretsmilowitz@dwt.com \n \nD. \nService. \n \nPJM has served a copy of this filing on all PJM Members and on all state utility regulatory \ncommissions in the PJM Region by posting this filing electronically.  In accordance with the \nCommission’s regulations,217 PJM will post a copy of this filing to the FERC filings section of its \ninternet site, https://www.pjm.com/library/filing-order, and will send an e-mail on the same date \nas this filing to all PJM Members and all state utility regulatory commissions in the PJM Region,218 \nalerting them that this filing has been made by PJM and is available by following such link.  If the \ndocument is not immediately available by using the referenced link, the document will be available \nthrough the referenced link within 24 hours of the filing.  Also, a copy of this filing will be available \non the Commission’s eLibrary website located at the following link: http://www.ferc.gov/docs-\nfiling/elibrary.asp in accordance with the Commission’s regulations and Order No. 714. \n \n \n \n \n217  \nSee 18 C.F.R §§ 35.2(e) and 385.2010(f)(3). \n218  \nPJM already maintains, updates, and regularly uses e-mail lists for all PJM members and affected state \ncommissions."},{"page":48,"startToken":21788,"endToken":21864,"text":"Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 48 \n \n \n \n \nVI. \nCONCLUSION \n \n \nFor the reasons stated herein, the PJM Transmission Owners respectfully request that the \nCommission accept the Tariff revisions without hearing, modification or condition.  \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n/s/ Michael Kunselman \nMichael Kunselman \nRichard P. Sparling  \nJonathan A. Namazi \nMargaret Smilowitz \nDavis Wright Tremaine LLP  \n1301 K Street NW  \nSuite 500 East  \nWashington, DC 20005 \n \n \n \n \n \n \n \n \n \n \n \nAttorneys for The FirstEnergy  \n \n \n \n \n \n \n \n Transmission Companies \n \n \n \n \n \n \n \n \nOn behalf of the PJM Transmission Owners"},{"page":49,"startToken":21864,"endToken":21878,"text":"Attachment A \nRevisions to the  \nPJM Open Access Transmission Tariff  \n(Clean Format) \nPage 1"},{"page":50,"startToken":21878,"endToken":22108,"text":"Definitions – R - S\nRamping Capability:\n“Ramping Capability” shall mean the sustained rate of change of generator output, in megawatts \nper minute.\nReal-time Congestion Price:\n“Real-time Congestion Price” shall mean the Congestion Price resulting from the Office of the \nInterconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReal-time Loss Price:\n“Real-time Loss Price” shall mean the Loss Price resulting from the Office of the \nInterconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReal-time Energy Market:\n“Real-time Energy Market” shall mean the purchase or sale of energy and payment of \nTransmission Congestion Charges for quantity deviations from the Day-ahead Energy Market in \nthe Operating Day.\nReal-time Offer:\n“Real-time Offer” shall mean a new offer or an update to a Market Seller’s existing cost-based or \nmarket-based offer for a clock hour, submitted for use after the close of the Day-ahead Energy \nMarket.\nReal-time Prices:\n“Real-time Prices” shall mean the Locational Marginal Prices resulting from the Office of the \nInterconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReal-time Settlement Interval:\n“Real-time Settlement Interval” shall mean the interval used by settlements, which shall be every \nfive minutes.\nReal-time System Energy Price:\n“Real-time System Energy Price” shall mean the System Energy Price resulting from the Office \nof the Interconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReasonable Efforts:\nPage 2"},{"page":51,"startToken":22108,"endToken":22412,"text":"“Reasonable Efforts” shall mean, with respect to any action required to be made, attempted, or \ntaken by an Interconnection Party or by a Construction Party under Tariff, Part IV or Part VI, an \nInterconnection Service Agreement, or a Construction Service Agreement, such efforts as are \ntimely and consistent with Good Utility Practice and with efforts that such party would undertake \nfor the protection of its own interests.\nReceiving Party:\n“Receiving Party” shall mean the entity receiving the capacity and energy transmitted by the \nTransmission Provider to Point(s) of Delivery.\nReferral:\n“Referral” shall mean a formal report of the Market Monitoring Unit to the Commission for \ninvestigation of behavior of a Market Participant, of behavior of PJM, or of a market design \nflaw, pursuant to Tariff, Attachment M, section IV.I.\nReference Resource:\n“Reference Resource” shall mean a combustion turbine generating station, configured with a \nsingle General Electric Frame 7HA turbine with evaporative cooling, Selective Catalytic \nReduction technology all CONE Areas, dual fuel capability, and a heat rate of 9.134 Mmbtu/ \nMWh. \nRegional Entity:\n“Regional Entity” shall have the same meaning specified in the Operating Agreement.\nRegional Transmission Expansion Plan:\n“Regional Transmission Expansion Plan” shall mean the plan prepared by the Office of the \nInterconnection pursuant to Operating Agreement, Schedule 6 for the enhancement and \nexpansion of the Transmission System in order to meet the demands for firm transmission \nservice in the PJM Region.\nRegional Transmission Group (RTG):\n“Regional Transmission Group” or “RTG” shall mean a voluntary organization of transmission \nowners, transmission users and other entities approved by the Commission to efficiently \ncoordinate transmission planning (and expansion), operation and use on a regional (and \ninterregional) basis.\nRegulation:\n“Regulation” shall mean the capability of a specific generation resource or Demand Resource \nwith appropriate telecommunications, control and response capability to separately increase and \nPage 3"},{"page":52,"startToken":22412,"endToken":22767,"text":"decrease its output or adjust load in response to a regulating control signal, in accordance with \nthe specifications in the PJM Manuals.  Regulation is inclusive of Regulation-Down Service and \nRegulation-Up Service.\nRegulation-Down Requirement:\n“Regulation-Down Requirement” shall mean the required megawatts of performance-adjusted \nRegulation-Down Service capability to be maintained in a Regulation Zone. The Regulation-\nDown Requirement is defined as a set megawatt value by hour in accordance with the PJM \nManuals, and can increase to account for additional operational uncertainty.\nRegulation-Down Service\n“Regulation-Down Service” shall mean the capability of a specific generation resource or \nDemand Resource with appropriate telecommunications and response capability to increase and \ndecrease its output in the downward range from a set point or adjust load in response to a \nregulating-down control signal, in accordance with the specification in the PJM Manuals.\nRegulation-Up Requirement:\n“Regulation-Up Requirement” shall mean the required megawatts of performance-adjusted\nRegulation-Up Service capability to be maintained in a Regulation Zone. The Regulation-Up\nRequirement is defined as a set megawatt value by hour in accordance with the PJM Manuals,\nand can increase to account for additional operational uncertainty.\nRegulation-Up Service\n“Regulation-Up Service” shall mean the capability of a specific generation resource or Demand\nResource with appropriate telecommunications and response capability to increase and decrease\nits output in the upward range from a set point or adjust load in response to a regulating-up\ncontrol signal, in accordance with the specification in the PJM Manuals.\nRegulation Zone:\n“Regulation Zone” shall mean any of those one or more geographic areas, each consisting of a \ncombination of one or more Control Zone(s) as designated by the Office of the Interconnection \nin the PJM Manuals, relevant to provision of, and requirements for, regulation service.\nRelevant Electric Retail Regulatory Authority:\n“Relevant Electric Retail Regulatory Authority” shall mean an entity that has jurisdiction over \nand establishes prices and policies for competition for providers of retail electric service to end-\ncustomers, such as the city council for a municipal utility, the governing board of a cooperative \nutility, the state public utility commission or any other such entity.\nReliability Assurance Agreement or PJM Reliability Assurance Agreement:\nPage 4"},{"page":53,"startToken":22767,"endToken":23163,"text":"“Reliability Assurance Agreement” or “PJM Reliability Assurance Agreement” shall mean that \ncertain Reliability Assurance Agreement Among Load Serving Entities in the PJM Region, on \nfile with FERC as PJM Interconnection L.L.C. Rate Schedule FERC No. 44, and as amended \nfrom time to time thereafter.\nReliability Pricing Model Auction:\n“Reliability Pricing Model Auction” or “RPM Auction” shall mean the Base Residual Auction or \nany Incremental Auction, or, for the 2016/2017 and 2017/2018 Delivery Years, any Capacity \nPerformance Transition Incremental Auction.\nRequired Transmission Enhancements:\n“Regional Transmission Enhancements” shall mean enhancements and expansions of the \nTransmission System that (1) a Regional Transmission Expansion Plan developed pursuant to \nOperating Agreement, Schedule 6 or (2) any joint planning or coordination agreement between \nPJM and another region or transmission planning authority set forth in Tariff, Schedule 12-\nAppendix B (“Appendix B Agreement”) designates one or more of the Transmission Owner(s) to \nconstruct and own or finance.  Required Transmission Enhancements shall also include \nenhancements and expansions of facilities in another region or planning authority that meet the \ndefinition of transmission facilities pursuant to FERC’s Uniform System of Accounts or have \nbeen classified as transmission facilities in a ruling by FERC addressing such facilities \nconstructed pursuant to an Appendix B Agreement cost responsibility for which has been \nassigned at least in part to PJM pursuant to such Appendix B Agreement. \nReserved Capacity:\n“Reserved Capacity” shall mean the maximum amount of capacity and energy that the \nTransmission Provider agrees to transmit for the Transmission Customer over the Transmission \nProvider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery \nunder Tariff, Part II.  Reserved Capacity shall be expressed in terms of whole megawatts on a \nsixty (60) minute interval (commencing on the clock hour) basis.\nReserve Penalty Factor:\n“Reserve Penalty Factor” shall mean the cost, in $/MWh, associated with being unable to meet a \nspecific reserve requirement in a Reserve Zone or Reserve Sub-zone.  A Reserve Penalty Factor \nwill be defined for each reserve requirement in a Reserve Zone or Reserve Sub-zone.\nReserve Sub-zone:\n“Reserve Sub-zone” shall mean any of those geographic areas wholly contained within a Reserve \nZone, consisting of a combination of a portion of one or more Control Zone(s) as designated by \nthe Office of the Interconnection in the PJM Manuals, relevant to provision of, and requirements \nfor, reserve service.\nPage 5"},{"page":54,"startToken":23163,"endToken":23509,"text":"Reserve Zone:\n“Reserve Zone” shall mean any of those geographic areas consisting of a combination of one or \nmore Control Zone(s), as designated by the Office of the Interconnection in the PJM Manuals, \nrelevant to provision of, and requirements for, reserve service.\nResidual Auction Revenue Rights:\n“Residual Auction Revenue Rights” shall mean incremental stage 1 Auction Revenue Rights \ncreated within a Planning Period by an increase in transmission system capability, including the \nreturn to service of existing transmission capability, that was not modeled pursuant to Operating \nAgreement, Schedule 1, section 7.5 and the parallel provisions of  Tariff, Attachment K-\nAppendix, section 7.5 in compliance with Operating Agreement, Schedule 1, section 7.4.2 (h) \nand the parallel provisions of Tariff, Attachment K-Appendix, section 7.4.2(h), and, if modeled, \nwould have increased the amount of stage 1 Auction Revenue Rights allocated pursuant to \nOperating Agreement, Schedule 1, section 7.4.2 and the parallel provisions of Tariff, Attachment \nK-Appendix, section 7.4.2; provided that, the foregoing notwithstanding, Residual Auction \nRevenue Rights shall exclude: 1) Incremental Auction Revenue Rights allocated pursuant to \nTariff, Part VI;  and 2) Auction Revenue Rights allocated to entities that are assigned cost \nresponsibility pursuant to Operating Agreement, Schedule 6 for  transmission upgrades that \ncreate such rights.\nResidual Metered Load:\n“Residual Metered Load” shall mean all load remaining in an electric distribution company’s \nfully metered franchise area(s) or service territory(ies) after all nodally priced load of entities \nserving load in such area(s) or territory(ies) has been carved out.\nResource Substitution Charge:\n“Resource Substitution Charge” shall mean a charge assessed on Capacity Market Buyers in an \nIncremental Auction to recover the cost of replacement Capacity Resources.\nResponsible Customer: \n“Responsible Customer” shall mean customers using Interim Network Integration Transmission \nService, Firm Contract Demand Transmission Service, Non-Firm Contract Demand \nTransmission Service, Point-to-Point Transmission Service and/or Network Integration \nTransmission Service and Merchant Transmission Facility owners, which are assigned cost \nresponsibility for Transmission Enhancement Charges as determined pursuant to Tariff, \nSchedule 12.\nRevenue Data for Settlements:\nPage 6"},{"page":55,"startToken":23509,"endToken":23802,"text":"“Revenue Data for Settlements” shall mean energy quantities used in accounting and billing as \ndetermined pursuant to Tariff, Attachment K-Appendix and the corresponding provisions of \nOperating Agreement, Schedule 1.\nRPM Seller Credit:\n“RPM Seller Credit” shall mean an additional form of Unsecured Credit defined in Tariff, \nAttachment Q, section IV.\nScheduled Incremental Auctions:\n“Scheduled Incremental Auctions” shall refer to the First, Second, or Third Incremental Auction.\nSchedule of Work:\n“Schedule of Work” shall mean that schedule attached to the Interconnection Construction \nService Agreement setting forth the timing of work to be performed by the Constructing Entity \npursuant to the Interconnection Construction Service Agreement, based upon the Facilities Study \nand subject to modification, as required, in accordance with Transmission Provider’s scope \nchange process for interconnection projects set forth in the PJM Manuals.\nScope of Work:\n“Scope of Work” shall mean that scope of the work attached as a schedule to the Interconnection \nConstruction Service Agreement and to be performed by the Constructing Entity(ies) pursuant to \nthe Interconnection Construction Service Agreement, provided that such Scope of Work may be \nmodified, as required, in accordance with Transmission Provider’s scope change process for \ninterconnection projects set forth in the PJM Manuals.\nSeasonal Capacity Performance Resource:\n“Seasonal Capacity Performance Resource” shall have the same meaning specified in Tariff, \nAttachment DD, section 5.5A.\nSeasonal Facility Rating:\n“Seasonal Facility Rating” shall mean a Transmission Facility Rating that:  \n(a) Applies to a specified season, where seasons are defined by the Office of the Interconnection \nto include not fewer than four seasons in each year, and to reasonably reflect portions of the year \nwhere expected high temperatures are relatively consistent.\n(b) Reflects an up-to-date forecast of ambient air temperature across the relevant season over \nwhich the rating applies.\nPage 7"},{"page":56,"startToken":23802,"endToken":24153,"text":"(c) Is evaluated annually, if not more frequently, for each season in the future for which \nTransmission Service can be requested\nSecondary Reserve: \n“Secondary Reserve” shall mean the reserve capability of generation resources that can be \nconverted fully into energy or Economic Load Response Participant resources whose demand \ncan be reduced within 30 minutes (less the capability of such resources to provide Primary \nReserve), from the request of the Office of the Interconnection, regardless of whether the \nequipment providing the reserve is electrically synchronized to the Transmission System or not.\nSecondary Systems:\n“Secondary Systems” shall mean control or power circuits that operate below 600 volts, AC or \nDC, including, but not limited to, any hardware, control or protective devices, cables, \nconductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and \nvoltage and current transformers.\nSecond Incremental Auction:\n“Second Incremental Auction” shall mean an Incremental Auction conducted ten months before \nthe Delivery Year to which it relates.  \nSecurity:\n“Security” shall mean the security provided by the New Service Customer pursuant to Tariff, \nsection 212.4 or Tariff, Part VI, section 213.4 to secure the New Service Customer’s \nresponsibility for Costs under the Interconnection Service Agreement or Upgrade Construction \nService Agreement and Tariff, Part VI, section 217. \nSegment:\n“Segment” shall have the same meaning as described in Operating Agreement, Schedule 1, \nsection 3.2.3(e).\nSelf-Supply:\n“Self-Supply” shall mean Capacity Resources secured by a Load-Serving Entity, by ownership \nor contract, outside a Reliability Pricing Model Auction, and used to meet obligations under this \nAttachment or the Reliability Assurance Agreement through submission in a Base Residual \nAuction or an Incremental Auction of a Sell Offer indicating such Market Seller’s intent that \nsuch Capacity Resource be Self-Supply.  Self-Supply may be either committed regardless of \nclearing price or submitted as a Sell Offer with a price bid. A Load Serving Entity's Sell Offer \nwith a price bid for an owned or contracted Capacity Resource shall not be deemed “Self-\nSupply,” unless it is designated as Self-Supply and used by the LSE to meet obligations under \nthis Attachment or the Reliability Assurance Agreement.\nPage 8"},{"page":57,"startToken":24153,"endToken":24527,"text":"Self-Supply Entity:\n“Self-Supply Entity” shall mean the following types of Load Serving Entity that operate under \nlong-standing business models: single customer entity, public power entity, or vertically \nintegrated utility, where “vertically integrated utility” means a utility that owns generation, \nincludes such generation in its regulated rates, and earns a regulated return on its investment in \nsuch generation or receives any cost recovery for such generation through bilateral contracts; \n“single customer entity”  means a Load Serving Entity that serves at retail only customers that \nare under common control with such Load Serving Entity, where such control means holding \n51% or more of the voting securities or voting interests of the Load Serving Entity and all its \nretail customers; and “public power entity” means cooperative and municipal utilities, including \npublic power supply entities comprised of either or both of the same and rural electric \ncooperatives, and joint action agencies.\nSelf-Supply Seller:\n“Self-Supply Seller” shall mean, for purposes of evaluating Buyer-Side Market Power, the \nfollowing types of Load Serving Entities that operate under long-standing business models: \nvertically integrated utility or public power entity, where “vertically integrated utility” means a \nutility that owns generation, includes such generation in its state-regulated rates, and earns a \nstate-regulated return on its investment in such generation; and “public power entity” means \nelectric cooperatives that are either rate regulated by the state or have their long-term resource \nplan approved or otherwise reviewed and accepted by a Relevant Electric Retail Regulatory \nAuthority and municipal utilities or joint action agencies that are subject to direct regulation by a \nRelevant Electric Retail Regulatory Authority.\nSell Offer:\n“Sell Offer” shall mean an offer to sell Capacity Resources in a Base Residual Auction, \nIncremental Auction, or Reliability Backstop Auction.\nService Agreement:\n“Service Agreement” shall mean the initial agreement and any amendments or supplements \nthereto entered into by the Transmission Customer and the Transmission Provider for service \nunder the Tariff.\nService Commencement Date:\n“Service Commencement Date” shall mean the date the Transmission Provider begins to provide \nservice pursuant to the terms of an executed Service Agreement, or the date the Transmission \nProvider begins to provide service in accordance with Tariff, Part II, section 15.3 or Tariff, Part \nIII, section 29.1.\nShort-Term Firm Point-To-Point Transmission Service:\nPage 9"},{"page":58,"startToken":24527,"endToken":24941,"text":"“Short-Term Firm Point-To-Point Transmission Service” shall mean Firm Point-To-Point \nTransmission Service under Tariff, Part II with a term of less than one year.\nShort-term Project:\n“Short-term Project” shall have the same meaning provided in the Operating Agreement.\nShort-Term Resource Procurement Target:\n“Short-Term Resource Procurement Target” shall mean, for Delivery Years through May 31, \n2018, as to the PJM Region, for purposes of the Base Residual Auction, 2.5% of the PJM Region \nReliability Requirement determined for such Base Residual Auction,  for purposes of the First \nIncremental Auction, 2% of the of the PJM Region Reliability Requirement as calculated at the \ntime of the Base Residual Auction; and, for purposes of the Second Incremental Auction, 1.5% \nof the of the PJM Region Reliability Requirement as calculated at the time of the Base Residual \nAuction; and, as to any Zone, an allocation of the PJM Region Short-Term Resource \nProcurement Target based on the Preliminary Zonal Forecast Peak Load, reduced by the amount \nof load served under the FRR Alternative.  For any LDA, the LDA Short-Term Resource \nProcurement Target shall be the sum of the Short-Term Resource Procurement Targets of all \nZones in the LDA.\nShort-Term Resource Procurement Target Applicable Share:\n“Short-Term Resource Procurement Target Applicable Share” shall mean, for Delivery Years \nthrough May 31, 2018: (i) for the PJM Region, as to the First and Second Incremental Auctions, \n0.2 times the Short-Term Resource Procurement Target used in the Base Residual Auction and, \nas to the Third Incremental Auction for the PJM Region, 0.6 times such target; and (ii) for an \nLDA, as to the First and Second Incremental Auctions, 0.2 times the Short-Term Resource \nProcurement Target used in the Base Residual Auction for such LDA and, as to the Third \nIncremental Auction, 0.6 times such target. \nSite:\n“Site” shall mean all of the real property, including but not limited to any leased real property \nand easements, on which the Customer Facility is situated and/or on which the Customer \nInterconnection Facilities are to be located.\nSmall Commercial Customer:\n“Small Commercial Customer,” as used in RAA, Schedule 6 and Tariff, Attachment DD-1, shall \nmean a commercial retail electric end-use customer of an electric distribution company that \nparticipates in a mass market demand response program under the jurisdiction of a RERRA and \nsatisfies the definition of a “small commercial customer” under the terms of the applicable \nRERRA’s program, provided that the customer has an annual peak demand no greater than \n100kW.\nPage 10"},{"page":59,"startToken":24941,"endToken":25222,"text":"Small Generation Resource:\n“Small Generation Resource” shall mean an Interconnection Customer’s device of 20 MW or \nless for the production and/or storage for later injection of electricity identified in an \nInterconnection Request, but shall not include the Interconnection Customer’s Interconnection \nFacilities.  This term shall include Energy Storage Resources and/or other devices for storage for \nlater injection of energy.\nSmall Inverter Facility:\n“Small Inverter Facility” shall mean an Energy Resource that is a certified small inverter-based \nfacility no larger than 10 kW.\nSmall Inverter ISA:\n“Small Inverter ISA” shall mean an agreement among Transmission Provider, Interconnection \nCustomer, and Interconnected Transmission Owner regarding interconnection of a Small Inverter \nFacility under Tariff, Part IV, section 112B.\nSpecial Member:\n“Special Member” shall mean an entity that satisfies the requirements of Operating Agreement, \nSchedule 1, section 1.5A.02, and the parallel provisions of Tariff, Attachment K-Appendix, \nsection 1.5A.02, or the special membership provisions established under the Emergency Load \nResponse and Pre-Emergency Load Response Programs.\nSpot Market Backup:\n“Spot Market Backup” shall mean the purchase of energy from, or the delivery of energy to, the \nPJM Interchange Energy Market in quantities sufficient to complete the delivery or receipt \nobligations of a bilateral contract that has been curtailed or interrupted for any reason.\nSpot Market Energy:\n“Spot Market Energy” shall mean energy bought or sold by Market Participants through the PJM \nInterchange Energy Market at System Energy Prices determined as specified in Operating \nAgreement, Schedule 1, section 2, and the parallel provisions of Tariff, Attachment K-Appendix, \nsection 2.\nStart Additional Labor Costs:\n“Start Additional Labor Costs” shall mean additional labor costs for startup required above \nnormal station manning levels. \nStart Fuel:\nPage 11"},{"page":60,"startToken":25222,"endToken":25594,"text":"For units without a soak process, “Start Fuel” shall consist of fuel consumed from first fire of the \nstart process to first breaker closing, plus any fuel expended from last breaker opening to \nshutdown.\nFor units with a soak process, “Start Fuel” is fuel consumed from first fire of the start process \n(initial reactor criticality for nuclear units) to dispatchable output (including auxiliary boiler \nfuel), plus any fuel expended from last breaker opening to shutdown, excluding normal plant \nheating/auxiliary equipment fuel requirements.  Start Fuel included for each temperature state \nfrom breaker closure to dispatchable output shall not exceed the unit specific soak time period \nreviewed and approved as part of the unit-specific parameter process detailed in Tariff, \nAttachment K-Appendix, section 6.6(c) or the defaults below:\n•\nCold Soak Time = 0.73 * unit specific Minimum Run Time (in hours)\n•\nIntermediate Soak Time = 0.61 * unit specific Minimum Run Time (in hours)\n•\nHot Soak Time = 0.43 * unit specific Minimum Run Time (in hours)  \nStart-Up Costs:\n“Start-Up Costs” shall consist primarily of the cost of fuel, as determined by the unit’s start heat \ninput (adjusted by the performance factor) times the fuel cost.  It also includes operating costs, \nMaintenance Adders, emissions allowances/adders, and station service cost.  Start-Up Costs can \nvary with the unit offline time being categorized in three unit temperature conditions: hot, \nintermediate and cold.\nFor units with a steam turbine and a soak process (nuclear, steam, and combined cycle), “Start \nFuel” is fuel consumed from first fire of start process (initial reactor criticality for nuclear units): \nStart-Up Costs shall mean the net unit costs from PJM’s notification to the level at which the unit \ncan follow PJM’s dispatch, and from last breaker open to shutdown.\nFor units without a steam turbine and no soak process (engines, combustion turbines, \nIntermittent Resources, and Energy Storage Resources): Start-Up Costs shall mean the unit costs \nfrom PJM’s notification to first breaker close and from last breaker open to shutdown.  \nState:\n“State” shall mean the District of Columbia and any State or Commonwealth of the United \nStates.\nState Commission:\n“State Commission” shall mean any state regulatory agency having jurisdiction over retail \nelectricity sales in any State in the PJM Region.\nState Estimator:\nPage 12"},{"page":61,"startToken":25594,"endToken":26187,"text":"“State Estimator” shall mean the computer model of power flows specified in Operating \nAgreement, Schedule 1, section 2.3 and the parallel provisions of Tariff, Attachment K-\nAppendix, section 2.3.\nState Subsidy:\n“State Subsidy” shall mean a direct or indirect payment, concession, rebate, subsidy, non-\nbypassable consumer charge, or other financial benefit that is as a result of any action, mandated \nprocess, or sponsored process of a state government, a political subdivision or agency of a state, \nor an electric cooperative formed pursuant to state law, and that \n(1) is derived from or connected to the procurement of (a) electricity or electric \ngeneration capacity sold at wholesale in interstate commerce, or (b) an attribute of the \ngeneration process for electricity or electric generation capacity sold at wholesale in \ninterstate commerce; or\n(2) will support the construction, development, or operation of a new or existing Capacity \nResource; or \n(3) could have the effect of allowing the unit to clear in any PJM capacity auction. \nNotwithstanding the foregoing, State Subsidy shall not include (a) payments, concessions, \nrebates, subsidies, or incentives designed to incent, or participation in a program, contract or \nother arrangement that utilizes criteria designed to incent or promote, general industrial \ndevelopment in an area or designed to incent siting facilities in that county or locality rather than \nanother county or locality; (b) state action that imposes a tax or assesses a charge utilizing the \nparameters of a regional program on a given set of resources notwithstanding the tax or cost \nhaving indirect benefits on resources not subject to the tax or cost (e.g., Regional Greenhouse \nGas Initiative); (c) any indirect benefits to a Capacity Resource as a result of any transmission \nproject approved as part of the Regional Transmission Expansion Plan; (d) any contract, legally \nenforceable obligation, or rate pursuant to the Public Utility Regulatory Policies Act or any other \nstate-administered federal regulatory program (e.g., the Cross-State Air Pollution Rule); (e) any \nrevenues from the sale or allocation, either direct or indirect, to an Entity Providing Supply \nServices to Default Retail Service Provider where such entity’s obligations was awarded through \na state default procurement auction that was subject to independent oversight by a consultant or \nmanager who certifies that the auction was conducted through a non-discriminatory and \ncompetitive bidding process, subject to the below condition, and provided further that nothing \nherein would exempt a Capacity Resource that would otherwise be subject to the minimum offer \nprice rule pursuant to this Tariff; (f) any revenues for providing capacity as part of an FRR \nCapacity Plan or through bilateral transactions with FRR Entities; or (g) any voluntary and arm’s \nlength bilateral transaction (including but not limited to those reported pursuant to Tariff, \nAttachment DD, section 4.6), such as a power purchase agreement or other similar contract \nwhere the buyer is a Self-Supply Entity and the transaction is (1) a short term transaction (one-\nyear or less) or (2) a long-term transaction that is the result of a competitive process that was not \nfuel-specific and is not used for the purpose of supporting uneconomic construction, \ndevelopment, or operation of the subject Capacity Resource, provided however that if the Self-\nSupply Entity is responsible for offering the Capacity Resource into an RPM Auction, the \nspecified amount of installed capacity purchased by such Self-Supply Entity shall be considered \nto receive a State Subsidy in the same manner, under the same conditions, and to the same extent \nas any other Capacity Resource of a Self-Supply Entity.  For purposes of subsection (e) of this \nPage 13"},{"page":62,"startToken":26187,"endToken":26599,"text":"definition, a state default procurement auction that has been certified to be a result of a non-\ndiscriminatory and competitive bidding process shall:\n(i)\nhave no conditions based on the ownership (except supplier diversity \nrequirements or limits), location (except to meet PJM deliverability \nrequirements), affiliation, fuel type, technology, or emissions of any resources or \nsupply (except state-mandated renewable portfolio standards for which Capacity \nResources are separately subject to the minimum offer price rule or eligible for an \nexemption);\n(ii)\nresult in contracts between an Entity Providing Supply Services to Default Retail \nService Provider and the electric distribution company for a retail default \ngeneration supply product and none of those contracts require that the retail \nobligation be sourced from any specific Capacity Resource or resource type as set \nforth in subsection (i) above; and\n(iii)\nestablish market-based compensation for a retail default generation supply \nproduct that retail customers can avoid paying for by obtaining supply from a \ncompetitive retail supplier of their choice.\nState of Charge:\n“State of Charge” shall mean the quantity of physical energy stored in an Energy Storage \nResource Model Participant or in the storage component of a Hybrid Resource in proportion to \nits maximum State of Charge capability. State of Charge is quantified as defined in the PJM \nManuals.\nState of Charge Management:\n“State of Charge Management” shall mean the control of State of Charge of an Energy Storage \nResource Market Participant or Hybrid Resource using minimum and maximum discharge (and, \nas applicable, charge) limits, changes in operating mode (as applicable), discharging (and, as \napplicable, charging) offer curves, and self-scheduling of non-dispatchable sales (and, as \napplicable, purchases) of energy in the PJM markets.  State of Charge Management shall not \ninterfere with the obligation of a Market Seller of an Energy Storage Resource Model Participant\nor of a Hybrid Resource to follow PJM dispatch, consistent with all other resources.\nStation Power:\n“Station Power” shall mean energy used for operating the electric equipment on the site of a \ngeneration facility located in the PJM Region or for the heating, lighting, air-conditioning and \noffice equipment needs of buildings on the site of such a generation facility that are used in the \noperation, maintenance, or repair of the facility.  Station Power does not include any energy (i) \nused to power synchronous condensers; (ii) used for pumping at a pumped storage facility; (iii) \nused in association with restoration or black start service; or (iv) that is Direct Charging Energy.\nSub-Annual Resource Constraint:\nPage 14"},{"page":63,"startToken":26599,"endToken":27154,"text":"“Sub-Annual Resource Constraint” shall mean, for the 2017/2018 Delivery Year and for FRR \nCapacity Plans the 2017/2018 and 2018/2019 Delivery Years, for the PJM Region or for each \nLDA for which the Office of the Interconnection is required under Tariff, Attachment DD, \nsection 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total \namount of Unforced Capacity that can be committed as Limited Demand Resources and \nExtended Summer Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in \nsuch LDA, calculated as the Sub-Annual Resource Reliability Target for the PJM Region or for \nsuch LDA, respectively, minus the Short-Term Resource Procurement Target for the PJM \nRegion or for such LDA, respectively. \nSub-Annual Resource Price Decrement:\n“Sub-Annual Resource Price Decrement” shall mean, for the 2017/2018 Delivery Year, a \ndifference between the clearing price for Extended Summer Demand Resources and the clearing \nprice for Annual Resources, representing the cost to procure additional Annual Resources out of \nmerit order when the Sub-Annual Resource Constraint is binding. \nSub-Annual Resource Reliability Target: \n“Sub-Annual Reliability Target” for the PJM Region or an LDA, shall mean the maximum \namount of the combination of Extended Summer Demand Resources and Limited Demand \nResources in Unforced Capacity determined by PJM to be consistent with the maintenance of \nreliability, stated in Unforced Capacity, that shall be used to calculate the Minimum Annual \nResource Requirement for Delivery Years through May 31, 2017 and the Sub-Annual Resource \nConstraint for the 2017/2018 and 2018/2019 Delivery Years.  As more fully set forth in the PJM \nManuals, PJM calculates the Sub-Annual Resource Reliability Target, by first determining a \nreference annual loss of load expectation (“LOLE”) assuming no Demand Resources.  The \ncalculation for the unconstrained portion of the PJM Region uses a daily distribution of loads \nunder a range of weather scenarios (based on the most recent load forecast and iteratively \nshifting the load distributions to result in the Installed Reserve Margin established for the \nDelivery Year in question) and a weekly capacity distribution (based on the cumulative capacity \navailability distributions developed for the Installed Reserve Margin study for the Delivery Year \nin question).  The calculation for each relevant LDA uses a daily distribution of loads under a \nrange of weather scenarios (based on the most recent load forecast for the Delivery Year in \nquestion) and a weekly capacity distribution (based on the cumulative capacity availability \ndistributions developed for the Capacity Emergency Transfer Objective study for the Delivery \nYear in question).  For the relevant LDA calculation, the weekly capacity distributions are \nadjusted to reflect the Capacity Emergency Transfer Limit for the Delivery Year in question.\nFor both the PJM Region and LDA analyses, PJM then models the commitment of varying \namounts of DR (displacing otherwise committed generation) as interruptible from May 1 through \nOctober 31 and unavailable from November 1 through April 30 and calculates the LOLE at each \nDR level.  The Extended Summer DR Reliability Target is the DR amount, stated as a percentage \nof the unrestricted peak load, that produces no more than a ten percent increase in the LOLE, \ncompared to the reference value.  The Sub-Annual Resource Reliability Target shall be \nexpressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is \nPage 15"},{"page":64,"startToken":27154,"endToken":27459,"text":"converted to Unforced Capacity by multiplying [the reliability target percentage] times [the \nForecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM \nRegion or such LDA, reduced by the amount of load served under the FRR Alternative].\nSub-meter:\n“Sub-meter” shall mean a metering point for electricity consumption that does not include all \nelectricity consumption for the end-use customer as defined by the electric distribution company \naccount number.  PJM shall only accept sub-meter load data from end-use customers for \nmeasurement and verification of Regulation service as set forth in the Economic Load Response \nrules and PJM Manuals.\nSummer-Period Capacity Performance Resource:\n“Summer-Period Capacity Performance Resource” shall have the same meaning specified in \nTariff, Attachment DD, section 5.5A.\nSurplus Interconnection Customer:\n“Surplus Interconnection Customer” shall mean either an Interconnection Customer whose \nGenerating Facility is already interconnected to the PJM Transmission System or one of its \naffiliates, or an unaffiliated entity that submits a Surplus Interconnection Request to utilize \nSurplus Interconnection Service within the Transmission System in the PJM Region.  A Surplus \nInterconnection Customer is not a New Service Customer.   \nSurplus Interconnection Request:\n“Surplus Interconnection Request” shall mean a request submitted by a Surplus Interconnection \nCustomer, pursuant to Tariff, Attachment RR, to utilize Surplus Interconnection Service within \nthe Transmission System in the PJM Region.  A Surplus Interconnection Request is not a New \nService Request.\nSurplus Interconnection Service:\n“Surplus Interconnection Service” shall mean any unneeded portion of Interconnection Service \nestablished in an Interconnection Service Agreement, such that if Surplus Interconnection \nService is utilized, the total amount of Interconnection Service at the Point of Interconnection \nwould remain the same.\nSwitching and Tagging Rules:\n“Switching and Tagging Rules” shall mean the switching and tagging procedures of \nInterconnected Transmission Owners and Interconnection Customer as they may be amended \nfrom time to time. \nSynchronized Reserve:\nPage 16"},{"page":65,"startToken":27459,"endToken":27834,"text":"“Synchronized Reserve” shall mean the reserve capability of generation resources that can be \nconverted fully into energy or Economic Load Response Participant resources whose demand \ncan be reduced within ten minutes from the request of the Office of the Interconnection \ndispatcher, and is provided by equipment that is electrically synchronized to the Transmission \nSystem.\nSynchronized Reserve Event:\n“Synchronized Reserve Event” shall mean a request from the Office of the Interconnection to \ngeneration resources and/or Economic Load Response Participant resources able, assigned or \nself-scheduled to provide Synchronized Reserve in one or more specified Reserve Zones or \nReserve Sub-zones, within ten minutes, to increase the energy output or reduce load by the \namount of assigned or self-scheduled Synchronized Reserve capability.\nSynchronized Reserve Requirement:\n“Synchronized Reserve Requirement” shall mean the megawatts required to be maintained in a \nReserve Zone or Reserve Sub-zone as Synchronized Reserve, absent any increase to account for \nadditional reserves scheduled to address operational uncertainty.  The Synchronized Reserve \nRequirement is calculated in accordance with the PJM Manuals.  This requirement can only be \nsatisfied by Synchronized Reserve resources.\nSystem Condition:\n“System Condition” shall mean a specified condition on the Transmission Provider’s system or \non a neighboring system, such as a constrained transmission element or flowgate, that may \ntrigger Curtailment of Long-Term Firm Point-to-Point Transmission Service using the \ncurtailment priority pursuant to Tariff, Part II, section 13.6.  Such conditions must be identified \nin the Transmission Customer’s Service Agreement.\nSystem Energy Price:\n“System Energy Price” shall mean the energy component of the Locational Marginal Price, \nwhich is the price at which the Market Seller has offered to supply an additional increment of \nenergy from a resource, calculated as specified in Operating Agreement, Schedule 1, section 2 \nand the parallel provisions of Tariff, Attachment K-Appendix, section 2.\nSystem Impact Study:\n“System Impact Study” shall mean an assessment by the Transmission Provider of (i) the \nadequacy of the Transmission System to accommodate a Completed Application, an \nInterconnection Request or an Upgrade Request, (ii) whether any additional costs may be \nincurred in order to provide such transmission service or to accommodate an Interconnection \nRequest, and (iii) with respect to an Interconnection Request, an estimated date that an \nInterconnection Customer’s Customer Facility can be interconnected with the Transmission \nPage 17"},{"page":66,"startToken":27834,"endToken":28022,"text":"System and an estimate of the Interconnection Customer’s cost responsibility for the \ninterconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested \nsystem upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to \nprovide the requested incremental rights.\nSystem Protection Facilities:\n“System Protection Facilities” shall refer to the equipment required to protect (i) the \nTransmission System, other delivery systems and/or other generating systems connected to the \nTransmission System from faults or other electrical disturbance occurring at or on the Customer \nFacility, and (ii) the Customer Facility from faults or other electrical system disturbance \noccurring on the Transmission System or on other delivery systems and/or other generating \nsystems to which the Transmission System is directly or indirectly connected.  System Protection \nFacilities shall include such protective and regulating devices as are identified in the Applicable \nTechnical Requirements and Standards or that are required by Applicable Laws and Regulations \nor other Applicable Standards, or as are otherwise necessary to protect personnel and equipment \nand to minimize deleterious effects to the Transmission System arising from the Customer \nFacility.\nPage 18"},{"page":67,"startToken":28022,"endToken":28234,"text":"Tariff, Part VIII, Subpart A, section 400\nDefinitions F\nFacilities Study:\n“Facilities Study” shall be an engineering study conducted by the Transmission Provider (in \ncoordination with the affected Transmission Owner(s)) to: (1) determine the required \nmodifications to the Transmission Provider’s Transmission System necessary to implement the \nconclusions of the System Impact Studies; and (2) complete any additional studies or analyses \ndocumented in the System Impact Studies or required by PJM Manuals, and determine the \nrequired modifications to the Transmission Provider's Transmission System based on the \nconclusions of such additional studies.  \nFederal Power Act:\n“Federal Power Act” shall mean the Federal Power Act, as amended, 16 U.S.C. §§ 791a, et seq.\nFERC or Commission:\n“FERC” or “Commission” shall mean the Federal Energy Regulatory Commission or any \nsuccessor federal agency, commission or department exercising jurisdiction over the Tariff, \nOperating Agreement and Reliability Assurance Agreement.\nFinal Agreement Negotiation Phase:\n“Final Agreement Negotiation Phase” shall mean the phase set forth in Tariff, Part VIII, Subpart \nD, section 411 to tender, negotiate, and execute any service agreement in Tariff, Part IX. \nFirm Transmission Service:\n“Firm Transmission Service” shall mean any or a combination of Network Integration \nTransmission Service, Firm Point-To-Point Transmission Service, or Firm Contract Demand \nTransmission Service taken by an Eligible Customer.\nPage 19"},{"page":68,"startToken":28234,"endToken":28246,"text":"Tariff, Part VIII, Subpart N\nCOST RECOVERY PROTECTION AND AGREEMENT\nPage 20"},{"page":69,"startToken":28246,"endToken":28788,"text":"Tariff, Part VIII, Subpart N, section 441\nCost Recovery Protection for Firm Transmission Service\n(a) Cost Recovery Assurances: With respect to Eligible Customers that intend to request any \nform of Firm Transmission Service from Transmission Provider on behalf of an Eligible Load or \nLarge Load, a Transmission Owner shall either:\n(i)\nEnter into a Cost Recovery Agreement in the form found in Tariff, Part IX, \nSubpart P with the applicable Eligible Customer and Eligible Load or Large Load.  The \nTransmission Owner counterparty shall be the Transmission Owner that owns the transmission \nfacilities with which the Eligible Load or Large Load will interconnect.  In the case of an \nEligible Load or Large Load that will not directly interconnect with a Transmission Owner, the \nTransmission Owner counterparty shall be the Transmission Owner to which the applicable \nEligible Customer is connected and from whom the Eligible Customer intends to take Firm \nTransmission Service.  The purpose of the Cost Recovery Agreement is to ensure the Eligible \nCustomer takes a minimum level of Firm Transmission Service on behalf of the Eligible Load or \nLarge Load based on the committed load level and the applicable rate for the Firm Transmission \nService, or, if not, the Eligible Load or Large Load shall be required to make a shortfall payment \nrepresenting any difference between the committed minimum level of service and the actual \nlevel of service taken.\n(ii)\nEnter into, subject to FERC acceptance, a separate agreement between at least the \nTransmission Owner and an Eligible Load or Large Load to prevent cost shifting among \ntransmission customers.  Such separate agreement will be determined to adequately prevent cost \nshifts if such agreement, in conjunction with relevant federal and state regulatory requirements, \nincluding applicable retail service tariffs, results in minimum Firm Transmission Service and \ncredit standards, or other comparable protections.\nAn Eligible Customer and/or Eligible Load or Large Load will be required to enter into and \nexecute a Cost Recovery Agreement or an agreement that meets the standards set forth in \nsubsection (a)(ii) in order to proceed past the Soft Close Date associated with the applicable PJM \nFast Energization Cycle, and obtain any form of Firm Transmission Service from the \nTransmission Provider.\n(b) Preservation of Legacy Treatment: No Cost Recovery Agreement or separate agreement \nunder subsection (a) above shall be required with respect to Eligible Load or Large Loads \ncovered by existing agreements that meet the criteria set forth in subsection (a)(ii) that have \nalready been filed and are pending acceptance, or that have been accepted by FERC.  Any \nagreement entered into prior to the effective date of this subsection not filed with FERC will not \nbe required to be filed and accepted by FERC; provided, however, in any complaint filed \npursuant to Section 206 of the Federal Power Act in which it is claimed that such agreement is \nnot just and reasonable or is unduly discriminatory within the meaning of the Federal Power Act, \nsuch agreement shall not be determined to be unjust and unreasonable or unduly discriminatory \nif it meets the standard set forth in subsection (a)(ii).\n(c) Tender and Negotiation of Cost Recovery Agreement:  As applicable, consistent with \nsubsections (a) and (b) above, Transmission Owner shall tender a draft of the Cost Recovery \nPage 21"},{"page":70,"startToken":28788,"endToken":29322,"text":"Agreement to Eligible Customer and Eligible Load or Large Load within 30 days of the \ncompletion of the Transmission Owner’s retail load interconnection study.  \nUpon receipt of the draft Cost Recovery Agreement, Eligible Customer, as well as the Eligible \nLoad or Large Load, shall provide the Transmission Owner with any written comments on the \ndraft Cost Recovery Agreement within seven (7) days. The parties will conduct further \nnegotiations as required, with such negotiations to be completed within twenty-five (25) days of \nthe Transmission Owner’s tender of the draft Cost Recovery Agreement.  \n(d) Execution and Filing of Cost Recovery Agreement: Not later than ten (10) days after the \nend of the negotiation period set forth in subsection (c) above, Eligible Customer and the Eligible \nLoad or Large Load shall (i) execute the Cost Recovery Agreement and return it to Transmission \nOwner; and (ii) provide the Credit Support specified in the Cost Recovery Agreement.\nIf the Eligible Load or Large Load fails to execute the Cost Recovery Agreement or provide the \nrequired Credit Support in the specified time period, Eligible Customer shall not be permitted to \nproceed through the applicable Fast Energization Cycle.  \nThe Transmission Owner shall file any executed Cost Recovery Agreement, if required, with \nFERC within twenty-one (21) days of the other parties executing the Cost Recovery Agreement.\n(e) Crediting of Termination Amounts: If the effective date of an Early Termination or Partial \nTermination, as defined in a Cost Recovery Agreement, occurs prior to the first Service Date \nspecified in such agreement, and the Eligible Load or Large Load that is a party to that \nagreement is required to make a termination payment, as applicable, such termination payment \nor other amounts received pursuant to such obligation, including any security drawn on by \nTransmission Owner, shall be divided amongst the pool of Transmission Owners constructing\nfacilities needed to provide the related transmission service, but which will no longer be \nconstructed, including the Transmission Owner that is a party to the Cost Recovery Agreement, \nas follows:\n(i)\nWithin thirty (30) days of such termination, the Transmission Owner that is party \nto the Cost Recovery Agreement (referred to herein as the “contracting Transmission Owner”) \nshall notify all other Transmission Owners that have been designated to construct and own \nInterconnection Reliability Reinforcements necessary to provide Firm Transmission Service to \nan Eligible Customer on behalf of the terminating Eligible Load or Large Load (referred to \nherein as the “third party Transmission Owners”) of such termination.  For purposes of this \nsubsection, third party Transmission Owners shall include all Transmission Owners designated \nto construct and own Interconnection Reliability Reinforcements identified in the PJM Fast \nEnergization Cycle in which the terminating Eligible Load or Large Load was studied, and for \nwhich the contracting Transmission Owner’s Zone received a cost responsibility share.\n(ii)\nEach third-party Transmission Owner shall, within thirty (30) days of the deadline \nfor filings its FERC Form 1 that includes all Eligible Costs, provide an account of such Eligible \nCosts to the contracting Transmission Owner.  For purposes of this subsection “Eligible Costs” \nconsist of all expenditures, costs, and cancellation fees incurred or due to commitments made by \nthe third-party Transmission Owner to engineer, design, procure, construct, own, operate, \nPage 22"},{"page":71,"startToken":29322,"endToken":29784,"text":"maintain, and service the Interconnection Reliability Reinforcements needed to serve the Eligible \nCustomer taking transmission service on behalf of the Eligible Load or Large Load, but which \nwill no longer be constructed, which (a) are incurred through the end of the calendar year in \nwhich notice of termination was received from the contracting Transmission Owner, and (b) are \nincluded in amounts reported in the Transmission Owner’s FERC Form 1 covering that calendar \nyear.  \nAny failure by a third-party Transmission Owner to provide such information within the \ntimeframe above shall bar said Transmission Owner from receiving a portion of amounts paid by \nEligible Load or Large Load as set forth below.\n(iii)\nWithin thirty (30) days of (a) receiving all Transmission Owner accountings in \naccordance with subsection (ii) above, and (b) receipt of termination amounts from the Eligible \nLoad or Large Load that is party to the Cost Recovery Agreement,  the contracting Transmission \nOwner shall divide such termination amounts among itself and the pool of third-party \nTransmission Owners based on each Transmission Owner’s pro rata share of the total amount of \napplicable expenditures, costs and cancellation fees, and disburse such amounts to the third-party \nTransmission Owners accordingly.  \nFor purposes of determining these pro rata shares, the contracting Transmission Owner shall be \npermitted to include Eligible Costs associated not only with its applicable Interconnection \nReliability Reinforcements but also any other transmission facilities, including Supplemental \nProjects and Direct Connection Facilities, that it was constructing in order to provide \ninterconnection or transmission service to the Eligible Load or Large Load, or Eligible Customer \ntaking transmission service on behalf of the Eligible Load or Large Load.\nTo the extent that additional termination funds are received or collected from the Eligible Load \nor Large Load after an initial distribution is made under this subsection, contracting \nTransmission Owner will make additional disbursements using the same methodology within \nfifteen (15) days of receipt of such amounts.\n(iv)\nNothing in this subsection (e) is intended or shall be interpreted to prevent any \nTransmission Owner from seeking cost recovery through an abandoned plant recovery filing \nmade with FERC or through any other proceeding, except insofar as the Transmission Owner has \nreceived amounts pursuant to the process set forth in this subsection (e), it shall be prohibited \nfrom requesting recovery of such amounts in any future proceeding.\n(v)\nTo the extent a Transmission Owner elects to satisfy its obligation under \nsubsection (a) above through a separate agreement as described in subsection (a)(ii), it shall \ninclude in such separate agreement reasonably comparable termination payment crediting \nprovisions as set forth in this subsection (e), as determined by FERC.\n(vi)\nAny disputes under this subsection (e) shall be subject to the dispute resolution \nprocedure set forth in Schedule 5 of the Operating Agreement.\nPage 23"},{"page":72,"startToken":29784,"endToken":29796,"text":"Tariff, Part IX, Subpart P\nFORM OF\nCOST RECOVERY AGREEMENT\nPage 24"},{"page":73,"startToken":29796,"endToken":29821,"text":"Service Agreement No. [____]\nCOST RECOVERY AGREEMENT\nBetween\n[TRANSMISSION OWNER] \nTransmission Owner\nand\n[LARGE LOAD CUSTOMER]\nLarge Load Customer\nand \n[ELIGIBLE CUSTOMER]\nEligible Customer\nPage 25"},{"page":74,"startToken":29821,"endToken":30198,"text":"Service Agreement No. [____]\nCOST RECOVERY AGREEMENT\nThis Cost Recovery Agreement (“Agreement” or “CRA”) is made and entered into as of \n[Insert Date] by and among [Transmission Owner], a [State and Entity Type] (“Transmission \nOwner”) and [Large Load Customer], a [State and Entity Type] (“Large Load Customer”), and\n[Eligible Customer], a [State and Entity Type] (“Eligible Customer”). Transmission Owner, \nEligible Customer, and Large Load Customer are referred to individually as a “Party” and \ncollectively as the “Parties.” \nLarge Load Customer will be responsible for all payment and Credit Support obligations \nassigned to Large Load Customer under this CRA. Eligible Customer will remain responsible for \nthe transmission-service, information-sharing, and administrative obligations expressly assigned \nto Eligible Customer under this CRA.\nRECITALS\nWHEREAS, Large Load Customer intends to construct, maintain, and operate new or \nmodified facilities located at or near [Facility Address] that will constitute a Large Load (the \n“Large Load Facilities”), with an anticipated initial service date of [Date] (the “Commercial \nOperation Date”);\nWHEREAS, Large Load Customer has completed retail interconnection studies \nconducted by Transmission Owner and/or one or more of its affiliates;\nWHEREAS,\nfollowing completion of the applicable Transmission Owner’s \ninterconnection study process, the Parties are entering into this CRA based on the Initial Load \nCommitment, proposed load ramp, and anticipated Service Dates identified in Exhibit A;\nWHEREAS, Eligible Customer intends to request Network Integration Transmission \nService (“NITS”), Firm Point-to-Point Transmission Service, or Firm Contract Demand \nTransmission Service (“FCDS”) under the PJM Open Access Transmission Tariff (“PJM Tariff”) \non behalf of the Large Load Customer to serve the Large Load Facilities , each of which \nconstitutes “Firm Transmission Service” under this CRA;\nWHEREAS, Exhibit A identifies the initial amount and type of Firm Transmission \nService to be requested by Eligible Customer on behalf of Large Load Customer, together with \nthe load ramp and anticipated Service Dates;\nWHEREAS, following completion of the applicable application and study process to \nobtain the Firm Transmission Service, Exhibit A and the related calculations under this CRA will \nbe updated to reflect the type, amount, and timing of Firm Transmission Service established in \nthe Final PJM Agreement;\nWHEREAS, in reliance on the Firm Load Commitment and in accordance with the PJM \nTariff and other applicable agreements, the Transmission Owner intends to construct, own, \nPage 26"},{"page":75,"startToken":30198,"endToken":30607,"text":"operate, maintain, service, and recover the costs associated with transmission facilities necessary \nto serve the Large Load Facilities;\nWHEREAS, this CRA establishes the payment and Credit Support obligations described \nherein and allocates the financial risk arising if Firm Transmission Service-related revenues \nattributable to service actually taken for the Large Load Facilities are less than the Committed \nRevenue Contribution.\nNOW, THEREFORE, in consideration of the premises and the mutual covenants and \nundertakings set forth herein, the receipt and sufficiency of which are acknowledged, the Parties, \nintending to be legally bound, agree as follows:\nARTICLE 1\nDEFINITIONS\n1.0\nDefined Terms \nCapitalized terms used in this CRA have the meanings set forth below. Capitalized terms used \nbut not defined in this CRA have the meanings set forth in the PJM Tariff.\n(a)\n“Actual Revenue Contribution” means, for each Measurement Period, the Firm \nTransmission Service-related revenues attributable to Firm Transmission Service actually \ntaken by \nEligible Customer to serve the Large Load Facilities, as calculated in \naccordance with Section 5.2 and Exhibit B.\n(b) \n“Agreement” or “CRA” means this Cost Recovery Agreement, including its Exhibits and \nany amendments that become effective in accordance with this CRA and applicable law.\n(c)\n“Applicable Credits” means the amounts identified in Article 9 and Exhibit D, Section 4, \nthat are deducted in calculating the Early Termination Amount or Partial Termination \nAmount, without duplication.\n(d)\n“Applicable Firm Transmission Service Rate” means, for each Measurement Period, the \nTransmission Owner’s rate or rates then in effect under the PJM Tariff for the applicable \nFirm Transmission Service in the applicable Transmission Zone, as used to calculate the \ncharges corresponding to the Firm Load Commitment.\n(e)\n“Applicable Termination Percentage” means the percentage set forth in Exhibit D for the \nperiod in which the termination or Partial Termination becomes effective.\n(f)\n“Business Day” means any day other than a Saturday, Sunday, or holiday recognized by \nthe North American Electric Reliability Corporation.\n(g)\n“Commercial Operation Date” means the anticipated initial service date for the Large \nLoad Facilities identified in Exhibit A.\n(h)\n“Committed Revenue Contribution”\nmeans, for each Measurement Period, the \ncontractually required portion of the Full Firm Transmission Service Benchmark, \ncalculated by applying the Minimum Commitment Percentage in accordance with Section \n5.1 and Exhibit B.\n(i)\n“Credit Support” means the financial security that Large Load Customer is required to \nprovide and maintain under Section 6.1 to secure Large Load Customer’s payment and \nother financial obligations under this CRA.\nPage 27"},{"page":76,"startToken":30607,"endToken":31136,"text":"(j)\n“Credit Support Requirement” means the amount of Credit Support that Large Load \nCustomer is required to cause to be provided and maintained, as calculated in accordance \nwith Section 6.5 and Exhibit C based on the aggregate Projected Full Firm Transmission \nService Benchmarks for all Measurement Periods remaining in the Term, including any \nportion of the applicable Measurement Period that remains incomplete. Before the \nrecalculation required under Section 3.2, the Credit Support Requirement shall be the \nInitial Credit Support Requirement.\n(k)\n“Effective Date” means the date on which this CRA becomes effective as set forth in \nSection 4.1.\n(l)\n“Early Termination Amount” means the amount payable by Large Load Customer upon \na termination of this CRA for which an Early Termination Amount is required under \nArticle 9, as calculated in accordance with Exhibit D.\n(m)\n“Early Termination Offset Amount” means the Firm Transmission Service-related \nrevenues received by Transmission Owner during the period corresponding to the \nremaining fixed period from incremental replacement load served at the same Point of \nDelivery, to the extent those revenues correspond to the revenue exposure included in the \nEarly Termination Amount or Partial Termination Amount, as determined in accordance \nwith Section 9.9.\n(n)\n“Eligible Customer” means the Person identified as  Eligible Customer in the preamble to \nthis CRA, which is an Eligible Customer under the PJM Tariff and the entity responsible \nfor taking Firm Transmission Service on behalf of Large Load Customer to serve the \nLarge Load Facilities. Eligible Customer is responsible only for the obligations expressly \nassigned to Eligible Customer under this CRA and is not responsible for Large Load \nCustomer’s payment or Credit Support obligations.\n(o)\n“FERC” means the Federal Energy Regulatory Commission or any successor agency.\n(p)\n“Final PJM Agreement” means the final Transmission Service Agreement or other \nagreement executed under the PJM Tariff that identifies the Firm Transmission Service to \nbe taken by Eligible Customer on behalf of Large Load Customer.\n(q)\n“Firm Load Commitment” means the amount of firm load identified in Exhibit A, \ntogether with the corresponding level of Firm Transmission Service that Eligible \nCustomer has committed to take on behalf of  Large Load Customer and any associated \nload-ramp milestones and Service Dates.\n(r)\n“Firm Transmission Service” means NITS, Firm Point-to-Point Transmission Service, or \nFCDS, as applicable, requested or taken by Eligible Customer under the PJM Tariff on \nbehalf of Large Load Customer to serve the Large Load Facilities. \n(s)\n“Full Firm Transmission Service Benchmark” means, for each Measurement Period, the \ncharges that would apply under the Applicable Firm Transmission Service Rate and \napplicable billing determinants if Eligible Customer took Firm Transmission Service \ncorresponding to the Firm Load Commitment scheduled to apply during that \nMeasurement Period, as calculated in accordance with Section 5.1 and Exhibit B.\n(t)\n“Force Majeure” has the meaning set forth in Article 12.\n(u)\n“FCDS” means Firm Contract Demand Transmission Service under the PJM Tariff.\n(v)\n“Initial Load Commitment” means the initial amount of Firm Transmission Service to be \nrequested by Eligible Customer on behalf of Large Load Customer, together with the \nproposed load ramp and anticipated Service Dates identified in Exhibit A at execution of \nthis CRA.\nPage 28"},{"page":77,"startToken":31136,"endToken":31647,"text":"(w)\n“Initial Credit Support Requirement” means the amount of Credit Support identified in \nExhibit C at execution by the Parties of this CRA based on the Initial Load Commitment, \nanticipated Service Dates, and aggregate Projected Full Firm Transmission Service \nBenchmarks for the Term, calculated in accordance with  the methodology specified in \nExhibit C.\n(x)\n“Large Load” shall mean end-use customer(s) load that has a cumulative peak load of 50 \nmegawatts or greater at a single electrical site behind one or more points of \ninterconnection, where for configurations involving multiple affiliated load facilities or \nmultiple points of interconnection with affiliated load facilities behind them, all affiliated \nload facilities within a one-mile radius will be considered a single electrical site as further \ndescribed in the PJM Manuals.\n(y)\n“Large Load Customer” means the Person identified in Exhibit A that owns, operates, \nleases, or otherwise controls the Large Load Facilities and on whose behalf Eligible \nCustomer takes Firm Transmission Service to serve the Large Load Facilities. Large \nLoad Customer is a Party to this CRA and is directly responsible for the payment and \nCredit Support obligations assigned to Large Load Customer under this CRA.\n(z)\n“Large Load Facilities” means the new or modified facilities identified in Exhibit A that \nconstitute the Large Load.\n(aa)\n“Measurement Period”  means each period, not to exceed one year, corresponding to \nTransmission Owner’s applicable formula rate cycle, or portion thereof, beginning on the \nfirst Service Date and continuing through the end of the Term, as specified in Exhibit A.\n(bb)\n“Minimum Commitment Percentage” means the percentage specified in Exhibit A that is \napplied to the Full Firm Transmission Service Benchmark to calculate the Committed \nRevenue Contribution, which percentage shall be no less than 80% and no greater than \n100%, per the schedule set forth in Exhibit A below.\n(cc)\n“MW” means megawatts.\n(dd)\n“NITS” means Network Integration Transmission Service provided pursuant to the PJM \nTariff, Part III.\n(ee)\n“Partial Termination Amount” means the amount payable by Large Load Customer upon \na permanent reduction of a specified portion of the Firm Load Commitment under \nSection 9.2, as calculated in accordance with Section 9.8 and Exhibit D.\n(ff)\n“Person” means an individual, corporation, limited liability company, partnership, \nassociation, trust, governmental authority, or other legal entity.\n(gg)\n“PJM” means PJM Interconnection, L.L.C. or its successor.\n(hh)\n“PJM Tariff” means the PJM Open Access Transmission Tariff, as accepted by FERC \nand effective from time to time.\n(ii)\n“Projected Committed Revenue Contributions” means the aggregate amounts projected to \nconstitute Committed Revenue Contributions during the applicable period, calculated by \napplying the Minimum Commitment Percentage to the Projected Full Firm Transmission \nService Benchmark for each applicable Measurement Period. \n(jj)\n“Project Development Costs” means all expenditures, costs, and cancellation fees \nincurred, or due to commitments made by the Transmission Owner or other transmission \nowners to engineer, design, procure, construct, own, operate, maintain, and service the \nnecessary transmission facilities needed to serve the Large Load Customer that are \nintended to be placed into transmission rate base and recovered through transmission \nrates.  \nPage 29"},{"page":78,"startToken":31647,"endToken":32074,"text":"(kk)\n“Projected Full Firm Transmission Service Benchmark” means, for each applicable \nMeasurement Period, 100% of the Firm Transmission Service-related charges projected \nto apply if Eligible Customer takes Firm Transmission Service corresponding to the \nInitial Load Commitment or Firm Load Commitment, as applicable, calculated in \naccordance with Exhibit C.\n(ll)\n“Service Date” means (i) before execution of the Final PJM Agreement, each anticipated \ndate identified in Exhibit A on which the Initial Load Commitment, or a portion thereof, \nis expected to become effective; and (ii) after execution of the Final PJM Agreement, \neach date identified in Exhibit A as updated pursuant to Section 3.2 on which the Firm \nLoad Commitment, or a specified portion thereof under an applicable load ramp, is \nscheduled to become effective..\n(mm) “Shortfall Amount” means, for each Measurement Period, the amount, if any, by which \nthe Committed Revenue Contribution exceeds the Actual Revenue Contribution, as \ncalculated in accordance with Section 5.3 and Exhibit B.\n(nn)\n“Term” has the meaning set forth in Section 4.2.\n(oo)\n“Transmission Owner” means the PJM Transmission Owner identified in the preamble to \nthis CRA.\n(pp)\n“Transmission System” shall mean the facilities controlled or operated by PJM that are \nused to provide transmission service under Part II and Part III of the PJM Tariff. \n(qq)\n“Transmission Zone” means the transmission zone identified in Exhibit A in which the \nLarge Load Facilities are located.\nARTICLE 2\nRECITALS\n2.1\nRecitals\nThe statements set forth in the recitals above are hereby incorporated herein into the terms and \nconditions of this CRA as if fully set forth herein.\nARTICLE 3\nFIRM LOAD COMMITMENT\n3.1\nInitial Load Commitment and Firm Load Commitment\nAt execution of this CRA, the Initial Load Commitment shall be established using the amount \nand type of Firm Transmission Service that Eligible Customer intends to request from PJM on \nbehalf of Large Load Customer through the applicable application and study process, together \nwith the proposed load ramp and anticipated Service Dates identified in Exhibit A.\nFollowing execution of the Final PJM Agreement, the Firm Load Commitment applicable during \neach Measurement Period shall be the amount and type of Firm Transmission Service that the \nEligible Customer takes on behalf of the Large Load during each Measurement Period, as set \nforth in Exhibit A.  This amount shall be based on the amount of load for the Large Load \nscheduled to be in service during each Measurement Period, or the amount of Firm Transmission \nService that the Eligible Customer has contracted for on behalf of the Large Load.\nPage 30"},{"page":79,"startToken":32074,"endToken":32494,"text":"If Exhibit A establishes a load ramp, consistent with the amount of Firm Transmission Service \nthat the Eligible Customer has contracted for on behalf of the Large Load, each scheduled load \nlevel becomes part of the Firm Load Commitment on the applicable Service Date.\nExcept as expressly provided in this CRA, Eligible Customer’s failure to begin taking Firm \nTransmission Service to serve the Large Load Facilities, take Firm Transmission Service\ncorresponding to a scheduled load level, or maintain that level of Firm Transmission Service\ndoes not reduce or defer the Firm Load Commitment or the Committed Revenue Contribution, or \nexcuse Large Load Customer from any payment or Credit Support obligation under this CRA.\n3.2\nPost-Final PJM Agreement Update and Subsequent Modification\nWithin thirty (30) days after execution of the Final PJM Agreement, Transmission Owner shall \nupdate Exhibit A to reflect the Firm Transmission Service, load ramp, and Service Dates \nestablished through or consistent with the Final PJM Agreement. Transmission Owner shall also \nupdate the Applicable Firm Transmission Service Rate, Projected Committed Revenue \nContributions, Projected Full Firm Transmission Service Benchmarks, Credit Support \nRequirement, the applicable schedules in Exhibits A and C, and the calculations under Exhibit B \nusing the information then available.\nThe information reflected in the Final PJM Agreement shall control over the corresponding \npreliminary information included in Exhibit A at execution. If the Final PJM Agreement \nestablishes less Firm Transmission Service than the Initial Load Commitment, the Firm Load \nCommitment shall be reduced accordingly. A reduction required by this paragraph shall not \nconstitute a Partial Termination and shall not result in a Partial Termination Amount.\nAn update required by this Section shall become effective without further agreement of the \nParties and shall not constitute an amendment to this CRA. Transmission Owner shall provide \nthe updated Exhibits and reasonable supporting calculations to Eligible Customer and Large \nLoad Customer.\nAfter the update required by this Section, a further modification to the Firm Load Commitment \nor a Service Date shall become effective only if the Parties execute any amendment required \nunder this CRA and the amendment receives any required PJM or FERC acceptance or approval. \nA customer-requested reduction remains subject to Article 9.\n3.3\nNo Transmission Owner Obligation\nExcept as otherwise explicitly provided herein, nothing in this Agreement shall constitute an \nobligation on the part of Transmission Owner to provide any service to any Party or place into \nservice any transmission facilities by any specific date or dates. \nARTICLE 4\nEFFECTIVE DATE AND TERM\n4.1\nEffective Date\nPage 31"},{"page":80,"startToken":32494,"endToken":32911,"text":"This CRA will become effective on the later of : (1) the date  executed by all Parties, or (2) the \ndate accepted or approved by FERC, if such acceptance or  approval is required, or (3) on such \nother date as FERC may establish in an order accepting or approving the CRA (the “Effective \nDate”).\n4.2\nTerm\nUnless terminated earlier in accordance with this CRA, the term of this CRA (the “Term”) shall\ncommence on the Effective Date and continue until the later of:  (i) the date that is at least ten \n(10) years after the first Service Date as specified in Exhibit A; and (ii) the date on which all \noutstanding obligations under this CRA have been satisfied. \nARTICLE 5\nREVENUE CONTRIBUTIONS AND SHORTFALL AMOUNT\n5.1\nCommitted Revenue Contribution\nFor each Measurement Period during the Term, Transmission Owner  shall calculate the \nCommitted Revenue Contribution in accordance with this Section and Exhibit B, using the \napplicable rates, billing determinants, and other information available in accordance with the \nPJM Tariff.  The Committed Revenue Contribution shall equal the Minimum Commitment \nPercentage multiplied by the Firm Transmission Service-related charges that would apply if \nEligible Customer took Firm Transmission Service corresponding to the Firm Load Commitment \napplicable during the Measurement Period.\nThe calculation shall use:\n(a) the Firm Load Commitment that applies during each Measurement Period;\n(b) the Applicable Firm Transmission Service Rate and the generally applicable billing \ndeterminants under the PJM Tariff; and\n(c) the portion of the Measurement Period during which each scheduled Firm Load \nCommitment amount and Applicable Firm Transmission Service Rate applies.\nIf more than one Firm Load Commitment amount or Applicable Firm Transmission Service Rate \napplies during a Measurement Period, Transmission Owner \nshall calculate separately the \namount applicable to each portion of the Measurement Period and aggregate those amounts to \ndetermine the Committed Revenue Contribution for the applicable Measurement Period.\nEligible Customer shall be responsible for timely payment of charges for Firm Transmission \nService in a given calendar year on a monthly basis in accordance with the PJM Tariff.\n5.2\nActual Revenue Contribution\nFor each Measurement Period during the Term, Transmission Owner shall calculate the Actual \nRevenue Contribution attributable to Firm Transmission Service actually taken to serve the \nLarge Load Facilities in accordance with Exhibit B.  To the extent that the Large Load Customer \nhas made separate payments through a retail tariff or other retail mechanism that reflect the \nassignment of Firm Transmission Service or related costs to the Large Load Customer, such \nPage 32"},{"page":81,"startToken":32911,"endToken":33352,"text":"payments shall be taken into account in determining its Actual Revenue Contribution, insofar as \ndoing so does not result in costs being shifted to other Eligible Customers taking service in the \nTransmission Owner’s Zone. To the extent that the applicable Firm Transmission Service \nmethodology calculates charges using an assigned Network Service Peak Load contribution or \nanother allocated billing determinant, the Actual Revenue Contribution shall be calculated using \nthe billing determinant assigned to the Large Load Facilities for the applicable Measurement \nPeriod and the same categories of rates used to calculate the Committed Revenue Contribution.\n5.3\nShortfall Amount\nFor each Measurement Period, the Shortfall Amount shall equal the amount, if any, by which the \nCommitted Revenue Contribution exceeds the Actual Revenue Contribution in accordance with \nExhibit B.\nLarge Load Customer shall pay each Shortfall Amount in accordance with Article 7.\n5.4\nSeparate Measurement Periods\nEach Measurement Period shall be calculated independently.\n5.5\nCommencement of Committed Revenue Contribution\nThe determination of the Committed Revenue Contribution and any corresponding Shortfall \nAmounts shall begin on the corresponding Service Date, as set forth in Exhibit A, regardless of \nwhether: (i) Eligible Customer has begun taking the corresponding level of Firm Transmission \nService; (ii) the amount of Firm Transmission Service taken by Eligible Customer corresponds to \nthe load level scheduled to apply on that Service Date; or (iii) the Large Load Facilities are \noperating at a lower load level than the one scheduled to apply on that Service Date.\nNotwithstanding the foregoing, if Eligible Customer cannot begin taking the applicable Firm \nTransmission Service on a Service Date solely because the necessary transmission facilities have \nnot been  completed, and such delay was not  caused in whole or in part by Large Load \nCustomer’s or Eligible Customer’s failure or lack of reasonable diligence in satisfying  its \nobligations under this CRA or under any other binding agreement, tariff, regulatory order, or \nother legal requirement, the Service Date and commencement of the corresponding Committed \nRevenue Contribution shall be extended on a day-for-day basis until the Firm Transmission \nService becomes available.  Large Load Customer’s obligations include, without limitation (a) \nconstruction, testing, commissioning and readiness of any facilities being constructed by Large \nLoad Customer, and (b) prompt and reasonable responses to Transmission Owner’s or \nTransmission Owners’ affiliate(s)’ requests for information, approvals, or other communications \nnecessary for Transmission Owner’s or Transmission Owners’ affiliate(s)’ work.\n5.6  \nAccess to Information\nEligible Customer shall provide, or authorize access to, the service, billing, settlement, and \nallocation information from PJM or any other entity reasonably necessary for Transmission \nOwner to calculate the Actual Revenue Contribution, Shortfall Amount, or any other calculation \nPage 33"},{"page":82,"startToken":33352,"endToken":33745,"text":"required under this Agreement.\nARTICLE 6\nCREDIT SUPPORT\n6.1\nObligation to Post and Maintain Credit Support\nIn accordance with Tariff, Part VIII, Subpart N, section 441(d), Large Load Customer shall, at its \nown expense, cause Credit Support equal to the Initial Credit Support Requirement identified in \nExhibit C to be provided in favor of Transmission Owner not later than ten (10) days after the \nend of the negotiation period specified in Tariff, Part VIII, Subpart N, section 441(c).\nIf Large Load Customer fails to provide the required Credit Support within that period, the \nconsequences specified in Tariff, Part VIII, Subpart N, section 441(d) shall apply.\nWithin five (5) Business Days after receipt of the post-PJM recalculation required under Section \n3.2, Large Load Customer shall cause the Credit Support to be increased, reduced, amended, or \nreplaced as necessary to equal the recalculated Credit Support Requirement.\nThe Credit Support shall secure Large Load Customer’s payment and other financial obligations \nunder this CRA and shall at all times equal or exceed the Credit Support Requirement set forth in \nExhibit C, subject to any reduction or treatment of prior draws expressly provided in this CRA.\nThe Credit Support Requirement shall be based on 100% of the Projected Full Firm \nTransmission Service Benchmarks for the applicable remaining Measurement Periods and shall \nnot be reduced by the Minimum Commitment Percentage.\nLarge Load Customer shall cause the Credit Support to be maintained throughout the Term and \nthereafter until:\n(a) all Shortfall Amounts and other amounts due under this CRA have been paid;\n(b) the final reconciliation required under this CRA has been completed; and\n(c) Transmission Owner has no remaining right to draw on the Credit Support under this \nCRA.\n6.2 \nForm of Credit Support \nCredit Support shall be a Letter of Credit in the form specified in Exhibit C and related \nattachments to Exhibit C.  \n6.3\nReplacement of Credit Support\nLarge Load Customer shall cause compliant replacement Credit Support to be provided within\nfive (5) Business Days after notice from Transmission Owner if:  (i) the issuer ceases to satisfy \nthe requirements of Exhibit C; (ii) the Credit Support ceases to satisfy this Article 6; (iii) the \nCredit Support will expire or terminate before Large Load Customer’s obligation to maintain \nCredit Support ends; or (iv) the issuer gives notice of nonrenewal.\nPage 34"},{"page":83,"startToken":33745,"endToken":34179,"text":"Replacement Credit Support provided under this Section shall be in an amount equal to the then-\napplicable Credit Support Requirement, as  determined under Section 6.5 and Exhibit C as of the \nreplacement date to reflect any completed Measurement Period that has been excluded from the \nCredit Support Requirement in accordance with Section 6.5, less the amount of any cash security \nthen held by Transmission Owner and legally available to secure the same obligations.\n6.4\nPreservation Draw\nIf Large Load Customer fails to cause timely replacement Credit Support to be provided under \nSection 6.3, Transmission Owner may draw the lesser of: (i) the full amount then available under \nthe existing Credit Support; and (ii) the then-applicable Credit Support Requirement, less any \ncash security then held by Transmission Owner and legally available to secure the same \nobligations. Transmission Owner may hold the proceeds as cash security for Large Load \nCustomer’s obligations under this CRA.\nA preservation draw does not constitute payment of an obligation unless and until Transmission \nOwner applies the proceeds to an amount due under this CRA.\nTransmission Owner shall release cash security held under this Section after Large Load \nCustomer causes compliant replacement Credit Support to be provided, except to the extent the \ncash has been applied to an amount due.\n6.5\nAdjustment of Credit Support Requirement\nThe Credit Support Requirement for each applicable period shall be calculated in accordance \nwith Exhibit C.\nTransmission Owner shall also recalculate the Credit Support Requirement following the update \nrequired under Section 3.2. That recalculation shall replace the Initial Credit Support \nRequirement and shall reflect the Firm Load Commitment, Service Dates, Applicable Firm \nTransmission Service Rate, Projected Full Firm Transmission Service Benchmarks, and other \ninformation established following the Final PJM Agreement.\nTransmission Owner shall recalculate the Credit Support Requirement after completion of each \nMeasurement Period and upon any other recalculation event specified in Exhibit C. The \nrecalculated Credit Support Requirement shall equal the aggregate Projected Full Firm \nTransmission Service Benchmarks for the Measurement Periods remaining in the Term, \nincluding any incomplete portion of the applicable Measurement Period. A completed \nMeasurement Period shall be excluded from the Credit Support Requirement only after: (i) the \nCommitted Revenue Contribution, Actual Revenue Contribution, and any resulting Shortfall \nAmount for that Measurement Period have been finally calculated; and (ii) Large Load Customer \nhas paid all amounts due for that Measurement Period.\nIf the Credit Support Requirement increases, Large Load Customer shall cause the Credit \nSupport to be increased to the recalculated Credit Support Requirement within five (5) Business \nDays after receipt of the calculation.\nPage 35"},{"page":84,"startToken":34179,"endToken":34580,"text":"If the Credit Support Requirement decreases, Transmission Owner shall authorize a \ncorresponding reduction within five (5) Business Days of a request by the financial institution \nissuing the Credit Support for such authorization, provided that no payment default or other \nEvent of Default exists and the remaining Credit Support, together with any cash security held by \nTransmission Owner, will equal or exceed the adjusted Credit Support Requirement.\nActual Revenue Contributions for a completed Measurement Period shall be used to determine \nthe Shortfall Amount for that completed Measurement Period but shall not reduce the Projected \nFull Firm Transmission Service Benchmarks used to calculate the Credit Support Requirement \nfor future Measurement Periods.\n6.6\nDraws for Unpaid Amounts\nExcept for a preservation draw under Section 6.4, Transmission Owner may draw on Credit \nSupport only after:  (i) Transmission Owner has issued an invoice identifying an amount due \nunder this CRA and the basis for that amount; and  (ii) Large Load Customer has failed to pay \nthe invoiced amount within the payment period specified in Article 7.\nA draw shall not exceed the amount due and unpaid.\nTransmission Owner shall apply the proceeds of a draw to the unpaid amount for which the draw \nwas made. Proceeds applied to a Shortfall Amount shall be credited in accordance with Section \n7.6, and proceeds applied to an Early Termination Amount or Partial Termination Amount shall \nbe applied and credited in accordance with Section 9.12.  Large Load Customer’s payment \ndefault shall be cured to the extent Transmission Owner receives and applies proceeds sufficient \nto satisfy the unpaid amount.\n6.7\nReplenishment\nFollowing a draw applied to satisfy an unpaid amount,  Large Load Customer shall cause the \nCredit Support to be restored to the applicable Credit Support Requirement within five (5) \nBusiness Days after notice from Transmission Owner.\n6.8\nRelease of Credit Support\nTransmission Owner shall release the remaining Credit Support within ninety (90) days after the \nlatest of:  (i) expiration or termination of the Term; (ii) completion of all calculations, invoices, \nand reconciliations required under this CRA; (iii) payment of all undisputed amounts determined \nto be due under this CRA; or (iv) resolution of any pending dispute that could result in an \nadditional amount payable by Large Load Customer .\nTransmission Owner shall provide release or cancellation documentation relating to Credit \nSupport to Large Load Customer, with a copy to Eligible Customer.\nARTICLE 7\nPage 36"},{"page":85,"startToken":34580,"endToken":34967,"text":"INVOICING AND PAYMENT\n7.1\nDetermination and Invoice\nAfter the end of each Measurement Period, Transmission Owner shall calculate the Committed \nRevenue Contribution, Actual Revenue Contribution, and resulting Shortfall Amount in \naccordance with Article 5 and Exhibit B.\nIf a Shortfall Amount exists, Transmission Owner shall inform the other Parties and issue an \ninvoice to Large Load Customer for the Shortfall Amount within sixty (60)  days after the end of \nthe applicable Measurement Period.  Transmission Owner shall provide Eligible Customer with a \ncopy of the invoice.\n7.2\nPayment\nLarge Load Customer shall timely pay all amounts invoiced and due under this CRA by no later \nthan thirty (30) days after the date of receipt of the applicable invoice.  Any payment made after \nthirty (30) days, including any draw made by a Transmission Owner pursuant to Sections 6.6 and \n7.3 below shall include interest at the FERC rate set forth in 18 CFR Section 35.19.\n7.3\nDraw on Credit Support\nIf Large Load Customer fails to timely pay an invoiced amount, Transmission Owner may draw \non the Credit Support for the unpaid amount in accordance with Section 6.6.\n7.4\nReview of Supporting Documentation\nUpon Large Load Customer’s timely request, Transmission Owner and  if applicable, Eligible \nCustomer, shall provide documentation reasonably necessary to enable Large Load Customer to\nverify the accuracy of an invoice, subject to applicable confidentiality requirements.  For \npurposes of this section, a request shall be considered timely if made no more than five (5) \nBusiness Days after the date of receipt of the applicable invoice.  \nEligible Customer shall provide or authorize access to any service, billing, settlement, or \nallocation information reasonably necessary to support that review.\nA request under this section shall not act to defer or extend the date on which payment is due \nunder Section 7.2.\n7.5\nDisputed Amounts\nLarge Load Customer shall timely pay each invoiced amount notwithstanding any dispute, and \nTransmission Owner’s right to draw on Credit Support shall not be suspended by the dispute. If \nthe final resolution determines that Large Load Customer paid, or Transmission Owner drew, \nmore than the amount properly due, Transmission Owner shall promptly return the excess \namount.  Any dispute must be made by no later than the date payment is due and conform to the \nPage 37"},{"page":86,"startToken":34967,"endToken":35396,"text":"requirements set forth in Section 15.1 below.\n7.6\nCrediting of Shortfall Amounts\nAll Shortfall Amounts collected by Transmission Owner shall be credited against the \nTransmission Revenue Requirement of the Transmission Owner for the Transmission  Zone in \nwhich the Eligible Customer is taking Firm Transmission Service.  Transmission Owner shall \naccount for and credit all amounts received under this CRA in accordance with this Section 7.6, \nSection 9.12, as applicable, the PJM Tariff, and its applicable FERC-jurisdictional rate.  \nTransmission Owner’s calculation, collection, accounting, and crediting of Shortfall Amounts \nshall be reflected in, and remain subject to review under, Transmission Owner’s applicable \nFERC-jurisdictional formula rate and related protocols.\nARTICLE 8\nDEFAULT AND REMEDIES\n8.1\nEvents of Default\nEach of the following constitutes an “Event of Default” by the applicable Party:\n(a) failure by Large Load Customer to cause the initial Credit Support to be timely \nprovided in the amount and form required under this CRA;\n(b) failure by Large Load Customer to cause to be timely provided replacement or \nadditional Credit Support required under Article 6;\n(c) failure by Large Load Customer to cause Credit Support to be replenished when \nrequired under Section 6.7;\n(d) a material misrepresentation by a Party concerning the Firm Load Commitment, \nActual Revenue Contribution, Credit Support, or another material matter under this CRA;\n(e) assignment or attempted assignment of this CRA by a Party in violation of Article 10;\n(f) repudiation of this CRA by a Party; \n(g) failure by Eligible Customer to take any PJM Tariff action expressly required of \nEligible Customer under this CRA or a default by Eligible Customer under any PJM \nagreement relating to the provision of Firm Transmission Service; or\n(h) failure by Eligible Customer or Large Load Customer to take an action expressly \nrequired under this CRA to request, pursue, or complete the applicable PJM process; or\n(i) a default by Large Load Customer under any agreement with Transmission Owner or \nits Affiliates relating to the Large Load Facilities, including any failure to comply with \nany retail service tariffs, retail agreements, or other retail obligations that would prevent \nthe Large Load Customer from meeting its obligations under this CRA;\n(j) the bankruptcy or insolvency of Large Load Customer; or\n(k) any other material breach by a Party  that remains uncured after the applicable period \nprovided in Section 8.2.\n8.2\nNotice and Cure\nExcept as otherwise expressly provided in this CRA, Transmission Owner shall provide the \nDefaulting Party with written notice of an Event of Default describing the default in reasonable \ndetail.\nPage 38"},{"page":87,"startToken":35396,"endToken":35790,"text":"The Defaulting Party  shall have: (i) five (5) Business Days after receipt of notice to cure a \nCredit Support default; and (ii) fifteen  (15) days after receipt of notice to cure any other curable \nEvent of Default.\n8.3\nRemedies\nFollowing an Event of Default that has not been timely cured, the non-Defaulting Party or Parties  \nmay, in their sole discretion:\n(a) if Transmission Owner is a non-Defaulting Party, draw on Credit Support in \naccordance with this CRA;\n(b) recover any amount due and unpaid under this CRA;\n(c) require specific performance of Large Load Customer’s obligation to cause Credit \nSupport to be provided or maintained;\n(d) exercise any right or remedy available under the PJM Tariff to the extent applicable to \nthat Party;\n(e) terminate this CRA only as expressly permitted under Article 9; and\n(f) exercise any other right or remedy available under applicable law.\nTransmission Owner shall credit all payments and Credit Support proceeds against the obligation \nfor which they were received and shall not obtain duplicative recovery of the same amount.\n8.4\nEffect of Credit Support Draw\nReceipt and application of Credit Support proceeds sufficient to satisfy an unpaid amount shall \ncure the applicable payment default to the extent of the proceeds received and applied.\nARTICLE 9\nEARLY AND PARTIAL TERMINATION\n9.1\nTermination or Reduction by Large Load Customer; Withdrawal from PJM \nProcess\nBefore execution of the Final PJM Agreement, Eligible Customer’s withdrawal or abandonment \nof the request for Firm Transmission Service from the applicable PJM process on behalf of Large \nLoad Customer, or refusal to execute the Final PJM Agreement shall constitute an early \ntermination of this CRA by Large Load Customer.  Large Load Customer shall pay the Early \nTermination Amount calculated under Section 9.7 and Exhibit D. Termination under this \nparagraph shall become effective upon the applicable withdrawal, abandonment, or refusal and \nshall not be subject to the 120-day notice period below.\nAfter execution of the Final PJM Agreement, Large Load Customer may terminate this CRA \nbefore expiration of the Term by providing Transmission Owner and Eligible Customer with at \nleast 120 days’ prior written notice. Notwithstanding the foregoing, termination shall not become \neffective unless and until (a) the Large Load Customer has paid in full the applicable Early \nTermination Amount or Partial Termination Amount, as determined pursuant to this CRA, or (b) \nPage 39"},{"page":88,"startToken":35790,"endToken":36179,"text":"if such amount remains unpaid, the Transmission Owner has drawn on the Credit Support and \nrecovered the full amount of such unpaid Early Termination Amount or Partial Termination \nAmount.  \nLarge Load Customer shall pay the Early Termination Amount calculated under Section 9.7 and \nExhibit D. \nLarge Load Customer’s  obligation to pay the Early Termination Amount shall survive \ntermination and remain secured by Credit Support until paid in full.\n9.2\nPartial Termination\nBefore execution of the Final PJM Agreement, a reduction by Large Load Customer or Eligible \nCustomer in the amount of Firm Transmission Service requested through the PJM process shall \nconstitute a Partial Termination.\nLarge Load Customer may permanently reduce a specified portion of the Firm Load \nCommitment by providing Transmission Owner and Eligible Customer with at least 120 days’ \nprior written notice and paying the Partial Termination Amount calculated under Section 9.8 and \nExhibit D.\nA Partial Termination shall become effective only after:  (i) PJM has approved, directed, or \notherwise recognized the reduction to the extent required under the PJM Tariff; (ii) the Parties \nhave executed an amendment to Exhibit A; and (iii) the amendment has become effective under \napplicable FERC requirements.\nIf the Large Load Facilities have not achieved the state of readiness necessary to take Firm \nTransmission Service corresponding to the applicable Firm Load Commitment by 120 days after \neach Service Date, such occurrence will constitute a Partial Termination.\n9.3\nProject Abandonment or Cessation\nEach Party shall notify the other Parties within five (5) Business Days after becoming aware \nthat:\n(a) the Large Load Customer has determined that it will not construct or complete the \nLarge Load Facilities or proceed with the applicable request for Firm Transmission \nService;\n(b) the Large Load Facilities have not achieved the state of readiness necessary to take \nFirm Transmission Service by 120 days after the initial Service Date;\n(c) the Large Load Customer intends to permanently cease operations at the Large Load \nFacilities; or\n(d) Eligible Customer intends to permanently cease taking Firm Transmission Service to \nserve the Large Load Facilities.\nUpon notice or occurrence of an event described in this Section, Transmission Owner may \nterminate this CRA upon thirty (30) days’ written notice to the other Parties, and  Large Load \nCustomer  shall pay the Early Termination Amount. Large Load Customer’s obligation to pay \nPage 40"},{"page":89,"startToken":36179,"endToken":36569,"text":"the Early Termination Amount shall survive termination and remain secured by Credit Support \nuntil paid in full.\n9.4\nTermination for Default\nTransmission Owner may terminate this CRA upon written notice to other Parties if a Party:\n(a) commits an Event of Default that is not capable of cure; or\n(b) fails to cure an Event of Default within the applicable period under Article 8.\nUpon termination, Large Load Customer shall pay:\n(a) all Shortfall Amounts and other amounts accrued through the termination date;\n(b) the Early Termination Amount; and\n(c) any other amount due under this CRA, subject to the prohibition against duplicative \nrecovery.\nTransmission Owner may apply Credit Support or cash security to those amounts in accordance \nwith Articles 6, 7 and 9.\n9.5\nTermination by Mutual Agreement\nThe Parties may terminate this CRA by mutual written agreement, subject to applicable FERC \nrequirements.\nAny such agreement shall specify the treatment of the Early Termination Amount, any \noutstanding Shortfall Amounts, and the remaining Credit Support provided by Large Load \nCustomer.\n9.6\nTermination Due to Transmission Facility-Related Delay  \nIf any extension of a Service Date or Committed Revenue Contribution under the second \nparagraph of Section 5.5 results in a forecasted or actual extension of [Insert number of months] \nmonths or more to either the first  Service Date or any subsequent Service Date, Large Load \nCustomer may, at its option, either (1) terminate this CRA; or (2) accept the timing and resulting \nadjustment to the applicable Service Date(s).\nIf Large Load Customer elects to terminate this CRA pursuant to this Section 9.6, Large Load \nCustomer shall be responsible for paying an Early Termination Amount calculated pursuant to  \nExhibit D.  However, for purposes of determining the Applicable Termination Percentage under \nExhibit D the number of days in any forecasted or actual extension to the Service Date or \nCommitted Revenue Contribution shall not be counted.  \nTo invoke this termination right, Large Load Customer must provide written notice to \nTransmission Owner and Eligible Customer within 60 days of receipt of notice that any \nforecasted or actual extension will equal or exceed [Insert number of months] months.  \nMoreover, Large Load Customer will not be permitted to invoke this termination right if the \ndelay is caused in whole or part by Large Load Customer’s failure or lack of reasonable \nPage 41"},{"page":90,"startToken":36569,"endToken":36960,"text":"diligence in meeting its obligations under this Agreement or any other binding agreement, tariff, \nregulatory order or other legal requirement, as set forth in Section 5.5.\n9.7\nEarly Termination Amount\nThe “Early Termination Amount” shall be calculated in accordance with Exhibit D. \n9.8\nPartial Termination Amount\nThe “Partial Termination Amount” shall be calculated in accordance with Exhibit D.  After the \nPartial Termination becomes effective, the Committed Revenue Contribution and Credit Support \nRequirement shall be calculated using the remaining Firm Load Commitment, provided that the \nCredit Support Requirement shall continue to be based on 100% of the Projected Full Firm \nTransmission Service Benchmarks corresponding to that remaining Firm Load Commitment.\n9.9\nEarly Termination Offset Amount\nIf the Early Termination Offset Amount is quantifiable when Transmission Owner issues the \ntermination invoice, it shall be included as an Applicable Credit.\nIf the offset becomes quantifiable afterward, Transmission Owner shall reflect it in a subsequent \nreconciliation and promptly return any resulting excess payment to Large Load Customer.\nNothing in this Section requires Transmission Owner to market the Point of Delivery, solicit \nreplacement load, modify its transmission planning or service processes, or enter into a service \narrangement with another Person.\n9.10\nInvoice and Payment\nTransmission Owner shall promptly invoice  Large Load Customer for the Early Termination \nAmount or Partial Termination Amount and provide reasonable substantiation of the calculation. \nFor the avoidance of doubt, in the event that the Large Load Customer fails to timely pay an \ninvoice for the Early Termination Amount or Partial Termination Amount, the Transmission \nOwner shall be permitted to draw on the Credit Support for the unpaid amount.  \n9.11\nEffect of Termination\nAny full termination of this CRA for any reason shall result in (i) before execution of the Final \nPJM Agreement, withdrawal or cancellation of the applicable request for Firm Transmission \nService; and (ii) after execution of the Final PJM Agreement, cancellation of the Firm \nTransmission Service taken by Eligible Customer on behalf of Large Load Customer and the \nrelated Transmission Service Agreement, except where FERC has accepted a replacement or \nsubstitute agreement that contains terms reasonably comparable to this CRA pursuant to PJM \nTariff, Part VIII, Section 438(b).\nA Partial Termination shall result in the corresponding reduction of the request for Firm \nTransmission Service or the Firm Transmission Service, as applicable.\nPage 42"},{"page":91,"startToken":36960,"endToken":37359,"text":"For avoidance of doubt, termination of this CRA and related cancellation of Firm Transmission \nService shall not prohibit Large Load Customer from seeking Firm Transmission Service in the \nfuture.\n9.12\nCrediting of Termination Amount\nIf the effective date of an Early Termination or Partial Termination occurs prior to the first \nService Date and the Large Load Customer is required to pay an Early Termination Amount or \nPartial Termination Amount, as applicable, such amount shall first be applied to the Project \nDevelopment Costs as of the effective date of such termination in accordance with PJM Tariff, \nPart VIII, Subpart N, section 441(e).  Any remaining amounts from the applicable Termination \nAmount shall be credited to the Transmission Owner's Transmission Revenue Requirement for \nthe Transmission Zone in which the Eligible Customer would have taken Transmission Service. \nFor the avoidance of doubt, if Transmission Owner allocates any of the applicable Termination \nAmount to the Project Development Costs, such amount shall not be recovered in Transmission \nrates.  \n \nIf the effective date of an Early Termination or Partial Termination occurs on or after the first \nService Date and the Large Load Customer is required to pay an Early Termination Amount or \nPartial Termination Amount, as applicable, such amount shall be credited to the Transmission \nOwner's Transmission Revenue Requirement for the Transmission Zone in which the Eligible \nCustomer would have taken Firm Transmission Service. \nARTICLE 10\nASSIGNMENT\n10.1\nAssignment by Eligible Customer\nEligible Customer may not assign or transfer this CRA, or any right or obligation arising under \nthis CRA, in whole or in part, without the prior written consent of Transmission Owner and \nLarge Load Customer, which consent shall not be unreasonably withheld, conditioned, or \ndelayed.\nNotwithstanding the foregoing, Eligible Customer may assign its rights and obligations under \nthis CRA to an Affiliate without Transmission Owner’s prior written consent, if:\n(a) Eligible Customer provides the other Parties with prior written notice of the proposed \nassignment;\n(b) the proposed assignee is an Eligible Customer under the PJM Tariff and is authorized \nto take Firm Transmission Service on behalf of the Large Load Customer;\n(c) the proposed assignee assumes in writing all obligations of Eligible Customer under \nthis CRA;\n(d) the assignment has received any acceptance, approval, or recognition required from \nPJM or FERC; and\n(e) all disputes between Transmission Owner and existing Eligible Customer as to \ninvoice outstanding have been reconciled.\nPage 43"},{"page":92,"startToken":37359,"endToken":37760,"text":"An assignment by Eligible Customer shall not change Large Load Customer’s status or release, \nreduce, or otherwise modify Large Load Customer’s obligations under this CRA.\nAn assignment shall not become effective until all applicable requirements of this Section have \nbeen satisfied.\n10.2\nEffect of Assignment\nExcept as expressly provided in a written assignment agreement accepted by Transmission \nOwner and Large Load Customer, an assignment shall not release the assigning Eligible \nCustomer from: (i) any breach or Event of Default occurring before the effective date of \nassignment; (ii) any obligation arising from information, service, or conduct occurring before the \neffective date of assignment but calculated or invoiced afterward; or (iii) any obligation that \nexpressly survives assignment.\nAfter the effective date of a permitted assignment, the assignee shall be treated as the Eligible \nCustomer for purposes of this CRA and shall perform all obligations\nassigned to Eligible \nCustomer under this CRA on and after the effective date of assignment.\n10.3\nAssignment by Large Load Customer\nLarge Load Customer may not assign or transfer this CRA or any right or obligation arising \nunder this CRA, in whole or in part, without the prior written consent of Transmission Owner \nand Eligible Customer, which consent shall not be unreasonably withheld, conditioned, or \ndelayed.\nAn assignment by Large Load Customer shall not become effective unless:\n(a) the proposed assignee assumes in writing all obligations of Large Load Customer \nunder this CRA;\n(b) compliant replacement Credit Support is provided that directly secures the proposed \nassignee’s obligations under this CRA;\n(c) the assignment is documented through a written amendment or assignment executed \nby the applicable Parties;\n(d) the assignment has received any acceptance, approval, or recognition required from \nPJM or FERC; and\n(e) All disputes between Transmission Owner and existing Large Load Customer as to \ninvoice outstanding have been reconciled.\nA transfer of ownership, operation, leasehold rights, or control of the Large Load Facilities does \nnot, by itself, assign this CRA or release Large Load Customer from its obligations under this \nCRA.\n10.4\nAssignment by Transmission Owner\nTransmission Owner may assign this CRA, in whole or in part, without the other Parties’ \nconsent:  (i) to a successor to all or substantially all of the transmission assets or obligations \nrelevant to this CRA; (ii) in connection with a merger, consolidation, reorganization, or other \ncorporate transaction; (iii) to an Affiliate that assumes Transmission Owner’s obligations under \nPage 44"},{"page":93,"startToken":37760,"endToken":38107,"text":"this CRA; or (iv) as required or authorized by the PJM Tariff, FERC, or another governmental \nauthority with jurisdiction.\nTransmission Owner shall provide the other Parties with written notice of the assignment.\nAny other assignment by Transmission Owner requires the prior written consent of the other \nParties, which consent shall not be unreasonably withheld, conditioned, or delayed.\nARTICLE 11\nREGULATORY PROVISIONS\n11.1\nRegulatory Effectiveness\nThis CRA shall be submitted, reported, designated, posted, or filed only to the extent required by \nthe PJM Tariff, a FERC order, regulation, or applicable law.\nCompletion of project-specific information, dates, amounts, percentages, schedules, and other \nelections expressly contemplated by the FERC-accepted form of CRA shall not constitute a \nnonconforming term or condition.\nUpdates to Exhibits A and C and calculations under Exhibit B required under Section 3.2 are \nexpressly contemplated by this CRA and shall not constitute nonconforming terms or \namendments, except to the extent a further filing with or acceptance by FERC is required.\n11.2\nRequired FERC Filing\nIf this CRA is required to be filed with FERC under the PJM Tariff, a FERC order, or applicable \nlaw, Transmission Owner shall submit this CRA for acceptance under Section 205 of the Federal \nPower Act in accordance with PJM Tariff, Part VIII, Subpart N.\nTransmission Owner shall take the lead in preparing and prosecuting the filing and shall use \nreasonable efforts to obtain FERC’s acceptance of this CRA.\nEach Party shall reasonably cooperate in connection with the filing and refrain from taking a \nposition inconsistent with the acceptance of this CRA, except as required by applicable law or \nexpressly permitted under this CRA.\nEach Party shall bear its own costs incurred in connection with the filing unless the Parties \notherwise agree in writing.\n11.3\nRelationship to Other Tariffs and Agreements\nNothing in this CRA shall be construed to grant, provide, guarantee, or otherwise convey \ntransmission service under the PJM Tariff, distribution or retail service under state-regulated \ntariffs or agreements, or any other service or rate, term or condition of such service, except as \nexpressly provided herein. \nPage 45"},{"page":94,"startToken":38107,"endToken":38613,"text":"Nothing in this CRA limits any obligation under the PJM Tariff or another applicable agreement \nto pay study costs, directly assigned facility costs, Network Upgrade costs, or other costs \nassociated with transmission service.\nARTICLE 12\nFORCE MAJEURE\n12.1\nDefinition and Scope of Force Majeure\n“Force Majeure” means an event or circumstance that:\n(a) physically and directly impacts the Large Load Facilities, new transmission facilities, \nor modifications to existing transmission facilities, and/or \n(b) prevents the Affected Party from performing its obligations under this CRA, \nwhich event or circumstance (i) could not have been  reasonably anticipated as of the Effective \nDate and (ii) which is not within the reasonable control of, or the result of negligence or \nmisconduct by, the Affected Party, and (iii) which the Affected Party is unable to overcome or \navoid or cause to be avoided, by the exercise of reasonable care.  Subject to meeting the \nrequirements of the prior sentence, Force Majeure events shall include, but not be limited to, acts \nof God; fire; flood; earthquake; war; explosions; labor disputes; lightning; hurricanes; tornadoes; \npandemics or epidemics; riots; or acts of terrorism that affect one or more Parties.  With respect \nto a Party’s obligation to make payments hereunder, Force Majeure will be only an event or act \nthat on any day disables the banking system through which a Party makes such payments.  \nNothing herein shall be construed so as to require a Party to settle any strike or labor dispute in \nwhich it may be involved.  Economic hardship of any Party shall not constitute a Force Majeure \nunder this CRA, even if that economic hardship is caused by an event or condition that would \nhave been a Force Majeure event if it has physically and directly impacted the Large Load \nFacilities, new transmission facilities, or modifications to existing transmission facilities.\nNo event affecting only the Large Load Customer, the Large Load Facilities, or the amount of \nFirm Transmission Service taken to serve the Large Load Facilities shall constitute Force \nMajeure with respect to Large Load Customer’s payment or Credit Support obligations under \nthis CRA.\nThe Party claiming Force Majeure bears the burden of establishing that the event satisfies every \nrequirement of this Section.\nIf a Party is rendered unable, wholly or in part, by Force Majeure to carry out its obligations with \nrespect to this CRA (the “Affected Party”), then the obligations of the Affected Party will, to the \nextent they are affected by such Force Majeure event, be suspended during the period of time \nthat the Force Majeure event renders the Affected Party unable, wholly or in part, to carry out its \nobligations.  The Affected Party will not be liable for breach of this CRA due to a Force Majeure \nevent nor shall the Affected Party be liable to the other Parties for, or on account of, any loss, \ndamage, injury, or expense resulting from, or arising out of such Force Majeure event.  The \nAffected Party must give written notice and full particulars of such Force Majeure event as soon \nPage 46"},{"page":95,"startToken":38613,"endToken":39081,"text":"as practical after the occurrence of the Force Majeure event.  If a Force Majeure event continues \nfor over 180 days in the aggregate during any 12 month period, the Parties will meet and in good \nfaith attempt to renegotiate the terms and conditions of this CRA to address and account for the \nForce Majeure event.  If the Parties are thereafter unable to mutually agree in writing on an \namendment to this CRA to address issues arising out of the Force Majeure event, Transmission \nOwner or Large Load Customer may terminate this CRA upon ten (10) days’ written notice to \nthe other Parties, subject to Section 12.2, Article 9, and any obligations that accrued or survive \nunder this CRA.\n12.2\nTermination Due to Force Majeure   \nIn the event that Large Load Customer terminates this Agreement pursuant to Section 12, the \nLarge Load Customer shall remain obligated to pay the Early Termination Amount.  However, if \nthe Transmission Owner terminates this Agreement pursuant to Section 12, Large Load \nCustomer shall not be required to pay the Early Termination Amount.\n12.3\nEffect of Force Majeure\nIf a Party is prevented by Force Majeure from performing an obligation under this CRA, that \nobligation shall be suspended only:  (i) to the extent performance is physically impossible \nbecause of the Force Majeure; (ii) for the period during which performance remains physically \nimpossible; and (iii) while the affected Party complies with Section 12.4.\nThe affected Party shall not be in breach of this CRA solely because it fails to perform an \nobligation properly suspended under this Section.\nForce Majeure does not:\n(a) excuse or delay an obligation to pay an amount due under this CRA, except solely to \nthe extent expressly provided in Section 12.1;\n(b) excuse or delay Large Load Customer’s obligation to cause Credit Support to be \nprovided, maintained, increased, renewed, replaced, or replenished;\n(c) except for an extension of a Service Date expressly permitted under Section 5.5, \nreduce, defer, or otherwise modify the Firm Load Commitment, any Service Date, or the \nMinimum Commitment Percentage;\n(d) reduce or defer the calculation of the Committed Revenue Contribution, Actual \nRevenue Contribution, Shortfall Amount, Early Termination Amount, or Partial \nTermination Amount;\n(e) excuse Eligible Customer’s failure to take Firm Transmission Service corresponding \nto the Firm Load Commitment;\n(f) require Transmission Owner to release or reduce Credit Support;\n(g) prevent Transmission Owner from issuing an invoice, completing a calculation or \nreconciliation, or drawing on Credit Support in accordance with this CRA; \n(h) excuse any obligation that arose before the Force Majeure began; or\n(i) affect the application of Article 9 to any abandonment, permanent cessation, \npermanent reduction, or termination associated with the Force Majeure.\nFor the avoidance of doubt, a Force Majeure affecting the Large Load Customer, the Large Load \nPage 47"},{"page":96,"startToken":39081,"endToken":39505,"text":"Facilities, or the amount of Firm Transmission Service taken to serve the Large Load Facilities \nshall not reduce, defer, or otherwise modify Large Load Customer’s payment or Credit Support \nobligations under this CRA. If circumstances associated with a Force Majeure result in \nabandonment, permanent cessation, permanent reduction, or termination, Article 9 shall govern \nthe availability, effectiveness, and financial consequences of that abandonment, cessation, \nreduction, or termination.\n12.4\nNotice\nA Party claiming Force Majeure shall provide the other Parties with written notice as soon as \nreasonably practicable after becoming aware of the event.\nFailure to provide timely notice shall not prevent an event from qualifying as Force Majeure, but \nthe affected Party shall not be excused from performance to the extent the delay in notice \nmaterially prejudices  another Party.\nARTICLE 13\nREPRESENTATIONS AND WARRANTIES\n13.1\nMutual Representations and Warranties\nEach Party represents and warrants to the other Parties, as of the date it executes this CRA and as \nof the Effective Date, that:\n(a) it is duly organized, validly existing, and in good standing under the laws of its \njurisdiction of organization, to the extent such concepts apply;\n(b) it has the power and authority to execute, deliver, and perform this CRA;\n(c) its execution by the Parties, delivery, and performance of this CRA have been duly \nauthorized by all necessary organizational action;\n(d) the individual executing this CRA on its behalf has authority to bind it;\n(e) this CRA constitutes its legal, valid, and binding obligation, enforceable against it in \naccordance with its terms, subject to applicable bankruptcy, insolvency, reorganization, \nmoratorium, and similar laws affecting creditors’ rights generally and to general \nprinciples of equity;\n(f) its execution by the Parties, delivery, and performance of this CRA do not violate its \norganizational documents, applicable law, or any agreement binding on it in a manner \nthat would materially impair its performance under this CRA; and\n(g) except for any acceptance, approval, filing, or other action expressly contemplated by \nthis CRA, the PJM Tariff, or applicable law, no consent or approval is required for its \nexecution by the Parties, delivery, or performance of this CRA that has not been obtained \nor will not be obtained when required.\n13.2\nEligible Customer Representations and Warranties\nEligible Customer represents and warrants to the other Parties, as of the date it executes this \nCRA and as of the Effective Date, that:\n(a) it is an Eligible Customer under the PJM Tariff;\n(b) it is authorized under the PJM Tariff and applicable law to take Firm Transmission \nPage 48"},{"page":97,"startToken":39505,"endToken":39967,"text":"Service on behalf of the Large Load Customer to serve the Large Load Facilities;\n(c) it has obtained, or will obtain when required, all authority, consent, and information \nnecessary to perform its obligations under this CRA;\n(d) all information provided by or on behalf of Eligible Customer for purposes of \ncalculating the Actual Revenue Contribution, Shortfall Amount, Credit Support \nRequirement, Early Termination Amount, or Partial Termination Amount is and shall be \nmaterially accurate and complete;\n(e) it has not relied on any representation or warranty by Transmission Owner concerning \nwhether the Large Load Facilities shall be constructed, completed, achieve commercial \noperation, operate at any load level, or remain economically viable;\n(f) it will provide or authorize access to the service, billing, settlement, and allocation \ninformation reasonably necessary to administer this CRA;\n(g) Eligible Customer’s obligations under this CRA are limited to the transmission-\nservice, information-sharing, cooperation, and administrative obligations expressly \nassigned to Eligible Customer and do not include Large Load Customer’s payment or \nCredit Support obligations; \n(h) Eligible Customer shall timely perform its expressly assigned obligations \nnotwithstanding any dispute with Large Load Customer; \n(i) it has agreed to request and pursue the Firm Transmission Service initially identified \nin Exhibit A on behalf of Large Load Customer through the applicable PJM process; and\n(j) neither the failure of the Large Load Customer to perform nor a dispute between \nEligible Customer and the Large Load Customer will excuse Eligible Customer’s \nperformance under this CRA.\n13.3\nLarge Load Customer Representations and Warranties\nLarge Load Customer represents and warrants to the other Parties, as of the date it executes this \nCRA and as of the Effective Date, that:\n(a) it owns, operates, leases, or otherwise controls the Large Load Facilities;\n(b) the information it provides concerning the Large Load Facilities, Firm Load\nCommitment, Service Dates, load ramp, construction status, anticipated operations, and \ncessation or reduction of operations, and any other information required by or necessary \nto administer this CRA is and shall be materially accurate and complete;\n(c) it has not relied on any representation or warranty by Transmission Owner concerning \nwhether the Large Load Facilities will be constructed, completed, achieve commercial \noperation, operate at any load level, or remain economically viable; \n(d) its payment and Credit Support obligations under this CRA are direct obligations to \nTransmission Owner and do not depend on the performance of Eligible Customer or any \nother Person; \n(e) Credit Support provided under Article 6 directly secures Large Load Customer’s \nobligations under this CRA and, to Large Load Customer’s knowledge, is valid and \nenforceable in accordance with its terms; \n(f) it has designated Eligible Customer to request and take Firm Transmission Service on \nits behalf and has obtained Eligible Customer’s agreement to participate in the applicable \nPJM process; and\nPage 49"},{"page":98,"startToken":39967,"endToken":40345,"text":"(g) Large Load Customer has not created or permitted any undisclosed lien, competing \nclaim, restriction, or other interest that would materially impair Transmission Owner’s \nrights in the Credit Support.\n13.4\nTransmission Owner Representations and Warranties\nTransmission Owner represents and warrants to the other Parties, as of the date it executes this \nCRA and as of the Effective Date, that:  (i) it is a PJM Transmission Owner; (ii) it is authorized \nto enter into this CRA and receive amounts and Credit Support payable or provided under this \nCRA, subject to the PJM Tariff and applicable FERC requirements.\nARTICLE 14\nCONFIDENTIALITY\n14.1\nConfidential Information\nFor purposes of this Article, “Confidential Information” means nonpublic commercial, financial, \noperational, technical, customer-specific, or proprietary information disclosed by or on behalf of \none Party to  another Party in connection with this CRA, whether disclosed orally, electronically, \nor in writing, including nonpublic information concerning:\n(a) the Large Load Customer or the Large Load Facilities;\n(b) the Firm Load Commitment, Service Dates, anticipated or actual load, or operating \nstatus of the Large Load Facilities;\n(c) Firm Transmission Service taken to serve the Large Load Facilities;\n(d) the calculation of the Actual Revenue Contribution, Shortfall Amount, Credit Support \nRequirement, Early Termination Amount, or Partial Termination Amount;\n(e) Credit Support, the financial condition of Large Load Customer , and communications \nwith an issuer; and\n(f) any invoice, supporting documentation, or other information exchanged in \nadministering this CRA.\nInformation shall constitute Confidential Information only if:  (i) it is identified as confidential \nwhen disclosed; or (ii) its nature or the circumstances of disclosure would reasonably indicate \nthat it is confidential.\n14.2\nExclusions\nConfidential Information does not include information that the receiving Party can demonstrate:  \n(i) is or becomes publicly available other than through a breach of this CRA; (ii) was lawfully \nknown to the receiving Party without a confidentiality restriction before disclosure by the \ndisclosing Party; (iii) is lawfully received from another Person without a confidentiality \nrestriction and without breach of an obligation owed to the disclosing Party; (iv) is independently \ndeveloped by or for the receiving Party without use of or reliance on the Confidential \nInformation; or (v) is approved for disclosure by the disclosing Party in writing.\n14.3\nUse and Protection of Confidential Information\nPage 50"},{"page":99,"startToken":40345,"endToken":40791,"text":"A Party receiving Confidential Information shall:  (i) use the Confidential Information only as \nreasonably necessary to perform, administer, enforce, or exercise its rights under this CRA; (ii) \nprotect the Confidential Information using at least the same degree of care that it uses to protect \nits own confidential information of a similar nature, but in no event less than reasonable care;\n(iii) disclose the Confidential Information only as permitted under this Article; and (iv) promptly \nnotify the disclosing Party upon becoming aware of an unauthorized use or disclosure of the \nConfidential Information.\nThe receiving Party may disclose Confidential Information to its Affiliates, employees, officers, \ndirectors, attorneys, accountants, auditors, consultants, insurers, lenders, issuers of Credit \nSupport, and other representatives that have a need to know the Confidential Information and are \nsubject to confidentiality obligations or professional duties of confidentiality.\n14.4\nTariff and Regulatory Requirements\nConfidential Information shall be protected and disclosed in accordance with:  (i) applicable \nFERC regulations and orders; (ii) applicable state law and any applicable retail-service tariff;\n(iii) any protective order or confidentiality agreement binding on the Parties; and (iv) this \nArticle.\n14.5\nPermitted Regulatory and Administrative Disclosures\nA Party may disclose Confidential Information to the extent reasonably necessary:  (i) to comply \nwith the PJM Tariff, a FERC order, applicable law, legal process, or a request or requirement of \na governmental authority with jurisdiction; (ii) to prepare, submit, support, or prosecute a filing, \nreport, audit, formula-rate update, rate proceeding, tariff proceeding, or other regulatory \nsubmission; (iii) to administer a service request, study, billing determination, settlement, \ncalculation, reconciliation, or Credit Support requirement relating to this CRA; (iv) to enforce \nthis CRA or resolve a dispute arising under it; (v) to provide information to PJM reasonably \nnecessary for Tariff administration, study, billing, settlement, or other administrative purposes \nrelating to the Firm Transmission Service or this CRA; (vi) to provide information to an \napplicable state regulatory authority to the extent reasonably necessary in connection with retail \nservice, retail Credit Support, or another state-jurisdictional arrangement relating to the Large \nLoad Facilities; or (vii) with the written consent of the disclosing Party.\nWith respect to disclosures identified in clauses (i)-(vi), the Party making the disclosure shall \nnotify the other Party so that such Party may seek a protective order or such other relief as such \nParty may deem appropriate under the circumstances. The Party making the disclosure may \ndisclose only that portion of the Confidential Information which such Party is required to \ndisclose.\n14.6\nNo Limitation on Required Information Sharing\nEligible Customer may not withhold information reasonably required to calculate, verify, \ninvoice, reconcile, or dispute an amount under this CRA solely because the information is \nPage 51"},{"page":100,"startToken":40791,"endToken":41173,"text":"confidential.\nLarge Load Customer may not withhold facility, project, load-ramp, operational, Credit Support, \nor other information within its possession or control that is reasonably required to administer this \nCRA solely because the information is confidential.\nTransmission Owner’s receipt or use of such information shall remain subject to this Article and \nany other applicable confidentiality requirement.\n14.7\nSurvival\nThe obligations under this Article shall survive expiration or termination of this CRA for five (5)\nyears; provided that (i) information constituting a trade secret shall remain protected for so long\nas it qualifies as a trade secret under applicable law; and (ii) information protected for a longer \nperiod under applicable law, the PJM Tariff, a regulatory order, or a binding confidentiality \nagreement shall remain protected for that longer period.\nARTICLE 15\nDISPUTE RESOLUTION\n15.1\nNotice of Dispute\nA Party disputing an invoice, calculation, Credit Support Requirement, or other matter arising \nunder this CRA shall provide the other Parties with written notice.  The disputing Party shall \nprovide available supporting information reasonably necessary for the other Parties to evaluate \nthe dispute.  A notice under this Section shall not excuse or delay performance except as \nexpressly provided in this CRA. Notwithstanding the foregoing and for the avoidance of doubt, \nthe Large Load Customer is not entitled to dispute resolution for its breach of Section 6.1.\n15.2\nGood-Faith Negotiation\nWithin ten (10) Business Days after receipt of a notice under Section 15.1, representatives of the \nParties with responsibility for administering this CRA shall meet or confer and attempt in good \nfaith to resolve the dispute.\nIf a Party does not request or participate in the Dispute resolution set forth in this Article 15 \nwithin 10 Business Days following the delivered date of the written request initiating the \nprocess, such Party waives any further right to this Dispute resolution process.  The Dispute \nresolution process set forth in this Article 15 shall, in any event, be concluded within 30 days \nfollowing the delivered date of the written request initiating the process or such longer period as \nthe Parties may mutually agree.  Thereafter, any Party may exercise all remedies available at law \nor in equity under this CRA, including the initiation of court proceedings.\n15.3\nContinuation of Performance\nWhile a dispute remains pending:\nPage 52"},{"page":101,"startToken":41173,"endToken":41569,"text":"(a) each Party shall continue performing its obligations under this CRA to the maximum \nextent practicable;\n(b) Large Load Customer shall timely pay each invoiced amount in accordance with \nSection 7.2, notwithstanding the dispute;\n(c) Large Load Customer shall continue to cause Credit Support to be provided, \nmaintained, increased, renewed, replaced, and replenished as required under Article 6;\n(d) Transmission Owner may exercise its rights with respect to Credit Support in \naccordance with Articles 6 and 7; and\n(e) no Party shall take action inconsistent with a final and binding determination \nresolving the dispute.\nPayment or performance during a dispute shall not waive the paying or performing Party’s \nposition or right to seek return of an overpayment or other appropriate relief.\n15.4\nNo Suspension of Credit Support Rights\nThe initiation or pendency of a dispute shall not:  (i) prevent Transmission Owner from making a \npreservation draw under Section 6.4; (ii) suspend Transmission Owner’s right to draw on Credit \nSupport for an invoiced amount not timely paid; (iii) relieve Large Load Customer of its\nobligation to cause compliant Credit Support to be maintained; or (iv) extend the expiration, \nnonrenewal, replacement, or replenishment deadline applicable to Credit Support.\nIf the final resolution of a dispute determines that Large Load Customer paid, or Transmission \nOwner drew, more than the amount properly due, Transmission Owner shall return the excess to \nLarge Load Customer or, if applicable, restore the excess Credit Support in accordance with \nSection 6.5.\nIf a Party receiving a written request to initiate the dispute-resolution process does not participate \nin that process within 10 Business Days after delivery of the written request, that Party waives its \nright to require completion of the informal dispute-resolution process before another Party \npursues available remedies.  The dispute resolution process set forth in this Article 15 shall, in \nany event, be concluded within 30 days following the delivered date of the written request \ninitiating the process or such longer period as the Parties may mutually agree.  \nThereafter, any Party may exercise all remedies available at law or in equity under this CRA, \nincluding the initiation of court proceedings.\nARTICLE 16\nNOTICES\n16.1\nGeneral Notices\nAll notices, demands, and other formal communications required or permitted under this CRA \nshall be in writing, and delivered to the applicable contacts identified in Section 16.2.\n16.2\nNotice Contacts\nPage 53"},{"page":102,"startToken":41569,"endToken":41701,"text":"Eligible Customer\n[Eligible Customer Name]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nWith a copy to:\n[Legal Department or Counsel]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nLarge Load Customer,\n[Large Load Customer Name]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nWith a copy to:\n[Legal Department or Counsel]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nTransmission Owner\n[Transmission Owner Name]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nWith a copy to:\n[Legal Department or Counsel]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nDelivery of a copy shall not be required for a notice to become effective unless expressly stated \nPage 54"},{"page":103,"startToken":41701,"endToken":41934,"text":"otherwise in this CRA.\n16.3\nCredit Support Notices\nAll notices, demands, and communications concerning the issuance, amendment, increase, \nreduction, renewal, replacement, nonrenewal, expiration, disqualification, transfer, draw, or \nrelease of Credit Support shall also be delivered to the following designated Credit Support \ncontacts:\nTransmission Owner Credit Contact\n[Name or Department]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nLarge Load Customer Credit Contact\n[Name or Department]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nSuch notices may be sent by overnight courier, personal delivery, or electronic mail. A notice \nfrom an issuer shall be effective only if delivered as required by the letter of credit.\nARTICLE 17\nGENERAL PROVISIONS\n17.1\nAmendment\nThis CRA may be amended only by a written instrument executed by authorized representatives \nof all Parties.\nAn amendment shall become effective only upon:  (i) acceptance or approval by FERC, if \nrequired; (ii) any approval or recognition required under the PJM Tariff; and (iii) satisfaction of \nany other requirement of applicable law.\nAn update to an Exhibit required under Section 3.2 shall not constitute an amendment for \npurposes of this Section.\n17.2\nEntire Agreement; Relationship to Other Agreements\nThis CRA and its Exhibits constitute the entire agreement between the Parties concerning the \nFirm Load Commitment and the payment, Credit Support, early-termination, and related \nadministrative obligations established under this CRA.  \nPage 55"},{"page":104,"startToken":41934,"endToken":42294,"text":"This CRA supersedes prior oral or written communications, negotiations, and understandings \nbetween the Parties concerning the subject matter of this agreement.  This CRA does not \nsupersede or otherwise impact other agreements (which may include security or cost recovery \nprovisions) that relate to the Large Load Facilities and that do not address matters set forth in this \nCRA related to Firm Load Commitments.\n17.3\nSeverability\nIf a provision of this CRA is held invalid, unlawful, or unenforceable by FERC or another \ngovernmental authority or tribunal having jurisdiction, the remaining provisions shall remain in \neffect to the maximum extent permitted by law.\nThe Parties shall cooperate in good faith to replace the affected provision with a lawful and \nenforceable provision that preserves, to the greatest extent permitted by law, the original \nprovision’s purpose and the economic protections established by this CRA.\nIf the affected provision cannot be replaced and its invalidity defeats the essential purpose of this \nCRA, the Parties’ rights shall be governed by the remaining enforceable provisions of this CRA \nand applicable law.\n17.4\nGoverning Law\nThis CRA shall be governed by:  (i) federal law, including the Federal Power Act, and the PJM \nTariff with respect to matters within federal jurisdiction; and (ii) the laws of the State of [State], \nwithout regard to its conflict-of-laws principles, with respect to matters not governed by federal \nlaw.\nNothing in this Section limits FERC’s jurisdiction or alters the allocation of jurisdiction between \nFERC, any state commission, and any court or other tribunal.\n17.5\nNo Third-Party Beneficiaries\nThis CRA is entered into solely for the benefit of the Parties and their permitted successors and \nassigns.\nExcept as expressly provided in this CRA, no other Person, including PJM, another transmission \ncustomer, a Load Serving Entity, an issuer of Credit Support, or a governmental authority, shall \nhave a right to enforce this CRA or be deemed a third-party beneficiary.\n17.6\nRelationship of the Parties\nNothing in this CRA creates or shall be construed to create:  (i) a partnership; (ii) a joint venture;\n(iii) an agency relationship; (iv) a fiduciary relationship; or (v) an employment relationship\namong any of the Parties..\nPage 56"},{"page":105,"startToken":42294,"endToken":42730,"text":"17.7\nCounterparts; Electronic Signatures\nThis CRA may be executed in any number of counterparts, each of which shall be deemed an \noriginal and all of which together shall constitute one instrument.\n17.8\nIndemnification\nEligible Customer and Large Load Customer shall, jointly and severally, to the fullest extent \npermitted by law, indemnify, defend upon request, and hold harmless Transmission Owner and \nits Representatives from and against all claims, damages, expenses, liabilities, and losses \n(including, without limitation, reasonable attorneys’ fees and expenses) asserted against, \nsustained, or incurred by Transmission Owner or its Representatives for any damage, harm, \ninjury, or loss, of any kind, direct or indirect, to any property or person (including death), \nincluding, without limitation:\n(a) claims for injuries or loss to employees of Transmission Owner, Eligible Customer,\nLarge Load Customer, or their respective Representatives, arising out of or relating to \nany act, omission, conduct, negligence or breach by Large Load Customer, or Eligible \nCustomer, or their respective Representatives; \n(b) arising out of or relating to the work performed under or in connection with this CRA \nby Large Load Customer, Eligible Customer, or their respective Representatives;  and/or\n(c) claims arising out of or relating to Large Load Customer’s, Eligible Customer’s, or \ntheir respective Representatives, contact or encounter with, compromise or disruption of, \nor loss or damage to any property of Transmission Owner or its Representatives’ \nproperty.  \nLarge Load Customer and Eligible Customer each specifically agree, to the fullest extent \npermitted by law, to assume liability for all personal injury claims brought by their respective \nemployees or the employees of their respective Representatives in connection with this CRA and \nwaive any limitation of liability defense based upon the applicable worker’s compensation law\nand cases decided thereunder. Eligible Customer and Large Load Customer agree to indemnify \nand defend Transmission Owner and its Representatives from and against all such loss, expense \ndamage or injury, including, without limitation, reasonable attorneys’ fees, which Transmission \nOwner’s Representatives may sustain as a result of personal injury claims by Eligible \nCustomer’s or Large Load Customer’s employees or their respective Representatives’ employees \nor representatives.  \n17.9\nEnforcement Costs\nEach of Eligible Customer and Large Load Customer shall reimburse Transmission Owner for \nall reasonable attorneys’ fees and expenses incurred in enforcing that Party’s obligations under \nthis CRA, to the extent Transmission Owner prevails in the applicable action or proceeding. \nNotwithstanding the foregoing, Large Load Customer shall be solely responsible for all \nreasonable attorneys’ fees and expenses incurred by Transmission Owner in enforcing Large \nLoad Customer’s payment or Credit Support obligations or collecting any amount due from \nLarge Load Customer under this CRA.\nPage 57"},{"page":106,"startToken":42730,"endToken":42915,"text":"17.10 Rules of Interpretation\nThe Parties intend that any grouping of words or phrases in a series of three or more shall be \ninterpreted to include the use of the Oxford (or serial) comma regardless of whether such Oxford \n(or serial) comma is actually present in the series.\n17.11 Survival\nExpiration or termination of this CRA shall not affect:  (i) any payment obligation accrued or \narising from a period before expiration or termination; (ii) any obligation to complete a \ncalculation, invoice, reconciliation, refund, or return of an excess draw; (iii) any continuing right \nconcerning Credit Support;  (iv) Large Load Customer’s obligation to pay any Shortfall Amount, \nEarly Termination Amount, Partial Termination Amount, or other amount that survives \nexpiration or termination; (v) Transmission Owner’s right to draw upon or apply Credit Support \nand its obligation to provide any required credit, refund, release, or reconciliation; (vi) the \nconfidentiality and dispute-resolution provisions of Articles 14 and 15; or (vii) any other \nprovision that expressly survives or that by its nature must survive to give effect to the Parties’ \nrights and obligations.\n[Signature page follows]\nPage 58"},{"page":107,"startToken":42915,"endToken":42978,"text":"IN WITNESS WHEREOF, the Parties, intending to be legally bound, have caused this CRA to \nbe executed by their duly authorized representatives as of the date first written above.\nTRANSMISSION OWNER:\n[Name of Transmission Owner]\nBy: ______________________________\nName: ____________________________\nTitle: _____________________________\nDate: _____________________________\nELIGIBLE CUSTOMER:\n[Name of Eligible Customer]\nBy: ______________________________\nName: ____________________________\nTitle: _____________________________\nDate: ____________________________\nLARGE LOAD CUSTOMER:\n[Name of Large Load Customer]\nBy: ______________________________\nName: ____________________________\nTitle: _____________________________\nDate: _____________________________\nPage 59"},{"page":108,"startToken":42978,"endToken":43107,"text":"EXHIBIT A\nLARGE LOAD FACILITIES AND FIRM LOAD COMMITMENT\n1.\nParties and Large Load Information\nTransmission Owner:\n[Name of Transmission Owner]\nEligible Customer:\n[Name of Eligible Customer]\nLarge Load Customer:\n[Name of Large Load Customer]\nLarge Load Facilities:\n[Name and general description of the Large Load Facilities]\nFacility Location:\n[Street Address]\n[City, State, ZIP Code]\nTransmission Zone:\n[Applicable PJM Transmission Zone]\nPoint of Delivery:\n[Point of Delivery or other applicable delivery-point identifier]\n2.\nTerm of Agreement: [__] Years\n3.\nMinimum Commitment Percentage:  [___] [add reduction schedule as \napplicable]%\n4.\nInitial Load and Firm Load Commitments\nEligible Customer’s Initial Load Commitment and Firm Load Commitment will be set forth in \nthe following schedule:\nLoad-Ramp \nStage\nService \nDate\nLoad Commitment / Associated Firm Transmission Service\nBenchmark\n1\n[Date]\n[___] MW\n2\n[Date]\n[___] MW\nPage 60"},{"page":109,"startToken":43107,"endToken":43410,"text":"3\n[Date]\n[___] MW\n[Additional \nStage]\n[Date]\n[___] MW\nFinal\n[Date]\n[___] MW\nFollowing the update required under Section 3.2, the information in this Section 4 shall replace \nthe Initial Load Commitment and shall establish the Firm Load Commitment for purposes of this\nCRA.\nThe Firm Load Commitment applicable during any Measurement Period is the amount of total \nload from the Large Load Facilities that is anticipated to be in service under the foregoing \nschedule if the Eligible Customer is taking NITS on behalf of the Large Load.  If the Eligible \nCustomer is taking FCDS or Firm Point-to-Point Transmission Service on behalf of the Large \nLoad, the Firm Load Commitment applicable during any Measurement Period is the amount of \nsuch Firm Transmission Service for which the Eligible Customer has contracted or reserved, as \napplicable, during such period.\nIf a subsequent Service Date occurs during a Measurement Period, the Firm Load Commitment \napplicable before and after that Service Date shall be determined separately for the applicable \nportions of the Measurement Period in accordance with Exhibit B.\n5.\nService Dates\nThe first Service Date under this Exhibit A is [Date].\nThe final Service Date under this Exhibit A is [Date].\n6.\nCommercial Operation Date\nThe anticipated Commercial Operation Date for the Large Load Facilities is [Date]. The \nanticipated Commercial Operation Date is not a guarantee of service on such date.\nExcept as expressly provided in the CRA, a change in the anticipated or actual Commercial \nOperation Date does not modify:\na Service Date;\nthe Firm Load Commitment;\nthe Committed Revenue Contribution;\nthe Credit Support Requirement; or\nany other obligation under the CRA.\n7.\nRelationship to Actual Load and Firm Transmission Service\nThe Firm Load Commitment is a contractual benchmark reflecting the anticipated load \nassociated with the Large Load Facilities and the corresponding Firm Transmission Service\nPage 61"},{"page":110,"startToken":43410,"endToken":43603,"text":"commitment on which the CRA is based. It is not a statement of the Large Load Facilities' actual \ndemand during any Measurement Period.\n8.\nUpdate and Amendment History\nThe following table will identify each update or amendment of this Exhibit A that becomes \neffective under Section 3.2 or Article 17 of the CRA:\nUpdate or \nAmendment No.\nEffective \nDate\nDescription of Update \nor Amendment\nFinal PJM Agreement Identifier or \nFERC Docket No./Order Date, as \nApplicable\n[___]\n[Date]\n[Description]\n[Final PJM Agreement Identifier or \nDocket No./Order Date]\n[___]\n[Date]\n[Description]\n[Final PJM Agreement Identifier or \nDocket No./Order Date]\n[___]\n[Date]\n[Description]\n[Final PJM Agreement Identifier or \nDocket No./Order Date]\nAn update required under Section 3.2 shall become effective without further agreement or \nsignature of the Parties and shall not constitute an amendment to the CRA, except to the extent a \nfiling with or acceptance by FERC is required. Any other change to this Exhibit A shall be made \nin accordance with Article 17.\nUnless and until an update or amendment becomes effective in accordance with the CRA, the \nthen-effective Firm Load Commitment and Service Dates will continue to control.\nPage 62"},{"page":111,"startToken":43603,"endToken":43908,"text":"EXHIBIT B\nREVENUE CONTRIBUTION AND SHORTFALL CALCULATION\n1. Applicable Firm Load Commitment\nFor each Measurement Period, the “Applicable Firm Load Commitment” shall mean each \namount of the Firm Load Commitment scheduled to apply during that Measurement Period \nunder Exhibit A.\nIf more than one load level is scheduled to apply during a Measurement Period, each load level \nshall apply for the portion of the Measurement Period during which it is scheduled to be \neffective.\nThe Applicable Firm Load Commitment shall not be reduced or deferred based on:\nthe amount of load that actually materializes;\nthe amount of Firm Transmission Service actually taken to serve the Large Load \nFacilities; or\nthe actual operating level of the Large Load Facilities.\n2. Full Firm Transmission Service Benchmark\nFor each Measurement Period, the “Full Firm Transmission Service Benchmark” shall equal \n100% of the Firm Transmission Service-related charges that would apply if Eligible Customer \ntook Firm Transmission Service corresponding to the Applicable Firm Load Commitment during \nthat Measurement Period.\nThe Full Firm Transmission Service Benchmark shall be calculated using:\nthe Applicable Firm Load Commitment;\nthe Applicable Firm Transmission Service Rate;\nthe generally applicable rate components and billing determinants used under the PJM \nTariff and Transmission Owner’s applicable FERC-jurisdictional rate to calculate charges \nfor  Firm Transmission Service; and\nthe portion of the Measurement Period during which each applicable load level and \nApplicable Firm Transmission Service Rate applies.\nIf the Applicable Firm Load Commitment or Applicable Firm Transmission Service Rate \nchanges during a Measurement Period, the Full Firm Transmission Service Benchmark shall \nequal the sum of the amounts separately calculated for each applicable portion of the \nMeasurement Period.\n3. Committed Revenue Contribution\nFor each Measurement Period, the Committed Revenue Contribution = Minimum Commitment \nPercentage × Full Firm Transmission Service Benchmark\nThe Minimum Commitment Percentage shall be the percentage specified in Exhibit A.\nPage 63"},{"page":112,"startToken":43908,"endToken":44265,"text":"The Minimum Commitment Percentage shall be applied only to the Full Firm Transmission \nService Benchmark and shall not be applied to the Actual Revenue Contribution.\n4. Actual Revenue Contribution\nFor each Measurement Period, the Actual Revenue Contribution shall equal the Firm \nTransmission Service-related revenues paid or payable to PJM for remittance or allocation to \nTransmission Owner, or otherwise paid or payable to Transmission Owner, that are attributable \nto transmission service actually taken to serve the Large Load Facilities.\nThe Actual Revenue Contribution shall include amounts to the extent those amounts:\nare attributable to Firm Transmission Service taken by Eligible Customer to serve the \nLarge Load Facilities;\ncorrespond to the same categories of rate components included in the Full Firm \nTransmission Service Benchmark; and\nhave not been refunded, reversed, or otherwise credited to the payer.\nTo the extent the applicable Firm Transmission Service methodology uses an assigned \nNetwork Service Peak Load contribution or another allocated billing determinant, the \nActual Revenue Contribution shall be calculated using:\nthe billing determinant assigned to the Large Load Facilities for the applicable \nMeasurement Period; and\nthe same categories of rates and rate components used to calculate the Full Firm \nTransmission Service Benchmark.\n5. Actual Billing Determinant and Allocation\nIf Firm Transmission Service-related charges or billing determinants attributable to the Large \nLoad Facilities are aggregated with charges or billing determinants attributable to other load, \nTransmission Owner shall determine the portion attributable to the Large Load Facilities using, \nin the following order of priority:\nPJM billing and settlement data that separately identifies the Large Load Facilities;\nmetering or other load data for the Large Load Facilities, applied in accordance with the \ngenerally applicable billing and allocation methodology under the PJM Tariff; and\nif the foregoing information is insufficient, other information supplied by Eligible \nCustomer or the applicable billing or service entity that Transmission Owner reasonably \ndetermines is sufficient to identify and verify the portion attributable to the Large Load \nFacilities.\nEligible Customer shall provide, or cause the applicable billing or service entity to provide, \ninformation reasonably necessary to identify and verify the portion attributable to the Large Load \nFacilities.\n6. Included Rate Components\nPage 64"},{"page":113,"startToken":44265,"endToken":44597,"text":"The same categories of Firm Transmission Service rate components shall be used to calculate the \nFull Firm Transmission Service Benchmark and the Actual Revenue Contribution.  The included \nrate components shall be derived from the applicable zonal Firm Transmission Service rate.\nThe following amounts shall be excluded:\ncharges for electric energy;\ncharges for generation capacity;\nretail electric service or distribution-service charges;\npenalties or charges for unreserved transmission use;\nadministrative-service or ancillary-service charges, unless expressly included above;\ninterest, late-payment charges, taxes, and fees unrelated to the included Firm \nTransmission Service rate components; and\namounts attributable to load other than the Large Load Facilities.\n7. Applicable Firm Transmission Service Rate\nThe Applicable Firm Transmission Service Rate for each Measurement Period shall be the \napplicable zonal rate then in effect under the PJM Tariff and Transmission Owner’s FERC-\njurisdictional rate for Firm Transmission Service in the applicable Transmission Zone.\nIf an applicable zonal Firm Transmission Service Rate changes during a Measurement Period, \neach rate shall apply to the portion of the Measurement Period during which it was in effect.\n8. Shortfall Amount\nFor each Measurement Period, the Shortfall Amount = Committed Revenue Contribution • \nActual Revenue Contribution\nIf the Actual Revenue Contribution equals or exceeds the Committed Revenue Contribution, the \nShortfall Amount shall be zero.\n9. Separate Measurement Periods\nEach Measurement Period shall be calculated independently. Any amount by which the Actual \nRevenue Contribution exceeds the Committed Revenue Contribution for one Measurement \nPeriod shall not reduce a Shortfall Amount for another Measurement Period, be carried forward \nor backward, or entitle Large Load Customer to any payment, refund, or credit.\n10. Partial Measurement Periods\nFor any partial Measurement Period, the Full Firm Transmission Service Benchmark, Committed \nRevenue Contribution, Actual Revenue Contribution, and Shortfall Amount shall be calculated \nfor the portion of the Measurement Period falling within the Term.\nThe Full Firm Transmission Service Benchmark shall be prorated in accordance with the billing \ninterval applicable to the Applicable Firm Transmission Service Rate, based on the portion of the \nPage 65"},{"page":114,"startToken":44597,"endToken":44615,"text":"Measurement Period during which each applicable load level and Applicable Firm Transmission \nService\nRate \nwas \neffective.\nPage 66"},{"page":115,"startToken":44615,"endToken":45013,"text":"EXHIBIT C\nCREDIT SUPPORT REQUIREMENT AND SCHEDULE\n1. Credit Support Requirement\nThe Credit Support Requirement is intended to secure Large Load Customer’s projected \nfinancial exposure under the CRA for the remaining Term and does not determine or limit any \namount otherwise payable by Large Load Customer under the CRA.\nAt execution by the Parties, the Initial Credit Support Requirement shall be calculated using the \nInitial Load Commitment, anticipated Service Dates, estimated Applicable Firm Transmission \nService Rate, and other information then available, and the methodology specified below. \nThe Initial Credit Support Requirement shall equal the aggregate Projected Full Firm \nTransmission Service Benchmarks for the full Term of this CRA beginning on the first Service \nDate through the end of the Term.\nFollowing the update required under Section 3.2 after execution of the Final PJM Agreement, \nTransmission Owner shall recalculate the Credit Support Requirement using the updated Firm \nLoad Commitment, Service Dates, Applicable Firm Transmission Service Rate, and Projected \nFull Firm Transmission Service Benchmarks for the remainder of the Term. The recalculated \nCredit Support Requirement shall replace the Initial Credit Support Requirement.\nAt the end of each Measurement Period, Transmission Owner shall recalculate Large Load \nCustomer’s Credit Support Requirement. The recalculation shall equal the aggregate Projected \nFull Firm Transmission Service Benchmarks for the remaining Term. Transmission Owner shall \nexclude a completed Measurement Period from the Credit Support Requirement only after:\n(i) Transmission Owner has finally calculated the Committed Revenue Contribution, Actual \nRevenue Contribution, and any resulting Shortfall Amount for that Measurement Period; and\n(ii) Large Load Customer has paid all amounts due for that Measurement Period.\nTransmission Owner shall provide Large Load Customer with notice after each recalculation, \nand the revised Credit Support Requirement shall become effective in accordance with Section \n6.5 of the CRA. These recalculations shall not constitute an amendment to this Exhibit or the \nCRA.\n2. Calculation of Projected Full Firm Transmission Service Benchmarks\nFor each Measurement Period included in the Credit Support Requirement, the Projected Full \nFirm Transmission Service Benchmark shall equal 100% of the Firm Transmission Service-\nrelated charges that would apply if Eligible Customer took Firm Transmission Service \ncorresponding to the Initial Load Commitment or Firm Load Commitment, as applicable, \nscheduled to apply during that Measurement Period.\nThe Credit Support Requirement shall equal the aggregate Projected Full Firm Transmission \nService Benchmarks for all Measurement Periods included in the applicable calculation.\nPage 67"},{"page":116,"startToken":45013,"endToken":45379,"text":"The Projected Full Firm Transmission Service Benchmark shall be calculated using:\nthe Initial Load Commitment or Firm Load Commitment, as applicable, and set forth in \nExhibit A;\nthe Applicable Firm Transmission Service Rate in effect or estimated to apply, as \napplicable, at the time of calculation;\nany rate change accepted by FERC and scheduled to become effective during the \napplicable Measurement Period;\nthe rate components and billing determinants identified in Exhibit B; and\nthe portion of each Measurement Period during which each applicable load level and \nApplicable Firm Transmission Service Rate is scheduled to apply.\n3. No Reduction for Minimum Commitment Percentage or Projected Actual Revenues\nThe Credit Support Requirement shall be calculated using 100% of the Projected Full Firm \nTransmission Service Benchmarks and shall not be reduced by:\nthe Minimum Commitment Percentage; or\nany projected or estimated Actual Revenue Contribution.\nActual Revenue Contributions shall be credited in determining the Shortfall Amount for a \ncompleted Measurement Period in accordance with Article 5 and Exhibit B.\nAfter the calculation for a completed Measurement Period has been finalized and Large Load \nCustomer has paid all amounts due for that Measurement Period, that Measurement Period shall \nbe excluded from the Credit Support Requirement in accordance with Sections 1 and 4 of this \nExhibit.\nFor avoidance of doubt, Actual Revenue Contributions attributable to a completed Measurement \nPeriod shall not reduce the Projected Full Firm Transmission Service Benchmark for any future \nMeasurement Period.\n4. Recalculation\nTransmission Owner shall recalculate the Credit Support Requirement:\nfollowing the update required under Section 3.2 after execution of the Final PJM \nAgreement;\nafter the Committed Revenue Contribution, Actual Revenue Contribution, and any \nresulting Shortfall Amount for a completed Measurement Period have been finally \ncalculated and Large Load Customer has paid all amounts due for that Measurement \nPeriod in accordance with Section 1 of this Exhibit;;\nfollowing an effective modification to the Firm Load Commitment or a Service Date;\nfollowing an effective Partial Termination;\nfollowing a change in the Applicable Firm Transmission Service Rate that has become \neffective, or a rate change that has been accepted by FERC and is scheduled to become \neffective during a Measurement Period included in the Credit Support Requirement; \nPage 68"},{"page":117,"startToken":45379,"endToken":45674,"text":"upon replacement of Credit Support following an issuer downgrade, disqualification, \nexpiration, termination, or notice of nonrenewal; and\nas otherwise expressly required under the CRA.\nTransmission Owner shall provide notice of each such recalculation, and the revised Credit \nSupport Requirement shall become effective in accordance with Section 6.5 of the CRA.  These \nupdates shall not constitute an amendment to this Exhibit or the CRA generally.\n5. Letter of Credit Issuer Requirements\nA financial institution issuing a letter of credit under the CRA shall:\nmaintain a long-term unsecured credit rating of [at least “A-” from S&P Global Ratings \nor Fitch Ratings or “A3” from Moody’s Investors Service] [insert alternative credit rating \nrequirement if applicable];\nsatisfy the requirements of Article 6 and any attachments to this Exhibit; and\notherwise satisfy Transmission Owner’s generally applicable credit requirements.\n6. Treatment of Prior Draws\nA draw applied to an unpaid amount shall not reduce the Credit Support Requirement. Large \nLoad Customer shall cause the Credit Support to be restored to the then-applicable Credit \nSupport Requirement in accordance with Section 6.7 of the CRA.\nA preservation draw under Section 6.4 shall not reduce the Credit Support Requirement because \nthe proceeds continue to be held as cash security securing Large Load Customer’s obligations \nunder the CRA.\nIn determining the amount of replacement or additional Credit Support required, cash security \nheld by Transmission Owner and legally available to secure the same obligations shall be \ncredited against the otherwise applicable Credit Support Requirement.\n7. Relationship to Amounts Payable\nThe Credit Support Requirement is a measure of secured exposure and does not determine or \nlimit:\nthe actual Committed Revenue Contribution;\nthe Actual Revenue Contribution;\nthe Shortfall Amount for a completed Measurement Period; or\nany amount otherwise payable under the CRA.\nPage 69"},{"page":118,"startToken":45674,"endToken":45679,"text":"EXHIBIT C, ATTACHMENT [__]\nPage 70"},{"page":119,"startToken":45679,"endToken":45991,"text":"EXHIBIT D\nEARLY AND PARTIAL TERMINATION AMOUNT SCHEDULE\n1. Applicable Termination Percentage\nThe Applicable Termination Percentage for an Early Termination or Partial Termination shall be \ndetermined based on the date on which the termination or Partial Termination becomes effective, \nas follows:\nEffective Date of Termination or Partial Termination Applicable Termination Percentage\nOn or after the Effective Date and before execution of the \nFinal PJM Agreement\n25%\nOn or after execution of the Final PJM Agreement through \nthe 180th day after execution of the Final PJM Agreement 50%\nAfter the 180th day after execution of the Final PJM \nAgreement but before the first Service Date\n75%\nOn or after the first Service Date\n100%\n2. Early Termination Amount\nThe Early Termination Amount shall be calculated in accordance with Article 9 and this Exhibit \nof the CRA as follows:\nEarly Termination Amount = (Applicable Termination Percentage × Present Value of Remaining \nProjected Committed Revenue Contributions) • Applicable Credits \nThe Applicable Termination Percentage used in the calculation shall be the percentage specified \nin Section 1 of this Exhibit for the date on which the termination becomes effective.\nBefore execution of the Final PJM Agreement, the Early Termination Amount shall be calculated \nusing the Initial Load Commitment, anticipated Service Dates, estimated Applicable Firm \nTransmission Service Rate, and other information then reflected in Exhibits A and C. After \nexecution of the Final PJM Agreement, the calculation shall use the updated information \nprovided pursuant to Section 3.2.\nThe Early Termination Amount shall not be less than zero.\n3. Present Value of Remaining Projected Committed Revenue Contributions\nThe Present Value of Remaining Projected Committed Revenue Contributions shall be \ncalculated as of the effective date of termination for the period beginning on the effective date of \ntermination and ending on the date the fixed period specified in Section 4.2(i) of the CRA would \nhave expired absent the termination.\nPage 71"},{"page":120,"startToken":45991,"endToken":46341,"text":"The calculation shall be based on:\nthe Initial Load Commitment or Firm Load Commitment, as applicable, and Service \nDates in effect immediately before termination;\nthe Minimum Commitment Percentage;\nthe Projected Full Firm Transmission Service Benchmark determined in accordance with \nExhibit C;\nthe Applicable Firm Transmission Service Rate in effect or estimated to apply, as \napplicable, on the effective date of termination; \nany rate change accepted by FERC and scheduled to become effective during the \nremaining fixed period;\nthe rate components and billing determinants identified in Exhibit B; and\nTransmission Owner’s then-effective FERC-approved weighted average cost of capital as \nthe discount rate.\nNo rate escalation or other projected rate change shall be included unless the rate change has \nbeen accepted by FERC and is scheduled to become effective during the remaining fixed period.\n4. Applicable Credits\nApplicable Credits shall include, without duplication:\nany Actual Revenue Contribution attributable to the portion of the Measurement Period \noccurring before the effective date of termination that has been paid or is payable and has \nnot otherwise been credited;\nany Shortfall Amount, Credit Support proceeds, or other amount previously collected and \napplied to the same revenue exposure; and\nany Early Termination Offset Amount determined under Section 9.9 of the CRA.\nNo amount shall be treated as an Applicable Credit unless it has been paid, received, or applied \nto the revenue exposure included in the Early Termination Amount.\n5. Partial Termination Amount\nUnless the permanently reduced portion of the Firm Load Commitment consists of a separately \nidentifiable load tranche, the Partial Termination Amount shall equal:\nPartial Termination Amount = Early Termination Amount × (Permanently Reduced MW ÷ \napplicable Initial Load Commitment or Firm Load Commitment immediately before reduction) \nThe Applicable Termination Percentage shall be the percentage specified in Section 1 of this \nExhibit for the effective date of the Partial Termination.\nIf the permanently reduced portion consists of one or more separately identifiable load tranches, \nthe Partial Termination Amount shall be calculated using the Projected Committed Revenue \nContributions attributable to the terminated tranche or tranches, including the applicable MW \namount and Service Date for each terminated tranche.\nPage 72"},{"page":121,"startToken":46341,"endToken":46607,"text":"The Partial Termination Amount shall not be less than zero.\n6. Treatment After the First Service Date\nOn and after the first Service Date, the Applicable Termination Percentage shall remain 100%.\nThe Present Value of Remaining Projected Committed Revenue Contributions will decline as the \nremaining portion of the fixed period decreases. Accordingly, the Applicable Termination \nPercentage will not be separately reduced based solely on the passage of time after the first \nService Date.\n7. Early Termination Offset Amount\nIf an Early Termination Offset Amount is quantifiable when Transmission Owner issues the \napplicable termination invoice, Transmission Owner shall include that amount as an Applicable \nCredit.\nIf all or part of the Early Termination Offset Amount becomes quantifiable after the termination \ninvoice is issued, Transmission Owner shall reflect the amount in a subsequent reconciliation and \npromptly return any resulting excess payment to Large Load Customer in accordance with \nArticles 7 and 9 of the CRA.\nNothing in this Exhibit requires Transmission Owner to market the Point of Delivery, solicit \nreplacement load, modify its transmission planning or service processes, or enter into a \ntransmission-service arrangement with another Person.\n8. No Duplicate Recovery\nThe Early Termination Amount and Partial Termination Amount are forward-looking amounts \nintended to address projected revenue exposure arising after the effective date of termination or \nPartial Termination.\nTransmission Owner shall not recover the same revenue exposure through both:\na Shortfall Amount; and\nan Early Termination Amount or Partial Termination Amount.\nAmounts collected before termination or Partial Termination shall be credited only to the extent \nrequired under Article 9 and this Exhibit to prevent duplicate recovery.\nPage 73"},{"page":122,"startToken":46607,"endToken":46904,"text":"706\nRates and Charges\nEligible Customers taking Interim Network Integration Transmission Service shall pay the \ncharges set forth in this Section 706.\n706.1 Monthly Demand Charge\nEligible Customer shall pay a Monthly Demand Charge for Zone Network Load and Non-Zone \nNetwork Load, which shall be determined as follows: Eligible Customer’s measured demand \namount (in MWs) multiplied by the applicable zonal Network Integration Transmission Service \nrate established pursuant to Section 34.1.\nRevenue Crediting.  Each month, revenue credits will be applied to the gross monthly Demand \nCharge to determine the actual charge to the Transmission Customer.  Revenue credits shall be \ncalculated based on the sum of the applicable Zone’s share of revenues collected during the \nmonth from the Non-Firm Contract Demand Charge under Schedule 19.  The sum of these \nrevenues will appear as a reduction to the gross monthly rate stated above on a Transmission \nCustomer’s bill in that month for service under this schedule.  \n706.2 Redispatch Charge\nThe Eligible Customer shall pay any redispatch costs as set forth in Tariff, Attachment K.\n706.3 Stranded Cost Recovery\nAny Transmission Owner may seek to recover stranded costs from the Eligible Customer \npursuant to this Tariff in accordance with the terms, conditions and procedures set forth in FERC \nOrder No. 888.  However, the Transmission Owner must separately file any proposal to recover \nstranded costs under section 205 of the Federal Power Act.\n706.4 Other Charges\nEligible Customer shall pay administrative services charges under Tariff, Schedule 1A; Tariff, \nSchedule 9; and Tariff, Schedule 10, consistent with the charges assessed to loads taking \nNetwork Integration Transmission Service.\nEligible Customer shall pay Ancillary Services charges in accordance with Tariff, Part I, \nsection 3. \nEligible Customer shall pay Black Start Service charges in accordance with Tariff, Schedule 6A.\nPage 74"},{"page":123,"startToken":46904,"endToken":46988,"text":"714 \nRates and Charges for Firm Contract Demand Transmission Service\nEligible Customers taking Firm Contract Demand Transmission Service on behalf of Eligible \nLoad or Large Load shall pay the charges set forth in this Section 714.\n714.1 Monthly Demand Charge\nEligible Customer taking service on behalf of Eligible Load or Large Load shall pay a Monthly \nDemand Charge based on the Firm Contract Demand Transmission Service amount (MW), as \nspecified in Eligible Customer’s Service Agreement, in accordance with Tariff, Schedule 18.\nPage 75"},{"page":124,"startToken":46988,"endToken":47066,"text":"715 \nRates and Charges for Non-Firm Contract Demand Transmission Service\nEligible Customers taking Non-Firm Contract Demand Transmission Service shall pay the \ncharges set forth in this Section 715.\n715.1 Monthly Demand Charge\nEligible Customer shall pay a discounted reservation rate set as a function of the Zonal Firm \nContract Demand Transmission Service rate and the transmission system load factor for a Zone, \nas specified in Eligible Customer’s Service Agreement, in accordance with Tariff, Schedule 19.\nPage 76"},{"page":125,"startToken":47066,"endToken":47267,"text":"SCHEDULE 7\nLong-Term Firm and Short-Term Firm Point-To-Point\nTransmission Service\n1) The Transmission Customer shall pay each month for Reserved Capacity at the sum of the applicable charges set forth below for the Point of Delivery:\nSummary of Charges\n(in $/kW)\nPoint of Delivery\nYearly Charge\nMonthly Charge\nWeekly Charge\nDaily On-Peak1/\nCharge\nDaily Off-Peak2/\nCharge\nBorder of PJM3/\nBorder Yearly Charge \nestablished pursuant to \nsection 11 below\nYearly Charge /12\nYearly Charge /52\nWeekly Charge /5\nWeekly Charge /7\nAE Zone\n23.809\n1.984\n0.4580\n0.0920\n0.0650\nBGE Zone\n15.675\n1.306\n0.3010\n0.0600\n0.0430\nDelmarva Zone\n19.378\n1.615\n0.3730\n0.0750\n0.0530\nJCPL Zone\n15.112\n1.259\n0.2906\n0.0581\n0.0414\nMetEd Zone\n15.112\n1.259\n0.2906\n0.0581\n0.0414\nPenelec Zone\n15.112\n1.259\n0.2906\n0.0581\n0.0414\nPECO Zone\n26.264\n2.189\n0.5051\n0.1010\n0.0722\nPPL Zone: Total charge is the sum of \nthe components\nPPL: *\nAEC: 0.463\nUGI: *\nPPL: *\nAEC: 0.039\nUGI: *\nPPL: *\nAEC: 0.0089\nUGI: *\nPPL: *\nAEC: 0.0018\nUGI: *\nPPL: *\nAEC: 0.0013\nUGI: *\nPage 77"},{"page":126,"startToken":47267,"endToken":47532,"text":"Point of Delivery\nYearly Charge\nMonthly Charge\nWeekly Charge\nDaily On-Peak1/\nCharge\nDaily Off-Peak2/\nCharge\nPepco Zone\n20.999\n1.750\n0.4040\n0.0810\n0.0580\nPSE&G Zone\n23.696\n1.975\n0.4557\n0.0911\n0.0651\nAP Zone\nRate Pursuant to Attachment H-\n11 and Attachment H-34\nRate Pursuant to \nAttachment H-11 and \nAttachment H-34\nRate Pursuant to Attachment \nH-11 and Attachment H-34\nRate Pursuant to Attachment \nH-11 and Attachment H-34\nRate Pursuant to \nAttachment H-11 and \nAttachment H-34\nRockland Zone\n53.766\n4.481\n1.0340\n0.2068\n0.1477\nComEd Zone4/\n5/\nAEP East Zone6/\nRate Pursuant to \nAttachment H-14 and \nAttachment H-20\nRate Pursuant to \nAttachment H-14 and \nAttachment H-20\nRate Pursuant to Attachment \nH-14 and Attachment H-20\nRate Pursuant to Attachment \nH-14 and Attachment H-20\nRate Pursuant to \nAttachment H-14 and \nAttachment H-20\nDayton Zone\nRate Pursuant to \nAttachment H-15\nRate Pursuant to \nAttachment H-15\nRate Pursuant to Attachment \nH-15\nRate Pursuant to Attachment \nH-15\nRate Pursuant to \nAttachment H-15\nDuquesne Zone\n14.17\n1.18\n0.27\n0.0540\n0.0386\nDominion Zone7/\nATSI Zone\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nDEOK Zone\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nEKPC Zone\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nPage 78"},{"page":127,"startToken":47532,"endToken":47997,"text":"OVEC Zone\n5.16\n0.43\n0.10\n0.02\n0.014\n* PPL Electric Utilities Corporation’s and UGI Utilities’ respective component of the total charge is posted on the PJM Internet website.\n1/\nMonday – Friday except the following holidays:  New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.\n2/\nSaturday and Sunday and the following holidays:  New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.\n3/\nThe charge for Points of Delivery at the Border of PJM shall not apply to any Reserved Capacity with a Point of Delivery of the Midcontinent Independent \nTransmission System Operator, Inc.\n4/\nEach month, revenue credits will be applied to the gross charge in accordance with section 8 below to determine the actual charge to the Transmission Customer. \n5/\nThe charges for the ComEd zone are posted on PJM’s website.  In addition to other rates set forth in this schedule, customers within the ComEd zone shall be \ncharged for recovery of RTO start-up costs at the following rates, each computed to four decimal places:\nAnnual Rate - $/kW/year = $1,523,039, divided by the 1 CP demand for the ComEd zone for the prior calendar year;\nMonthly Rate - $/kW/month. = Annual Rate divided by 12;\nWeekly Rate - $/kW/week = Annual Rate divided by 52;\nDaily Rate - $/kW/day = Weekly Rate divided by 5.\nIn order to ensure that the charge does not result in either an over-recovery or under-recovery of ComEd’s start-up costs, PJM will institute an annual true-up \nmechanism in the month of May of each of the years 2008-2014.  In May of each of those years, PJM will compare the amount collected under this charge for the \nprevious 12 months with the target annual amount of $1,523,039 and calculate any credits or surcharges that would be needed to ensure that $1,523,039 is collected \nfor each year.  Any credit or surcharge will be assessed in the June bills for years 2008-2014, consistent with the above methodology.\n6/\nThe rates for firm point-to-point transmission service in the AEP Zone will be charged at the yearly, monthly, weekly or daily rate equivalent to the rate effective in \nsuch period under Attachments H-14 and H-20. In addition to other rates set forth in this schedule, customers within the AEP East Zone shall be charged for \nrecovery of RTO start-up costs at the following rates, each computed to four decimal places:\nAnnual Rate - $/kW/year = $2,362,185, plus any applicable true-up adjustment, divided by the 1 CP demand for the AEP East Zone for the prior calendar year;\nMonthly Rate - $/kW/month. = Annual Rate divided by 12;\nWeekly Rate - $/kW/week = Annual Rate divided by 52;\nDaily Rate - $/kW/day = Weekly Rate divided by 5.\nPage 79"},{"page":128,"startToken":47997,"endToken":48397,"text":"For the period November 1, 2005 through March 31, 2006, the rate shall be $8.94/MW-month; for the period April 1 through December 31, 2006, the rate shall be \n$8.60/MW-month, thereafter, the rate will be subject to the following true-up:\nIn order to ensure that the charge does not result in either over-recovery or under-recovery of AEP’s start-up costs, PJM will institute an annual true-up mechanism \nand implement revised charges as of January 1st of each of the years 2007-2019.  In January of each of those years, PJM will compare the amount collected under \nthis charge for the previous year or part thereof with the target annual amount of $2,362,185 and calculate the rates that would be needed, given the expected billing \ndemands, to collect $2,362,185, adjusted for any prior year over-collection or under-collection.  In the final year that the rate is collected, PJM will calculate the rate \nto collect five-twelfths of the annual amount ($984,244), plus or minus any prior year true up amount, by May 31 of that year, and shall charge such rate until that \namount is collected, whether that date be before or after May 31, 2020.   \n7/\nThe service period charges rounded to four decimal places for the Dominion Zone are as follows:\nYearly Charge - $/kW/year = the formula rate for Network Integration Transmission Service as described in Attachment H-16 and Attachment H-16A \ndivided by 1000 kW/MW\nMonthly Charge - $/kW/month. = Yearly Charge divided by 12;\nWeekly Charge - $/kW/week = Yearly Charge divided by 52;\nDaily On-Peak Charge - $/kW/day = Weekly Charge divided by 5;\nDaily Off-Peak Charge - $/kW/day = Weekly Charge divided by 7.\nOn a monthly basis, revenue credits shall be calculated based on the sum of VEPCO’s share of revenues collected during the month from Schedule 7 and Network \nIntegration Transmission Service to Non-Zone Network Load under Attachment H-A.  The sum of these revenue credits will appear as an adjustment to the to the \ngross monthly service period charges produced by the above formula.\n2)\nThe total demand charge in any week, pursuant to a reservation for Daily On-Peak Delivery, or Daily Off-Peak Delivery shall not exceed the Weekly Delivery rate \nspecified in section (1) above for weekly service times the highest amount in kilowatts of Reserved Capacity and any additional transmission service, if any, in any day during such \nweek.\nPage 80"},{"page":129,"startToken":48397,"endToken":48990,"text":"3)\nDiscounts:  Three principal requirements apply to discounts for transmission service as follows:  (1) any offer of a discount made by the Transmission Provider must be \nannounced to all Eligible Customers solely by posting on the OASIS, (2) any customer-initiated requests for discounts (including requests for use by one’s wholesale merchant or \nan Affiliate’s use) must occur solely by posting on the OASIS, and (3) once a discount is negotiated, details must be immediately posted on the OASIS.  For any discount agreed \nupon for service on a path, from point(s) of receipt to point(s) of delivery, the Transmission Provider must offer the same discounted transmission service rate for the same time \nperiod to all Eligible Customers on all unconstrained transmission paths that go to the same point(s) of delivery on the Transmission System.\n4)\nCongestion, Losses and Capacity Export:  In addition to any payment under this Schedule, the Transmission Customer shall pay Redispatch Costs as specified in Section \n27 of the Tariff.  The Transmission Customer shall be responsible for losses as specified in the Tariff.  Any Transmission Customer that is a Capacity Export Transmission \nCustomer, shall pay any applicable charges, and receive any applicable credits, for such a customer pursuant to Attachment DD.\n5)\nOther Supporting Facilities and Taxes:  In addition to the rates set forth in section (1) of this schedule, the Transmission Customer shall pay charges determined on a \ncase-by-case basis for facilities necessary to provide Transmission Service at voltages lower than those shown in Attachment H for the applicable Zone(s) and any amounts \nnecessary to reimburse PJMSettlement for any amounts payable as sales, excise, “Btu,” carbon, value-added or similar taxes (other than taxes based upon or measured by net \nincome) with respect to the amounts payable pursuant to the Tariff.\n6)\n[Reserved]\n7)\nTransmission Enhancement Charges. Except for Points of Delivery at the Border of PJM, which are subject to the Border Yearly Charge determined under section 11, in \naddition to the rates set forth in section (1) of this Schedule and any other applicable charges, the Transmission Customer shall also pay any Transmission Enhancement Charges \nfor which it is designated as a Responsible Customer under Schedule 12 appended to the Tariff.\n8)\nDetermination of monthly charges for ComEd Zone: On a monthly basis, revenue credits shall be calculated based on the sum of ComEd’s share of revenues collected \nduring the month from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission Service to Non-Zone Network Load under Attachment H-A; (iii) Seams \nElimination Charge/Cost Adjustment/Assignment (“SECA”) revenues allocable to ComEd under the Tariff; and (iv) any Point-To-Point Transmission Service where the Point of \nReceipt and the Point of Delivery are both internal to the ComEd Zone. On this basis, the sum of these revenues will appear as a reduction to the gross monthly rate stated above \non a Transmission Customer’s bill in that month for service under this schedule.\n9)\nDetermination of monthly charges for AEP Zone: On a monthly basis, revenue credits shall be calculated based on the sum of AEP’s share of revenues collected during \nthe month from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission Service to Non-Zone Network Load under Attachment H-A; and (iii) Firm \nPoint-To-Point Transmission Service where the Point of Delivery is internal to the AEP Zone. The sum of these revenue credits will appear as an adjustment (reduction) to the \ngross monthly rate stated above on a Transmission Customer’s bill in that month for service under this schedule.\nPage 81"},{"page":130,"startToken":48990,"endToken":49304,"text":"10)\nResales:  The rates and rules governing charges and discounts stated above shall not   apply to resales of transmission service, compensation for which shall be governed by \nsection 23.1 of the Tariff.\n11)\nDetermining the Border Yearly Charge\n(A) Formula for Determining the Border Yearly Charge\n(i)  Beginning with the calendar year 2020, the Border Yearly Charge shall be based on the following formula:\nBYC = SHRR/SZPL\nWhere:\nBYC is the Border Yearly Charge stated in dollars per kW of Reserved Capacity; \nSHRR is the sum of the Revenue Requirements for each Transmission Owner used to determine charges for Network Integration Transmission Service either (a) \nstated in Attachment H for a Transmission Owner or (b) determined pursuant to a formula rate set forth in Attachment H, both as adjusted in accordance with this \nsection (11)(A). \nSZPL is the sum of each Zone’s annual peak load (in kW) plus the peak day firm reservations for Point-to-Point service at the Border of PJM (in kW) subject to the \ncharges set forth in section (1) herein (prior to any applicable discount) from the most recently completed 12-month period ending October 31.\n(ii) Where the Revenue Requirement of a Transmission Owner is determined pursuant to a formula rate: \n(a) the Revenue Requirement shall be increased by the amount of any revenue included in the Transmission Owner’s formula rate as credits in \ndetermining the Revenue Requirement for Network Integration Transmission Service from: (i) Transmission Enhancement Charges; (ii) Firm Point-to-Point \nTransmission Service charges under Schedule 7; (iii) Network Integration Transmission Service to Non-Zone Network Load under Attachment H-A; (iv) \nInterconnection Reliability Reinforcement Charges;  or (v) Generator Reliability Reinforcement Recovery Fees that are included in the Transmission Owner’s \nformula rate as revenue credits in determining the Revenue Requirement for Network Integration Transmission Service, if such credits are identified in the \nTransmission Owner’s formula rate annual update; and\nPage 82"},{"page":131,"startToken":49304,"endToken":49843,"text":"(b)  (I) the Revenue Requirement shall be reduced by the amount of any credit applied directly to Network Customers to offset the cost of Network \nIntegration Transmission Service, including credits to Network Customers resulting from: (i) a Network Upgrade Funding Agreement, Tariff, Attachment O-2; (ii) a \nState Agreement Public Policy Project subject to Tariff, Schedule 12, section (b)(xii)(B);  (iii) agreements for transmission service entered into prior to a \nTransmission Owner signing the Consolidated Transmission Owners Agreement or any of its predecessor agreements or (iv) an entity executing an agreement by \nwhich such entity is obligated to pay for some, or all, of the Revenue Requirement of Transmission Facilities for which Network Customers would otherwise be \nresponsible. (II) The Revenue Requirement for inclusion in the SHRR shall not be reduced by the amount of any credits for (i) Transmission Enhancement Charges; \n(ii) Firm Point-to-Point Transmission Service charges under this Schedule 7; (iii) Network Integration Transmission Service to Non-Zone Network Load under \nTariff, Attachment H-A; (iv) Interconnection Reliability Reinforcement Charges;  or (v) Generator Reliability Reinforcement Recovery Fees.\n(B) The Transmission Provider shall update the Border Yearly Charge annually based on the Revenue Requirements for each Transmission Owner used to \ndetermine charges for Network Integration Transmission Service in effect on January 1, provided that such Revenue Requirements were approved by FERC, stated in a \nformula rate update informational filing with FERC, or posted on the Transmission Provider’s website no later than the preceding October 31.  The Border Yearly Charge \nso updated shall become effective as of January 1 and remain in effect for the remainder of the calendar year.  Except as provided in subsection (D) of this section (11), any \nchange to the data used to determine the Border Yearly Charge following October 31, including any change in the number or identity of Transmission Owners filing \nRevenue Requirements for Network Integration Transmission Service under Attachment H, shall not be reflected in Border Yearly Charge until the next annual update.\n(C) Not later than the first Business Day of December each year, the Transmission Provider shall post on the Transmission Provider’s website a “BYC Workbook” \nthat shall include (1) all of the inputs and calculations used to determine the Border Yearly Charge, (2) references to the sources of the inputs used to determine the Border \nYearly Charge from each Transmission Owner’s stated or formula rate filing or posting, (3) a variance report detailing all changes to the calculations, inputs, or procedures \nused to determine the proposed Border Yearly Charge as compared to the calculations, inputs or procedures used to determine the Border Yearly Charge then in effect, and \n(4) contact information for the submission of inquiries or comments regarding the posted BYC Workbook.  All inputs used to determine the SHRR must be taken either \nfrom a stated Revenue Requirement for Network Integration Transmission Service specified in Attachment H or from an identified entry in a Transmission Owner’s \nformula rate update either filed with the FERC or posted on the Transmission Provider’s website for the rate for Network Integration Transmission Service that will be in \neffect on January 1.  \n(D)  Procedure for Review of and Challenge to the Border Yearly Charge Determination.\n(i)  Review of the Border Yearly Charge Determination.\nPage 83"},{"page":132,"startToken":49843,"endToken":50479,"text":"(a)  Within sixty (60) days of the posting of the BYC Workbook, Interested Parties, including entities with existing, requested or planned \ntransmission service reservations for service at the Border of PJM (“Border Rate Transmission Customers”), state utility regulatory commissions, consumer advocacy \nagencies, state attorneys general, and any entity having standing under Section 206 of the Federal Power Act (“Interested Party”), may submit reasonable information \nrequests to the Transmission Provider regarding its selection and use of inputs and the calculations performed in calculating the Border Yearly Charge, including the \ncreation of the BYC Workbook, with respect to any adjustments made by the Transmission Provider, including adjustments made based on information provided by a \nTransmission Owner to the Transmission Provider:  (1) to a Transmission Owner’s Revenue Requirement for Network Integration Transmission Service prior to its \ninclusion as an input into the calculation of the SHRR for the Border Yearly Charge; (2) to the data used in determining SZPL; (3) to the Revenue Requirement of a \nTransmission Owner in determining the Border Yearly Charge made in accordance with Section (11)(A)(ii); and (4) in response to any FERC orders approving or requiring \nchanges to, or refunds associated with, a Transmission Owner’s formula rate or resulting annual Revenue Requirement.\n(b)  The Transmission Provider shall respond to such reasonable information requests as soon as practicable, but no later than within forty-five (45) \ndays of the receipt of the information request, unless it determines that additional time is required to respond.  The Transmission Provider shall post any information \nrequests received and its responses thereto on the Transmission Provider’s website, provided that any responsive information that has been designated by a Transmission \nOwner as confidential pursuant to the provisions of the Operating Agreement or Consolidated Transmission Owners Agreement shall not be posted and shall be handled \nsolely in accordance with such provisions.  An Interested Party may request a meeting with the Transmission Provider and any interested Transmission Owner to discuss \nany response to an information request or any dispute regarding the calculation of the Border Yearly Charge annual update. The Transmission Provider and any interested \nTransmission Owner shall exercise good faith in responding to an Interested Party’s meeting request and shall not unreasonably deny or delay such meeting in a manner \nthat prejudices an Interested Party’s opportunity to timely review the Border Yearly Charge annual update.\n(c)  At any time after posting of the BYC Workbook, but before a challenge pursuant to section (11)(D)(ii) (“Challenge”) is filed, at the request of an \nInterested Party, the Transmission Provider will be required to meet with the Interested Party within ten (10) Business Days of such request in an attempt to resolve any \ndispute regarding the calculation of the Border Yearly Charge raised by the Interested Party in its meeting request. If the dispute relates to information from one or more \nTransmission Owners’ Tariff, Attachment H stated or formula rate or Zonal peak load determination, the relevant Transmission Owner(s) will be notified by the \nTransmission Provider of the dispute and will be permitted to attend the meeting.\n(d)  If it is determined that the Border Yearly Charge is based on an incorrect input or calculation or FERC directs that a Transmission Owner’s\nRevenue Requirement, upon which the Border Yearly Charge is based, be changed and implemented as a change to the Transmission Owner’s rate for Network Integration \nTransmission Service at a time other than provided for in the Transmission Owner’s formula rate protocols (“Changed Revenue Requirement”), the Transmission Provider \nshall change the   Border Yearly Charge as necessary to account for such Changed Revenue Requirement and post on the Transmission Provider’s website a revised BYC \nWorkbook documenting the changes to the Border Yearly Charge to incorporate the correction or change. The correction to the Border Yearly Charge shall take effect no \nPage 84"},{"page":133,"startToken":50479,"endToken":50997,"text":"later than the first day of the month that begins 30 days after a correction is posted by the Transmission Provider or, if the correction or Changed Revenue Requirement \nresults from a FERC order, on a schedule consistent with that order. Subject to the notice of correction described above, to the extent permitted by Tariff, Part I, section \n10.4, PJM Settlement, on behalf of itself or as agent for the Transmission Provider, shall adjust the charges to Border Rate Transmission Customers with respect to any \nmonth prior to the effective date of the Changed Revenue Requirement being reflected in the Border Yearly Charge that is affected by the correction or Changed Revenue \nRequirement and refund or credit any amount paid in excess of the corrected Border Yearly Charge. Any correction under this subsection (D) shall be limited to any \nChanged Revenue Requirement and the Transmission Provider’s selection and use of Border Yearly Charge inputs and the calculations necessary to determine the Border \nYearly Charge. This section does not apply to a FERC order that changes a Transmission Owner’s Revenue Requirement that is implemented through a true-up mechanism.\n(e) If FERC issues an order directing or approving refunds associated with a Transmission Owner’s Revenue Requirement that previously was, or \ncurrently is, incorporated into the SHRR to be paid to Network Integration Transmission Service customers, Border Rate Transmission Customers shall also receive a \nrefund, to the extent that the changes in a Transmission Owner’s Revenue Requirement upon which such refund is based affects the calculation of the Border Yearly \nCharge.\n(f)  Nothing in section (11) shall authorize an inquiry into the data or information filed or posted by a Transmission Owner as part of its transmission \nrate protocols pursuant to Tariff, Attachment H, or shall affect the rights that any Border Rate Transmission Customer may have under said protocols.\n(ii)  Challenge to the Border Yearly Charge Determination.\n(a)  An Interested Party may file with FERC a Challenge to the annual update of the Border Yearly Charge within  ninety (90) days of the posting of \nthe BYC Workbook or thirty (30) days of receiving a response to any information request it submitted under subsection (11)(D)(i)(a), whichever is later.  Any such \nChallenge shall be served on Transmission Provider and each Transmission Owner with Revenue Requirements included in the BYC Workbook.\n(b)  A Challenge must specify and include adequate supporting documentation, detailing how the Transmission Provider’s selection of inputs to or \ncalculation of the Border Yearly Charge fails to comply with the provisions of this Schedule 7, section (11), identifying any input data or other BYC Workbook entry that is \nalleged to be missing or inaccurate or the Border Yearly Charge calculations alleged to be performed incorrectly.\n(c)  A Challenge must be limited to the Transmission Provider’s selection and use of Border Yearly Charge inputs and the calculations necessary to \ndetermine the Border Yearly Charge and may not seek to modify Tariff, Schedules 7 and 8 or Attachment H-A or question the data or information filed or posted by a \nTransmission Owner pursuant to Tariff, Attachment H. \nPage 85"},{"page":134,"startToken":50997,"endToken":51345,"text":"(d)  The Transmission Provider and each Transmission Owner with Revenue Requirements included in the BYC Workbook shall have thirty (30) \ndays to answer a Challenge.\n(e)  In any proceeding before the FERC in response to a Challenge, the Transmission Provider shall bear the burden, consistent with Section 205 of \nthe FPA, of demonstrating that it has correctly applied the terms of this Schedule 7, section (11).\n(E) When the Transmission Provider posts on its website a Border Yearly Charge annual update under subsection (C) or correction under subsection (D) of this \nsection (11), it shall also make an informational filing with the FERC that includes such posting.\n(F) A Transmission Customer taking Point-to-Point Transmission Service at the Border of PJM under this Schedule 7, including any discounted service pursuant to \nSection (3), is relieved from, and shall not be separately allocated or assigned Transmission Enhancement Charges under Schedule 12 §(c)(5) on the basis of its reservation \nof Firm Point-to-Point Transmission Service at the Border of PJM.  Payment of the charges set forth in this Schedule does not relieve the responsibility of a Transmission \nCustomer or Merchant Transmission Facility to pay Transmission Enhancement Charges assigned to such Merchant Transmission Facility, other than pursuant to Tariff, \nSchedule 12, §(c)(5), nor does it determine other cost obligations of Transmission Customers or Merchant Transmission Facilities that may be imposed under other \nprovisions of the Tariff.  \n(G)  Point-to-Point Transmission Service at the Border of PJM includes service to a Point of Delivery at a Merchant Transmission Facility that provides service to a \nneighboring transmission system.\n(H)  Customers taking Point-to-Point Transmission Service at the Border of PJM with a Point of Delivery at a Merchant Transmission Facility and not receiving a \ndiscount from the Border Yearly Charge pursuant to this Schedule 7, section (3) under the settlement entered into in FERC Docket No. ER19-2105, shall receive a credit \ndetermined in accordance with the following formula:\nMTFC = BYC*MTFTEC/SHRR\nWhere:\nMTFC is the credit to the Border Yearly Charge per kW of reserved capacity; \nBYC is the Border Yearly Charge;\nPage 86"},{"page":135,"startToken":51345,"endToken":51420,"text":"MTFTEC is the total annual Transmission Enhancement Charges under Tariff, Schedule 12 applicable to the Merchant Transmission Facility to which the customer \nis taking Point-to-Point Transmission Service during the current calendar year; and \nSHRR is the amount determined pursuant to subsection (A) of this section (11).\nThe MTFC shall be credited on a monthly basis only for those months during which the customer takes Firm Point-to-Point Transmission Service to the Merchant \nTransmission Facility.\nPage 87"},{"page":136,"startToken":51420,"endToken":51847,"text":"SCHEDULE 12\nTransmission Enhancement Charges and \nInterconnection Reliability Reinforcement Cost Recovery\n(a)\nEstablishment of Transmission Enhancement Charges.  \n(i)\nEstablishment of Transmission Enhancement Charges by Transmission \nOwners and Entities That Will Become Transmission Owners.  One or more of the \nTransmission Owners may be designated to construct and own and/or finance Required \nTransmission Enhancements by (1) the Regional Transmission Expansion Plan periodically \ndeveloped pursuant to Operating Agreement, Schedule 6 or (2) any joint planning or \ncoordination agreement between PJM and another region or transmission planning authority set \nforth in Tariff, Schedule 12-Appendix B (“Appendix B Agreement”) (collectively, for purposes \nof this Schedule 12 only, “Regional Transmission Expansion Plan”).  Operating Agreement, \nSchedule 6, section 1.7 recognizes that Transmission Owners, subject to obtaining any necessary \nregulatory approvals, may seek to recover the costs of Required Transmission Enhancements and \nobligates PJMSettlement to collect on behalf of Transmission Owner(s) any charges established \nby Transmission Owners to recover the costs of Required Transmission Enhancements.  If a \nTransmission Owner is designated by the Regional Transmission Expansion Plan to construct \nand own and/or finance a Required Transmission Enhancement, such Transmission Owner may \nchoose any of the following cost recovery mechanisms, subject to the crediting procedures set \nforth in section (e) below: \n(1)\nDecline to seek to recover the costs of Required Transmission Enhancements \nfrom customers until such time as it makes a filing pursuant to Section 205 of the Federal \nPower Act to revise its Network Integration Transmission Service rates;\n(2) \nMake a filing pursuant Section 205 of the Federal Power Act and the FERC’s \nrules and regulations to establish the revenue requirement with respect to a Required \nTransmission Enhancement, without filing to revise its rates for Network Integration \nTransmission Service generally; or\n(3) \nEstablish the revenue requirement with respect to a Required Transmission \nEnhancement through the operation of a formula rate in effect applicable to its rates for \nNetwork Integration Transmission Service.\nA charge established to recover the revenue requirement with respect to a Required Transmission \nEnhancement is hereafter referred to as a “Transmission Enhancement Charge.”  Transmission \nEnhancement Charges of one or more Transmission Owners for Required Transmission \nEnhancements shall be established in accordance with this Schedule 12.   \n(ii)\nEstablishment of Transmission Enhancement Charges With Respect to \nRequired Transmission Enhancements Constructed by Entities in Another Region. The \nrevenue requirement with respect to a Required Transmission Enhancement constructed pursuant \nto an Appendix B Agreement in another region by an entity designated by such other region shall \nbe governed by the tariffs or agreements in effect in such region. Transmission Enhancement \nPage 88"},{"page":137,"startToken":51847,"endToken":52345,"text":"Charges to recover the costs of such Required Transmission Enhancement for which PJM is \nresponsible shall be determined in accordance with this Schedule 12.  Other than with respect to \na Required Transmission Enhancement constructed pursuant to an Appendix B Agreement, no \nPJM Network or Transmission Customer will bear cost responsibility for any required \ntransmission upgrades in another region as a consequence of a Required Transmission \nEnhancement included in the Regional Transmission Expansion Plan.  \n(iii)\nTransmission Facilities Not Eligible for Cost Responsibility Assignment.  Any \nalternating current (“A.C.”) facilities or direct current (“D.C.”) facilities that are Attachment \nFacilities, Local Upgrades, Merchant Network Upgrades, Merchant Transmission Facilities, \nNetwork Upgrades, Supplemental Projects, or any other Transmission Facilities that operate or \nare planned to be operated in a manner that requires customers to subscribe to transmission \nservice over such facilities or to a portion of the electric capability of such facilities shall not be \neligible for cost responsibility assignment pursuant to this Schedule 12.  \n(iv)\nEntities Not Yet Eligible to Become Transmission Owners.  For purposes of \nthis Schedule 12 only, the term, “Transmission Owner,” shall include any entity that undertakes \nto construct and own and/or finance a Required Transmission Enhancement pursuant to a \ndesignation in the Regional Transmission Expansion Plan to construct and own and/or finance \nsuch Required Transmission Enhancement, even if such entity is not yet eligible to become a \nparty to the Consolidated Transmission Owners Agreement.  Nothing in the PJM Tariff nor the \nConsolidated Transmission Owners Agreement shall prevent an entity that undertakes to \nconstruct and own and/or finance a Required Transmission Enhancement pursuant to a \ndesignation in the Regional Transmission Expansion Plan to construct and own and/or finance \nsuch Required Transmission Enhancement from recovering the costs of such Required \nTransmission Enhancement through this Schedule 12.\n(v)\nEffective Date.  The assignment of cost responsibility or classification of \nRequired Transmission Enhancements either (1) made by the Transmission Provider prior to \nFebruary 1, 2013, or (2) applicable to Required Transmission Enhancements approved by the \nPJM Board pursuant to Operating Agreement, section 1.6 prior to February 1, 2013 are set forth \nin Tariff, Schedule 12-Appendix.  Except as specifically set forth herein, nothing in this \nSchedule 12 shall change the assignment of cost responsibility or classification of Required \nTransmission Enhancements included in Tariff, Schedule 12-Appendix.  The assignment of cost \nresponsibility or classification of all other Required Transmission Enhancements shall be set \nforth in Tariff, Schedule 12-Appendix A. \n(b)\nDesignation of Customers Subject to Transmission Enhancement Charges.  \n(i)\nRegional Facilities and Necessary Lower Voltage Facilities.  Transmission \nProvider shall assign cost responsibility on a region-wide basis for Required Transmission \nEnhancements included in the Regional Transmission Expansion Plan that (1) (a) are A.C. \nfacilities that operate at or above 500 kV; (b) constitute a single Required Transmission \nEnhancement comprising two A.C. circuits operating at or above 345 kV and below 500 kV, \nwhere both circuits originate from a single substation or switching station at one end and \nPage 89"},{"page":138,"startToken":52345,"endToken":52819,"text":"terminate at a single substation or switching station at the other end, regardless of whether or not \nthe two circuits are routed in the same right-of-way (“Double-circuit 345 kV Required \nTransmission Enhancement”); (c) are A.C. or D.C. shunt reactive resources (such as capacitors, \nstatic var compensators, static synchronous condenser (STATCON), synchronous condensers, \ninductors, other shunt devices, or their equivalent) connected to a Transmission Facility \ndescribed in clause (a) or (b) of this subsection, or (d) are D.C. facilities meeting the criteria set \nforth in subsection (b)(i)(D) (collectively, “Regional Facilities”), or (2) new A.C. Transmission \nFacilities or expansions or enhancements to existing Transmission Facilities that operate below \n500 kV (or 345 kV in the case of a Regional Facility described in clause (1)(b) of this \nsubsection) or new D.C. Transmission Facilities that do not meet the criteria of subsection \n(b)(i)(D) that must be constructed or strengthened to support new Regional Facilities, based on \nthe planning criteria used by the Transmission Provider in developing the applicable Regional \nTransmission Expansion Plan (“Necessary Lower Voltage Facilities”) as follows: \n(A)\nCost responsibility for Regional Facilities and Necessary Lower Voltage \nFacilities shall be allocated among Responsible Customers as defined in this Schedule 12 as \nfollows:\n(1)\nFifty percent (50%) shall be assigned annually on a load-ratio \nshare basis as follows:\n(a)\nWith respect to each Zone, using, consistent with Tariff, \nPart III, section 34.1, the applicable zonal loads at the time of such Zone’s annual peak load from \nthe 12-month period ending October 31 preceding the calendar year for which the annual cost \nresponsibility allocation is determined; and\n(b)\nWith respect to Merchant Transmission Facilities, (1) for \nthe calendar year following the year in which it initiates operation, the actually awarded Firm \nTransmission Withdrawal Rights associated with its existing Merchant Transmission Facility; \nand (2) for all subsequent calendar years, the annual peak load of the Merchant Transmission \nFacility (not to exceed its actual Firm Transmission Withdrawal Rights) from the 12-month \nperiod ending October 31 of the calendar year preceding the calendar year for which the annual \ncost responsibility allocation is determined.\n(2)\nFifty percent (50%) shall be assigned as follows:\n(a)\nIn the case of a Required Transmission Enhancement \nincluded in the Regional Transmission Expansion Plan to address one or more reliability \nviolations or to address operational adequacy and performance issues (collectively, “Reliability \nProject”), in accordance with the distribution factor (“DFAX”) analysis described in subsection \n(b)(iii) or the analysis applicable to Regional Facilities that address stability issues described in \nsubsection (b)(xviii) of this Schedule 12 as applicable; and\n(b)\nIn the case of a Required Transmission Enhancement \nincluded in the Regional Transmission Expansion Plan to relieve one or more economic \nconstraints as described in Operating Agreement, Schedule 6, section 1.5.7(b)(iii) (“Economic \nPage 90"},{"page":139,"startToken":52819,"endToken":53270,"text":"Project”), in accordance with the methodology described in subsection (b)(v) of this Schedule \n12.\n(B)\n(1) Except for transformers that are an integral component of a Regional \nFacility, transformers connected to Lower Voltage Facilities, as defined in section (b)(ii) of this \nSchedule 12, shall not be considered Regional Facilities or Necessary Lower Voltage Facilities; \nand (2) Transmission Facilities that are not Regional Facilities and deliver energy from a \nRegional Facility to load shall not be considered Necessary Lower Voltage Facilities.\n(C)\nWith respect Required Transmission Enhancements that qualify as \nRegional Facilities under subsection (b)(i)(1)(b) or subsection (b)(i)(D)(2) of this Schedule 12:\n(1)\nwhere the Required Transmission Enhancement includes both new \nTransmission Facilities and pre-existing Transmission Facilities, cost responsibility under this \nsection (b)(i) shall apply only to the cost of the new Transmission Facilities plus the original cost \nless accumulated depreciation of pre-existing Transmission Facilities that are included in Tariff, \nSchedule 12-Appendix or Tariff, Schedule 12-Appendix A;\n(2)\ncost responsibility shall be assigned under this section (b)(i) only \nafter the Required Transmission Enhancement goes into service as a Double-circuit 345 kV \nRequired Transmission Enhancement or a Double-circuit D.C. Required Transmission \nEnhancement; and \n(3)\ncost responsibility shall be assigned under this section (b)(i) for \nany CWIP permitted to be recovered before the Required Transmission Enhancement goes into \nservice only after such Transmission Facilities are approved in a Regional Transmission \nExpansion Plan as a Double-circuit 345 kV Required Transmission Enhancement or a Double-\ncircuit D.C. Required Transmission Enhancement.\n(D)\nA Required Transmission Enhancement included in the Regional \nTransmission Expansion Plan that is a D.C. facility, consisting of D.C. lines (i.e., wires or \ncables) and A.C./D.C. converters, shall be a Regional Facility only if: \n(1) \nsuch D.C. facility comprises two poles and operates at a voltage of \n±433 kV D.C. or above; or\n(2)\nsuch D.C. Facility constitutes a single Required Transmission \nEnhancement comprising two D.C. circuits where (i) both circuits originate from a single \nsubstation or switching station at one end and terminate at a single substation or switching \nstation at the other end, regardless of whether or not both circuits are routed in the same right-of-\nway, and (ii) each such circuit consists of two poles and operates at a voltage of ±298 kV D.C or \nabove (“Double-circuit D.C. Required Transmission Enhancement”).\n(ii)\nLower Voltage Facilities.  Transmission Provider shall assign cost responsibility \nfor Required Transmission Enhancements that (a) are not Regional Facilities; and (b) are not \n“Necessary Lower Voltage Facilities” as defined in section(b)(i) of this Schedule 12 (collectively \n“Lower Voltage Facilities”), as follows:\nPage 91"},{"page":140,"startToken":53270,"endToken":53646,"text":"(A)\nIf the Lower Voltage Facility is a Reliability Project,  Transmission \nProvider shall use the DFAX analysis described in subsection (b)(iii) or the analysis applicable to \nRegional Facilities that address stability issues described in subsection (b)(xviii) of this Schedule \n12 as applicable; and\n(B)\nIf the Lower Voltage Facility is an Economic Project, Transmission \nProvider shall use the methodology described in subsection (b)(v) of this Schedule 12.\n(iii)\nDFAX Analysis for Reliability Projects.  \n(A)  For purposes of the assignment of cost responsibility for Reliability Projects \nunder subsection (b)(i)(A)(2)(a) and subsection (b)(ii)(A) of this Schedule 12, the Transmission \nProvider, based on a computer model of the electric network and using power flow modeling \nsoftware, shall calculate distribution factors, represented as decimal values or percentages, which \nexpress the portions of a transfer of energy from a defined source to a defined sink that will flow \nacross a particular transmission facility or group of transmission facilities.  These distribution \nfactors represent a measure of the use by the load of each Zone or Merchant Transmission \nFacility (collectively, “Responsible Zone”) of the Required Transmission Enhancement, as \ndetermined by a power flow analysis.  In general, a distribution factor can be represented as:\nDistribution Factor = (After-shift power flow – pre-shift power flow) / Total amount of power \nshifted\nTotal amount of power shifted = Modeled incremental megawatt transfer to a given Load \nDeliverability Area or Merchant Transmission Facility\nPre-shift power flow = Megawatt flow over the Required Transmission Enhancement  \nbefore the incremental megawatt transfer\nAfter-shift power flow = Megawatt flow over the Required Transmission Enhancement \nafter the incremental megawatt transfer\nWhen calculating such distribution factors:\n(1)\nAll distribution factors are calculated with respect to the Required \nTransmission Enhancement subject to cost allocation under subsection (b)(i)(A)(2)(a) and \nsubsection (b)(ii)(A) of this Schedule 12.\n(2)\nThe calculation of distribution factors shall be determined using \nlinear matrix algebra, such that distribution factors represent the ratio of (i) a change in megawatt \nflow on a Required Transmission Enhancement to (ii) a change in megawatts transferred to \naggregate load within a Zone or, in the case of a Merchant Transmission Facility, the point of \nwithdrawal associated with Firm Transmission Withdrawal Rights over such Merchant \nTransmission Facility.\nPage 92"},{"page":141,"startToken":53646,"endToken":54131,"text":"(3)\nWith respect to a Merchant Transmission Facility, zonal peak load \nshall mean (i) the existing Firm Transmission Withdrawal Rights of the Merchant Transmission \nFacility being evaluated, if the Merchant Transmission Facility is in service, or (ii) for a \nMerchant Transmission Facility that is not yet in service, the planned Firm Transmission \nWithdrawal Rights of the Merchant Transmission Facility being evaluated as identified in the \nInterconnection Service Agreement in effect for such Merchant Transmission Facility. \n(4)\nIn the DFAX analysis, when Transmission Provider models a \ntransfer from generation to all load within an individual Zone, Transmission Provider shall \nmodel the transfer to the Zone as a whole (not on a bus-by-bus basis).  \n(5)\nIn the DFAX analysis, Transmission Provider shall model \ngeneration both external and internal to individual Responsible Zones to reflect (a) the \nboundaries of Locational Deliverability Areas (“LDAs”), and (b) limitations with respect to the \nreliability objective for moving generation capacity across the transmission system.  \nTransmission Provider shall adopt the Capacity Emergency Transfer Objective (“CETO”), \nassociated with that LDA and calculated for the applicable planning year to be the transfer \nlimitation into the LDA.  In modeling the system generation and load, Transmission Provider \nshall assume that the percentage of the zonal load in the LDA served by external (or internal) \ngeneration to the LDA shall equal the ratio of (i) the CETO associated within that LDA (or \ngeneration internal with the LDA) to (ii) the sum of (a) the internal generation within the LDA \nand (b) the CETO associated with that LDA.  For the generation dispatch used in calculating the \ndistribution factor, Transmission Provider shall distribute these amounts of external/internal \ngeneration among all generation in the PJM Region external to/internal within the LDA, \nrespectively, in proportion to their capacity.  For Responsible Zones that are located within \nLDAs that are also entirely contained in other larger LDAs, the modeling approach and \ndistribution factor calculations shall be repeated for such Responsible Zones for each LDA.  The \nlowest distribution factor derived from these calculations shall be applied to the Responsible \nZone in the calculation of the use of the Required Transmission Enhancement.  \n(B) \nThe DFAX analysis will be performed in accordance with the following \nsteps:\n(1)\nTransmission Provider shall calculate a distribution factor and a \ndirection of use for each Responsible Zone by modeling a transfer from all generation in the PJM \nRegion to each Responsible Zone.  To establish the use by a Responsible Zone, in megawatts, of \na Required Transmission Enhancement, the distribution factor of a Required Transmission \nEnhancement associated with the resulting transfer modeled by the Transmission Provider to \neach Responsible Zone shall be multiplied by the Responsible Zone’s peak load.\n(2)\nThe Transmission Provider shall separately determine the relative \nuse of the Required Transmission Enhancement by each Responsible Zone in each direction by \ndividing the megawatts of use by each Responsible Zone determined in section (iii)(B)(1) above \nPage 93"},{"page":142,"startToken":54131,"endToken":54547,"text":"by the total use of all Responsible Zones using the Required Transmission Enhancement in the \nsame direction of use.\n(3) \nTransmission Provider shall determine the direction of use \npercentage of the Required Transmission Enhancement in each direction using a production cost \nanalysis to determine the total use, in megawatt-hours, of the Required Transmission \nEnhancement by all Zones and Merchant Transmission Facilities in each direction over the \ncourse of a year.  The Transmission Provider shall calculate the percentage use in each direction \nby dividing the megawatt-hours of use in each direction by total use in megawatt-hours in both \ndirections of use.\n(4)\nThe Transmission Provider shall multiply the relative use by each \nResponsible Zone of the Required Transmission Enhancement in each direction of use \ndetermined in section (iii)(B)(2) above, by the applicable direction of use percentage determined \nin section (iii)(B)(3) above. \n(5)\nThe products of the calculation performed in section (iii)(B)(4) \nabove, shall determine the relative allocation to each Responsible Zone of cost responsibility for \nthe Required Transmission Enhancement.\n(C)\nIn the DFAX analysis, the Zones of Public Service Electric and Gas \nCompany and Rockland Electric Company will be treated as one Zone unless and until Rockland \nElectric Company elects to be treated as a separate Zone in accordance with the terms of the \nSettlement Agreement And Offer Of Partial Settlement approved by FERC in Docket Nos. \nER06-456-000, et al.\n(D)\nTransmission Provider shall round cost responsibility assignments \ndetermined using the DFAX analysis described in subsection (b)(iii) of this Schedule 12 to the \nnearest one-hundredth of one percent.\n(E)\nTransmission Provider shall not account for the ability to adjust use of \nphase angle regulators (“PARs”) in the DFAX analysis described in subsection (b)(iii) of this \nSchedule 12.  In the DFAX analysis, all PAR angles shall be fixed at their base case settings. \n(F)\nIn the DFAX analysis, if the Required Transmission Enhancement is a \nD.C. facility, the Transmission Provider shall determine cost responsibility assignment as \nfollows:\n(1)\nThe Required Transmission Enhancement shall be replaced in the \nmodel with a comparable proxy A.C. facility, the impedance of which shall be calculated based \non the length of the D.C. facility that was removed from the model multiplied by an approximate \nper unit/mile impedance value for the proxy A.C. facility.\n(2)\nWhere a D.C. facility is an integral part of a Required \nTransmission Enhancement that also includes A.C. facilities, the methodology described in \nPage 94"},{"page":143,"startToken":54547,"endToken":55029,"text":"subsection (b)(iii)(F)(1) above shall be used only for the D.C. facility segment of such Required \nTransmission Enhancement.\n(3)\nA D.C. facility used to control flow over portions of the \nTransmission System shall be modeled with a zero impedance and no control shall be applied.\n(G)\nIf Transmission Provider determines in its reasonable engineering judgment \nthat, as a result of applying the provisions in section (b)(iii) of this Schedule 12, the DFAX \nanalysis cannot be performed or that the results of such DFAX analysis are objectively \nunreasonable, the Transmission Provider may use an appropriate substitute proxy for the \nRequired Transmission Enhancement in conducting the DFAX analysis.  If a proxy is used that is \nnot specified in this Schedule 12, Transmission Provider shall state in a written report (a) the \nreasons why it determined the DFAX analysis could not be performed or that the results of the \nDFAX analysis were objectively unreasonable; (b) why the substitute proxy produced \nobjectively reasonable results; and (3) a recommendation as to what changes, if any, should be \nconsidered in conducting the DFAX analysis.\n(H)\nThe Transmission Provider shall make a preliminary cost responsibility \ndetermination for each Required Transmission Enhancement subject to section (b)(iii) of this \nSchedule 12 at the time such Required Transmission Enhancement is included in the Regional \nTransmission Expansion Plan.  \n(1) \nWhen CWIP in connection with a Required Transmission \nEnhancement subject to this section (b)(iii) of this Schedule 12 is entitled to be recovered, the \npreliminary determination of cost responsibility made at the time that the Required Transmission \nEnhancement was included in the Regional Transmission Expansion Plan shall be used to assign \ncost responsibility for such CWIP and such cost responsibility shall remain unchanged until the \ndate the Required Transmission Enhancement goes into service.  Once a Required Transmission \nEnhancement has gone into service, the updated cost responsibility determination provided for in \nsubsection (b)(iii)(H)(2) below shall apply.\n(2)\nBeginning with the calendar year in which a Required \nTransmission Enhancement is scheduled to enter service, and thereafter annually at the \nbeginning of each calendar year, the Transmission Provider shall update the preliminary cost \nresponsibility determination for each Required Transmission Enhancement using the values and \ninputs used in the base case of the most recent Regional Transmission Expansion Plan approved \nby the PJM Board prior to the date of the update.  All values and inputs used in the calculation of \nthe distribution factor in a determination of cost responsibility shall be the same values and \ninputs as used in the base case of the most recent Regional Transmission Expansion Plan \napproved by the PJM Board prior to the determination of cost responsibility.  \n(iv)\nSpare Parts, Replacement Equipment And Circuit Breakers.  Transmission \nProvider shall assign cost responsibility for spare parts, replacement equipment, and circuit \nbreakers and associated equipment, included in the Regional Transmission Expansion Plan as \nfollows:\nPage 95"},{"page":144,"startToken":55029,"endToken":55580,"text":"(A)\nSpare parts that are part of the design specifications of a Required \nTransmission Enhancement at the time such Required Transmission Enhancement is first \nincluded in the Regional Transmission Expansion Plan shall be considered part of the Required \nTransmission Enhancement for the purpose of applying the cost threshold described in \nsubsection (b)(vi) of this Schedule 12 and cost responsibility for such spare parts shall be \nassigned in the same manner as the Required Transmission Enhancement.  Cost responsibility for \nspare parts independently included the Regional Transmission Expansion Plan and not a part of \nthe design specifications of a Required Transmission Enhancement as described above in this \nsubsection shall be assigned to the Zone of the owner of the spare part, if the owner of the spare \npart is a Transmission Owner listed in Tariff, Attachment J.  If the owner of the spare part is not \na Transmission Owner listed in Tariff, Attachment J, cost responsibility shall be assigned on a \npro rata basis to the zones that bear cost responsibility for the owner’s Required Transmission \nEnhancements.\n(B)\nReplacement equipment that is part of the design specifications of a \nRequired Transmission Enhancement at the time the Required Transmission Enhancement is first \nincluded in the Regional Transmission Expansion Plan shall be considered part of the Required \nTransmission Enhancement for the purpose of applying the cost threshold described in section \n(b)(vi) of this Schedule 12 and cost responsibility for such replacement equipment shall be \nassigned in the same manner as the Required Transmission Enhancement. Cost responsibility for \nRequired Transmission Enhancement replacement equipment independently included in the \nRegional Transmission Expansion Plan and not a part of the design specifications of a Required \nTransmission Enhancement as described above in this subsection, shall be assigned to the same \nZones and/or Merchant Transmission Facilities and in the same proportions as the then-existing \nassignments of cost responsibility for the facilities that the replacement equipment is replacing.\n(C)\nCircuit breakers and associated equipment that are part of the design \nspecifications of a Required Transmission Enhancement at the time the Required Transmission \nEnhancement is first included in the Regional Transmission Expansion Plan shall be considered \npart of the Required Transmission Enhancement for the purpose of applying the cost threshold \ndescribed in subsection (b)(vi) of this Schedule 12 and cost responsibility for such circuit \nbreakers and associated equipment shall be assigned in the same manner as the Required \nTransmission Enhancement.  Cost responsibility for circuit breakers and associated equipment \nindependently included in the Regional Transmission Expansion Plan and not a part of the design \nspecifications of a transmission element of a  Required Transmission Enhancement as described \nabove in this subsection, shall be assigned to the Zone of the owner of the circuit breaker and \nassociated equipment if the owner of the circuit breaker is a Transmission Owner listed in Tariff, \nAttachment J.  If the owner of the circuit breaker is not a Transmission Owner listed in Tariff, \nAttachment J, cost responsibility shall be assigned on a pro rata basis to the zones that bear cost \nresponsibility for the owner’s Required Transmission Enhancements. \n(v)\nEconomic Projects.  Transmission Provider shall assign (i) fifty percent (50%) of \ncost responsibility for Economic Projects that are Regional Facilities; and (ii) full cost \nresponsibility for Economic Projects that are Lower Voltage Facilities; as follows:\nPage 96"},{"page":145,"startToken":55580,"endToken":56150,"text":"(A)\nTransmission Provider shall assign cost responsibility for Economic \nProjects that are accelerations of Reliability Projects as described in Operating Agreement, \nSchedule 6, section 1.5.7(b)(i) (“Acceleration Projects”) by performing and comparing (1) a \nDFAX analysis consistent with the methodology described in subsection (b)(iii) of this Schedule \n12, and (2) a methodology that is intended to act as a proxy for expected economic benefits from \nreduced Locational Marginal Prices (“LMP Benefit”) over the period that the reliability-based \nenhancement or expansion is to be accelerated (“LMP Benefits Methodology”).  The LMP \nBenefits Methodology shall determine cost responsibility assignment percentages to Zones and \nMerchant Transmission Facilities in the following manner.  The LMP Benefit to a Zone shall be \ndeemed to be equal to the reduction in Locational Marginal Price payments made by Load \nServing Entities as a result of the Acceleration Project assuming the customers purchase all \nenergy needs from the PJM Interchange Energy Market, and LMP Benefits so calculated shall be \nconverted into percentage cost responsibility assignments for the affected Zones.  The LMP \nBenefits Methodology shall not incorporate the financial effects of allocations of Auction \nRevenue Rights or Financial Transmission Rights.  The LMP Benefit to a Merchant \nTransmission Facility shall be deemed to be equal to the proportionate share of assigned cost \nresponsibility using the DFAX analysis and the assignments of cost responsibility to other Zones \nin the LMP Benefits Methodology shall be proportionately adjusted, as necessary, to reflect this \ntreatment of Merchant Transmission Facilities to ensure that the total allocation for any \neconomic-based Required Transmission Enhancement equals one hundred percent.  If, after \nperforming both analyses and comparing the percentage cost responsibility assignments for the \naffected Zones calculated pursuant to the DFAX analysis and the LMP Benefits Methodology, \nthe results do not indicate at least a ten percentage point cost responsibility assignment \ndifferential between the two methods for any Zone, cost responsibility for the Acceleration \nProject shall be assigned using the DFAX analysis.  If, after performing both analyses and \ncomparing the percentage cost responsibility assignments for the affected Zones calculated \npursuant to the DFAX analysis and LMP Benefits Methodology, the results indicate at least a ten \npercentage point cost responsibility assignment differential between the DFAX analysis and the \nLMP Benefits Methodology for any Zone, cost responsibility for the Acceleration Project for the \nperiod of time the Reliability Project is accelerated (i.e. the period between the date the \nReliability Project actually goes into service and the date the Reliability Project originally was \nscheduled to go in service in the PJM Board approved Regional Transmission Expansion Plan) \nshall be assigned using the LMP Benefits Methodology.  For all periods other than the period of \ntime the Reliability Project is accelerated, cost responsibility for such an Acceleration Project \nshall be assigned in accordance with the provisions of this Schedule 12 governing the assignment \nof cost responsibility of Regional Facility Reliability Projects or Lower Voltage Facility \nReliability Projects, as applicable.  \n(B)\nTransmission Provider shall assign cost responsibility for Economic \nProjects that are modifications to Reliability Projects as described in Operating Agreement, \nSchedule 6, section 1.5.7(b)(ii) in accordance with the provisions of this Schedule 12 governing \nthe assignment of cost responsibility of Regional Facility Reliability Projects or Lower Voltage \nFacility Reliability Projects, as applicable.\n(C)\nTransmission Provider shall assign cost responsibility for Economic \nProjects that are new enhancements or expansions that could relieve one or more economic \nPage 97"},{"page":146,"startToken":56150,"endToken":56747,"text":"constraints as described in Operating Agreement, Schedule 6, section 1.5.7(b)(iii) to the Zones \nthat show a decrease in the net present value of the Changes in Load Energy Payment.  The \nChange in Load Energy Payment for each year shall be determined using the methodology set \nforth in Operating Agreement, Schedule 6, section 1.5.7(d) for the period specified in that \nsection.  Cost responsibility shall be assigned based on each Zone’s pro rata share of the sum of \nthe net present values of the Changes in Load Energy Payment only of the Zones in which the \nnet present value of the Changes in Load Energy Payment shows a decrease.\n(vi)\nRequired Transmission Enhancements Costing Less Than $5 Million.  \nNotwithstanding sections (b)(i), (b)(ii), (b)(iv) and (b)(v) of this Schedule 12, cost responsibility \nfor a Required Transmission Enhancement for which the good faith estimate of the cost of the \nRequired Transmission Enhancement (a) prepared in connection with the development of the \nRegional Transmission Expansion Plan and (b) provided to the PJM Board at the time the \nRequired Transmission Enhancement is included for the first time in the Regional Transmission \nExpansion Plan, does not equal or exceed $5 million shall be assigned to the Zone where the \nRequired Transmission Enhancement is to be located.  The determination of whether the \nestimated cost of a Required Transmission Enhancement does not equal or exceed $5 million \nshall be based solely on such good faith estimate of the cost of the Required Transmission \nEnhancement regardless of the actual costs incurred.  The estimated cost of a Required \nTransmission Enhancement shall include the aggregate estimated costs of all of the transmission \nelements approved by the PJM Board at the time such elements are included in the Regional \nTransmission Expansion Plan that collectively are intended (i) in the case of a Reliability Project, \nto resolve a specific reliability criteria violation, or (ii) in the case of an Economic Project, \nprovide a specific LMP Benefit.  Where a Required Transmission Enhancement subject to this \nsection (b)(vi) consists of a single transmission element or multiple transmission elements that \nwill be located in more than one Zone, each Zone shall be assigned cost responsibility for the \ntransmission elements or portions of the transmission elements located in such Zone.  Merchant \nTransmission Facilities shall not be assigned cost responsibility for a Required Transmission \nEnhancement subject to this section (b)(vi).\n(vii)\nModifications of Required Transmission Enhancements.  Once a Required \nTransmission Enhancement is included in the Regional Transmission Expansion Plan, any \nmodification to such Required Transmission Enhancement that subsequently is included in the \nRegional Transmission Expansion Plan as a separate Reliability or Economic Project shall be \nconsidered a separate and distinct Required Transmission Enhancement for purposes of cost \nresponsibility assignment under this Schedule 12.  Except as provided in sections (b)(iv) and \n(b)(xiv) of this Schedule 12, any cost responsibility assignment that has been made for a \npreviously approved Required Transmission Enhancement shall have no impact on the cost \nresponsibility assignment of such modification.\n(viii)\nFERC Filing.  Within 30 days of the approval of each Regional Transmission \nExpansion Plan or an addition to such plan by the PJM Board pursuant to Operating Agreement, \nSchedule 6, section 1.6, the Transmission Provider shall designate in the Tariff, Schedule 12-\nAppendix A and in a report filed with the FERC the Responsible Customers based on the cost \nresponsibility assignments determined pursuant to this Schedule 12.  Those customers designated \nby the Transmission Provider as Responsible Customers shall have 30 days from the date the \nPage 98"},{"page":147,"startToken":56747,"endToken":57233,"text":"filing is made with the FERC to seek review of such designation. Such cost responsibility \ndesignations shall be the same as those made for the relevant Regional Facility, Necessary Lower \nVoltage Facility, or Lower Voltage Facility in the Regional Transmission Expansion Plan.\n(ix)\nRegions With Which PJM Has Entered Into an Agreement Listed in \nSchedule 12-Appendix B .  For purposes of this Schedule 12, where costs of a Required \nTransmission Enhancement are allocated to a region other than PJM pursuant to an agreement set \nforth in Tariff, Schedule 12-Appendix B, Responsible Customers for such costs shall be \ncustomers in such region. Cost responsibility with respect to the costs of a Required \nTransmission Enhancements  allocated to a region other than PJM shall be allocated within such \nregion in accordance with the applicable tariff or agreement governing the allocation of such \ncosts in such region.\n(x)\nMerchant Transmission Facilities.\n(A)\nFor purposes of this Schedule 12, where the Transmission Provider has \nallocated all or a portion of a Required Transmission Enhancement to a Merchant Transmission \nFacility, the owner of the Merchant Transmission Facility shall be the Responsible Customer \nwith respect to such Required Transmission Enhancement, and shall pay the Transmission \nEnhancement Charges associated with the Required Transmission Enhancement.\n(B)\n(1)\nTransmission Provider shall defer collection of Transmission \nEnhancement Charges from a Merchant Transmission Facility until the Merchant Transmission \nFacility goes into commercial operation; provided, however, in the event the commercial \noperation of a Merchant Transmission Facility is delayed beyond the commercial operation \nmilestone date(s) specified in the Interconnection Service Agreement associated with the \nMerchant Transmission Facility and the Transmission Provider or Transmission Owner \nconstructing the Required Transmission Enhancement demonstrates that the Merchant \nTransmission Facility is responsible for such delay, Transmission Provider may begin collecting \nTransmission Enhancement Charges from the Merchant Transmission Facility prior to the \nMerchant Transmission Facility going into commercial operation.  Transmission Enhancement \nCharges allocated to a Merchant Transmission Facility for which collection is deferred in \naccordance with this section (b)(x)(B)(1) shall be recorded in appropriate Transmission Provider \naccounts for deferred charges and collected in accordance with section (b)(x)(B)(3) below.  \n(2)\nTransmission Provider shall base the collection of Transmission \nEnhancement Charges associated with Required Transmission Enhancements from a Merchant \nTransmission Facility on the actual Firm Transmission Withdrawal Rights that have been \nawarded to the Merchant Transmission Facility; provided, however, to the extent that a Merchant \nTransmission Facility has been awarded less than the amount of Firm Transmission Withdrawal \nRights specified in the Interconnection Service Agreement associated with the Merchant\nTransmission Facility, then Transmission Provider shall record the difference between the \namount of Transmission Enhancement Charges collected based on the lesser amount of Firm \nTransmission Withdrawal Rights and the amount of Transmission Enhancement Charges based \non the full amount of Firm Transmission Withdrawal Rights specified in the applicable \nInterconnection Service Agreement in appropriate accounts for deferred charges and, after the \nPage 99"},{"page":148,"startToken":57233,"endToken":57736,"text":"Merchant Transmission Facility has been awarded the full amount of Firm Transmission \nWithdrawal Rights specified in the Interconnection Service Agreement, collect such deferred \namounts in accordance with section (b)(x)(B)(3) below.  Notwithstanding the foregoing, \nTransmission Provider may collect Transmission Enhancement Charges based on more than a \nMerchant Transmission Facility’s actually awarded Firm Transmission Withdrawal Rights (not \nto exceed the Firm Transmission Withdrawal Rights specified in the applicable Interconnection \nService Agreement) if the Transmission Provider or Transmission Owner demonstrates that the \nMerchant Transmission Facility is responsible for receiving fewer Firm Transmission \nWithdrawal Rights than are specified in the applicable Interconnection Service Agreement.\n(3)\nTransmission Provider shall record: (i) in an appropriate deferred \nasset account, the Transmission Enhancement Charges associated with Required Transmission \nEnhancements for which collection is deferred in accordance with sections (b)(x)(B)(1) and \n(b)(x)(B)(2) above; and (ii) in an appropriate deferred liability account, the revenues associated \nwith the Transmission Enhancement Charges that, absent the deferred charges, would have been \ndue to Transmission Owners or to Transmission Owners’ customers as directed by the applicable \nTransmission Owner. At such time as collection of such deferred Transmission Enhancement \nCharges are permitted in accordance with sections (b)(x)(B)(1) and (b)(x)(B)(2) above, the \ndeferred charges (along with appropriate interest) shall be collected from the Merchant \nTransmission Facility in equal installments over the twelve months following the \ncommencement of the collection of the deferred charges. Such amounts shall be distributed to \nTransmission Owners or to Transmission Owners’ customers as directed by the applicable \nTransmission Owner, and the Transmission Provider shall make appropriate adjustments to the \ndeferred asset and liability accounts.  Transmission Provider shall not be responsible for \ndistributing revenues associated with deferred Transmission Enhancement Charges unless and \nuntil such charges are collected in accordance with this section (b)(x)(B), and uncollected \ndeferred Transmission Enhancement Charges shall not be subject to Default Allocation \nAssessments to the Members pursuant to Operating Agreement, section 15.2.\n(xi)\nConsolidated Edison Company of New York.\n(A) Cost responsibility \nassignments to Consolidated Edison Company of New York for Required Transmission \nEnhancements pursuant to this Schedule 12 with respect to the Firm Point-To-Point Service \nAgreements designated as Original Service Agreement No. 1873 and Original Service \nAgreement No. 1874 accepted by the Commission in Docket No. ER08-858 (“ConEd Service \nAgreements”) shall be in accordance with the terms and conditions of the settlement approved by \nthe FERC in Docket No. ER08-858-000.  (B) All cost responsibility assignments for Required \nTransmission Enhancements pursuant to this Schedule 12 shall be adjusted at the commencement \nand termination of service under the ConEd Service Agreements to take account of the \nassignments under subsection (xi)(A) of this section.  \n(xii)\nPublic Policy Projects.  \n(A)\nTransmission Facilities as defined in  Consolidated Transmission Owners \nAgreement, section 1.27 constructed by a Transmission Owner pursuant to a Public Policy \nRequirement but not included in a Regional Transmission Expansion Plan as a Required \nTransmission Enhancement, shall be as considered a Supplemental Project. \nPage 100"},{"page":149,"startToken":57736,"endToken":58190,"text":"(B)\nIf a transmission enhancement or expansion is proposed pursuant to \nOperating Agreement, Schedule 6, section 1.5.9(a) which is not a Supplemental Project (“State \nAgreement Public Policy Project”),  the Transmission Provider shall submit the assignment of \ncosts to Responsible Customers proposed in connection with such State Agreement Public Policy \nProject to the Transmission Owners Agreement Administrative Committee for consideration and \nfiling pursuant to Consolidated Transmission Owners Agreement, section 7.3 and Tariff, Part I, \nsection 9.1(a).  Nothing in this section (b)(xii) shall prevent the Transmission Provider or the \nstate governmental entities proposing such State Agreement Public Policy Project from filing a \nproposed assignment of costs to Responsible Customers for such project pursuant to Section 206 \nof the Federal Power Act.\n(xiii)\nReplacement of Transmission Facilities.  Unless determined by PJM to be a \nRequired Transmission Enhancement included in a Regional Transmission Expansion Plan, cost \nresponsibility for the replacement of Transmission Facilities, as defined in Consolidated \nTransmission Owners Agreement, section 1.27, shall be assigned to the Zonal loads and Merchant \nTransmission Facilities responsible for the costs of the Transmission Facilities being replaced.\n(xiv)    Multi-Driver Projects.  \n(A)\nAssignment of Proportional Multi-Driver Project Costs.  The Transmission \nProvider shall assign cost responsibility for Proportional Multi-Driver Projects in proportion \nto the relative percentage benefit that each driver of a Proportional Multi-Driver Project \naddresses, respectively, reliability violations or operational performance (“reliability”), \neconomic constraints (“economic”) and/or Public Policy Requirements (“public policy”) as \nfollows: \n(1)\nAs part of the open planning process provided for in Operating \nAgreement, Schedule 6, section 1.5.10(h), the Transmission Provider employs the \nProportional Method to develop a Proportional Multi-Driver Project, by determining \nwhich of the following drivers a Proportional Multi-Driver Project addresses: \nreliability, economic, or public policy, and the extent to which each such driver \ncontributes to the size, scope, and estimated costs of such Proportional Multi-Driver \nProject (irrespective of the reliability cost allocation treatment that is otherwise \naccorded an incremental market efficiency modification thereto pursuant to section \n(b)(v)(B) of this Schedule 12).  The Transmission Provider shall identify the \ncontribution of each driver in terms of a percentage totaling 100 percent for all such \ndrivers at the time that each Proportional Multi-Driver Project is submitted to the PJM \nBoard for approval and included in the Regional Transmission Expansion Plan. The \npercentage contribution of each driver shall be based on the ratio of the estimated cost \nof each project that the Multi-Driver Project replaces to the total of the estimated costs \nof all projects combined into the Multi-Driver Project. \n(2)\nOnce a Proportional Multi-Driver Project is approved by the PJM Board, \nthe percentage contributions of each driver shall not be changed unless the PJM Board \nPage 101"},{"page":150,"startToken":58190,"endToken":58719,"text":"subsequently approves an upgrade or modification to the Proportional Multi-Driver \nProject.  In that event, the cost responsibility for the Proportional Multi-Driver Project, \nincluding any costs incurred prior to the upgrade or modification, will be determined as \nif it were a new Proportional Multi-Driver Project, such that the percentage \ncontribution for each driver shall be established anew.  \n(B)\nAssignment of Incremental Multi-Driver Project Costs.  The Transmission \nProvider shall assign cost responsibility for  Incremental Multi-Driver Projects as defined in \nOperating Agreement, Schedule 6, section 1.15B using the same methodology described in \nsection (b)(xiv)(A)(1) above treating the estimated cost of modifying the original project as if \nit were the estimated cost of a separate project included in a Proportional Multi-Driver \nProject.  Any costs that had been expended on the original project prior its designation by \nTransmission Provider as an Incremental Multi-Driver Project shall be included in the \ncalculation of the Incremental Multi-Driver Project pursuant to this section (b)(xiv)(B).  \n(C)\nThe Transmission Provider shall separately assign cost responsibility for the \ncosts assigned to each driver pursuant to this section (b)(xiv) in accordance with the provisions \nof this Schedule 12 governing the assignment of cost responsibility for a single driver project \nof each driver’s respective type (reliability, economic or public policy).  Except as provided in \nsection (b)(xiv)(D) below, cost responsibility will be assigned based on the final voltage and \nconfiguration of the Multi-Driver Project determined in accordance with sections (b)(i), (b)(ii), \nor (b)(vi) of this Schedule 12. \n(D)     Notwithstanding the cost assignments that would otherwise be provided for in \nsection (b)(xiv)(C) above, if a Multi-Driver Project includes a public policy driver that is the \nresult of the State Agreement Approach provided for in Operating Agreement, Schedule 6, \nsection 1.5.9 and is a Regional Facility as defined in section (b)(i) of this Schedule 12 and such \nMulti-Driver Project would not be a Regional Facility but for the inclusion of the public policy \ndriver, then the percentage of costs of such Multi-Driver Project assigned to the non-public \npolicy drivers in accordance with the procedures set forth in in section (b)(i)(A)(1) above shall \nbe twenty percent (20%) and the percentage of costs assigned to the non-public policy drivers \nof such Multi-Driver Project in accordance section (b)(i)(A)(2) above shall be eighty percent \n(80%), and not the fifty percent (50%) cost responsibility percentages provided for in section \n(b)(i)(A)(i) and section (b)(i)(A)(2), respectively, of this Schedule 12. \n(xv) Reserved.\n(xvi)\nRequired Transmission Enhancements Designed to Address Reliability \nViolations on Transmission Facilities Operating Below 200 kV. Notwithstanding section \n(b)(ii), above, cost responsibility for any Required Transmission Enhancements that are included \nin the Regional Transmission Expansion Plan to address reliability violations on Transmission \nFacilities that are designed to operate at below 200 kV and, pursuant to Operating Agreement, \nSchedule 6, section 1.5.8(n), were not included in an Operating Agreement, Schedule 6, section \n1.5.8(c) proposal window, shall be assigned to the Responsible Customers in the Zone where the \nRequired Transmission Enhancement is to be located.\nPage 102"},{"page":151,"startToken":58719,"endToken":59338,"text":"(xvii) Required Transmission Enhancements Constructed As Targeted Market \nEfficiency Projects Under The Midcontinent Independent Transmission System Operator, \nInc. and PJM Interconnection, L.L.C. Coordinated System Plan.   Notwithstanding sections \n(b)(i), (b)(ii), (b)(iv), (b)(v), (b)(vi) and (b)(x)(B)(2) of this Schedule 12, cost responsibility for \nthe costs of a Required Transmission Enhancement that is included in the Regional Transmission \nExpansion Plan because it is a Targeted Market Efficiency Project (“TMEP”) identified in the \nCoordinated System Plan periodically developed pursuant to the Joint Operating Agreement \nBetween the Midcontinent Independent Transmission System Operator, Inc. and PJM \nInterconnection, L.L.C. (“PJM-MISO JOA”) and assigned to PJM pursuant to PJM-MISO JOA, \nsection 9.4.4.2.5, shall be assigned among Zones and Merchant Transmission Facilities in \naccordance with this section (b)(xvii).  Using the Targeted Market Efficiency Project study \nconducted pursuant to PJM-MISO JOA, section 9.3.7.2(c) of in which the TMEP was identified, \nthe Transmission Provider shall determine, in accordance with Tariff, Attachment K-Appendix, \nsection 5.1, the average annual Transmission Congestion Charges experienced by Market Buyers \nin Zones and at Merchant Transmission Facilities attributable to the targeted Reciprocal \nCoordinated Flowgate during the two historical calendar years prior to the study year of the \nTargeted Market Efficiency Project study.  In making this determination, the Transmission \nProvider shall net any increases in Day-ahead and Real-time Prices paid by Market Buyers in a \nZone or at a Merchant Transmission Facility against any decreases in Day-ahead and Real-time \nPrices paid by Market Buyers in such Zone or at such Merchant Transmission Facility \nattributable to the targeted Reciprocal Coordinated Flowgate.  Where a single TMEP is \nconstructed to reduce Transmission Congestion Charges attributable to more than one targeted \nReciprocal Coordinated Flowgate, the Transmission Provider shall net any increases in Day-\nahead and Real-time Prices paid by Market Buyers in a Zone or at a Merchant Transmission \nFacility against any decreases in Day-ahead and Real-time Prices paid by Market Buyers in such \nZone or at such Merchant Transmission Facility attributable to all targeted Reciprocal \nCoordinated Flowgates.  Cost responsibility shall be assigned based on each Zone’s and \nMerchant Transmission Facility’s pro rata share of the sum of the net Transmission Congestion \nCharges paid by Market Buyers only of the Zones and Merchant Transmission Facilities in \nwhich Market Buyers experienced net Transmission Congestion Charges.\n(xviii) Required Transmission Enhancements Designed to Address Stability Issues.\nFor purposes of the assignment of cost responsibility for Reliability Projects designed to address \nstability issues under subsection (b)(i)(A)(2)(a) and subsection (b)(ii)(A) of this Schedule 12, the \nTransmission Provider shall, using the same inputs and assumptions from the simulation that \noriginally drove the need for the stability upgrade, perform a stability simulation that includes \nthe stability upgrade under the worst fault condition. The worst fault condition shall be the fault \ncondition in the simulation that produces the maximum rotor angle swing with the stability \nupgrade included.  For each load bus on the system, the difference between the highest and \nlowest voltage angle that occurs during the simulation of the worst fault condition will be \nrecorded. Load buses having a voltage angle deviation less than 25 percent of the load bus with \nthe largest voltage angle deviation will not be included in the cost allocation calculation. For the \nremaining load buses, the voltage angle deviation will be multiplied by the megawatt load at the \nbus obtained from the stability simulation model, or, in the case of a Merchant Transmission \nFacility, the Firm Transmission Withdrawal Rights at the bus. The products of the voltage angle \ndeviation and megawatt load at each bus will be summed for each Responsible Zone. The \nPage 103"},{"page":152,"startToken":59338,"endToken":59741,"text":"Stability Deviation cost allocation for a Responsible Zone or Merchant Transmission Facility \nwill be determined by dividing the sum of the load-weighted angle deviations for the \nResponsible Zone or Merchant Transmission Facility by the sum of the load-weighted angle \ndeviations for each Responsible Zone and Merchant Transmission Facility. Transmission \nProvider shall round cost responsibility assignments to the nearest one-hundredth of one percent.\n(c)\nDetermination of Transmission Enhancement Charges. In the event that any \nTransmission Owner recovers the cost of a Required Transmission Enhancement through a \nTransmission Enhancement Charge, such charge shall be determined as follows:\n(1)\nTransmission Provider shall identify in writing and post on the PJM Internet site \nthe Required Transmission Enhancement(s) to which each Transmission Enhancement \nCharge corresponds. The Transmission Enhancement Charge with respect to a Required \nTransmission Enhancement shall recover the applicable Transmission Owner’s annual \ntransmission revenue requirement associated with the Required Transmission \nEnhancement.\n(2)  \nEach Transmission Enhancement Charge shall be a monthly charge based on all \ncosts and applicable incentives associated with a particular Required Transmission \nEnhancement for which the Transmission Owner is responsible. \n(3) \nA Transmission Owner’s annual transmission revenue requirement associated \nwith a Required Transmission Enhancement shall be determined pursuant to either (i) a \nunilateral filing by the Transmission Owner under Section 205 of the Federal Power Act \nand the FERC’s rules and regulations thereunder; or (ii) a formula rate in effect \napplicable to the Transmission Owner’s rates for Network Integration Transmission \nService, including the costs associated with Required Transmission Enhancements. \n(4) \nEach Transmission Enhancement Charge applicable to Network Customers and \nNon-Zone Network Customers shall be recalculated annually to reflect the annual \nrevisions to the billing determinants used by the Transmission Provider to calculate \ncharges to Network Customers for Network Integration Transmission Service under \nTariff, Part III, section 34.1.  The Transmission Provider shall post on its Internet site by \nOctober 31 of each calendar year each recalculated Transmission Enhancement Charge \nthat shall be effective during the subsequent calendar year.\n(5) \nEach Transmission Enhancement Charge applicable to customers using Point-To-\nPoint Transmission Service shall be calculated monthly to reflect the billing determinants \nused by the Transmission Provider to determine charges for customers of Point-To-Point \nTransmission Service in accordance with Tariff, Part II, section 25. \n(6)\nEach Transmission Enhancement Charge payable by an owner of a Merchant \nTransmission Facility pursuant to section (b) of this Schedule 12 shall be calculated as a \nfixed monthly charge. \nPage 104"},{"page":153,"startToken":59741,"endToken":60169,"text":"(7)\nIf a Transmission Owner chooses to recover the cost of Required Transmission \nEnhancements through the operation of a formula rate as described in section (a) of this \nSchedule 12, the Transmission Owner must make an informational filing with the \nCommission one year from the date the selecting Transmission Owner’s formula rates go \ninto effect, and each year thereafter, providing a detailed list of the costs the \nTransmission Owner has incurred, and the revenues the Transmission Owner has \nreceived to provide service.\n(d)\nRecovery of Transmission Enhancement Charges.  \n(1)\nResponsible Customers shall pay Transmission Provider all applicable \nTransmission Enhancement Charges as required by this Schedule 12 in addition to \nall other charges for transmission service for which such Responsible Customers \nare responsible under the Tariff.\n(2)\nTransmission Provider shall collect all applicable Transmission Enhancement \nCharges from each Responsible Customer on a monthly basis.  Transmission \nProvider shall remit or credit all revenues received from Responsible Customers \nunder this Schedule 12 to the Transmission Owner(s) that established such charge \nor to the appropriate authority in a region other than PJM in the case of \nTransmission Enhancement Charges established in such region in connection with \na Required Transmission Enhancement constructed pursuant to an Appendix B \nAgreement, to be distributed in accordance with the applicable tariff or agreement \ngoverning the distribution of such charges in such region.\n(e)\nCrediting of Revenue from Transmission Enhancement Charges.  In recognition that \na Transmission Owner’s charges for Network Integration Transmission Service set forth in \nTariff, Attachment H are established based upon the Transmission Owner’s total cost of \nproviding FERC-jurisdictional transmission service, including the costs associated with Required \nTransmission Enhancements, revenue from a Transmission Owner’s Transmission Enhancement \nCharges for a billing month shall be credited pursuant to this Schedule 12 to the Network \nCustomers in the Transmission Owner’s Zone (including, where applicable, the Transmission \nOwner) and Transmission Customers purchasing Firm Point-to-Point Transmission Service for \ndelivery in the Transmission Owner’s Zone in proportion to their Demand Charges (including \nany imputed Demand Charges for bundled service to Native Load Customers) for Network \nIntegration Transmission Service and Reserved Capacity for Firm Point-to-Point Transmission \nService; provided that such credits shall be reduced by the amount of any applicable incentives \nincluded in such Transmission Enhancement Charges.  \n(f)\nRecovery of Interconnection Reliability Reinforcement Costs.  \n(1)\nCustomers Subject to Cost Responsibility for Interconnection Reliability \nReinforcements. For each Fast Energization Process Cycle, the Transmission \nProvider shall determine cost responsibility for Interconnection Reliability \nReinforcements identified and designated for construction pursuant to this section \n(f) of this Schedule 12.  Cost responsibility for Interconnection Reliability \nPage 105"},{"page":154,"startToken":60169,"endToken":60518,"text":"Reinforcements in a Fast Energization Cycle shall be assigned to Responsible \nCustomers in Zones containing Transmission Customers taking Firm \nTransmission Service on behalf of Eligible Loads and Large Loads (“Large Load \nZones”).  Generator Interconnection Customers in a given Cycle that are parties to \na Generator Interconnection Agreement will pay a Generator Reliability \nReinforcement Fee established in section (f)(vi) below.    \n(2)\nDetermination of Cost Responsibility and Generator Allocation for \nInterconnection Reliability Reinforcements.  The Transmission Provider shall \ndetermine cost responsibility for Interconnection Reliability Reinforcements and \nthe Generator Reliability Reinforcement Fee based on a proportional impact \napproach that considers all of the constraints identified in the Fast Energization \nProcess Cycle.  \nThis proportional impact methodology will apply to thermal and non-thermal \nconstraints, and will determine the pro rata share of impacts of Project \nDevelopers, Eligible Loads and Large Loads on the aggregate of constraints being \nalleviated by the portfolio of Interconnection Reliability Reinforcements as \nfurther described below and in the PJM Manuals.\nThe Transmission Provider shall determine each Project Developer, Eligible Load \nand Large Load’s proportional impact as follows:\n(A)\nWith respect to the portfolio of Interconnection Reliability Reinforcements \naddressing thermal, stability and voltage constraints:\n(1)\nThe Transmission Provider shall apply aggregation and thresholds \nas set forth in the PJM Manuals to identify the set of constrained \nfacilities identified as having violations requiring mitigation \nthrough Interconnection Reliability Reinforcements in the Fast \nEnergization Process Cycle studies, resulting in distribution \nfactors, represented as decimal values or percentages, which \nexpress the portions of impact on constrained facilities from each \nProject Developer, Eligible Customer seeking Long-Term Firm \nPoint-to-Point Transmission Service, Eligible Load, or Large Load.  \n(2)\nFor purposes of determining MW impacts, each calculated \ndistribution factor, if it exceeds the threshold set forth in the PJM \nManuals, shall first be multiplied, for each Project Developer, \nEligible Customer seeking Long-Term Firm Point-to-Point \nTransmission Service, Eligible Load or Large Load, by its \nrequested MW value as studied in the Fast Energization Process.  \n(3)\nNo allocation relating to a constrained facility shall result unless \nthe calculated MW impact exceeds the thresholds set forth in the \nPJM Manuals.\nPage 106"},{"page":155,"startToken":60518,"endToken":60853,"text":"(4)\nAll calculated MW impacts on constrained facilities above the \nrelevant thresholds for each Project Developer, Eligible Customer \nseeking Long-Term Firm Point-to-Point Transmission Service, \nEligible Load or Large Load are converted to proportional MW \nimpacts representing the pro rata share of all MW impacts on the \nsame constrained facility.\n(5)\nThe proportional MW impacts are weighted using values as further \ndescribed in the PJM Manuals resulting in a weighted proportional \nMW impact.\n(6)\nThe percentage proportional impact values allocated for each Project \nDeveloper, Eligible Load or Large Load is based on its pro rata share \nof the weighted proportional MW impact relative to the total of \nweighted proportional MW impact for the Cycle.  For Project \nDevelopers, this value is the Generation Interconnection Customer’s \nAllocated Percentage (GCAP) as outlined in (f)(vi)(B).\n(B)\nWith respect to the portfolio of Interconnection Reliability Reinforcements \naddressing short-circuit constraints, allocation will be based on contributing fault \ncurrent impact on the circuit breaker’s applicable interrupting rating, as set forth \nin the PJM Manuals.\n(C)\nThe aggregate impact values calculated pursuant to subsection (f)(ii)(A) \nand (f)(ii)(B) above shall determine the relative assignment of cost responsibility \nfor Interconnection Reliability Reinforcements and the Generator Reliability \nReinforcement Fee subject to the following rules:\n \n(1)\nThe percentage proportional impacts of Eligible Load and Large \nLoad Transmission Service Requests will be summed on a Zonal \nbasis assigned to the relevant Transmission Owner Zones.\n(2)\nFor purposes of this proportional allocation, the entire cost \nresponsibility calculated pursuant to this subsection (f)(ii) will be \nassigned to Transmission Owner Zones based on their summed \npercentage proportional impacts.  Interconnection Reliability \nReinforcement costs representing the relative contribution \nattributable to Generator Interconnection Customers shall be \nrecovered from Generator Interconnection Customers through \nGenerator Reliability Reinforcement Fees as set forth in subsection \n(f)(vi) below.\n(D)\nThe Transmission Provider shall complete the analysis described in this \nsubsection (f)(ii) within 30 days before Transmission Service Agreements and \nGenerator Interconnection Agreements have been executed.  Within 30 days of \nPage 107"},{"page":156,"startToken":60853,"endToken":61215,"text":"the completion of this analysis, the Transmission Provider shall post on the PJM \nInternet Site the cost responsibility assignments determined pursuant to this \nsection (f).  \n(3)\nInterconnection Reliability Reinforcements Charge.  The charge established to \nrecover the revenue requirement with respect to an Interconnection Reliability \nReinforcement is hereafter referred to as an “Interconnection Reliability \nReinforcement Charge.”  Interconnection Reliability Reinforcement Charges of \none or more Transmission Owners for Interconnection Reliability Reinforcements \nshall be established in accordance with this section (f) of Schedule 12.  \nTransmission Provider shall assess an Interconnection Reliability Reinforcement \nCharge to Firm Transmission Customers in Zones based on the cost responsibility \nassignments determined pursuant to subsection (f)(ii) above.  The Interconnection \nReliability Reinforcement Charge shall recover the applicable Transmission \nOwner's annual transmission revenue requirement associated with the \nInterconnection Reliability Reinforcements constructed and owned and/or \nfinanced by that Transmission Owner for a period of 15 years after an \nInterconnection Reliability Reinforcement enters service.  After this period, \nbeginning with the next full calendar year, Transmission Provider will assign \nresponsibility for and recover the remaining costs of the Interconnection \nReliability Reinforcement in accordance with sections (a) through (e) of this \nSchedule 12. \n(A)\nA Transmission Owner’s annual transmission revenue requirement \nassociated with an Interconnection Reliability Reinforcement shall be determined \npursuant to the formula rate in effect applicable to the Transmission Owner’s rates \nfor Network Integration Transmission Service and Firm Contract Demand \nTransmission Service (“Firm Transmission Service”), including the costs \nassociated with Interconnection Reliability Reinforcements.\n(B)\nEach Interconnection Reliability Reinforcement Charge applicable to Firm \nTransmission Customers shall be recalculated annually to reflect the annual \nrevisions to the billing determinants used by the Transmission Provider to \ncalculate charges for Firm Transmission Service.  The Transmission Provider \nshall post on its Internet site by October 31 of each calendar year each \nrecalculated Interconnection Reliability Reinforcement Charge that shall be \neffective during the subsequent calendar year.\n(C)\nEach Interconnection Reliability Reinforcement Charge applicable to \ncustomers using Point-To-Point Transmission Service shall be calculated monthly \nto reflect the billing determinants used by the Transmission Provider to determine \ncharges for customers of Point-To-Point Transmission Service in accordance with \nTariff, Part II, section 25.\n(4)\nRecovery of Interconnection Reliability Reinforcement Charges.\nPage 108"},{"page":157,"startToken":61215,"endToken":61574,"text":"(A)\nTransmission Customers shall pay the Transmission Provider all \napplicable Interconnection Reliability Reinforcement Charge as required by this \nSchedule 12 in addition to all other charges for transmission service for which \nsuch Transmission Customers are responsible under the Tariff.\n(B)\nThe Transmission Provider shall collect all applicable Interconnection \nReliability Reinforcement Charges from each applicable Transmission Customer \non a monthly basis. The Transmission Provider shall remit or credit all revenues \nreceived from Transmission Customers under this Schedule 12 to the \nTransmission Owner(s) owning the relevant Interconnection Reliability \nReinforcements.\n(5)\nCrediting of Revenue from Interconnection Reliability Reinforcement \nCharges.  In recognition that a Transmission Owner’s charges for Firm \nTransmission Service set forth in Tariff, Attachment H are established based upon \nthe Transmission Owner's total cost of providing FERC-jurisdictional \ntransmission service, including the costs associated with Interconnection \nReliability Reinforcements, revenue Interconnection Reliability Reinforcement \nCharges for a billing month shall be credited pursuant to this Schedule 12 to the \nFirm Transmission Customers in the Transmission Owner’s Zone (including, \nwhere applicable, the Transmission Owner) and Transmission Customers \npurchasing Firm Point-To-Point Transmission Service for delivery in the \nTransmission Owner's Zone in proportion to their Demand Charges (including \nany imputed Demand Charges for bundled service to Native Load Customers) for \nNetwork Integration Transmission Service and Reserved Capacity for Firm \nContract Demand Transmission Service and Firm Point-To-Point Transmission \nService; provided that such credits shall be reduced by the amount of any \napplicable incentives included in such Interconnection Reliability Reinforcement \nCharges.\n(6)\nGenerator Reliability Reinforcement Fee.  The Transmission Provider shall \nrecover the portion of the costs of Interconnection Reliability Reinforcements \nallocated to Generator Interconnection Customers in a Fast Energization Process \nCycle, as determined pursuant to subsection (f)(ii) of this Schedule 12, through \nGenerator Interconnection Reliability Reinforcement Fees as follows:\n(A)\nThe Transmission Provider shall assess and each Generator \nInterconnection Customer will pay the Generator Reliability Reinforcement Fee \nbeginning on the earlier of: (1) in the calendar year when the Generator \nInterconnection Customer’s facility achieves Commercial Operation, or (2) three \nyears after the Commercial Operation date in the Customer’s original Generator \nInterconnection Agreement, and continuing for a period of 15 years from the \nCommercial Operation Date.\nPage 109"},{"page":158,"startToken":61574,"endToken":61915,"text":"(B)\nThe Transmission Provider shall calculate the Generator Reliability \nReinforcement Fee after each System Impact Study Phase as part of the Fast \nEnergization Process as follows:\nAGRRRF = GCAP X TRRGP x {[ACCC X (1 + ACCC)15]/[(1 + ACCC)15 – 1]}\nWhere:\nGRRRF is the Generator Reliability Reinforcement Fee\nGCAP is the Generator Interconnection Customer’s Allocated Percentage, which \nis the Generator Interconnection Customer’s allocated percentage for the portfolio \nof Interconnection Reliability Reinforcements from its New Service Request \nCycle, determined pursuant to subsection (f)(ii) above.\n \nTRRGP is the Total Reliability Reinforcement Gross Plant, which is based on the \ngross plant of all Interconnection Reliability Reinforcements included in the \nRTEP approved by the PJM Board with respect to the Generator Interconnection \nCustomer’s New Service Request Cycle, and for which it has been allocated a \npercentage pursuant to subsection (f)(ii) above.  The gross plant amounts used in \nthis calculation shall be based on the final estimated costs of the Interconnection \nReliability Reinforcements as determined by the Transmission Provider through \nthe Fast Energization Process.  \nACCC is the Annual Carrying Charge Component, which shall be calculated as \nthe weighted average of the Weighted Average Cost of Capital for all \nTransmission Owners with Interconnection Reliability Reinforcements included \nin the RTEP approved by the PJM Board with respect to the Generator \nInterconnection Customer’s New Service Request Cycle.  The Weighted Average \nCost of Capital values shall be derived from the applicable Transmission Owner’s \nformula rates, as set forth in Attachment H and in effect at the time the Annual \nGenerator Reliability Reinforcement Fee is calculated.  For purposes of \ncalculating such weighted average, each applicable Transmission Owner’s \nWeighted Average Cost of Capital shall be weighted based on the ratio of the \nfinal estimated costs of the Interconnection Reliability Reinforcements that it has \nbeen designated to construct and own and/or finance identified in the New Service \nRequest Cycle that contains the Generator Interconnection Customer, to the final \nestimated costs for all Interconnection Reliability Reinforcements identified in the \nNew Service Request Cycle that contains the Generator Interconnection \nCustomer.  \nPage 110"},{"page":159,"startToken":61915,"endToken":62338,"text":"SCHEDULE 20\nFirm Contract Demand Transmission Service\nFor Eligible Load and Large Load\n1)\nEligible Customer taking Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are determined based on formula rates set \nforth in Attachment H shall pay a Monthly Demand Charge based on the Firm Contract Demand \nTransmission Service Amount (MW), as specified in Eligible Customer’s Service Agreement, \nwhich shall be determined as follows:\nMDC = FCDTSA X RTZ/12\nWhere:\nMDC is the monthly demand charge\nFCDTSA is the Firm Contract Demand Transmission Service Amount (MW), as \nspecified in Eligible Customer’s Service Agreement \nRTZ is the rate for Network Integration Transmission Service from Attachment H for the \nZone in which the Eligible Customer’s Eligible Load or Large Load is located, stated in \ndollars per megawatt per year.  For purposes of establishing the RTZ component in the \nrelevant Attachment H, the annual peak of the Zone shall be based on the sum of \nNetwork Customer Loads in the Zone and Firm Contract Demand Transmission Service \nAmounts for all Eligible Customers taking Firm Contract Demand Transmission Service \nin the Zone for the applicable peak period.\n2)\nEligible Customers taking Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are not established based on formula rates \nshall pay a Monthly Demand Charge based on the Firm Contract Demand Transmission Service \nAmount (MW), as specified in Eligible Customer’s Service Agreement, multiplied by a Zonal-\nspecific Firm Contract Demand Transmission Service rate filed with FERC pursuant to Section \n205 of the Federal Power Act.  Those rates will be posted on Transmission Provider’s website.\n3)\nRevenue Crediting.  Each month, credits will be applied to the Eligible Customer’s \ngross Monthly Demand Charge stated above associated with revenue collected from Non-Firm \nContract Demand Transmission Service Charges in accordance with Schedule 19, based on each  \nEligible Customer’s pro rata share of the Zone’s annual peak load, from the most recent 12-\nmonth period ending October 31.  The Eligible Customer’s pro rata share shall be based on the \nratio of its Firm Contract Demand Transmission Service Amount during the peak period to the \nsum of Network Customer Loads in the Zone and Firm Contract Demand Transmission Service \nAmounts for all Eligible Customers taking Firm Contract Demand Transmission Service in the \nZone for the applicable peak period.  The sum of these revenue credits will appear as a reduction \nto the gross monthly rate stated above on a Eligible Customer’s bill in that month for service \nunder this schedule.  \nPage 111"},{"page":160,"startToken":62338,"endToken":62717,"text":"4)\nTransmission Enhancement Charges. In addition to the rates set forth in section (1) of \nthis Schedule and any other applicable charges, the Eligible Customer shall also pay any \nTransmission Enhancement Charges for which it is designated as a Responsible Customer \nunder Schedule 12 appended to the Tariff.\n5)\nDetermination of Monthly Charges for ComEd Zone. On a monthly basis, revenue\ncredits shall be calculated based on the sum of ComEd’s share of revenues collected during the \nmonth from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission \nService to Non-Zone Network Load under Attachment H-A; and (iii) any Point-To-Point \nTransmission Service where the Point of Receipt and the Point of Delivery are both internal to \nthe ComEd Zone.  On this basis, the sum of these revenues will appear as a reduction to the gross \nmonthly rate stated above on a Transmission Customer’s1 bill in that month for service under this \nschedule.\n6)\nDetermination of Monthly Charges for AEP Zone. On a monthly basis, revenue \ncredits shall be calculated based on the sum of AEP’s share of revenues collected during the \nmonth from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission \nService to Non-Zone Network Load under Attachment H-A; and (iii) Firm Point-To-Point \nTransmission Service where the Point of Delivery is internal to the AEP Zone.  The sum of these \nrevenue credits will appear as an adjustment (reduction) to the gross monthly rate stated above \non a Eligible Customer’s bill in that month for service under this schedule.\n7)\nOther Supporting Facilities and Taxes.  In addition to the charges set forth in section \n(1) of this schedule, the Eligible Customer shall pay charges determined on a case-by-case basis \nfor facilities necessary to provide Transmission Service at voltages lower than those shown \nin Attachment H for the applicable Zone(s) and any amounts necessary to reimburse \nthe Transmission Provider for any amounts payable as sales, excise, “Btu,” carbon, value-added \nor similar taxes (other than taxes based upon or measured by net income) with respect to the \namounts payable pursuant to the Tariff. \n1/ Transmission Customer is defined as an Eligible Customer that executes a Service Agreement, \nor requests PJM file an unexecuted Service Agreement, to receive transmission service under the \nTariff.\nPage 112"},{"page":161,"startToken":62717,"endToken":63101,"text":"SCHEDULE 21\nNon-Firm Contract Demand Service\nFor Eligible Load and Large Load\n1)\nEligible Customer taking Non-Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are determined based on formula rates set \nforth in Attachment H shall pay for such service at a discounted reservation rate calculated by \napplying the Zone’s Annual Load Factor to the applicable Zonal Firm Contract Demand \nTransmission Service rate as follows:\nMonthly Rate ($/MW): Zonal Firm Contract Demand Transmission Rate (RTZ) multiplied by \nthe Zone’s Annual Load Factor, and divided by 12, where the Annual Load Factor is calculated \nas follows: Annual Load Factor = Zonal Annual Energy divided by (Zonal Peak Demand \nmultiplied by 8,760 hours).  For purposes of this Schedule, Zonal Annual Energy shall be the \ntotal net energy for load measured as net generation plus energy receipts minus energy deliveries \nfor the Zone from the 12-month period ending October 31 preceding the calendar year during \nwhich Non-Firm Contract Demand Transmission Service is taken.  For purposes of this \nSchedule, Zonal Peak Demand shall be the Zone’s annual peak load from the 12-month period \nending October 31 preceding the calendar year during which Non-Firm Contract Demand \nTransmission Service is taken.\nWeekly Rate ($/MW): Zonal Firm Contract Demand Transmission Rate (RTZ) multiplied by the \nZone’s Annual Load Factor, and divided by 52, where the Annual Load Factor is calculated as \nfollows: Annual Load Factor = Zonal Annual Energy divided by (Zonal Peak Demand multiplied \nby 8,760 hours).\nDaily On-Peak Rate1 ($/MW): Weekly Rate divided by 5.\nDaily Off-Peak Rate2 ($/MW): Weekly Rate divided by 7.\nHourly On-Peak Rate3 ($/MWh): Zonal Firm Contract Demand Transmission Rate (RTZ), \nmultiplied by the Zone’s Annual Load Factor, and divided by 4,160.\nHourly Off-Peak Rate4 ($/MWh): Zonal Firm Contract Demand Transmission Rate (RTZ), \nmultiplied by the Zone’s Annual Load Factor, divided by 8,760.\n1/ Monday–Friday except the following holidays: New Years Day, Memorial Day, Independence \nDay, Labor Day, Thanksgiving Day, and Christmas Day.\n2/ Saturday and Sunday and the following holidays: New Years Day, Memorial Day, \nIndependence Day, Labor Day, Thanksgiving Day, and Christmas Day.\n3/ 7:00 a.m. up to the hour ending 11:00 p.m.\n4/ 11:00 p.m. up to the hour ending 7:00 a.m.\nPage 113"},{"page":162,"startToken":63101,"endToken":63541,"text":"2)\nEligible Customers taking Non-Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are not established based on formula rates \nshall pay for Non-Firm Contract Demand Transmission Service based on the amount of Non-\nFirm Contract Demand Transmission Service reserved by the Eligible Customer in MW, \nmultiplied by Zonal-specific Non-Firm Contract Demand Transmission Service rates filed with \nFERC pursuant to Section 205 of the Federal Power Act.  Those rates will be posted on \nTransmission Provider’s website.\n3)\nDiscounts.  Three principal requirements apply to discounts for Non-Firm Contract \nDemand Transmission Service as follows: (1) any offer of a discount made by the Transmission \nProvider must be announced to all Eligible Customers solely by posting on the OASIS, (2) any \ncustomer-initiated requests for discounts (including requests for use by one’s wholesale \nmerchant or an Affiliate’s use) must occur solely by posting on OASIS, and (3) once a discount \nis negotiated, details must be immediately posted on the OASIS.  For any discount agreed to by  \nTransmission Provider, Transmission Provider must offer the same discounted transmission \nservice rate for the same time period to all Eligible Customers taking Non-Firm Contract \nDemand Transmission Service.\n4)\nRevenue Crediting.  Revenues collected from Non-Firm Contract Demand Transmission \nService Charges shall be credited to Eligible Customers taking Network Integration Transmission \nService, Firm Contract Demand Transmission Service, and Firm Point-to-Point Transmission \nService based on each Eligible Customer’s pro rata share of the Zone’s annual peak load based \non the most recent 12-month period ending October 31.  The Eligible Customer’s pro rata share \nshall be based on the ratio of its Zone Network Load, Firm Point-To-Point Transmission Service \nand Firm Contract Demand Transmission Service Amount to the sum of Network Customer \nLoads in the Zone and Firm Contract Demand Transmission Service Amounts for all Eligible \nCustomers taking Firm Contract Demand Transmission Service in the Zone, for the applicable \npeak period.  The sum of these revenue credits will appear as a reduction to the gross monthly \nrate for Firm Contract Demand Transmission Service on a Eligible Customer’s bill in that month. \n5)\nOther Supporting Facilities and Taxes.  In addition to the charges set forth in section \n(1) of this schedule, the Eligible Customer shall pay charges determined on a case-by-case basis \nfor facilities necessary to provide Transmission Service at voltages lower than those shown \nin Attachment H for the applicable Zone(s) and any amounts necessary to reimburse \nthe Transmission Provider for any amounts payable as sales, excise, “Btu,” carbon, value-added \nor similar taxes (other than taxes based upon or measured by net income) with respect to the \namounts payable pursuant to the Tariff.\nPage 114"},{"page":163,"startToken":63541,"endToken":63893,"text":"SCHEDULE 22\nFinancial Penalty Charge for \nUnreserved Use by Eligible Load and Large Load\nAn Eligible Customer taking Firm Contract Demand Transmission Service, Non-Firm Contract \nDemand Transmission Service, or Interim Network Integration Transmission Service on behalf \nof Eligible Load or Large Load shall be subject to financial penalties for its unreserved use of the \ntransmission system.\nThe financial penalty charge for unreserved use shall include two components: (1) a base penalty \ncharge, which applies to each individual hour in which the reserved transmission service limit is \nexceeded, and (2) a penalty ratchet, which applies when such exceedances occur repeatedly.\nBase Penalty Charge\nWhen an Eligible Customer taking service on behalf of Eligible Load or Large Load exceeds its \nreserved transmission service limit, a base penalty charge shall be assessed for any hour in which \nat least one five-minute interval occurs during which the Eligible Customer’s telemetered load at \nthe Point of Delivery exceeds its reserved transmission service limit.  This five-minute interval is \ndefined as an Exceedance Interval, and such an hour is defined as an Exceedance Hour.  The \nbase penalty charge shall apply to each Exceedance Hour.  \nFor an Eligible Customer taking only Firm Contract Demand Transmission Service, the \nreserved transmission service limit shall equal the Firm Contract Demand Transmission \nService minus any curtailed MW.  \nFor an Eligible Customer taking only Non-Firm Contract Demand Transmission Service, \nthe reserved transmission service limit shall equal the approved Non-Firm Contract \nDemand Transmission Service minus any curtailed MW.  \nFor an Eligible Customer taking Firm Contract Demand and Non-Firm Contract Demand \nTransmission Services, the reserved transmission service limit shall equal the Firm \nContract Demand Transmission Service plus the approved Non-Firm Contract Demand \nTransmission Service minus any curtailed MW.  \nFor an Eligible Customer taking Interim Network Integration Transmission Service, the \nreserved transmission service limit shall equal the Interim Network Integration \nTransmission Service demand minus any curtailed MW.\nEach five-minute interval beginning with the first minute of each hour shall constitute a \nseparate interval and each hour from 0100 through 2400 shall constitute a separate hour \nfor purposes of determining whether one or more exceedances have occurred.\nPage 115"},{"page":164,"startToken":63893,"endToken":64183,"text":"The base penalty charge shall be applied to each Exceedance Hour and shall be calculated as:\nHourly Exceedance MW × Equivalent Hourly Firm Contract Demand (“FCD”) rate × \nnumber of Exceedance Intervals within the hour\nWhere:\nHourly Exceedance MW = Maximum telemetered load during the hour – Reserved \nTransmission Service Limit for the hour\nEquivalent Hourly FCD rate = FCD rate / 8,760 hours\nPenalty Ratchet\nA penalty rachet shall apply when multiple Exceedance Hours occur during a particular time \nperiod in order to escalate the penalty charges as the frequency of unreserved transmission use \nincreases.  \nIf more than one Exceedance Hour occurs on the same calendar day, an additional daily \npenalty shall apply.  \nIf exceedances occur on multiple calendar days within the same calendar week, an \nadditional weekly penalty shall apply. \nIf exceedances occur in multiple calendar weeks within the same calendar month, an \nadditional monthly penalty shall apply.\nIf exceedances occur in multiple calendar months within the same calendar year, an \nadditional yearly penalty shall apply.  \nThe penalty ratchet shall be based on an Eligible Customer’s exceedance pattern and applies \nescalating FCD-equivalent rates as the frequency of unreserved transmission use increases.  \nDepending on whether exceedances occur within the same calendar day, calendar week, calendar \nmonth, or calendar year, the penalty ratchet shall apply daily, weekly, monthly, or annual penalty \ncharges, respectively, as follows: \nExceedance Pattern\nPenalty Rate Applied\nMultiple Exceedance Hours in a single calendar day\nDaily FCD-Equivalent Rate\nMultiple Exceedance Days within a calendar week\nWeekly FCD-Equivalent Rate\nMultiple Exceedance Weeks within a calendar month\nMonthly FCD-Equivalent Rate\nMultiple Exceedance Months within a calendar year\nFCD Annual Rate\nDaily Penalty Charge\nThe Daily Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar day\n× Daily FCD Equivalent Rate\nPage 116"},{"page":165,"startToken":64183,"endToken":64460,"text":"× Number of Exceedance Hours in the calendar day\nWeekly Penalty Charge\nThe Weekly Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar week\n× Weekly FCD Equivalent Rate\n× Number of Exceedance Days in the calendar week\nMonthly Penalty Charge\nThe Monthly Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar month\n× Monthly FCD Equivalent Rate\n× Number of Exceedance Weeks in the calendar months\nAnnual Penalty Charge\nThe Annual Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar year\n× Annual FCD Rate\n× Number of Exceedance Months in the calendar year\nRevenues collected from Financial Penalty Charges shall be credited to Eligible Customers \ntaking Firm Contract Demand Transmission Service, Non-Firm Contract Demand Transmission \nService, Network Integration Transmission Service, and Interim Network Integration \nTransmission Service.  The Transmission Provider shall return revenues collected from Financial \nPenalty Charges on a monthly and annual basis as bill credits to Eligible Customers taking Firm \nContact Demand Service, Non-Firm Contract Demand Transmission Service, Network \nIntegration Transmission Service, and Interim Network Integration Transmission Service, who \nwere not assessed Financial Penalty Charges during the year based on each Eligible Customer’s \npro rata share of the Zone’s annual peak load based on the most recent 12-month period ending \nOctober 31.  The Eligible Customer’s pro rata share shall be based on the ratio of its Zone \nNetwork Load, Firm Contract Demand Transmission Service Amount, and Non-Firm Contract \nTransmission Service Amount to the sum of Network Customer Loads in the Zone and Firm and \nNon-Firm Contract Demand Transmission Service Amounts for all Eligible Customers taking \nFirm and Non-Firm Contract Demand Transmission Service in the Zone, for the applicable peak \nperiod.\nPage 117"},{"page":166,"startToken":64460,"endToken":64474,"text":"Attachment B \nRevisions to the  \nPJM Open Access Transmission Tariff  \n(Marked Format) \nPage 1"},{"page":167,"startToken":64474,"endToken":64704,"text":"Definitions – R - S\nRamping Capability:\n“Ramping Capability” shall mean the sustained rate of change of generator output, in megawatts \nper minute.\nReal-time Congestion Price:\n“Real-time Congestion Price” shall mean the Congestion Price resulting from the Office of the \nInterconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReal-time Loss Price:\n“Real-time Loss Price” shall mean the Loss Price resulting from the Office of the \nInterconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReal-time Energy Market:\n“Real-time Energy Market” shall mean the purchase or sale of energy and payment of \nTransmission Congestion Charges for quantity deviations from the Day-ahead Energy Market in \nthe Operating Day.\nReal-time Offer:\n“Real-time Offer” shall mean a new offer or an update to a Market Seller’s existing cost-based or \nmarket-based offer for a clock hour, submitted for use after the close of the Day-ahead Energy \nMarket.\nReal-time Prices:\n“Real-time Prices” shall mean the Locational Marginal Prices resulting from the Office of the \nInterconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReal-time Settlement Interval:\n“Real-time Settlement Interval” shall mean the interval used by settlements, which shall be every \nfive minutes.\nReal-time System Energy Price:\n“Real-time System Energy Price” shall mean the System Energy Price resulting from the Office \nof the Interconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.\nReasonable Efforts:\nPage 2"},{"page":168,"startToken":64704,"endToken":65008,"text":"“Reasonable Efforts” shall mean, with respect to any action required to be made, attempted, or \ntaken by an Interconnection Party or by a Construction Party under Tariff, Part IV or Part VI, an \nInterconnection Service Agreement, or a Construction Service Agreement, such efforts as are \ntimely and consistent with Good Utility Practice and with efforts that such party would undertake \nfor the protection of its own interests.\nReceiving Party:\n“Receiving Party” shall mean the entity receiving the capacity and energy transmitted by the \nTransmission Provider to Point(s) of Delivery.\nReferral:\n“Referral” shall mean a formal report of the Market Monitoring Unit to the Commission for \ninvestigation of behavior of a Market Participant, of behavior of PJM, or of a market design \nflaw, pursuant to Tariff, Attachment M, section IV.I.\nReference Resource:\n“Reference Resource” shall mean a combustion turbine generating station, configured with a \nsingle General Electric Frame 7HA turbine with evaporative cooling, Selective Catalytic \nReduction technology all CONE Areas, dual fuel capability, and a heat rate of 9.134 Mmbtu/ \nMWh. \nRegional Entity:\n“Regional Entity” shall have the same meaning specified in the Operating Agreement.\nRegional Transmission Expansion Plan:\n“Regional Transmission Expansion Plan” shall mean the plan prepared by the Office of the \nInterconnection pursuant to Operating Agreement, Schedule 6 for the enhancement and \nexpansion of the Transmission System in order to meet the demands for firm transmission \nservice in the PJM Region.\nRegional Transmission Group (RTG):\n“Regional Transmission Group” or “RTG” shall mean a voluntary organization of transmission \nowners, transmission users and other entities approved by the Commission to efficiently \ncoordinate transmission planning (and expansion), operation and use on a regional (and \ninterregional) basis.\nRegulation:\n“Regulation” shall mean the capability of a specific generation resource or Demand Resource \nwith appropriate telecommunications, control and response capability to separately increase and \nPage 3"},{"page":169,"startToken":65008,"endToken":65363,"text":"decrease its output or adjust load in response to a regulating control signal, in accordance with \nthe specifications in the PJM Manuals.  Regulation is inclusive of Regulation-Down Service and \nRegulation-Up Service.\nRegulation-Down Requirement:\n“Regulation-Down Requirement” shall mean the required megawatts of performance-adjusted \nRegulation-Down Service capability to be maintained in a Regulation Zone. The Regulation-\nDown Requirement is defined as a set megawatt value by hour in accordance with the PJM \nManuals, and can increase to account for additional operational uncertainty.\nRegulation-Down Service\n“Regulation-Down Service” shall mean the capability of a specific generation resource or \nDemand Resource with appropriate telecommunications and response capability to increase and \ndecrease its output in the downward range from a set point or adjust load in response to a \nregulating-down control signal, in accordance with the specification in the PJM Manuals.\nRegulation-Up Requirement:\n“Regulation-Up Requirement” shall mean the required megawatts of performance-adjusted\nRegulation-Up Service capability to be maintained in a Regulation Zone. The Regulation-Up\nRequirement is defined as a set megawatt value by hour in accordance with the PJM Manuals,\nand can increase to account for additional operational uncertainty.\nRegulation-Up Service\n“Regulation-Up Service” shall mean the capability of a specific generation resource or Demand\nResource with appropriate telecommunications and response capability to increase and decrease\nits output in the upward range from a set point or adjust load in response to a regulating-up\ncontrol signal, in accordance with the specification in the PJM Manuals.\nRegulation Zone:\n“Regulation Zone” shall mean any of those one or more geographic areas, each consisting of a \ncombination of one or more Control Zone(s) as designated by the Office of the Interconnection \nin the PJM Manuals, relevant to provision of, and requirements for, regulation service.\nRelevant Electric Retail Regulatory Authority:\n“Relevant Electric Retail Regulatory Authority” shall mean an entity that has jurisdiction over \nand establishes prices and policies for competition for providers of retail electric service to end-\ncustomers, such as the city council for a municipal utility, the governing board of a cooperative \nutility, the state public utility commission or any other such entity.\nReliability Assurance Agreement or PJM Reliability Assurance Agreement:\nPage 4"},{"page":170,"startToken":65363,"endToken":65759,"text":"“Reliability Assurance Agreement” or “PJM Reliability Assurance Agreement” shall mean that \ncertain Reliability Assurance Agreement Among Load Serving Entities in the PJM Region, on \nfile with FERC as PJM Interconnection L.L.C. Rate Schedule FERC No. 44, and as amended \nfrom time to time thereafter.\nReliability Pricing Model Auction:\n“Reliability Pricing Model Auction” or “RPM Auction” shall mean the Base Residual Auction or \nany Incremental Auction, or, for the 2016/2017 and 2017/2018 Delivery Years, any Capacity \nPerformance Transition Incremental Auction.\nRequired Transmission Enhancements:\n“Regional Transmission Enhancements” shall mean enhancements and expansions of the \nTransmission System that (1) a Regional Transmission Expansion Plan developed pursuant to \nOperating Agreement, Schedule 6 or (2) any joint planning or coordination agreement between \nPJM and another region or transmission planning authority set forth in Tariff, Schedule 12-\nAppendix B (“Appendix B Agreement”) designates one or more of the Transmission Owner(s) to \nconstruct and own or finance.  Required Transmission Enhancements shall also include \nenhancements and expansions of facilities in another region or planning authority that meet the \ndefinition of transmission facilities pursuant to FERC’s Uniform System of Accounts or have \nbeen classified as transmission facilities in a ruling by FERC addressing such facilities \nconstructed pursuant to an Appendix B Agreement cost responsibility for which has been \nassigned at least in part to PJM pursuant to such Appendix B Agreement. \nReserved Capacity:\n“Reserved Capacity” shall mean the maximum amount of capacity and energy that the \nTransmission Provider agrees to transmit for the Transmission Customer over the Transmission \nProvider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery \nunder Tariff, Part II.  Reserved Capacity shall be expressed in terms of whole megawatts on a \nsixty (60) minute interval (commencing on the clock hour) basis.\nReserve Penalty Factor:\n“Reserve Penalty Factor” shall mean the cost, in $/MWh, associated with being unable to meet a \nspecific reserve requirement in a Reserve Zone or Reserve Sub-zone.  A Reserve Penalty Factor \nwill be defined for each reserve requirement in a Reserve Zone or Reserve Sub-zone.\nReserve Sub-zone:\n“Reserve Sub-zone” shall mean any of those geographic areas wholly contained within a Reserve \nZone, consisting of a combination of a portion of one or more Control Zone(s) as designated by \nthe Office of the Interconnection in the PJM Manuals, relevant to provision of, and requirements \nfor, reserve service.\nPage 5"},{"page":171,"startToken":65759,"endToken":66105,"text":"Reserve Zone:\n“Reserve Zone” shall mean any of those geographic areas consisting of a combination of one or \nmore Control Zone(s), as designated by the Office of the Interconnection in the PJM Manuals, \nrelevant to provision of, and requirements for, reserve service.\nResidual Auction Revenue Rights:\n“Residual Auction Revenue Rights” shall mean incremental stage 1 Auction Revenue Rights \ncreated within a Planning Period by an increase in transmission system capability, including the \nreturn to service of existing transmission capability, that was not modeled pursuant to Operating \nAgreement, Schedule 1, section 7.5 and the parallel provisions of  Tariff, Attachment K-\nAppendix, section 7.5 in compliance with Operating Agreement, Schedule 1, section 7.4.2 (h) \nand the parallel provisions of Tariff, Attachment K-Appendix, section 7.4.2(h), and, if modeled, \nwould have increased the amount of stage 1 Auction Revenue Rights allocated pursuant to \nOperating Agreement, Schedule 1, section 7.4.2 and the parallel provisions of Tariff, Attachment \nK-Appendix, section 7.4.2; provided that, the foregoing notwithstanding, Residual Auction \nRevenue Rights shall exclude: 1) Incremental Auction Revenue Rights allocated pursuant to \nTariff, Part VI;  and 2) Auction Revenue Rights allocated to entities that are assigned cost \nresponsibility pursuant to Operating Agreement, Schedule 6 for  transmission upgrades that \ncreate such rights.\nResidual Metered Load:\n“Residual Metered Load” shall mean all load remaining in an electric distribution company’s \nfully metered franchise area(s) or service territory(ies) after all nodally priced load of entities \nserving load in such area(s) or territory(ies) has been carved out.\nResource Substitution Charge:\n“Resource Substitution Charge” shall mean a charge assessed on Capacity Market Buyers in an \nIncremental Auction to recover the cost of replacement Capacity Resources.\nResponsible Customer: \n“Responsible Customer” shall mean customers using Interim Network Integration Transmission \nService, Firm Contract Demand Transmission Service, Non-Firm Contract Demand \nTransmission Service, Point-to-Point Transmission Service and/or Network Integration \nTransmission Service and Merchant Transmission Facility owners, which are assigned cost \nresponsibility for Transmission Enhancement Charges as determined pursuant to Tariff, \nSchedule 12.\nRevenue Data for Settlements:\nPage 6"},{"page":172,"startToken":66105,"endToken":66398,"text":"“Revenue Data for Settlements” shall mean energy quantities used in accounting and billing as \ndetermined pursuant to Tariff, Attachment K-Appendix and the corresponding provisions of \nOperating Agreement, Schedule 1.\nRPM Seller Credit:\n“RPM Seller Credit” shall mean an additional form of Unsecured Credit defined in Tariff, \nAttachment Q, section IV.\nScheduled Incremental Auctions:\n“Scheduled Incremental Auctions” shall refer to the First, Second, or Third Incremental Auction.\nSchedule of Work:\n“Schedule of Work” shall mean that schedule attached to the Interconnection Construction \nService Agreement setting forth the timing of work to be performed by the Constructing Entity \npursuant to the Interconnection Construction Service Agreement, based upon the Facilities Study \nand subject to modification, as required, in accordance with Transmission Provider’s scope \nchange process for interconnection projects set forth in the PJM Manuals.\nScope of Work:\n“Scope of Work” shall mean that scope of the work attached as a schedule to the Interconnection \nConstruction Service Agreement and to be performed by the Constructing Entity(ies) pursuant to \nthe Interconnection Construction Service Agreement, provided that such Scope of Work may be \nmodified, as required, in accordance with Transmission Provider’s scope change process for \ninterconnection projects set forth in the PJM Manuals.\nSeasonal Capacity Performance Resource:\n“Seasonal Capacity Performance Resource” shall have the same meaning specified in Tariff, \nAttachment DD, section 5.5A.\nSeasonal Facility Rating:\n“Seasonal Facility Rating” shall mean a Transmission Facility Rating that:  \n(a) Applies to a specified season, where seasons are defined by the Office of the Interconnection \nto include not fewer than four seasons in each year, and to reasonably reflect portions of the year \nwhere expected high temperatures are relatively consistent.\n(b) Reflects an up-to-date forecast of ambient air temperature across the relevant season over \nwhich the rating applies.\nPage 7"},{"page":173,"startToken":66398,"endToken":66749,"text":"(c) Is evaluated annually, if not more frequently, for each season in the future for which \nTransmission Service can be requested\nSecondary Reserve: \n“Secondary Reserve” shall mean the reserve capability of generation resources that can be \nconverted fully into energy or Economic Load Response Participant resources whose demand \ncan be reduced within 30 minutes (less the capability of such resources to provide Primary \nReserve), from the request of the Office of the Interconnection, regardless of whether the \nequipment providing the reserve is electrically synchronized to the Transmission System or not.\nSecondary Systems:\n“Secondary Systems” shall mean control or power circuits that operate below 600 volts, AC or \nDC, including, but not limited to, any hardware, control or protective devices, cables, \nconductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and \nvoltage and current transformers.\nSecond Incremental Auction:\n“Second Incremental Auction” shall mean an Incremental Auction conducted ten months before \nthe Delivery Year to which it relates.  \nSecurity:\n“Security” shall mean the security provided by the New Service Customer pursuant to Tariff, \nsection 212.4 or Tariff, Part VI, section 213.4 to secure the New Service Customer’s \nresponsibility for Costs under the Interconnection Service Agreement or Upgrade Construction \nService Agreement and Tariff, Part VI, section 217. \nSegment:\n“Segment” shall have the same meaning as described in Operating Agreement, Schedule 1, \nsection 3.2.3(e).\nSelf-Supply:\n“Self-Supply” shall mean Capacity Resources secured by a Load-Serving Entity, by ownership \nor contract, outside a Reliability Pricing Model Auction, and used to meet obligations under this \nAttachment or the Reliability Assurance Agreement through submission in a Base Residual \nAuction or an Incremental Auction of a Sell Offer indicating such Market Seller’s intent that \nsuch Capacity Resource be Self-Supply.  Self-Supply may be either committed regardless of \nclearing price or submitted as a Sell Offer with a price bid. A Load Serving Entity's Sell Offer \nwith a price bid for an owned or contracted Capacity Resource shall not be deemed “Self-\nSupply,” unless it is designated as Self-Supply and used by the LSE to meet obligations under \nthis Attachment or the Reliability Assurance Agreement.\nPage 8"},{"page":174,"startToken":66749,"endToken":67123,"text":"Self-Supply Entity:\n“Self-Supply Entity” shall mean the following types of Load Serving Entity that operate under \nlong-standing business models: single customer entity, public power entity, or vertically \nintegrated utility, where “vertically integrated utility” means a utility that owns generation, \nincludes such generation in its regulated rates, and earns a regulated return on its investment in \nsuch generation or receives any cost recovery for such generation through bilateral contracts; \n“single customer entity”  means a Load Serving Entity that serves at retail only customers that \nare under common control with such Load Serving Entity, where such control means holding \n51% or more of the voting securities or voting interests of the Load Serving Entity and all its \nretail customers; and “public power entity” means cooperative and municipal utilities, including \npublic power supply entities comprised of either or both of the same and rural electric \ncooperatives, and joint action agencies.\nSelf-Supply Seller:\n“Self-Supply Seller” shall mean, for purposes of evaluating Buyer-Side Market Power, the \nfollowing types of Load Serving Entities that operate under long-standing business models: \nvertically integrated utility or public power entity, where “vertically integrated utility” means a \nutility that owns generation, includes such generation in its state-regulated rates, and earns a \nstate-regulated return on its investment in such generation; and “public power entity” means \nelectric cooperatives that are either rate regulated by the state or have their long-term resource \nplan approved or otherwise reviewed and accepted by a Relevant Electric Retail Regulatory \nAuthority and municipal utilities or joint action agencies that are subject to direct regulation by a \nRelevant Electric Retail Regulatory Authority.\nSell Offer:\n“Sell Offer” shall mean an offer to sell Capacity Resources in a Base Residual Auction, \nIncremental Auction, or Reliability Backstop Auction.\nService Agreement:\n“Service Agreement” shall mean the initial agreement and any amendments or supplements \nthereto entered into by the Transmission Customer and the Transmission Provider for service \nunder the Tariff.\nService Commencement Date:\n“Service Commencement Date” shall mean the date the Transmission Provider begins to provide \nservice pursuant to the terms of an executed Service Agreement, or the date the Transmission \nProvider begins to provide service in accordance with Tariff, Part II, section 15.3 or Tariff, Part \nIII, section 29.1.\nShort-Term Firm Point-To-Point Transmission Service:\nPage 9"},{"page":175,"startToken":67123,"endToken":67537,"text":"“Short-Term Firm Point-To-Point Transmission Service” shall mean Firm Point-To-Point \nTransmission Service under Tariff, Part II with a term of less than one year.\nShort-term Project:\n“Short-term Project” shall have the same meaning provided in the Operating Agreement.\nShort-Term Resource Procurement Target:\n“Short-Term Resource Procurement Target” shall mean, for Delivery Years through May 31, \n2018, as to the PJM Region, for purposes of the Base Residual Auction, 2.5% of the PJM Region \nReliability Requirement determined for such Base Residual Auction,  for purposes of the First \nIncremental Auction, 2% of the of the PJM Region Reliability Requirement as calculated at the \ntime of the Base Residual Auction; and, for purposes of the Second Incremental Auction, 1.5% \nof the of the PJM Region Reliability Requirement as calculated at the time of the Base Residual \nAuction; and, as to any Zone, an allocation of the PJM Region Short-Term Resource \nProcurement Target based on the Preliminary Zonal Forecast Peak Load, reduced by the amount \nof load served under the FRR Alternative.  For any LDA, the LDA Short-Term Resource \nProcurement Target shall be the sum of the Short-Term Resource Procurement Targets of all \nZones in the LDA.\nShort-Term Resource Procurement Target Applicable Share:\n“Short-Term Resource Procurement Target Applicable Share” shall mean, for Delivery Years \nthrough May 31, 2018: (i) for the PJM Region, as to the First and Second Incremental Auctions, \n0.2 times the Short-Term Resource Procurement Target used in the Base Residual Auction and, \nas to the Third Incremental Auction for the PJM Region, 0.6 times such target; and (ii) for an \nLDA, as to the First and Second Incremental Auctions, 0.2 times the Short-Term Resource \nProcurement Target used in the Base Residual Auction for such LDA and, as to the Third \nIncremental Auction, 0.6 times such target. \nSite:\n“Site” shall mean all of the real property, including but not limited to any leased real property \nand easements, on which the Customer Facility is situated and/or on which the Customer \nInterconnection Facilities are to be located.\nSmall Commercial Customer:\n“Small Commercial Customer,” as used in RAA, Schedule 6 and Tariff, Attachment DD-1, shall \nmean a commercial retail electric end-use customer of an electric distribution company that \nparticipates in a mass market demand response program under the jurisdiction of a RERRA and \nsatisfies the definition of a “small commercial customer” under the terms of the applicable \nRERRA’s program, provided that the customer has an annual peak demand no greater than \n100kW.\nPage 10"},{"page":176,"startToken":67537,"endToken":67818,"text":"Small Generation Resource:\n“Small Generation Resource” shall mean an Interconnection Customer’s device of 20 MW or \nless for the production and/or storage for later injection of electricity identified in an \nInterconnection Request, but shall not include the Interconnection Customer’s Interconnection \nFacilities.  This term shall include Energy Storage Resources and/or other devices for storage for \nlater injection of energy.\nSmall Inverter Facility:\n“Small Inverter Facility” shall mean an Energy Resource that is a certified small inverter-based \nfacility no larger than 10 kW.\nSmall Inverter ISA:\n“Small Inverter ISA” shall mean an agreement among Transmission Provider, Interconnection \nCustomer, and Interconnected Transmission Owner regarding interconnection of a Small Inverter \nFacility under Tariff, Part IV, section 112B.\nSpecial Member:\n“Special Member” shall mean an entity that satisfies the requirements of Operating Agreement, \nSchedule 1, section 1.5A.02, and the parallel provisions of Tariff, Attachment K-Appendix, \nsection 1.5A.02, or the special membership provisions established under the Emergency Load \nResponse and Pre-Emergency Load Response Programs.\nSpot Market Backup:\n“Spot Market Backup” shall mean the purchase of energy from, or the delivery of energy to, the \nPJM Interchange Energy Market in quantities sufficient to complete the delivery or receipt \nobligations of a bilateral contract that has been curtailed or interrupted for any reason.\nSpot Market Energy:\n“Spot Market Energy” shall mean energy bought or sold by Market Participants through the PJM \nInterchange Energy Market at System Energy Prices determined as specified in Operating \nAgreement, Schedule 1, section 2, and the parallel provisions of Tariff, Attachment K-Appendix, \nsection 2.\nStart Additional Labor Costs:\n“Start Additional Labor Costs” shall mean additional labor costs for startup required above \nnormal station manning levels. \nStart Fuel:\nPage 11"},{"page":177,"startToken":67818,"endToken":68190,"text":"For units without a soak process, “Start Fuel” shall consist of fuel consumed from first fire of the \nstart process to first breaker closing, plus any fuel expended from last breaker opening to \nshutdown.\nFor units with a soak process, “Start Fuel” is fuel consumed from first fire of the start process \n(initial reactor criticality for nuclear units) to dispatchable output (including auxiliary boiler \nfuel), plus any fuel expended from last breaker opening to shutdown, excluding normal plant \nheating/auxiliary equipment fuel requirements.  Start Fuel included for each temperature state \nfrom breaker closure to dispatchable output shall not exceed the unit specific soak time period \nreviewed and approved as part of the unit-specific parameter process detailed in Tariff, \nAttachment K-Appendix, section 6.6(c) or the defaults below:\n•\nCold Soak Time = 0.73 * unit specific Minimum Run Time (in hours)\n•\nIntermediate Soak Time = 0.61 * unit specific Minimum Run Time (in hours)\n•\nHot Soak Time = 0.43 * unit specific Minimum Run Time (in hours)  \nStart-Up Costs:\n“Start-Up Costs” shall consist primarily of the cost of fuel, as determined by the unit’s start heat \ninput (adjusted by the performance factor) times the fuel cost.  It also includes operating costs, \nMaintenance Adders, emissions allowances/adders, and station service cost.  Start-Up Costs can \nvary with the unit offline time being categorized in three unit temperature conditions: hot, \nintermediate and cold.\nFor units with a steam turbine and a soak process (nuclear, steam, and combined cycle), “Start \nFuel” is fuel consumed from first fire of start process (initial reactor criticality for nuclear units): \nStart-Up Costs shall mean the net unit costs from PJM’s notification to the level at which the unit \ncan follow PJM’s dispatch, and from last breaker open to shutdown.\nFor units without a steam turbine and no soak process (engines, combustion turbines, \nIntermittent Resources, and Energy Storage Resources): Start-Up Costs shall mean the unit costs \nfrom PJM’s notification to first breaker close and from last breaker open to shutdown.  \nState:\n“State” shall mean the District of Columbia and any State or Commonwealth of the United \nStates.\nState Commission:\n“State Commission” shall mean any state regulatory agency having jurisdiction over retail \nelectricity sales in any State in the PJM Region.\nState Estimator:\nPage 12"},{"page":178,"startToken":68190,"endToken":68783,"text":"“State Estimator” shall mean the computer model of power flows specified in Operating \nAgreement, Schedule 1, section 2.3 and the parallel provisions of Tariff, Attachment K-\nAppendix, section 2.3.\nState Subsidy:\n“State Subsidy” shall mean a direct or indirect payment, concession, rebate, subsidy, non-\nbypassable consumer charge, or other financial benefit that is as a result of any action, mandated \nprocess, or sponsored process of a state government, a political subdivision or agency of a state, \nor an electric cooperative formed pursuant to state law, and that \n(1) is derived from or connected to the procurement of (a) electricity or electric \ngeneration capacity sold at wholesale in interstate commerce, or (b) an attribute of the \ngeneration process for electricity or electric generation capacity sold at wholesale in \ninterstate commerce; or\n(2) will support the construction, development, or operation of a new or existing Capacity \nResource; or \n(3) could have the effect of allowing the unit to clear in any PJM capacity auction. \nNotwithstanding the foregoing, State Subsidy shall not include (a) payments, concessions, \nrebates, subsidies, or incentives designed to incent, or participation in a program, contract or \nother arrangement that utilizes criteria designed to incent or promote, general industrial \ndevelopment in an area or designed to incent siting facilities in that county or locality rather than \nanother county or locality; (b) state action that imposes a tax or assesses a charge utilizing the \nparameters of a regional program on a given set of resources notwithstanding the tax or cost \nhaving indirect benefits on resources not subject to the tax or cost (e.g., Regional Greenhouse \nGas Initiative); (c) any indirect benefits to a Capacity Resource as a result of any transmission \nproject approved as part of the Regional Transmission Expansion Plan; (d) any contract, legally \nenforceable obligation, or rate pursuant to the Public Utility Regulatory Policies Act or any other \nstate-administered federal regulatory program (e.g., the Cross-State Air Pollution Rule); (e) any \nrevenues from the sale or allocation, either direct or indirect, to an Entity Providing Supply \nServices to Default Retail Service Provider where such entity’s obligations was awarded through \na state default procurement auction that was subject to independent oversight by a consultant or \nmanager who certifies that the auction was conducted through a non-discriminatory and \ncompetitive bidding process, subject to the below condition, and provided further that nothing \nherein would exempt a Capacity Resource that would otherwise be subject to the minimum offer \nprice rule pursuant to this Tariff; (f) any revenues for providing capacity as part of an FRR \nCapacity Plan or through bilateral transactions with FRR Entities; or (g) any voluntary and arm’s \nlength bilateral transaction (including but not limited to those reported pursuant to Tariff, \nAttachment DD, section 4.6), such as a power purchase agreement or other similar contract \nwhere the buyer is a Self-Supply Entity and the transaction is (1) a short term transaction (one-\nyear or less) or (2) a long-term transaction that is the result of a competitive process that was not \nfuel-specific and is not used for the purpose of supporting uneconomic construction, \ndevelopment, or operation of the subject Capacity Resource, provided however that if the Self-\nSupply Entity is responsible for offering the Capacity Resource into an RPM Auction, the \nspecified amount of installed capacity purchased by such Self-Supply Entity shall be considered \nto receive a State Subsidy in the same manner, under the same conditions, and to the same extent \nas any other Capacity Resource of a Self-Supply Entity.  For purposes of subsection (e) of this \nPage 13"},{"page":179,"startToken":68783,"endToken":69195,"text":"definition, a state default procurement auction that has been certified to be a result of a non-\ndiscriminatory and competitive bidding process shall:\n(i)\nhave no conditions based on the ownership (except supplier diversity \nrequirements or limits), location (except to meet PJM deliverability \nrequirements), affiliation, fuel type, technology, or emissions of any resources or \nsupply (except state-mandated renewable portfolio standards for which Capacity \nResources are separately subject to the minimum offer price rule or eligible for an \nexemption);\n(ii)\nresult in contracts between an Entity Providing Supply Services to Default Retail \nService Provider and the electric distribution company for a retail default \ngeneration supply product and none of those contracts require that the retail \nobligation be sourced from any specific Capacity Resource or resource type as set \nforth in subsection (i) above; and\n(iii)\nestablish market-based compensation for a retail default generation supply \nproduct that retail customers can avoid paying for by obtaining supply from a \ncompetitive retail supplier of their choice.\nState of Charge:\n“State of Charge” shall mean the quantity of physical energy stored in an Energy Storage \nResource Model Participant or in the storage component of a Hybrid Resource in proportion to \nits maximum State of Charge capability. State of Charge is quantified as defined in the PJM \nManuals.\nState of Charge Management:\n“State of Charge Management” shall mean the control of State of Charge of an Energy Storage \nResource Market Participant or Hybrid Resource using minimum and maximum discharge (and, \nas applicable, charge) limits, changes in operating mode (as applicable), discharging (and, as \napplicable, charging) offer curves, and self-scheduling of non-dispatchable sales (and, as \napplicable, purchases) of energy in the PJM markets.  State of Charge Management shall not \ninterfere with the obligation of a Market Seller of an Energy Storage Resource Model Participant\nor of a Hybrid Resource to follow PJM dispatch, consistent with all other resources.\nStation Power:\n“Station Power” shall mean energy used for operating the electric equipment on the site of a \ngeneration facility located in the PJM Region or for the heating, lighting, air-conditioning and \noffice equipment needs of buildings on the site of such a generation facility that are used in the \noperation, maintenance, or repair of the facility.  Station Power does not include any energy (i) \nused to power synchronous condensers; (ii) used for pumping at a pumped storage facility; (iii) \nused in association with restoration or black start service; or (iv) that is Direct Charging Energy.\nSub-Annual Resource Constraint:\nPage 14"},{"page":180,"startToken":69195,"endToken":69750,"text":"“Sub-Annual Resource Constraint” shall mean, for the 2017/2018 Delivery Year and for FRR \nCapacity Plans the 2017/2018 and 2018/2019 Delivery Years, for the PJM Region or for each \nLDA for which the Office of the Interconnection is required under Tariff, Attachment DD, \nsection 5.10(a) to establish a separate VRR Curve for a Delivery Year, a limit on the total \namount of Unforced Capacity that can be committed as Limited Demand Resources and \nExtended Summer Demand Resources for the 2017/2018 Delivery Year in the PJM Region or in \nsuch LDA, calculated as the Sub-Annual Resource Reliability Target for the PJM Region or for \nsuch LDA, respectively, minus the Short-Term Resource Procurement Target for the PJM \nRegion or for such LDA, respectively. \nSub-Annual Resource Price Decrement:\n“Sub-Annual Resource Price Decrement” shall mean, for the 2017/2018 Delivery Year, a \ndifference between the clearing price for Extended Summer Demand Resources and the clearing \nprice for Annual Resources, representing the cost to procure additional Annual Resources out of \nmerit order when the Sub-Annual Resource Constraint is binding. \nSub-Annual Resource Reliability Target: \n“Sub-Annual Reliability Target” for the PJM Region or an LDA, shall mean the maximum \namount of the combination of Extended Summer Demand Resources and Limited Demand \nResources in Unforced Capacity determined by PJM to be consistent with the maintenance of \nreliability, stated in Unforced Capacity, that shall be used to calculate the Minimum Annual \nResource Requirement for Delivery Years through May 31, 2017 and the Sub-Annual Resource \nConstraint for the 2017/2018 and 2018/2019 Delivery Years.  As more fully set forth in the PJM \nManuals, PJM calculates the Sub-Annual Resource Reliability Target, by first determining a \nreference annual loss of load expectation (“LOLE”) assuming no Demand Resources.  The \ncalculation for the unconstrained portion of the PJM Region uses a daily distribution of loads \nunder a range of weather scenarios (based on the most recent load forecast and iteratively \nshifting the load distributions to result in the Installed Reserve Margin established for the \nDelivery Year in question) and a weekly capacity distribution (based on the cumulative capacity \navailability distributions developed for the Installed Reserve Margin study for the Delivery Year \nin question).  The calculation for each relevant LDA uses a daily distribution of loads under a \nrange of weather scenarios (based on the most recent load forecast for the Delivery Year in \nquestion) and a weekly capacity distribution (based on the cumulative capacity availability \ndistributions developed for the Capacity Emergency Transfer Objective study for the Delivery \nYear in question).  For the relevant LDA calculation, the weekly capacity distributions are \nadjusted to reflect the Capacity Emergency Transfer Limit for the Delivery Year in question.\nFor both the PJM Region and LDA analyses, PJM then models the commitment of varying \namounts of DR (displacing otherwise committed generation) as interruptible from May 1 through \nOctober 31 and unavailable from November 1 through April 30 and calculates the LOLE at each \nDR level.  The Extended Summer DR Reliability Target is the DR amount, stated as a percentage \nof the unrestricted peak load, that produces no more than a ten percent increase in the LOLE, \ncompared to the reference value.  The Sub-Annual Resource Reliability Target shall be \nexpressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is \nPage 15"},{"page":181,"startToken":69750,"endToken":70055,"text":"converted to Unforced Capacity by multiplying [the reliability target percentage] times [the \nForecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM \nRegion or such LDA, reduced by the amount of load served under the FRR Alternative].\nSub-meter:\n“Sub-meter” shall mean a metering point for electricity consumption that does not include all \nelectricity consumption for the end-use customer as defined by the electric distribution company \naccount number.  PJM shall only accept sub-meter load data from end-use customers for \nmeasurement and verification of Regulation service as set forth in the Economic Load Response \nrules and PJM Manuals.\nSummer-Period Capacity Performance Resource:\n“Summer-Period Capacity Performance Resource” shall have the same meaning specified in \nTariff, Attachment DD, section 5.5A.\nSurplus Interconnection Customer:\n“Surplus Interconnection Customer” shall mean either an Interconnection Customer whose \nGenerating Facility is already interconnected to the PJM Transmission System or one of its \naffiliates, or an unaffiliated entity that submits a Surplus Interconnection Request to utilize \nSurplus Interconnection Service within the Transmission System in the PJM Region.  A Surplus \nInterconnection Customer is not a New Service Customer.   \nSurplus Interconnection Request:\n“Surplus Interconnection Request” shall mean a request submitted by a Surplus Interconnection \nCustomer, pursuant to Tariff, Attachment RR, to utilize Surplus Interconnection Service within \nthe Transmission System in the PJM Region.  A Surplus Interconnection Request is not a New \nService Request.\nSurplus Interconnection Service:\n“Surplus Interconnection Service” shall mean any unneeded portion of Interconnection Service \nestablished in an Interconnection Service Agreement, such that if Surplus Interconnection \nService is utilized, the total amount of Interconnection Service at the Point of Interconnection \nwould remain the same.\nSwitching and Tagging Rules:\n“Switching and Tagging Rules” shall mean the switching and tagging procedures of \nInterconnected Transmission Owners and Interconnection Customer as they may be amended \nfrom time to time. \nSynchronized Reserve:\nPage 16"},{"page":182,"startToken":70055,"endToken":70430,"text":"“Synchronized Reserve” shall mean the reserve capability of generation resources that can be \nconverted fully into energy or Economic Load Response Participant resources whose demand \ncan be reduced within ten minutes from the request of the Office of the Interconnection \ndispatcher, and is provided by equipment that is electrically synchronized to the Transmission \nSystem.\nSynchronized Reserve Event:\n“Synchronized Reserve Event” shall mean a request from the Office of the Interconnection to \ngeneration resources and/or Economic Load Response Participant resources able, assigned or \nself-scheduled to provide Synchronized Reserve in one or more specified Reserve Zones or \nReserve Sub-zones, within ten minutes, to increase the energy output or reduce load by the \namount of assigned or self-scheduled Synchronized Reserve capability.\nSynchronized Reserve Requirement:\n“Synchronized Reserve Requirement” shall mean the megawatts required to be maintained in a \nReserve Zone or Reserve Sub-zone as Synchronized Reserve, absent any increase to account for \nadditional reserves scheduled to address operational uncertainty.  The Synchronized Reserve \nRequirement is calculated in accordance with the PJM Manuals.  This requirement can only be \nsatisfied by Synchronized Reserve resources.\nSystem Condition:\n“System Condition” shall mean a specified condition on the Transmission Provider’s system or \non a neighboring system, such as a constrained transmission element or flowgate, that may \ntrigger Curtailment of Long-Term Firm Point-to-Point Transmission Service using the \ncurtailment priority pursuant to Tariff, Part II, section 13.6.  Such conditions must be identified \nin the Transmission Customer’s Service Agreement.\nSystem Energy Price:\n“System Energy Price” shall mean the energy component of the Locational Marginal Price, \nwhich is the price at which the Market Seller has offered to supply an additional increment of \nenergy from a resource, calculated as specified in Operating Agreement, Schedule 1, section 2 \nand the parallel provisions of Tariff, Attachment K-Appendix, section 2.\nSystem Impact Study:\n“System Impact Study” shall mean an assessment by the Transmission Provider of (i) the \nadequacy of the Transmission System to accommodate a Completed Application, an \nInterconnection Request or an Upgrade Request, (ii) whether any additional costs may be \nincurred in order to provide such transmission service or to accommodate an Interconnection \nRequest, and (iii) with respect to an Interconnection Request, an estimated date that an \nInterconnection Customer’s Customer Facility can be interconnected with the Transmission \nPage 17"},{"page":183,"startToken":70430,"endToken":70618,"text":"System and an estimate of the Interconnection Customer’s cost responsibility for the \ninterconnection; and (iv) with respect to an Upgrade Request, the estimated cost of the requested \nsystem upgrades or expansion, or of the cost of the system upgrades or expansion, necessary to \nprovide the requested incremental rights.\nSystem Protection Facilities:\n“System Protection Facilities” shall refer to the equipment required to protect (i) the \nTransmission System, other delivery systems and/or other generating systems connected to the \nTransmission System from faults or other electrical disturbance occurring at or on the Customer \nFacility, and (ii) the Customer Facility from faults or other electrical system disturbance \noccurring on the Transmission System or on other delivery systems and/or other generating \nsystems to which the Transmission System is directly or indirectly connected.  System Protection \nFacilities shall include such protective and regulating devices as are identified in the Applicable \nTechnical Requirements and Standards or that are required by Applicable Laws and Regulations \nor other Applicable Standards, or as are otherwise necessary to protect personnel and equipment \nand to minimize deleterious effects to the Transmission System arising from the Customer \nFacility.\nPage 18"},{"page":184,"startToken":70618,"endToken":70830,"text":"Tariff, Part VIII, Subpart A, section 400\nDefinitions F\nFacilities Study:\n“Facilities Study” shall be an engineering study conducted by the Transmission Provider (in \ncoordination with the affected Transmission Owner(s)) to: (1) determine the required \nmodifications to the Transmission Provider’s Transmission System necessary to implement the \nconclusions of the System Impact Studies; and (2) complete any additional studies or analyses \ndocumented in the System Impact Studies or required by PJM Manuals, and determine the \nrequired modifications to the Transmission Provider's Transmission System based on the \nconclusions of such additional studies.  \nFederal Power Act:\n“Federal Power Act” shall mean the Federal Power Act, as amended, 16 U.S.C. §§ 791a, et seq.\nFERC or Commission:\n“FERC” or “Commission” shall mean the Federal Energy Regulatory Commission or any \nsuccessor federal agency, commission or department exercising jurisdiction over the Tariff, \nOperating Agreement and Reliability Assurance Agreement.\nFinal Agreement Negotiation Phase:\n“Final Agreement Negotiation Phase” shall mean the phase set forth in Tariff, Part VIII, Subpart \nD, section 411 to tender, negotiate, and execute any service agreement in Tariff, Part IX. \nFirm Transmission Service:\n“Firm Transmission Service” shall mean any or a combination of Network Integration \nTransmission Service, Firm Point-To-Point Transmission Service, or Firm Contract Demand \nTransmission Service taken by an Eligible Customer.\nPage 19"},{"page":185,"startToken":70830,"endToken":70842,"text":"Tariff, Part VIII, Subpart N\nCOST RECOVERY PROTECTION AND AGREEMENT\nPage 20"},{"page":186,"startToken":70842,"endToken":71384,"text":"Tariff, Part VIII, Subpart N, section 441\nCost Recovery Protection for Firm Transmission Service\n(a) Cost Recovery Assurances: With respect to Eligible Customers that intend to request any \nform of Firm Transmission Service from Transmission Provider on behalf of an Eligible Load or \nLarge Load, a Transmission Owner shall either:\n(i)\nEnter into a Cost Recovery Agreement in the form found in Tariff, Part IX, \nSubpart P with the applicable Eligible Customer and Eligible Load or Large Load.  The \nTransmission Owner counterparty shall be the Transmission Owner that owns the transmission \nfacilities with which the Eligible Load or Large Load will interconnect.  In the case of an \nEligible Load or Large Load that will not directly interconnect with a Transmission Owner, the \nTransmission Owner counterparty shall be the Transmission Owner to which the applicable \nEligible Customer is connected and from whom the Eligible Customer intends to take Firm \nTransmission Service.  The purpose of the Cost Recovery Agreement is to ensure the Eligible \nCustomer takes a minimum level of Firm Transmission Service on behalf of the Eligible Load or \nLarge Load based on the committed load level and the applicable rate for the Firm Transmission \nService, or, if not, the Eligible Load or Large Load shall be required to make a shortfall payment \nrepresenting any difference between the committed minimum level of service and the actual \nlevel of service taken.\n(ii)\nEnter into, subject to FERC acceptance, a separate agreement between at least the \nTransmission Owner and an Eligible Load or Large Load to prevent cost shifting among \ntransmission customers.  Such separate agreement will be determined to adequately prevent cost \nshifts if such agreement, in conjunction with relevant federal and state regulatory requirements, \nincluding applicable retail service tariffs, results in minimum Firm Transmission Service and \ncredit standards, or other comparable protections.\nAn Eligible Customer and/or Eligible Load or Large Load will be required to enter into and \nexecute a Cost Recovery Agreement or an agreement that meets the standards set forth in \nsubsection (a)(ii) in order to proceed past the Soft Close Date associated with the applicable PJM \nFast Energization Cycle, and obtain any form of Firm Transmission Service from the \nTransmission Provider.\n(b) Preservation of Legacy Treatment: No Cost Recovery Agreement or separate agreement \nunder subsection (a) above shall be required with respect to Eligible Load or Large Loads \ncovered by existing agreements that meet the criteria set forth in subsection (a)(ii) that have \nalready been filed and are pending acceptance, or that have been accepted by FERC.  Any \nagreement entered into prior to the effective date of this subsection not filed with FERC will not \nbe required to be filed and accepted by FERC; provided, however, in any complaint filed \npursuant to Section 206 of the Federal Power Act in which it is claimed that such agreement is \nnot just and reasonable or is unduly discriminatory within the meaning of the Federal Power Act, \nsuch agreement shall not be determined to be unjust and unreasonable or unduly discriminatory \nif it meets the standard set forth in subsection (a)(ii).\n(c) Tender and Negotiation of Cost Recovery Agreement:  As applicable, consistent with \nsubsections (a) and (b) above, Transmission Owner shall tender a draft of the Cost Recovery \nPage 21"},{"page":187,"startToken":71384,"endToken":71918,"text":"Agreement to Eligible Customer and Eligible Load or Large Load within 30 days of the \ncompletion of the Transmission Owner’s retail load interconnection study.  \nUpon receipt of the draft Cost Recovery Agreement, Eligible Customer, as well as the Eligible \nLoad or Large Load, shall provide the Transmission Owner with any written comments on the \ndraft Cost Recovery Agreement within seven (7) days. The parties will conduct further \nnegotiations as required, with such negotiations to be completed within twenty-five (25) days of \nthe Transmission Owner’s tender of the draft Cost Recovery Agreement.  \n(d) Execution and Filing of Cost Recovery Agreement: Not later than ten (10) days after the \nend of the negotiation period set forth in subsection (c) above, Eligible Customer and the Eligible \nLoad or Large Load shall (i) execute the Cost Recovery Agreement and return it to Transmission \nOwner; and (ii) provide the Credit Support specified in the Cost Recovery Agreement.\nIf the Eligible Load or Large Load fails to execute the Cost Recovery Agreement or provide the \nrequired Credit Support in the specified time period, Eligible Customer shall not be permitted to \nproceed through the applicable Fast Energization Cycle.  \nThe Transmission Owner shall file any executed Cost Recovery Agreement, if required, with \nFERC within twenty-one (21) days of the other parties executing the Cost Recovery Agreement.\n(e) Crediting of Termination Amounts: If the effective date of an Early Termination or Partial \nTermination, as defined in a Cost Recovery Agreement, occurs prior to the first Service Date \nspecified in such agreement, and the Eligible Load or Large Load that is a party to that \nagreement is required to make a termination payment, as applicable, such termination payment \nor other amounts received pursuant to such obligation, including any security drawn on by \nTransmission Owner, shall be divided amongst the pool of Transmission Owners constructing\nfacilities needed to provide the related transmission service, but which will no longer be \nconstructed, including the Transmission Owner that is a party to the Cost Recovery Agreement, \nas follows:\n(i)\nWithin thirty (30) days of such termination, the Transmission Owner that is party \nto the Cost Recovery Agreement (referred to herein as the “contracting Transmission Owner”) \nshall notify all other Transmission Owners that have been designated to construct and own \nInterconnection Reliability Reinforcements necessary to provide Firm Transmission Service to \nan Eligible Customer on behalf of the terminating Eligible Load or Large Load (referred to \nherein as the “third party Transmission Owners”) of such termination.  For purposes of this \nsubsection, third party Transmission Owners shall include all Transmission Owners designated \nto construct and own Interconnection Reliability Reinforcements identified in the PJM Fast \nEnergization Cycle in which the terminating Eligible Load or Large Load was studied, and for \nwhich the contracting Transmission Owner’s Zone received a cost responsibility share.\n(ii)\nEach third-party Transmission Owner shall, within thirty (30) days of the deadline \nfor filings its FERC Form 1 that includes all Eligible Costs, provide an account of such Eligible \nCosts to the contracting Transmission Owner.  For purposes of this subsection “Eligible Costs” \nconsist of all expenditures, costs, and cancellation fees incurred or due to commitments made by \nthe third-party Transmission Owner to engineer, design, procure, construct, own, operate, \nPage 22"},{"page":188,"startToken":71918,"endToken":72380,"text":"maintain, and service the Interconnection Reliability Reinforcements needed to serve the Eligible \nCustomer taking transmission service on behalf of the Eligible Load or Large Load, but which \nwill no longer be constructed, which (a) are incurred through the end of the calendar year in \nwhich notice of termination was received from the contracting Transmission Owner, and (b) are \nincluded in amounts reported in the Transmission Owner’s FERC Form 1 covering that calendar \nyear.  \nAny failure by a third-party Transmission Owner to provide such information within the \ntimeframe above shall bar said Transmission Owner from receiving a portion of amounts paid by \nEligible Load or Large Load as set forth below.\n(iii)\nWithin thirty (30) days of (a) receiving all Transmission Owner accountings in \naccordance with subsection (ii) above, and (b) receipt of termination amounts from the Eligible \nLoad or Large Load that is party to the Cost Recovery Agreement,  the contracting Transmission \nOwner shall divide such termination amounts among itself and the pool of third-party \nTransmission Owners based on each Transmission Owner’s pro rata share of the total amount of \napplicable expenditures, costs and cancellation fees, and disburse such amounts to the third-party \nTransmission Owners accordingly.  \nFor purposes of determining these pro rata shares, the contracting Transmission Owner shall be \npermitted to include Eligible Costs associated not only with its applicable Interconnection \nReliability Reinforcements but also any other transmission facilities, including Supplemental \nProjects and Direct Connection Facilities, that it was constructing in order to provide \ninterconnection or transmission service to the Eligible Load or Large Load, or Eligible Customer \ntaking transmission service on behalf of the Eligible Load or Large Load.\nTo the extent that additional termination funds are received or collected from the Eligible Load \nor Large Load after an initial distribution is made under this subsection, contracting \nTransmission Owner will make additional disbursements using the same methodology within \nfifteen (15) days of receipt of such amounts.\n(iv)\nNothing in this subsection (e) is intended or shall be interpreted to prevent any \nTransmission Owner from seeking cost recovery through an abandoned plant recovery filing \nmade with FERC or through any other proceeding, except insofar as the Transmission Owner has \nreceived amounts pursuant to the process set forth in this subsection (e), it shall be prohibited \nfrom requesting recovery of such amounts in any future proceeding.\n(v)\nTo the extent a Transmission Owner elects to satisfy its obligation under \nsubsection (a) above through a separate agreement as described in subsection (a)(ii), it shall \ninclude in such separate agreement reasonably comparable termination payment crediting \nprovisions as set forth in this subsection (e), as determined by FERC.\n(vi)\nAny disputes under this subsection (e) shall be subject to the dispute resolution \nprocedure set forth in Schedule 5 of the Operating Agreement.\nPage 23"},{"page":189,"startToken":72380,"endToken":72392,"text":"Tariff, Part IX, Subpart P\nFORM OF\nCOST RECOVERY AGREEMENT\nPage 24"},{"page":190,"startToken":72392,"endToken":72417,"text":"Service Agreement No. [____]\nCOST RECOVERY AGREEMENT\nBetween\n[TRANSMISSION OWNER] \nTransmission Owner\nand\n[LARGE LOAD CUSTOMER]\nLarge Load Customer\nand \n[ELIGIBLE CUSTOMER]\nEligible Customer\nPage 25"},{"page":191,"startToken":72417,"endToken":72794,"text":"Service Agreement No. [____]\nCOST RECOVERY AGREEMENT\nThis Cost Recovery Agreement (“Agreement” or “CRA”) is made and entered into as of \n[Insert Date] by and among [Transmission Owner], a [State and Entity Type] (“Transmission \nOwner”) and [Large Load Customer], a [State and Entity Type] (“Large Load Customer”), and\n[Eligible Customer], a [State and Entity Type] (“Eligible Customer”). Transmission Owner, \nEligible Customer, and Large Load Customer are referred to individually as a “Party” and \ncollectively as the “Parties.” \nLarge Load Customer will be responsible for all payment and Credit Support obligations \nassigned to Large Load Customer under this CRA. Eligible Customer will remain responsible for \nthe transmission-service, information-sharing, and administrative obligations expressly assigned \nto Eligible Customer under this CRA.\nRECITALS\nWHEREAS, Large Load Customer intends to construct, maintain, and operate new or \nmodified facilities located at or near [Facility Address] that will constitute a Large Load (the \n“Large Load Facilities”), with an anticipated initial service date of [Date] (the “Commercial \nOperation Date”);\nWHEREAS, Large Load Customer has completed retail interconnection studies \nconducted by Transmission Owner and/or one or more of its affiliates;\nWHEREAS,\nfollowing completion of the applicable Transmission Owner’s \ninterconnection study process, the Parties are entering into this CRA based on the Initial Load \nCommitment, proposed load ramp, and anticipated Service Dates identified in Exhibit A;\nWHEREAS, Eligible Customer intends to request Network Integration Transmission \nService (“NITS”), Firm Point-to-Point Transmission Service, or Firm Contract Demand \nTransmission Service (“FCDS”) under the PJM Open Access Transmission Tariff (“PJM Tariff”) \non behalf of the Large Load Customer to serve the Large Load Facilities , each of which \nconstitutes “Firm Transmission Service” under this CRA;\nWHEREAS, Exhibit A identifies the initial amount and type of Firm Transmission \nService to be requested by Eligible Customer on behalf of Large Load Customer, together with \nthe load ramp and anticipated Service Dates;\nWHEREAS, following completion of the applicable application and study process to \nobtain the Firm Transmission Service, Exhibit A and the related calculations under this CRA will \nbe updated to reflect the type, amount, and timing of Firm Transmission Service established in \nthe Final PJM Agreement;\nWHEREAS, in reliance on the Firm Load Commitment and in accordance with the PJM \nTariff and other applicable agreements, the Transmission Owner intends to construct, own, \nPage 26"},{"page":192,"startToken":72794,"endToken":73203,"text":"operate, maintain, service, and recover the costs associated with transmission facilities necessary \nto serve the Large Load Facilities;\nWHEREAS, this CRA establishes the payment and Credit Support obligations described \nherein and allocates the financial risk arising if Firm Transmission Service-related revenues \nattributable to service actually taken for the Large Load Facilities are less than the Committed \nRevenue Contribution.\nNOW, THEREFORE, in consideration of the premises and the mutual covenants and \nundertakings set forth herein, the receipt and sufficiency of which are acknowledged, the Parties, \nintending to be legally bound, agree as follows:\nARTICLE 1\nDEFINITIONS\n1.0\nDefined Terms \nCapitalized terms used in this CRA have the meanings set forth below. Capitalized terms used \nbut not defined in this CRA have the meanings set forth in the PJM Tariff.\n(a)\n“Actual Revenue Contribution” means, for each Measurement Period, the Firm \nTransmission Service-related revenues attributable to Firm Transmission Service actually \ntaken by \nEligible Customer to serve the Large Load Facilities, as calculated in \naccordance with Section 5.2 and Exhibit B.\n(b) \n“Agreement” or “CRA” means this Cost Recovery Agreement, including its Exhibits and \nany amendments that become effective in accordance with this CRA and applicable law.\n(c)\n“Applicable Credits” means the amounts identified in Article 9 and Exhibit D, Section 4, \nthat are deducted in calculating the Early Termination Amount or Partial Termination \nAmount, without duplication.\n(d)\n“Applicable Firm Transmission Service Rate” means, for each Measurement Period, the \nTransmission Owner’s rate or rates then in effect under the PJM Tariff for the applicable \nFirm Transmission Service in the applicable Transmission Zone, as used to calculate the \ncharges corresponding to the Firm Load Commitment.\n(e)\n“Applicable Termination Percentage” means the percentage set forth in Exhibit D for the \nperiod in which the termination or Partial Termination becomes effective.\n(f)\n“Business Day” means any day other than a Saturday, Sunday, or holiday recognized by \nthe North American Electric Reliability Corporation.\n(g)\n“Commercial Operation Date” means the anticipated initial service date for the Large \nLoad Facilities identified in Exhibit A.\n(h)\n“Committed Revenue Contribution”\nmeans, for each Measurement Period, the \ncontractually required portion of the Full Firm Transmission Service Benchmark, \ncalculated by applying the Minimum Commitment Percentage in accordance with Section \n5.1 and Exhibit B.\n(i)\n“Credit Support” means the financial security that Large Load Customer is required to \nprovide and maintain under Section 6.1 to secure Large Load Customer’s payment and \nother financial obligations under this CRA.\nPage 27"},{"page":193,"startToken":73203,"endToken":73732,"text":"(j)\n“Credit Support Requirement” means the amount of Credit Support that Large Load \nCustomer is required to cause to be provided and maintained, as calculated in accordance \nwith Section 6.5 and Exhibit C based on the aggregate Projected Full Firm Transmission \nService Benchmarks for all Measurement Periods remaining in the Term, including any \nportion of the applicable Measurement Period that remains incomplete. Before the \nrecalculation required under Section 3.2, the Credit Support Requirement shall be the \nInitial Credit Support Requirement.\n(k)\n“Effective Date” means the date on which this CRA becomes effective as set forth in \nSection 4.1.\n(l)\n“Early Termination Amount” means the amount payable by Large Load Customer upon \na termination of this CRA for which an Early Termination Amount is required under \nArticle 9, as calculated in accordance with Exhibit D.\n(m)\n“Early Termination Offset Amount” means the Firm Transmission Service-related \nrevenues received by Transmission Owner during the period corresponding to the \nremaining fixed period from incremental replacement load served at the same Point of \nDelivery, to the extent those revenues correspond to the revenue exposure included in the \nEarly Termination Amount or Partial Termination Amount, as determined in accordance \nwith Section 9.9.\n(n)\n“Eligible Customer” means the Person identified as  Eligible Customer in the preamble to \nthis CRA, which is an Eligible Customer under the PJM Tariff and the entity responsible \nfor taking Firm Transmission Service on behalf of Large Load Customer to serve the \nLarge Load Facilities. Eligible Customer is responsible only for the obligations expressly \nassigned to Eligible Customer under this CRA and is not responsible for Large Load \nCustomer’s payment or Credit Support obligations.\n(o)\n“FERC” means the Federal Energy Regulatory Commission or any successor agency.\n(p)\n“Final PJM Agreement” means the final Transmission Service Agreement or other \nagreement executed under the PJM Tariff that identifies the Firm Transmission Service to \nbe taken by Eligible Customer on behalf of Large Load Customer.\n(q)\n“Firm Load Commitment” means the amount of firm load identified in Exhibit A, \ntogether with the corresponding level of Firm Transmission Service that Eligible \nCustomer has committed to take on behalf of  Large Load Customer and any associated \nload-ramp milestones and Service Dates.\n(r)\n“Firm Transmission Service” means NITS, Firm Point-to-Point Transmission Service, or \nFCDS, as applicable, requested or taken by Eligible Customer under the PJM Tariff on \nbehalf of Large Load Customer to serve the Large Load Facilities. \n(s)\n“Full Firm Transmission Service Benchmark” means, for each Measurement Period, the \ncharges that would apply under the Applicable Firm Transmission Service Rate and \napplicable billing determinants if Eligible Customer took Firm Transmission Service \ncorresponding to the Firm Load Commitment scheduled to apply during that \nMeasurement Period, as calculated in accordance with Section 5.1 and Exhibit B.\n(t)\n“Force Majeure” has the meaning set forth in Article 12.\n(u)\n“FCDS” means Firm Contract Demand Transmission Service under the PJM Tariff.\n(v)\n“Initial Load Commitment” means the initial amount of Firm Transmission Service to be \nrequested by Eligible Customer on behalf of Large Load Customer, together with the \nproposed load ramp and anticipated Service Dates identified in Exhibit A at execution of \nthis CRA.\nPage 28"},{"page":194,"startToken":73732,"endToken":74243,"text":"(w)\n“Initial Credit Support Requirement” means the amount of Credit Support identified in \nExhibit C at execution by the Parties of this CRA based on the Initial Load Commitment, \nanticipated Service Dates, and aggregate Projected Full Firm Transmission Service \nBenchmarks for the Term, calculated in accordance with  the methodology specified in \nExhibit C.\n(x)\n“Large Load” shall mean end-use customer(s) load that has a cumulative peak load of 50 \nmegawatts or greater at a single electrical site behind one or more points of \ninterconnection, where for configurations involving multiple affiliated load facilities or \nmultiple points of interconnection with affiliated load facilities behind them, all affiliated \nload facilities within a one-mile radius will be considered a single electrical site as further \ndescribed in the PJM Manuals.\n(y)\n“Large Load Customer” means the Person identified in Exhibit A that owns, operates, \nleases, or otherwise controls the Large Load Facilities and on whose behalf Eligible \nCustomer takes Firm Transmission Service to serve the Large Load Facilities. Large \nLoad Customer is a Party to this CRA and is directly responsible for the payment and \nCredit Support obligations assigned to Large Load Customer under this CRA.\n(z)\n“Large Load Facilities” means the new or modified facilities identified in Exhibit A that \nconstitute the Large Load.\n(aa)\n“Measurement Period”  means each period, not to exceed one year, corresponding to \nTransmission Owner’s applicable formula rate cycle, or portion thereof, beginning on the \nfirst Service Date and continuing through the end of the Term, as specified in Exhibit A.\n(bb)\n“Minimum Commitment Percentage” means the percentage specified in Exhibit A that is \napplied to the Full Firm Transmission Service Benchmark to calculate the Committed \nRevenue Contribution, which percentage shall be no less than 80% and no greater than \n100%, per the schedule set forth in Exhibit A below.\n(cc)\n“MW” means megawatts.\n(dd)\n“NITS” means Network Integration Transmission Service provided pursuant to the PJM \nTariff, Part III.\n(ee)\n“Partial Termination Amount” means the amount payable by Large Load Customer upon \na permanent reduction of a specified portion of the Firm Load Commitment under \nSection 9.2, as calculated in accordance with Section 9.8 and Exhibit D.\n(ff)\n“Person” means an individual, corporation, limited liability company, partnership, \nassociation, trust, governmental authority, or other legal entity.\n(gg)\n“PJM” means PJM Interconnection, L.L.C. or its successor.\n(hh)\n“PJM Tariff” means the PJM Open Access Transmission Tariff, as accepted by FERC \nand effective from time to time.\n(ii)\n“Projected Committed Revenue Contributions” means the aggregate amounts projected to \nconstitute Committed Revenue Contributions during the applicable period, calculated by \napplying the Minimum Commitment Percentage to the Projected Full Firm Transmission \nService Benchmark for each applicable Measurement Period. \n(jj)\n“Project Development Costs” means all expenditures, costs, and cancellation fees \nincurred, or due to commitments made by the Transmission Owner or other transmission \nowners to engineer, design, procure, construct, own, operate, maintain, and service the \nnecessary transmission facilities needed to serve the Large Load Customer that are \nintended to be placed into transmission rate base and recovered through transmission \nrates.  \nPage 29"},{"page":195,"startToken":74243,"endToken":74670,"text":"(kk)\n“Projected Full Firm Transmission Service Benchmark” means, for each applicable \nMeasurement Period, 100% of the Firm Transmission Service-related charges projected \nto apply if Eligible Customer takes Firm Transmission Service corresponding to the \nInitial Load Commitment or Firm Load Commitment, as applicable, calculated in \naccordance with Exhibit C.\n(ll)\n“Service Date” means (i) before execution of the Final PJM Agreement, each anticipated \ndate identified in Exhibit A on which the Initial Load Commitment, or a portion thereof, \nis expected to become effective; and (ii) after execution of the Final PJM Agreement, \neach date identified in Exhibit A as updated pursuant to Section 3.2 on which the Firm \nLoad Commitment, or a specified portion thereof under an applicable load ramp, is \nscheduled to become effective..\n(mm) “Shortfall Amount” means, for each Measurement Period, the amount, if any, by which \nthe Committed Revenue Contribution exceeds the Actual Revenue Contribution, as \ncalculated in accordance with Section 5.3 and Exhibit B.\n(nn)\n“Term” has the meaning set forth in Section 4.2.\n(oo)\n“Transmission Owner” means the PJM Transmission Owner identified in the preamble to \nthis CRA.\n(pp)\n“Transmission System” shall mean the facilities controlled or operated by PJM that are \nused to provide transmission service under Part II and Part III of the PJM Tariff. \n(qq)\n“Transmission Zone” means the transmission zone identified in Exhibit A in which the \nLarge Load Facilities are located.\nARTICLE 2\nRECITALS\n2.1\nRecitals\nThe statements set forth in the recitals above are hereby incorporated herein into the terms and \nconditions of this CRA as if fully set forth herein.\nARTICLE 3\nFIRM LOAD COMMITMENT\n3.1\nInitial Load Commitment and Firm Load Commitment\nAt execution of this CRA, the Initial Load Commitment shall be established using the amount \nand type of Firm Transmission Service that Eligible Customer intends to request from PJM on \nbehalf of Large Load Customer through the applicable application and study process, together \nwith the proposed load ramp and anticipated Service Dates identified in Exhibit A.\nFollowing execution of the Final PJM Agreement, the Firm Load Commitment applicable during \neach Measurement Period shall be the amount and type of Firm Transmission Service that the \nEligible Customer takes on behalf of the Large Load during each Measurement Period, as set \nforth in Exhibit A.  This amount shall be based on the amount of load for the Large Load \nscheduled to be in service during each Measurement Period, or the amount of Firm Transmission \nService that the Eligible Customer has contracted for on behalf of the Large Load.\nPage 30"},{"page":196,"startToken":74670,"endToken":75090,"text":"If Exhibit A establishes a load ramp, consistent with the amount of Firm Transmission Service \nthat the Eligible Customer has contracted for on behalf of the Large Load, each scheduled load \nlevel becomes part of the Firm Load Commitment on the applicable Service Date.\nExcept as expressly provided in this CRA, Eligible Customer’s failure to begin taking Firm \nTransmission Service to serve the Large Load Facilities, take Firm Transmission Service\ncorresponding to a scheduled load level, or maintain that level of Firm Transmission Service\ndoes not reduce or defer the Firm Load Commitment or the Committed Revenue Contribution, or \nexcuse Large Load Customer from any payment or Credit Support obligation under this CRA.\n3.2\nPost-Final PJM Agreement Update and Subsequent Modification\nWithin thirty (30) days after execution of the Final PJM Agreement, Transmission Owner shall \nupdate Exhibit A to reflect the Firm Transmission Service, load ramp, and Service Dates \nestablished through or consistent with the Final PJM Agreement. Transmission Owner shall also \nupdate the Applicable Firm Transmission Service Rate, Projected Committed Revenue \nContributions, Projected Full Firm Transmission Service Benchmarks, Credit Support \nRequirement, the applicable schedules in Exhibits A and C, and the calculations under Exhibit B \nusing the information then available.\nThe information reflected in the Final PJM Agreement shall control over the corresponding \npreliminary information included in Exhibit A at execution. If the Final PJM Agreement \nestablishes less Firm Transmission Service than the Initial Load Commitment, the Firm Load \nCommitment shall be reduced accordingly. A reduction required by this paragraph shall not \nconstitute a Partial Termination and shall not result in a Partial Termination Amount.\nAn update required by this Section shall become effective without further agreement of the \nParties and shall not constitute an amendment to this CRA. Transmission Owner shall provide \nthe updated Exhibits and reasonable supporting calculations to Eligible Customer and Large \nLoad Customer.\nAfter the update required by this Section, a further modification to the Firm Load Commitment \nor a Service Date shall become effective only if the Parties execute any amendment required \nunder this CRA and the amendment receives any required PJM or FERC acceptance or approval. \nA customer-requested reduction remains subject to Article 9.\n3.3\nNo Transmission Owner Obligation\nExcept as otherwise explicitly provided herein, nothing in this Agreement shall constitute an \nobligation on the part of Transmission Owner to provide any service to any Party or place into \nservice any transmission facilities by any specific date or dates. \nARTICLE 4\nEFFECTIVE DATE AND TERM\n4.1\nEffective Date\nPage 31"},{"page":197,"startToken":75090,"endToken":75507,"text":"This CRA will become effective on the later of : (1) the date  executed by all Parties, or (2) the \ndate accepted or approved by FERC, if such acceptance or  approval is required, or (3) on such \nother date as FERC may establish in an order accepting or approving the CRA (the “Effective \nDate”).\n4.2\nTerm\nUnless terminated earlier in accordance with this CRA, the term of this CRA (the “Term”) shall\ncommence on the Effective Date and continue until the later of:  (i) the date that is at least ten \n(10) years after the first Service Date as specified in Exhibit A; and (ii) the date on which all \noutstanding obligations under this CRA have been satisfied. \nARTICLE 5\nREVENUE CONTRIBUTIONS AND SHORTFALL AMOUNT\n5.1\nCommitted Revenue Contribution\nFor each Measurement Period during the Term, Transmission Owner  shall calculate the \nCommitted Revenue Contribution in accordance with this Section and Exhibit B, using the \napplicable rates, billing determinants, and other information available in accordance with the \nPJM Tariff.  The Committed Revenue Contribution shall equal the Minimum Commitment \nPercentage multiplied by the Firm Transmission Service-related charges that would apply if \nEligible Customer took Firm Transmission Service corresponding to the Firm Load Commitment \napplicable during the Measurement Period.\nThe calculation shall use:\n(a) the Firm Load Commitment that applies during each Measurement Period;\n(b) the Applicable Firm Transmission Service Rate and the generally applicable billing \ndeterminants under the PJM Tariff; and\n(c) the portion of the Measurement Period during which each scheduled Firm Load \nCommitment amount and Applicable Firm Transmission Service Rate applies.\nIf more than one Firm Load Commitment amount or Applicable Firm Transmission Service Rate \napplies during a Measurement Period, Transmission Owner \nshall calculate separately the \namount applicable to each portion of the Measurement Period and aggregate those amounts to \ndetermine the Committed Revenue Contribution for the applicable Measurement Period.\nEligible Customer shall be responsible for timely payment of charges for Firm Transmission \nService in a given calendar year on a monthly basis in accordance with the PJM Tariff.\n5.2\nActual Revenue Contribution\nFor each Measurement Period during the Term, Transmission Owner shall calculate the Actual \nRevenue Contribution attributable to Firm Transmission Service actually taken to serve the \nLarge Load Facilities in accordance with Exhibit B.  To the extent that the Large Load Customer \nhas made separate payments through a retail tariff or other retail mechanism that reflect the \nassignment of Firm Transmission Service or related costs to the Large Load Customer, such \nPage 32"},{"page":198,"startToken":75507,"endToken":75948,"text":"payments shall be taken into account in determining its Actual Revenue Contribution, insofar as \ndoing so does not result in costs being shifted to other Eligible Customers taking service in the \nTransmission Owner’s Zone. To the extent that the applicable Firm Transmission Service \nmethodology calculates charges using an assigned Network Service Peak Load contribution or \nanother allocated billing determinant, the Actual Revenue Contribution shall be calculated using \nthe billing determinant assigned to the Large Load Facilities for the applicable Measurement \nPeriod and the same categories of rates used to calculate the Committed Revenue Contribution.\n5.3\nShortfall Amount\nFor each Measurement Period, the Shortfall Amount shall equal the amount, if any, by which the \nCommitted Revenue Contribution exceeds the Actual Revenue Contribution in accordance with \nExhibit B.\nLarge Load Customer shall pay each Shortfall Amount in accordance with Article 7.\n5.4\nSeparate Measurement Periods\nEach Measurement Period shall be calculated independently.\n5.5\nCommencement of Committed Revenue Contribution\nThe determination of the Committed Revenue Contribution and any corresponding Shortfall \nAmounts shall begin on the corresponding Service Date, as set forth in Exhibit A, regardless of \nwhether: (i) Eligible Customer has begun taking the corresponding level of Firm Transmission \nService; (ii) the amount of Firm Transmission Service taken by Eligible Customer corresponds to \nthe load level scheduled to apply on that Service Date; or (iii) the Large Load Facilities are \noperating at a lower load level than the one scheduled to apply on that Service Date.\nNotwithstanding the foregoing, if Eligible Customer cannot begin taking the applicable Firm \nTransmission Service on a Service Date solely because the necessary transmission facilities have \nnot been  completed, and such delay was not  caused in whole or in part by Large Load \nCustomer’s or Eligible Customer’s failure or lack of reasonable diligence in satisfying  its \nobligations under this CRA or under any other binding agreement, tariff, regulatory order, or \nother legal requirement, the Service Date and commencement of the corresponding Committed \nRevenue Contribution shall be extended on a day-for-day basis until the Firm Transmission \nService becomes available.  Large Load Customer’s obligations include, without limitation (a) \nconstruction, testing, commissioning and readiness of any facilities being constructed by Large \nLoad Customer, and (b) prompt and reasonable responses to Transmission Owner’s or \nTransmission Owners’ affiliate(s)’ requests for information, approvals, or other communications \nnecessary for Transmission Owner’s or Transmission Owners’ affiliate(s)’ work.\n5.6  \nAccess to Information\nEligible Customer shall provide, or authorize access to, the service, billing, settlement, and \nallocation information from PJM or any other entity reasonably necessary for Transmission \nOwner to calculate the Actual Revenue Contribution, Shortfall Amount, or any other calculation \nPage 33"},{"page":199,"startToken":75948,"endToken":76341,"text":"required under this Agreement.\nARTICLE 6\nCREDIT SUPPORT\n6.1\nObligation to Post and Maintain Credit Support\nIn accordance with Tariff, Part VIII, Subpart N, section 441(d), Large Load Customer shall, at its \nown expense, cause Credit Support equal to the Initial Credit Support Requirement identified in \nExhibit C to be provided in favor of Transmission Owner not later than ten (10) days after the \nend of the negotiation period specified in Tariff, Part VIII, Subpart N, section 441(c).\nIf Large Load Customer fails to provide the required Credit Support within that period, the \nconsequences specified in Tariff, Part VIII, Subpart N, section 441(d) shall apply.\nWithin five (5) Business Days after receipt of the post-PJM recalculation required under Section \n3.2, Large Load Customer shall cause the Credit Support to be increased, reduced, amended, or \nreplaced as necessary to equal the recalculated Credit Support Requirement.\nThe Credit Support shall secure Large Load Customer’s payment and other financial obligations \nunder this CRA and shall at all times equal or exceed the Credit Support Requirement set forth in \nExhibit C, subject to any reduction or treatment of prior draws expressly provided in this CRA.\nThe Credit Support Requirement shall be based on 100% of the Projected Full Firm \nTransmission Service Benchmarks for the applicable remaining Measurement Periods and shall \nnot be reduced by the Minimum Commitment Percentage.\nLarge Load Customer shall cause the Credit Support to be maintained throughout the Term and \nthereafter until:\n(a) all Shortfall Amounts and other amounts due under this CRA have been paid;\n(b) the final reconciliation required under this CRA has been completed; and\n(c) Transmission Owner has no remaining right to draw on the Credit Support under this \nCRA.\n6.2 \nForm of Credit Support \nCredit Support shall be a Letter of Credit in the form specified in Exhibit C and related \nattachments to Exhibit C.  \n6.3\nReplacement of Credit Support\nLarge Load Customer shall cause compliant replacement Credit Support to be provided within\nfive (5) Business Days after notice from Transmission Owner if:  (i) the issuer ceases to satisfy \nthe requirements of Exhibit C; (ii) the Credit Support ceases to satisfy this Article 6; (iii) the \nCredit Support will expire or terminate before Large Load Customer’s obligation to maintain \nCredit Support ends; or (iv) the issuer gives notice of nonrenewal.\nPage 34"},{"page":200,"startToken":76341,"endToken":76775,"text":"Replacement Credit Support provided under this Section shall be in an amount equal to the then-\napplicable Credit Support Requirement, as  determined under Section 6.5 and Exhibit C as of the \nreplacement date to reflect any completed Measurement Period that has been excluded from the \nCredit Support Requirement in accordance with Section 6.5, less the amount of any cash security \nthen held by Transmission Owner and legally available to secure the same obligations.\n6.4\nPreservation Draw\nIf Large Load Customer fails to cause timely replacement Credit Support to be provided under \nSection 6.3, Transmission Owner may draw the lesser of: (i) the full amount then available under \nthe existing Credit Support; and (ii) the then-applicable Credit Support Requirement, less any \ncash security then held by Transmission Owner and legally available to secure the same \nobligations. Transmission Owner may hold the proceeds as cash security for Large Load \nCustomer’s obligations under this CRA.\nA preservation draw does not constitute payment of an obligation unless and until Transmission \nOwner applies the proceeds to an amount due under this CRA.\nTransmission Owner shall release cash security held under this Section after Large Load \nCustomer causes compliant replacement Credit Support to be provided, except to the extent the \ncash has been applied to an amount due.\n6.5\nAdjustment of Credit Support Requirement\nThe Credit Support Requirement for each applicable period shall be calculated in accordance \nwith Exhibit C.\nTransmission Owner shall also recalculate the Credit Support Requirement following the update \nrequired under Section 3.2. That recalculation shall replace the Initial Credit Support \nRequirement and shall reflect the Firm Load Commitment, Service Dates, Applicable Firm \nTransmission Service Rate, Projected Full Firm Transmission Service Benchmarks, and other \ninformation established following the Final PJM Agreement.\nTransmission Owner shall recalculate the Credit Support Requirement after completion of each \nMeasurement Period and upon any other recalculation event specified in Exhibit C. The \nrecalculated Credit Support Requirement shall equal the aggregate Projected Full Firm \nTransmission Service Benchmarks for the Measurement Periods remaining in the Term, \nincluding any incomplete portion of the applicable Measurement Period. A completed \nMeasurement Period shall be excluded from the Credit Support Requirement only after: (i) the \nCommitted Revenue Contribution, Actual Revenue Contribution, and any resulting Shortfall \nAmount for that Measurement Period have been finally calculated; and (ii) Large Load Customer \nhas paid all amounts due for that Measurement Period.\nIf the Credit Support Requirement increases, Large Load Customer shall cause the Credit \nSupport to be increased to the recalculated Credit Support Requirement within five (5) Business \nDays after receipt of the calculation.\nPage 35"},{"page":201,"startToken":76775,"endToken":77176,"text":"If the Credit Support Requirement decreases, Transmission Owner shall authorize a \ncorresponding reduction within five (5) Business Days of a request by the financial institution \nissuing the Credit Support for such authorization, provided that no payment default or other \nEvent of Default exists and the remaining Credit Support, together with any cash security held by \nTransmission Owner, will equal or exceed the adjusted Credit Support Requirement.\nActual Revenue Contributions for a completed Measurement Period shall be used to determine \nthe Shortfall Amount for that completed Measurement Period but shall not reduce the Projected \nFull Firm Transmission Service Benchmarks used to calculate the Credit Support Requirement \nfor future Measurement Periods.\n6.6\nDraws for Unpaid Amounts\nExcept for a preservation draw under Section 6.4, Transmission Owner may draw on Credit \nSupport only after:  (i) Transmission Owner has issued an invoice identifying an amount due \nunder this CRA and the basis for that amount; and  (ii) Large Load Customer has failed to pay \nthe invoiced amount within the payment period specified in Article 7.\nA draw shall not exceed the amount due and unpaid.\nTransmission Owner shall apply the proceeds of a draw to the unpaid amount for which the draw \nwas made. Proceeds applied to a Shortfall Amount shall be credited in accordance with Section \n7.6, and proceeds applied to an Early Termination Amount or Partial Termination Amount shall \nbe applied and credited in accordance with Section 9.12.  Large Load Customer’s payment \ndefault shall be cured to the extent Transmission Owner receives and applies proceeds sufficient \nto satisfy the unpaid amount.\n6.7\nReplenishment\nFollowing a draw applied to satisfy an unpaid amount,  Large Load Customer shall cause the \nCredit Support to be restored to the applicable Credit Support Requirement within five (5) \nBusiness Days after notice from Transmission Owner.\n6.8\nRelease of Credit Support\nTransmission Owner shall release the remaining Credit Support within ninety (90) days after the \nlatest of:  (i) expiration or termination of the Term; (ii) completion of all calculations, invoices, \nand reconciliations required under this CRA; (iii) payment of all undisputed amounts determined \nto be due under this CRA; or (iv) resolution of any pending dispute that could result in an \nadditional amount payable by Large Load Customer .\nTransmission Owner shall provide release or cancellation documentation relating to Credit \nSupport to Large Load Customer, with a copy to Eligible Customer.\nARTICLE 7\nPage 36"},{"page":202,"startToken":77176,"endToken":77563,"text":"INVOICING AND PAYMENT\n7.1\nDetermination and Invoice\nAfter the end of each Measurement Period, Transmission Owner shall calculate the Committed \nRevenue Contribution, Actual Revenue Contribution, and resulting Shortfall Amount in \naccordance with Article 5 and Exhibit B.\nIf a Shortfall Amount exists, Transmission Owner shall inform the other Parties and issue an \ninvoice to Large Load Customer for the Shortfall Amount within sixty (60)  days after the end of \nthe applicable Measurement Period.  Transmission Owner shall provide Eligible Customer with a \ncopy of the invoice.\n7.2\nPayment\nLarge Load Customer shall timely pay all amounts invoiced and due under this CRA by no later \nthan thirty (30) days after the date of receipt of the applicable invoice.  Any payment made after \nthirty (30) days, including any draw made by a Transmission Owner pursuant to Sections 6.6 and \n7.3 below shall include interest at the FERC rate set forth in 18 CFR Section 35.19.\n7.3\nDraw on Credit Support\nIf Large Load Customer fails to timely pay an invoiced amount, Transmission Owner may draw \non the Credit Support for the unpaid amount in accordance with Section 6.6.\n7.4\nReview of Supporting Documentation\nUpon Large Load Customer’s timely request, Transmission Owner and  if applicable, Eligible \nCustomer, shall provide documentation reasonably necessary to enable Large Load Customer to\nverify the accuracy of an invoice, subject to applicable confidentiality requirements.  For \npurposes of this section, a request shall be considered timely if made no more than five (5) \nBusiness Days after the date of receipt of the applicable invoice.  \nEligible Customer shall provide or authorize access to any service, billing, settlement, or \nallocation information reasonably necessary to support that review.\nA request under this section shall not act to defer or extend the date on which payment is due \nunder Section 7.2.\n7.5\nDisputed Amounts\nLarge Load Customer shall timely pay each invoiced amount notwithstanding any dispute, and \nTransmission Owner’s right to draw on Credit Support shall not be suspended by the dispute. If \nthe final resolution determines that Large Load Customer paid, or Transmission Owner drew, \nmore than the amount properly due, Transmission Owner shall promptly return the excess \namount.  Any dispute must be made by no later than the date payment is due and conform to the \nPage 37"},{"page":203,"startToken":77563,"endToken":77992,"text":"requirements set forth in Section 15.1 below.\n7.6\nCrediting of Shortfall Amounts\nAll Shortfall Amounts collected by Transmission Owner shall be credited against the \nTransmission Revenue Requirement of the Transmission Owner for the Transmission  Zone in \nwhich the Eligible Customer is taking Firm Transmission Service.  Transmission Owner shall \naccount for and credit all amounts received under this CRA in accordance with this Section 7.6, \nSection 9.12, as applicable, the PJM Tariff, and its applicable FERC-jurisdictional rate.  \nTransmission Owner’s calculation, collection, accounting, and crediting of Shortfall Amounts \nshall be reflected in, and remain subject to review under, Transmission Owner’s applicable \nFERC-jurisdictional formula rate and related protocols.\nARTICLE 8\nDEFAULT AND REMEDIES\n8.1\nEvents of Default\nEach of the following constitutes an “Event of Default” by the applicable Party:\n(a) failure by Large Load Customer to cause the initial Credit Support to be timely \nprovided in the amount and form required under this CRA;\n(b) failure by Large Load Customer to cause to be timely provided replacement or \nadditional Credit Support required under Article 6;\n(c) failure by Large Load Customer to cause Credit Support to be replenished when \nrequired under Section 6.7;\n(d) a material misrepresentation by a Party concerning the Firm Load Commitment, \nActual Revenue Contribution, Credit Support, or another material matter under this CRA;\n(e) assignment or attempted assignment of this CRA by a Party in violation of Article 10;\n(f) repudiation of this CRA by a Party; \n(g) failure by Eligible Customer to take any PJM Tariff action expressly required of \nEligible Customer under this CRA or a default by Eligible Customer under any PJM \nagreement relating to the provision of Firm Transmission Service; or\n(h) failure by Eligible Customer or Large Load Customer to take an action expressly \nrequired under this CRA to request, pursue, or complete the applicable PJM process; or\n(i) a default by Large Load Customer under any agreement with Transmission Owner or \nits Affiliates relating to the Large Load Facilities, including any failure to comply with \nany retail service tariffs, retail agreements, or other retail obligations that would prevent \nthe Large Load Customer from meeting its obligations under this CRA;\n(j) the bankruptcy or insolvency of Large Load Customer; or\n(k) any other material breach by a Party  that remains uncured after the applicable period \nprovided in Section 8.2.\n8.2\nNotice and Cure\nExcept as otherwise expressly provided in this CRA, Transmission Owner shall provide the \nDefaulting Party with written notice of an Event of Default describing the default in reasonable \ndetail.\nPage 38"},{"page":204,"startToken":77992,"endToken":78386,"text":"The Defaulting Party  shall have: (i) five (5) Business Days after receipt of notice to cure a \nCredit Support default; and (ii) fifteen  (15) days after receipt of notice to cure any other curable \nEvent of Default.\n8.3\nRemedies\nFollowing an Event of Default that has not been timely cured, the non-Defaulting Party or Parties  \nmay, in their sole discretion:\n(a) if Transmission Owner is a non-Defaulting Party, draw on Credit Support in \naccordance with this CRA;\n(b) recover any amount due and unpaid under this CRA;\n(c) require specific performance of Large Load Customer’s obligation to cause Credit \nSupport to be provided or maintained;\n(d) exercise any right or remedy available under the PJM Tariff to the extent applicable to \nthat Party;\n(e) terminate this CRA only as expressly permitted under Article 9; and\n(f) exercise any other right or remedy available under applicable law.\nTransmission Owner shall credit all payments and Credit Support proceeds against the obligation \nfor which they were received and shall not obtain duplicative recovery of the same amount.\n8.4\nEffect of Credit Support Draw\nReceipt and application of Credit Support proceeds sufficient to satisfy an unpaid amount shall \ncure the applicable payment default to the extent of the proceeds received and applied.\nARTICLE 9\nEARLY AND PARTIAL TERMINATION\n9.1\nTermination or Reduction by Large Load Customer; Withdrawal from PJM \nProcess\nBefore execution of the Final PJM Agreement, Eligible Customer’s withdrawal or abandonment \nof the request for Firm Transmission Service from the applicable PJM process on behalf of Large \nLoad Customer, or refusal to execute the Final PJM Agreement shall constitute an early \ntermination of this CRA by Large Load Customer.  Large Load Customer shall pay the Early \nTermination Amount calculated under Section 9.7 and Exhibit D. Termination under this \nparagraph shall become effective upon the applicable withdrawal, abandonment, or refusal and \nshall not be subject to the 120-day notice period below.\nAfter execution of the Final PJM Agreement, Large Load Customer may terminate this CRA \nbefore expiration of the Term by providing Transmission Owner and Eligible Customer with at \nleast 120 days’ prior written notice. Notwithstanding the foregoing, termination shall not become \neffective unless and until (a) the Large Load Customer has paid in full the applicable Early \nTermination Amount or Partial Termination Amount, as determined pursuant to this CRA, or (b) \nPage 39"},{"page":205,"startToken":78386,"endToken":78775,"text":"if such amount remains unpaid, the Transmission Owner has drawn on the Credit Support and \nrecovered the full amount of such unpaid Early Termination Amount or Partial Termination \nAmount.  \nLarge Load Customer shall pay the Early Termination Amount calculated under Section 9.7 and \nExhibit D. \nLarge Load Customer’s  obligation to pay the Early Termination Amount shall survive \ntermination and remain secured by Credit Support until paid in full.\n9.2\nPartial Termination\nBefore execution of the Final PJM Agreement, a reduction by Large Load Customer or Eligible \nCustomer in the amount of Firm Transmission Service requested through the PJM process shall \nconstitute a Partial Termination.\nLarge Load Customer may permanently reduce a specified portion of the Firm Load \nCommitment by providing Transmission Owner and Eligible Customer with at least 120 days’ \nprior written notice and paying the Partial Termination Amount calculated under Section 9.8 and \nExhibit D.\nA Partial Termination shall become effective only after:  (i) PJM has approved, directed, or \notherwise recognized the reduction to the extent required under the PJM Tariff; (ii) the Parties \nhave executed an amendment to Exhibit A; and (iii) the amendment has become effective under \napplicable FERC requirements.\nIf the Large Load Facilities have not achieved the state of readiness necessary to take Firm \nTransmission Service corresponding to the applicable Firm Load Commitment by 120 days after \neach Service Date, such occurrence will constitute a Partial Termination.\n9.3\nProject Abandonment or Cessation\nEach Party shall notify the other Parties within five (5) Business Days after becoming aware \nthat:\n(a) the Large Load Customer has determined that it will not construct or complete the \nLarge Load Facilities or proceed with the applicable request for Firm Transmission \nService;\n(b) the Large Load Facilities have not achieved the state of readiness necessary to take \nFirm Transmission Service by 120 days after the initial Service Date;\n(c) the Large Load Customer intends to permanently cease operations at the Large Load \nFacilities; or\n(d) Eligible Customer intends to permanently cease taking Firm Transmission Service to \nserve the Large Load Facilities.\nUpon notice or occurrence of an event described in this Section, Transmission Owner may \nterminate this CRA upon thirty (30) days’ written notice to the other Parties, and  Large Load \nCustomer  shall pay the Early Termination Amount. Large Load Customer’s obligation to pay \nPage 40"},{"page":206,"startToken":78775,"endToken":79165,"text":"the Early Termination Amount shall survive termination and remain secured by Credit Support \nuntil paid in full.\n9.4\nTermination for Default\nTransmission Owner may terminate this CRA upon written notice to other Parties if a Party:\n(a) commits an Event of Default that is not capable of cure; or\n(b) fails to cure an Event of Default within the applicable period under Article 8.\nUpon termination, Large Load Customer shall pay:\n(a) all Shortfall Amounts and other amounts accrued through the termination date;\n(b) the Early Termination Amount; and\n(c) any other amount due under this CRA, subject to the prohibition against duplicative \nrecovery.\nTransmission Owner may apply Credit Support or cash security to those amounts in accordance \nwith Articles 6, 7 and 9.\n9.5\nTermination by Mutual Agreement\nThe Parties may terminate this CRA by mutual written agreement, subject to applicable FERC \nrequirements.\nAny such agreement shall specify the treatment of the Early Termination Amount, any \noutstanding Shortfall Amounts, and the remaining Credit Support provided by Large Load \nCustomer.\n9.6\nTermination Due to Transmission Facility-Related Delay  \nIf any extension of a Service Date or Committed Revenue Contribution under the second \nparagraph of Section 5.5 results in a forecasted or actual extension of [Insert number of months] \nmonths or more to either the first  Service Date or any subsequent Service Date, Large Load \nCustomer may, at its option, either (1) terminate this CRA; or (2) accept the timing and resulting \nadjustment to the applicable Service Date(s).\nIf Large Load Customer elects to terminate this CRA pursuant to this Section 9.6, Large Load \nCustomer shall be responsible for paying an Early Termination Amount calculated pursuant to  \nExhibit D.  However, for purposes of determining the Applicable Termination Percentage under \nExhibit D the number of days in any forecasted or actual extension to the Service Date or \nCommitted Revenue Contribution shall not be counted.  \nTo invoke this termination right, Large Load Customer must provide written notice to \nTransmission Owner and Eligible Customer within 60 days of receipt of notice that any \nforecasted or actual extension will equal or exceed [Insert number of months] months.  \nMoreover, Large Load Customer will not be permitted to invoke this termination right if the \ndelay is caused in whole or part by Large Load Customer’s failure or lack of reasonable \nPage 41"},{"page":207,"startToken":79165,"endToken":79556,"text":"diligence in meeting its obligations under this Agreement or any other binding agreement, tariff, \nregulatory order or other legal requirement, as set forth in Section 5.5.\n9.7\nEarly Termination Amount\nThe “Early Termination Amount” shall be calculated in accordance with Exhibit D. \n9.8\nPartial Termination Amount\nThe “Partial Termination Amount” shall be calculated in accordance with Exhibit D.  After the \nPartial Termination becomes effective, the Committed Revenue Contribution and Credit Support \nRequirement shall be calculated using the remaining Firm Load Commitment, provided that the \nCredit Support Requirement shall continue to be based on 100% of the Projected Full Firm \nTransmission Service Benchmarks corresponding to that remaining Firm Load Commitment.\n9.9\nEarly Termination Offset Amount\nIf the Early Termination Offset Amount is quantifiable when Transmission Owner issues the \ntermination invoice, it shall be included as an Applicable Credit.\nIf the offset becomes quantifiable afterward, Transmission Owner shall reflect it in a subsequent \nreconciliation and promptly return any resulting excess payment to Large Load Customer.\nNothing in this Section requires Transmission Owner to market the Point of Delivery, solicit \nreplacement load, modify its transmission planning or service processes, or enter into a service \narrangement with another Person.\n9.10\nInvoice and Payment\nTransmission Owner shall promptly invoice  Large Load Customer for the Early Termination \nAmount or Partial Termination Amount and provide reasonable substantiation of the calculation. \nFor the avoidance of doubt, in the event that the Large Load Customer fails to timely pay an \ninvoice for the Early Termination Amount or Partial Termination Amount, the Transmission \nOwner shall be permitted to draw on the Credit Support for the unpaid amount.  \n9.11\nEffect of Termination\nAny full termination of this CRA for any reason shall result in (i) before execution of the Final \nPJM Agreement, withdrawal or cancellation of the applicable request for Firm Transmission \nService; and (ii) after execution of the Final PJM Agreement, cancellation of the Firm \nTransmission Service taken by Eligible Customer on behalf of Large Load Customer and the \nrelated Transmission Service Agreement, except where FERC has accepted a replacement or \nsubstitute agreement that contains terms reasonably comparable to this CRA pursuant to PJM \nTariff, Part VIII, Section 438(b).\nA Partial Termination shall result in the corresponding reduction of the request for Firm \nTransmission Service or the Firm Transmission Service, as applicable.\nPage 42"},{"page":208,"startToken":79556,"endToken":79955,"text":"For avoidance of doubt, termination of this CRA and related cancellation of Firm Transmission \nService shall not prohibit Large Load Customer from seeking Firm Transmission Service in the \nfuture.\n9.12\nCrediting of Termination Amount\nIf the effective date of an Early Termination or Partial Termination occurs prior to the first \nService Date and the Large Load Customer is required to pay an Early Termination Amount or \nPartial Termination Amount, as applicable, such amount shall first be applied to the Project \nDevelopment Costs as of the effective date of such termination in accordance with PJM Tariff, \nPart VIII, Subpart N, section 441(e).  Any remaining amounts from the applicable Termination \nAmount shall be credited to the Transmission Owner's Transmission Revenue Requirement for \nthe Transmission Zone in which the Eligible Customer would have taken Transmission Service. \nFor the avoidance of doubt, if Transmission Owner allocates any of the applicable Termination \nAmount to the Project Development Costs, such amount shall not be recovered in Transmission \nrates.  \n \nIf the effective date of an Early Termination or Partial Termination occurs on or after the first \nService Date and the Large Load Customer is required to pay an Early Termination Amount or \nPartial Termination Amount, as applicable, such amount shall be credited to the Transmission \nOwner's Transmission Revenue Requirement for the Transmission Zone in which the Eligible \nCustomer would have taken Firm Transmission Service. \nARTICLE 10\nASSIGNMENT\n10.1\nAssignment by Eligible Customer\nEligible Customer may not assign or transfer this CRA, or any right or obligation arising under \nthis CRA, in whole or in part, without the prior written consent of Transmission Owner and \nLarge Load Customer, which consent shall not be unreasonably withheld, conditioned, or \ndelayed.\nNotwithstanding the foregoing, Eligible Customer may assign its rights and obligations under \nthis CRA to an Affiliate without Transmission Owner’s prior written consent, if:\n(a) Eligible Customer provides the other Parties with prior written notice of the proposed \nassignment;\n(b) the proposed assignee is an Eligible Customer under the PJM Tariff and is authorized \nto take Firm Transmission Service on behalf of the Large Load Customer;\n(c) the proposed assignee assumes in writing all obligations of Eligible Customer under \nthis CRA;\n(d) the assignment has received any acceptance, approval, or recognition required from \nPJM or FERC; and\n(e) all disputes between Transmission Owner and existing Eligible Customer as to \ninvoice outstanding have been reconciled.\nPage 43"},{"page":209,"startToken":79955,"endToken":80356,"text":"An assignment by Eligible Customer shall not change Large Load Customer’s status or release, \nreduce, or otherwise modify Large Load Customer’s obligations under this CRA.\nAn assignment shall not become effective until all applicable requirements of this Section have \nbeen satisfied.\n10.2\nEffect of Assignment\nExcept as expressly provided in a written assignment agreement accepted by Transmission \nOwner and Large Load Customer, an assignment shall not release the assigning Eligible \nCustomer from: (i) any breach or Event of Default occurring before the effective date of \nassignment; (ii) any obligation arising from information, service, or conduct occurring before the \neffective date of assignment but calculated or invoiced afterward; or (iii) any obligation that \nexpressly survives assignment.\nAfter the effective date of a permitted assignment, the assignee shall be treated as the Eligible \nCustomer for purposes of this CRA and shall perform all obligations\nassigned to Eligible \nCustomer under this CRA on and after the effective date of assignment.\n10.3\nAssignment by Large Load Customer\nLarge Load Customer may not assign or transfer this CRA or any right or obligation arising \nunder this CRA, in whole or in part, without the prior written consent of Transmission Owner \nand Eligible Customer, which consent shall not be unreasonably withheld, conditioned, or \ndelayed.\nAn assignment by Large Load Customer shall not become effective unless:\n(a) the proposed assignee assumes in writing all obligations of Large Load Customer \nunder this CRA;\n(b) compliant replacement Credit Support is provided that directly secures the proposed \nassignee’s obligations under this CRA;\n(c) the assignment is documented through a written amendment or assignment executed \nby the applicable Parties;\n(d) the assignment has received any acceptance, approval, or recognition required from \nPJM or FERC; and\n(e) All disputes between Transmission Owner and existing Large Load Customer as to \ninvoice outstanding have been reconciled.\nA transfer of ownership, operation, leasehold rights, or control of the Large Load Facilities does \nnot, by itself, assign this CRA or release Large Load Customer from its obligations under this \nCRA.\n10.4\nAssignment by Transmission Owner\nTransmission Owner may assign this CRA, in whole or in part, without the other Parties’ \nconsent:  (i) to a successor to all or substantially all of the transmission assets or obligations \nrelevant to this CRA; (ii) in connection with a merger, consolidation, reorganization, or other \ncorporate transaction; (iii) to an Affiliate that assumes Transmission Owner’s obligations under \nPage 44"},{"page":210,"startToken":80356,"endToken":80703,"text":"this CRA; or (iv) as required or authorized by the PJM Tariff, FERC, or another governmental \nauthority with jurisdiction.\nTransmission Owner shall provide the other Parties with written notice of the assignment.\nAny other assignment by Transmission Owner requires the prior written consent of the other \nParties, which consent shall not be unreasonably withheld, conditioned, or delayed.\nARTICLE 11\nREGULATORY PROVISIONS\n11.1\nRegulatory Effectiveness\nThis CRA shall be submitted, reported, designated, posted, or filed only to the extent required by \nthe PJM Tariff, a FERC order, regulation, or applicable law.\nCompletion of project-specific information, dates, amounts, percentages, schedules, and other \nelections expressly contemplated by the FERC-accepted form of CRA shall not constitute a \nnonconforming term or condition.\nUpdates to Exhibits A and C and calculations under Exhibit B required under Section 3.2 are \nexpressly contemplated by this CRA and shall not constitute nonconforming terms or \namendments, except to the extent a further filing with or acceptance by FERC is required.\n11.2\nRequired FERC Filing\nIf this CRA is required to be filed with FERC under the PJM Tariff, a FERC order, or applicable \nlaw, Transmission Owner shall submit this CRA for acceptance under Section 205 of the Federal \nPower Act in accordance with PJM Tariff, Part VIII, Subpart N.\nTransmission Owner shall take the lead in preparing and prosecuting the filing and shall use \nreasonable efforts to obtain FERC’s acceptance of this CRA.\nEach Party shall reasonably cooperate in connection with the filing and refrain from taking a \nposition inconsistent with the acceptance of this CRA, except as required by applicable law or \nexpressly permitted under this CRA.\nEach Party shall bear its own costs incurred in connection with the filing unless the Parties \notherwise agree in writing.\n11.3\nRelationship to Other Tariffs and Agreements\nNothing in this CRA shall be construed to grant, provide, guarantee, or otherwise convey \ntransmission service under the PJM Tariff, distribution or retail service under state-regulated \ntariffs or agreements, or any other service or rate, term or condition of such service, except as \nexpressly provided herein. \nPage 45"},{"page":211,"startToken":80703,"endToken":81209,"text":"Nothing in this CRA limits any obligation under the PJM Tariff or another applicable agreement \nto pay study costs, directly assigned facility costs, Network Upgrade costs, or other costs \nassociated with transmission service.\nARTICLE 12\nFORCE MAJEURE\n12.1\nDefinition and Scope of Force Majeure\n“Force Majeure” means an event or circumstance that:\n(a) physically and directly impacts the Large Load Facilities, new transmission facilities, \nor modifications to existing transmission facilities, and/or \n(b) prevents the Affected Party from performing its obligations under this CRA, \nwhich event or circumstance (i) could not have been  reasonably anticipated as of the Effective \nDate and (ii) which is not within the reasonable control of, or the result of negligence or \nmisconduct by, the Affected Party, and (iii) which the Affected Party is unable to overcome or \navoid or cause to be avoided, by the exercise of reasonable care.  Subject to meeting the \nrequirements of the prior sentence, Force Majeure events shall include, but not be limited to, acts \nof God; fire; flood; earthquake; war; explosions; labor disputes; lightning; hurricanes; tornadoes; \npandemics or epidemics; riots; or acts of terrorism that affect one or more Parties.  With respect \nto a Party’s obligation to make payments hereunder, Force Majeure will be only an event or act \nthat on any day disables the banking system through which a Party makes such payments.  \nNothing herein shall be construed so as to require a Party to settle any strike or labor dispute in \nwhich it may be involved.  Economic hardship of any Party shall not constitute a Force Majeure \nunder this CRA, even if that economic hardship is caused by an event or condition that would \nhave been a Force Majeure event if it has physically and directly impacted the Large Load \nFacilities, new transmission facilities, or modifications to existing transmission facilities.\nNo event affecting only the Large Load Customer, the Large Load Facilities, or the amount of \nFirm Transmission Service taken to serve the Large Load Facilities shall constitute Force \nMajeure with respect to Large Load Customer’s payment or Credit Support obligations under \nthis CRA.\nThe Party claiming Force Majeure bears the burden of establishing that the event satisfies every \nrequirement of this Section.\nIf a Party is rendered unable, wholly or in part, by Force Majeure to carry out its obligations with \nrespect to this CRA (the “Affected Party”), then the obligations of the Affected Party will, to the \nextent they are affected by such Force Majeure event, be suspended during the period of time \nthat the Force Majeure event renders the Affected Party unable, wholly or in part, to carry out its \nobligations.  The Affected Party will not be liable for breach of this CRA due to a Force Majeure \nevent nor shall the Affected Party be liable to the other Parties for, or on account of, any loss, \ndamage, injury, or expense resulting from, or arising out of such Force Majeure event.  The \nAffected Party must give written notice and full particulars of such Force Majeure event as soon \nPage 46"},{"page":212,"startToken":81209,"endToken":81677,"text":"as practical after the occurrence of the Force Majeure event.  If a Force Majeure event continues \nfor over 180 days in the aggregate during any 12 month period, the Parties will meet and in good \nfaith attempt to renegotiate the terms and conditions of this CRA to address and account for the \nForce Majeure event.  If the Parties are thereafter unable to mutually agree in writing on an \namendment to this CRA to address issues arising out of the Force Majeure event, Transmission \nOwner or Large Load Customer may terminate this CRA upon ten (10) days’ written notice to \nthe other Parties, subject to Section 12.2, Article 9, and any obligations that accrued or survive \nunder this CRA.\n12.2\nTermination Due to Force Majeure   \nIn the event that Large Load Customer terminates this Agreement pursuant to Section 12, the \nLarge Load Customer shall remain obligated to pay the Early Termination Amount.  However, if \nthe Transmission Owner terminates this Agreement pursuant to Section 12, Large Load \nCustomer shall not be required to pay the Early Termination Amount.\n12.3\nEffect of Force Majeure\nIf a Party is prevented by Force Majeure from performing an obligation under this CRA, that \nobligation shall be suspended only:  (i) to the extent performance is physically impossible \nbecause of the Force Majeure; (ii) for the period during which performance remains physically \nimpossible; and (iii) while the affected Party complies with Section 12.4.\nThe affected Party shall not be in breach of this CRA solely because it fails to perform an \nobligation properly suspended under this Section.\nForce Majeure does not:\n(a) excuse or delay an obligation to pay an amount due under this CRA, except solely to \nthe extent expressly provided in Section 12.1;\n(b) excuse or delay Large Load Customer’s obligation to cause Credit Support to be \nprovided, maintained, increased, renewed, replaced, or replenished;\n(c) except for an extension of a Service Date expressly permitted under Section 5.5, \nreduce, defer, or otherwise modify the Firm Load Commitment, any Service Date, or the \nMinimum Commitment Percentage;\n(d) reduce or defer the calculation of the Committed Revenue Contribution, Actual \nRevenue Contribution, Shortfall Amount, Early Termination Amount, or Partial \nTermination Amount;\n(e) excuse Eligible Customer’s failure to take Firm Transmission Service corresponding \nto the Firm Load Commitment;\n(f) require Transmission Owner to release or reduce Credit Support;\n(g) prevent Transmission Owner from issuing an invoice, completing a calculation or \nreconciliation, or drawing on Credit Support in accordance with this CRA; \n(h) excuse any obligation that arose before the Force Majeure began; or\n(i) affect the application of Article 9 to any abandonment, permanent cessation, \npermanent reduction, or termination associated with the Force Majeure.\nFor the avoidance of doubt, a Force Majeure affecting the Large Load Customer, the Large Load \nPage 47"},{"page":213,"startToken":81677,"endToken":82101,"text":"Facilities, or the amount of Firm Transmission Service taken to serve the Large Load Facilities \nshall not reduce, defer, or otherwise modify Large Load Customer’s payment or Credit Support \nobligations under this CRA. If circumstances associated with a Force Majeure result in \nabandonment, permanent cessation, permanent reduction, or termination, Article 9 shall govern \nthe availability, effectiveness, and financial consequences of that abandonment, cessation, \nreduction, or termination.\n12.4\nNotice\nA Party claiming Force Majeure shall provide the other Parties with written notice as soon as \nreasonably practicable after becoming aware of the event.\nFailure to provide timely notice shall not prevent an event from qualifying as Force Majeure, but \nthe affected Party shall not be excused from performance to the extent the delay in notice \nmaterially prejudices  another Party.\nARTICLE 13\nREPRESENTATIONS AND WARRANTIES\n13.1\nMutual Representations and Warranties\nEach Party represents and warrants to the other Parties, as of the date it executes this CRA and as \nof the Effective Date, that:\n(a) it is duly organized, validly existing, and in good standing under the laws of its \njurisdiction of organization, to the extent such concepts apply;\n(b) it has the power and authority to execute, deliver, and perform this CRA;\n(c) its execution by the Parties, delivery, and performance of this CRA have been duly \nauthorized by all necessary organizational action;\n(d) the individual executing this CRA on its behalf has authority to bind it;\n(e) this CRA constitutes its legal, valid, and binding obligation, enforceable against it in \naccordance with its terms, subject to applicable bankruptcy, insolvency, reorganization, \nmoratorium, and similar laws affecting creditors’ rights generally and to general \nprinciples of equity;\n(f) its execution by the Parties, delivery, and performance of this CRA do not violate its \norganizational documents, applicable law, or any agreement binding on it in a manner \nthat would materially impair its performance under this CRA; and\n(g) except for any acceptance, approval, filing, or other action expressly contemplated by \nthis CRA, the PJM Tariff, or applicable law, no consent or approval is required for its \nexecution by the Parties, delivery, or performance of this CRA that has not been obtained \nor will not be obtained when required.\n13.2\nEligible Customer Representations and Warranties\nEligible Customer represents and warrants to the other Parties, as of the date it executes this \nCRA and as of the Effective Date, that:\n(a) it is an Eligible Customer under the PJM Tariff;\n(b) it is authorized under the PJM Tariff and applicable law to take Firm Transmission \nPage 48"},{"page":214,"startToken":82101,"endToken":82563,"text":"Service on behalf of the Large Load Customer to serve the Large Load Facilities;\n(c) it has obtained, or will obtain when required, all authority, consent, and information \nnecessary to perform its obligations under this CRA;\n(d) all information provided by or on behalf of Eligible Customer for purposes of \ncalculating the Actual Revenue Contribution, Shortfall Amount, Credit Support \nRequirement, Early Termination Amount, or Partial Termination Amount is and shall be \nmaterially accurate and complete;\n(e) it has not relied on any representation or warranty by Transmission Owner concerning \nwhether the Large Load Facilities shall be constructed, completed, achieve commercial \noperation, operate at any load level, or remain economically viable;\n(f) it will provide or authorize access to the service, billing, settlement, and allocation \ninformation reasonably necessary to administer this CRA;\n(g) Eligible Customer’s obligations under this CRA are limited to the transmission-\nservice, information-sharing, cooperation, and administrative obligations expressly \nassigned to Eligible Customer and do not include Large Load Customer’s payment or \nCredit Support obligations; \n(h) Eligible Customer shall timely perform its expressly assigned obligations \nnotwithstanding any dispute with Large Load Customer; \n(i) it has agreed to request and pursue the Firm Transmission Service initially identified \nin Exhibit A on behalf of Large Load Customer through the applicable PJM process; and\n(j) neither the failure of the Large Load Customer to perform nor a dispute between \nEligible Customer and the Large Load Customer will excuse Eligible Customer’s \nperformance under this CRA.\n13.3\nLarge Load Customer Representations and Warranties\nLarge Load Customer represents and warrants to the other Parties, as of the date it executes this \nCRA and as of the Effective Date, that:\n(a) it owns, operates, leases, or otherwise controls the Large Load Facilities;\n(b) the information it provides concerning the Large Load Facilities, Firm Load\nCommitment, Service Dates, load ramp, construction status, anticipated operations, and \ncessation or reduction of operations, and any other information required by or necessary \nto administer this CRA is and shall be materially accurate and complete;\n(c) it has not relied on any representation or warranty by Transmission Owner concerning \nwhether the Large Load Facilities will be constructed, completed, achieve commercial \noperation, operate at any load level, or remain economically viable; \n(d) its payment and Credit Support obligations under this CRA are direct obligations to \nTransmission Owner and do not depend on the performance of Eligible Customer or any \nother Person; \n(e) Credit Support provided under Article 6 directly secures Large Load Customer’s \nobligations under this CRA and, to Large Load Customer’s knowledge, is valid and \nenforceable in accordance with its terms; \n(f) it has designated Eligible Customer to request and take Firm Transmission Service on \nits behalf and has obtained Eligible Customer’s agreement to participate in the applicable \nPJM process; and\nPage 49"},{"page":215,"startToken":82563,"endToken":82941,"text":"(g) Large Load Customer has not created or permitted any undisclosed lien, competing \nclaim, restriction, or other interest that would materially impair Transmission Owner’s \nrights in the Credit Support.\n13.4\nTransmission Owner Representations and Warranties\nTransmission Owner represents and warrants to the other Parties, as of the date it executes this \nCRA and as of the Effective Date, that:  (i) it is a PJM Transmission Owner; (ii) it is authorized \nto enter into this CRA and receive amounts and Credit Support payable or provided under this \nCRA, subject to the PJM Tariff and applicable FERC requirements.\nARTICLE 14\nCONFIDENTIALITY\n14.1\nConfidential Information\nFor purposes of this Article, “Confidential Information” means nonpublic commercial, financial, \noperational, technical, customer-specific, or proprietary information disclosed by or on behalf of \none Party to  another Party in connection with this CRA, whether disclosed orally, electronically, \nor in writing, including nonpublic information concerning:\n(a) the Large Load Customer or the Large Load Facilities;\n(b) the Firm Load Commitment, Service Dates, anticipated or actual load, or operating \nstatus of the Large Load Facilities;\n(c) Firm Transmission Service taken to serve the Large Load Facilities;\n(d) the calculation of the Actual Revenue Contribution, Shortfall Amount, Credit Support \nRequirement, Early Termination Amount, or Partial Termination Amount;\n(e) Credit Support, the financial condition of Large Load Customer , and communications \nwith an issuer; and\n(f) any invoice, supporting documentation, or other information exchanged in \nadministering this CRA.\nInformation shall constitute Confidential Information only if:  (i) it is identified as confidential \nwhen disclosed; or (ii) its nature or the circumstances of disclosure would reasonably indicate \nthat it is confidential.\n14.2\nExclusions\nConfidential Information does not include information that the receiving Party can demonstrate:  \n(i) is or becomes publicly available other than through a breach of this CRA; (ii) was lawfully \nknown to the receiving Party without a confidentiality restriction before disclosure by the \ndisclosing Party; (iii) is lawfully received from another Person without a confidentiality \nrestriction and without breach of an obligation owed to the disclosing Party; (iv) is independently \ndeveloped by or for the receiving Party without use of or reliance on the Confidential \nInformation; or (v) is approved for disclosure by the disclosing Party in writing.\n14.3\nUse and Protection of Confidential Information\nPage 50"},{"page":216,"startToken":82941,"endToken":83387,"text":"A Party receiving Confidential Information shall:  (i) use the Confidential Information only as \nreasonably necessary to perform, administer, enforce, or exercise its rights under this CRA; (ii) \nprotect the Confidential Information using at least the same degree of care that it uses to protect \nits own confidential information of a similar nature, but in no event less than reasonable care;\n(iii) disclose the Confidential Information only as permitted under this Article; and (iv) promptly \nnotify the disclosing Party upon becoming aware of an unauthorized use or disclosure of the \nConfidential Information.\nThe receiving Party may disclose Confidential Information to its Affiliates, employees, officers, \ndirectors, attorneys, accountants, auditors, consultants, insurers, lenders, issuers of Credit \nSupport, and other representatives that have a need to know the Confidential Information and are \nsubject to confidentiality obligations or professional duties of confidentiality.\n14.4\nTariff and Regulatory Requirements\nConfidential Information shall be protected and disclosed in accordance with:  (i) applicable \nFERC regulations and orders; (ii) applicable state law and any applicable retail-service tariff;\n(iii) any protective order or confidentiality agreement binding on the Parties; and (iv) this \nArticle.\n14.5\nPermitted Regulatory and Administrative Disclosures\nA Party may disclose Confidential Information to the extent reasonably necessary:  (i) to comply \nwith the PJM Tariff, a FERC order, applicable law, legal process, or a request or requirement of \na governmental authority with jurisdiction; (ii) to prepare, submit, support, or prosecute a filing, \nreport, audit, formula-rate update, rate proceeding, tariff proceeding, or other regulatory \nsubmission; (iii) to administer a service request, study, billing determination, settlement, \ncalculation, reconciliation, or Credit Support requirement relating to this CRA; (iv) to enforce \nthis CRA or resolve a dispute arising under it; (v) to provide information to PJM reasonably \nnecessary for Tariff administration, study, billing, settlement, or other administrative purposes \nrelating to the Firm Transmission Service or this CRA; (vi) to provide information to an \napplicable state regulatory authority to the extent reasonably necessary in connection with retail \nservice, retail Credit Support, or another state-jurisdictional arrangement relating to the Large \nLoad Facilities; or (vii) with the written consent of the disclosing Party.\nWith respect to disclosures identified in clauses (i)-(vi), the Party making the disclosure shall \nnotify the other Party so that such Party may seek a protective order or such other relief as such \nParty may deem appropriate under the circumstances. The Party making the disclosure may \ndisclose only that portion of the Confidential Information which such Party is required to \ndisclose.\n14.6\nNo Limitation on Required Information Sharing\nEligible Customer may not withhold information reasonably required to calculate, verify, \ninvoice, reconcile, or dispute an amount under this CRA solely because the information is \nPage 51"},{"page":217,"startToken":83387,"endToken":83769,"text":"confidential.\nLarge Load Customer may not withhold facility, project, load-ramp, operational, Credit Support, \nor other information within its possession or control that is reasonably required to administer this \nCRA solely because the information is confidential.\nTransmission Owner’s receipt or use of such information shall remain subject to this Article and \nany other applicable confidentiality requirement.\n14.7\nSurvival\nThe obligations under this Article shall survive expiration or termination of this CRA for five (5)\nyears; provided that (i) information constituting a trade secret shall remain protected for so long\nas it qualifies as a trade secret under applicable law; and (ii) information protected for a longer \nperiod under applicable law, the PJM Tariff, a regulatory order, or a binding confidentiality \nagreement shall remain protected for that longer period.\nARTICLE 15\nDISPUTE RESOLUTION\n15.1\nNotice of Dispute\nA Party disputing an invoice, calculation, Credit Support Requirement, or other matter arising \nunder this CRA shall provide the other Parties with written notice.  The disputing Party shall \nprovide available supporting information reasonably necessary for the other Parties to evaluate \nthe dispute.  A notice under this Section shall not excuse or delay performance except as \nexpressly provided in this CRA. Notwithstanding the foregoing and for the avoidance of doubt, \nthe Large Load Customer is not entitled to dispute resolution for its breach of Section 6.1.\n15.2\nGood-Faith Negotiation\nWithin ten (10) Business Days after receipt of a notice under Section 15.1, representatives of the \nParties with responsibility for administering this CRA shall meet or confer and attempt in good \nfaith to resolve the dispute.\nIf a Party does not request or participate in the Dispute resolution set forth in this Article 15 \nwithin 10 Business Days following the delivered date of the written request initiating the \nprocess, such Party waives any further right to this Dispute resolution process.  The Dispute \nresolution process set forth in this Article 15 shall, in any event, be concluded within 30 days \nfollowing the delivered date of the written request initiating the process or such longer period as \nthe Parties may mutually agree.  Thereafter, any Party may exercise all remedies available at law \nor in equity under this CRA, including the initiation of court proceedings.\n15.3\nContinuation of Performance\nWhile a dispute remains pending:\nPage 52"},{"page":218,"startToken":83769,"endToken":84165,"text":"(a) each Party shall continue performing its obligations under this CRA to the maximum \nextent practicable;\n(b) Large Load Customer shall timely pay each invoiced amount in accordance with \nSection 7.2, notwithstanding the dispute;\n(c) Large Load Customer shall continue to cause Credit Support to be provided, \nmaintained, increased, renewed, replaced, and replenished as required under Article 6;\n(d) Transmission Owner may exercise its rights with respect to Credit Support in \naccordance with Articles 6 and 7; and\n(e) no Party shall take action inconsistent with a final and binding determination \nresolving the dispute.\nPayment or performance during a dispute shall not waive the paying or performing Party’s \nposition or right to seek return of an overpayment or other appropriate relief.\n15.4\nNo Suspension of Credit Support Rights\nThe initiation or pendency of a dispute shall not:  (i) prevent Transmission Owner from making a \npreservation draw under Section 6.4; (ii) suspend Transmission Owner’s right to draw on Credit \nSupport for an invoiced amount not timely paid; (iii) relieve Large Load Customer of its\nobligation to cause compliant Credit Support to be maintained; or (iv) extend the expiration, \nnonrenewal, replacement, or replenishment deadline applicable to Credit Support.\nIf the final resolution of a dispute determines that Large Load Customer paid, or Transmission \nOwner drew, more than the amount properly due, Transmission Owner shall return the excess to \nLarge Load Customer or, if applicable, restore the excess Credit Support in accordance with \nSection 6.5.\nIf a Party receiving a written request to initiate the dispute-resolution process does not participate \nin that process within 10 Business Days after delivery of the written request, that Party waives its \nright to require completion of the informal dispute-resolution process before another Party \npursues available remedies.  The dispute resolution process set forth in this Article 15 shall, in \nany event, be concluded within 30 days following the delivered date of the written request \ninitiating the process or such longer period as the Parties may mutually agree.  \nThereafter, any Party may exercise all remedies available at law or in equity under this CRA, \nincluding the initiation of court proceedings.\nARTICLE 16\nNOTICES\n16.1\nGeneral Notices\nAll notices, demands, and other formal communications required or permitted under this CRA \nshall be in writing, and delivered to the applicable contacts identified in Section 16.2.\n16.2\nNotice Contacts\nPage 53"},{"page":219,"startToken":84165,"endToken":84297,"text":"Eligible Customer\n[Eligible Customer Name]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nWith a copy to:\n[Legal Department or Counsel]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nLarge Load Customer,\n[Large Load Customer Name]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nWith a copy to:\n[Legal Department or Counsel]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nTransmission Owner\n[Transmission Owner Name]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nWith a copy to:\n[Legal Department or Counsel]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nDelivery of a copy shall not be required for a notice to become effective unless expressly stated \nPage 54"},{"page":220,"startToken":84297,"endToken":84530,"text":"otherwise in this CRA.\n16.3\nCredit Support Notices\nAll notices, demands, and communications concerning the issuance, amendment, increase, \nreduction, renewal, replacement, nonrenewal, expiration, disqualification, transfer, draw, or \nrelease of Credit Support shall also be delivered to the following designated Credit Support \ncontacts:\nTransmission Owner Credit Contact\n[Name or Department]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nLarge Load Customer Credit Contact\n[Name or Department]\n[Address]\n[City, State ZIP Code]\nAttention: [Name or Title]\nEmail: [Email Address]\nSuch notices may be sent by overnight courier, personal delivery, or electronic mail. A notice \nfrom an issuer shall be effective only if delivered as required by the letter of credit.\nARTICLE 17\nGENERAL PROVISIONS\n17.1\nAmendment\nThis CRA may be amended only by a written instrument executed by authorized representatives \nof all Parties.\nAn amendment shall become effective only upon:  (i) acceptance or approval by FERC, if \nrequired; (ii) any approval or recognition required under the PJM Tariff; and (iii) satisfaction of \nany other requirement of applicable law.\nAn update to an Exhibit required under Section 3.2 shall not constitute an amendment for \npurposes of this Section.\n17.2\nEntire Agreement; Relationship to Other Agreements\nThis CRA and its Exhibits constitute the entire agreement between the Parties concerning the \nFirm Load Commitment and the payment, Credit Support, early-termination, and related \nadministrative obligations established under this CRA.  \nPage 55"},{"page":221,"startToken":84530,"endToken":84890,"text":"This CRA supersedes prior oral or written communications, negotiations, and understandings \nbetween the Parties concerning the subject matter of this agreement.  This CRA does not \nsupersede or otherwise impact other agreements (which may include security or cost recovery \nprovisions) that relate to the Large Load Facilities and that do not address matters set forth in this \nCRA related to Firm Load Commitments.\n17.3\nSeverability\nIf a provision of this CRA is held invalid, unlawful, or unenforceable by FERC or another \ngovernmental authority or tribunal having jurisdiction, the remaining provisions shall remain in \neffect to the maximum extent permitted by law.\nThe Parties shall cooperate in good faith to replace the affected provision with a lawful and \nenforceable provision that preserves, to the greatest extent permitted by law, the original \nprovision’s purpose and the economic protections established by this CRA.\nIf the affected provision cannot be replaced and its invalidity defeats the essential purpose of this \nCRA, the Parties’ rights shall be governed by the remaining enforceable provisions of this CRA \nand applicable law.\n17.4\nGoverning Law\nThis CRA shall be governed by:  (i) federal law, including the Federal Power Act, and the PJM \nTariff with respect to matters within federal jurisdiction; and (ii) the laws of the State of [State], \nwithout regard to its conflict-of-laws principles, with respect to matters not governed by federal \nlaw.\nNothing in this Section limits FERC’s jurisdiction or alters the allocation of jurisdiction between \nFERC, any state commission, and any court or other tribunal.\n17.5\nNo Third-Party Beneficiaries\nThis CRA is entered into solely for the benefit of the Parties and their permitted successors and \nassigns.\nExcept as expressly provided in this CRA, no other Person, including PJM, another transmission \ncustomer, a Load Serving Entity, an issuer of Credit Support, or a governmental authority, shall \nhave a right to enforce this CRA or be deemed a third-party beneficiary.\n17.6\nRelationship of the Parties\nNothing in this CRA creates or shall be construed to create:  (i) a partnership; (ii) a joint venture;\n(iii) an agency relationship; (iv) a fiduciary relationship; or (v) an employment relationship\namong any of the Parties..\nPage 56"},{"page":222,"startToken":84890,"endToken":85326,"text":"17.7\nCounterparts; Electronic Signatures\nThis CRA may be executed in any number of counterparts, each of which shall be deemed an \noriginal and all of which together shall constitute one instrument.\n17.8\nIndemnification\nEligible Customer and Large Load Customer shall, jointly and severally, to the fullest extent \npermitted by law, indemnify, defend upon request, and hold harmless Transmission Owner and \nits Representatives from and against all claims, damages, expenses, liabilities, and losses \n(including, without limitation, reasonable attorneys’ fees and expenses) asserted against, \nsustained, or incurred by Transmission Owner or its Representatives for any damage, harm, \ninjury, or loss, of any kind, direct or indirect, to any property or person (including death), \nincluding, without limitation:\n(a) claims for injuries or loss to employees of Transmission Owner, Eligible Customer,\nLarge Load Customer, or their respective Representatives, arising out of or relating to \nany act, omission, conduct, negligence or breach by Large Load Customer, or Eligible \nCustomer, or their respective Representatives; \n(b) arising out of or relating to the work performed under or in connection with this CRA \nby Large Load Customer, Eligible Customer, or their respective Representatives;  and/or\n(c) claims arising out of or relating to Large Load Customer’s, Eligible Customer’s, or \ntheir respective Representatives, contact or encounter with, compromise or disruption of, \nor loss or damage to any property of Transmission Owner or its Representatives’ \nproperty.  \nLarge Load Customer and Eligible Customer each specifically agree, to the fullest extent \npermitted by law, to assume liability for all personal injury claims brought by their respective \nemployees or the employees of their respective Representatives in connection with this CRA and \nwaive any limitation of liability defense based upon the applicable worker’s compensation law\nand cases decided thereunder. Eligible Customer and Large Load Customer agree to indemnify \nand defend Transmission Owner and its Representatives from and against all such loss, expense \ndamage or injury, including, without limitation, reasonable attorneys’ fees, which Transmission \nOwner’s Representatives may sustain as a result of personal injury claims by Eligible \nCustomer’s or Large Load Customer’s employees or their respective Representatives’ employees \nor representatives.  \n17.9\nEnforcement Costs\nEach of Eligible Customer and Large Load Customer shall reimburse Transmission Owner for \nall reasonable attorneys’ fees and expenses incurred in enforcing that Party’s obligations under \nthis CRA, to the extent Transmission Owner prevails in the applicable action or proceeding. \nNotwithstanding the foregoing, Large Load Customer shall be solely responsible for all \nreasonable attorneys’ fees and expenses incurred by Transmission Owner in enforcing Large \nLoad Customer’s payment or Credit Support obligations or collecting any amount due from \nLarge Load Customer under this CRA.\nPage 57"},{"page":223,"startToken":85326,"endToken":85511,"text":"17.10 Rules of Interpretation\nThe Parties intend that any grouping of words or phrases in a series of three or more shall be \ninterpreted to include the use of the Oxford (or serial) comma regardless of whether such Oxford \n(or serial) comma is actually present in the series.\n17.11 Survival\nExpiration or termination of this CRA shall not affect:  (i) any payment obligation accrued or \narising from a period before expiration or termination; (ii) any obligation to complete a \ncalculation, invoice, reconciliation, refund, or return of an excess draw; (iii) any continuing right \nconcerning Credit Support;  (iv) Large Load Customer’s obligation to pay any Shortfall Amount, \nEarly Termination Amount, Partial Termination Amount, or other amount that survives \nexpiration or termination; (v) Transmission Owner’s right to draw upon or apply Credit Support \nand its obligation to provide any required credit, refund, release, or reconciliation; (vi) the \nconfidentiality and dispute-resolution provisions of Articles 14 and 15; or (vii) any other \nprovision that expressly survives or that by its nature must survive to give effect to the Parties’ \nrights and obligations.\n[Signature page follows]\nPage 58"},{"page":224,"startToken":85511,"endToken":85574,"text":"IN WITNESS WHEREOF, the Parties, intending to be legally bound, have caused this CRA to \nbe executed by their duly authorized representatives as of the date first written above.\nTRANSMISSION OWNER:\n[Name of Transmission Owner]\nBy: ______________________________\nName: ____________________________\nTitle: _____________________________\nDate: _____________________________\nELIGIBLE CUSTOMER:\n[Name of Eligible Customer]\nBy: ______________________________\nName: ____________________________\nTitle: _____________________________\nDate: ____________________________\nLARGE LOAD CUSTOMER:\n[Name of Large Load Customer]\nBy: ______________________________\nName: ____________________________\nTitle: _____________________________\nDate: _____________________________\nPage 59"},{"page":225,"startToken":85574,"endToken":85703,"text":"EXHIBIT A\nLARGE LOAD FACILITIES AND FIRM LOAD COMMITMENT\n1.\nParties and Large Load Information\nTransmission Owner:\n[Name of Transmission Owner]\nEligible Customer:\n[Name of Eligible Customer]\nLarge Load Customer:\n[Name of Large Load Customer]\nLarge Load Facilities:\n[Name and general description of the Large Load Facilities]\nFacility Location:\n[Street Address]\n[City, State, ZIP Code]\nTransmission Zone:\n[Applicable PJM Transmission Zone]\nPoint of Delivery:\n[Point of Delivery or other applicable delivery-point identifier]\n2.\nTerm of Agreement: [__] Years\n3.\nMinimum Commitment Percentage:  [___] [add reduction schedule as \napplicable]%\n4.\nInitial Load and Firm Load Commitments\nEligible Customer’s Initial Load Commitment and Firm Load Commitment will be set forth in \nthe following schedule:\nLoad-Ramp \nStage\nService \nDate\nLoad Commitment / Associated Firm Transmission Service\nBenchmark\n1\n[Date]\n[___] MW\n2\n[Date]\n[___] MW\nPage 60"},{"page":226,"startToken":85703,"endToken":86006,"text":"3\n[Date]\n[___] MW\n[Additional \nStage]\n[Date]\n[___] MW\nFinal\n[Date]\n[___] MW\nFollowing the update required under Section 3.2, the information in this Section 4 shall replace \nthe Initial Load Commitment and shall establish the Firm Load Commitment for purposes of this\nCRA.\nThe Firm Load Commitment applicable during any Measurement Period is the amount of total \nload from the Large Load Facilities that is anticipated to be in service under the foregoing \nschedule if the Eligible Customer is taking NITS on behalf of the Large Load.  If the Eligible \nCustomer is taking FCDS or Firm Point-to-Point Transmission Service on behalf of the Large \nLoad, the Firm Load Commitment applicable during any Measurement Period is the amount of \nsuch Firm Transmission Service for which the Eligible Customer has contracted or reserved, as \napplicable, during such period.\nIf a subsequent Service Date occurs during a Measurement Period, the Firm Load Commitment \napplicable before and after that Service Date shall be determined separately for the applicable \nportions of the Measurement Period in accordance with Exhibit B.\n5.\nService Dates\nThe first Service Date under this Exhibit A is [Date].\nThe final Service Date under this Exhibit A is [Date].\n6.\nCommercial Operation Date\nThe anticipated Commercial Operation Date for the Large Load Facilities is [Date]. The \nanticipated Commercial Operation Date is not a guarantee of service on such date.\nExcept as expressly provided in the CRA, a change in the anticipated or actual Commercial \nOperation Date does not modify:\na Service Date;\nthe Firm Load Commitment;\nthe Committed Revenue Contribution;\nthe Credit Support Requirement; or\nany other obligation under the CRA.\n7.\nRelationship to Actual Load and Firm Transmission Service\nThe Firm Load Commitment is a contractual benchmark reflecting the anticipated load \nassociated with the Large Load Facilities and the corresponding Firm Transmission Service\nPage 61"},{"page":227,"startToken":86006,"endToken":86199,"text":"commitment on which the CRA is based. It is not a statement of the Large Load Facilities' actual \ndemand during any Measurement Period.\n8.\nUpdate and Amendment History\nThe following table will identify each update or amendment of this Exhibit A that becomes \neffective under Section 3.2 or Article 17 of the CRA:\nUpdate or \nAmendment No.\nEffective \nDate\nDescription of Update \nor Amendment\nFinal PJM Agreement Identifier or \nFERC Docket No./Order Date, as \nApplicable\n[___]\n[Date]\n[Description]\n[Final PJM Agreement Identifier or \nDocket No./Order Date]\n[___]\n[Date]\n[Description]\n[Final PJM Agreement Identifier or \nDocket No./Order Date]\n[___]\n[Date]\n[Description]\n[Final PJM Agreement Identifier or \nDocket No./Order Date]\nAn update required under Section 3.2 shall become effective without further agreement or \nsignature of the Parties and shall not constitute an amendment to the CRA, except to the extent a \nfiling with or acceptance by FERC is required. Any other change to this Exhibit A shall be made \nin accordance with Article 17.\nUnless and until an update or amendment becomes effective in accordance with the CRA, the \nthen-effective Firm Load Commitment and Service Dates will continue to control.\nPage 62"},{"page":228,"startToken":86199,"endToken":86504,"text":"EXHIBIT B\nREVENUE CONTRIBUTION AND SHORTFALL CALCULATION\n1. Applicable Firm Load Commitment\nFor each Measurement Period, the “Applicable Firm Load Commitment” shall mean each \namount of the Firm Load Commitment scheduled to apply during that Measurement Period \nunder Exhibit A.\nIf more than one load level is scheduled to apply during a Measurement Period, each load level \nshall apply for the portion of the Measurement Period during which it is scheduled to be \neffective.\nThe Applicable Firm Load Commitment shall not be reduced or deferred based on:\nthe amount of load that actually materializes;\nthe amount of Firm Transmission Service actually taken to serve the Large Load \nFacilities; or\nthe actual operating level of the Large Load Facilities.\n2. Full Firm Transmission Service Benchmark\nFor each Measurement Period, the “Full Firm Transmission Service Benchmark” shall equal \n100% of the Firm Transmission Service-related charges that would apply if Eligible Customer \ntook Firm Transmission Service corresponding to the Applicable Firm Load Commitment during \nthat Measurement Period.\nThe Full Firm Transmission Service Benchmark shall be calculated using:\nthe Applicable Firm Load Commitment;\nthe Applicable Firm Transmission Service Rate;\nthe generally applicable rate components and billing determinants used under the PJM \nTariff and Transmission Owner’s applicable FERC-jurisdictional rate to calculate charges \nfor  Firm Transmission Service; and\nthe portion of the Measurement Period during which each applicable load level and \nApplicable Firm Transmission Service Rate applies.\nIf the Applicable Firm Load Commitment or Applicable Firm Transmission Service Rate \nchanges during a Measurement Period, the Full Firm Transmission Service Benchmark shall \nequal the sum of the amounts separately calculated for each applicable portion of the \nMeasurement Period.\n3. Committed Revenue Contribution\nFor each Measurement Period, the Committed Revenue Contribution = Minimum Commitment \nPercentage × Full Firm Transmission Service Benchmark\nThe Minimum Commitment Percentage shall be the percentage specified in Exhibit A.\nPage 63"},{"page":229,"startToken":86504,"endToken":86861,"text":"The Minimum Commitment Percentage shall be applied only to the Full Firm Transmission \nService Benchmark and shall not be applied to the Actual Revenue Contribution.\n4. Actual Revenue Contribution\nFor each Measurement Period, the Actual Revenue Contribution shall equal the Firm \nTransmission Service-related revenues paid or payable to PJM for remittance or allocation to \nTransmission Owner, or otherwise paid or payable to Transmission Owner, that are attributable \nto transmission service actually taken to serve the Large Load Facilities.\nThe Actual Revenue Contribution shall include amounts to the extent those amounts:\nare attributable to Firm Transmission Service taken by Eligible Customer to serve the \nLarge Load Facilities;\ncorrespond to the same categories of rate components included in the Full Firm \nTransmission Service Benchmark; and\nhave not been refunded, reversed, or otherwise credited to the payer.\nTo the extent the applicable Firm Transmission Service methodology uses an assigned \nNetwork Service Peak Load contribution or another allocated billing determinant, the \nActual Revenue Contribution shall be calculated using:\nthe billing determinant assigned to the Large Load Facilities for the applicable \nMeasurement Period; and\nthe same categories of rates and rate components used to calculate the Full Firm \nTransmission Service Benchmark.\n5. Actual Billing Determinant and Allocation\nIf Firm Transmission Service-related charges or billing determinants attributable to the Large \nLoad Facilities are aggregated with charges or billing determinants attributable to other load, \nTransmission Owner shall determine the portion attributable to the Large Load Facilities using, \nin the following order of priority:\nPJM billing and settlement data that separately identifies the Large Load Facilities;\nmetering or other load data for the Large Load Facilities, applied in accordance with the \ngenerally applicable billing and allocation methodology under the PJM Tariff; and\nif the foregoing information is insufficient, other information supplied by Eligible \nCustomer or the applicable billing or service entity that Transmission Owner reasonably \ndetermines is sufficient to identify and verify the portion attributable to the Large Load \nFacilities.\nEligible Customer shall provide, or cause the applicable billing or service entity to provide, \ninformation reasonably necessary to identify and verify the portion attributable to the Large Load \nFacilities.\n6. Included Rate Components\nPage 64"},{"page":230,"startToken":86861,"endToken":87193,"text":"The same categories of Firm Transmission Service rate components shall be used to calculate the \nFull Firm Transmission Service Benchmark and the Actual Revenue Contribution.  The included \nrate components shall be derived from the applicable zonal Firm Transmission Service rate.\nThe following amounts shall be excluded:\ncharges for electric energy;\ncharges for generation capacity;\nretail electric service or distribution-service charges;\npenalties or charges for unreserved transmission use;\nadministrative-service or ancillary-service charges, unless expressly included above;\ninterest, late-payment charges, taxes, and fees unrelated to the included Firm \nTransmission Service rate components; and\namounts attributable to load other than the Large Load Facilities.\n7. Applicable Firm Transmission Service Rate\nThe Applicable Firm Transmission Service Rate for each Measurement Period shall be the \napplicable zonal rate then in effect under the PJM Tariff and Transmission Owner’s FERC-\njurisdictional rate for Firm Transmission Service in the applicable Transmission Zone.\nIf an applicable zonal Firm Transmission Service Rate changes during a Measurement Period, \neach rate shall apply to the portion of the Measurement Period during which it was in effect.\n8. Shortfall Amount\nFor each Measurement Period, the Shortfall Amount = Committed Revenue Contribution • \nActual Revenue Contribution\nIf the Actual Revenue Contribution equals or exceeds the Committed Revenue Contribution, the \nShortfall Amount shall be zero.\n9. Separate Measurement Periods\nEach Measurement Period shall be calculated independently. Any amount by which the Actual \nRevenue Contribution exceeds the Committed Revenue Contribution for one Measurement \nPeriod shall not reduce a Shortfall Amount for another Measurement Period, be carried forward \nor backward, or entitle Large Load Customer to any payment, refund, or credit.\n10. Partial Measurement Periods\nFor any partial Measurement Period, the Full Firm Transmission Service Benchmark, Committed \nRevenue Contribution, Actual Revenue Contribution, and Shortfall Amount shall be calculated \nfor the portion of the Measurement Period falling within the Term.\nThe Full Firm Transmission Service Benchmark shall be prorated in accordance with the billing \ninterval applicable to the Applicable Firm Transmission Service Rate, based on the portion of the \nPage 65"},{"page":231,"startToken":87193,"endToken":87211,"text":"Measurement Period during which each applicable load level and Applicable Firm Transmission \nService\nRate \nwas \neffective.\nPage 66"},{"page":232,"startToken":87211,"endToken":87609,"text":"EXHIBIT C\nCREDIT SUPPORT REQUIREMENT AND SCHEDULE\n1. Credit Support Requirement\nThe Credit Support Requirement is intended to secure Large Load Customer’s projected \nfinancial exposure under the CRA for the remaining Term and does not determine or limit any \namount otherwise payable by Large Load Customer under the CRA.\nAt execution by the Parties, the Initial Credit Support Requirement shall be calculated using the \nInitial Load Commitment, anticipated Service Dates, estimated Applicable Firm Transmission \nService Rate, and other information then available, and the methodology specified below. \nThe Initial Credit Support Requirement shall equal the aggregate Projected Full Firm \nTransmission Service Benchmarks for the full Term of this CRA beginning on the first Service \nDate through the end of the Term.\nFollowing the update required under Section 3.2 after execution of the Final PJM Agreement, \nTransmission Owner shall recalculate the Credit Support Requirement using the updated Firm \nLoad Commitment, Service Dates, Applicable Firm Transmission Service Rate, and Projected \nFull Firm Transmission Service Benchmarks for the remainder of the Term. The recalculated \nCredit Support Requirement shall replace the Initial Credit Support Requirement.\nAt the end of each Measurement Period, Transmission Owner shall recalculate Large Load \nCustomer’s Credit Support Requirement. The recalculation shall equal the aggregate Projected \nFull Firm Transmission Service Benchmarks for the remaining Term. Transmission Owner shall \nexclude a completed Measurement Period from the Credit Support Requirement only after:\n(i) Transmission Owner has finally calculated the Committed Revenue Contribution, Actual \nRevenue Contribution, and any resulting Shortfall Amount for that Measurement Period; and\n(ii) Large Load Customer has paid all amounts due for that Measurement Period.\nTransmission Owner shall provide Large Load Customer with notice after each recalculation, \nand the revised Credit Support Requirement shall become effective in accordance with Section \n6.5 of the CRA. These recalculations shall not constitute an amendment to this Exhibit or the \nCRA.\n2. Calculation of Projected Full Firm Transmission Service Benchmarks\nFor each Measurement Period included in the Credit Support Requirement, the Projected Full \nFirm Transmission Service Benchmark shall equal 100% of the Firm Transmission Service-\nrelated charges that would apply if Eligible Customer took Firm Transmission Service \ncorresponding to the Initial Load Commitment or Firm Load Commitment, as applicable, \nscheduled to apply during that Measurement Period.\nThe Credit Support Requirement shall equal the aggregate Projected Full Firm Transmission \nService Benchmarks for all Measurement Periods included in the applicable calculation.\nPage 67"},{"page":233,"startToken":87609,"endToken":87975,"text":"The Projected Full Firm Transmission Service Benchmark shall be calculated using:\nthe Initial Load Commitment or Firm Load Commitment, as applicable, and set forth in \nExhibit A;\nthe Applicable Firm Transmission Service Rate in effect or estimated to apply, as \napplicable, at the time of calculation;\nany rate change accepted by FERC and scheduled to become effective during the \napplicable Measurement Period;\nthe rate components and billing determinants identified in Exhibit B; and\nthe portion of each Measurement Period during which each applicable load level and \nApplicable Firm Transmission Service Rate is scheduled to apply.\n3. No Reduction for Minimum Commitment Percentage or Projected Actual Revenues\nThe Credit Support Requirement shall be calculated using 100% of the Projected Full Firm \nTransmission Service Benchmarks and shall not be reduced by:\nthe Minimum Commitment Percentage; or\nany projected or estimated Actual Revenue Contribution.\nActual Revenue Contributions shall be credited in determining the Shortfall Amount for a \ncompleted Measurement Period in accordance with Article 5 and Exhibit B.\nAfter the calculation for a completed Measurement Period has been finalized and Large Load \nCustomer has paid all amounts due for that Measurement Period, that Measurement Period shall \nbe excluded from the Credit Support Requirement in accordance with Sections 1 and 4 of this \nExhibit.\nFor avoidance of doubt, Actual Revenue Contributions attributable to a completed Measurement \nPeriod shall not reduce the Projected Full Firm Transmission Service Benchmark for any future \nMeasurement Period.\n4. Recalculation\nTransmission Owner shall recalculate the Credit Support Requirement:\nfollowing the update required under Section 3.2 after execution of the Final PJM \nAgreement;\nafter the Committed Revenue Contribution, Actual Revenue Contribution, and any \nresulting Shortfall Amount for a completed Measurement Period have been finally \ncalculated and Large Load Customer has paid all amounts due for that Measurement \nPeriod in accordance with Section 1 of this Exhibit;;\nfollowing an effective modification to the Firm Load Commitment or a Service Date;\nfollowing an effective Partial Termination;\nfollowing a change in the Applicable Firm Transmission Service Rate that has become \neffective, or a rate change that has been accepted by FERC and is scheduled to become \neffective during a Measurement Period included in the Credit Support Requirement; \nPage 68"},{"page":234,"startToken":87975,"endToken":88270,"text":"upon replacement of Credit Support following an issuer downgrade, disqualification, \nexpiration, termination, or notice of nonrenewal; and\nas otherwise expressly required under the CRA.\nTransmission Owner shall provide notice of each such recalculation, and the revised Credit \nSupport Requirement shall become effective in accordance with Section 6.5 of the CRA.  These \nupdates shall not constitute an amendment to this Exhibit or the CRA generally.\n5. Letter of Credit Issuer Requirements\nA financial institution issuing a letter of credit under the CRA shall:\nmaintain a long-term unsecured credit rating of [at least “A-” from S&P Global Ratings \nor Fitch Ratings or “A3” from Moody’s Investors Service] [insert alternative credit rating \nrequirement if applicable];\nsatisfy the requirements of Article 6 and any attachments to this Exhibit; and\notherwise satisfy Transmission Owner’s generally applicable credit requirements.\n6. Treatment of Prior Draws\nA draw applied to an unpaid amount shall not reduce the Credit Support Requirement. Large \nLoad Customer shall cause the Credit Support to be restored to the then-applicable Credit \nSupport Requirement in accordance with Section 6.7 of the CRA.\nA preservation draw under Section 6.4 shall not reduce the Credit Support Requirement because \nthe proceeds continue to be held as cash security securing Large Load Customer’s obligations \nunder the CRA.\nIn determining the amount of replacement or additional Credit Support required, cash security \nheld by Transmission Owner and legally available to secure the same obligations shall be \ncredited against the otherwise applicable Credit Support Requirement.\n7. Relationship to Amounts Payable\nThe Credit Support Requirement is a measure of secured exposure and does not determine or \nlimit:\nthe actual Committed Revenue Contribution;\nthe Actual Revenue Contribution;\nthe Shortfall Amount for a completed Measurement Period; or\nany amount otherwise payable under the CRA.\nPage 69"},{"page":235,"startToken":88270,"endToken":88275,"text":"EXHIBIT C, ATTACHMENT [__]\nPage 70"},{"page":236,"startToken":88275,"endToken":88587,"text":"EXHIBIT D\nEARLY AND PARTIAL TERMINATION AMOUNT SCHEDULE\n1. Applicable Termination Percentage\nThe Applicable Termination Percentage for an Early Termination or Partial Termination shall be \ndetermined based on the date on which the termination or Partial Termination becomes effective, \nas follows:\nEffective Date of Termination or Partial Termination Applicable Termination Percentage\nOn or after the Effective Date and before execution of the \nFinal PJM Agreement\n25%\nOn or after execution of the Final PJM Agreement through \nthe 180th day after execution of the Final PJM Agreement 50%\nAfter the 180th day after execution of the Final PJM \nAgreement but before the first Service Date\n75%\nOn or after the first Service Date\n100%\n2. Early Termination Amount\nThe Early Termination Amount shall be calculated in accordance with Article 9 and this Exhibit \nof the CRA as follows:\nEarly Termination Amount = (Applicable Termination Percentage × Present Value of Remaining \nProjected Committed Revenue Contributions) • Applicable Credits \nThe Applicable Termination Percentage used in the calculation shall be the percentage specified \nin Section 1 of this Exhibit for the date on which the termination becomes effective.\nBefore execution of the Final PJM Agreement, the Early Termination Amount shall be calculated \nusing the Initial Load Commitment, anticipated Service Dates, estimated Applicable Firm \nTransmission Service Rate, and other information then reflected in Exhibits A and C. After \nexecution of the Final PJM Agreement, the calculation shall use the updated information \nprovided pursuant to Section 3.2.\nThe Early Termination Amount shall not be less than zero.\n3. Present Value of Remaining Projected Committed Revenue Contributions\nThe Present Value of Remaining Projected Committed Revenue Contributions shall be \ncalculated as of the effective date of termination for the period beginning on the effective date of \ntermination and ending on the date the fixed period specified in Section 4.2(i) of the CRA would \nhave expired absent the termination.\nPage 71"},{"page":237,"startToken":88587,"endToken":88937,"text":"The calculation shall be based on:\nthe Initial Load Commitment or Firm Load Commitment, as applicable, and Service \nDates in effect immediately before termination;\nthe Minimum Commitment Percentage;\nthe Projected Full Firm Transmission Service Benchmark determined in accordance with \nExhibit C;\nthe Applicable Firm Transmission Service Rate in effect or estimated to apply, as \napplicable, on the effective date of termination; \nany rate change accepted by FERC and scheduled to become effective during the \nremaining fixed period;\nthe rate components and billing determinants identified in Exhibit B; and\nTransmission Owner’s then-effective FERC-approved weighted average cost of capital as \nthe discount rate.\nNo rate escalation or other projected rate change shall be included unless the rate change has \nbeen accepted by FERC and is scheduled to become effective during the remaining fixed period.\n4. Applicable Credits\nApplicable Credits shall include, without duplication:\nany Actual Revenue Contribution attributable to the portion of the Measurement Period \noccurring before the effective date of termination that has been paid or is payable and has \nnot otherwise been credited;\nany Shortfall Amount, Credit Support proceeds, or other amount previously collected and \napplied to the same revenue exposure; and\nany Early Termination Offset Amount determined under Section 9.9 of the CRA.\nNo amount shall be treated as an Applicable Credit unless it has been paid, received, or applied \nto the revenue exposure included in the Early Termination Amount.\n5. Partial Termination Amount\nUnless the permanently reduced portion of the Firm Load Commitment consists of a separately \nidentifiable load tranche, the Partial Termination Amount shall equal:\nPartial Termination Amount = Early Termination Amount × (Permanently Reduced MW ÷ \napplicable Initial Load Commitment or Firm Load Commitment immediately before reduction) \nThe Applicable Termination Percentage shall be the percentage specified in Section 1 of this \nExhibit for the effective date of the Partial Termination.\nIf the permanently reduced portion consists of one or more separately identifiable load tranches, \nthe Partial Termination Amount shall be calculated using the Projected Committed Revenue \nContributions attributable to the terminated tranche or tranches, including the applicable MW \namount and Service Date for each terminated tranche.\nPage 72"},{"page":238,"startToken":88937,"endToken":89203,"text":"The Partial Termination Amount shall not be less than zero.\n6. Treatment After the First Service Date\nOn and after the first Service Date, the Applicable Termination Percentage shall remain 100%.\nThe Present Value of Remaining Projected Committed Revenue Contributions will decline as the \nremaining portion of the fixed period decreases. Accordingly, the Applicable Termination \nPercentage will not be separately reduced based solely on the passage of time after the first \nService Date.\n7. Early Termination Offset Amount\nIf an Early Termination Offset Amount is quantifiable when Transmission Owner issues the \napplicable termination invoice, Transmission Owner shall include that amount as an Applicable \nCredit.\nIf all or part of the Early Termination Offset Amount becomes quantifiable after the termination \ninvoice is issued, Transmission Owner shall reflect the amount in a subsequent reconciliation and \npromptly return any resulting excess payment to Large Load Customer in accordance with \nArticles 7 and 9 of the CRA.\nNothing in this Exhibit requires Transmission Owner to market the Point of Delivery, solicit \nreplacement load, modify its transmission planning or service processes, or enter into a \ntransmission-service arrangement with another Person.\n8. No Duplicate Recovery\nThe Early Termination Amount and Partial Termination Amount are forward-looking amounts \nintended to address projected revenue exposure arising after the effective date of termination or \nPartial Termination.\nTransmission Owner shall not recover the same revenue exposure through both:\na Shortfall Amount; and\nan Early Termination Amount or Partial Termination Amount.\nAmounts collected before termination or Partial Termination shall be credited only to the extent \nrequired under Article 9 and this Exhibit to prevent duplicate recovery.\nPage 73"},{"page":239,"startToken":89203,"endToken":89500,"text":"706\nRates and Charges\nEligible Customers taking Interim Network Integration Transmission Service shall pay the \ncharges set forth in this Section 706.\n706.1 Monthly Demand Charge\nEligible Customer shall pay a Monthly Demand Charge for Zone Network Load and Non-Zone \nNetwork Load, which shall be determined as follows: Eligible Customer’s measured demand \namount (in MWs) multiplied by the applicable zonal Network Integration Transmission Service \nrate established pursuant to Section 34.1.\nRevenue Crediting.  Each month, revenue credits will be applied to the gross monthly Demand \nCharge to determine the actual charge to the Transmission Customer.  Revenue credits shall be \ncalculated based on the sum of the applicable Zone’s share of revenues collected during the \nmonth from the Non-Firm Contract Demand Charge under Schedule 19.  The sum of these \nrevenues will appear as a reduction to the gross monthly rate stated above on a Transmission \nCustomer’s bill in that month for service under this schedule.  \n706.2 Redispatch Charge\nThe Eligible Customer shall pay any redispatch costs as set forth in Tariff, Attachment K.\n706.3 Stranded Cost Recovery\nAny Transmission Owner may seek to recover stranded costs from the Eligible Customer \npursuant to this Tariff in accordance with the terms, conditions and procedures set forth in FERC \nOrder No. 888.  However, the Transmission Owner must separately file any proposal to recover \nstranded costs under section 205 of the Federal Power Act.\n706.4 Other Charges\nEligible Customer shall pay administrative services charges under Tariff, Schedule 1A; Tariff, \nSchedule 9; and Tariff, Schedule 10, consistent with the charges assessed to loads taking \nNetwork Integration Transmission Service.\nEligible Customer shall pay Ancillary Services charges in accordance with Tariff, Part I, \nsection 3. \nEligible Customer shall pay Black Start Service charges in accordance with Tariff, Schedule 6A.\nPage 74"},{"page":240,"startToken":89500,"endToken":89584,"text":"714 \nRates and Charges for Firm Contract Demand Transmission Service\nEligible Customers taking Firm Contract Demand Transmission Service on behalf of Eligible \nLoad or Large Load shall pay the charges set forth in this Section 714.\n714.1 Monthly Demand Charge\nEligible Customer taking service on behalf of Eligible Load or Large Load shall pay a Monthly \nDemand Charge based on the Firm Contract Demand Transmission Service amount (MW), as \nspecified in Eligible Customer’s Service Agreement, in accordance with Tariff, Schedule 18.\nPage 75"},{"page":241,"startToken":89584,"endToken":89662,"text":"715 \nRates and Charges for Non-Firm Contract Demand Transmission Service\nEligible Customers taking Non-Firm Contract Demand Transmission Service shall pay the \ncharges set forth in this Section 715.\n715.1 Monthly Demand Charge\nEligible Customer shall pay a discounted reservation rate set as a function of the Zonal Firm \nContract Demand Transmission Service rate and the transmission system load factor for a Zone, \nas specified in Eligible Customer’s Service Agreement, in accordance with Tariff, Schedule 19.\nPage 76"},{"page":242,"startToken":89662,"endToken":89863,"text":"SCHEDULE 7\nLong-Term Firm and Short-Term Firm Point-To-Point\nTransmission Service\n1) The Transmission Customer shall pay each month for Reserved Capacity at the sum of the applicable charges set forth below for the Point of Delivery:\nSummary of Charges\n(in $/kW)\nPoint of Delivery\nYearly Charge\nMonthly Charge\nWeekly Charge\nDaily On-Peak1/\nCharge\nDaily Off-Peak2/\nCharge\nBorder of PJM3/\nBorder Yearly Charge \nestablished pursuant to \nsection 11 below\nYearly Charge /12\nYearly Charge /52\nWeekly Charge /5\nWeekly Charge /7\nAE Zone\n23.809\n1.984\n0.4580\n0.0920\n0.0650\nBGE Zone\n15.675\n1.306\n0.3010\n0.0600\n0.0430\nDelmarva Zone\n19.378\n1.615\n0.3730\n0.0750\n0.0530\nJCPL Zone\n15.112\n1.259\n0.2906\n0.0581\n0.0414\nMetEd Zone\n15.112\n1.259\n0.2906\n0.0581\n0.0414\nPenelec Zone\n15.112\n1.259\n0.2906\n0.0581\n0.0414\nPECO Zone\n26.264\n2.189\n0.5051\n0.1010\n0.0722\nPPL Zone: Total charge is the sum of \nthe components\nPPL: *\nAEC: 0.463\nUGI: *\nPPL: *\nAEC: 0.039\nUGI: *\nPPL: *\nAEC: 0.0089\nUGI: *\nPPL: *\nAEC: 0.0018\nUGI: *\nPPL: *\nAEC: 0.0013\nUGI: *\nPage 77"},{"page":243,"startToken":89863,"endToken":90128,"text":"Point of Delivery\nYearly Charge\nMonthly Charge\nWeekly Charge\nDaily On-Peak1/\nCharge\nDaily Off-Peak2/\nCharge\nPepco Zone\n20.999\n1.750\n0.4040\n0.0810\n0.0580\nPSE&G Zone\n23.696\n1.975\n0.4557\n0.0911\n0.0651\nAP Zone\nRate Pursuant to Attachment H-\n11 and Attachment H-34\nRate Pursuant to \nAttachment H-11 and \nAttachment H-34\nRate Pursuant to Attachment \nH-11 and Attachment H-34\nRate Pursuant to Attachment \nH-11 and Attachment H-34\nRate Pursuant to \nAttachment H-11 and \nAttachment H-34\nRockland Zone\n53.766\n4.481\n1.0340\n0.2068\n0.1477\nComEd Zone4/\n5/\nAEP East Zone6/\nRate Pursuant to \nAttachment H-14 and \nAttachment H-20\nRate Pursuant to \nAttachment H-14 and \nAttachment H-20\nRate Pursuant to Attachment \nH-14 and Attachment H-20\nRate Pursuant to Attachment \nH-14 and Attachment H-20\nRate Pursuant to \nAttachment H-14 and \nAttachment H-20\nDayton Zone\nRate Pursuant to \nAttachment H-15\nRate Pursuant to \nAttachment H-15\nRate Pursuant to Attachment \nH-15\nRate Pursuant to Attachment \nH-15\nRate Pursuant to \nAttachment H-15\nDuquesne Zone\n14.17\n1.18\n0.27\n0.0540\n0.0386\nDominion Zone7/\nATSI Zone\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nRate Pursuant to \nAttachment H-21\nDEOK Zone\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nRate Pursuant to \nAttachment H-22\nEKPC Zone\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nRate Pursuant to \nAttachment H-24\nPage 78"},{"page":244,"startToken":90128,"endToken":90593,"text":"OVEC Zone\n5.16\n0.43\n0.10\n0.02\n0.014\n* PPL Electric Utilities Corporation’s and UGI Utilities’ respective component of the total charge is posted on the PJM Internet website.\n1/\nMonday – Friday except the following holidays:  New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.\n2/\nSaturday and Sunday and the following holidays:  New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.\n3/\nThe charge for Points of Delivery at the Border of PJM shall not apply to any Reserved Capacity with a Point of Delivery of the Midcontinent Independent \nTransmission System Operator, Inc.\n4/\nEach month, revenue credits will be applied to the gross charge in accordance with section 8 below to determine the actual charge to the Transmission Customer. \n5/\nThe charges for the ComEd zone are posted on PJM’s website.  In addition to other rates set forth in this schedule, customers within the ComEd zone shall be \ncharged for recovery of RTO start-up costs at the following rates, each computed to four decimal places:\nAnnual Rate - $/kW/year = $1,523,039, divided by the 1 CP demand for the ComEd zone for the prior calendar year;\nMonthly Rate - $/kW/month. = Annual Rate divided by 12;\nWeekly Rate - $/kW/week = Annual Rate divided by 52;\nDaily Rate - $/kW/day = Weekly Rate divided by 5.\nIn order to ensure that the charge does not result in either an over-recovery or under-recovery of ComEd’s start-up costs, PJM will institute an annual true-up \nmechanism in the month of May of each of the years 2008-2014.  In May of each of those years, PJM will compare the amount collected under this charge for the \nprevious 12 months with the target annual amount of $1,523,039 and calculate any credits or surcharges that would be needed to ensure that $1,523,039 is collected \nfor each year.  Any credit or surcharge will be assessed in the June bills for years 2008-2014, consistent with the above methodology.\n6/\nThe rates for firm point-to-point transmission service in the AEP Zone will be charged at the yearly, monthly, weekly or daily rate equivalent to the rate effective in \nsuch period under Attachments H-14 and H-20. In addition to other rates set forth in this schedule, customers within the AEP East Zone shall be charged for \nrecovery of RTO start-up costs at the following rates, each computed to four decimal places:\nAnnual Rate - $/kW/year = $2,362,185, plus any applicable true-up adjustment, divided by the 1 CP demand for the AEP East Zone for the prior calendar year;\nMonthly Rate - $/kW/month. = Annual Rate divided by 12;\nWeekly Rate - $/kW/week = Annual Rate divided by 52;\nDaily Rate - $/kW/day = Weekly Rate divided by 5.\nPage 79"},{"page":245,"startToken":90593,"endToken":90993,"text":"For the period November 1, 2005 through March 31, 2006, the rate shall be $8.94/MW-month; for the period April 1 through December 31, 2006, the rate shall be \n$8.60/MW-month, thereafter, the rate will be subject to the following true-up:\nIn order to ensure that the charge does not result in either over-recovery or under-recovery of AEP’s start-up costs, PJM will institute an annual true-up mechanism \nand implement revised charges as of January 1st of each of the years 2007-2019.  In January of each of those years, PJM will compare the amount collected under \nthis charge for the previous year or part thereof with the target annual amount of $2,362,185 and calculate the rates that would be needed, given the expected billing \ndemands, to collect $2,362,185, adjusted for any prior year over-collection or under-collection.  In the final year that the rate is collected, PJM will calculate the rate \nto collect five-twelfths of the annual amount ($984,244), plus or minus any prior year true up amount, by May 31 of that year, and shall charge such rate until that \namount is collected, whether that date be before or after May 31, 2020.   \n7/\nThe service period charges rounded to four decimal places for the Dominion Zone are as follows:\nYearly Charge - $/kW/year = the formula rate for Network Integration Transmission Service as described in Attachment H-16 and Attachment H-16A \ndivided by 1000 kW/MW\nMonthly Charge - $/kW/month. = Yearly Charge divided by 12;\nWeekly Charge - $/kW/week = Yearly Charge divided by 52;\nDaily On-Peak Charge - $/kW/day = Weekly Charge divided by 5;\nDaily Off-Peak Charge - $/kW/day = Weekly Charge divided by 7.\nOn a monthly basis, revenue credits shall be calculated based on the sum of VEPCO’s share of revenues collected during the month from Schedule 7 and Network \nIntegration Transmission Service to Non-Zone Network Load under Attachment H-A.  The sum of these revenue credits will appear as an adjustment to the to the \ngross monthly service period charges produced by the above formula.\n2)\nThe total demand charge in any week, pursuant to a reservation for Daily On-Peak Delivery, or Daily Off-Peak Delivery shall not exceed the Weekly Delivery rate \nspecified in section (1) above for weekly service times the highest amount in kilowatts of Reserved Capacity and any additional transmission service, if any, in any day during such \nweek.\nPage 80"},{"page":246,"startToken":90993,"endToken":91586,"text":"3)\nDiscounts:  Three principal requirements apply to discounts for transmission service as follows:  (1) any offer of a discount made by the Transmission Provider must be \nannounced to all Eligible Customers solely by posting on the OASIS, (2) any customer-initiated requests for discounts (including requests for use by one’s wholesale merchant or \nan Affiliate’s use) must occur solely by posting on the OASIS, and (3) once a discount is negotiated, details must be immediately posted on the OASIS.  For any discount agreed \nupon for service on a path, from point(s) of receipt to point(s) of delivery, the Transmission Provider must offer the same discounted transmission service rate for the same time \nperiod to all Eligible Customers on all unconstrained transmission paths that go to the same point(s) of delivery on the Transmission System.\n4)\nCongestion, Losses and Capacity Export:  In addition to any payment under this Schedule, the Transmission Customer shall pay Redispatch Costs as specified in Section \n27 of the Tariff.  The Transmission Customer shall be responsible for losses as specified in the Tariff.  Any Transmission Customer that is a Capacity Export Transmission \nCustomer, shall pay any applicable charges, and receive any applicable credits, for such a customer pursuant to Attachment DD.\n5)\nOther Supporting Facilities and Taxes:  In addition to the rates set forth in section (1) of this schedule, the Transmission Customer shall pay charges determined on a \ncase-by-case basis for facilities necessary to provide Transmission Service at voltages lower than those shown in Attachment H for the applicable Zone(s) and any amounts \nnecessary to reimburse PJMSettlement for any amounts payable as sales, excise, “Btu,” carbon, value-added or similar taxes (other than taxes based upon or measured by net \nincome) with respect to the amounts payable pursuant to the Tariff.\n6)\n[Reserved]\n7)\nTransmission Enhancement Charges. Except for Points of Delivery at the Border of PJM, which are subject to the Border Yearly Charge determined under section 11, in \naddition to the rates set forth in section (1) of this Schedule and any other applicable charges, the Transmission Customer shall also pay any Transmission Enhancement Charges \nfor which it is designated as a Responsible Customer under Schedule 12 appended to the Tariff.\n8)\nDetermination of monthly charges for ComEd Zone: On a monthly basis, revenue credits shall be calculated based on the sum of ComEd’s share of revenues collected \nduring the month from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission Service to Non-Zone Network Load under Attachment H-A; (iii) Seams \nElimination Charge/Cost Adjustment/Assignment (“SECA”) revenues allocable to ComEd under the Tariff; and (iv) any Point-To-Point Transmission Service where the Point of \nReceipt and the Point of Delivery are both internal to the ComEd Zone. On this basis, the sum of these revenues will appear as a reduction to the gross monthly rate stated above \non a Transmission Customer’s bill in that month for service under this schedule.\n9)\nDetermination of monthly charges for AEP Zone: On a monthly basis, revenue credits shall be calculated based on the sum of AEP’s share of revenues collected during \nthe month from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission Service to Non-Zone Network Load under Attachment H-A; and (iii) Firm \nPoint-To-Point Transmission Service where the Point of Delivery is internal to the AEP Zone. The sum of these revenue credits will appear as an adjustment (reduction) to the \ngross monthly rate stated above on a Transmission Customer’s bill in that month for service under this schedule.\nPage 81"},{"page":247,"startToken":91586,"endToken":91901,"text":"10)\nResales:  The rates and rules governing charges and discounts stated above shall not   apply to resales of transmission service, compensation for which shall be governed by \nsection 23.1 of the Tariff.\n11)\nDetermining the Border Yearly Charge\n(A) Formula for Determining the Border Yearly Charge\n(i)  Beginning with the calendar year 2020, the Border Yearly Charge shall be based on the following formula:\nBYC = SHRR/SZPL\nWhere:\nBYC is the Border Yearly Charge stated in dollars per kW of Reserved Capacity; \nSHRR is the sum of the Revenue Requirements for each Transmission Owner used to determine charges for Network Integration Transmission Service either (a) \nstated in Attachment H for a Transmission Owner or (b) determined pursuant to a formula rate set forth in Attachment H, both as adjusted in accordance with this \nsection (11)(A). \nSZPL is the sum of each Zone’s annual peak load (in kW) plus the peak day firm reservations for Point-to-Point service at the Border of PJM (in kW) subject to the \ncharges set forth in section (1) herein (prior to any applicable discount) from the most recently completed 12-month period ending October 31.\n(ii) Where the Revenue Requirement of a Transmission Owner is determined pursuant to a formula rate: \n(a) the Revenue Requirement shall be increased by the amount of any revenue included in the Transmission Owner’s formula rate as credits in \ndetermining the Revenue Requirement for Network Integration Transmission Service from: (i) Transmission Enhancement Charges; (ii) Firm Point-to-Point \nTransmission Service charges under Schedule 7; or (iii) Network Integration Transmission Service to Non-Zone Network Load under Attachment H-A; (iv) \nInterconnection Reliability Reinforcement Charges;  or (v) Generator Reliability Reinforcement Recovery Fees that are included in the Transmission Owner’s \nformula rate as revenue credits in determining the Revenue Requirement for Network Integration Transmission Service, if such credits are identified in the \nTransmission Owner’s formula rate annual update; and\nPage 82"},{"page":248,"startToken":91901,"endToken":92441,"text":"(b)  (I) the Revenue Requirement shall be reduced by the amount of any credit applied directly to Network Customers to offset the cost of Network \nIntegration Transmission Service, including credits to Network Customers resulting from: (i) a Network Upgrade Funding Agreement, Tariff, Attachment O-2; (ii) a \nState Agreement Public Policy Project subject to Tariff, Schedule 12, section (b)(xii)(B);  (iii) agreements for transmission service entered into prior to a \nTransmission Owner signing the Consolidated Transmission Owners Agreement or any of its predecessor agreements or (iv) an entity executing an agreement by \nwhich such entity is obligated to pay for some, or all, of the Revenue Requirement of Transmission Facilities for which Network Customers would otherwise be \nresponsible. (II) The Revenue Requirement for inclusion in the SHRR shall not be reduced by the amount of any credits for (i) Transmission Enhancement Charges; \n(ii) Firm Point-to-Point Transmission Service charges under this Schedule 7; or (iii) Network Integration Transmission Service to Non-Zone Network Load under \nTariff, Attachment H-A; (iv) Interconnection Reliability Reinforcement Charges;  or (v) Generator Reliability Reinforcement Recovery Fees.\n(B) The Transmission Provider shall update the Border Yearly Charge annually based on the Revenue Requirements for each Transmission Owner used to \ndetermine charges for Network Integration Transmission Service in effect on January 1, provided that such Revenue Requirements were approved by FERC, stated in a \nformula rate update informational filing with FERC, or posted on the Transmission Provider’s website no later than the preceding October 31.  The Border Yearly Charge \nso updated shall become effective as of January 1 and remain in effect for the remainder of the calendar year.  Except as provided in subsection (D) of this section (11), any \nchange to the data used to determine the Border Yearly Charge following October 31, including any change in the number or identity of Transmission Owners filing \nRevenue Requirements for Network Integration Transmission Service under Attachment H, shall not be reflected in Border Yearly Charge until the next annual update.\n(C) Not later than the first Business Day of December each year, the Transmission Provider shall post on the Transmission Provider’s website a “BYC Workbook” \nthat shall include (1) all of the inputs and calculations used to determine the Border Yearly Charge, (2) references to the sources of the inputs used to determine the Border \nYearly Charge from each Transmission Owner’s stated or formula rate filing or posting, (3) a variance report detailing all changes to the calculations, inputs, or procedures \nused to determine the proposed Border Yearly Charge as compared to the calculations, inputs or procedures used to determine the Border Yearly Charge then in effect, and \n(4) contact information for the submission of inquiries or comments regarding the posted BYC Workbook.  All inputs used to determine the SHRR must be taken either \nfrom a stated Revenue Requirement for Network Integration Transmission Service specified in Attachment H or from an identified entry in a Transmission Owner’s \nformula rate update either filed with the FERC or posted on the Transmission Provider’s website for the rate for Network Integration Transmission Service that will be in \neffect on January 1.  \n(D)  Procedure for Review of and Challenge to the Border Yearly Charge Determination.\n(i)  Review of the Border Yearly Charge Determination.\nPage 83"},{"page":249,"startToken":92441,"endToken":93077,"text":"(a)  Within sixty (60) days of the posting of the BYC Workbook, Interested Parties, including entities with existing, requested or planned \ntransmission service reservations for service at the Border of PJM (“Border Rate Transmission Customers”), state utility regulatory commissions, consumer advocacy \nagencies, state attorneys general, and any entity having standing under Section 206 of the Federal Power Act (“Interested Party”), may submit reasonable information \nrequests to the Transmission Provider regarding its selection and use of inputs and the calculations performed in calculating the Border Yearly Charge, including the \ncreation of the BYC Workbook, with respect to any adjustments made by the Transmission Provider, including adjustments made based on information provided by a \nTransmission Owner to the Transmission Provider:  (1) to a Transmission Owner’s Revenue Requirement for Network Integration Transmission Service prior to its \ninclusion as an input into the calculation of the SHRR for the Border Yearly Charge; (2) to the data used in determining SZPL; (3) to the Revenue Requirement of a \nTransmission Owner in determining the Border Yearly Charge made in accordance with Section (11)(A)(ii); and (4) in response to any FERC orders approving or requiring \nchanges to, or refunds associated with, a Transmission Owner’s formula rate or resulting annual Revenue Requirement.\n(b)  The Transmission Provider shall respond to such reasonable information requests as soon as practicable, but no later than within forty-five (45) \ndays of the receipt of the information request, unless it determines that additional time is required to respond.  The Transmission Provider shall post any information \nrequests received and its responses thereto on the Transmission Provider’s website, provided that any responsive information that has been designated by a Transmission \nOwner as confidential pursuant to the provisions of the Operating Agreement or Consolidated Transmission Owners Agreement shall not be posted and shall be handled \nsolely in accordance with such provisions.  An Interested Party may request a meeting with the Transmission Provider and any interested Transmission Owner to discuss \nany response to an information request or any dispute regarding the calculation of the Border Yearly Charge annual update. The Transmission Provider and any interested \nTransmission Owner shall exercise good faith in responding to an Interested Party’s meeting request and shall not unreasonably deny or delay such meeting in a manner \nthat prejudices an Interested Party’s opportunity to timely review the Border Yearly Charge annual update.\n(c)  At any time after posting of the BYC Workbook, but before a challenge pursuant to section (11)(D)(ii) (“Challenge”) is filed, at the request of an \nInterested Party, the Transmission Provider will be required to meet with the Interested Party within ten (10) Business Days of such request in an attempt to resolve any \ndispute regarding the calculation of the Border Yearly Charge raised by the Interested Party in its meeting request. If the dispute relates to information from one or more \nTransmission Owners’ Tariff, Attachment H stated or formula rate or Zonal peak load determination, the relevant Transmission Owner(s) will be notified by the \nTransmission Provider of the dispute and will be permitted to attend the meeting.\n(d)  If it is determined that the Border Yearly Charge is based on an incorrect input or calculation or FERC directs that a Transmission Owner’s\nRevenue Requirement, upon which the Border Yearly Charge is based, be changed and implemented as a change to the Transmission Owner’s rate for Network Integration \nTransmission Service at a time other than provided for in the Transmission Owner’s formula rate protocols (“Changed Revenue Requirement”), the Transmission Provider \nshall change the   Border Yearly Charge as necessary to account for such Changed Revenue Requirement and post on the Transmission Provider’s website a revised BYC \nWorkbook documenting the changes to the Border Yearly Charge to incorporate the correction or change. The correction to the Border Yearly Charge shall take effect no \nPage 84"},{"page":250,"startToken":93077,"endToken":93595,"text":"later than the first day of the month that begins 30 days after a correction is posted by the Transmission Provider or, if the correction or Changed Revenue Requirement \nresults from a FERC order, on a schedule consistent with that order. Subject to the notice of correction described above, to the extent permitted by Tariff, Part I, section \n10.4, PJM Settlement, on behalf of itself or as agent for the Transmission Provider, shall adjust the charges to Border Rate Transmission Customers with respect to any \nmonth prior to the effective date of the Changed Revenue Requirement being reflected in the Border Yearly Charge that is affected by the correction or Changed Revenue \nRequirement and refund or credit any amount paid in excess of the corrected Border Yearly Charge. Any correction under this subsection (D) shall be limited to any \nChanged Revenue Requirement and the Transmission Provider’s selection and use of Border Yearly Charge inputs and the calculations necessary to determine the Border \nYearly Charge. This section does not apply to a FERC order that changes a Transmission Owner’s Revenue Requirement that is implemented through a true-up mechanism.\n(e) If FERC issues an order directing or approving refunds associated with a Transmission Owner’s Revenue Requirement that previously was, or \ncurrently is, incorporated into the SHRR to be paid to Network Integration Transmission Service customers, Border Rate Transmission Customers shall also receive a \nrefund, to the extent that the changes in a Transmission Owner’s Revenue Requirement upon which such refund is based affects the calculation of the Border Yearly \nCharge.\n(f)  Nothing in section (11) shall authorize an inquiry into the data or information filed or posted by a Transmission Owner as part of its transmission \nrate protocols pursuant to Tariff, Attachment H, or shall affect the rights that any Border Rate Transmission Customer may have under said protocols.\n(ii)  Challenge to the Border Yearly Charge Determination.\n(a)  An Interested Party may file with FERC a Challenge to the annual update of the Border Yearly Charge within  ninety (90) days of the posting of \nthe BYC Workbook or thirty (30) days of receiving a response to any information request it submitted under subsection (11)(D)(i)(a), whichever is later.  Any such \nChallenge shall be served on Transmission Provider and each Transmission Owner with Revenue Requirements included in the BYC Workbook.\n(b)  A Challenge must specify and include adequate supporting documentation, detailing how the Transmission Provider’s selection of inputs to or \ncalculation of the Border Yearly Charge fails to comply with the provisions of this Schedule 7, section (11), identifying any input data or other BYC Workbook entry that is \nalleged to be missing or inaccurate or the Border Yearly Charge calculations alleged to be performed incorrectly.\n(c)  A Challenge must be limited to the Transmission Provider’s selection and use of Border Yearly Charge inputs and the calculations necessary to \ndetermine the Border Yearly Charge and may not seek to modify Tariff, Schedules 7 and 8 or Attachment H-A or question the data or information filed or posted by a \nTransmission Owner pursuant to Tariff, Attachment H. \nPage 85"},{"page":251,"startToken":93595,"endToken":93943,"text":"(d)  The Transmission Provider and each Transmission Owner with Revenue Requirements included in the BYC Workbook shall have thirty (30) \ndays to answer a Challenge.\n(e)  In any proceeding before the FERC in response to a Challenge, the Transmission Provider shall bear the burden, consistent with Section 205 of \nthe FPA, of demonstrating that it has correctly applied the terms of this Schedule 7, section (11).\n(E) When the Transmission Provider posts on its website a Border Yearly Charge annual update under subsection (C) or correction under subsection (D) of this \nsection (11), it shall also make an informational filing with the FERC that includes such posting.\n(F) A Transmission Customer taking Point-to-Point Transmission Service at the Border of PJM under this Schedule 7, including any discounted service pursuant to \nSection (3), is relieved from, and shall not be separately allocated or assigned Transmission Enhancement Charges under Schedule 12 §(c)(5) on the basis of its reservation \nof Firm Point-to-Point Transmission Service at the Border of PJM.  Payment of the charges set forth in this Schedule does not relieve the responsibility of a Transmission \nCustomer or Merchant Transmission Facility to pay Transmission Enhancement Charges assigned to such Merchant Transmission Facility, other than pursuant to Tariff, \nSchedule 12, §(c)(5), nor does it determine other cost obligations of Transmission Customers or Merchant Transmission Facilities that may be imposed under other \nprovisions of the Tariff.  \n(G)  Point-to-Point Transmission Service at the Border of PJM includes service to a Point of Delivery at a Merchant Transmission Facility that provides service to a \nneighboring transmission system.\n(H)  Customers taking Point-to-Point Transmission Service at the Border of PJM with a Point of Delivery at a Merchant Transmission Facility and not receiving a \ndiscount from the Border Yearly Charge pursuant to this Schedule 7, section (3) under the settlement entered into in FERC Docket No. ER19-2105, shall receive a credit \ndetermined in accordance with the following formula:\nMTFC = BYC*MTFTEC/SHRR\nWhere:\nMTFC is the credit to the Border Yearly Charge per kW of reserved capacity; \nBYC is the Border Yearly Charge;\nPage 86"},{"page":252,"startToken":93943,"endToken":94018,"text":"MTFTEC is the total annual Transmission Enhancement Charges under Tariff, Schedule 12 applicable to the Merchant Transmission Facility to which the customer \nis taking Point-to-Point Transmission Service during the current calendar year; and \nSHRR is the amount determined pursuant to subsection (A) of this section (11).\nThe MTFC shall be credited on a monthly basis only for those months during which the customer takes Firm Point-to-Point Transmission Service to the Merchant \nTransmission Facility.\nPage 87"},{"page":253,"startToken":94018,"endToken":94445,"text":"SCHEDULE 12\nTransmission Enhancement Charges and \nInterconnection Reliability Reinforcement Cost Recovery\n(a)\nEstablishment of Transmission Enhancement Charges.  \n(i)\nEstablishment of Transmission Enhancement Charges by Transmission \nOwners and Entities That Will Become Transmission Owners.  One or more of the \nTransmission Owners may be designated to construct and own and/or finance Required \nTransmission Enhancements by (1) the Regional Transmission Expansion Plan periodically \ndeveloped pursuant to Operating Agreement, Schedule 6 or (2) any joint planning or \ncoordination agreement between PJM and another region or transmission planning authority set \nforth in Tariff, Schedule 12-Appendix B (“Appendix B Agreement”) (collectively, for purposes \nof this Schedule 12 only, “Regional Transmission Expansion Plan”).  Operating Agreement, \nSchedule 6, section 1.7 recognizes that Transmission Owners, subject to obtaining any necessary \nregulatory approvals, may seek to recover the costs of Required Transmission Enhancements and \nobligates PJMSettlement to collect on behalf of Transmission Owner(s) any charges established \nby Transmission Owners to recover the costs of Required Transmission Enhancements.  If a \nTransmission Owner is designated by the Regional Transmission Expansion Plan to construct \nand own and/or finance a Required Transmission Enhancement, such Transmission Owner may \nchoose any of the following cost recovery mechanisms, subject to the crediting procedures set \nforth in section (e) below: \n(1)\nDecline to seek to recover the costs of Required Transmission Enhancements \nfrom customers until such time as it makes a filing pursuant to Section 205 of the Federal \nPower Act to revise its Network Integration Transmission Service rates;\n(2) \nMake a filing pursuant Section 205 of the Federal Power Act and the FERC’s \nrules and regulations to establish the revenue requirement with respect to a Required \nTransmission Enhancement, without filing to revise its rates for Network Integration \nTransmission Service generally; or\n(3) \nEstablish the revenue requirement with respect to a Required Transmission \nEnhancement through the operation of a formula rate in effect applicable to its rates for \nNetwork Integration Transmission Service.\nA charge established to recover the revenue requirement with respect to a Required Transmission \nEnhancement is hereafter referred to as a “Transmission Enhancement Charge.”  Transmission \nEnhancement Charges of one or more Transmission Owners for Required Transmission \nEnhancements shall be established in accordance with this Schedule 12.   \n(ii)\nEstablishment of Transmission Enhancement Charges With Respect to \nRequired Transmission Enhancements Constructed by Entities in Another Region. The \nrevenue requirement with respect to a Required Transmission Enhancement constructed pursuant \nto an Appendix B Agreement in another region by an entity designated by such other region shall \nbe governed by the tariffs or agreements in effect in such region. Transmission Enhancement \nPage 88"},{"page":254,"startToken":94445,"endToken":94943,"text":"Charges to recover the costs of such Required Transmission Enhancement for which PJM is \nresponsible shall be determined in accordance with this Schedule 12.  Other than with respect to \na Required Transmission Enhancement constructed pursuant to an Appendix B Agreement, no \nPJM Network or Transmission Customer will bear cost responsibility for any required \ntransmission upgrades in another region as a consequence of a Required Transmission \nEnhancement included in the Regional Transmission Expansion Plan.  \n(iii)\nTransmission Facilities Not Eligible for Cost Responsibility Assignment.  Any \nalternating current (“A.C.”) facilities or direct current (“D.C.”) facilities that are Attachment \nFacilities, Local Upgrades, Merchant Network Upgrades, Merchant Transmission Facilities, \nNetwork Upgrades, Supplemental Projects, or any other Transmission Facilities that operate or \nare planned to be operated in a manner that requires customers to subscribe to transmission \nservice over such facilities or to a portion of the electric capability of such facilities shall not be \neligible for cost responsibility assignment pursuant to this Schedule 12.  \n(iv)\nEntities Not Yet Eligible to Become Transmission Owners.  For purposes of \nthis Schedule 12 only, the term, “Transmission Owner,” shall include any entity that undertakes \nto construct and own and/or finance a Required Transmission Enhancement pursuant to a \ndesignation in the Regional Transmission Expansion Plan to construct and own and/or finance \nsuch Required Transmission Enhancement, even if such entity is not yet eligible to become a \nparty to the Consolidated Transmission Owners Agreement.  Nothing in the PJM Tariff nor the \nConsolidated Transmission Owners Agreement shall prevent an entity that undertakes to \nconstruct and own and/or finance a Required Transmission Enhancement pursuant to a \ndesignation in the Regional Transmission Expansion Plan to construct and own and/or finance \nsuch Required Transmission Enhancement from recovering the costs of such Required \nTransmission Enhancement through this Schedule 12.\n(v)\nEffective Date.  The assignment of cost responsibility or classification of \nRequired Transmission Enhancements either (1) made by the Transmission Provider prior to \nFebruary 1, 2013, or (2) applicable to Required Transmission Enhancements approved by the \nPJM Board pursuant to Operating Agreement, section 1.6 prior to February 1, 2013 are set forth \nin Tariff, Schedule 12-Appendix.  Except as specifically set forth herein, nothing in this \nSchedule 12 shall change the assignment of cost responsibility or classification of Required \nTransmission Enhancements included in Tariff, Schedule 12-Appendix.  The assignment of cost \nresponsibility or classification of all other Required Transmission Enhancements shall be set \nforth in Tariff, Schedule 12-Appendix A. \n(b)\nDesignation of Customers Subject to Transmission Enhancement Charges.  \n(i)\nRegional Facilities and Necessary Lower Voltage Facilities.  Transmission \nProvider shall assign cost responsibility on a region-wide basis for Required Transmission \nEnhancements included in the Regional Transmission Expansion Plan that (1) (a) are A.C. \nfacilities that operate at or above 500 kV; (b) constitute a single Required Transmission \nEnhancement comprising two A.C. circuits operating at or above 345 kV and below 500 kV, \nwhere both circuits originate from a single substation or switching station at one end and \nPage 89"},{"page":255,"startToken":94943,"endToken":95417,"text":"terminate at a single substation or switching station at the other end, regardless of whether or not \nthe two circuits are routed in the same right-of-way (“Double-circuit 345 kV Required \nTransmission Enhancement”); (c) are A.C. or D.C. shunt reactive resources (such as capacitors, \nstatic var compensators, static synchronous condenser (STATCON), synchronous condensers, \ninductors, other shunt devices, or their equivalent) connected to a Transmission Facility \ndescribed in clause (a) or (b) of this subsection, or (d) are D.C. facilities meeting the criteria set \nforth in subsection (b)(i)(D) (collectively, “Regional Facilities”), or (2) new A.C. Transmission \nFacilities or expansions or enhancements to existing Transmission Facilities that operate below \n500 kV (or 345 kV in the case of a Regional Facility described in clause (1)(b) of this \nsubsection) or new D.C. Transmission Facilities that do not meet the criteria of subsection \n(b)(i)(D) that must be constructed or strengthened to support new Regional Facilities, based on \nthe planning criteria used by the Transmission Provider in developing the applicable Regional \nTransmission Expansion Plan (“Necessary Lower Voltage Facilities”) as follows: \n(A)\nCost responsibility for Regional Facilities and Necessary Lower Voltage \nFacilities shall be allocated among Responsible Customers as defined in this Schedule 12 as \nfollows:\n(1)\nFifty percent (50%) shall be assigned annually on a load-ratio \nshare basis as follows:\n(a)\nWith respect to each Zone, using, consistent with Tariff, \nPart III, section 34.1, the applicable zonal loads at the time of such Zone’s annual peak load from \nthe 12-month period ending October 31 preceding the calendar year for which the annual cost \nresponsibility allocation is determined; and\n(b)\nWith respect to Merchant Transmission Facilities, (1) for \nthe calendar year following the year in which it initiates operation, the actually awarded Firm \nTransmission Withdrawal Rights associated with its existing Merchant Transmission Facility; \nand (2) for all subsequent calendar years, the annual peak load of the Merchant Transmission \nFacility (not to exceed its actual Firm Transmission Withdrawal Rights) from the 12-month \nperiod ending October 31 of the calendar year preceding the calendar year for which the annual \ncost responsibility allocation is determined.\n(2)\nFifty percent (50%) shall be assigned as follows:\n(a)\nIn the case of a Required Transmission Enhancement \nincluded in the Regional Transmission Expansion Plan to address one or more reliability \nviolations or to address operational adequacy and performance issues (collectively, “Reliability \nProject”), in accordance with the distribution factor (“DFAX”) analysis described in subsection \n(b)(iii) or the analysis applicable to Regional Facilities that address stability issues described in \nsubsection (b)(xviii) of this Schedule 12 as applicable; and\n(b)\nIn the case of a Required Transmission Enhancement \nincluded in the Regional Transmission Expansion Plan to relieve one or more economic \nconstraints as described in Operating Agreement, Schedule 6, section 1.5.7(b)(iii) (“Economic \nPage 90"},{"page":256,"startToken":95417,"endToken":95868,"text":"Project”), in accordance with the methodology described in subsection (b)(v) of this Schedule \n12.\n(B)\n(1) Except for transformers that are an integral component of a Regional \nFacility, transformers connected to Lower Voltage Facilities, as defined in section (b)(ii) of this \nSchedule 12, shall not be considered Regional Facilities or Necessary Lower Voltage Facilities; \nand (2) Transmission Facilities that are not Regional Facilities and deliver energy from a \nRegional Facility to load shall not be considered Necessary Lower Voltage Facilities.\n(C)\nWith respect Required Transmission Enhancements that qualify as \nRegional Facilities under subsection (b)(i)(1)(b) or subsection (b)(i)(D)(2) of this Schedule 12:\n(1)\nwhere the Required Transmission Enhancement includes both new \nTransmission Facilities and pre-existing Transmission Facilities, cost responsibility under this \nsection (b)(i) shall apply only to the cost of the new Transmission Facilities plus the original cost \nless accumulated depreciation of pre-existing Transmission Facilities that are included in Tariff, \nSchedule 12-Appendix or Tariff, Schedule 12-Appendix A;\n(2)\ncost responsibility shall be assigned under this section (b)(i) only \nafter the Required Transmission Enhancement goes into service as a Double-circuit 345 kV \nRequired Transmission Enhancement or a Double-circuit D.C. Required Transmission \nEnhancement; and \n(3)\ncost responsibility shall be assigned under this section (b)(i) for \nany CWIP permitted to be recovered before the Required Transmission Enhancement goes into \nservice only after such Transmission Facilities are approved in a Regional Transmission \nExpansion Plan as a Double-circuit 345 kV Required Transmission Enhancement or a Double-\ncircuit D.C. Required Transmission Enhancement.\n(D)\nA Required Transmission Enhancement included in the Regional \nTransmission Expansion Plan that is a D.C. facility, consisting of D.C. lines (i.e., wires or \ncables) and A.C./D.C. converters, shall be a Regional Facility only if: \n(1) \nsuch D.C. facility comprises two poles and operates at a voltage of \n±433 kV D.C. or above; or\n(2)\nsuch D.C. Facility constitutes a single Required Transmission \nEnhancement comprising two D.C. circuits where (i) both circuits originate from a single \nsubstation or switching station at one end and terminate at a single substation or switching \nstation at the other end, regardless of whether or not both circuits are routed in the same right-of-\nway, and (ii) each such circuit consists of two poles and operates at a voltage of ±298 kV D.C or \nabove (“Double-circuit D.C. Required Transmission Enhancement”).\n(ii)\nLower Voltage Facilities.  Transmission Provider shall assign cost responsibility \nfor Required Transmission Enhancements that (a) are not Regional Facilities; and (b) are not \n“Necessary Lower Voltage Facilities” as defined in section(b)(i) of this Schedule 12 (collectively \n“Lower Voltage Facilities”), as follows:\nPage 91"},{"page":257,"startToken":95868,"endToken":96244,"text":"(A)\nIf the Lower Voltage Facility is a Reliability Project,  Transmission \nProvider shall use the DFAX analysis described in subsection (b)(iii) or the analysis applicable to \nRegional Facilities that address stability issues described in subsection (b)(xviii) of this Schedule \n12 as applicable; and\n(B)\nIf the Lower Voltage Facility is an Economic Project, Transmission \nProvider shall use the methodology described in subsection (b)(v) of this Schedule 12.\n(iii)\nDFAX Analysis for Reliability Projects.  \n(A)  For purposes of the assignment of cost responsibility for Reliability Projects \nunder subsection (b)(i)(A)(2)(a) and subsection (b)(ii)(A) of this Schedule 12, the Transmission \nProvider, based on a computer model of the electric network and using power flow modeling \nsoftware, shall calculate distribution factors, represented as decimal values or percentages, which \nexpress the portions of a transfer of energy from a defined source to a defined sink that will flow \nacross a particular transmission facility or group of transmission facilities.  These distribution \nfactors represent a measure of the use by the load of each Zone or Merchant Transmission \nFacility (collectively, “Responsible Zone”) of the Required Transmission Enhancement, as \ndetermined by a power flow analysis.  In general, a distribution factor can be represented as:\nDistribution Factor = (After-shift power flow – pre-shift power flow) / Total amount of power \nshifted\nTotal amount of power shifted = Modeled incremental megawatt transfer to a given Load \nDeliverability Area or Merchant Transmission Facility\nPre-shift power flow = Megawatt flow over the Required Transmission Enhancement  \nbefore the incremental megawatt transfer\nAfter-shift power flow = Megawatt flow over the Required Transmission Enhancement \nafter the incremental megawatt transfer\nWhen calculating such distribution factors:\n(1)\nAll distribution factors are calculated with respect to the Required \nTransmission Enhancement subject to cost allocation under subsection (b)(i)(A)(2)(a) and \nsubsection (b)(ii)(A) of this Schedule 12.\n(2)\nThe calculation of distribution factors shall be determined using \nlinear matrix algebra, such that distribution factors represent the ratio of (i) a change in megawatt \nflow on a Required Transmission Enhancement to (ii) a change in megawatts transferred to \naggregate load within a Zone or, in the case of a Merchant Transmission Facility, the point of \nwithdrawal associated with Firm Transmission Withdrawal Rights over such Merchant \nTransmission Facility.\nPage 92"},{"page":258,"startToken":96244,"endToken":96729,"text":"(3)\nWith respect to a Merchant Transmission Facility, zonal peak load \nshall mean (i) the existing Firm Transmission Withdrawal Rights of the Merchant Transmission \nFacility being evaluated, if the Merchant Transmission Facility is in service, or (ii) for a \nMerchant Transmission Facility that is not yet in service, the planned Firm Transmission \nWithdrawal Rights of the Merchant Transmission Facility being evaluated as identified in the \nInterconnection Service Agreement in effect for such Merchant Transmission Facility. \n(4)\nIn the DFAX analysis, when Transmission Provider models a \ntransfer from generation to all load within an individual Zone, Transmission Provider shall \nmodel the transfer to the Zone as a whole (not on a bus-by-bus basis).  \n(5)\nIn the DFAX analysis, Transmission Provider shall model \ngeneration both external and internal to individual Responsible Zones to reflect (a) the \nboundaries of Locational Deliverability Areas (“LDAs”), and (b) limitations with respect to the \nreliability objective for moving generation capacity across the transmission system.  \nTransmission Provider shall adopt the Capacity Emergency Transfer Objective (“CETO”), \nassociated with that LDA and calculated for the applicable planning year to be the transfer \nlimitation into the LDA.  In modeling the system generation and load, Transmission Provider \nshall assume that the percentage of the zonal load in the LDA served by external (or internal) \ngeneration to the LDA shall equal the ratio of (i) the CETO associated within that LDA (or \ngeneration internal with the LDA) to (ii) the sum of (a) the internal generation within the LDA \nand (b) the CETO associated with that LDA.  For the generation dispatch used in calculating the \ndistribution factor, Transmission Provider shall distribute these amounts of external/internal \ngeneration among all generation in the PJM Region external to/internal within the LDA, \nrespectively, in proportion to their capacity.  For Responsible Zones that are located within \nLDAs that are also entirely contained in other larger LDAs, the modeling approach and \ndistribution factor calculations shall be repeated for such Responsible Zones for each LDA.  The \nlowest distribution factor derived from these calculations shall be applied to the Responsible \nZone in the calculation of the use of the Required Transmission Enhancement.  \n(B) \nThe DFAX analysis will be performed in accordance with the following \nsteps:\n(1)\nTransmission Provider shall calculate a distribution factor and a \ndirection of use for each Responsible Zone by modeling a transfer from all generation in the PJM \nRegion to each Responsible Zone.  To establish the use by a Responsible Zone, in megawatts, of \na Required Transmission Enhancement, the distribution factor of a Required Transmission \nEnhancement associated with the resulting transfer modeled by the Transmission Provider to \neach Responsible Zone shall be multiplied by the Responsible Zone’s peak load.\n(2)\nThe Transmission Provider shall separately determine the relative \nuse of the Required Transmission Enhancement by each Responsible Zone in each direction by \ndividing the megawatts of use by each Responsible Zone determined in section (iii)(B)(1) above \nPage 93"},{"page":259,"startToken":96729,"endToken":97145,"text":"by the total use of all Responsible Zones using the Required Transmission Enhancement in the \nsame direction of use.\n(3) \nTransmission Provider shall determine the direction of use \npercentage of the Required Transmission Enhancement in each direction using a production cost \nanalysis to determine the total use, in megawatt-hours, of the Required Transmission \nEnhancement by all Zones and Merchant Transmission Facilities in each direction over the \ncourse of a year.  The Transmission Provider shall calculate the percentage use in each direction \nby dividing the megawatt-hours of use in each direction by total use in megawatt-hours in both \ndirections of use.\n(4)\nThe Transmission Provider shall multiply the relative use by each \nResponsible Zone of the Required Transmission Enhancement in each direction of use \ndetermined in section (iii)(B)(2) above, by the applicable direction of use percentage determined \nin section (iii)(B)(3) above. \n(5)\nThe products of the calculation performed in section (iii)(B)(4) \nabove, shall determine the relative allocation to each Responsible Zone of cost responsibility for \nthe Required Transmission Enhancement.\n(C)\nIn the DFAX analysis, the Zones of Public Service Electric and Gas \nCompany and Rockland Electric Company will be treated as one Zone unless and until Rockland \nElectric Company elects to be treated as a separate Zone in accordance with the terms of the \nSettlement Agreement And Offer Of Partial Settlement approved by FERC in Docket Nos. \nER06-456-000, et al.\n(D)\nTransmission Provider shall round cost responsibility assignments \ndetermined using the DFAX analysis described in subsection (b)(iii) of this Schedule 12 to the \nnearest one-hundredth of one percent.\n(E)\nTransmission Provider shall not account for the ability to adjust use of \nphase angle regulators (“PARs”) in the DFAX analysis described in subsection (b)(iii) of this \nSchedule 12.  In the DFAX analysis, all PAR angles shall be fixed at their base case settings. \n(F)\nIn the DFAX analysis, if the Required Transmission Enhancement is a \nD.C. facility, the Transmission Provider shall determine cost responsibility assignment as \nfollows:\n(1)\nThe Required Transmission Enhancement shall be replaced in the \nmodel with a comparable proxy A.C. facility, the impedance of which shall be calculated based \non the length of the D.C. facility that was removed from the model multiplied by an approximate \nper unit/mile impedance value for the proxy A.C. facility.\n(2)\nWhere a D.C. facility is an integral part of a Required \nTransmission Enhancement that also includes A.C. facilities, the methodology described in \nPage 94"},{"page":260,"startToken":97145,"endToken":97627,"text":"subsection (b)(iii)(F)(1) above shall be used only for the D.C. facility segment of such Required \nTransmission Enhancement.\n(3)\nA D.C. facility used to control flow over portions of the \nTransmission System shall be modeled with a zero impedance and no control shall be applied.\n(G)\nIf Transmission Provider determines in its reasonable engineering judgment \nthat, as a result of applying the provisions in section (b)(iii) of this Schedule 12, the DFAX \nanalysis cannot be performed or that the results of such DFAX analysis are objectively \nunreasonable, the Transmission Provider may use an appropriate substitute proxy for the \nRequired Transmission Enhancement in conducting the DFAX analysis.  If a proxy is used that is \nnot specified in this Schedule 12, Transmission Provider shall state in a written report (a) the \nreasons why it determined the DFAX analysis could not be performed or that the results of the \nDFAX analysis were objectively unreasonable; (b) why the substitute proxy produced \nobjectively reasonable results; and (3) a recommendation as to what changes, if any, should be \nconsidered in conducting the DFAX analysis.\n(H)\nThe Transmission Provider shall make a preliminary cost responsibility \ndetermination for each Required Transmission Enhancement subject to section (b)(iii) of this \nSchedule 12 at the time such Required Transmission Enhancement is included in the Regional \nTransmission Expansion Plan.  \n(1) \nWhen CWIP in connection with a Required Transmission \nEnhancement subject to this section (b)(iii) of this Schedule 12 is entitled to be recovered, the \npreliminary determination of cost responsibility made at the time that the Required Transmission \nEnhancement was included in the Regional Transmission Expansion Plan shall be used to assign \ncost responsibility for such CWIP and such cost responsibility shall remain unchanged until the \ndate the Required Transmission Enhancement goes into service.  Once a Required Transmission \nEnhancement has gone into service, the updated cost responsibility determination provided for in \nsubsection (b)(iii)(H)(2) below shall apply.\n(2)\nBeginning with the calendar year in which a Required \nTransmission Enhancement is scheduled to enter service, and thereafter annually at the \nbeginning of each calendar year, the Transmission Provider shall update the preliminary cost \nresponsibility determination for each Required Transmission Enhancement using the values and \ninputs used in the base case of the most recent Regional Transmission Expansion Plan approved \nby the PJM Board prior to the date of the update.  All values and inputs used in the calculation of \nthe distribution factor in a determination of cost responsibility shall be the same values and \ninputs as used in the base case of the most recent Regional Transmission Expansion Plan \napproved by the PJM Board prior to the determination of cost responsibility.  \n(iv)\nSpare Parts, Replacement Equipment And Circuit Breakers.  Transmission \nProvider shall assign cost responsibility for spare parts, replacement equipment, and circuit \nbreakers and associated equipment, included in the Regional Transmission Expansion Plan as \nfollows:\nPage 95"},{"page":261,"startToken":97627,"endToken":98178,"text":"(A)\nSpare parts that are part of the design specifications of a Required \nTransmission Enhancement at the time such Required Transmission Enhancement is first \nincluded in the Regional Transmission Expansion Plan shall be considered part of the Required \nTransmission Enhancement for the purpose of applying the cost threshold described in \nsubsection (b)(vi) of this Schedule 12 and cost responsibility for such spare parts shall be \nassigned in the same manner as the Required Transmission Enhancement.  Cost responsibility for \nspare parts independently included the Regional Transmission Expansion Plan and not a part of \nthe design specifications of a Required Transmission Enhancement as described above in this \nsubsection shall be assigned to the Zone of the owner of the spare part, if the owner of the spare \npart is a Transmission Owner listed in Tariff, Attachment J.  If the owner of the spare part is not \na Transmission Owner listed in Tariff, Attachment J, cost responsibility shall be assigned on a \npro rata basis to the zones that bear cost responsibility for the owner’s Required Transmission \nEnhancements.\n(B)\nReplacement equipment that is part of the design specifications of a \nRequired Transmission Enhancement at the time the Required Transmission Enhancement is first \nincluded in the Regional Transmission Expansion Plan shall be considered part of the Required \nTransmission Enhancement for the purpose of applying the cost threshold described in section \n(b)(vi) of this Schedule 12 and cost responsibility for such replacement equipment shall be \nassigned in the same manner as the Required Transmission Enhancement. Cost responsibility for \nRequired Transmission Enhancement replacement equipment independently included in the \nRegional Transmission Expansion Plan and not a part of the design specifications of a Required \nTransmission Enhancement as described above in this subsection, shall be assigned to the same \nZones and/or Merchant Transmission Facilities and in the same proportions as the then-existing \nassignments of cost responsibility for the facilities that the replacement equipment is replacing.\n(C)\nCircuit breakers and associated equipment that are part of the design \nspecifications of a Required Transmission Enhancement at the time the Required Transmission \nEnhancement is first included in the Regional Transmission Expansion Plan shall be considered \npart of the Required Transmission Enhancement for the purpose of applying the cost threshold \ndescribed in subsection (b)(vi) of this Schedule 12 and cost responsibility for such circuit \nbreakers and associated equipment shall be assigned in the same manner as the Required \nTransmission Enhancement.  Cost responsibility for circuit breakers and associated equipment \nindependently included in the Regional Transmission Expansion Plan and not a part of the design \nspecifications of a transmission element of a  Required Transmission Enhancement as described \nabove in this subsection, shall be assigned to the Zone of the owner of the circuit breaker and \nassociated equipment if the owner of the circuit breaker is a Transmission Owner listed in Tariff, \nAttachment J.  If the owner of the circuit breaker is not a Transmission Owner listed in Tariff, \nAttachment J, cost responsibility shall be assigned on a pro rata basis to the zones that bear cost \nresponsibility for the owner’s Required Transmission Enhancements. \n(v)\nEconomic Projects.  Transmission Provider shall assign (i) fifty percent (50%) of \ncost responsibility for Economic Projects that are Regional Facilities; and (ii) full cost \nresponsibility for Economic Projects that are Lower Voltage Facilities; as follows:\nPage 96"},{"page":262,"startToken":98178,"endToken":98748,"text":"(A)\nTransmission Provider shall assign cost responsibility for Economic \nProjects that are accelerations of Reliability Projects as described in Operating Agreement, \nSchedule 6, section 1.5.7(b)(i) (“Acceleration Projects”) by performing and comparing (1) a \nDFAX analysis consistent with the methodology described in subsection (b)(iii) of this Schedule \n12, and (2) a methodology that is intended to act as a proxy for expected economic benefits from \nreduced Locational Marginal Prices (“LMP Benefit”) over the period that the reliability-based \nenhancement or expansion is to be accelerated (“LMP Benefits Methodology”).  The LMP \nBenefits Methodology shall determine cost responsibility assignment percentages to Zones and \nMerchant Transmission Facilities in the following manner.  The LMP Benefit to a Zone shall be \ndeemed to be equal to the reduction in Locational Marginal Price payments made by Load \nServing Entities as a result of the Acceleration Project assuming the customers purchase all \nenergy needs from the PJM Interchange Energy Market, and LMP Benefits so calculated shall be \nconverted into percentage cost responsibility assignments for the affected Zones.  The LMP \nBenefits Methodology shall not incorporate the financial effects of allocations of Auction \nRevenue Rights or Financial Transmission Rights.  The LMP Benefit to a Merchant \nTransmission Facility shall be deemed to be equal to the proportionate share of assigned cost \nresponsibility using the DFAX analysis and the assignments of cost responsibility to other Zones \nin the LMP Benefits Methodology shall be proportionately adjusted, as necessary, to reflect this \ntreatment of Merchant Transmission Facilities to ensure that the total allocation for any \neconomic-based Required Transmission Enhancement equals one hundred percent.  If, after \nperforming both analyses and comparing the percentage cost responsibility assignments for the \naffected Zones calculated pursuant to the DFAX analysis and the LMP Benefits Methodology, \nthe results do not indicate at least a ten percentage point cost responsibility assignment \ndifferential between the two methods for any Zone, cost responsibility for the Acceleration \nProject shall be assigned using the DFAX analysis.  If, after performing both analyses and \ncomparing the percentage cost responsibility assignments for the affected Zones calculated \npursuant to the DFAX analysis and LMP Benefits Methodology, the results indicate at least a ten \npercentage point cost responsibility assignment differential between the DFAX analysis and the \nLMP Benefits Methodology for any Zone, cost responsibility for the Acceleration Project for the \nperiod of time the Reliability Project is accelerated (i.e. the period between the date the \nReliability Project actually goes into service and the date the Reliability Project originally was \nscheduled to go in service in the PJM Board approved Regional Transmission Expansion Plan) \nshall be assigned using the LMP Benefits Methodology.  For all periods other than the period of \ntime the Reliability Project is accelerated, cost responsibility for such an Acceleration Project \nshall be assigned in accordance with the provisions of this Schedule 12 governing the assignment \nof cost responsibility of Regional Facility Reliability Projects or Lower Voltage Facility \nReliability Projects, as applicable.  \n(B)\nTransmission Provider shall assign cost responsibility for Economic \nProjects that are modifications to Reliability Projects as described in Operating Agreement, \nSchedule 6, section 1.5.7(b)(ii) in accordance with the provisions of this Schedule 12 governing \nthe assignment of cost responsibility of Regional Facility Reliability Projects or Lower Voltage \nFacility Reliability Projects, as applicable.\n(C)\nTransmission Provider shall assign cost responsibility for Economic \nProjects that are new enhancements or expansions that could relieve one or more economic \nPage 97"},{"page":263,"startToken":98748,"endToken":99338,"text":"constraints as described in Operating Agreement, Schedule 6, section 1.5.7(b)(iii) to the Zones \nthat show a decrease in the net present value of the Changes in Load Energy Payment.  The \nChange in Load Energy Payment for each year shall be determined using the methodology set \nforth in Operating Agreement, Schedule 6, section 1.5.7(d) for the period specified in that \nsection.  Cost responsibility shall be assigned based on each Zone’s pro rata share of the sum of \nthe net present values of the Changes in Load Energy Payment only of the Zones in which the \nnet present value of the Changes in Load Energy Payment shows a decrease.\n(vi)\nRequired Transmission Enhancements Costing Less Than $5 Million.  \nNotwithstanding sections (b)(i), (b)(ii), (b)(iv) and (b)(v) of this Schedule 12, cost responsibility \nfor a Required Transmission Enhancement for which the good faith estimate of the cost of the \nRequired Transmission Enhancement (a) prepared in connection with the development of the \nRegional Transmission Expansion Plan and (b) provided to the PJM Board at the time the \nRequired Transmission Enhancement is included for the first time in the Regional Transmission \nExpansion Plan, does not equal or exceed $5 million shall be assigned to the Zone where the \nRequired Transmission Enhancement is to be located.  The determination of whether the \nestimated cost of a Required Transmission Enhancement does not equal or exceed $5 million \nshall be based solely on such good faith estimate of the cost of the Required Transmission \nEnhancement regardless of the actual costs incurred.  The estimated cost of a Required \nTransmission Enhancement shall include the aggregate estimated costs of all of the transmission \nelements approved by the PJM Board at the time such elements are included in the Regional \nTransmission Expansion Plan that collectively are intended (i) in the case of a Reliability Project, \nto resolve a specific reliability criteria violation, or (ii) in the case of an Economic Project, \nprovide a specific LMP Benefit.  Where a Required Transmission Enhancement subject to this \nsection (b)(vi) consists of a single transmission element or multiple transmission elements that \nwill be located in more than one Zone, each Zone shall be assigned cost responsibility for the \ntransmission elements or portions of the transmission elements located in such Zone.  Merchant \nTransmission Facilities shall not be assigned cost responsibility for a Required Transmission \nEnhancement subject to this section (b)(vi).\n(vii)\nModifications of Required Transmission Enhancements.  Once a Required \nTransmission Enhancement is included in the Regional Transmission Expansion Plan, any \nmodification to such Required Transmission Enhancement that subsequently is included in the \nRegional Transmission Expansion Plan as a separate Reliability or Economic Project shall be \nconsidered a separate and distinct Required Transmission Enhancement for purposes of cost \nresponsibility assignment under this Schedule 12.  Except as provided in sections (b)(iv) and \n(b)(xiv) of this Schedule 12, any cost responsibility assignment that has been made for a \npreviously approved Required Transmission Enhancement shall have no impact on the cost \nresponsibility assignment of such modification.\n(viii)\nFERC Filing.  Within 30 days of the approval of each Regional Transmission \nExpansion Plan or an addition to such plan by the PJM Board pursuant to Operating Agreement, \nSchedule 6, section 1.6, the Transmission Provider shall designate in the Tariff, Schedule 12-\nAppendix A and in a report filed with the FERC the customers using Point-to-Point \nTransmission Service and/or Network Integration Transmission Service and Merchant \nTransmission Facility owners that will be subject to each such Transmission Enhancement \nPage 98"},{"page":264,"startToken":99338,"endToken":99821,"text":"Charge (“Responsible Customers”) based on the cost responsibility assignments determined \npursuant to this Schedule 12.  Those customers designated by the Transmission Provider as \nResponsible Customers shall have 30 days from the date the filing is made with the FERC to \nseek review of such designation. Such cost responsibility designations shall be the same as those \nmade for the relevant Regional Facility, Necessary Lower Voltage Facility, or Lower Voltage \nFacility in the Regional Transmission Expansion Plan.\n(ix)\nRegions With Which PJM Has Entered Into an Agreement Listed in \nSchedule 12-Appendix B .  For purposes of this Schedule 12, where costs of a Required \nTransmission Enhancement are allocated to a region other than PJM pursuant to an agreement set \nforth in Tariff, Schedule 12-Appendix B, Responsible Customers for such costs shall be \ncustomers in such region. Cost responsibility with respect to the costs of a Required \nTransmission Enhancements  allocated to a region other than PJM shall be allocated within such \nregion in accordance with the applicable tariff or agreement governing the allocation of such \ncosts in such region.\n(x)\nMerchant Transmission Facilities.\n(A)\nFor purposes of this Schedule 12, where the Transmission Provider has \nallocated all or a portion of a Required Transmission Enhancement to a Merchant Transmission \nFacility, the owner of the Merchant Transmission Facility shall be the Responsible Customer \nwith respect to such Required Transmission Enhancement, and shall pay the Transmission \nEnhancement Charges associated with the Required Transmission Enhancement.\n(B)\n(1)\nTransmission Provider shall defer collection of Transmission \nEnhancement Charges from a Merchant Transmission Facility until the Merchant Transmission \nFacility goes into commercial operation; provided, however, in the event the commercial \noperation of a Merchant Transmission Facility is delayed beyond the commercial operation \nmilestone date(s) specified in the Interconnection Service Agreement associated with the \nMerchant Transmission Facility and the Transmission Provider or Transmission Owner \nconstructing the Required Transmission Enhancement demonstrates that the Merchant \nTransmission Facility is responsible for such delay, Transmission Provider may begin collecting \nTransmission Enhancement Charges from the Merchant Transmission Facility prior to the \nMerchant Transmission Facility going into commercial operation.  Transmission Enhancement \nCharges allocated to a Merchant Transmission Facility for which collection is deferred in \naccordance with this section (b)(x)(B)(1) shall be recorded in appropriate Transmission Provider \naccounts for deferred charges and collected in accordance with section (b)(x)(B)(3) below.  \n(2)\nTransmission Provider shall base the collection of Transmission \nEnhancement Charges associated with Required Transmission Enhancements from a Merchant \nTransmission Facility on the actual Firm Transmission Withdrawal Rights that have been \nawarded to the Merchant Transmission Facility; provided, however, to the extent that a Merchant \nTransmission Facility has been awarded less than the amount of Firm Transmission Withdrawal \nRights specified in the Interconnection Service Agreement associated with the Merchant\nTransmission Facility, then Transmission Provider shall record the difference between the \namount of Transmission Enhancement Charges collected based on the lesser amount of Firm \nPage 99"},{"page":265,"startToken":99821,"endToken":100315,"text":"Transmission Withdrawal Rights and the amount of Transmission Enhancement Charges based \non the full amount of Firm Transmission Withdrawal Rights specified in the applicable \nInterconnection Service Agreement in appropriate accounts for deferred charges and, after the \nMerchant Transmission Facility has been awarded the full amount of Firm Transmission \nWithdrawal Rights specified in the Interconnection Service Agreement, collect such deferred \namounts in accordance with section (b)(x)(B)(3) below.  Notwithstanding the foregoing, \nTransmission Provider may collect Transmission Enhancement Charges based on more than a \nMerchant Transmission Facility’s actually awarded Firm Transmission Withdrawal Rights (not \nto exceed the Firm Transmission Withdrawal Rights specified in the applicable Interconnection \nService Agreement) if the Transmission Provider or Transmission Owner demonstrates that the \nMerchant Transmission Facility is responsible for receiving fewer Firm Transmission \nWithdrawal Rights than are specified in the applicable Interconnection Service Agreement.\n(3)\nTransmission Provider shall record: (i) in an appropriate deferred \nasset account, the Transmission Enhancement Charges associated with Required Transmission \nEnhancements for which collection is deferred in accordance with sections (b)(x)(B)(1) and \n(b)(x)(B)(2) above; and (ii) in an appropriate deferred liability account, the revenues associated \nwith the Transmission Enhancement Charges that, absent the deferred charges, would have been \ndue to Transmission Owners or to Transmission Owners’ customers as directed by the applicable \nTransmission Owner. At such time as collection of such deferred Transmission Enhancement \nCharges are permitted in accordance with sections (b)(x)(B)(1) and (b)(x)(B)(2) above, the \ndeferred charges (along with appropriate interest) shall be collected from the Merchant \nTransmission Facility in equal installments over the twelve months following the \ncommencement of the collection of the deferred charges. Such amounts shall be distributed to \nTransmission Owners or to Transmission Owners’ customers as directed by the applicable \nTransmission Owner, and the Transmission Provider shall make appropriate adjustments to the \ndeferred asset and liability accounts.  Transmission Provider shall not be responsible for \ndistributing revenues associated with deferred Transmission Enhancement Charges unless and \nuntil such charges are collected in accordance with this section (b)(x)(B), and uncollected \ndeferred Transmission Enhancement Charges shall not be subject to Default Allocation \nAssessments to the Members pursuant to Operating Agreement, section 15.2.\n(xi)\nConsolidated Edison Company of New York.\n(A) Cost responsibility \nassignments to Consolidated Edison Company of New York for Required Transmission \nEnhancements pursuant to this Schedule 12 with respect to the Firm Point-To-Point Service \nAgreements designated as Original Service Agreement No. 1873 and Original Service \nAgreement No. 1874 accepted by the Commission in Docket No. ER08-858 (“ConEd Service \nAgreements”) shall be in accordance with the terms and conditions of the settlement approved by \nthe FERC in Docket No. ER08-858-000.  (B) All cost responsibility assignments for Required \nTransmission Enhancements pursuant to this Schedule 12 shall be adjusted at the commencement \nand termination of service under the ConEd Service Agreements to take account of the \nassignments under subsection (xi)(A) of this section.  \n(xii)\nPublic Policy Projects.  \nPage 100"},{"page":266,"startToken":100315,"endToken":100780,"text":"(A)\nTransmission Facilities as defined in  Consolidated Transmission Owners \nAgreement, section 1.27 constructed by a Transmission Owner pursuant to a Public Policy \nRequirement but not included in a Regional Transmission Expansion Plan as a Required \nTransmission Enhancement, shall be as considered a Supplemental Project. \n(B)\nIf a transmission enhancement or expansion is proposed pursuant to \nOperating Agreement, Schedule 6, section 1.5.9(a) which is not a Supplemental Project (“State \nAgreement Public Policy Project”),  the Transmission Provider shall submit the assignment of \ncosts to Responsible Customers proposed in connection with such State Agreement Public Policy \nProject to the Transmission Owners Agreement Administrative Committee for consideration and \nfiling pursuant to Consolidated Transmission Owners Agreement, section 7.3 and Tariff, Part I, \nsection 9.1(a).  Nothing in this section (b)(xii) shall prevent the Transmission Provider or the \nstate governmental entities proposing such State Agreement Public Policy Project from filing a \nproposed assignment of costs to Responsible Customers for such project pursuant to Section 206 \nof the Federal Power Act.\n(xiii)\nReplacement of Transmission Facilities.  Unless determined by PJM to be a \nRequired Transmission Enhancement included in a Regional Transmission Expansion Plan, cost \nresponsibility for the replacement of Transmission Facilities, as defined in Consolidated \nTransmission Owners Agreement, section 1.27, shall be assigned to the Zonal loads and Merchant \nTransmission Facilities responsible for the costs of the Transmission Facilities being replaced.\n(xiv)    Multi-Driver Projects.  \n(A)\nAssignment of Proportional Multi-Driver Project Costs.  The Transmission \nProvider shall assign cost responsibility for Proportional Multi-Driver Projects in proportion \nto the relative percentage benefit that each driver of a Proportional Multi-Driver Project \naddresses, respectively, reliability violations or operational performance (“reliability”), \neconomic constraints (“economic”) and/or Public Policy Requirements (“public policy”) as \nfollows: \n(1)\nAs part of the open planning process provided for in Operating \nAgreement, Schedule 6, section 1.5.10(h), the Transmission Provider employs the \nProportional Method to develop a Proportional Multi-Driver Project, by determining \nwhich of the following drivers a Proportional Multi-Driver Project addresses: \nreliability, economic, or public policy, and the extent to which each such driver \ncontributes to the size, scope, and estimated costs of such Proportional Multi-Driver \nProject (irrespective of the reliability cost allocation treatment that is otherwise \naccorded an incremental market efficiency modification thereto pursuant to section \n(b)(v)(B) of this Schedule 12).  The Transmission Provider shall identify the \ncontribution of each driver in terms of a percentage totaling 100 percent for all such \ndrivers at the time that each Proportional Multi-Driver Project is submitted to the PJM \nBoard for approval and included in the Regional Transmission Expansion Plan. The \npercentage contribution of each driver shall be based on the ratio of the estimated cost \nof each project that the Multi-Driver Project replaces to the total of the estimated costs \nPage 101"},{"page":267,"startToken":100780,"endToken":101301,"text":"of all projects combined into the Multi-Driver Project. \n(2)\nOnce a Proportional Multi-Driver Project is approved by the PJM Board, \nthe percentage contributions of each driver shall not be changed unless the PJM Board \nsubsequently approves an upgrade or modification to the Proportional Multi-Driver \nProject.  In that event, the cost responsibility for the Proportional Multi-Driver Project, \nincluding any costs incurred prior to the upgrade or modification, will be determined as \nif it were a new Proportional Multi-Driver Project, such that the percentage \ncontribution for each driver shall be established anew.  \n(B)\nAssignment of Incremental Multi-Driver Project Costs.  The Transmission \nProvider shall assign cost responsibility for  Incremental Multi-Driver Projects as defined in \nOperating Agreement, Schedule 6, section 1.15B using the same methodology described in \nsection (b)(xiv)(A)(1) above treating the estimated cost of modifying the original project as if \nit were the estimated cost of a separate project included in a Proportional Multi-Driver \nProject.  Any costs that had been expended on the original project prior its designation by \nTransmission Provider as an Incremental Multi-Driver Project shall be included in the \ncalculation of the Incremental Multi-Driver Project pursuant to this section (b)(xiv)(B).  \n(C)\nThe Transmission Provider shall separately assign cost responsibility for the \ncosts assigned to each driver pursuant to this section (b)(xiv) in accordance with the provisions \nof this Schedule 12 governing the assignment of cost responsibility for a single driver project \nof each driver’s respective type (reliability, economic or public policy).  Except as provided in \nsection (b)(xiv)(D) below, cost responsibility will be assigned based on the final voltage and \nconfiguration of the Multi-Driver Project determined in accordance with sections (b)(i), (b)(ii), \nor (b)(vi) of this Schedule 12. \n(D)     Notwithstanding the cost assignments that would otherwise be provided for in \nsection (b)(xiv)(C) above, if a Multi-Driver Project includes a public policy driver that is the \nresult of the State Agreement Approach provided for in Operating Agreement, Schedule 6, \nsection 1.5.9 and is a Regional Facility as defined in section (b)(i) of this Schedule 12 and such \nMulti-Driver Project would not be a Regional Facility but for the inclusion of the public policy \ndriver, then the percentage of costs of such Multi-Driver Project assigned to the non-public \npolicy drivers in accordance with the procedures set forth in in section (b)(i)(A)(1) above shall \nbe twenty percent (20%) and the percentage of costs assigned to the non-public policy drivers \nof such Multi-Driver Project in accordance section (b)(i)(A)(2) above shall be eighty percent \n(80%), and not the fifty percent (50%) cost responsibility percentages provided for in section \n(b)(i)(A)(i) and section (b)(i)(A)(2), respectively, of this Schedule 12. \n(xv) Reserved.\n(xvi)\nRequired Transmission Enhancements Designed to Address Reliability \nViolations on Transmission Facilities Operating Below 200 kV. Notwithstanding section \n(b)(ii), above, cost responsibility for any Required Transmission Enhancements that are included \nin the Regional Transmission Expansion Plan to address reliability violations on Transmission \nFacilities that are designed to operate at below 200 kV and, pursuant to Operating Agreement, \nPage 102"},{"page":268,"startToken":101301,"endToken":101901,"text":"Schedule 6, section 1.5.8(n), were not included in an Operating Agreement, Schedule 6, section \n1.5.8(c) proposal window, shall be assigned to the Responsible Customers in the Zone where the \nRequired Transmission Enhancement is to be located.\n(xvii) Required Transmission Enhancements Constructed As Targeted Market \nEfficiency Projects Under The Midcontinent Independent Transmission System Operator, \nInc. and PJM Interconnection, L.L.C. Coordinated System Plan.   Notwithstanding sections \n(b)(i), (b)(ii), (b)(iv), (b)(v), (b)(vi) and (b)(x)(B)(2) of this Schedule 12, cost responsibility for \nthe costs of a Required Transmission Enhancement that is included in the Regional Transmission \nExpansion Plan because it is a Targeted Market Efficiency Project (“TMEP”) identified in the \nCoordinated System Plan periodically developed pursuant to the Joint Operating Agreement \nBetween the Midcontinent Independent Transmission System Operator, Inc. and PJM \nInterconnection, L.L.C. (“PJM-MISO JOA”) and assigned to PJM pursuant to PJM-MISO JOA, \nsection 9.4.4.2.5, shall be assigned among Zones and Merchant Transmission Facilities in \naccordance with this section (b)(xvii).  Using the Targeted Market Efficiency Project study \nconducted pursuant to PJM-MISO JOA, section 9.3.7.2(c) of in which the TMEP was identified, \nthe Transmission Provider shall determine, in accordance with Tariff, Attachment K-Appendix, \nsection 5.1, the average annual Transmission Congestion Charges experienced by Market Buyers \nin Zones and at Merchant Transmission Facilities attributable to the targeted Reciprocal \nCoordinated Flowgate during the two historical calendar years prior to the study year of the \nTargeted Market Efficiency Project study.  In making this determination, the Transmission \nProvider shall net any increases in Day-ahead and Real-time Prices paid by Market Buyers in a \nZone or at a Merchant Transmission Facility against any decreases in Day-ahead and Real-time \nPrices paid by Market Buyers in such Zone or at such Merchant Transmission Facility \nattributable to the targeted Reciprocal Coordinated Flowgate.  Where a single TMEP is \nconstructed to reduce Transmission Congestion Charges attributable to more than one targeted \nReciprocal Coordinated Flowgate, the Transmission Provider shall net any increases in Day-\nahead and Real-time Prices paid by Market Buyers in a Zone or at a Merchant Transmission \nFacility against any decreases in Day-ahead and Real-time Prices paid by Market Buyers in such \nZone or at such Merchant Transmission Facility attributable to all targeted Reciprocal \nCoordinated Flowgates.  Cost responsibility shall be assigned based on each Zone’s and \nMerchant Transmission Facility’s pro rata share of the sum of the net Transmission Congestion \nCharges paid by Market Buyers only of the Zones and Merchant Transmission Facilities in \nwhich Market Buyers experienced net Transmission Congestion Charges.\n(xviii) Required Transmission Enhancements Designed to Address Stability Issues.\nFor purposes of the assignment of cost responsibility for Reliability Projects designed to address \nstability issues under subsection (b)(i)(A)(2)(a) and subsection (b)(ii)(A) of this Schedule 12, the \nTransmission Provider shall, using the same inputs and assumptions from the simulation that \noriginally drove the need for the stability upgrade, perform a stability simulation that includes \nthe stability upgrade under the worst fault condition. The worst fault condition shall be the fault \ncondition in the simulation that produces the maximum rotor angle swing with the stability \nupgrade included.  For each load bus on the system, the difference between the highest and \nlowest voltage angle that occurs during the simulation of the worst fault condition will be \nrecorded. Load buses having a voltage angle deviation less than 25 percent of the load bus with \nthe largest voltage angle deviation will not be included in the cost allocation calculation. For the \nPage 103"},{"page":269,"startToken":101901,"endToken":102335,"text":"remaining load buses, the voltage angle deviation will be multiplied by the megawatt load at the \nbus obtained from the stability simulation model, or, in the case of a Merchant Transmission \nFacility, the Firm Transmission Withdrawal Rights at the bus. The products of the voltage angle \ndeviation and megawatt load at each bus will be summed for each Responsible Zone. The \nStability Deviation cost allocation for a Responsible Zone or Merchant Transmission Facility \nwill be determined by dividing the sum of the load-weighted angle deviations for the \nResponsible Zone or Merchant Transmission Facility by the sum of the load-weighted angle \ndeviations for each Responsible Zone and Merchant Transmission Facility. Transmission \nProvider shall round cost responsibility assignments to the nearest one-hundredth of one percent.\n(c)\nDetermination of Transmission Enhancement Charges. In the event that any \nTransmission Owner recovers the cost of a Required Transmission Enhancement through a \nTransmission Enhancement Charge, such charge shall be determined as follows:\n(1)\nTransmission Provider shall identify in writing and post on the PJM Internet site \nthe Required Transmission Enhancement(s) to which each Transmission Enhancement \nCharge corresponds. The Transmission Enhancement Charge with respect to a Required \nTransmission Enhancement shall recover the applicable Transmission Owner’s annual \ntransmission revenue requirement associated with the Required Transmission \nEnhancement.\n(2)  \nEach Transmission Enhancement Charge shall be a monthly charge based on all \ncosts and applicable incentives associated with a particular Required Transmission \nEnhancement for which the Transmission Owner is responsible. \n(3) \nA Transmission Owner’s annual transmission revenue requirement associated \nwith a Required Transmission Enhancement shall be determined pursuant to either (i) a \nunilateral filing by the Transmission Owner under Section 205 of the Federal Power Act \nand the FERC’s rules and regulations thereunder; or (ii) a formula rate in effect \napplicable to the Transmission Owner’s rates for Network Integration Transmission \nService, including the costs associated with Required Transmission Enhancements. \n(4) \nEach Transmission Enhancement Charge applicable to Network Customers and \nNon-Zone Network Customers shall be recalculated annually to reflect the annual \nrevisions to the billing determinants used by the Transmission Provider to calculate \ncharges to Network Customers for Network Integration Transmission Service under \nTariff, Part III, section 34.1.  The Transmission Provider shall post on its Internet site by \nOctober 31 of each calendar year each recalculated Transmission Enhancement Charge \nthat shall be effective during the subsequent calendar year.\n(5) \nEach Transmission Enhancement Charge applicable to customers using Point-To-\nPoint Transmission Service shall be calculated monthly to reflect the billing determinants \nused by the Transmission Provider to determine charges for customers of Point-To-Point \nTransmission Service in accordance with Tariff, Part II, section 25. \nPage 104"},{"page":270,"startToken":102335,"endToken":102747,"text":"(6)\nEach Transmission Enhancement Charge payable by an owner of a Merchant \nTransmission Facility pursuant to section (b) of this Schedule 12 shall be calculated as a \nfixed monthly charge. \n(7)\nIf a Transmission Owner chooses to recover the cost of Required Transmission \nEnhancements through the operation of a formula rate as described in section (a) of this \nSchedule 12, the Transmission Owner must make an informational filing with the \nCommission one year from the date the selecting Transmission Owner’s formula rates go \ninto effect, and each year thereafter, providing a detailed list of the costs the \nTransmission Owner has incurred, and the revenues the Transmission Owner has \nreceived to provide service.\n(d)\nRecovery of Transmission Enhancement Charges.  \n(1)\nResponsible Customers shall pay Transmission Provider all applicable \nTransmission Enhancement Charges as required by this Schedule 12 in addition to \nall other charges for transmission service for which such Responsible Customers \nare responsible under the Tariff.\n(2)\nTransmission Provider shall collect all applicable Transmission Enhancement \nCharges from each Responsible Customer on a monthly basis.  Transmission \nProvider shall remit or credit all revenues received from Responsible Customers \nunder this Schedule 12 to the Transmission Owner(s) that established such charge \nor to the appropriate authority in a region other than PJM in the case of \nTransmission Enhancement Charges established in such region in connection with \na Required Transmission Enhancement constructed pursuant to an Appendix B \nAgreement, to be distributed in accordance with the applicable tariff or agreement \ngoverning the distribution of such charges in such region.\n(e)\nCrediting of Revenue from Transmission Enhancement Charges.  In recognition that \na Transmission Owner’s charges for Network Integration Transmission Service set forth in \nTariff, Attachment H are established based upon the Transmission Owner’s total cost of \nproviding FERC-jurisdictional transmission service, including the costs associated with Required \nTransmission Enhancements, revenue from a Transmission Owner’s Transmission Enhancement \nCharges for a billing month shall be credited pursuant to this Schedule 12 to the Network \nCustomers in the Transmission Owner’s Zone (including, where applicable, the Transmission \nOwner) and Transmission Customers purchasing Firm Point-to-Point Transmission Service for \ndelivery in the Transmission Owner’s Zone in proportion to their Demand Charges (including \nany imputed Demand Charges for bundled service to Native Load Customers) for Network \nIntegration Transmission Service and Reserved Capacity for Firm Point-to-Point Transmission \nService; provided that such credits shall be reduced by the amount of any applicable incentives \nincluded in such Transmission Enhancement Charges.  \n(f)\nRecovery of Interconnection Reliability Reinforcement Costs.  \nPage 105"},{"page":271,"startToken":102747,"endToken":103099,"text":"(1)\nCustomers Subject to Cost Responsibility for Interconnection Reliability \nReinforcements. For each Fast Energization Process Cycle, the Transmission \nProvider shall determine cost responsibility for Interconnection Reliability \nReinforcements identified and designated for construction pursuant to this section \n(f) of this Schedule 12.  Cost responsibility for Interconnection Reliability \nReinforcements in a Fast Energization Cycle shall be assigned to Responsible \nCustomers in Zones containing Transmission Customers taking Firm \nTransmission Service on behalf of Eligible Loads and Large Loads (“Large Load \nZones”).  Generator Interconnection Customers in a given Cycle that are parties to \na Generator Interconnection Agreement will pay a Generator Reliability \nReinforcement Fee established in section (f)(vi) below.    \n(2)\nDetermination of Cost Responsibility and Generator Allocation for \nInterconnection Reliability Reinforcements.  The Transmission Provider shall \ndetermine cost responsibility for Interconnection Reliability Reinforcements and \nthe Generator Reliability Reinforcement Fee based on a proportional impact \napproach that considers all of the constraints identified in the Fast Energization \nProcess Cycle.  \nThis proportional impact methodology will apply to thermal and non-thermal \nconstraints, and will determine the pro rata share of impacts of Project \nDevelopers, Eligible Loads and Large Loads on the aggregate of constraints being \nalleviated by the portfolio of Interconnection Reliability Reinforcements as \nfurther described below and in the PJM Manuals.\nThe Transmission Provider shall determine each Project Developer, Eligible Load \nand Large Load’s proportional impact as follows:\n(A)\nWith respect to the portfolio of Interconnection Reliability Reinforcements \naddressing thermal, stability and voltage constraints:\n(1)\nThe Transmission Provider shall apply aggregation and thresholds \nas set forth in the PJM Manuals to identify the set of constrained \nfacilities identified as having violations requiring mitigation \nthrough Interconnection Reliability Reinforcements in the Fast \nEnergization Process Cycle studies, resulting in distribution \nfactors, represented as decimal values or percentages, which \nexpress the portions of impact on constrained facilities from each \nProject Developer, Eligible Customer seeking Long-Term Firm \nPoint-to-Point Transmission Service, Eligible Load, or Large Load.  \n(2)\nFor purposes of determining MW impacts, each calculated \ndistribution factor, if it exceeds the threshold set forth in the PJM \nManuals, shall first be multiplied, for each Project Developer, \nEligible Customer seeking Long-Term Firm Point-to-Point \nPage 106"},{"page":272,"startToken":103099,"endToken":103433,"text":"Transmission Service, Eligible Load or Large Load, by its \nrequested MW value as studied in the Fast Energization Process.  \n(3)\nNo allocation relating to a constrained facility shall result unless \nthe calculated MW impact exceeds the thresholds set forth in the \nPJM Manuals.\n(4)\nAll calculated MW impacts on constrained facilities above the \nrelevant thresholds for each Project Developer, Eligible Customer \nseeking Long-Term Firm Point-to-Point Transmission Service, \nEligible Load or Large Load are converted to proportional MW \nimpacts representing the pro rata share of all MW impacts on the \nsame constrained facility.\n(5)\nThe proportional MW impacts are weighted using values as further \ndescribed in the PJM Manuals resulting in a weighted proportional \nMW impact.\n(6)\nThe percentage proportional impact values allocated for each Project \nDeveloper, Eligible Load or Large Load is based on its pro rata share \nof the weighted proportional MW impact relative to the total of \nweighted proportional MW impact for the Cycle.  For Project \nDevelopers, this value is the Generation Interconnection Customer’s \nAllocated Percentage (GCAP) as outlined in (f)(vi)(B).\n(B)\nWith respect to the portfolio of Interconnection Reliability Reinforcements \naddressing short-circuit constraints, allocation will be based on contributing fault \ncurrent impact on the circuit breaker’s applicable interrupting rating, as set forth \nin the PJM Manuals.\n(C)\nThe aggregate impact values calculated pursuant to subsection (f)(ii)(A) \nand (f)(ii)(B) above shall determine the relative assignment of cost responsibility \nfor Interconnection Reliability Reinforcements and the Generator Reliability \nReinforcement Fee subject to the following rules:\n \n(1)\nThe percentage proportional impacts of Eligible Load and Large \nLoad Transmission Service Requests will be summed on a Zonal \nbasis assigned to the relevant Transmission Owner Zones.\n(2)\nFor purposes of this proportional allocation, the entire cost \nresponsibility calculated pursuant to this subsection (f)(ii) will be \nassigned to Transmission Owner Zones based on their summed \npercentage proportional impacts.  Interconnection Reliability \nReinforcement costs representing the relative contribution \nattributable to Generator Interconnection Customers shall be \nrecovered from Generator Interconnection Customers through \nPage 107"},{"page":273,"startToken":103433,"endToken":103805,"text":"Generator Reliability Reinforcement Fees as set forth in subsection \n(f)(vi) below.\n(D)\nThe Transmission Provider shall complete the analysis described in this \nsubsection (f)(ii) within 30 days before Transmission Service Agreements and \nGenerator Interconnection Agreements have been executed.  Within 30 days of \nthe completion of this analysis, the Transmission Provider shall post on the PJM \nInternet Site the cost responsibility assignments determined pursuant to this \nsection (f).  \n(3)\nInterconnection Reliability Reinforcements Charge.  The charge established to \nrecover the revenue requirement with respect to an Interconnection Reliability \nReinforcement is hereafter referred to as an “Interconnection Reliability \nReinforcement Charge.”  Interconnection Reliability Reinforcement Charges of \none or more Transmission Owners for Interconnection Reliability Reinforcements \nshall be established in accordance with this section (f) of Schedule 12.  \nTransmission Provider shall assess an Interconnection Reliability Reinforcement \nCharge to Firm Transmission Customers in Zones based on the cost responsibility \nassignments determined pursuant to subsection (f)(ii) above.  The Interconnection \nReliability Reinforcement Charge shall recover the applicable Transmission \nOwner's annual transmission revenue requirement associated with the \nInterconnection Reliability Reinforcements constructed and owned and/or \nfinanced by that Transmission Owner for a period of 15 years after an \nInterconnection Reliability Reinforcement enters service.  After this period, \nbeginning with the next full calendar year, Transmission Provider will assign \nresponsibility for and recover the remaining costs of the Interconnection \nReliability Reinforcement in accordance with sections (a) through (e) of this \nSchedule 12. \n(A)\nA Transmission Owner’s annual transmission revenue requirement \nassociated with an Interconnection Reliability Reinforcement shall be determined \npursuant to the formula rate in effect applicable to the Transmission Owner’s rates \nfor Network Integration Transmission Service and Firm Contract Demand \nTransmission Service (“Firm Transmission Service”), including the costs \nassociated with Interconnection Reliability Reinforcements.\n(B)\nEach Interconnection Reliability Reinforcement Charge applicable to Firm \nTransmission Customers shall be recalculated annually to reflect the annual \nrevisions to the billing determinants used by the Transmission Provider to \ncalculate charges for Firm Transmission Service.  The Transmission Provider \nshall post on its Internet site by October 31 of each calendar year each \nrecalculated Interconnection Reliability Reinforcement Charge that shall be \neffective during the subsequent calendar year.\n(C)\nEach Interconnection Reliability Reinforcement Charge applicable to \ncustomers using Point-To-Point Transmission Service shall be calculated monthly \nPage 108"},{"page":274,"startToken":103805,"endToken":104172,"text":"to reflect the billing determinants used by the Transmission Provider to determine \ncharges for customers of Point-To-Point Transmission Service in accordance with \nTariff, Part II, section 25.\n(4)\nRecovery of Interconnection Reliability Reinforcement Charges.\n(A)\nTransmission Customers shall pay the Transmission Provider all \napplicable Interconnection Reliability Reinforcement Charge as required by this \nSchedule 12 in addition to all other charges for transmission service for which \nsuch Transmission Customers are responsible under the Tariff.\n(B)\nThe Transmission Provider shall collect all applicable Interconnection \nReliability Reinforcement Charges from each applicable Transmission Customer \non a monthly basis. The Transmission Provider shall remit or credit all revenues \nreceived from Transmission Customers under this Schedule 12 to the \nTransmission Owner(s) owning the relevant Interconnection Reliability \nReinforcements.\n(5)\nCrediting of Revenue from Interconnection Reliability Reinforcement \nCharges.  In recognition that a Transmission Owner’s charges for Firm \nTransmission Service set forth in Tariff, Attachment H are established based upon \nthe Transmission Owner's total cost of providing FERC-jurisdictional \ntransmission service, including the costs associated with Interconnection \nReliability Reinforcements, revenue Interconnection Reliability Reinforcement \nCharges for a billing month shall be credited pursuant to this Schedule 12 to the \nFirm Transmission Customers in the Transmission Owner’s Zone (including, \nwhere applicable, the Transmission Owner) and Transmission Customers \npurchasing Firm Point-To-Point Transmission Service for delivery in the \nTransmission Owner's Zone in proportion to their Demand Charges (including \nany imputed Demand Charges for bundled service to Native Load Customers) for \nNetwork Integration Transmission Service and Reserved Capacity for Firm \nContract Demand Transmission Service and Firm Point-To-Point Transmission \nService; provided that such credits shall be reduced by the amount of any \napplicable incentives included in such Interconnection Reliability Reinforcement \nCharges.\n(6)\nGenerator Reliability Reinforcement Fee.  The Transmission Provider shall \nrecover the portion of the costs of Interconnection Reliability Reinforcements \nallocated to Generator Interconnection Customers in a Fast Energization Process \nCycle, as determined pursuant to subsection (f)(ii) of this Schedule 12, through \nGenerator Interconnection Reliability Reinforcement Fees as follows:\n(A)\nThe Transmission Provider shall assess and each Generator \nInterconnection Customer will pay the Generator Reliability Reinforcement Fee \nbeginning on the earlier of: (1) in the calendar year when the Generator \nInterconnection Customer’s facility achieves Commercial Operation, or (2) three \nPage 109"},{"page":275,"startToken":104172,"endToken":104539,"text":"years after the Commercial Operation date in the Customer’s original Generator \nInterconnection Agreement, and continuing for a period of 15 years from the \nCommercial Operation Date.\n(B)\nThe Transmission Provider shall calculate the Generator Reliability \nReinforcement Fee after each System Impact Study Phase as part of the Fast \nEnergization Process as follows:\nAGRRRF = GCAP X TRRGP x {[ACCC X (1 + ACCC)15]/[(1 + ACCC)15 – 1]}\nWhere:\nGRRRF is the Generator Reliability Reinforcement Fee\nGCAP is the Generator Interconnection Customer’s Allocated Percentage, which \nis the Generator Interconnection Customer’s allocated percentage for the portfolio \nof Interconnection Reliability Reinforcements from its New Service Request \nCycle, determined pursuant to subsection (f)(ii) above.\n \nTRRGP is the Total Reliability Reinforcement Gross Plant, which is based on the \ngross plant of all Interconnection Reliability Reinforcements included in the \nRTEP approved by the PJM Board with respect to the Generator Interconnection \nCustomer’s New Service Request Cycle, and for which it has been allocated a \npercentage pursuant to subsection (f)(ii) above.  The gross plant amounts used in \nthis calculation shall be based on the final estimated costs of the Interconnection \nReliability Reinforcements as determined by the Transmission Provider through \nthe Fast Energization Process.  \nACCC is the Annual Carrying Charge Component, which shall be calculated as \nthe weighted average of the Weighted Average Cost of Capital for all \nTransmission Owners with Interconnection Reliability Reinforcements included \nin the RTEP approved by the PJM Board with respect to the Generator \nInterconnection Customer’s New Service Request Cycle.  The Weighted Average \nCost of Capital values shall be derived from the applicable Transmission Owner’s \nformula rates, as set forth in Attachment H and in effect at the time the Annual \nGenerator Reliability Reinforcement Fee is calculated.  For purposes of \ncalculating such weighted average, each applicable Transmission Owner’s \nWeighted Average Cost of Capital shall be weighted based on the ratio of the \nfinal estimated costs of the Interconnection Reliability Reinforcements that it has \nbeen designated to construct and own and/or finance identified in the New Service \nRequest Cycle that contains the Generator Interconnection Customer, to the final \nestimated costs for all Interconnection Reliability Reinforcements identified in the \nNew Service Request Cycle that contains the Generator Interconnection \nCustomer.  \nPage 110"},{"page":276,"startToken":104539,"endToken":104962,"text":"SCHEDULE 20\nFirm Contract Demand Transmission Service\nFor Eligible Load and Large Load\n1)\nEligible Customer taking Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are determined based on formula rates set \nforth in Attachment H shall pay a Monthly Demand Charge based on the Firm Contract Demand \nTransmission Service Amount (MW), as specified in Eligible Customer’s Service Agreement, \nwhich shall be determined as follows:\nMDC = FCDTSA X RTZ/12\nWhere:\nMDC is the monthly demand charge\nFCDTSA is the Firm Contract Demand Transmission Service Amount (MW), as \nspecified in Eligible Customer’s Service Agreement \nRTZ is the rate for Network Integration Transmission Service from Attachment H for the \nZone in which the Eligible Customer’s Eligible Load or Large Load is located, stated in \ndollars per megawatt per year.  For purposes of establishing the RTZ component in the \nrelevant Attachment H, the annual peak of the Zone shall be based on the sum of \nNetwork Customer Loads in the Zone and Firm Contract Demand Transmission Service \nAmounts for all Eligible Customers taking Firm Contract Demand Transmission Service \nin the Zone for the applicable peak period.\n2)\nEligible Customers taking Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are not established based on formula rates \nshall pay a Monthly Demand Charge based on the Firm Contract Demand Transmission Service \nAmount (MW), as specified in Eligible Customer’s Service Agreement, multiplied by a Zonal-\nspecific Firm Contract Demand Transmission Service rate filed with FERC pursuant to Section \n205 of the Federal Power Act.  Those rates will be posted on Transmission Provider’s website.\n3)\nRevenue Crediting.  Each month, credits will be applied to the Eligible Customer’s \ngross Monthly Demand Charge stated above associated with revenue collected from Non-Firm \nContract Demand Transmission Service Charges in accordance with Schedule 19, based on each  \nEligible Customer’s pro rata share of the Zone’s annual peak load, from the most recent 12-\nmonth period ending October 31.  The Eligible Customer’s pro rata share shall be based on the \nratio of its Firm Contract Demand Transmission Service Amount during the peak period to the \nsum of Network Customer Loads in the Zone and Firm Contract Demand Transmission Service \nAmounts for all Eligible Customers taking Firm Contract Demand Transmission Service in the \nZone for the applicable peak period.  The sum of these revenue credits will appear as a reduction \nto the gross monthly rate stated above on a Eligible Customer’s bill in that month for service \nunder this schedule.  \nPage 111"},{"page":277,"startToken":104962,"endToken":105341,"text":"4)\nTransmission Enhancement Charges. In addition to the rates set forth in section (1) of \nthis Schedule and any other applicable charges, the Eligible Customer shall also pay any \nTransmission Enhancement Charges for which it is designated as a Responsible Customer \nunder Schedule 12 appended to the Tariff.\n5)\nDetermination of Monthly Charges for ComEd Zone. On a monthly basis, revenue\ncredits shall be calculated based on the sum of ComEd’s share of revenues collected during the \nmonth from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission \nService to Non-Zone Network Load under Attachment H-A; and (iii) any Point-To-Point \nTransmission Service where the Point of Receipt and the Point of Delivery are both internal to \nthe ComEd Zone.  On this basis, the sum of these revenues will appear as a reduction to the gross \nmonthly rate stated above on a Transmission Customer’s1 bill in that month for service under this \nschedule.\n6)\nDetermination of Monthly Charges for AEP Zone. On a monthly basis, revenue \ncredits shall be calculated based on the sum of AEP’s share of revenues collected during the \nmonth from: (i) the PJM Border Rate under Schedule 7; (ii) Network Integration Transmission \nService to Non-Zone Network Load under Attachment H-A; and (iii) Firm Point-To-Point \nTransmission Service where the Point of Delivery is internal to the AEP Zone.  The sum of these \nrevenue credits will appear as an adjustment (reduction) to the gross monthly rate stated above \non a Eligible Customer’s bill in that month for service under this schedule.\n7)\nOther Supporting Facilities and Taxes.  In addition to the charges set forth in section \n(1) of this schedule, the Eligible Customer shall pay charges determined on a case-by-case basis \nfor facilities necessary to provide Transmission Service at voltages lower than those shown \nin Attachment H for the applicable Zone(s) and any amounts necessary to reimburse \nthe Transmission Provider for any amounts payable as sales, excise, “Btu,” carbon, value-added \nor similar taxes (other than taxes based upon or measured by net income) with respect to the \namounts payable pursuant to the Tariff. \n1/ Transmission Customer is defined as an Eligible Customer that executes a Service Agreement, \nor requests PJM file an unexecuted Service Agreement, to receive transmission service under the \nTariff.\nPage 112"},{"page":278,"startToken":105341,"endToken":105725,"text":"SCHEDULE 21\nNon-Firm Contract Demand Service\nFor Eligible Load and Large Load\n1)\nEligible Customer taking Non-Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are determined based on formula rates set \nforth in Attachment H shall pay for such service at a discounted reservation rate calculated by \napplying the Zone’s Annual Load Factor to the applicable Zonal Firm Contract Demand \nTransmission Service rate as follows:\nMonthly Rate ($/MW): Zonal Firm Contract Demand Transmission Rate (RTZ) multiplied by \nthe Zone’s Annual Load Factor, and divided by 12, where the Annual Load Factor is calculated \nas follows: Annual Load Factor = Zonal Annual Energy divided by (Zonal Peak Demand \nmultiplied by 8,760 hours).  For purposes of this Schedule, Zonal Annual Energy shall be the \ntotal net energy for load measured as net generation plus energy receipts minus energy deliveries \nfor the Zone from the 12-month period ending October 31 preceding the calendar year during \nwhich Non-Firm Contract Demand Transmission Service is taken.  For purposes of this \nSchedule, Zonal Peak Demand shall be the Zone’s annual peak load from the 12-month period \nending October 31 preceding the calendar year during which Non-Firm Contract Demand \nTransmission Service is taken.\nWeekly Rate ($/MW): Zonal Firm Contract Demand Transmission Rate (RTZ) multiplied by the \nZone’s Annual Load Factor, and divided by 52, where the Annual Load Factor is calculated as \nfollows: Annual Load Factor = Zonal Annual Energy divided by (Zonal Peak Demand multiplied \nby 8,760 hours).\nDaily On-Peak Rate1 ($/MW): Weekly Rate divided by 5.\nDaily Off-Peak Rate2 ($/MW): Weekly Rate divided by 7.\nHourly On-Peak Rate3 ($/MWh): Zonal Firm Contract Demand Transmission Rate (RTZ), \nmultiplied by the Zone’s Annual Load Factor, and divided by 4,160.\nHourly Off-Peak Rate4 ($/MWh): Zonal Firm Contract Demand Transmission Rate (RTZ), \nmultiplied by the Zone’s Annual Load Factor, divided by 8,760.\n1/ Monday–Friday except the following holidays: New Years Day, Memorial Day, Independence \nDay, Labor Day, Thanksgiving Day, and Christmas Day.\n2/ Saturday and Sunday and the following holidays: New Years Day, Memorial Day, \nIndependence Day, Labor Day, Thanksgiving Day, and Christmas Day.\n3/ 7:00 a.m. up to the hour ending 11:00 p.m.\n4/ 11:00 p.m. up to the hour ending 7:00 a.m.\nPage 113"},{"page":279,"startToken":105725,"endToken":106165,"text":"2)\nEligible Customers taking Non-Firm Contract Demand Transmission Service in a Zone in \nwhich Network Integration Transmission Service rates are not established based on formula rates \nshall pay for Non-Firm Contract Demand Transmission Service based on the amount of Non-\nFirm Contract Demand Transmission Service reserved by the Eligible Customer in MW, \nmultiplied by Zonal-specific Non-Firm Contract Demand Transmission Service rates filed with \nFERC pursuant to Section 205 of the Federal Power Act.  Those rates will be posted on \nTransmission Provider’s website.\n3)\nDiscounts.  Three principal requirements apply to discounts for Non-Firm Contract \nDemand Transmission Service as follows: (1) any offer of a discount made by the Transmission \nProvider must be announced to all Eligible Customers solely by posting on the OASIS, (2) any \ncustomer-initiated requests for discounts (including requests for use by one’s wholesale \nmerchant or an Affiliate’s use) must occur solely by posting on OASIS, and (3) once a discount \nis negotiated, details must be immediately posted on the OASIS.  For any discount agreed to by  \nTransmission Provider, Transmission Provider must offer the same discounted transmission \nservice rate for the same time period to all Eligible Customers taking Non-Firm Contract \nDemand Transmission Service.\n4)\nRevenue Crediting.  Revenues collected from Non-Firm Contract Demand Transmission \nService Charges shall be credited to Eligible Customers taking Network Integration Transmission \nService, Firm Contract Demand Transmission Service, and Firm Point-to-Point Transmission \nService based on each Eligible Customer’s pro rata share of the Zone’s annual peak load based \non the most recent 12-month period ending October 31.  The Eligible Customer’s pro rata share \nshall be based on the ratio of its Zone Network Load, Firm Point-To-Point Transmission Service \nand Firm Contract Demand Transmission Service Amount to the sum of Network Customer \nLoads in the Zone and Firm Contract Demand Transmission Service Amounts for all Eligible \nCustomers taking Firm Contract Demand Transmission Service in the Zone, for the applicable \npeak period.  The sum of these revenue credits will appear as a reduction to the gross monthly \nrate for Firm Contract Demand Transmission Service on a Eligible Customer’s bill in that month. \n5)\nOther Supporting Facilities and Taxes.  In addition to the charges set forth in section \n(1) of this schedule, the Eligible Customer shall pay charges determined on a case-by-case basis \nfor facilities necessary to provide Transmission Service at voltages lower than those shown \nin Attachment H for the applicable Zone(s) and any amounts necessary to reimburse \nthe Transmission Provider for any amounts payable as sales, excise, “Btu,” carbon, value-added \nor similar taxes (other than taxes based upon or measured by net income) with respect to the \namounts payable pursuant to the Tariff.\nPage 114"},{"page":280,"startToken":106165,"endToken":106517,"text":"SCHEDULE 22\nFinancial Penalty Charge for \nUnreserved Use by Eligible Load and Large Load\nAn Eligible Customer taking Firm Contract Demand Transmission Service, Non-Firm Contract \nDemand Transmission Service, or Interim Network Integration Transmission Service on behalf \nof Eligible Load or Large Load shall be subject to financial penalties for its unreserved use of the \ntransmission system.\nThe financial penalty charge for unreserved use shall include two components: (1) a base penalty \ncharge, which applies to each individual hour in which the reserved transmission service limit is \nexceeded, and (2) a penalty ratchet, which applies when such exceedances occur repeatedly.\nBase Penalty Charge\nWhen an Eligible Customer taking service on behalf of Eligible Load or Large Load exceeds its \nreserved transmission service limit, a base penalty charge shall be assessed for any hour in which \nat least one five-minute interval occurs during which the Eligible Customer’s telemetered load at \nthe Point of Delivery exceeds its reserved transmission service limit.  This five-minute interval is \ndefined as an Exceedance Interval, and such an hour is defined as an Exceedance Hour.  The \nbase penalty charge shall apply to each Exceedance Hour.  \nFor an Eligible Customer taking only Firm Contract Demand Transmission Service, the \nreserved transmission service limit shall equal the Firm Contract Demand Transmission \nService minus any curtailed MW.  \nFor an Eligible Customer taking only Non-Firm Contract Demand Transmission Service, \nthe reserved transmission service limit shall equal the approved Non-Firm Contract \nDemand Transmission Service minus any curtailed MW.  \nFor an Eligible Customer taking Firm Contract Demand and Non-Firm Contract Demand \nTransmission Services, the reserved transmission service limit shall equal the Firm \nContract Demand Transmission Service plus the approved Non-Firm Contract Demand \nTransmission Service minus any curtailed MW.  \nFor an Eligible Customer taking Interim Network Integration Transmission Service, the \nreserved transmission service limit shall equal the Interim Network Integration \nTransmission Service demand minus any curtailed MW.\nEach five-minute interval beginning with the first minute of each hour shall constitute a \nseparate interval and each hour from 0100 through 2400 shall constitute a separate hour \nfor purposes of determining whether one or more exceedances have occurred.\nPage 115"},{"page":281,"startToken":106517,"endToken":106807,"text":"The base penalty charge shall be applied to each Exceedance Hour and shall be calculated as:\nHourly Exceedance MW × Equivalent Hourly Firm Contract Demand (“FCD”) rate × \nnumber of Exceedance Intervals within the hour\nWhere:\nHourly Exceedance MW = Maximum telemetered load during the hour – Reserved \nTransmission Service Limit for the hour\nEquivalent Hourly FCD rate = FCD rate / 8,760 hours\nPenalty Ratchet\nA penalty rachet shall apply when multiple Exceedance Hours occur during a particular time \nperiod in order to escalate the penalty charges as the frequency of unreserved transmission use \nincreases.  \nIf more than one Exceedance Hour occurs on the same calendar day, an additional daily \npenalty shall apply.  \nIf exceedances occur on multiple calendar days within the same calendar week, an \nadditional weekly penalty shall apply. \nIf exceedances occur in multiple calendar weeks within the same calendar month, an \nadditional monthly penalty shall apply.\nIf exceedances occur in multiple calendar months within the same calendar year, an \nadditional yearly penalty shall apply.  \nThe penalty ratchet shall be based on an Eligible Customer’s exceedance pattern and applies \nescalating FCD-equivalent rates as the frequency of unreserved transmission use increases.  \nDepending on whether exceedances occur within the same calendar day, calendar week, calendar \nmonth, or calendar year, the penalty ratchet shall apply daily, weekly, monthly, or annual penalty \ncharges, respectively, as follows: \nExceedance Pattern\nPenalty Rate Applied\nMultiple Exceedance Hours in a single calendar day\nDaily FCD-Equivalent Rate\nMultiple Exceedance Days within a calendar week\nWeekly FCD-Equivalent Rate\nMultiple Exceedance Weeks within a calendar month\nMonthly FCD-Equivalent Rate\nMultiple Exceedance Months within a calendar year\nFCD Annual Rate\nDaily Penalty Charge\nThe Daily Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar day\n× Daily FCD Equivalent Rate\nPage 116"},{"page":282,"startToken":106807,"endToken":107084,"text":"× Number of Exceedance Hours in the calendar day\nWeekly Penalty Charge\nThe Weekly Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar week\n× Weekly FCD Equivalent Rate\n× Number of Exceedance Days in the calendar week\nMonthly Penalty Charge\nThe Monthly Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar month\n× Monthly FCD Equivalent Rate\n× Number of Exceedance Weeks in the calendar months\nAnnual Penalty Charge\nThe Annual Penalty Charge is calculated as:\nMaximum Hourly Exceedance MW during the calendar year\n× Annual FCD Rate\n× Number of Exceedance Months in the calendar year\nRevenues collected from Financial Penalty Charges shall be credited to Eligible Customers \ntaking Firm Contract Demand Transmission Service, Non-Firm Contract Demand Transmission \nService, Network Integration Transmission Service, and Interim Network Integration \nTransmission Service.  The Transmission Provider shall return revenues collected from Financial \nPenalty Charges on a monthly and annual basis as bill credits to Eligible Customers taking Firm \nContact Demand Service, Non-Firm Contract Demand Transmission Service, Network \nIntegration Transmission Service, and Interim Network Integration Transmission Service, who \nwere not assessed Financial Penalty Charges during the year based on each Eligible Customer’s \npro rata share of the Zone’s annual peak load based on the most recent 12-month period ending \nOctober 31.  The Eligible Customer’s pro rata share shall be based on the ratio of its Zone \nNetwork Load, Firm Contract Demand Transmission Service Amount, and Non-Firm Contract \nTransmission Service Amount to the sum of Network Customer Loads in the Zone and Firm and \nNon-Firm Contract Demand Transmission Service Amounts for all Eligible Customers taking \nFirm and Non-Firm Contract Demand Transmission Service in the Zone, for the applicable peak \nperiod.\nPage 117"},{"page":283,"startToken":107084,"endToken":107317,"text":"Exhibit No. PTO-0001 \nPage 1 of 43 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nExelon Corporation, et al.\n)  \nDocket No. ER27-___-000 \nDIRECT JOINT TESTIMONY \nOF \nPETER BLAZUNAS AND HANHAN HAMMER \nI. \nINTRODUCTION  \n1 \nQ.  \nPlease state your name, title, business address, and provide your professional \n2 \nbackground and relevant experience. \n3 \nA. \n[Blazunas] My name is Peter Blazunas, and my business address is 293 Boston Post Road \n4 \nWest, Marlborough, MA 01752.  I am a Vice President with Concentric Energy Advisors, \n5 \nInc (“Concentric”).  I joined Concentric in 2021, and I provide regulatory strategy and rate \n6 \ncase expertise to regulated electric and gas utilities, especially with respect to the topics of \n7 \ncost of service and rate design.  Prior to Concentric, I managed a team overseeing the cost \n8 \nof service, rate design, and rate administration functions for Potomac Electric Power \n9 \nCompany’s (“Pepco”) Maryland and District of Columbia jurisdictions.  Prior to Pepco, I \n10 \nworked as an analyst in the FirstEnergy Corp. Rates and Regulatory Affairs department.  I \n11 \nhave testified before the Federal Energy Regulatory Commission (“FERC” or \n12 \n“Commission”) as well as regulatory commissions in Delaware, the District of Columbia, \n13 \nMaryland, Ohio, and Rhode Island.  \n14 \n[Hammer] My name is Hanhan Hammer, and my business address is 293 Boston \n15 \nPost Road West, Marlborough, MA 01752.  I am a Senior Project Manager with \n16"},{"page":284,"startToken":107317,"endToken":107582,"text":"Exhibit No. PTO-0001 \nPage 2 of 43 \nConcentric.  In my current role, I advise regulators, utilities, grid operators, and project \n1 \ndevelopers on complex regulatory and market matters, with a particular focus on \n2 \ntransmission planning, cost allocation and cost recovery, and large load tariffs.  I also \n3 \nadvise clients on generation and large load interconnection rules, compliance with FERC \n4 \norders, wholesale market participation, and resource planning. \n5 \nPrior to joining Concentric in 2024, I spent 15 years working at three Regional \n6 \nTransmission Organizations/Independent System Operators. My experience includes \n7 \ndesigning wholesale market rules, particularly wholesale pricing mechanisms at ISO New \n8 \nEngland Inc. (“ISO-NE”), and overseeing competitive market performance and monitoring \n9 \nactivities at the Midcontinent Independent System Operator, Inc. (“MISO”) and Southwest \n10 \nPower Pool, Inc. (“SPP”).  I have testified before FERC as well as the New Hampshire \n11 \nPublic Utilities Commission. \n12 \n[Blazunas and Hammer] Our professional backgrounds and relevant experience \n13 \nare provided in Exhibit No. PTO-0002.  \n14 \nII. \nBACKGROUND \n15 \nQ. \nWhat is the background for this proceeding? \n16 \nA. \n[Blazunas and Hammer] In this proceeding, the PJM Transmission Owners submitted for \n17 \nfiling revisions to the PJM Interconnection, L.L.C. (“PJM”) Open Access Transmission \n18 \nTariff (“Tariff”).  The proposed Tariff revisions establish rates, cost allocation and cost \n19 \nrecovery mechanisms, financial protections, revenue-crediting requirements, and \n20 \ntransparency measures associated with transmission service to be taken by Eligible \n21 \nCustomers on behalf of Co-Located Loads and Large Loads.  These revisions respond to \n22 \nthe Commission’s preliminary finding in its June 18, 2026 Order Instituting Proceeding \n23"},{"page":285,"startToken":107582,"endToken":107861,"text":"Exhibit No. PTO-0001 \nPage 3 of 43 \nUnder Section 206 of the Federal Power Act in Docket No. EL26-67-000 (“Show Cause \n1 \nOrder”).  The proposed revisions also comply with the Commission’s June 18, 2026 Order \n2 \non Rehearing, Clarification, Compliance Filing and Paper Hearing in Docket Nos. EL25-\n3 \n49, et al. (“Co-Located Load Paper Hearing Order”).  The PJM Transmission Owners’ \n4 \nfiling consists of several key elements, which we address in detail in our testimony below.  \n5 \nThese are:     \n6 \n1. \nRates for transmission services available to Eligible Customers taking \n7 \nservice on behalf of Large Loads and Co-Located Loads.\n8 \n9 \nThe new services available to Eligible Customers taking service on behalf of Large Loads \n10 \nand Co-Located Loads include: (i) Firm Contract Demand Transmission Service \n11 \n(“FCDS”); (ii) Non-Firm Contract Demand Transmission Service (“NFCDS”); and (iii) \n12 \nInterim Network Integration Transmission Service (“Interim NITS”). The Co-Located \n13 \nLoad Paper Hearing Order found the PJM Transmission Owners’ rate treatment proposals \n14 \nfor FCDS and Interim NITS just and reasonable.1  However, the Commission rejected the \n15 \nPJM Transmission Owners’ proposed NFCDS maximum rate and required a lower \n16 \nmaximum rate or nondiscriminatory discounts supported by transparent calculations.  \n17 \nAccordingly, the PJM Transmission Owners’ filing implements the rate treatments already \n18 \nfound just and reasonable for FCDS and Interim NITS through compliance tariff records,2\n19 \nand proposes a revised NFCDS discounted rate methodology and related tariff provisions \n20 \nin compliance with the Commission’s directives.3  The filing extends and adapts those rates \n21 \n1\nCo-Located Load Paper Hearing Order at PP 398, 572. \n2\nId. at PP 398, 400, 401. \n3\nId. at PP 400, 401, 412."},{"page":286,"startToken":107861,"endToken":108166,"text":"Exhibit No. PTO-0001 \nPage 4 of 43 \nto Eligible Customers taking service on behalf of Large Loads based on the eligibility \n1 \ncriteria set forth in the filing PJM submits on this same date. \n2 \n2. \nA pro forma Cost Recovery Agreement and related implementing \n3 \nTariff provisions.   \n4 \n5 \nThe pro forma Cost Recovery Agreement (“CRA”) and related Tariff provisions address \n6 \nthe Commission’s concerns regarding the lack of an adequate mechanism in the Tariff to \n7 \nmitigate the risk of cost shifting among wholesale transmission customers.4  The pro forma\n8 \nCRA accomplishes this through imposing on Large Load customers a financially secured \n9 \nminimum transmission-revenue contribution associated with the amount of firm \n10 \ntransmission service requested from PJM by an Eligible Customer on behalf of the Large \n11 \nLoad, along with a shortfall payment and crediting mechanism and financial security \n12 \nobligations, in order to ensure that each customer’s minimum commitment is satisfied over \n13 \nthe term of the CRA.  The PJM Transmission Owners’ proposed pro forma CRA also \n14 \nappropriately recognizes that voluntary cost recovery agreements and other ratepayer \n15 \nprotection mechanisms have been, and continue to be, utilized at the retail and wholesale \n16 \nlevel by utilities within PJM.  It makes clear that Transmission Owners in PJM will \n17 \ncontinue to be permitted to utilize existing as well as new consumer protection \n18 \narrangements, as alternatives to the pro forma CRA, so long as those arrangements result \n19 \nin comparable protections and are accepted for filing by the Commission.5\n20 \nThe pro forma CRA is a three-party agreement among the Transmission Owner, \n21 \nthe Large Load Customer, and the Eligible Customer that takes transmission service on the \n22 \n4\nShow Cause Order at PP 77-81. \n5\nProposed Tariff, Part VIII, Subpart N, sections 441(a)(ii), 441(e)(v)."},{"page":287,"startToken":108166,"endToken":108466,"text":"Exhibit No. PTO-0001 \nPage 5 of 43 \nLarge Load’s behalf.  The Large Load Customer controls the project, so it bears the \n1 \npayment and credit support obligations.  The Eligible Customer remains the transmission \n2 \ncustomer, and the Transmission Owner administers the agreement and credits the amounts \n3 \nit collects.  The Large Load must execute the CRA and post credit support before it can \n4 \nproceed through PJM’s Fast Energization Process.  That up-front commitment is intended \n5 \nto discourage speculative or duplicative requests.  The commitment is first set from the \n6 \nLarge Load’s expected demand and ramp schedule.  It is then updated after PJM’s study to \n7 \nreflect when service can actually be provided, without financial penalty for that schedule \n8 \nadjustment.6\n9 \nOnce service begins, the Transmission Owner compares, at least once a year, the \n10 \nrevenue actually produced by the Large Load’s firm transmission service with a committed \n11 \nminimum of 80 to 100 percent of the anticipated full-service revenue.  The Large Load \n12 \npays any shortfall, and that payment reduces the Transmission Owner’s revenue \n13 \nrequirement, thereby protecting other customers in the Transmission Owner’s zone against \n14 \nthe risk of cost shifting.7  If the project is cancelled or permanently reduced, the Large Load \n15 \npays a termination amount that increases as the project advances.  If termination occurs \n16 \nbefore service begins – that payment is first applied to the Project Development Costs \n17 \nassociated with the transmission facilities needed to serve the Large Load, in accordance \n18 \nwith the Tariff’s allocation provisions.  Any remainder is credited against the transmission \n19 \n6\nId. at section 441(d); Proposed pro forma Cost Recovery Agreement, Part IX, Subpart P at Preamble and \nArticles 3.1-3.2, 6.1. \n7\nId. at Articles 5.1-5.5, 7.6 and Exhibit B."},{"page":288,"startToken":108466,"endToken":108758,"text":"Exhibit No. PTO-0001 \nPage 6 of 43 \nrevenue requirements of the applicable Transmission Owners, reducing the amounts \n1 \notherwise recovered from transmission customers.8\n2 \n3. \nTariff provisions addressing the recovery of the costs of transmission \n3 \nupgrades necessary to provide transmission service to Large Loads and \n4 \ninterconnection service to generators on a combined study basis.\n5 \n6 \nThe Tariff revisions include a methodology for allocating and recovering the costs of \n7 \ntransmission upgrades, referred to as “Interconnection Reliability Reinforcements,” \n8 \nresulting from PJM’s proposed Fast Energization Process.  The allocation methodology is \n9 \nbased on a modified version of PJM’s existing proportional impact allocation methodology \n10 \nfor customers in its New Service Request process.  Cost responsibility will be assigned to \n11 \nthose Zones containing Large Loads being studied for transmission service in the PJM Fast \n12 \nEnergization Process via a new Interconnection Reliability Reinforcement Charge \n13 \n(“IRRC”).  The PJM Transmission Owners are also proposing a Generator Reliability \n14 \nReinforcement Fee (“GRRF”) that PJM will assess to generators in each Fast Energization \n15 \nstudy cycle to recover a commercially reasonable portion of overall portfolio costs based \n16 \non each generator’s proportional impact on the reliability constraints mitigated by the \n17 \nportfolio of Interconnection Reliability Reinforcements.  The GRRF revenues will be \n18 \ncredited to transmission customers in those Zones based on their allocation of IRRCs.9\n19 \n4. \nTransparency and customer protection commitments.   \n20 \nIn addition to the basic cost allocation and rate design features of the PJM Transmission \n21 \nOwners’ proposal, the PJM Transmission Owners are committing to make, on compliance, \n22 \n8\nProposed Tariff, Part VIII, Subpart N, section 441(e); Proposed pro forma CRA, Part IX, Subpart P at Article \n9.12. \n9\nProposed Schedule 12, Sections (f)(1)-(6)."},{"page":289,"startToken":108758,"endToken":109043,"text":"Exhibit No. PTO-0001 \nPage 7 of 43 \nnecessary changes to their formula rate templates to: (i) provide transparency to state \n1 \nregulators and other interested parties regarding the costs of transmission facilities being \n2 \nconstructed by the Transmission Owner to provide transmission service to Large Loads; \n3 \nand (ii) adopt a mechanism designed to protect wholesale transmission customers not \n4 \nregulated at the retail level (municipals, cooperatives, and other applicable load-serving \n5 \nentities) from having to bear excessive large-load-related transmission upgrade costs. \n6 \nIII.  \nPURPOSE OF TESTIMONY \n7 \nQ. \nWhat is the purpose of your testimony?  \n8 \nA.   \n[Blazunas and Hammer] The purpose of this testimony is to describe and support certain \n9 \nPJM Transmission Owners’ Tariff revisions submitted in response to the Show Cause \n10 \nOrder and Co-Located Load Paper Hearing Order.  Specifically, this testimony addresses \n11 \nthe proposed extension of new transmission services to Eligible Customers taking service \n12 \non behalf of flexible Large Loads; the proposed discounted rate for NFCDS; the recovery \n13 \nof transmission-upgrade costs associated with Large Loads and generation; transparency \n14 \nand customer-protection commitments; and the proposed CRA.  \n15 \nIV. \nEXTENSION OF APPROVED RATE DESIGN ELEMENTS TO LARGE LOAD-\n16 \nRELATED TRANSMISSION SERVICE REQUESTS \n17 \nQ. \nPlease describe the PJM Transmission Owners’ proposal to extend the rates and \n18 \nfinancial penalty framework approved with respect to new transmission services for \n19 \nCo-Located Loads to Eligible Customers taking service on behalf of Large Loads.  \n20 \nA.  \n[Blazunas] In the Show Cause Order, the Commission expressed concerns that “PJM’s \n21 \ntariff does not include transmission services that reflect the use of the transmission system \n22 \nby Eligible Customers on behalf of flexible large load, on both an interim and permanent \n23"},{"page":290,"startToken":109043,"endToken":109341,"text":"Exhibit No. PTO-0001 \nPage 8 of 43 \nbasis.”10  In its filing in response to the Show Cause Order, PJM is proposing to extend the \n1 \nnew transmission services (FCDS, NFCDS, and Interim NITS) to Eligible Customers \n2 \ntaking service on behalf of Large Load customers, in addition to Co-Located Load.  \n3 \nConsequently, the PJM Transmission Owners propose to extend the rates and financial \n4 \npenalty framework for unreserved transmission system use developed for Co-Located Load \n5 \nand approved by the Commission in the Co-Located Load Paper Hearing Order to Eligible \n6 \nCustomers taking service on behalf of Large Loads.  Accordingly, the PJM Transmission \n7 \nOwners propose to extend the approved rates for FCDS and Interim NITS to Eligible \n8 \nCustomers taking service on behalf of Large Loads.11  The PJM Transmission Owners also \n9 \npropose to extend their new proposed rate design for NFCDS, as discussed below, to \n10 \nEligible Customers on behalf of Large Loads.    \n11 \nThe PJM Transmission Owners’ proposal to extend these services to all eligible \n12 \nlarge load customers is consistent with the “operational reality that large loads may use the \n13 \ntransmission system to differing extents and certain large loads are willing and able to limit \n14 \ntheir use of the transmission system under certain conditions.”12  These services are \n15 \nfunctionally identical to the services developed for Co-Located Loads.  Therefore, it is \n16 \nreasonable that the same rate design approach should apply to Eligible Customers seeking \n17 \none or more of these new services on behalf of either Co-Located Load or Large Load. \n18 \n19 \n10\nShow Cause Order at P 87. \n11\nProposed Tariff, Part XI, Subpart A, Section 706; Tariff, Part XI, Subpart C, Section 714; and Proposed \nSchedules 20 and 22. \n12\nShow Cause Order at P 86."},{"page":291,"startToken":109341,"endToken":109616,"text":"Exhibit No. PTO-0001 \nPage 9 of 43 \nV. \nPROPOSED RATE FOR NON-FIRM CONTRACT DEMAND TRANSMISSION \n1 \nSERVICE \n2 \nQ.  \nPlease describe the Commission’s determination with respect to the PJM \n3 \nTransmission Owners original proposal for Non-Firm Contract Demand Service \n4 \nrates.  \n5 \nA.  \n[Blazunas] In the Co-Located Load Paper Hearing Order, the Commission rejected the \n6 \nPJM Transmission Owners’ original proposal to charge the same maximum rate for both \n7 \nFCDS and NFCDS, and directed the PJM Transmission Owners to submit a compliance \n8 \nfiling with revised rates for NFCDS.13  Specifically, the Commission directed the PJM \n9 \nTransmission Owners to propose a lower maximum rate or non-discriminatory discounts \n10 \nfor the revised NFCDS.14 In addition, the Commission directed the PJM Transmission \n11 \nOwners to ensure that the revised rates for NFCDS are transparent with respect to how they \n12 \nwill be calculated for individual customers.15\n13 \nQ.  \nPlease describe the PJM Transmission Owners’ revised proposal for NFCDS rates.  \n14 \nA.  \n[Blazunas] The PJM Transmission Owners propose a discounted NFCDS rate using a \n15 \nreservation rate set by Zone and that is a function of the zonal FCDS rate (i.e., the NFCDS \n16 \nmaximum rate) and the transmission system load factor for a Zone.  In short, the discounted \n17 \nNFCDS rate for a given Zone is calculated as the zonal FCDS rate multiplied by the \n18 \ntransmission system load factor for the Zone.16  The transmission system load factor is \n19 \n13\nCo-Located Load Paper Hearing Order at PP 402, 404, 412. \n14\nId. at P 412. \n15\nId. \n16\nProposed Tariff, Part XI, Subpart C, Section 715 and Proposed Schedule 21."},{"page":292,"startToken":109616,"endToken":109877,"text":"Exhibit No. PTO-0001 \nPage 10 of 43 \ncalculated as annual zonal energy divided by the product of zonal peak demand for an \n1 \nannual period multiplied by 8,760 hours.  An example calculation of the proposed \n2 \ndiscounted NFCDS rate is provided below: \n3 \nTable 1: Example Calculation of Discounted Non-Firm Contract Demand Transmission \nService Rate \nComponent \nCalculation \nAmount \n(a) Zonal Firm Contract Demand Rate ($/MW-Year)\n$90,000\n(b) Zonal Peak Demand (MW)\n150,000\n(c) Zonal Annual Energy (MWh)\n850,000,000\n(d) Hours Per Year\n8,760\n(e) Zonal Discounted Non-Firm Contract Demand Rate \n($/MW-Year)\n= (a) x [(c) ÷ ((b) x (d))] \n$58,219 \n(f) Implied Discount to Maximum Rate\n= 1 – [(e) ÷ (a)]\n35.3%\nThe underlying rationale for this methodology is the fact that the transmission system is \n4 \nbuilt to accommodate a peak demand that is driven by firm load.  The difference between \n5 \nactual zonal annual energy and zonal annual energy at a 100 percent load factor represents \n6 \na reasonable proxy for the “excess capacity” for which non-firm load is arguably not \n7 \nresponsible.  A lower system load factor for a Zone indicates relatively more “excess \n8 \ncapacity” and justifies a higher discount for non-firm load’s use of that “excess capacity,” \n9 \nand vice-versa.  The PJM Transmission Owners’ proposal meets the directives that the \n10 \nCommission set forth in the Co-Located Load Paper Hearing Order insofar as it results in \n11 \na non-discriminatory and transparent discount for NFCDS for each PJM Zone that can be \n12 \ncalculated using publicly available data.  \n13 \n14 \n15 \n16 \n17"},{"page":293,"startToken":109877,"endToken":110136,"text":"Exhibit No. PTO-0001 \nPage 11 of 43 \nVI. \nALLOCATION AND RECOVERY OF COSTS ASSOCIATED WITH UPGRADES \n1 \nIDENTIFIED IN PJM’S FAST ENERGIZATION PROCESS \n2 \n A. \nSummary of Cost Allocation and Recovery \n3 \nQ. \nWhy are the PJM Transmission Owners proposing a new cost allocation methodology \n4 \nas part of the response to the Commission’s Show Cause Order? \n5 \nA. \n[Hammer] The Transmission Owners are proposing a new cost allocation framework \n6 \nbecause PJM’s proposed Fast Energization Process will study Large Load transmission \n7 \nservice requests in the same study cycle as existing New Service Requests, including \n8 \ngeneration and long-term firm transmission service requests.  These different service \n9 \nrequests will result in a single overall portfolio of projects needed to address the reliability \n10 \nconstraints identified through PJM’s Fast Energization Process, as opposed to a process in \n11 \nwhich specific projects are attributable to specific service requests.  Therefore, a \n12 \nmethodology is needed to allocate the costs of the transmission facilities, known as \n13 \n“Interconnection Reliability Reinforcements,” required to resolve those constraints. \n14 \nPJM’s existing interconnection cost allocation procedures were not designed to \n15 \nallocate the costs of a single cohesive portfolio of transmission facilities resulting from a \n16 \nstudy process involving both generation interconnection requests and transmission service \n17 \nrequests made by Eligible Customers on behalf of Large Loads.  The PJM Transmission \n18 \nOwners have therefore developed a proportional impact assessment framework based on \n19 \nPJM’s existing proportional impact allocation methodology for New Service Requests.  \n20 \nThis framework measures each request’s relative contribution to the identified reliability \n21"},{"page":294,"startToken":110136,"endToken":110398,"text":"Exhibit No. PTO-0001 \nPage 12 of 43 \nconstraints and uses those impacts to allocate the costs of the resulting Interconnection \n1 \nReliability Reinforcements.17\n2 \nQ. \nWhat are Interconnection Reliability Reinforcements, and why is it necessary to \n3 \nestablish a specific methodology for allocating the costs of those facilities? \n4 \nA. \n[Hammer] Interconnection Reliability Reinforcements are the transmission facilities \n5 \nidentified by PJM through the Fast Energization Process as necessary to address reliability \n6 \nviolations associated with the generation interconnection requests and transmission service \n7 \nrequests made by Eligible Customers on behalf of Large Loads that PJM examines in the \n8 \ncluster study.  Because those reliability violations may result from the combined impacts \n9 \nof generator and Large Load requests, it is necessary to establish a methodology that \n10 \nassigns cost responsibility based on each request’s contribution to the identified reliability \n11 \nconstraints, rather than by allocating the costs of  individual upgrades to individual \n12 \nrequests. \n13 \nQ.  \nPlease provide an overview of the cost recovery provisions proposed by the PJM \n14 \nTransmission Owners in this filing. \n15 \nA.  \n[Blazunas] Under the PJM Transmission Owners’ cost allocation methodology, cost \n16 \nresponsibility for Interconnection Reliability Reinforcements will be determined using a \n17 \nmodified version of PJM’s proportional impact methodology and initially assigned to those \n18 \nZones containing Large Loads being studied for transmission service in the PJM Fast \n19 \nEnergization Process.  Those costs will be included in the rate base of the Transmission \n20 \nOwners designated to construct and own the Interconnection Reliability Reinforcements \n21 \n17\nProposed Schedule 12, Sections (f)(1)-(2)."},{"page":295,"startToken":110398,"endToken":110712,"text":"Exhibit No. PTO-0001 \nPage 13 of 43 \nand recovered from transmission customers in the applicable Zones through a new IRRC \n1 \nassessed based on the calculated impact of the Large Loads within the Zones.  This \n2 \nallocation methodology will apply to all portfolios of Interconnection Reliability \n3 \nReinforcements identified through PJM’s Fast Energization Process for 15 years, after \n4 \nwhich the remaining costs of the upgrade will be subject to regional allocation using the \n5 \nthen-current Schedule 12 methodology that applies to Regional Transmission Expansion \n6 \nPlan (“RTEP”) reliability projects.   \n7 \nUnder the PJM Transmission Owners’ proposal, generators in the Fast Energization \n8 \nProcess will pay a fee, referred to as the Generator Reliability Reinforcement Fee (or \n9 \nGRRF), representing their appropriate share of the costs of the Interconnection Reliability \n10 \nReinforcement portfolio, to be billed and collected by PJM over a 15-year period.  In order \n11 \nto provide certainty to generators as early in the process as possible, the GRRF will be \n12 \ncalculated at the end of the PJM Fast Energization study process based on the estimated \n13 \ncosts of the Interconnection Reliability Reinforcements available at that time, along with \n14 \nan appropriate carrying charge calculation.  Revenues collected by PJM via the GRRF will \n15 \nbe credited to transmission customers in the Zones that have been assigned cost \n16 \nresponsibility for the relevant Interconnection Reliability Reinforcements.  Likewise, \n17 \nIRRCs assessed to external Zones based on the calculated impact of Large Loads within \n18 \nthe Zones will be credited to firm transmission customers in the Zones where the \n19 \nInterconnection Reliability Reinforcements are located.  The practical impact of this \n20 \ncrediting approach is that it ensures that no customer pays twice for the same facilities.  \n21 \nIn addition to the basic cost allocation and rate design features of the PJM \n22 \nTransmission Owners’ proposal, the PJM Transmission Owners are committing to make, \n23"},{"page":296,"startToken":110712,"endToken":110936,"text":"Exhibit No. PTO-0001 \nPage 14 of 43 \non compliance, necessary changes to their respective formula rate templates to: (1) provide \n1 \ntransparency to state regulators and other interested parties regarding the costs of \n2 \ntransmission facilities being constructed by the Transmission Owner to provide \n3 \ntransmission service to Large Loads; and (2) adopt a mechanism designed to protect \n4 \nwholesale transmission customers not regulated at the retail level (municipals, \n5 \ncooperatives, and other applicable load-serving entities) from having to bear excessive \n6 \nlarge-load-related transmission upgrade costs. \n7 \nB. \nProportional Impact Methodology \n8 \nQ. \nWhat is the proportional impact methodology? \n9 \nA. \n[Hammer] A proportional impact allocation methodology is a cluster-based cost allocation \n10 \nframework that determines the relative contribution to a portfolio of shared transmission \n11 \nupgrades based on a customer’s quantified impact on identified transmission constraints.  \n12 \nSpecifically, applied to the Fast Energization Process, it evaluates how much each \n13 \ngenerator interconnection request and transmission service request made by an Eligible \n14 \nCustomer on behalf of a Large Load impacts the aggregate reliability constraints addressed \n15 \nby a portfolio of Interconnection Reliability Reinforcements.  Each request’s impacts are \n16 \nthen weighted and aggregated to determine its proportional impact on the constraints \n17 \ndriving the need for the Interconnection Reliability Reinforcement portfolio.18\n18 \n19 \n20 \n18\nProposed Schedule 12, Section (f)(2)(A)-(C)."},{"page":297,"startToken":110936,"endToken":111232,"text":"Exhibit No. PTO-0001 \nPage 15 of 43 \nQ. \nWhy is a proportional impact methodology appropriate for determining \n1 \nInterconnection Reliability Reinforcement cost allocation and the resulting charges?\n2 \nA. \n[Hammer] A proportional impact methodology is appropriate because it establishes an \n3 \nengineering-based relationship between each request’s contribution to the reliability \n4 \nconstraints and the allocation of the costs of the Interconnection Reliability Reinforcements\n5 \nneeded to address these constraints.  Unlike an allocation based on project size or requested \n6 \nMWs of service, the proportional impact methodology measures the extent to which the \n7 \ngeneration interconnection and Large Load transmission service requests impact the \n8 \nunderlying reliability needs and the resulting portfolio of Interconnection Reliability \n9 \nReinforcements.  This aligns cost allocation and recovery with the principle of cost \n10 \ncausation.  This approach is also consistent with the proportional impact approach reflected \n11 \nin FERC Order No. 2023 for allocating the costs of certain shared Network Upgrades.19\n12 \nQ. \nHow are the proportional impacts calculated? \n13 \nA. \n[Hammer] The Transmission Owners’ proposal uses violation-based distribution factors \n14 \n(“DFAX”) to measure the relative impacts of generation and Large Load requests on the \n15 \nreliability constraints identified in a cluster study.  For identified constraints, PJM would \n16 \nfirst calculate a DFAX, representing the percentage of an energy transfer that flows across \n17 \na constrained facility.  For a generator, the applicable DFAX is multiplied by the MW \n18 \ncapacity studied in the Fast Energization Process to determine the generator’s MW impact \n19 \non the constrained facility.  For a Large Load, the applicable DFAX is multiplied by the \n20 \n19\nSee Improvements to Generator Interconnection Procs. and Agreements, Order No. 2023, 184 FERC ¶ \n61,054, at PP 455, 486 (2023), order on reh’g, Order No. 2023-A, 186 FERC ¶ 61,199 (2024)."},{"page":298,"startToken":111232,"endToken":111512,"text":"Exhibit No. PTO-0001 \nPage 16 of 43 \nMW amount of Firm Transmission Service requested.  Only impacts that exceed the \n1 \napplicable thresholds specified in the PJM Manuals are included in the allocation.20\n2 \nThe qualifying impacts for each request are then converted into proportional MW \n3 \nimpacts representing the pro rata share of all MW impacts on the same constrained \n4 \nfacility.21  Those proportional MW impacts are weighted and aggregated to develop each \n5 \nrequest’s share of the overall portfolio of Interconnection Reliability Reinforcements. \n6 \nQ. \nWhy does the proposal weigh and aggregate impacts across constrained facilities?\n7 \nA. \n[Hammer] Weighting is necessary because a MW of impact on one constrained facility \n8 \ndoes not necessarily have the same transmission investment significance as a MW of \n9 \nimpact on another.  For example, a 1 MW impact on a 20-mile, 138 kV constrained facility \n10 \nmay have materially different transmission investment implications than a 1 MW impact \n11 \non a 150-mile, 500 kV constrained facility.  Simply adding those MW impacts on an \n12 \nunweighted basis could therefore treat materially different transmission impacts as \n13 \nequivalent.  Weighting is intended to place impacts across different constrained facilities \n14 \non a reasonably comparable basis before they are aggregated.  The detailed weighting \n15 \nmethodology will be developed by the PJM Transmission Owners, specified in the PJM \n16 \nManuals, and applied consistently to all requests studied through the Fast Energization \n17 \nProcess.\n18 \nAggregation is necessary because a single request may contribute to violations on \n19 \nmultiple constrained facilities.  The proposal aggregates the request’s weighted impacts \n20 \n20\nProposed Schedule 12, Section (f)(2)(A)(3). \n21\nId. at Section (f)(2)(A)(4)."},{"page":299,"startToken":111512,"endToken":111773,"text":"Exhibit No. PTO-0001 \nPage 17 of 43 \nacross constrained facilities to develop a measure of its overall contribution to the \n1 \nreliability needs addressed by the Interconnection Reliability Reinforcement portfolio.22\n2 \nQ.\nHow does the proposed proportional impact methodology differ from PJM’s existing \n3 \ninterconnection cost allocation approach detailed in Manual 14H? \n4 \nA. \n[Hammer] The proposed methodology builds on concepts used in PJM’s existing \n5 \ninterconnection cost allocation methodology detailed in Manual 14H, including the use of \n6 \nDFAX, MW impacts, applicable thresholds, and proportional contribution to reliability \n7 \nviolations.  The key difference is that the proposed methodology for allocating the costs of \n8 \nInterconnection Reliability Reinforcements determines cost responsibility at the portfolio \n9 \nlevel rather than on a facility-by-facility basis.  Because the Fast Energization Process \n10 \ndevelops a portfolio of Interconnection Reliability Reinforcements to address the aggregate \n11 \nreliability constraints identified in the cluster study, each request’s qualifying impacts \n12 \nacross those constraints are weighted and aggregated to establish its proportional impact \n13 \non the constraints addressed by the Interconnection Reliability Reinforcement portfolio.  \n14 \nThus, the proposal preserves the existing impact-based approach while adapting it to a \n15 \nportfolio-based reliability solution.23\n16 \nQ.\nWhy is a portfolio approach appropriate for the Fast Energization Process?\n17 \nA. \n[Hammer] A portfolio approach is appropriate because the Fast Energization Process \n18 \ndevelops a portfolio of upgrades to address reliability violations resulting from the \n19 \ncombined impacts of generator interconnection and transmission service requests, rather \n20 \n22\nId. at Section (f)(2)(C). \n23\nId. at Section (f)(2)(A)-(C)."},{"page":300,"startToken":111773,"endToken":112029,"text":"Exhibit No. PTO-0001 \nPage 18 of 43 \nthan assigning individual upgrades directly to individual requests.  The proposed \n1 \nmethodology therefore determines each request’s relative contribution to the need for the \n2 \nInterconnection Reliability Reinforcement portfolio as a whole.24\n3 \nQ.       Can you provide a simple example to illustrate the proposed proportional impact \n4 \nmethodology?\n5 \nA.        [Hammer] Yes.  Assume that a PJM Fast Energization Process Cycle includes two requests: \n6 \na 200 MW generation interconnection request, which I will refer to as Gen 1, and 300 MW \n7 \nLarge Load transmission service request, which I will refer to as Load 1.   \n8 \nThe first step is to determine the extent to which each request impacts the identified \n9 \nconstrained facilities.  For purposes of this simplified example, the impact is calculated by \n10 \nmultiplying each request’s MW quantity by its DFAX on each constrained facility.  For \n11 \nexample, Gen 1 has an 8 percent DFAX on Facility 1.  Multiplying its 200 MW request by \n12 \n8 percent results in a 16 MW impact on Facility 1. \n13 \n14 \nConstrained \nFacilities\nGen 1 DFAX\nLoad 1 \nDFAX\nGen 1 MW \nImpact\nLoad 1 MW \nImpact\nTotal MW \nImpact \nFacility 1\n8%\n0%\n16\n0\n16 \nFacility 2\n4%\n9%\n8\n27\n35 \nFacility 3\n0%\n6%\n0\n18\n18 \n15 \nThe MW impacts are then converted to proportional impact on each constrained \n16 \nfacility based on the pro rata shares of their MW impact on the constrained facility. \n17 \n18 \n24\nId. at Section (f)(2)(C)."},{"page":301,"startToken":112029,"endToken":112285,"text":"Exhibit No. PTO-0001 \nPage 19 of 43 \nConstrained \nFacilities\nGen 1 \nProportional \nImpact  \nLoad 1 \nProportional \nImpact\nFacility 1\n100.00%\n0.00%\nFacility 2\n22.86%\n77.14%\nFacility 3\n0.00%\n100.00% \n1 \nThe next step is to apply a weighting factor that reflects the relative characteristics \n2 \nof each constrained facility.  In this example, the weighting factor is based on the product \n3 \nof the facility’s voltage and line length, expressed as kV-miles. Facility 1, with the lowest \n4 \nkV-mile value, is assigned a weighting factor of 1.00, and the other facilities are weighted \n5 \nrelative to Facility 1.25\n6 \nConstrained Facilities\nVoltage (kV)\nMiles\nkV x Miles\nWeighting Factor\nFacility 1\n138\n30\n4,140\n1.00\nFacility 2\n345\n20\n6,900\n1.67\nFacility 3\n500\n100\n50,000\n12.08\n7 \nThese weighting factors are then applied to each request’s unweighted proportional \n8 \nimpact on each constrained facility.\n9 \nConstrained \nFacilities\nWeighting \nFactor\nGen 1 \nProportional \nImpact\nLoad 1 \nProportional \nImpact\nGen 1 \nWeighted \nProportional \nImpact\nLoad 1 \nWeighted \nProportional \nImpact\nFacility 1\n1.00\n1.00 \n0.00 \n1.00 \n0.00 \nFacility 2\n1.67\n0.23 \n0.77 \n0.38 \n1.29 \nFacility 3\n12.08\n0.00 \n1.00 \n0.00 \n12.08 \nPortfolio \nTotal\n- \n- \n- \n1.38 \n13.37 \n10 \n25\nIt is important to note that this specific calculation is provided for illustrative purposes.  The PJM \nTransmission Owners intend to propose a methodology for determining these weighting factors in future filings."},{"page":302,"startToken":112285,"endToken":112543,"text":"Exhibit No. PTO-0001 \nPage 20 of 43 \nEach request’s weighted proportional impact on the constrained facility is summed \n1 \nto calculate its portfolio weighted proportional impact.  The portfolio cost allocator for \n2 \neach request is then calculated by dividing that request’s portfolio weighted proportional \n3 \nimpact by the total portfolio weighted proportional impact of all requests in the portfolio.   \n4 \nThe resulting allocation percentages are then used to determine the applicable IRRCs and \n5 \nGRRFs for recovery of the costs of the portfolio of Interconnection Reliability \n6 \nReinforcements.26\n7 \nGen 1\nLoad 1\nPortfolio Weighted Proportional Impact\n1.38\n13.37\nPortfolio Cost Allocator (%)\n9.37%\n90.63%\n8 \nQ. \nPlease provide a simple example of this transmission cost recovery construct. \n9 \nA.  \n[Blazunas] Assume that a study cycle of the PJM Fast Energization Process identifies \n10 \nInterconnection Reliability Reinforcements necessary to provide service to a group of \n11 \ngenerator interconnection requests and transmission service requests made by Eligible \n12 \nCustomers on behalf of Large Loads.  These Interconnection Reliability Reinforcements \n13 \nultimately cost $100 million to construct.  The full $100 million investment would be \n14 \nincluded in the transmission revenue requirements of the Transmission Owners that are \n15 \ndesignated to construct and own the Interconnection Reliability Reinforcements.  This \n16 \namount would be billed and recovered via IRRCs assessed to transmission customers in \n17 \nPJM Zones based on the calculated impact of Large Loads within those Zones.27\n18 \n26\nProposed Schedule 12, Section (f)(2)(A), (C). \n27\nId. at Sections (f)(2)(C), (f)(3)–(4)."},{"page":303,"startToken":112543,"endToken":112824,"text":"Exhibit No. PTO-0001 \nPage 21 of 43 \nAssume also that at the end of the relevant Fast Energization Process study, the \n1 \nInterconnection Reliability Reinforcements were estimated to cost $90 million, and the \n2 \nproportional impacts of the generators in the cycle represented 40 percent of the overall \n3 \nimpacts.  This would result in PJM calculating GRRFs for each of the generators equal to \n4 \n$36 million (40 percent of $90 million), along with the applicable carrying charge, and \n5 \nbilling those amounts to the applicable generators once they enter service.28\n6 \nRevenues from both the GRRFs and the IRRCs would be returned in the form of \n7 \ncredits to other transmission customers.  Specifically, GRRF revenues collected by PJM \n8 \nwould be credited back to transmission customers in the Zones assigned cost responsibility \n9 \nfor the Interconnection Reliability Reinforcements through the IRRC.  Likewise, IRRC \n10 \nrevenues collected by PJM would be credited to firm transmission customers in the \n11 \napplicable Zones where the Interconnection Reliability Reinforcements are located.  This \n12 \napproach ensures that the various costs are allocated in a manner that is roughly \n13 \ncommensurate with the benefits of the overall portfolio of Interconnection Reliability \n14 \nReinforcements, while preventing double recovery by the Transmission Owners that own \n15 \nthe Interconnection Reliability Reinforcements and are including them in their rate bases.29\n16 \nQ. \nHow does the PJM Transmission Owners’ proposal address short-circuit constraints? \n17 \nA. \n[Hammer] The proposal measures each request’s contribution to fault current relative to \n18 \nthe interrupting capability of the circuit breaker, consistent with PJM’s existing \n19 \nmethodology.  \n20 \n28\nId. at Section (f)(6)(B)-(C). \n29\nId. at Sections (f)(5), (f)(6)(D)."},{"page":304,"startToken":112824,"endToken":113053,"text":"Exhibit No. PTO-0001 \nPage 22 of 43 \nAlthough the engineering measure differs, the underlying cost allocation principle \n1 \nis the same: the methodology applies an engineering metric appropriate to each type of \n2 \nreliability constraint to measure each request’s relative contribution to the underlying \n3 \nreliability need, thereby aligning cost responsibility with cost causation. \n4 \nQ. \nIn your opinion, is the proportional impact methodology appropriate? \n5 \nA. \n[Hammer] The proportional impact methodology is appropriate because it builds on the \n6 \nproportional impact approach already used in PJM’s existing New Service Request \n7 \nframework and is consistent with the cost allocation principles reflected in FERC Order \n8 \nNo. 2023.  For reliability constraints, the methodology uses violation-based DFAX to \n9 \nmeasure the relative contribution of each generation and Large Load request to the \n10 \nidentified constraints and uses those relative impacts as the basis for both the IRRCs and \n11 \nGRRFs.30  It therefore aligns with cost causation principles, as I understand them, by \n12 \nallocating and recovering costs based on each request’s contribution to the underlying need \n13 \nbeing addressed.  The proposal adapts an established, engineering-based approach that \n14 \naccounts for the fact that generation and Large Load requests are studied together and the \n15 \nreliability solution consists of an integrated portfolio of Interconnection Reliability \n16 \nReinforcements. \n17 \n18 \n19 \n20 \n21 \n30\nId. at Section (f)(2)(A), (C)."},{"page":305,"startToken":113053,"endToken":113324,"text":"Exhibit No. PTO-0001 \nPage 23 of 43 \nC. \nGenerator Reliability Reinforcement Fee \n1 \nQ.  \nPlease describe the PJM Transmission Owners’ proposed Generator Reliability \n2 \nReinforcement Fee. \n3 \nA.  \n[Blazunas] As noted above, the PJM Transmission Owners are proposing a GRRF  \n4 \ncalculated to recover an appropriate portion of the Interconnection Reliability \n5 \nReinforcements from Generator Interconnection Customers in each PJM Fast Energization \n6 \nProcess Cycle.  The GRRF will be calculated after each System Impact Study Phase as part \n7 \nof the PJM Fast Energization Process based on the following formula: \n8 \nGRRF = GCAP x TRRGP x {[ACCC X (1 + ACCC)15]÷[(1 + ACCC)15 – 1]}31\n9 \nIn this calculation, the GRRF is equal to the product of the Generator Interconnection \n10 \nCustomer’s Allocated Percentage (or “GCAP”), the Total Reliability Reinforcement Gross \n11 \nPlant (or “TRRGP”), and the annualization factor for recovering an investment over a 15-\n12 \nyear period, which itself includes the Annual Carrying Charge Component (or “ACCC”).  \n13 \nThe GCAP represents the Generator Interconnection Customer’s proportional impact on \n14 \nthe portfolio of Interconnection Reliability Reinforcements in the relevant Cycle.  The \n15 \nTRRGP represents the estimated gross plant of all Interconnection Reliability \n16 \nReinforcements approved by the PJM Board with respect to the relevant Cycle and for \n17 \nwhich the Generator Interconnection Customer has been determined to have an impact per \n18 \nthe GCAP calculation.  This estimate is determined at the end of the applicable System \n19 \nImpact Study Phase.  The ACCC represents the weighted average of the Weighted Average \n20 \nCosts of Capital for all Transmission Owners with Interconnection Reliability \n21 \n31\nId. at Section (f)(6)(B)."},{"page":306,"startToken":113324,"endToken":113648,"text":"Exhibit No. PTO-0001 \nPage 24 of 43 \nReinforcements included in the RTEP approved by the PJM Board with respect to the New \n1 \nService Request Cycle that contains the Generator Interconnection Customer.32  The GRRF \n2 \nis calculated as an annual amount that will be recovered by PJM via a monthly charge.33\n3 \nRevenues received from the GRRF will, as discussed above, be credited to firm \n4 \ntransmission customers in each Zone on a pro rata basis as described in the Tariff.34\n5 \nQ.  \nPlease describe the underlying rationale for the PJM Transmission Owners’ proposed \n6 \nGenerator Reliability Reinforcement Fee. \n7 \nA.  \n[Blazunas] As designed, the proposed Generator Reliability Reinforcement Fee ensures \n8 \nthat Generator Interconnection Customers bear an appropriate share of the costs incurred \n9 \nto serve them, while also ensuring commercial feasibility by limiting the term over which \n10 \nthose costs are recovered as well as providing the Generator Interconnection Customer with \n11 \nupfront certainty as to the size of the required payment.  The use of a 15-year period for \n12 \nthe term of the GRRF balances the longer life of the associated transmission assets \n13 \nconstructed to serve the Generator Interconnection Customer with consideration of the fact \n14 \nthat the payment should not be so long as to place excessive financial burdens on \n15 \ngenerators.  This latter need is particularly relevant in the current environment where, \n16 \nespecially in PJM, capacity is short and the need for additional capacity is acute.  This 15-\n17 \n32\nFor purposes of calculating such weighted average, each applicable Transmission Owner’s Weighted \nAverage Cost of Capital shall be weighted based on the ratio of the final estimated costs of the Interconnection \nReliability Reinforcements that it has been designated to construct and own to the final estimated costs for all \nInterconnection Reliability Reinforcements.  See Proposed Schedule 12, Section (f)(6)(B). \n33\nId. at Section (f)(6)(C). \n34\nId. at Section (f)(6)(D)."},{"page":307,"startToken":113648,"endToken":113888,"text":"Exhibit No. PTO-0001 \nPage 25 of 43 \nyear payment period also harmonizes with the 15-year allocation transition mechanism I \n1 \nmentioned above and discuss in greater detail below.35\n2 \nFinally, the Annual Carrying Charge component of the calculation ensures that \n3 \nTransmission Owners, and their customers, are fairly compensated for the carrying costs \n4 \nassociated with the Interconnection Reliability Reinforcement investment.  The Annual \n5 \nCarrying Charge is based on the applicable Transmission Owners’ Weighted Average Cost \n6 \nof Capital.36  Again, this approach strikes an appropriate balance between recovering a fair \n7 \nportion of the costs of Interconnection Reliability Reinforcements from generators without \n8 \nimposing an excessive commercial burden that would disincentivize generation investment \n9 \nin PJM. \n10 \nD. \nInterconnection Reliability Reinforcement Charge and Cost Allocation \n11 \nTransition Mechanism \n12 \n13 \nQ. \nPlease explain the Interconnection Reliability Reinforcement Charge. \n14 \nA. \n[Blazunas] As I indicated earlier, the costs of Interconnection Reliability Reinforcements \n15 \nwill be included in the rate base of the Transmission Owners designated to construct and \n16 \nown the Interconnection Reliability Reinforcements.  However, these costs will be \n17 \nallocated and recovered from transmission customers throughout PJM through the IRRC. \n18 \nPJM will calculate and assess the IRRC based on the proportional impact of the Large \n19 \nLoads within each Zone and the revenue requirements for the Interconnection Reliability \n20 \n35\nProposed Schedule 12, Sections (f)(3), (f)(6)(B)-(C). \n36\nId. at Section (f)(6)(B)."},{"page":308,"startToken":113888,"endToken":114152,"text":"Exhibit No. PTO-0001 \nPage 26 of 43 \nReinforcements as determined by the Transmission Owners owning those facilities, based \n1 \non their formula rate templates.37\n2 \nQ. \nHow will the revenues associated with Interconnection Reliability Reinforcement \n3 \nCharges be treated? \n4 \nA. \n[Blazunas] Revenues associated with IRRCs collected by PJM will be credited back to the \n5 \nZones in which the Interconnection Reliability Reinforcements are located and included in \n6 \nTransmission Owner rate base.  This avoids any issue with potential double recovery.38\n7 \nQ. \nIs there any existing analogue in PJM to the Interconnection Reliability \n8 \nReinforcement Charge? \n9 \nA. \n[Blazunas] Yes, the manner in which the IRRC is determined and recovered is very similar \n10 \nto the existing Transmission Enhancement Charge (“TEC”), which PJM calculates and \n11 \nbills in order to recover the costs of transmission upgrades identified in the PJM RTEP and \n12 \nallocated regionally.  As with the TEC, the IRRC will be determined based on allocation \n13 \nfactors established pursuant to a formula set forth in Schedule 12 of the Tariff along with \n14 \nthe revenue requirements associated with the upgrades as determined by the applicable \n15 \nTransmission Owners using their formula rate templates.  Moreover, revenues collected by \n16 \nPJM pursuant to the IRRC, just like the TEC, will be credited back to transmission \n17 \ncustomers in the Zones where the upgrades are located, so as to avoid potential double \n18 \nrecovery due to the fact that both regionally-allocated RTEP projects and Interconnection \n19 \n37\nId. at Sections (f)(2)(C), (f)(3)-(4). \n38\nId. at Section (f)(5)."},{"page":309,"startToken":114152,"endToken":114425,"text":"Exhibit No. PTO-0001 \nPage 27 of 43 \nReliability Reinforcements will be included in Transmission Owners’ transmission rate \n1 \nbase.39\n2 \nQ. \nWill the costs of Interconnection Reliability Reinforcements be allocated and \n3 \nrecovered based on the Interconnection Reliability Reinforcement Charge over the \n4 \nentire life of the assets? \n5 \nA. \n[Blazunas] No.  The PJM Transmission Owners propose to allocate and recover the costs \n6 \nof Interconnection Reliability Reinforcements using the IRRC mechanism for a period of \n7 \n15 years after they enter service.  After 15 years, the remaining costs of Interconnection \n8 \nReliability Reinforcements shall be allocated and recovered pursuant to the existing \n9 \nregional cost allocation methodology set forth in Schedule 12.  That methodology relies on \n10 \na combination of solution-based DFAX and load-ratio share allocation approaches \n11 \ndepending on the type of upgrade at issue.40\n12 \nQ. \nPlease explain why the PJM Transmission Owners are proposing a 15-year transition \n13 \nperiod for allocating the costs of Interconnection Reliability Reinforcements. \n14 \nA. \n[Blazunas] The use of a 15-year allocation period recognizes the fact that the topology of \n15 \nthe transmission system changes over time in terms of both load and generation, meaning \n16 \nthat over time, more customers will be benefitting from the use of the Interconnection \n17 \nReliability Reinforcements.  For instance, as shown in Section (I) of Exhibit No. PTO-\n18 \n0003, the 2026 PJM Load Forecast Report reflects a wide range of rates of growth of \n19 \nsummer and winter peak load across Zones over a 15-year period, with the Dominion \n20 \n39\nId. at Sections (f)(2)(C), (f)(4)-(5). \n40\nId. at Section (f)(3)."},{"page":310,"startToken":114425,"endToken":114770,"text":"Exhibit No. PTO-0001 \nPage 28 of 43 \nVirginia Power zone forecast to have annualized 15-year summer and winter peak load \n1 \ngrowth rates of 4.90 percent and 4.70 percent, respectively.41  The overall PJM Regional \n2 \nTransmission Organization is forecast to have annualized 15-year summer and winter peak \n3 \nload growth rates of 2.90 percent and 3.30 percent, respectively.  As load grows and more \n4 \ntransmission facilities are added to the system, those facilities will increasingly be used by \n5 \nand relied on, and therefore benefit, customers across the region.   \n6 \nSimilarly, the generation characteristics of the PJM system have undergone \n7 \nsignificant changes over the past fifteen years.  Section (II) of Exhibit No. PTO-0003 \n8 \npresents existing MW capacity in PJM by zone between December 31, 2011, and \n9 \nSeptember 30, 2026.  Between the end of 2011 and the end of the third quarter of 2026, \n10 \nPJM saw existing capacity increase by 2.5 percent overall.  This overall increase, however, \n11 \ndoes not reflect the wide variation in the change in existing capacity in individual zones \n12 \nacross that same period.  For instance, the Dominion Virginia Power zone saw existing \n13 \ncapacity increase by 38 percent across that period whereas the Dayton Power & Light zone \n14 \nsaw its equivalent figure decrease by 71 percent.  The ability of both load and generation \n15 \nto change significantly across these periods supports the idea that the transmission system \n16 \nis dynamic and, consequently, transmission assets constructed to primarily serve one set of \n17 \ncustomers today can reasonably be expected to benefit other customers in the future.  These \n18 \nchanges in the topology of the transmission system reduce the meaningfulness of constraint \n19 \nimpacts measured at a single point in time as a measure of benefits to customers over time. \n20 \nInstead, the fact that the way transmission assets are used will change as the topology of \n21 \n41\nPJM Interconnection, L.L.C., 2026 PJM Load Forecast Report (Jan. 14, 2026), https://www.pjm.com/ \n/media/DotCom/library/reports-notices/load-forecast/2026-load-report.pdf."},{"page":311,"startToken":114770,"endToken":115038,"text":"Exhibit No. PTO-0001 \nPage 29 of 43 \nthe transmission system changes supports the need to transition the recovery of the costs \n1 \nof the transmission assets to a broader base of customers. \n2 \nAccordingly, I believe that 15 years represents a reasonable balance consistent with \n3 \ncost-causation and beneficiary-pays principles, recognizing that the Interconnection \n4 \nReliability Reinforcements are initially driven by generation interconnection requests and \n5 \ntransmission service requests made by Eligible Customers on behalf of Large Loads, but \n6 \nthat the benefits associated with these facilities will broaden as the transmission system \n7 \nchanges over time. \n8 \nE. \nRatepayer Protection Mechanisms \n9 \nQ. \nDoes the PJM Transmission Owners’ proposal address potential cost shifts among \n10 \nwholesale transmission customers? \n11 \nA. \n[Hammer] Yes.  First, as discussed below, the PJM Transmission Owners proposal \n12 \nincludes a pro forma CRA that, along with comparable individual agreements, will ensure \n13 \nthat Large Load customers commit to a minimum contribution to each Transmission \n14 \nOwner’s revenue requirement.42\n15 \nSecond, each PJM Transmission Owner commits to make a compliance filing to \n16 \ninclude in its formula rate provisions a mechanism designed to protect wholesale \n17 \ntransmission customers in its Zone from having to bear excessive large-load-related system \n18 \nupgrade costs when they do not have service requests associated with Large Load in a \n19 \ncluster.  In particular, this mechanism will protect municipal and cooperative entities that \n20 \nare not regulated by states, and therefore state jurisdictional retail efforts cannot insulate \n21 \n42\nProposed Tariff, Part VIII, Subpart N, section 441(a); Proposed pro forma CRA, Part IX, Subpart P at Articles \n5-7."},{"page":312,"startToken":115038,"endToken":115379,"text":"Exhibit No. PTO-0001 \nPage 30 of 43 \nthem from bearing a potentially disproportionate amount of costs associated with \n1 \nreinforcements necessary to provide transmission service to Large Load.  The PJM \n2 \nTransmission Owners have deliberately avoided specifying a single mechanism for \n3 \nimplementing this commitment due to the need for flexibility so that Transmission Owners \n4 \ncan design and propose wholesale customer protection mechanisms that are consistent with \n5 \nany applicable retail allocation or charge mechanisms. \n6 \nQ. \nDoes the PJM Transmission Owners’ proposal address potential cost shifts among \n7 \nretail customers within the same utility? \n8 \nA.  \n[Hammer] Consistent with the Commission’s findings in the Show Cause Order, the PJM \n9 \nTransmission Owners’ proposal focuses on cost allocation and potential cost shifts at the \n10 \nwholesale transmission level.  The allocation of transmission costs among retail customer \n11 \nclasses, including Large Load customers, is generally addressed through retail rate design \n12 \nsubject to state regulatory jurisdiction.  However, to facilitate the ability of state regulators \n13 \nto allocate costs at the retail level and to provide the transparency desired by the \n14 \nCommission as expressed in the Show Cause Order, the PJM Transmission Owners are \n15 \ncommitting to make, on compliance, necessary changes to their formula rate templates to \n16 \ninclude information regarding the costs of transmission facilities being constructed by the \n17 \nTransmission Owner to provide transmission service to Large Loads.43  This information \n18 \nis similar to information already provided by PJM Transmission Owners regarding PJM \n19 \nRTEP projects subject to regional cost allocation, and recovered through the TEC.  Based \n20 \n43\nProposed Schedule 12, Sections (f)(3)-(5). The Transmission Owner’s annual transmission revenue \nrequirement associated with an Interconnection Reliability Reinforcement will be determined pursuant to the formula \nrate in effect applicable to the Transmission Owner’s rates for Firm Transmission Service.  Transmission Owners will \nmake a compliance filing to be submitted within 120 days after the Commission issues an order accepting this filing \nto include any necessary revisions to the Transmission Owner’s formula rate template to identify each IRR."},{"page":313,"startToken":115379,"endToken":115613,"text":"Exhibit No. PTO-0001 \nPage 31 of 43 \non this information, state regulators may then determine whether and how such costs \n1 \nshould be assigned to Large Load customers through retail Large Load tariffs, special \n2 \ncontracts, riders, minimum demand or revenue requirements, or other retail rate \n3 \nmechanisms. \n4 \nQ. \nHow would the cost allocation proposal apply to a co-located Large Load and \n5 \ngeneration arrangement? \n6 \nA. \n[Hammer] For a co-located arrangement, the proposed methodology separately evaluates \n7 \nthe generation interconnection request and the Large Load transmission service request.  \n8 \nAt the same time, consistent with the Commission’s directive, the co-located generation \n9 \nmay reduce the amount of Firm Transmission Service required by the Large Load and, \n10 \ntherefore, the Large Load’s impact on the transmission system and the Interconnection \n11 \nReliability Reinforcements required to serve it. \n12 \nFor example, assume a co-located facility consists of a 500 MW Large Load and \n13 \n400 MW of generation.  If the Large Load requests 100 MW of Firm Contract Demand \n14 \nTransmission Service and the generator requests 400 MW of generator interconnection \n15 \nservice, the generator’s proportional impact would be evaluated based on the generation \n16 \nstudied through the Fast Energization Process, while the Large Load’s proportional impact \n17 \nwould be evaluated based on its 100 MW Firm Transmission Service request.44\n18 \n19 \n20 \n21 \n44\n Proposed Schedule 12, Sections (f)(2)(A), (C)."},{"page":314,"startToken":115613,"endToken":115880,"text":"Exhibit No. PTO-0001 \nPage 32 of 43 \nVIII. COST RECOVERY AGREEMENT \n1 \nQ. \nWhat concern identified by the Commission in the Show Cause Order is the proposed \n2 \nCost Recovery Agreement intended to address? \n3 \nA. \n[Hammer] The Commission expressed concern that transmission costs incurred to serve a \n4 \nLarge Load could be shifted to other wholesale transmission customers if the Large Load \n5 \ndoes not materialize, ramps more slowly than expected, or reduces or terminates service.45\n6 \nThe proposed pro forma CRA addresses this risk by establishing financial protections \n7 \ndesigned to ensure that the Large Load Customer bears an appropriate share of the financial \n8 \nrisk associated with its Firm Transmission Service commitment, thereby protecting other \n9 \nwholesale transmission customers from potential cost shifts. \n10 \nQ. \nPlease provide an overview of the proposed CRA. \n11 \nA. \n[Hammer] The proposed CRA is a three-party agreement among the Transmission Owner, \n12 \nthe Eligible Customer taking transmission service on behalf of the Large Load Customer, \n13 \nand the underlying Large Load Customer designed to protect other wholesale transmission \n14 \ncustomers from cost shifts associated with serving a Large Load.  The CRA includes a \n15 \ncommitment extending for a minimum of ten years after the first Service Date and several \n16 \nkey financial protections, including a minimum revenue commitment and associated \n17 \nshortfall payment mechanism, credit support, and early and partial termination amounts \n18 \nthat collectively address the risk that the anticipated transmission revenues associated with \n19 \nthe Large Load’s Firm Transmission Service commitment will not materialize over the \n20 \n45\nShow Cause Order at PP 79, 83."},{"page":315,"startToken":115880,"endToken":116173,"text":"Exhibit No. PTO-0001 \nPage 33 of 43 \nterm of the CRA, thereby reducing the risk that the resulting revenue exposure will be \n1 \nborne by other wholesale transmission customers.46\n2 \nThe CRA initially reflects the Large Load Customer’s anticipated load demand and \n3 \nramp schedule, including the anticipated dates for each stage of service, together with the \n4 \namount and type of firm transmission service that the Eligible Customer intends to request \n5 \non the Large Load Customer’s behalf, which establish the customer’s initial commitment \n6 \nbefore completion of PJM’s Fast Energization Process.  Following completion of PJM’s \n7 \ntransmission Fast Energization Process and execution of the Final PJM Agreement, the \n8 \nCRA is updated to reflect the type of and amount of Firm Transmission Service, load ramp, \n9 \nand Service Dates established through that process.  These amounts and dates establish the \n10 \nLarge Load Customer’s Firm Load Commitment, which identifies the committed load \n11 \nlevel, corresponding level of Firm Transmission Service, and applicable load-ramp \n12 \nmilestones and Service Dates.  The Firm Load Commitment serves as the benchmark for \n13 \ndetermining the Large Load Customer’s minimum transmission-revenue obligation.47\n14 \nBeginning on each applicable Service Date, and no more frequently than annually, \n15 \nthe applicable Transmission Owner calculates the minimum transmission-revenue \n16 \ncontribution associated with the Firm Load Commitment, referred to as the Committed \n17 \nRevenue Contribution, and compares that amount against qualifying revenues attributable \n18 \nto the firm transmission service actually taken to serve the Large Load, referred to as the \n19 \nActual Revenue Contribution.  If the Actual Revenue Contribution is less than the \n20 \n46\nProposed pro forma CRA, Part IX, Subpart P at Preamble and Articles 4.2, 5-6, 9. \n47\nId. at Articles 3.1-3.2 and Exhibit A."},{"page":316,"startToken":116173,"endToken":116483,"text":"Exhibit No. PTO-0001 \nPage 34 of 43 \nCommitted Revenue Contribution for the applicable Measurement Period, the Large Load \n1 \nCustomer is required to pay only the difference, or Shortfall Amount.  Credit Support \n2 \nsecures the Large Load Customer’s payment and other financial obligations under the \n3 \nCRA, including any Shortfall Amount, Early Termination Amount, or Partial Termination \n4 \nAmount.48  The CRA’s early and partial termination provisions likewise protect against the \n5 \napplicable portion of the remaining projected revenue commitment if the transmission \n6 \nrequest or commitment is withdrawn, the Large Load is abandoned or terminated, or its \n7 \ncapacity is permanently reduced.  In the event of termination before the first Service Date, \n8 \nthe Transmission Owner may draw on Credit Support to satisfy the applicable termination \n9 \npayment.  That payment is applied first to Project Development Costs associated with \n10 \ntransmission facilities that will no longer be needed to serve the Large Load, including \n11 \nsuch costs incurred by other Transmission Owners, thereby ensuring that these costs will \n12 \nnot be included in transmission rate base and recovered from other customers.49\n13 \nQ. \nPlease explain how the proposed CRA is designed to address the risk of cost shifts \n14 \namong wholesale transmission customers. \n15 \nA. \n[Hammer] The PJM Transmission Owners’ proposed CRA combines a minimum revenue \n16 \ncontribution, financial-security requirements, and flexibility to tailor specified terms to the \n17 \napplicable Transmission Owner and customer parties.  That framework is intended to \n18 \nprovide necessary wholesale customer protections while promoting timely Large Load \n19 \nintegration.  Each of the CRA’s financial security requirement addresses a different aspect \n20 \n48\nId. at Articles 5.1-5.5, 6.1–6.5, 7.6 and Exhibits B–C. \n49\nProposed Tariff, Part VIII, Subpart N, section 441(e); Proposed pro forma CRA, Part IX, Subpart P at \nArticles 9.1-9.12 and Exhibit D."},{"page":317,"startToken":116483,"endToken":116771,"text":"Exhibit No. PTO-0001 \nPage 35 of 43 \nof wholesale transmission cost shift risk.  The minimum revenue commitment addresses \n1 \nthe risk that anticipated Firm Transmission Service revenues associated with serving a \n2 \nLarge Load do not materialize.  Credit Support provides financial assurance that the Large \n3 \nLoad Customer can satisfy its transmission payment obligations over the remaining term \n4 \nof the CRA.  Finally, early and partial termination amounts protect against the loss of the \n5 \nanticipated revenue contribution if the Large Load Customer terminates or permanently \n6 \nreduces its commitment before the end of the agreed period.  Together, these protections \n7 \nprovide reasonable assurance that the financial risks associated with the Large Load \n8 \nCustomer’s Firm Transmission Service commitment are not shifted to other wholesale \n9 \ntransmission customers.50\n10 \nQ.\nPlease explain the minimum revenue contribution mechanism and how it protects \n11 \nother wholesale transmission customers from potential cost shifts. \n12 \nA. \n[Hammer] The minimum revenue contribution mechanism establishes a minimum level \n13 \nof transmission revenue that the Large Load Customer is responsible for providing, through \n14 \ntransmission service payments made by an Eligible Customer on its behalf, during each \n15 \nMeasurement Period, generally one year.  The CRA establishes a Committed Revenue \n16 \nContribution based on the projected Firm Transmission Service charges associated with \n17 \nthe applicable load commitment, multiplied by the applicable Minimum Commitment \n18 \nPercentage, which ranges from 80 to 100 percent.  For each Measurement Period, the \n19 \nTransmission Owner then compares the customer’s actual contribution to the Transmission \n20 \nOwner’s revenue requirement, based on its actual use, to its Committed Revenue \n21 \n50\nProposed Tariff, Part VIII, Subpart N, section 441(a); Proposed pro forma CRA, Part IX, Subpart P at Articles \n5-6, 9."},{"page":318,"startToken":116771,"endToken":117054,"text":"Exhibit No. PTO-0001 \nPage 36 of 43 \nContribution.  If actual revenues fall below the committed amount, the Large Load \n1 \nCustomer must pay the difference as a Shortfall Amount.  The minimum revenue \n2 \ncontribution is initially determined at CRA execution prior to the Large Load customer \n3 \nentering the PJM Fast Energization Process based on the amount of service to be requested \n4 \non behalf of the Large Load (the “Initial Load Commitment”), and then updated at the end \n5 \nof the PJM Fast Energization Process based on any changes made during that process (the \n6 \n“Firm Load Commitment”).51\n7 \nThis mechanism mitigates potential cost shifts by ensuring that the Large Load \n8 \nCustomer provides a minimum level of revenue associated with its Firm Transmission \n9 \nService commitment, even if its load does not materialize or ramp as expected.  At the \n10 \nsame time, revenues attributable to serving the Large Load are counted against that \n11 \ncommitment, so the Shortfall Amount reflects only the difference needed to satisfy the \n12 \nagreed minimum contribution.  Shortfall Amounts are credited against the Transmission \n13 \nOwner’s transmission revenue requirement, thereby reducing the costs that otherwise could \n14 \nbe recovered from other wholesale transmission customers.52\n15 \nQ.\nWhy is the proposed Minimum Commitment Percentage range of 80 to 100 percent \n16 \nreasonable? \n17 \nA. \n[Hammer] In my opinion, the proposed range is reasonable because it establishes a \n18 \nmeaningful minimum revenue commitment while allowing individual Transmission \n19 \nOwners to require a higher commitment where appropriate based on their particular \n20 \n51\nProposed pro forma CRA, Part IX, Subpart P at Articles 3.1-3.2, 5.1-5.5 and Exhibits A-B. \n52\nId. at Article 7.6."},{"page":319,"startToken":117054,"endToken":117346,"text":"Exhibit No. PTO-0001 \nPage 37 of 43 \ncircumstances.  The 80 percent floor is also consistent with prior agreements accepted by \n1 \nthe Commission.53\n2 \nQ.\nHow is the Credit Support Requirement determined? \n3 \nA. \n[Hammer] The Credit Support Requirement is designed to secure the Transmission \n4 \nOwner’s projected Firm Transmission Service revenue exposure associated with the Large \n5 \nLoad Customer’s commitment over the remaining term of the CRA.  It equals the aggregate \n6 \nProjected Full Firm Transmission Service Benchmarks for the Measurement Periods \n7 \nremaining in the Term, including any incomplete portion of the applicable Measurement \n8 \nPeriod.  Initially, it is based on 100 percent of the projected Firm Transmission Service-\n9 \nrelated charges associated with the Initial Load Commitment over the CRA term.  \n10 \nFollowing completion of the PJM Fast Energization Process and execution of the relevant \n11 \nservice agreement with PJM (referred to in the filing as the “Final PJM Agreement”), that \n12 \namount is recalculated based on the Firm Load Commitment, Service Dates, and other \n13 \ninformation established following the Final PJM Agreement.  The Credit Support \n14 \nRequirement is then recalculated after each Measurement Period.  Once the Large Load \n15 \nCustomer has satisfied its obligations for a Measurement Period, that period is removed \n16 \nfrom the calculation.  As a result, the Credit Support Requirement generally declines as \n17 \ncompleted Measurement Periods are reconciled, paid, and removed from the calculation, \n18 \nalthough it may also be adjusted when other relevant inputs change.54\n19 \n20 \n53\nSee Commonwealth Edison Co., 194 FERC ¶ 61,109 (2026); Commonwealth Edison Co., 194 FERC ¶ 61,185 \n(2026); PECO Energy Co., 193 FERC ¶ 61,148 (2025). \n54\nProposed pro forma CRA, Part IX, Subpart P at Articles 6.1, 6.5 and Exhibit C."},{"page":320,"startToken":117346,"endToken":117624,"text":"Exhibit No. PTO-0001 \nPage 38 of 43 \nQ.\nHow is the Projected Full Firm Transmission Service Benchmark determined?\n1 \nA. \n[Hammer] The Projected Full Firm Transmission Service Benchmark represents the \n2 \nprojected charges for 100 percent of the Large Load Customer’s applicable Firm \n3 \nTransmission Service for each Measurement Period.  For each Measurement Period \n4 \nincluded in the Credit Support Requirement, the Projected Full Firm Transmission Service \n5 \nBenchmark equals the Firm Transmission Service-related charges that would apply if \n6 \nEligible Customer took Firm Transmission Service corresponding to the Initial Load \n7 \nCommitment or Firm Load Commitment, as applicable, scheduled to apply during that \n8 \nMeasurement Period.  It is calculated using the customer’s Firm Load Commitment, the \n9 \napplicable Firm Transmission Service rates, and the portion of the Measurement Period \n10 \nduring which those load levels and rates apply.  The calculation also reflects any rate \n11 \nchange accepted by the Commission and scheduled to become effective during the \n12 \napplicable Measurement Period.55\n13 \nQ. \nWhy is the Credit Support Requirement adjusted over the life of the CRA, and why \n14 \nis that approach reasonable? \n15 \nA. \n[Hammer] The Credit Support Requirement is adjusted over the life of the CRA so that \n16 \nthe amount of financial security continues to reflect the Transmission Owner’s full \n17 \nprojected Firm Transmission Service revenue exposure over the remaining term of the \n18 \nCRA.  After each Measurement Period is finally reconciled and the Large Load Customer \n19 \nhas paid all amounts due for that period, that Measurement Period is removed from the \n20 \nCredit Support Requirement.  The requirement is also recalculated when relevant inputs \n21 \n55\nId. at Exhibit C, Sections 1-3."},{"page":321,"startToken":117624,"endToken":117922,"text":"Exhibit No. PTO-0001 \nPage 39 of 43 \nchange, such as the Firm Load Commitment, Service Dates, or applicable Firm \n1 \nTransmission Service rates.56\n2 \nThis approach is reasonable because it appropriately aligns the amount of financial \n3 \nsecurity with the exposure that remains under the CRA.  The Transmission Owner, to the \n4 \nbenefit of other customers, retains financial assurance for its full projected exposure over \n5 \nthe remaining term, while the Large Load Customer receives the benefit of a reduction in \n6 \nCredit Support as it satisfies its obligations over time.  Once a Measurement Period has \n7 \nbeen completed, reconciled, and paid, there is no longer a need to include that period in the \n8 \namount being secured.  The result is a Credit Support Requirement that remains sufficient \n9 \nto protect against prospective revenue risk without requiring the Large Load Customer to \n10 \ncollateralize exposure that has already been eliminated through performance.  \n11 \nQ.\nWhat are the early and partial termination provisions?\n12 \nA. \n[Hammer] The early and partial termination provisions address circumstances in which \n13 \nthe Firm Transmission Service request is: (i) withdrawn or abandoned, (ii) the CRA \n14 \nterminates before the end of its agreed term, (iii) the project is abandoned or ceases \n15 \noperations, or (iv) the Large Load Customer permanently reduces its Firm Load \n16 \nCommitment.  In those circumstances, the Large Load Customer is responsible for an Early \n17 \nTermination Amount or Partial Termination Amount.  The Early Termination Amount \n18 \nprotects a specified portion of the revenue contribution projected for the remainder of the \n19 \nCRA and is generally based on the applicable Termination Percentage and the present value \n20 \nof the remaining Projected Committed Revenue Contributions, less applicable credits.  For \n21 \n56\nId. at Article 6.5 and Exhibit C, Sections 1-4."},{"page":322,"startToken":117922,"endToken":118191,"text":"Exhibit No. PTO-0001 \nPage 40 of 43 \na partial termination, the amount is adjusted to reflect the permanent reduction in the Large \n1 \nLoad Customer’s Firm Load Commitment.57\n2 \nQ.\nWhy are these termination provisions necessary?\n3 \nA.  \n[Hammer] These termination provisions are necessary because the Transmission Owner \n4 \nmay make long-term transmission planning and investment decisions based on the Large \n5 \nLoad Customer’s Firm Load Commitment.  If the customer terminates or materially \n6 \nreduces that commitment, the associated transmission revenues may no longer materialize. \n7 \nThe termination provisions mitigate that risk by assigning an appropriate portion of the \n8 \nremaining revenue exposure to the Large Load Customer whose project and Firm Load \n9 \nCommitment gave rise to the exposure, thereby reducing the potential for the resulting \n10 \nrevenue shortfall to be shifted to other wholesale transmission customers. \n11 \nQ.\nHow are the Early Termination Amount and Partial Termination Amount \n12 \ndetermined? \n13 \nA. \n[Hammer] The Early Termination Amount is generally calculated by applying the \n14 \napplicable Termination Percentage to the present value of the remaining Projected \n15 \nCommitted Revenue Contributions, less any applicable credits. The Termination \n16 \nPercentage increases as the project progresses, from 25 percent before execution of the \n17 \nFinal PJM Agreement, to 50 percent during the first 180 days following execution of the \n18 \nFinal PJM Agreement, to 75 percent thereafter and before the first Service Date, and to 100 \n19 \npercent on and after the first Service Date.58  The present value calculation reflects the \n20 \n57\nId. at Articles 9.1-9.9 and Exhibit D. \n58\nId. at Exhibit D, Section 1."},{"page":323,"startToken":118191,"endToken":118467,"text":"Exhibit No. PTO-0001 \nPage 41 of 43 \nLarge Load Customer’s remaining Firm Load Commitment, the Minimum Commitment \n1 \nPercentage, applicable transmission service rates, rate components and billing \n2 \ndeterminants identified in Exhibit B to the CRA, and the Transmission Owner’s then-\n3 \neffective FERC-approved Weighted Average Cost of Capital as the discount rate.  \n4 \nThe Partial Termination Amount applies the same framework to the portion of the \n5 \nFirm Load Commitment that is permanently reduced. Generally, it is determined by \n6 \nmultiplying the Early Termination Amount by the percentage of committed MW being \n7 \nreduced.59\n8 \nQ.\nHow are the Termination Percentages determined and why are they reasonable?\n9 \nA. \n[Hammer] The Termination Percentages increase as the project progresses, reflecting the \n10 \nincreasing financial exposure associated with the Large Load Customer’s commitment.  \n11 \nUnder the CRA, the applicable percentage increases from 25 percent prior to execution of \n12 \nthe Final PJM Agreement to 100 percent on and after the first Service Date.60\n13 \nThis approach is reasonable because it aligns the customer’s termination \n14 \nresponsibility with the stage of its commitment and the Transmission Owner’s increasing \n15 \nexposure as the project advances.  At earlier stages, when the project is less advanced and \n16 \nthe Transmission Owner’s exposure is correspondingly lower, only a portion of the \n17 \nremaining committed revenue exposure is assigned to the Large Load Customer.  As the \n18 \nproject advances and the Transmission Owner increasingly relies on the Firm Load \n19 \nCommitment for planning, investment, and anticipated revenue recovery, the Large Load \n20 \n59\nId. at Articles 9.7-9.9 and Exhibit D, Sections 1-5. \n60\nId. at Exhibit D, Section 1."},{"page":324,"startToken":118467,"endToken":118690,"text":"Exhibit No. PTO-0001 \nPage 42 of 43 \nCustomer assumes a greater share of that exposure.  Once service begins, the Large Load \n1 \nCustomer is responsible for 100 percent of its remaining committed revenue obligation in \n2 \nthe event of termination.  \n3 \nQ.\nWhy is the Termination Amount based on the minimum revenue obligation rather \n4 \nthan projected full transmission revenues, as used to calculate the Credit Support \n5 \nRequirement? \n6 \nA. \n[Hammer] The Termination Amount represents an actual payment obligation, whereas the \n7 \nCredit Support Requirement represents financial security for potential exposure.  Because \n8 \nthe Large Load Customer’s contractual minimum revenue obligation is determined by \n9 \napplying the Minimum Commitment Percentage to projected transmission revenues, it is \n10 \nreasonable for the Termination Amount to be based on that committed revenue obligation \n11 \nrather than 100 percent of projected revenues.  This distinction ensures that the more \n12 \nconservative Credit Support Requirement provides financial assurance against potential \n13 \nexposure without converting that higher level of security into a greater payment obligation \n14 \nupon termination. \n15 \nThus, the two provisions serve different but complementary purposes: Credit \n16 \nSupport secures the Transmission Owner’s full projected exposure, while the Termination \n17 \nAmount reflects the Large Load Customer’s contractual payment responsibility upon \n18 \ntermination.61\n19 \n61\nId. at Exhibit C, Sections 1-3, 7 and Exhibit D, Sections 2-3."},{"page":325,"startToken":118690,"endToken":118931,"text":"Exhibit No. PTO-0001 \nPage 43 of 43 \nQ.\nIn your opinion, does the proposed CRA provide an appropriate framework for \n1 \nmitigating potential cost shifts associated with Large Loads among wholesale \n2 \ntransmission customers? \n3 \nA. \n[Hammer] Yes. The proposed CRA provides an appropriate set of financial protections \n4 \ndesigned to mitigate the risk that costs associated with serving a Large Load will be shifted \n5 \nto other wholesale transmission customers.  It achieves this through a set of  interlocking \n6 \nmechanisms. \n7 \nThe proposed CRA establishes a minimum revenue commitment to provide a \n8 \ndefined level of transmission revenue even if the Large Load does not materialize or ramp \n9 \nas expected. It requires Credit Support based on 100 percent of projected Firm \n10 \nTransmission Service revenues, providing a strong financial backstop for the Transmission \n11 \nOwner’s potential exposure.  And, if the customer terminates or reduces its commitment, \n12 \nthe early and partial termination provisions require the customer to bear an appropriate \n13 \nportion of its remaining committed revenue obligation.62\n14 \nCollectively, these provisions appropriately allocate the financial risks associated \n15 \nwith the Large Load Customer’s Firm Transmission Service commitment to that customer, \n16 \nwhile calibrating the customer’s payment and Credit Support obligations to the nature and \n17 \nextent of the exposure being addressed. \n18 \nQ. \nDoes this complete your testimony at this time? \n19 \nA. \n[Blazunas and Hammer] Yes.\n20 \n62\nId. at Articles 5-6, 9 and Exhibits B-D."},{"page":326,"startToken":118931,"endToken":119031,"text":"UNITED STATES OT' AMERIC.A.\nBEFORE THE\nFEDERAL ENERGY RBGULATORY COMMISSIOI\\\nlrxelotr Corporatiofi, et ill.\n)\n[-]ockct No. Ir,l{27-, ---00t)\nDECLARATION OF PETER BLAZUNAS\nI depose and state under penalty of perjury that the_ foregoing exhibits were prepared or\nassembled by me or under my direction, and that I have read the foregoing questions and answers\nlabeled as my testimony: ttrat if asked the same questions my answffs in response would be as\nshown; and that the facts contained in my answers are true to the best of my knowledge,\ninfirrrnati r-rn\" and heli ef -\nNovember 16. 2()26"},{"page":327,"startToken":119031,"endToken":119127,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nExelon Corporation, et al.  \n \n \n)  \n \nDocket No. ER27-___-000 \n \n \nDECLARATION OF HANHAN HAMMER \n \n \nI depose and state under penalty of perjury that the foregoing exhibits were prepared or \nassembled by me or under my direction, and that I have read the foregoing questions and answers \nlabeled as my testimony: that if asked the same questions my answers in response would be as \nshown; and that the facts contained in my answers are true to the best of my knowledge, \ninformation, and belief. \n \n \n \n \n \n \n \n \n                                                       \n \n \n \n \n \n \n \n \n______________________ \n \n \n \n \n \n \n \nHanhan Hammer \n \nNovember 16, 2026"},{"page":328,"startToken":119127,"endToken":119539,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \n \n \n \n  CONCENTRIC ENERGY ADVISORS \nPETER BLAZUNAS \nVICE PRESIDENT \nPROFESSIONAL HISTORY \nConcentric Energy Advisors, Inc.  \nVice President (January 2026 – Present) \nAssistant Vice President (January 2024 – December 2025) \nSenior Project Manager (January 2023 - December 2023) \nProject Manager (October 2021 - December 2022)  \n \nCurrently serve as the project manager and expert witness for a long-term staff augmentation \nengagement with Narragansett Electric Company (“NECO”, also known as Rhode Island \nEnergy) following its acquisition by PPL from National Grid. Staff augmentation services \ninclude the provision of expert witness testimony and analyst support in the litigation of gas \nand electric rate mechanism proceedings, the execution of both internal and external monthly \nreporting, the development of written processes and procedures, and the training of new \npersonnel.  \n \nExecutes projects and initiatives related to cost of service and rate design and, where \nappropriate, serves as an expert witness in regulatory proceedings. \n \nA recent engagement included the provision of expert witness testimony with respect to rate \ndesign in a multi-year rate plan application for an electric utility in Maryland.  \n \nManages all phases of assigned projects with teams of senior staff and supporting analysts \nacross multiple offices. \nMr. Blazunas specializes in regulatory strategy and rate case expertise for regulated electric \nand gas utility rate proceedings. He joined Concentric in 2021 after nine years in progressively \nsenior roles within the regulatory departments of large investor-owned electric utilities. Most \nrecently, at Exelon Corp., he managed a team overseeing cost of service, revenue allocation, \nrate design, revenue decoupling, and rate administration for Pepco’s Maryland and District of \nColumbia jurisdictions. At Concentric, Peter Blazunas has led diverse projects, including staff \naugmentation for a New England gas and electric utility’s pricing team, assisting in the \ndevelopment of the revenue requirement and minimum filing requirements for the multiyear \nrate plan application of a large Midwestern electric utility, and testifying on rate design and \nrevenue decoupling for mid-Atlantic electric utilities in multiyear rate plan applications. He is a \nseasoned expert witness, having testified in traditional base distribution rate cases and \nmultiyear rate plan proceedings before regulatory commissions in Delaware, the District of \nColumbia, Maryland, Ohio, and Rhode Island. Mr.  Blazunas has also testified before the Federal \nEnergy Regulatory Commission. Mr. Blazunas earned a B.A. and M.A. in Economics from the \nUniversity of Dayton and the University of Akron, respectively. He has also taught undergraduate \nand graduate economics at the University of Akron and Cuyahoga Community College. \nExhibit No. PTO-0002\nPage 1 of 8"},{"page":329,"startToken":119539,"endToken":119942,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \n CONCENTRIC ENERGY ADVISORS \nPepco (Exelon Corp.), Washington, D.C.  \nManager of Rate Administration (November 2018 – January 2021) \nSenior Rate Analyst (July 2017 – November 2018) \n \nManaged a team of four rate analysts responsible for the cost of service and rate design \nfunctions with respect to Pepco’s base distribution rates.  \n \nServed as the rate design witness for Pepco’s Maryland and District of Columbia base \ndistribution rate case and multi-year rate plan proceedings, with a focus on revenue allocation, \nrate design, and decoupling in both traditional and non-traditional contexts.  \n \nServed as the rate design and cost recovery witness for several of Exelon’s Pepco Holdings Inc. \n(“PHI\") jurisdictions with respect to transportation electrification.  \n \nOversaw the development of self-contained cost-of-service (“COS”) and rate design Microsoft \nExcel models for use in regulatory proceedings.  \n \nGuided the creation of concise and well-written processes and procedures as it relates to the \ndevelopment of base distribution rates, numerous distribution riders, and transmission retail \nrates.  \n \nDirected the development of internal project plan templates for use in executing initiatives \nrelated to the implementation of traditional and innovative rates.  \n \nSupervised the development of internal documents to direct Pepco’s policy positions on a range \nof issues in work group settings with a diverse set of external stakeholders (primarily, the \nMaryland Public Service Commission Public Conference 44 Rate Design Working Group and the \nDistrict of Columbia Public Service Commission Rate Design Working Group). \nFirst Energy Corp., Akron, OH  \nState Regulatory Analyst (January 2012 – June 2017) \n \nServed as the lead analyst for the FirstEnergy Ohio operating companies’ Delivery Capital \nRecovery Rider (“Rider DCR”). Duties included the preparation of a detailed quarterly filing \nwith the Public Utilities Commission of Ohio (“PUCO”) that requires complex revenue \nrequirement calculations, extensive intra-company communication and collaboration in the \ndevelopment of financial inputs, month-to-month analysis, and participation in an annual audit \nconducted by an outside consultant on behalf of the PUCO.  \n \nDuties also included (a) the role of Rates and Regulatory Affairs Department point of contact \nfor internal customers in relation to the application of The Cleveland Electric Illuminating \nCompany’s and The Toledo Edison Company’s tariffs and (b) participation in various state \nregulatory proceedings, including testifying in front of the PUCO. \nCuyahoga Community College, Highland Hills, OH \nAdjunct Faculty (Hybrid) (January 2022 – May 2022) \n \nCourses Taught: Principles of Microeconomics (Undergraduate) \nUniversity of Akron, Akron, OH \nAssistant Lecturer (In-Person) (September 2023 – Present) \nExhibit No. PTO-0002\nPage 2 of 8"},{"page":330,"startToken":119942,"endToken":120077,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \n CONCENTRIC ENERGY ADVISORS \n \nCourses Taught: Introduction to Economic Analysis (Undergraduate); Economic Decision \nMaking for Business (Graduate); Regulatory Economics (Undergraduate/Graduate) \nAssociate Lecturer (Online) (January 2018 – May 2018) \n \nCourses Taught: Survey of Basic Economics (Undergraduate) \nAssociate Lecturer (In-Person) (August 2012 – May 2017) \n \nCourses Taught: Principles of Microeconomics and Principles of Macroeconomics \n(Undergraduate) \nEDUCATION \nUniversity of Akron (Akron, Ohio), December 2011 \nMaster of Arts, Economics  \nUniversity of Dayton (Dayton, Ohio), May 2009 \nBachelor of Arts, Economics, Summa Cum Laude \nCONTINUED EDUCATION \nUtility Accounting and Finance Seminar, January 2018 \nFinancial Accounting Institute, Washington, D.C. \nMorgan Stanley Investment Banking Client Training Program, April 2016 \nTraining the Street, New York City, NY \nEdison Electric Institute Advanced Ratemaking Course, August 2013 \nEdison Electric Institute, Madison, WI \n \nExhibit No. PTO-0002\nPage 3 of 8"},{"page":331,"startToken":120077,"endToken":120471,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \nCONCENTRIC ENERGY ADVISORS \nSPONSOR  \nDATE  \nCASE/APPLICANT  \nDOCKET  \nSUBJECT \nFederal Energy Regulatory Commission \nPJM Transmission Owners \n2026 \nPJM Transmission \nOwners \nDocket No. \nEL25-49 \nRate Design  \nDelaware Public Service Commission \nDelmarva Power and Light \nCompany \n2018\nDelmarva Power \nand Light Company \nDocket No. \n17-1094 \nRate Design and Cost Recovery \n(Transportation \nElectrification) \nPublic Service Commission of the District of Columbia \nPotomac Electric Power \nCompany  \n2019 \nPotomac Electric \nPower Company \nFormal Case \nNo. 1156 \nRate Design (Multi-Year Rate \nPlan) \nPotomac Electric Power \nCompany \n2019 \nPotomac Electric \nPower Company \nFormal Case \nNo. \n1145/1159 \nRate Design and Cost Recovery \n(Undergrounding Application) \nPotomac Electric Power \nCompany \n2018\nPotomac Electric \nPower Company \nFormal Case \nNo. 1130 \nRate Design and Cost Recovery \n(Transportation \nElectrification) \nMaryland Public Service Commission \nPotomac Electric Power \nCompany \n2025 \nPotomac Electric \nPower Company \nCase No. 9820 \nRate Design (Fully Forecasted \nTest Year) \nPotomac Electric Power \nCompany \n2023 \nPotomac Electric \nPower Company \nCase No. 9702 \nRate Design (Multi-Year Rate \nPlan) \nDelmarva Power and Light \nCompany \n2022 \nDelmarva Power \nand Light Company \nCase No. 9681 \nRate Design (Multi-Year Rate \nPlan) \nPotomac Electric Power \nCompany  \n2020 \nPotomac Electric \nPower Company \nCase No. 9655 \nRate Design (Multi-Year Rate \nPlan) \nPotomac Electric Power \nCompany  \n2019 \nPotomac Electric \nPower Company \nCase No. 9602 \nRate Design (Traditional Rate \nCase) \nPotomac Electric Power \nCompany  \n2018 \nPotomac Electric \nPower Company \nCase No. 9472 \nRate Design (Traditional Rate \nCase) \nPublic Utilities Commission of Ohio\nThe Cleveland Electric \nIlluminating Company  \n2017\nThe Cleveland \nElectric Illuminating \nCompany \nCase No. 16-\n2213-EL-CSS \nCustomer Complaint Case\nThe Toledo Edison Company\n2014\nThe Toledo Edison \nCompany \nCase No. 13-\n2145-EL-CSS \nCustomer Complaint Case\nRhode Island Public Utilities Commission \nRhode Island Energy \n2025 \nRhode Island \nEnergy \nDocket No. \n25-45-GE \nRate Design (General Rate \nCase) \nRhode Island Energy\n2025\nRhode Island \nEnergy \nDocket No. \n25-23-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy \n2025 \nRhode Island \nEnergy \nDocket No. \n25-04-REG \nRate Design and Cost Recovery \n(Annual Retail Rate Filing) \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n24-48-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n24-29-NG \nRate Design and Cost Recovery \n(Distribution Adjustment \nCharge and Gas Cost Recovery) \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n23-45-EL \nRate Design and Cost Recovery \n(Renewable Resource Rider) \nExhibit No. PTO-0002\nPage 4 of 8"},{"page":332,"startToken":120471,"endToken":120732,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \nCONCENTRIC ENERGY ADVISORS \nSPONSOR  \nDATE  \nCASE/APPLICANT  \nDOCKET  \nSUBJECT \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n24-18-EL \nRate Design and Cost Recovery \n(Electric Revenue Decoupling \nMechanism) \nRhode Island Energy\n2024\nRhode Island \nEnergy \nDocket No. \n24-17-EL \nRate Design and Cost Recovery\n(Residential Assistance \nRecovery Filing) \nRhode Island Energy \n2024 \nRhode Island \nEnergy \nDocket No. \n24-07-EL \nRate Design and Cost Recovery \n(Annual Retail Rate Filing) \nRhode Island Energy\n2023\nRhode Island \nEnergy \nDocket No. \n23-05-EL \nTariff Advice (Net Metering)\nRhode Island Energy \n2023 \nRhode Island \nEnergy \nDocket No. \n23-23-NG \nRate Design and Cost Recovery \n(Distribution Adjustment \nCharge and Gas Cost Recovery) \nRhode Island Energy \n2023 \nRhode Island \nEnergy \nDocket No. \n23-24-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy \n2023 \nRhode Island \nEnergy \nDocket No. \n23-03-EL \nRate Design and Cost Recovery \n(Annual Retail Rate Filing) \nRhode Island Energy \n2022\nRhode Island \nEnergy \nDocket No. \n22-04-REG \nRate Design and Cost Recovery \n(Renewable Energy Program) \nRhode Island Energy \n2022 \nRhode Island \nEnergy \nDocket No. \n22-13-NG \nRate Design and Cost Recovery \n(Distribution Adjustment \nCharge) \nRhode Island Energy \n2022 \nRhode Island \nEnergy \nDocket No. \n5098 \nRate Design (Rider \nReconciliation) \nRhode Island Energy\n2022\nRhode Island \nEnergy \nDocket No. \n22-20-NG \nRate Design and Cost Recovery \n(Gas Cost Recovery) \nRhode Island Energy \n2022 \nRhode Island \nEnergy \nDocket No. \n22-54-NG \nRate Design and Cost Recovery \n(Infrastructure, Safety, and \nReliability Program) \nRhode Island Energy\n2022\nRhode Island \nEnergy \nDocket No. \n22-53-EL \nRate Design and Cost Recovery \n(Infrastructure, Safety, and \nReliability Program) \n \n \nExhibit No. PTO-0002\nPage 5 of 8"},{"page":333,"startToken":120732,"endToken":121075,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \nCONCENTRIC ENERGY ADVISORS \nHANHAN HAMMER \nSENIOR PROJECT MANAGER \nEXPERTISE & KEY SKILLS \n \nEnergy Industry Expertise – 17+ years of experience in ISO/RTO markets and stakeholder \nprocess, utility regulation, transmission ratemaking, wholesale and retail tariff design, \nmarket revenue forecasting, resource and transmission planning, and regulatory compliance. \n \nRegulatory Strategy & Testimony – Extensive experience preparing tariff filings, provided \nexpert witness testimony, and advising clients through FERC and state regulatory \nproceedings. \n \nWholesale Power Markets – Led design of market rules for DERs, energy storage, and \nancillary services; skilled in market power analysis, revenue forecasting, and locational \nmarginal price formation. \n \nStrategic Communication – Effective at translating complex regulatory and technical issues \ninto clear insights for executives, regulators, policymakers, and industry forums. \n \nProject & Team Leadership – Strong record of managing cross-functional teams, guiding \ncomplex initiatives under fixed budgets, and delivering results. Directed cross-functional \nproject teams, ensuring projects were completed on scope, budget, and schedule; presented \nfindings to executives and regulators to support high-stakes decision-making. \nPROFESSIONAL HISTORY \nConcentric Energy Advisors (2024 – Present) \nSenior Project Manager \n \nShaped client regulatory strategy by supporting filings and expert testimony on large load \ntariffs, transmission ratemaking, ancillary service rates in merger cases, and market power \nanalyses, directly informing multimillion-dollar business decisions. \n \nAdvised utilities and developers on compliance and opportunity capture under evolving \nfederal and state rules (e.g., Order 2222, transmission–distribution coordination, data center \ninterconnection/colocation), enabling clients to position early for regulatory and market \nadvantages. \nMs. Hammer is a recognized expert in the energy industry with over 17 years of experience in \nutility regulation and ISO/RTO operation, planning, and markets. At Concentric, she advises \nutilities, developers, grid operators, and regulators on complex regulatory, commercial, and \nmarket issues, including large load tariffs, transmission ratemaking and cost allocation, resource \nand transmission planning, compliance with FERC orders, and wholesale market strategies.  Ms. \nHammer has provided expert testimony before the Federal Energy Regulatory Commission and \nNew Hampshire Public Utilities Commission. Her work has helped clients secure critical \nregulatory approvals, optimize capital investments, and unlock new revenue opportunities.  \nExhibit No. PTO-0002\nPage 6 of 8"},{"page":334,"startToken":121075,"endToken":121293,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \nCONCENTRIC ENERGY ADVISORS \n \nDelivered market and revenue analyses that optimized generation and storage investment \ndecisions, improving projected returns and clarifying participation strategies across \nwholesale and retail programs. \n \nRecommended ISO market design enhancements that incentivized preferred generation \nresources, influencing stakeholder discussions and policy direction. \nISO New England (2014-2024) \nPrincipal/Lead Analyst \n \nDesigned wholesale market rules enabling DERs, storage, and renewables to participate; \ndeveloped ancillary service products and reliability solutions. \n \nPrepared tariff filings, provided expert testimony, and presented initiatives to regulators, \nlegislators, and stakeholders. \n \nAdvised project teams and senior management on policy trends and market design \nopportunities. \nSouthwest Power Pool (2011-2014) \nSenior Market Analyst \n \nEvaluated nodal pricing and transmission congestion to support power trading hubs; \nauthored State of the Market reports and presented to stakeholders and FERC. \n \nDeveloped analytic dashboards to monitor market performance, identify trends, and brief \nexecutives and boards. \nPotomac Economics (2009-2011) \nSenior Market Monitor  \n \nMonitored the Midcontinent ISO (MISO) wholesale markets to detect anti-competitive \nbehavior; prepared FERC referrals and supported regulatory enforcement. \n \nAdvised investor-owned utilities on operational efficiency and market performance to inform \nstrategic decisions. \nEDUCATION \nUniversity of Arkansas \nMaster of Business Administration  \nWestern Illinois University \nMaster of Art in Economics  \nAnhui University of Technology \nBachler of Art in Economics and International Trade \nExhibit No. PTO-0002\nPage 7 of 8"},{"page":335,"startToken":121293,"endToken":121503,"text":"RESUMES OF PETER BLAZUNAS AND HANHAN HAMMER \n \nCONCENTRIC ENERGY ADVISORS \nSPONSOR\nDATE\nCASE/APPLICANT\nDOCKET NO.\nSUBJECT\nFederal Energy Regulatory Commission\nISO New England \nInc. and New \nEngland Power \nPool \n2016 \nISO New England Inc. \nand New England \nPower Pool \nER16-1838-000 \nReal-Time Energy \nMarket and Real-\nTime reserves \nISO New England \nInc. \n2016 \nISO New England Inc. \nER17-680-000 \nNet Commitment \nPeriod \nCompensation \n(“NCPC”) credit \nrules \nISO New England \nInc. and New \nEngland Power \nPool \n2017 \nISO New England Inc. \nand New England \nPower Pool \nER17-1706-000 \nMarket Rule 1 \nRevisions to Permit \nUse of Five-Minute \nRevenue Quality \nMeter Data in \nEnergy Market \nSettlement \nISO New England \nInc. and New \nEngland Power \nPool \n2018 \nISO New England Inc. \nand New England \nPower Pool \nER18-897-000 \nThe designation and \nsettlement of \nOperating Reserves \nin the Real-Time \nEnergy Market \nPJM Transmission \nOwners \n2026 \nPJM Transmission \nOwners \nEL25-49 \nLarge load co-\nlocation \narrangement in PJM \nSuperior Court of the State of California County of Los Angeles\nLos Angeles \nDepartment of \nWater and Power \n(“LADWP”) \n2025 \nClass Counsel Kabateck \nLLP \nLead Case No., \nBC577267 \nLADWP key \nperformance \nIndicators \ncompliance \nNew Hampshire Public Utilities Commission\nLiberty Utilities \n(Granite State \nElectric) \n2026 \nLiberty Utilities \n(Granite State Electric) \nDE 25-030 \nDefault Service \nSolicitation \n \nExhibit No. PTO-0002\nPage 8 of 8"},{"page":336,"startToken":121503,"endToken":121986,"text":"Exhibit No. PTO-0003\nPage 1 of 1\n(I) PJM Zonal 15-Year Annualized Peak Load Growth Rates\n(a)\n(b)\n(c)\nZone\nSummer\nWinter\n(1)\n   \nAE\n0.5%\n1.0%\n(2)\n   \nBGE\n0.5%\n0.7%\n(3)\n   \nDPL\n0.3%\n0.2%\n(4)\n   \nJCPL\n1.4%\n2.2%\n(5)\n   \nMETED\n1.7%\n1.8%\n(6)\n   \nPECO\n1.5%\n1.9%\n(7)\n   \nPENLC\n0.4%\n0.4%\n(8)\n   \nPEPCO\n1.7%\n1.8%\n(9)\n   \nPL\n4.4%\n4.4%\n(10)\n \nPS\n2.1%\n3.1%\n(11)\n \nRECO\n0.4%\n1.2%\n(12)\n \nUGI\n0.2%\n0.1%\n(13)\n \nAEP\n4.1%\n4.4%\n(14)\n \nAPS\n2.3%\n2.2%\n(15)\n \nATSI\n1.4%\n1.8%\n(16)\n \nCOMED\n2.6%\n3.8%\n(17)\n \nDAYTON\n3.6%\n3.9%\n(18)\n \nDEOK\n0.8%\n0.8%\n(19)\n \nDLCO\n0.8%\n1.0%\n(20)\n \nEKPC\n0.6%\n0.3%\n(21)\n \nDOM\n4.9%\n4.7%\n(22)\n \nPJM RTO\n2.9%\n3.3%\n(23)\n \nMinimum\n0.2%\n0.1%\n(24)\n \nMaximum\n4.9%\n4.7%\n(25)\n \nMinimum\nUGI\nUGI\n(26)\n \nMaximum\nDOM\nDOM\nSource: Pages 9 and 14-34 of 2026 PJM Load Forecast Report  (January 14, 2026).\n(II) PJM: Existing Capacity by Zone (MW)\n(a)\n(b)\n(c)\n(d) = (c) - (b)\n(e) = (d) ÷ (b)\nZone\n2011\nQ3 2026\nDifference\n% Difference\n(1)\n   \nAE\n1,990\n                            \n1,274\n                            \n(716)\n                             \n-36.0%\n(2)\n   \nBGE\n5,554\n                            \n4,288\n                            \n(1,266)\n                           \n-22.8%\n(3)\n   \nDPL\n4,819\n                            \n5,038\n                            \n219\n                               \n4.5%\n(4)\n   \nJCPL\n3,980\n                            \n3,629\n                            \n(351)\n                             \n-8.8%\n(5)\n   \nMETED\n4,167\n                            \n3,650\n                            \n(517)\n                             \n-12.4%\n(6)\n   \nOVEC\n-\n                                \n2,389\n                            \n2,389\n                            \n-\n(7)\n   \nPECO\n11,743\n                          \n11,978\n                          \n235\n                               \n2.0%\n(8)\n   \nPENLC\n8,366\n                            \n9,665\n                            \n1,299\n                            \n15.5%\n(9)\n   \nPEPCO\n6,248\n                            \n4,025\n                            \n(2,223)\n                           \n-35.6%\n(10)\n \nPL\n11,274\n                          \n14,590\n                          \n3,316\n                            \n29.4%\n(11)\n \nPS\n11,534\n                          \n9,118\n                            \n(2,416)\n                           \n-20.9%\n(12)\n \nAEP\n34,938\n                          \n38,844\n                          \n3,906\n                            \n11.2%\n(13)\n \nAPS\n11,702\n                          \n11,109\n                          \n(593)\n                             \n-5.1%\n(14)\n \nATSI\n12,530\n                          \n10,645\n                          \n(1,885)\n                           \n-15.0%\n(15)\n \nCOMED\n28,183\n                          \n30,464\n                          \n2,281\n                            \n8.1%\n(16)\n \nDAYTON\n5,785\n                            \n1,674\n                            \n(4,111)\n                           \n-71.1%\n(17)\n \nDEOK\n-\n                                \n2,892\n                            \n2,892\n                            \n-\n(18)\n \nDLCO\n3,286\n                            \n2,173\n                            \n(1,113)\n                           \n-33.9%\n(19)\n \nEKPC\n-\n                                \n2,802\n                            \n2,802\n                            \n-\n(20)\n \nDOM\n23,383\n                          \n32,241\n                          \n8,858\n                            \n37.9%\n(21)\n \nExternal\n8,943\n                            \n3,241\n                            \n(5,702)\n                           \n-63.8%\n(22)\n \nPJM RTO\n198,425\n                        \n205,730\n                        \n7,305\n                            \n3.7%\n(23)\n \nMinimum\n1,990\n                            \n1,274\n                            \n(5,702)\n                           \n-71.1%\n(24)\n \nMaximum\n34,938\n                          \n38,844\n                          \n8,858\n                            \n37.9%\n(25)\n \nMinimum\nAE\nAE\nExternal\nDAYTON\n(26)\n \nMaximum\nAEP\nAEP\nDOM\nDOM\nSources:\n(b) See the 2011 State of the Market Report for PJM , Table 11-8 (March 15, 2012).\n(c)\nSee the 2026 Quarterly State of the Market Report for PJM: January through September , Table 12-1 (November 12, 2026)."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":5,"endAt":67,"startToken":0,"endToken":1814},{"p":5,"at":67,"title":"I. EXECUTIVE SUMMARY","method":"printed heading","endPage":5,"endAt":71,"startToken":1814,"endToken":1815},{"p":5,"at":71,"title":"EXECUTIVE SUMMARY","method":"printed heading","endPage":7,"endAt":1136,"startToken":1815,"endToken":2966},{"p":7,"at":1136,"title":"II. BACKGROUND","method":"printed heading","endPage":7,"endAt":1141,"startToken":2966,"endToken":2967},{"p":7,"at":1141,"title":"BACKGROUND","method":"printed heading","endPage":7,"endAt":1153,"startToken":2967,"endToken":2968},{"p":7,"at":1153,"title":"A. PJM Transmission Owner Filing Rights","method":"printed heading","endPage":7,"endAt":1887,"startToken":2968,"endToken":3079},{"p":7,"at":1887,"title":"B. Procedural Background","method":"printed heading","endPage":10,"endAt":191,"startToken":3079,"endToken":4170},{"p":10,"at":191,"title":"III. DISCUSSION","method":"printed heading","endPage":10,"endAt":197,"startToken":4170,"endToken":4171},{"p":10,"at":197,"title":"DISCUSSION","method":"printed heading","endPage":10,"endAt":209,"startToken":4171,"endToken":4172},{"p":10,"at":209,"title":"A. Pro Forma Cost Recovery Agreement and Related Tariff Provisions","method":"printed heading","endPage":27,"endAt":68,"startToken":4172,"endToken":12068},{"p":27,"at":68,"title":"B. Transmission Service Rates and Related Charges for Co-Located Load and","method":"printed heading","endPage":28,"endAt":1280,"startToken":12068,"endToken":12668},{"p":28,"at":1280,"title":"C. Extension of Transmission Services and Financial Penalties for Unreserved","method":"printed heading","endPage":34,"endAt":1975,"startToken":12668,"endToken":15422},{"p":34,"at":1975,"title":"D. Cost Allocation and Recovery for Interconnection Reliability Reinforcements","method":"printed heading","endPage":45,"endAt":1990,"startToken":15422,"endToken":20958},{"p":45,"at":1990,"title":"IV. EFFECTIVE DATE AND IMPLEMENTATION","method":"printed heading","endPage":45,"endAt":2212,"startToken":20958,"endToken":20994},{"p":45,"at":2212,"title":"Attachment F-3A, Attachment F-4, and certain parts of Part VIII to the Tariff. For the remaining","method":"printed heading","endPage":46,"endAt":1057,"startToken":20994,"endToken":21319},{"p":46,"at":1057,"title":"V. ADDITIONAL FILING INFORMATION","method":"printed heading","endPage":46,"endAt":1092,"startToken":21319,"endToken":21323},{"p":46,"at":1092,"title":"A. Request for Waiver.","method":"printed heading","endPage":46,"endAt":1667,"startToken":21323,"endToken":21414},{"p":46,"at":1667,"title":"B. Documents Submitted With This Filing.","method":"printed heading","endPage":47,"endAt":68,"startToken":21414,"endToken":21479},{"p":47,"at":68,"title":"C. Communications.","method":"printed heading","endPage":47,"endAt":927,"startToken":21479,"endToken":21588},{"p":47,"at":927,"title":"D. Service.","method":"printed heading","endPage":48,"endAt":68,"startToken":21588,"endToken":21797},{"p":48,"at":68,"title":"VI. CONCLUSION","method":"printed heading","endPage":48,"endAt":73,"startToken":21797,"endToken":21798},{"p":48,"at":73,"title":"CONCLUSION","method":"printed heading","endPage":49,"endAt":0,"startToken":21798,"endToken":21864},{"p":49,"at":0,"title":"Attachment A","method":"printed heading","endPage":60,"endAt":780,"startToken":21864,"endToken":25340},{"p":60,"at":780,"title":"Attachment K-Appendix, section 6.6(c) or the defaults below:","method":"printed heading","endPage":126,"endAt":278,"startToken":25340,"endToken":47321},{"p":126,"at":278,"title":"Attachment H-11 and","method":"printed heading","endPage":126,"endAt":299,"startToken":47321,"endToken":47324},{"p":126,"at":299,"title":"Attachment H-34","method":"printed heading","endPage":126,"endAt":441,"startToken":47324,"endToken":47345},{"p":126,"at":441,"title":"Attachment H-11 and","method":"printed heading","endPage":126,"endAt":462,"startToken":47345,"endToken":47348},{"p":126,"at":462,"title":"Attachment H-34","method":"printed heading","endPage":126,"endAt":576,"startToken":47348,"endToken":47371},{"p":126,"at":576,"title":"Attachment H-14 and","method":"printed heading","endPage":126,"endAt":597,"startToken":47371,"endToken":47374},{"p":126,"at":597,"title":"Attachment H-20","method":"printed heading","endPage":126,"endAt":631,"startToken":47374,"endToken":47379},{"p":126,"at":631,"title":"Attachment H-14 and","method":"printed heading","endPage":126,"endAt":652,"startToken":47379,"endToken":47382},{"p":126,"at":652,"title":"Attachment H-20","method":"printed heading","endPage":126,"endAt":794,"startToken":47382,"endToken":47403},{"p":126,"at":794,"title":"Attachment H-14 and","method":"printed heading","endPage":126,"endAt":815,"startToken":47403,"endToken":47406},{"p":126,"at":815,"title":"Attachment H-20","method":"printed heading","endPage":126,"endAt":861,"startToken":47406,"endToken":47413},{"p":126,"at":861,"title":"Attachment H-15","method":"printed heading","endPage":126,"endAt":895,"startToken":47413,"endToken":47418},{"p":126,"at":895,"title":"Attachment H-15","method":"printed heading","endPage":126,"endAt":997,"startToken":47418,"endToken":47433},{"p":126,"at":997,"title":"Attachment H-15","method":"printed heading","endPage":126,"endAt":1101,"startToken":47433,"endToken":47454},{"p":126,"at":1101,"title":"Attachment H-21","method":"printed heading","endPage":126,"endAt":1135,"startToken":47454,"endToken":47459},{"p":126,"at":1135,"title":"Attachment H-21","method":"printed heading","endPage":126,"endAt":1169,"startToken":47459,"endToken":47464},{"p":126,"at":1169,"title":"Attachment H-21","method":"printed heading","endPage":126,"endAt":1203,"startToken":47464,"endToken":47469},{"p":126,"at":1203,"title":"Attachment H-21","method":"printed heading","endPage":126,"endAt":1237,"startToken":47469,"endToken":47474},{"p":126,"at":1237,"title":"Attachment H-21","method":"printed heading","endPage":126,"endAt":1281,"startToken":47474,"endToken":47481},{"p":126,"at":1281,"title":"Attachment H-22","method":"printed heading","endPage":126,"endAt":1315,"startToken":47481,"endToken":47486},{"p":126,"at":1315,"title":"Attachment H-22","method":"printed heading","endPage":126,"endAt":1349,"startToken":47486,"endToken":47491},{"p":126,"at":1349,"title":"Attachment H-22","method":"printed heading","endPage":126,"endAt":1383,"startToken":47491,"endToken":47496},{"p":126,"at":1383,"title":"Attachment H-22","method":"printed heading","endPage":126,"endAt":1417,"startToken":47496,"endToken":47501},{"p":126,"at":1417,"title":"Attachment H-22","method":"printed heading","endPage":126,"endAt":1461,"startToken":47501,"endToken":47508},{"p":126,"at":1461,"title":"Attachment H-24","method":"printed heading","endPage":126,"endAt":1495,"startToken":47508,"endToken":47513},{"p":126,"at":1495,"title":"Attachment H-24","method":"printed heading","endPage":126,"endAt":1529,"startToken":47513,"endToken":47518},{"p":126,"at":1529,"title":"Attachment H-24","method":"printed heading","endPage":126,"endAt":1563,"startToken":47518,"endToken":47523},{"p":126,"at":1563,"title":"Attachment H-24","method":"printed heading","endPage":126,"endAt":1597,"startToken":47523,"endToken":47528},{"p":126,"at":1597,"title":"Attachment H-24","method":"printed heading","endPage":166,"endAt":0,"startToken":47528,"endToken":64460},{"p":166,"at":0,"title":"Attachment B","method":"printed heading","endPage":177,"endAt":780,"startToken":64460,"endToken":67936},{"p":177,"at":780,"title":"Attachment K-Appendix, section 6.6(c) or the defaults below:","method":"printed heading","endPage":243,"endAt":278,"startToken":67936,"endToken":89917},{"p":243,"at":278,"title":"Attachment H-11 and","method":"printed heading","endPage":243,"endAt":299,"startToken":89917,"endToken":89920},{"p":243,"at":299,"title":"Attachment H-34","method":"printed heading","endPage":243,"endAt":441,"startToken":89920,"endToken":89941},{"p":243,"at":441,"title":"Attachment H-11 and","method":"printed heading","endPage":243,"endAt":462,"startToken":89941,"endToken":89944},{"p":243,"at":462,"title":"Attachment H-34","method":"printed heading","endPage":243,"endAt":576,"startToken":89944,"endToken":89967},{"p":243,"at":576,"title":"Attachment H-14 and","method":"printed heading","endPage":243,"endAt":597,"startToken":89967,"endToken":89970},{"p":243,"at":597,"title":"Attachment H-20","method":"printed heading","endPage":243,"endAt":631,"startToken":89970,"endToken":89975},{"p":243,"at":631,"title":"Attachment H-14 and","method":"printed heading","endPage":243,"endAt":652,"startToken":89975,"endToken":89978},{"p":243,"at":652,"title":"Attachment H-20","method":"printed heading","endPage":243,"endAt":794,"startToken":89978,"endToken":89999},{"p":243,"at":794,"title":"Attachment H-14 and","method":"printed heading","endPage":243,"endAt":815,"startToken":89999,"endToken":90002},{"p":243,"at":815,"title":"Attachment H-20","method":"printed heading","endPage":243,"endAt":861,"startToken":90002,"endToken":90009},{"p":243,"at":861,"title":"Attachment H-15","method":"printed heading","endPage":243,"endAt":895,"startToken":90009,"endToken":90014},{"p":243,"at":895,"title":"Attachment H-15","method":"printed heading","endPage":243,"endAt":997,"startToken":90014,"endToken":90029},{"p":243,"at":997,"title":"Attachment H-15","method":"printed heading","endPage":243,"endAt":1101,"startToken":90029,"endToken":90050},{"p":243,"at":1101,"title":"Attachment H-21","method":"printed heading","endPage":243,"endAt":1135,"startToken":90050,"endToken":90055},{"p":243,"at":1135,"title":"Attachment H-21","method":"printed heading","endPage":243,"endAt":1169,"startToken":90055,"endToken":90060},{"p":243,"at":1169,"title":"Attachment H-21","method":"printed heading","endPage":243,"endAt":1203,"startToken":90060,"endToken":90065},{"p":243,"at":1203,"title":"Attachment H-21","method":"printed heading","endPage":243,"endAt":1237,"startToken":90065,"endToken":90070},{"p":243,"at":1237,"title":"Attachment H-21","method":"printed heading","endPage":243,"endAt":1281,"startToken":90070,"endToken":90077},{"p":243,"at":1281,"title":"Attachment H-22","method":"printed heading","endPage":243,"endAt":1315,"startToken":90077,"endToken":90082},{"p":243,"at":1315,"title":"Attachment H-22","method":"printed heading","endPage":243,"endAt":1349,"startToken":90082,"endToken":90087},{"p":243,"at":1349,"title":"Attachment H-22","method":"printed heading","endPage":243,"endAt":1383,"startToken":90087,"endToken":90092},{"p":243,"at":1383,"title":"Attachment H-22","method":"printed heading","endPage":243,"endAt":1417,"startToken":90092,"endToken":90097},{"p":243,"at":1417,"title":"Attachment H-22","method":"printed heading","endPage":243,"endAt":1461,"startToken":90097,"endToken":90104},{"p":243,"at":1461,"title":"Attachment H-24","method":"printed heading","endPage":243,"endAt":1495,"startToken":90104,"endToken":90109},{"p":243,"at":1495,"title":"Attachment H-24","method":"printed heading","endPage":243,"endAt":1529,"startToken":90109,"endToken":90114},{"p":243,"at":1529,"title":"Attachment H-24","method":"printed heading","endPage":243,"endAt":1563,"startToken":90114,"endToken":90119},{"p":243,"at":1563,"title":"Attachment H-24","method":"printed heading","endPage":243,"endAt":1597,"startToken":90119,"endToken":90124},{"p":243,"at":1597,"title":"Attachment H-24","method":"printed heading","endPage":283,"endAt":230,"startToken":90124,"endToken":107118},{"p":283,"at":230,"title":"I. INTRODUCTION","method":"printed heading","endPage":283,"endAt":234,"startToken":107118,"endToken":107119},{"p":283,"at":234,"title":"INTRODUCTION","method":"printed heading","endPage":284,"endAt":1160,"startToken":107119,"endToken":107482},{"p":284,"at":1160,"title":"II. BACKGROUND","method":"printed heading","endPage":284,"endAt":1165,"startToken":107482,"endToken":107483},{"p":284,"at":1165,"title":"BACKGROUND","method":"printed heading","endPage":289,"endAt":589,"startToken":107483,"endToken":108841},{"p":289,"at":589,"title":"III. PURPOSE OF TESTIMONY","method":"printed heading","endPage":289,"endAt":1289,"startToken":108841,"endToken":108943},{"p":289,"at":1289,"title":"IV. EXTENSION OF APPROVED RATE DESIGN ELEMENTS TO LARGE LOAD-","method":"printed heading","endPage":291,"endAt":36,"startToken":108943,"endToken":109348},{"p":291,"at":36,"title":"V. PROPOSED RATE FOR NON-FIRM CONTRACT DEMAND TRANSMISSION","method":"printed heading","endPage":293,"endAt":37,"startToken":109348,"endToken":109884},{"p":293,"at":37,"title":"VI. ALLOCATION AND RECOVERY OF COSTS ASSOCIATED WITH UPGRADES","method":"printed heading","endPage":293,"endAt":154,"startToken":109884,"endToken":109901},{"p":293,"at":154,"title":"A. Summary of Cost Allocation and Recovery","method":"printed heading","endPage":296,"endAt":619,"startToken":109901,"endToken":110799},{"p":296,"at":619,"title":"B. Proportional Impact Methodology","method":"printed heading","endPage":305,"endAt":37,"startToken":110799,"endToken":113060},{"p":305,"at":37,"title":"C. Generator Reliability Reinforcement Fee","method":"printed heading","endPage":307,"endAt":837,"startToken":113060,"endToken":113767},{"p":307,"at":837,"title":"D. Interconnection Reliability Reinforcement Charge and Cost Allocation","method":"printed heading","endPage":311,"endAt":676,"startToken":113767,"endToken":114868},{"p":311,"at":676,"title":"E. Ratepayer Protection Mechanisms","method":"printed heading","endPage":314,"endAt":37,"startToken":114868,"endToken":115620},{"p":314,"at":37,"title":"VIII. COST RECOVERY AGREEMENT","method":"printed heading","endPage":336,"endAt":4151,"startToken":115620,"endToken":121986}]}
