{"document":{"slug":"filing-er27-531-pjm-large-loads","title":"PJM files large-load tariff revisions and co-location compliance changes under section 205","issued":"2026-11-16","accession":"20261116-5340","docket":"ER27-531-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"filing","file":"sources/originals/20261116-5340_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20261116-5340","sha256":"816478c587a2668626547b6ece6d63a6504be0156ec6a2ed4175af0f4169485d","pages":91,"tokens":28369,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":124,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \nPJM Interconnection, L.L.C.  \n) \nDocket No. ER27-____-000 \n \n \n \n \n \n \nPROPOSED TARIFF REVISIONS FOR LARGE LOADS AND ADDITIONAL \nCOMPLIANCE WITH CO-LOCATION ORDER AND REQUEST FOR \nEXTENDED 60-DAY COMMENT PERIOD \n \n \n \n \n \n \nMark J. Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nNorristown, PA  19403-2429 \n610-666-4707 \nmark.stanisz@pjm.com    \n \nChristopher B. Holt  \nManaging General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nAudubon, PA  19403-2429 \n610-666-2368 \nchristopher.holt@pjm.com \n \n       Wendy B. Warren \nRuth M. Porter \nAlexander L. Peterson \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n202-393-1200 \nwarren@wrightlaw.com \nporter@wrightlaw.com \npeterson@wrightlaw.com \n \n \nCounsel for PJM Interconnection, L.L.C. \n \nNovember 16, 2026"},{"page":2,"startToken":124,"endToken":313,"text":"TABLE OF CONTENTS \n \nI. \nINTRODUCTION .................................................................................................. 7 \nII. \nBACKGROUND .................................................................................................. 10 \nA. \n2025 Show Cause Orders ...........................................................................10 \n1. \nFebruary Order ...............................................................................10 \n2. \nDecember Order .............................................................................11 \nB. \nCompliance Filings and Paper Hearing Procedure ....................................12 \n1. \nThirty-Day Compliance Filing .......................................................12 \n2. \nSixty-Day Compliance Filing ........................................................13 \n3. \nPaper hearing procedures ...............................................................13 \nC. \nJune 2026 Orders .......................................................................................14 \n1. \nCo-Location Order .........................................................................14 \n2. \nLarge Load Show Cause Order ......................................................15 \nD. \nPartial Extension and Partial Compliance Filing .......................................16 \nE. \nPJM’s Stakeholder Engagement Process ...................................................18 \nIII. \nOVERVIEW OF PROPOSED CHANGES .......................................................... 22 \nA. \nPart III—NITS ...........................................................................................22 \n1. \nNITS quantity for Large Load .......................................................22 \n2. \nInformation updates .......................................................................23 \n3. \n50 MW limit on netting Behind the Meter Generation ..................24 \nB. \nPart VIII—Fast Energization Process ........................................................27 \n1. \nThe Fast Energization Process is designed for speed and \naccuracy .........................................................................................27 \n2. \nThe Fast Energization Process includes a Soft Close Date \nand Early Application Engagement to improve the quality \nof Applications and reduce disputes and litigation ........................30 \n3. \nTiming of Fast Energization Process implementation and \nthe interim period ...........................................................................30 \n4. \nPJM is eschewing parallel processes, to streamline for \nspeed and accuracy ........................................................................32 \n5. \nPJM will maintain transparency of its study results ......................33"},{"page":3,"startToken":313,"endToken":546,"text":"ii \nC. \nPart XI—New Transmission Services .......................................................33 \n1. \nInterim NITS ..................................................................................33 \n2. \nContract Demand Transmission Service ........................................37 \n3. \nCommon service provisions for Interim NITS and \nContract Demand Transmission Services ......................................42 \n4. \nPro Forma Service Agreement for Interim NITS \n(Attachment F-3A) .........................................................................45 \n5. \nPro Forma Service Agreement for Contract Demand \nTransmission Service (Attachment F-4) ........................................48 \nD. \nRe-Filing Co-Located Load Compliance Changes ....................................50 \n1. \nProhibition on serving Co-Located Load from existing \ngenerators .......................................................................................50 \n2. \nExpansion of service to “Eligible Load” for load with \nBTMG ............................................................................................52 \n3. \nElimination of new GIA requirement ............................................54 \n4. \nEffective date only .........................................................................57 \nE. \nChanges to Be Addressed in Future Filings ...............................................57 \nIV. \nTHE COMMISSION SHOULD ACCEPT THE PROPOSED CHANGES \nAS JUST AND REASONABLE .......................................................................... 59 \nA. \nThe Proposed Fast Energization Process Is Just and Reasonable \nand Advances the Commission’s Categories for Reform in the \nJune 2026 Orders .......................................................................................59 \nB. \nCore Features of the Fast Energization Process That Enhance the \nCurrent Cycle Process ................................................................................60 \n1. \nPJM’s current process provides only some visibility into \nthe transmission needs created by Large Loads .............................60 \n2. \nResource Adequacy requires getting new generation \nonline faster ....................................................................................60 \n3. \nIncremental and parallel fixes are not enough – a singular \nprocess for generation and transmission service requests \nyields efficiencies...........................................................................61 \n4. \nThe Fast Energization Process is a single, unified process \nthat should be twice as fast as the current process .........................62 \n5. \nTechnology and early engagement speed the process ...................63"},{"page":4,"startToken":546,"endToken":740,"text":"iii \n6. \nStudy consolidation preserves study rigor .....................................64 \n7. \nReadiness requirements are moved to the front of the \nprocess............................................................................................65 \n8. \nA portfolio approach to system reinforcements provides \ntransparency and certainty .............................................................66 \n9. \nInterim rights allow service to begin sooner ..................................67 \nC. \nThe Fast Energization Process Is Consistent with the Large Load \nShow Cause Order’s Directives .................................................................68 \n1. \nTimely, clear, and consistent study of transmission \nservice for large loads ....................................................................69 \n2. \nReadiness requirements that deter speculative requests ................70 \n3. \nTransparency regarding upgrades and their costs ..........................71 \n4. \nProtection against cost shifting ......................................................71 \n5. \nTransmission services that reflect flexible use of the \nsystem ............................................................................................73 \n6. \nStudying generation and transmission service requests to \nserve Large Load together leverages technology and \ninnovation ......................................................................................73 \n7. \nPJM’s proposal respects existing commercial \narrangements and provides for a clear transition from the \nexisting process to the Fast Energization Process..........................75 \nD. \nThe New Transmission Services Proposed in Part XI are Just and \nReasonable .................................................................................................77 \nE. \nPJM’s Proposed Changes to NITS are Just and Reasonable .....................79 \nV. \nEFFECTIVE DATE .............................................................................................. 82 \nVI. \nCONSENT TO SEVERANCE OF ISSUES ......................................................... 82 \nVII. \nDOCUMENTS ENCLOSED ................................................................................ 84 \nVIII. \nCORRESPONDENCE AND COMMUNICATIONS .......................................... 85 \nIX. \nSERVICE .............................................................................................................. 85 \nX. \nCONCLUSION ..................................................................................................... 87"},{"page":5,"startToken":740,"endToken":1133,"text":"1200 G Street, N.W., Suite 600 \nWashington, D.C.  20005-3898 \nPhone: 202.393.1200 \nFax: 202.393.1240 \nwrightlaw.com \n \nNovember 16, 2026 \n \n \nHonorable Debbie-Anne A. Reese \nSecretary  \nFederal Energy Regulatory Commission  \n888 First Street, NE, Room 1A \nWashington, DC  20426 \n \nRe: \nPJM Interconnection, L.L.C., Docket No. ER27-____-000  \nProposed Tariff Revisions for Large Loads and Additional Compliance with \nCo-Location Order and Request for Extended 60-Day Comment Period \n \nDear Secretary Reese:  \nPursuant to section 205 of the Federal Power Act (“FPA”),1 part 35 of the Federal \nEnergy Regulatory Commission’s (“Commission”) regulations,2 and the August 14, 2026 \nletter order issued in Docket No. EL26-67-000,3 PJM Interconnection, L.L.C. (“PJM”) \nhereby proposes revisions to Parts I, III, VI, VII, VIII, IX, X, and XI, and Attachments F-3, \nF-3A, and F-4 of PJM’s Open Access Transmission Tariff (“Tariff”), and to Schedule 8 of \nthe Reliability Assurance Agreement Among Load Serving Entities in the PJM Region \n(“RAA”).4  With the reforms proposed here and the other filings being concurrently \n \n1 16 U.S.C. § 824d. \n2 18 C.F.R. part 35.   \n3 PJM Interconnection, L.L.C., 196 FERC ¶ 61,129, at P 10 (2026) (noting that to extent PJM submits “an \nFPA section 205 filing addressing the Commission’s preliminary findings in the Show Cause Order on or \nbefore November 16, 2026, then the obligation of the respondent(s) who have made such an FPA section 205 \nfiling to file a response to the Show Cause Order will be suspended”). \n4 The PJM Transmission Owners (“Transmission Owners”) are separately filing revisions to Tariff, Parts \nVIII, IX, and XI to add provisions concerning the allocation of the costs of system reinforcements needed for \ngenerator interconnection and transmission service for Eligible Loads and Large Loads, a cost-recovery \nframework for those system reinforcements, and proposed rates for the three new transmission services PJM \nproposes to offer.  PJM concurrently is filing ride-through provisions for Large Computational Load to \nmitigate against future incidents like the one that occurred July 22, 2026, in the PJM Region, along with other \nproposed operational requirements and annual transmission service reporting requirements.  That filing, and \nall evidence submitted in support thereof, is incorporated by reference into this filing.  Given the multiple \nsame-day filings and the fact that these filings are making changes, some of them overlapping, to over 100"},{"page":6,"startToken":1133,"endToken":1665,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 2 \n \n2 \nsubmitted today as described in Attachment D, PJM has responded fully to the Large Load \nShow Cause Order and requests that the FPA section 206 aspect of the order be closed.  \nThe Tariff revisions PJM proposes include: \n• Revisions to the terms and conditions for Network Integration Transmission \nService (“NITS”)5 to impose new terms and conditions on Eligible Customers \ntaking transmission service on behalf of Eligible Load (including specifically \nCo-Located Load and customers with Behind the Meter Generation (“BTMG”)) \nand Large Loads;6 \n• Revisions to Part VIII of the Tariff to create the new Fast Energization Process, \nwhich will study together New Service Requests, including Generation \nInterconnection Requests, and requests from Eligible Customers seeking \ntransmission service on behalf of Eligible Load and Large Load7 in a single, \n12-month process;8 \n• Addition of the new Part XI to the Tariff, providing the terms and conditions \nfor new transmission services (Interim NITS, Firm Contract Demand (“FCD”) \nTransmission \nService, \nand \nNon-Firm \nContract \nDemand \n(“NFCD”) \n \nTariff sections in nine parts of the Tariff, PJM expects it will need to make one or more clean-up filings in \nthe future to ensure the Tariff is clear, and commits to doing so.  PJM will promptly submit a letter in Docket \nNos. EL25-49 and EL26-27 informing participants in those dockets of today’s tariff filings, some parts of \nwhich are submitted in compliance with Commission directives and others of which are submitted pursuant \nto Section 205 of the FPA.  In an abundance of caution, PJM requests waiver of any regulation or filing \nrequirements relating to submissions in Docket Nos. EL25-49 and EL26-27 relating to today’s tariff \nfilings.  Good cause exists to grant any necessary waivers because submission of these tariff filings in the \nstructure presented efficiently addresses the complexity of the overlapping filing obligations and differing \nrequested effective dates, PJM is requesting a sixty-day comment period and 120 day Commission action \ndate that affords interested participants reasonable time to engage in the tariff filing dockets. \n5 Terms not otherwise defined herein shall have the meaning set forth in the Tariff, the RAA, or Amended \nand Restated Operating Agreement of PJM Interconnection, L.L.C. (“Operating Agreement”). \n6 See infra Section III.A. \n7 The Commission accepted PJM’s definition of “Large Load” as “end-use customer(s) load that has a \ncumulative peak load of 50 [megawatts (“MW”)] or greater at a single electrical site behind one or more \npoints of interconnection, where for configurations involving multiple affiliated load facilities or multiple \npoints of interconnection with affiliated load facilities behind them, all affiliated load facilities within a one-\nmile radius will be considered a single electrical site as further described in the PJM Manuals” in its \nOctober 9, 2026 order in Docket No. ER26-3515-000.  PJM Interconnection, L.L.C., 197 FERC ¶ 61,019, at \nPP 13, 24 (2026).  That definition is now in the RAA, Article I, Definitions, and cross-referenced in Tariff, \nParts I and VIII.  PJM Interconnection, L.L.C., Thirty-Day Compliance Filing to the Commission’s \nOctober 9, 2026 Order on PJM’s Large Load Definition and Large Load Registry, Docket No. \nER26-3515-002 (Nov. 9, 2026). \n8 See infra Section III.B."},{"page":7,"startToken":1665,"endToken":2076,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 3 \n \n3 \nTransmission Service) available to Eligible Customers taking transmission \nservice on behalf of Eligible Load and Large Load;9 and \n• Revised versions of Tariff provisions concerning Co-Located Load and BTMG \npending in Docket No. ER26-1479-002,10 which PJM has reevaluated and \nrevised in connection with its response to the Order Instituting Proceeding \nUnder Section 206 of the FPA (“Large Load Show Cause Order”).11 \nPJM’s proposed revisions address the Commission’s areas of concern in the Large \nLoad and Co-Located Load show cause proceedings:  promotion of reliability; efficient \ntransmission service study processes; cost transparency and mitigation of cost-shifting; \nflexible load service; accommodating Co-Located Loads and BTMG; and generation study \nprocedures for generators serving electrically proximate Large Loads and Co-Located \nLoads.  PJM proposes to add to its Tariff an enhanced process to identify and study \ntransmission service for new Large Loads. PJM will require Large Loads (i.e., loads over \n50 MW at a single location) to be identified on a registry to set a baseline for the current \nlevel of transmission service.12  PJM will then require any new requests for transmission \nservice or requests to increase existing service beyond the baseline level to apply for that \nservice and be studied.13  In evaluating such requests, PJM proposes to use a new, reformed \n“Fast Energization Process,” to make the study process faster, even more focused on \n \n9 See infra Section III.C. \n10 See infra Section III.D.  Revisions to these Tariff provisions were filed initially on August 17, 2026, PJM \nInterconnection, L.L.C., Compliance Filing of PJM Interconnection, L.L.C. in Response to Order on \nRehearing, Clarification, Compliance Filing, and Paper Hearing in Docket Nos. EL25-49-002, et al, Docket \nNo. ER26-1479-002 (Aug. 17, 2026) (“August 17 Filing”), in compliance with the Commission’s \nJune 18, 2026 order in Docket Nos. EL25-49-000, et al.  PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 \n(“Co-Location Order”), notice of denial of reh’g by operation of law & providing for further consideration, \n196 FERC ¶ 62,089 (2026).  Earlier today, PJM filed a motion to withdraw the August 17 Filing in Docket \nNo. ER26-1479-002 so that it could file replacement revisions in this filing. \n11 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211, errata notice, 196 FERC ¶ 61,122, order dismissing \nrequests for reh’g & clarification, 196 FERC ¶ 61,214 (2026). \n12 See Attachment A-1, Proposed Tariff, Part III, General. \n13 See infra Section III.A."},{"page":8,"startToken":2076,"endToken":2379,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 4 \n \n4 \nreadiness and certainty, and provide enhanced transparency.14  The Fast Energization \nProcess proposes key reforms to the existing process to complete studies in 12 months.15  \nPJM’s Fast Energization Process will study requests for transmission service and \nGeneration Interconnection Requests together to optimize the Transmission System and \nyield efficiencies for electrically proximate load and generation.16     \nPJM also proposes implementing the three new transmission services the \nCommission put forward in a way that will ensure reliability, with technical and operational \nlimitations on withdrawals of energy by flexible Large Loads and Eligible Loads, and on \ninjections of energy by Eligible Generating Facilities. \nIn short, this filing responds in a unified fashion to two separate show cause orders, \none that has been ongoing for almost two years, with briefing and several compliance \nfilings required, and a second issued only five months ago, with overlapping concerns and \nconsiderations.  A chart detailing where each directive from the Co-Location Order and the \nLarge Load Show Cause Order (together, “June 2026 Orders”)17 is addressed is provided \nas Attachment D to this filing.18  In light of the resulting scope and complexity of this filing, \nPJM respectfully requests that the Commission establish a 60-day comment period for this \nfiling, to allow all interested parties sufficient time to review the proposed revisions and \nfor PJM to continue to engage with stakeholders after filing to potentially further improve \nand augment the proposals set forth in this filing.  PJM further requests a Commission \n \n14 See infra Section III.B. \n15 See infra Section III.B. \n16 See infra Section III.B. \n17 Co-Location Order, 195 FERC ¶ 61,209; Large Load Show Cause Order, 195 FERC ¶ 61,211.  \n18 See generally Attachment D, Chart Mapping Order Directives to Tariff Changes attached hereto."},{"page":9,"startToken":2379,"endToken":2743,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 5 \n \n5 \norder on this filing within 120 days.  The Commission’s full acceptance of this filing within \n10 months of the date it is filed would likely be necessary to facilitate implementation in \ntime for Cycle 02.19   \nAs PJM discussed in the PJM Abeyance Motion,20 the Commission’s June 2026 \nOrders presented certain interrelated and overlapping issues that PJM needed to address in \na holistic, coordinated manner.21  PJM noted in the PJM Abeyance Motion that the June \n2026 Orders directed PJM to expand the availability of new transmission services, enhance \nits Large Load study procedures, and detail the operational requirements and control \ntechnologies that customers taking transmission service on behalf of certain loads must \nuse.22  PJM submitted a partial compliance filing on August 17, 2026, that addressed certain \ndirectives of the Co-Location Order.23   \nSince the August 17 Filing, and as PJM worked on its response to the Large Load \nShow Cause Order, PJM has determined that it must amend its earlier filing to comply with \nthe Co-Location Order to harmonize the treatment of Eligible Loads and Large Loads.  PJM \ntherefore seeks an effective date of March 16, 2027, for certain Tariff revisions in Part VIII \nrelating to Eligible Loads and for the revisions in Part III and the new Part XI, to establish \navailable services as soon as practicable.  PJM seeks an indefinite effective date for the \n \n19 See infra Section III.B.3 (explaining that the Submission Window for the first Cycle under the Fast \nEnergization Process would open in late November 2027). \n20 PJM Interconnection, L.L.C., Motion of PJM Interconnection, L.L.C. to Hold Proceeding in Abeyance and \nRequest for Shortened Answer Period and Expedited Treatment, Docket No. EL26-67-000, at 4-8 (July 28, \n2026); PJM Interconnection, L.L.C, Motion for Extension of Time for Specified Compliance Requirements \nand Request for Expedited Treatment of PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et al., at \n4-8 (July 28, 2026) (“PJM Extension Motion”).  \n21 See supra note 10. \n22 PJM Abeyance Motion at 4-5. \n23 PJM Abeyance Motion at 1, 6-7; PJM Extension Motion at 1-2, 6-7."},{"page":10,"startToken":2743,"endToken":3215,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 6 \n \n6 \nFast Energization provisions of Part VIII, as the Fast Energization Process cannot begin \nuntil Cycle 01 of PJM’s current interconnection process is sufficiently advanced.24 \nEach element of this proposal is just and reasonable.  However, if the Commission \ndeems necessary, and to help facilitate the Commission’s acceptance of this filing without \ndelay so that PJM can comply expeditiously with the June 2026 Orders, PJM provides \nnotice that it consents to the Commission’s exercise of authority to sever any element of \nthe Proposed Tariff and RAA language to the extent necessary and permitted under sections \n205 and 206 of the FPA and NRG Power Marketing, LLC v. FERC.25  \nPJM submits this filing pursuant to its independent authority to modify its Tariff \nunder FPA section 205 pursuant to Tariff, Part I, section 9.2(a) and the Consolidated \nTransmission Owners Agreement (“CTOA”), section 7.5.1(ii), following the requisite \nconsultation specified under Tariff, Part I, section 9.2(b) and the CTOA, section 7.5.1(ii). \n \n24  In order to avoid intervening proposed Tariff revisions from other filings potentially causing the Tariff \nrevisions herein to be overwritten, PJM has included revisions with proposed effective dates of \nMarch 16, 2027, in certain of the Tariff sections with indefinite dates that are attached hereto as Attachment \nA-2.  Specifically, the changes proposed to the following Tariff sections with a proposed March 16, 2027 \neffective date have been added into the proposed revisions in the version of the marked Tariff with an \nindefinite effective date:  Tariff, Part VIII, section 400, Definitions C, E, N, P, and R; and Tariff, Part VIII, \nsections 401, 403, 404, 406, 408, and 414.  When PJM makes a compliance filing to establish the effective \ndate for the sections listed here that it is filing with indefinite effective dates, assuming they are accepted, it \nwill address the earlier language and update its status as well.  \n25 NRG Power Mktg., LLC v. FERC, 862 F.3d 108 (D.C. Cir. 2017).  As the Commission has often stated, \n“[t]he United States Court of Appeals for the District of Columbia Circuit has held that, in certain \ncircumstances, the Commission has ‘authority to propose modifications to a utility’s [FPA section 205] \nproposal if the utility consents to the modifications.’”  N.Y. Indep. Sys. Operator, Inc., 188 FERC ¶ 61,051, \nat P 22 n.36 (2024) (alteration in original) (citing NRG Power Mktg., 862 F.3d at 114-15); see Midcontinent \nIndep. Sys. Operator, Inc., 180 FERC ¶ 61,141, at P 26 n.29 (2022) (same), order on reh’g, 182 FERC \n¶ 61,096 (2023), aff’d sub nom., Entergy Ark., LLC v. FERC, 109 F.4th 583 (D.C. Cir. 2024); ISO New Eng. \nInc., 175 FERC ¶ 61,172, at P 16 n.20 (2021) (same)."},{"page":11,"startToken":3215,"endToken":3640,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 7 \n \n7 \nI. \nINTRODUCTION \nAs it is elsewhere in the country, data center construction and operation is causing \nunprecedented load growth in the PJM Region.26  PJM’s 2025 long-term load forecast \nshows a peak load growth of 32 gigawatts (“GW”) from 2024 to 2030, with 30 GW of that \ngrowth coming from data centers.27  PJM’s 2026 long-term load forecast projects a 3.6% \nannual increase in its summer peak load over the next 10 years;28 in 2023, PJM projected \njust a 0.8% annual increase over a 10-15 year horizon.29  The extraordinary growth of data \ncenters and other Large Loads presents unique reliability and resource adequacy challenges \nas compared to traditional loads.  Data centers have significant energy and capacity \ndemands and can be built faster (12-18 months) than the generation and transmission \nfacilities necessary to meet those demands.30  The North American Electric Reliability \nCorporation (“NERC”) recognizes this as a resource adequacy issue, explaining that Large \nLoads are “magnitudes larger than most loads historically seen on the system and \n \n26 RTEP 2024: Regional Transmission Expansion Plan, PJM Interconnection, L.L.C., 47 (Apr. 17, 2025), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/2024-rtep/2024-rtep-report.pdf \n[https://perma.cc/PV4N-VA3P] (explaining that there is significant load growth in the PJM Balancing \nAuthority Area due to new construction of data centers).  As the Commission also has recognized, Large \nLoads have unique operational characteristics, including significant load fluctuations.  As noted earlier, PJM \nis concurrently proposing ride through requirements and other operational requirements in a separate section \n205 filing.   \n27 Letter from David E. Mills, PJM Board of Managers Chair, PJM Interconnection, L.L.C. to PJM \nStakeholders, 1 (Aug. 8, 2025), https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-\ndisclosures/2025/20250808-pjm-board-letter-re-implementation-of-critical-issue-fast-path-process-for-\nlarge-load-additions.pdf [https://perma.cc/977B-93NW].  \n28 PJM Resource Adequacy Planning Department, 2026 PJM Load Forecast Report, PJM Interconnection, \nL.L.C., 6 (Jan. 14, 2026), https://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2026-\nload-report.pdf [https://perma.cc/6BPF-LJYA].  \n29 PJM Resource Adequacy Planning Department, PJM Load Forecast Report: January 2023, PJM \nInterconnection, L.L.C.,  3 (Jan. 2023), https://www.pjm.com/-/media/DotCom/library/reports-notices/load-\nforecast/2023-load-report.ashx [https://perma.cc/XG66-PBQK].  \n30 Characteristics and Risks of Emerging Large Loads: Large Loads Task Force White Paper, North America \nElectric Reliability Corporation, 15-16 (July 2025), https://www.nerc.com/globalassets/who-we-\nare/standing-committees/rstc/3_doc_white-paper-characteristics-and-risks-of-emerging-large-loads.pdf \n[https://perma.cc/HVX5-8J9V] (“NERC Large Loads White Paper”)."},{"page":12,"startToken":3640,"endToken":4009,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 8 \n \n8 \nproliferating more quickly than most historical load growth” and therefore “the need for \nadditional generation may not have been planned for, and current system plans may not be \nable to meet it.”31  Additionally, unlike traditional loads, Large Loads can materialize and \ngrow quickly in geographically concentrated areas,32 which makes them more difficult to \nplan for than other loads.33  In the Large Load Show Cause Order, the Commission \nrecognized the material differences between Large Loads and other load categories, \nexplaining that “integrating large loads poses specific challenges to transmission system \noperation given their size, operational behavior, and unique potential to impact the \ntransmission system.”34  \nTo meet this moment, the Commission, on its own motion and in response to \nsection 205 filings, has issued a number of landmark orders stimulating innovation and \nadvancement.  In parallel, the PJM Five-Year Strategy released September 1, 2026, sets \nforth how PJM will lead during the next five years and beyond, with reliability as its North \nStar.35  The third objective of the PJM Five-Year Strategy, titled “Proactively Adapt \nPlanning Processes,” includes multiple workstreams to achieve this objective.  These \ninclude:  (1) a one-year generation interconnection process; (2) incorporating Large Load \n \n31 NERC Large Loads White Paper at 16.  \n32 See Declaration of Donald Bielak, P.E. on Behalf of PJM Interconnection, L.L.C. (Attachment C) ¶ 15 \n(“Bielak Decl.”) (“Large Loads differ fundamentally from traditional loads in their size, pace of growth, and \nconcentration, and they are presently the major source of load growth in the PJM Region.”). \n33 NERC Large Loads White Paper at 16 (“The arrival and timing of large loads is also frequently \nuncertain. . . .  Some proposed large loads do not materialize as planned: they may be canceled due to \neconomic and financial challenges or other setbacks.  Due to the uncertainty of these large loads \nmaterializing, forecasting load for resource adequacy and transmission planning may be much more \ndifficult.”).  \n34 See Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 58.  \n35 Corporate Strategy and Value, PJM Interconnection, L.L.C., https://www.pjm.com/about-pjm/corporate-\nstrategy-and-value [https://perma.cc/N92H-AQZ8] (last visited Nov. 14, 2026)."},{"page":13,"startToken":4009,"endToken":4319,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 9 \n \n9 \nforecasting and modeling into planning processes; (3) determining interim solutions for \nnear-term reliability needs; and (4) creating a synchronized planning and interconnection \nprocess for greater efficiency and transparency.36  These objectives align closely with the \nCommission’s Large Load Show Cause Order, offering PJM an opportunity to accelerate \nits strategic timeline.   \nThrough this filing, PJM responds to the Large Load Show Cause Order, consistent \nwith strategic objectives to proactively adapt PJM’s planning processes to deliver \naccelerated interconnection and transmission service and processes.  PJM proposes to \nefficiently, reliably, and transparently provide transmission service to both co-located and \nflexible Large Loads (i.e., Large Loads that are not co-located with generation, but are \nwilling and able to limit their energy withdrawals from the Transmission System under \ncertain conditions)37 and to quickly bring additional generation online to meet current and \nforecasted demand from Large Loads.  PJM further proposes Tariff revisions to provide \njust and reasonable terms and conditions of service for the provision of transmission \nservice, including the new transmission services the Commission first advanced for Co-\nLocated Load in PJM and then proposed more broadly in show cause orders for all the \njurisdictional Regional Transmission Organizations, including the Large Load Show Cause \nOrder directed to PJM and Transmission Owners in the PJM Region.38   \nPJM also seeks to meet the need for “speed to power” and accelerate its generation \ninterconnection procedures to a one-year process by leveraging technology and process \n \n36 Shaping a Power Change: PJM Five-Year Strategy, PJM Interconnection, L.L.C., 9 (Aug. 2026), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/special-reports/2026/20260819-shaping-a-\npowerful-change-pjm-five-year-strategy.pdf [https://perma.cc/2RBY-MPLH]. \n37 See Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 85 n.178. \n38 See generally Large Load Show Cause Order, 195 FERC ¶ 61,211."},{"page":14,"startToken":4319,"endToken":4622,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 10 \n \n10 \nefficiencies.  PJM will deliver at each turn of its new process non-binding good-faith \nestimates of the cost and time to construct facilities within 60-90 calendar days, consistent \nwith the Commission’s findings in the Large Load Show Cause Order.39  To provide \ntransmission service to Eligible Loads and Large Loads as contemplated in the June 2026 \nOrders, PJM proposes to add transmission service requests to the existing New Service \nRequest study process in Tariff, Part VIII, which will allow PJM to optimize upgrades to \nthe Transmission System, eliminate duplicative upgrades, and offer timely transmission \nservice and generator deliverability based on current system topology rather than requiring \ncustomers to wait on contingent upgrades to be built.  With the reforms proposed here and \nthe supplemental filings PJM proposes to make, addressed in Section III.G below, PJM has \nresponded fully to the Large Load Show Cause Order and requests that the FPA section \n206 aspect of the order be closed. \nII. \nBACKGROUND \nA. \n2025 Show Cause Orders \n1. \nFebruary Order \nFollowing a technical conference discussing the co-location of large loads at \ngenerating facilities, the Commission initiated a show-cause proceeding against PJM and \nthe Transmission Owners  on February 20, 2025 (“February Order”).40  In the February \nOrder, the Commission expressed concern that PJM’s Tariff did not address co-location \narrangements with sufficient clarity and consistency.41  The Commission made several \n \n39 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 63; Bielak Decl. ¶ 21.  \n40 PJM Interconnection, L.L.C., 190 FERC ¶ 61,115, order on show cause, 193 FERC ¶ 61,217 (2025) \n(“December Order”), order on compliance, 195 FERC ¶ 61,030, order on reh’g, clarification, compliance & \npaper hearing, Co-Location Order,195 FERC ¶ 61,209. \n41 February Order, 190 FERC ¶ 61,115, at P 2."},{"page":15,"startToken":4622,"endToken":4936,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 11 \n \n11 \npreliminary findings that the Tariff appeared to be unjust and unreasonable regarding co-\nlocation arrangements, and it directed PJM and the Transmission Owners to respond to \nnumerous questions addressing its concerns.42 \n2. \nDecember Order \nOn December 18, 2025, the Commission issued an order on show cause finding the \nTariff unjust and unreasonable due to, among other reasons, the lack of specificity for the \nrates, terms, and conditions that apply to Interconnection Customers43 serving Co-Located \nLoad and Eligible Customers taking transmission service on behalf of Co-Located Load.44  \nThe December Order directed PJM to make a compliance filing within 30 days to, among \nother things, clarify the rates, terms, and conditions that apply to an Interconnection \nCustomer seeking to serve Co-Located Load with new generation.45  The December Order \nalso directed PJM to make a compliance filing within 60 days to revise the Tariff in a \nnumber of ways, including to modify the retail BTMG netting rules to limit netting over a \ncertain threshold46 and to require that an Eligible Customer taking transmission service on \nbehalf of a Co-Located Load select at least one of three transmission services:  (1) NITS \nor Interim NITS; (2) FCD Transmission Service; or (3) and NFCD Transmission Service.47  \n \n42 February Order, 190 FERC ¶ 61,115, at PP 74-75, 87-88. \n43 Under PJM’s current interconnection rules in Tariff, Parts VII, VIII, and IX, Interconnection Customers \nare referred to as “Project Developers.”  PJM uses in this filing the term used in its current interconnection \nrules, but it should be understood as consistent with the Commission’s references to Interconnection \nCustomers.  \n44 December Order, 193 FERC ¶ 61,217, at P 159. \n45 December Order, 193 FERC ¶ 61,217, at PP 232-35. \n46 December Order, 193 FERC ¶ 61,217, at P 221. \n47 December Order, 193 FERC ¶ 61,217, at P 193."},{"page":16,"startToken":4936,"endToken":5214,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 12 \n \n12 \nThe December Order established a paper hearing procedure to obtain additional \nevidence to determine the appropriate rates, terms, and conditions for these transmission \nservices.48  The Commission required parties to address, among other things, the \ninterconnection requirements and operational practices necessary to maintain system \nreliability if a Co-Located Load or associated generator trips offline and the eligibility \nrequirements necessary for an Eligible Customer to take FCD or NFCD Transmission \nService on behalf of Co-Located Load.49 \nB. \nCompliance Filings and Paper Hearing Procedure \n1. \nThirty-Day Compliance Filing \nOn January 20, 2026, PJM made its 30-day compliance filing in Docket No. \nER26-1088-000 pursuant to the December Order (“Thirty-Day Compliance Filing”).50  \nAmong other changes, the Thirty-Day Compliance Filing proposed to clarify that existing \nservices in the Tariff could be used by Project Developers serving Co-Located Load, \nincluding Provisional Interconnection Service and Surplus Interconnection Service.51  The \nThirty-Day Compliance Filing also clarified that Project Developers serving Co-Located \nLoad can request interconnection service below nameplate capacity and accelerate the \ninterconnection process under certain circumstances.52  The Commission accepted in part \nand rejected in part PJM’s compliance filing in an order on April 16, 2026;53 PJM \n \n48 See December Order, 193 FERC ¶ 61,217, at PP 194, 203, 207, 219. \n49 December Order, 193 FERC ¶ 61,217 at P 219(8), (10).  \n50 PJM Interconnection, L.L.C., Thirty-Day Compliance Filing with Order on Show Cause of PJM \nInterconnection, L.L.C., Docket No. ER26-1088-000 (Jan. 20, 2026). \n51 Thirty-Day Compliance Filing at 5-7. \n52 Thirty-Day Compliance Filing at 4-5. \n53 PJM Interconnection, L.L.C., 195 FERC ¶ 61,030."},{"page":17,"startToken":5214,"endToken":5518,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 13 \n \n13 \nsubmitted an additional compliance filing on May 18, 2026, to comply with the \nCommission’s order.54   \n2. \nSixty-Day Compliance Filing \nOn February 23, 2026, PJM made its 60-day compliance filing in Docket No. \nER26-1479-000 pursuant to the December Order (“Sixty-Day Compliance Filing”).55  The \nSixty-Day Compliance Filing proposed Tariff revisions to, among other things:  (1) amend \nPJM’s BTMG Tariff provisions;56 (2) establish certain aspects of three new transmission \nservices for Eligible Customers seeking to take service on behalf of Co-Located Load;57 \nand (3) amend PJM’s Necessary Studies processes.58   \n3. \nPaper hearing procedures \nPJM submitted an initial brief to address the Commission’s finding in the December \nOrder that additional record evidence was needed to set the appropriate replacement rates, \nterms, and conditions for new transmission services for Eligible Customers serving Co-\nLocated Load, including for Interim NITS, FCD Transmission Service, and NFCD \nTransmission Service.59  PJM’s initial brief set forth the non-rate terms and conditions for \nthese new transmission services along with illustrative Tariff language.  Various parties \n \n54 PJM Interconnection, L.L.C., Compliance Filing to the Commission’s April 16 Order on PJM’s Thirty-Day \nCompliance Filing with the Order to Show Cause of PJM Interconnection, L.L.C., Docket No. \nER26-1088-001 (May 18, 2026). \n55 PJM Interconnection, L.L.C., 60-Day Compliance Filing for Co-Located Load Related Revisions to Open \nAccess Transmission Tariff to Comply with Commission Order in Docket No. EL25-49, et al. of PJM \nInterconnection, L.L.C., Docket No. ER26-1479-000 (Feb. 23, 2026) (“Sixty-Day Compliance Filing”). \n56 Sixty-Day Compliance Filing at 4-18. \n57 Sixty-Day Compliance Filing at 18-24. \n58 Sixty-Day Compliance Filing at 24-28. \n59 PJM Interconnection, L.L.C., Brief of PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et al. (Feb. \n23, 2026) (“PJM Initial Brief”)."},{"page":18,"startToken":5518,"endToken":5915,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 14 \n \n14 \nprotested aspects of PJM’s illustrative Tariff language.60  PJM proposed certain \nrefinements to the illustrative language in its reply brief.61 \nC. \nJune 2026 Orders \n1. \nCo-Location Order \nThe Commission issued the Co-Location Order addressing the Sixty-Day \nCompliance Filing, the paper hearing submissions, and requests for rehearing and \nclarification of the December Order.62  The Co-Location Order accepted most of PJM’s \nproposed Tariff changes, but directed PJM to make a number of additional changes within \n60 days.63  Among other things, the Co-Location Order directed PJM to revise the Tariff \nto adopt more detailed study procedures for customers requesting FCD and/or NFCD \nTransmission Service that mirror existing cluster study procedures.64  The Co-Location \nOrder also directed PJM to make new transmission services available to customers with \nBTMG that are willing and able to limit their withdrawals from the Transmission System.65  \nTo accomplish this, the Commission directed PJM to either add a definition of “Eligible \nLoad” that encompasses customers serving Co-Located Load and customers serving load \n \n60 See, e.g., PJM Interconnection, L.L.C., Reply Brief of Joint Co-Location Developers and Motion to \nIntervene Out-of-Time of Calibrant, Convergent, U.S. Energy Storage Coalition, and Verrus, Docket Nos. \nEL25-49-000, et al., at 2 (Mar. 25, 2026); PJM Interconnection, L.L.C., Reply Brief and Protest of Enchanted \nRock, Docket Nos. EL25-49-000, et al., at 7-9 (Mar. 25, 2026) (arguing that PJM’s proposal “renders Interim \nNITS entirely unworkable”); PJM Interconnection, L.L.C., Reply Brief of Advanced Energy United and \nSolar Energy Industries Association, Docket Nos. EL25-49-000, et al., at 6-10 (Mar. 25, 2026). \n61 PJM Interconnection, L.L.C., Reply Brief of PJM Interconnection, L.L.C., Docket Nos. EL25-49-000, et \nal., Attachment A (Redlines on Reply Brief to Illustrative Language for New Tariff, Part XI; Attachments F-\n3A and F-4; and Other Illustrative Tariff Revisions), Illustrative Tariff, Part XI, Subpart A, section 701.1 \n(Apr. 24, 2026) (“PJM Reply Brief”). \n62 See Co-Location Order, 195 FERC ¶ 61,209, at PP 1-2, 4-7.  \n63 See, e.g., Co-Location Order, 195 FERC ¶ 61,209, at P 280 (directing PJM to revise Tariff to specify what \ninformation about Necessary Studies will be available in the PJM Manuals). \n64 Co-Location Order, 195 FERC ¶ 61,209, at P 370. \n65 Co-Location Order, 195 FERC ¶ 61,209, at P 91."},{"page":19,"startToken":5915,"endToken":6227,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 15 \n \n15 \nwith BTMG, or to propose comparable Tariff revisions.66  The Co-Location Order further \nrequired PJM to revise the Tariff to provide additional detail regarding the operational \nrequirements and necessary control technologies to be employed for customers taking new \ntransmission services on behalf of Eligible Load.67   \n2. \nLarge Load Show Cause Order \nThe Large Load Show Cause Order found that several aspects of the Tariff appeared \nunjust and unreasonable because it lacked specific procedures for integrating large loads, \nincluding Large Load-specific procedures for interconnection studies, processing \ntransmission service requests, and providing transmission service without cost shifting.68  \nThe Large Load Show Cause Order also found that the Tariff appeared to be unjust and \nunreasonable because it lacked transmission service options for customers serving large \nloads that are willing and able to limit their withdrawals from the Transmission System.69  \nThe Commission was specifically concerned whether the Tariff was just and reasonable \nwithout allowing customers to take Interim NITS, FCD Transmission Service, and/or \nNFCD Transmission Service on behalf of Eligible Load.70  The Commission also \nemphasized that, in the Co-Location Order, it approved a requirement that customers taking \ntransmission service on behalf of Eligible Load must have necessary control technologies \nor protection systems to limit energy withdrawals to approved levels.71  The Large Load \n \n66 Co-Location Order, 195 FERC ¶ 61,209, at P 91. \n67 Co-Location Order, 195 FERC ¶ 61,209, at PP 482, 541. \n68 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 59-60, 65, 77. \n69 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 86.  \n70 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 87.  \n71 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 87 & n.189 (citing Co-Location Order, 195 FERC \n¶ 61,209, at P 480)."},{"page":20,"startToken":6227,"endToken":6545,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 16 \n \n16 \nShow Cause Order further found that PJM’s Tariff appeared to be unjust and unreasonable \ndue to a lack of mechanisms to ensure that costs are not shifted between transmission \ncustomers.72 \nTo address these issues, the Large Load Show Cause Order directed PJM to make \ntwo compliance filings.73  First, the Large Load Show Cause Order directed PJM to submit \nan informational filing within 30 days to explain how PJM intends to ensure that it has \nadequate generation to serve existing and new large loads.74  Second, the Large Load Show \nCause Order directed PJM to submit within 60 days a compliance filing explaining whether \nits Tariff remains just and reasonable in light of the issues identified in the order, or to \npropose Tariff changes that would remedy the identified concerns.75  The Commission \nnoted that it would entertain requests to hold the show cause proceedings in abeyance if \nPJM demonstrated a plan to file changes pursuant to FPA section 205 to address the \nidentified concerns.76 \nD. \nPartial Extension and Partial Compliance Filing \nOn July 28, 2026, PJM moved for a 90-day extension of time to meet certain Co-\nLocation Order requirements,77 and it simultaneously requested the Commission to hold \nthe Large Load Show Cause Order proceedings in abeyance for 90 days.78  PJM explained \nthat the June 2026 Orders contained certain interrelated and overlapping issues that must \n \n72 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 77. \n73 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 3-4. \n74 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 4. \n75 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 3. \n76 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 39. \n77 See generally PJM Extension Motion. \n78 See generally PJM Abeyance Motion."},{"page":21,"startToken":6545,"endToken":6797,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 17 \n \n17 \nbe addressed on a holistic basis, which required additional time and stakeholder \nengagement.79  For example, PJM noted that the June 2026 Orders both directed PJM to \nexpand the availability of new transmission services, enhance its Large Load study \nprocedures, and detail the operational requirements and control technologies that \ncustomers taking transmission service on behalf of certain loads must use.80  PJM \ncommitted to submitting a partial compliance filing by August 17, 2026, that addressed \ncertain directives of the Co-Location Order.81  The Commission granted PJM’s requests on \nAugust 14, 2026.82 \nPursuant to its commitment, PJM made a partial compliance filing on August 17, \n2026, in Docket No. ER26-1479-002 to address many of the Co-Location Order’s \ndirectives, including by proposing to add the term Eligible Load to the Tariff to encompass \nboth Co-Located Load and load with BTMG; adopting various modifications to the terms \nand conditions for Interim NITS; modifying the definition of Retail BTMG to eliminate \nthe 50 MW nameplate limit for netting; and removing the requirement for existing \ncustomers to execute a new Generation Interconnection Agreement (“GIA”) to serve Co-\nLocated Load.83 \n \n79 PJM Abeyance Motion at 4-8; PJM Extension Motion at 4-8.  \n80 PJM Abeyance Motion at 4-5. \n81 PJM Abeyance Motion at 1, 6-7; PJM Extension Motion at 1-2, 6-7. \n82 PJM Interconnection, L.L.C., Notice of Extension of Time, Docket Nos. EL25-49-000, et al. (Aug. 14, \n2026). \n83 See generally August 17 Filing."},{"page":22,"startToken":6797,"endToken":7100,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 18 \n \n18 \nE. \nPJM’s Stakeholder Engagement Process \nPJM held engagement sessions to inform stakeholders about the June 2026 Orders \nand solicit feedback on the proposed Tariff revisions PJM would file in response to those \norders.  PJM’s stakeholder engagement process is detailed below: \n• July 30, 2026, Co-Located Load Order Workshop (“CLLOW”):  PJM \npresented on the June 2026 Orders and explained PJM’s proposed compliance \napproach.84  \n• August 18, 2026, CLLOW:  PJM provided an update on its June 2026 Orders \ncompliance strategy.  PJM presented its proposed Large Load Show Cause \nOrder compliance framework85 and discussed the overlap between Large Load, \nCo-Located Load, and load with BTMG.86  PJM solicited and received \nstakeholder feedback on its presentation.87 \n• September 16, 2026, CLLOW:  PJM presented its proposed process for \nintegrating Large Loads with the Transmission System, pursuant to the Large \n \n84 See Co-Located Load Order Workshop, PJM Interconnection, L.L.C., https://www.pjm.com/committees-\nand-groups/workshops/cllsco [https://perma.cc/B3FW-BRLM] (last visited Nov. 12, 2026) (follow “Meeting \nMaterials” subheading; then choose “2026” from dropdown; then choose “7.30.2026 – Co-Located Load \nOrder Workshop”; then select and click “Download”).  \n85 Donnie Bielak, Show Cause for Large Loads Framework, PJM Interconnection, L.L.C. (Aug. 18, 2026), \n20260818-item-03---show-cause-for-large-loads-framework---presentation.pdf \n[https://perma.cc/V2Q3-\nA9NT]. \n86 See Tim Horger, Overlap of Large Load, Co-Located Load and Load with BTMG, PJM Interconnection, \nL.L.C. \n(Aug. \n18, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20260818/20260818-item-02---overlap-of-large-load-co-located-load-and-\nload-with-btmg---presentation.pdf [https://perma.cc/XQ8A-M3PU]. \n87 See August 18 Co-Located Load Order Workshop Stakeholder Feedback Poll Responses, PJM \nInterconnection, \nL.L.C. \n(Aug. \n18, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20260818/20260818-august-18-co-located-load-order-workshop-\nstakeholder-feedback-poll-responses-received-by-8-28-26-final.pdf [https://perma.cc/V7NB-9RR5]."},{"page":23,"startToken":7100,"endToken":7455,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 19 \n \n19 \nLoad Show Cause Order.88  PJM solicited and received stakeholder feedback \non its presentation.89 \n• September 30, 2026, CLLOW:  PJM presented its proposed Large Load study \nprocess and received stakeholder feedback.90 \n• October 5, 2026, CLLOW:  PJM presented and solicited feedback on certain \ndraft Tariff redlines to comply with the June 2026 Orders PJM gave a \npresentation on proposed Eligible Load Curtailment priority by transmission \nservice type.91 \n• October 16, 2026, CLLOW:  PJM presented and solicited feedback on certain \ndraft Tariff redlines to comply with the June 2026 Orders.92  \n• October 26, 2026, CLLOW:  PJM presented on proposed Tariff redlines \nassociated with its new transmission services.93  PJM also discussed its \n \n88 See Donnie Bielak, Show Cause for Large Loads Framework, PJM Interconnection, L.L.C. (Sep. 16, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/cllsco/2026/20260916/20260916-\nitem-03---show-cause-for-large-loads-approach---presentation.pdf [https://perma.cc/YLW3-DGTK]. \n89 See September 16 Co-Located Load Order Workshop Stakeholder Feedback Poll Responses, PJM \nInterconnection, \nL.L.C. \n(Sep. \n16, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20260916/20260916-september-16-co-located-load-order-workshop-\nstakeholder-feedback-poll-responses-received-by-9-22-26.pdf [https://perma.cc/CM3H-E66H]. \n90 Donnie Bielak, Show Cause for Large Loads Framework, PJM Interconnection, L.L.C. (Sep. 30, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/cllsco/2026/20260930/20260930-\nitem-02---show-cause-for-large-loads-approach---presentation.pdf [https://perma.cc/FB8W-CDDV].  \n91 Chris Pilong, Operationalizing Flexible Large Loads: Curtailment Overview, PJM Interconnection, L.L.C. \n(Oct. \n5, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20261005/20261005-item-02---operationalizing-flexible-large-loads-\ncurtailment-overview---presentation.pdf [https://perma.cc/FTM9-LLB6]. \n92 See Item 02 – Draft Tariff Revisions – Redline, PJM Interconnection, L.L.C. (Oct. 15, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/cllsco/2026/20261016/20261016-\nitem-02---draft-tariff-revisions---redline.pdf [https://perma.cc/K3V7-7G28] (presenting redline Tariff \nrevisions at the October 16, 2026 CLLOW).  \n93 See, e.g., Item 02 – Tariff Part XI New Transmission Services – Redlines, PJM Interconnection, L.L.C. \n(Oct. \n26, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20261026/20261026-item-02---tariff-part-xi-new-transmission-services---"},{"page":24,"startToken":7455,"endToken":7723,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 20 \n \n20 \nproposed Fast Energization Process, which would require PJM to annually \nstudy all (i) generation and Merchant Transmission Interconnection requests; \nand (ii) Large Load and Long Term Firm Transmission Service requests in a \nsingle cluster over a 12-month period.94  In Section III below, PJM describes its \nFast Energization Process proposal and associated Tariff revisions in detail.  \nAdditionally, the Transmission Owners discussed proposed transmission rates, \ncost allocation, and a cost-recovery framework, to be separately filed.95  \n• October 28, 2026, Markets and Reliability Committee:  PJM discussed its \nproposed response to the Large Load Show Cause Order, including its Fast \nEnergization Process proposal.96  \n• November 5, 2026, Special Members Committee:  PJM provided notice in \naccordance with Tariff, Part I, section 9.2(b) regarding its proposed Tariff \n \nredlines.pdf [https://perma.cc/WF4R-RKYC] (presenting redline Tariff revisions at the October 26, 2026 \nCLLOW).  \n94 Donnie Bielak, Fast Energization, PJM Interconnection, L.L.C. (Oct. 26, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/workshops/cllsco/2026/20261026/20261026-item-03---1-fast-\nenergization---presentation.pdf [https://perma.cc/VSE5-5235].  \n95 See Notice of PJM Transmission Owners Consultation with the Members Committee Regarding Proposed \nRevisions to the PJM Tariff, PJM Interconnection, L.L.C. (Oct. 9, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/workshops/cllsco/2026/20261026/20261026-item-04---pjm-to-large-\nload-mc-consultation-notice.pdf [https://perma.cc/MT5Z-GKR7].  \n96 Donnie Bielak et al., Large Load Show Cause Response, PJM Interconnection, L.L.C. (Oct. 28, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/mrc/2026/20261028/20261028-\nitem-06---large-load-show-cause-response---presentation.pdf [https://perma.cc/58FJ-VLAZ]."},{"page":25,"startToken":7723,"endToken":8045,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 21 \n \n21 \nrevisions to comply with the June 2026 Orders,97 including its Fast Energization \nproposal.98  \n• November 6, 2026, TOA-AC: \nPJM provided notice to the Transmission \nOwners in accordance with Tariff, Part I, section 9.2(b) regarding its proposed \nTariff revisions to comply with the June 2026 Orders, including its Fast \nEnergization proposal.99 \n• November 12, 2026, CLLOW:  PJM discussed its proposed revisions to the \nTariff and RAA to implement its Fast Energization proposal.  PJM provided \ndraft Tariff and RAA redlines to stakeholders for discussion.100 \nPJM intends to schedule additional stakeholder sessions after the submission of this \nfiling to continue the process of education and discussion on the proposal submitted here.  \nIn particular, PJM is planning sessions on at least November 23, 2026, and December 15, \n2026, to answer stakeholder questions and receive feedback.  \n \n97 \nSee \nMeeting \nDetails, \nPJM \nInterconnection, \nL.L.C. \n(Nov. \n5, \n2026), \nhttps://www.pjm.com/forms/registration/Meeting%20Registration.aspx?ID=%7b1045ffcd-c613-47d7-\n90be-24f2afa0c1c4%7d [https://perma.cc/N8TQ-ELZR] (November 5, 2026 Special Members Committee \nMeeting Materials).  \n98 Donnie Bielak, Fast Energization, PJM Interconnection, L.L.C. (Nov. 5, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/mc/2026/20261105-special/item-01---1-fast-energization--\n-presentation.pdf [https://perma.cc/Z87G-9U6R].  \n99 See TOA-AC Meeting Agenda, PJM Interconnection, L.L.C. (Nov. 6, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/toa-ac/2026/20261106-special/agenda.pdf \n[https://perma.cc/FK73-PBGQ].  \n100 See, e.g., Item 02 – Tariff Part XI New Transmission Services – Redlines, PJM Interconnection, L.L.C. \n(Nov. \n11, \n2026), \nhttps://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20261112/20261112-item-02---tariff-revisions-part-xi-new-transmission-\nservices-november-11-draft---redline.pdf [https://perma.cc/7VBQ-P2RQ]; Item 02 – RAA Schedule 8 – \nRedlines, PJM Interconnection, L.L.C. (Nov. 11, 2026), https://www.pjm.com/-/media/DotCom/committees-\ngroups/workshops/cllsco/2026/20261112/20261112-item-02---raa-revisions-schedule-8-november-11-\ndraft--redline.pdf [https://perma.cc/579S-MCKS]."},{"page":26,"startToken":8045,"endToken":8344,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 22 \n \n22 \nIII. \nOVERVIEW OF PROPOSED CHANGES \nA. \nPart III—NITS \nPJM is proposing certain changes to the terms and conditions of NITS in Part III to \nensure that PJM is appropriately studying, planning, and upgrading the Transmission \nSystem for Large Load growth.  Currently, there is no limit on a Network Customer’s load \ngrowth when taking NITS, including for Large Load.101  Under the current process, PJM \nplans the Transmission System based on the yearly load forecast, including adjustments to \naccount for Large Loads.102  To promote efficiency and transparency for Large Load \nadditions, PJM is proposing the new Fast Energization study process in Part VIII as \ndiscussed below.103  However, certain changes to Part III are needed to ensure that Large \nLoad is captured in that study process. \n1. \nNITS quantity for Large Load  \nPJM is proposing to add language to capture the existing level of NITS being \nprovided to Network Customers serving Large Loads.  In this regard, Part III would now \nspecify that “[t]he amount of Regional Network Integration Transmission Service \nprovisioned to Network Customers for serving Large Loads are at levels specified in an \neffective Service Agreement or, if not specified therein, as reflected on the Large Load \nRegistry per the terms of the Reliability Assurance Agreement, Schedule 11.B.1.”104  The \nRAA now requires all Large Load in the PJM Region to be registered as of March 1, \n \n101 See, e.g., Tariff, Part III, section 31.6. \n102 See generally RAA, Schedule 8 (setting Unforced Capacity Obligations based on Obligation Peak Load \nwith Load Adjustments); Operating Agreement, Schedule 6 (specifying procedures for PJM’s Regional \nTransmission Expansion Plan (“RTEP”) Protocol). \n103 See infra Section III.B. \n104 Attachment A-1, Proposed Tariff, Part III, General."},{"page":27,"startToken":8344,"endToken":8632,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 23 \n \n23 \n2027.105  This addition to Part III is necessary to set a baseline of the Large Load currently \nbeing served via NITS to allow PJM to study future Large Load additions. \n2. \nInformation updates \nThe Tariff currently provides for Network Customers to provide PJM with annual \nupdates on its Network Load and Network Resources forecasts, consistent with the \ninformation provided in its Application for NITS, including any information provided \nunder Tariff, Part III, section 29.2(ix) pursuant to the Transmission Provider’s planning \nprocess in Operating Agreement, Schedule 6, but does not require the Network Customer \nto file an Application for those changes.106  Because NITS is available to Eligible \nCustomers taking service on behalf of Eligible Load, PJM is proposing to add language to \nclarify that the annual information updates Network Customers provide must include \nchanges to Eligible Load and, as applicable, the Eligible Generating Facility serving that \nload.107  Further, PJM’s Tariff remains unchanged in that the Network Customer must \nprovide PJM with timely notice of material changes relating to the Network Customer’s \nNetwork Load (including any Network Load that is Large Load), and the Network \nCustomer’s Transmission System or other aspects of its facilities or operations affecting \nPJM’s ability to provide reliable service.108  This obligation, in tandem with the obligation \n \n105 PJM Interconnection, L.L.C., 197 FERC ¶ 61,019, at P 48; PJM Interconnection, L.L.C., Thirty-Day \nCompliance Filing to the Commission’s October 9, 2026 Order on PJM’s Large Load Definition and Large \nLoad Registry, Docket No. ER26-3515-002 (Nov. 9, 2026). \n106 See Tariff, Part III, section 31.6. \n107 Attachment A-1, Proposed Tariff, Part III, section 31.6. \n108 Id."},{"page":28,"startToken":8632,"endToken":8955,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 24 \n \n24 \nto also update the Large Load Registry means that PJM and others will have a clearer \npicture of the Large Load on its system.109   \nGoing forward, Large Load growth for NITS customers will require an Application \nto be studied through the Fast Energization Process.110  Accordingly, PJM is proposing to \nstrike the language in section 31.6 that suggests an Application would not be required for \nsuch changes (i.e., “[e]ven if an Application is no longer required”).111 \n3. \n50 MW limit on netting Behind the Meter Generation \nThe Commission directed PJM to allow Eligible Customers with Retail BTMG to \nnet up to 50 MW of Retail BTMG from their load, subjection to certain exclusions for a \nthree-year transition provision, to grandfather existing commercial arrangements, and for \nCogeneration Facilities with load that follows the facility.112  Consistent with this directive, \nPJM is proposing a revised definition of Retail BTMG that eliminates the rejected 50 MW \nnameplate limit and other netting exemptions from the definition.113  In addition, PJM is \nproposing revisions to Part III, section 34.2 and Schedule 8 of the RAA to implement the \n50 MW netting limit.114   \nCurrently, there is no limit to Retail BTMG’s daily load reduction for purposes of \ncalculating capacity requirements under the RAA or transmission service charges under \n \n109 RAA, Schedule 11.B.1 (accepted in PJM Interconnection, L.L.C., 197 FERC ¶ 61,019, at P 48).. \n110 See infra Section III.B. \n111 Attachment A-1, Proposed Tariff, Part III, section 31.6. \n112 Co-Location Order, 195 FERC ¶ 61,209, at PP 207, 220. \n113 Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – R - S) (adding the definition of “Retail \nBehind The Meter Generation”); Proposed Tariff, Part VIII, Subpart A, section 400, Definitions R. \n114 Attachment A-1, Proposed Tariff, Part III, section 34.2; Proposed Tariff, RAA, Schedule 8."},{"page":29,"startToken":8955,"endToken":9295,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 25 \n \n25 \nthe Tariff.115  Any load that is served by operating BTMG is simply not included in the \ndaily load of the Network Customer.116  Pursuant to the Commission’s directive,117 PJM is \nproposing revisions to section 34.2 that would limit the daily load reduction from Retail \nBTMG to 50 MW effective March 16, 2027 based on the status of the BTMG as of \nDecember 18, 2025, unless an exemption applies.118  As directed, PJM has included three \nexemptions from the netting limit.  First, the 50 MW limit would not apply for a three-year \ntransition period for existing Retail BTMG that was used to serve load as of December 18, \n2025.119  Second, the 50 MW netting limit would not apply to Retail BTMG that was \nowned, operated and/or contracted for as of December 18, 2025, for the current term \nremaining under any contract to effectuate the Retail BTMG arrangement (including any \nrenewal, amendment, or extension per the contract’s terms).120  To qualify for this \nexemption, the retail load served by the Retail BTMG must be on the Large Load Registry, \nthe Retail BTMG must be registered with the Transmission Provider in accordance with \nthe PJM Manuals, and the Network Customer must comply with any requests for \ninformation to verify eligibility.121   \nPJM is proposing that the load be added to the Large Load Registry and that Retail \nBTMG be registered to track utilization of the netting exemptions for settlement and \n \n115 Tariff, Part III, section 34.2 (“The daily load of a Network Customer does not include load served by \noperating Behind The Meter Generation.”). \n116 Tariff, Part III, section 34.2. \n117 Co-Location Order, 195 FERC ¶ 61,209, at PP 207, 220. \n118 Attachment A-1, Proposed Tariff, Part III, section 34.2(B). \n119 Attachment A-1, Proposed Tariff, Part III, section 34.2(C). \n120 Attachment A-1, Proposed Tariff, Part III, section 34.2(D). \n121 Attachment A-1, Proposed Tariff, Part III, section 34.2(D)."},{"page":30,"startToken":9295,"endToken":9603,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 26 \n \n26 \nresource planning purposes.  The 50 MW netting limit will not apply to a Cogeneration \nFacility (consistent with the requirements of the Public Utility Regulatory Policies Act of \n1978) that is integrated with the retail load it serves such that if the Cogeneration Facility \ntrips offline, the retail load follows.122  To qualify, the retail load must be on the Large \nLoad Registry, the Retail BTMG must be registered, the Network Customer must certify \neligibility, the Network Customer must comply with requests for information to verify \neligibility, and the Network Customer must update PJM in the event it no longer qualifies \nfor the exemption.123  PJM also reserves the right to periodically audit compliance with \nthese requirements.124 \nTo effectuate the netting limit for the purpose of capacity cost allocation, PJM is \nproposing changes to RAA, Schedule 8 to incorporate the netting limits into the calculation \nof Obligation Peak Load for purposes of determining the Unforced Capacity \nObligations.125  Currently, the Daily Unforced Capacity Obligation of a Party to the RAA \nis calculated by taking the Party’s Obligation Peak Load and applying scaling factors.126  \nThe Obligation Peak Load is calculated by taking the daily summation of the Party’s \nweather adjusted coincident summer peak for the last Delivery Year for the end-users in \nthe Zone, net of BTMG.127  Because PJM is proposing to limit BTMG netting to 50 MW \nexcept in specific circumstances, PJM is proposing to add language in RAA, Schedule 8 to \n \n122 Attachment A-1, Proposed Tariff, Part III, section 34.2(E). \n123 Attachment A-1, Proposed Tariff, Part III, sections 34.2(E)(a)-(e). \n124 Attachment A-1, Proposed Tariff, Part III, section 34.2(F). \n125 Attachment A-1, Proposed Tariff, RAA, Schedule 8. \n126 RAA, Schedule 8(A). \n127 RAA, Schedule 8(A)."},{"page":31,"startToken":9603,"endToken":9928,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 27 \n \n27 \nincorporate those netting limits into the Obligation Peak Load calculation for settlement \nand planning purposes.128 \nB. \nPart VIII—Fast Energization Process \nConsistent with the Commission’s directives to establish a study process for Large \nLoad and to avoid duplicating system reinforcements for generator interconnection and \ntransmission service for Large Loads,129 and with PJM’s strategic objectives,130 PJM \nproposes to evaluate requests for Transmission Service on behalf of Eligible Loads and \nLarge Loads as part of its Tariff, Part VIII procedures for studying the interconnection of \nGenerating Facilities and Merchant Transmission and the provision of Long Term Firm \nTransmission Service.  PJM further proposes new reforms to Tariff, Part VIII to speed up \nthe studies, increase readiness requirements, and increase certainty as to responsibility for \nupgrades.  PJM calls the resulting process the “Fast Energization Process,” as it is designed \nboth to get Generating Facilities online quickly and provide transmission service to Eligible \nLoads and Large Loads efficiently through a single, one-year process. \n1. \nThe Fast Energization Process is designed for speed and accuracy. \nThe Fast Energization Process would supplant the current interconnection process’s \nthree System Impact Study phases with an accelerated Screening Phase and a single System \nImpact Study.131  This shift from three System Impact Studies to one will greatly expedite \nthe interconnection process.  The one System Impact Study in the Fast Energization \n \n128 Attachment A-1, Proposed RAA, Schedule 8(A). \n129 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 60. \n130 See supra Section I discussion of PJM’s Five-Year Strategy and its objectives. \n131 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401 (Applications for Cycle Process \nIntroduction); Proposed Tariff, Part VIII, Subpart C, section 404(B)(1) (Introduction); Proposed Tariff, Part \nVIII, Subpart C, section 405(B) (Phase I or Screening Phase); Proposed Tariff, Part VIII, Subpart C, section \n409 (Phase III or System Impact Study Phase)."},{"page":32,"startToken":9928,"endToken":10166,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 28 \n \n28 \nProcess is preceded by a Screening Phase, during which PJM and Transmission Owners \nwill provide two “turns” of system impact analysis with preliminary desk-side estimates \nfor system upgrade costs and construction durations.132  After each of these turns of \nanalysis, there will be a Decision Point—a period during which Project Developers and \nEligible Customers can choose whether or not to proceed and, if they are proceeding, \ncommit Readiness Deposits.133  This accelerated Screening Phase will extend for \napproximately four months, thereby providing two quick rounds of analysis that each take \nless than 60 days and get actionable information to Project Developers and Eligible \nCustomers quickly.134 \n \n \n132 Attachment A-2, Proposed Tariff, Part VIII, Subpart C, section 404(B)(1) (Introduction); Proposed Tariff, \nPart VIII, Subpart C, section 405(B) (Phase I or Screening Phase); Proposed Tariff, Part VIII, Subpart C, \nsection 409 (Phase III or System Impact Study Phase).  \n133 Attachment A-2, Proposed Tariff, Part VIII, Subpart C, section 404(B)(1) (Introduction); Proposed Tariff, \nPart VIII, Subpart C, section 406(C) (Decision Point I); Proposed Tariff, Part VIII, Subpart C, section 408(C) \n(Decision Point II). \n134 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 63 (directing PJM to explain whether the Tariff \nremains just and reasonable without processes for a study deadline of no more than 60 to 90 calendar days)."},{"page":33,"startToken":10166,"endToken":10483,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 29 \n \n29 \nThe Fast Energization Process will create additional time savings by having the \nFinal Agreement Phase begin at the same time the System Impact Study Phase begins.135  \nThe process will also be expedited by imposing higher readiness requirements in the \nApplication and having Readiness Deposits posted with the Applications and at risk at \nDecision Points I and II, earlier in the interconnection process than they currently are.136  \nHigher and earlier readiness requirements and Readiness Deposits will better screen out \nspeculative projects and ensure that projects that advance through the Fast Energization \nProcess and enter into an interconnection-related service agreement are truly ready to start \nconstruction of their facility, complete construction, and get their facility in service.137 \nFinally, PJM has been and plans to continue to make investments in automation \nand technology to facilitate expediting the interconnection process.  As described in the \nBielak Declaration, PJM has been evaluating Tapestry, an AI-powered interconnection \nplatform, and is close to the point at which it can trust results produced by the platform \nwithout parallel human verification.138  This evaluation and PJM’s own significant \nautomation efforts have given PJM the confidence to work on developing a suite of \nautomation that will enhance existing technology applications and also deploy technologies \ninto new areas.139  PJM is focusing particularly on improving its modeling platform, to turn \n \n135 See Attachment A-2, Proposed Tariff, Part VIII, Subpart D, section 411(C)(1) (“The Final Agreement \nNegotiation Phase shall run concurrently with the System Impact Study Phase.”).  \n136 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, sections 401(D)(1)-(3) (Required Study \nDeposits and Readiness Deposits); Proposed Tariff, Part VIII, Subpart C, section 406(C) (Decision Point I); \nProposed Tariff, Part VIII, Subpart C, section 408(C) (Decision Point II). \n137 Bielak Decl. ¶ 7. \n138 Bielak Decl. ¶ 19. \n139 Bielak Decl. ¶ 19."},{"page":34,"startToken":10483,"endToken":10832,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 30 \n \n30 \naround grid studies more quickly, and on developing quality assurance tools to continue to \ndrive high quality study results in a shorter period of time.140 \n2. \nThe Fast Energization Process includes a Soft Close Date and Early \nApplication Engagement to improve the quality of Applications and \nreduce disputes and litigation. \nThe Fast Energization Process includes a 14-week period between the Soft Close \nDate and the Application Deadline, called the Early Application Engagement, during which \nPJM will work with Applicants to improve their Applications.141  This collaborative \nprocess will include PJM testing and giving feedback on Applicants’ models, and giving \nguidance as to readiness.142  This will result in cleaner Applications that can be validated \nquickly, thereby reducing disputes and litigation, with time-saving benefits for all \nconcerned, including the Commission.143 \n3. \nTiming of Fast Energization Process implementation and the \ninterim period \nPJM proposes to implement the Fast Energization Process once the current Cycle \nreaches the end of Decision Point II, consistent with the current Tariff timeline for opening \na new Cycle.144  PJM thus proposes to open the Submission Window for the Fast \nEnergization Process the next Business Day after Decision Point II of Cycle 01 ends.145  \n \n140 Bielak Decl. ¶ 19. \n141 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 400 Definitions E (defining Early \nApplication Engagement); Proposed Tariff, Part VIII, Subpart B, section 403(E)(2) (Early Application \nEngagement, Kickoff Calls, and Scoping Meetings). \n142 Attachment A-2, Proposed Tariff, Part VIII, Subpart B, section 403(E)(2) (Early Application Engagement, \nKickoff Calls, and Scoping Meetings). \n143 See Bielak Decl. ¶ 20. \n144 See Tariff, Part VIII, Subpart B, section 403(A) (under the current Cycle process, PJM opens the \nApplication window for the next Cycle when the current Cycle reaches Phase III). \n145 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(A) (“Part VIII of the Tariff applies . \n. . to valid Eligible Customer for Load Requests, submitted on or after the next Business Day after the close \nof Decision Point II of Cycle 01.”)."},{"page":35,"startToken":10832,"endToken":11172,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 31 \n \n31 \nThis is expected to be late November 2027.146  At that time, all the pending Applications \nsubmitted for Cycle 02 under the existing process will be re-submitted for new Cycle 02 \nunder the Fast Energization Process.147  Opening the Submission Window in late \nNovember 2027 would result in a Soft Close Date in early May 2028,148 followed by Early \nApplication Engagement,149 and an Application Deadline for the new Cycle 02 in \nAugust 2028.150  The first Fast Energization Cycle would therefore finish in 2029. \nDuring the interim period until the Fast Energization Process is in effect, PJM will \nuse the Necessary Studies process, as directed in the Co-Location proceedings.151  Once \nthe Fast Energization Process is in effect, all Eligible Customer requests for transmission \nservice to serve load, including Co-Located Load, will proceed through the Fast \nEnergization Process.152 \n \n146 See Stacey Nestel, Cycle 01 Application, PJM Interconnection, L.L.C., 2 (Jan. 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/ips/2026/20260126/20260126-\nitem-05---cycle-1-application-requirements-and-nextgen-process.pdf [https://perma.cc/6RJL-DWPF]. \n147 Attachment A-2, Proposed Tariff, Part VIII, Subpart C, section 404(A)(8).  Requests to transfer Capacity \nInterconnection Rights in existing Cycle 02 Applications will be carried over to the new Cycle 02.  Id. \n148 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 400 (Definitions S) (Soft Close Date).  \n149 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 400 (Definitions E) (Early Application \nEngagement). \n150 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 400 (Definitions A) (Application \nDeadline). \n151 December Order, 193 FERC ¶ 61,217, at P 226; Co-Location Order, 195 FERC ¶ 61,209, at P 284. \n152 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(H)(3)(a) (effective 12/31/9998) \n(“[P]lanned modifications that include the addition of an Eligible Load or Large Load configuration must be \nstudied as part of the Fast Energization process set forth in this Tariff, Part VIII.”)."},{"page":36,"startToken":11172,"endToken":11512,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 32 \n \n32 \n4. \nPJM is eschewing parallel processes, to streamline for speed and \naccuracy.  \nAs part of the effort to streamline for speed, PJM proposes to eliminate \nReplacement Generation Interconnection Service.153  Replacement Generation \nInterconnection Service was developed to address the delay in processing Generation \nInterconnection Requests during the transition from the old, serial process to the current \nclustered Cycle process.154  That delay was particularly a problem for generators seeking \nto transfer Capacity Interconnection Rights from a deactivating resource to a New Service \nRequest, because Capacity Interconnection Rights must be transferred within one year of \ndeactivation of a resource.155  With the Fast Energization Process taking only a year, there \nwill no longer be a need for Replacement Generation Interconnection Service as a separate \nparallel process.  Parallel processes, despite their value and benefit, increase complexity \nand tend to slow down processing; therefore PJM proposes to limit their use.156 \nPJM also proposes to return the Necessary Studies process to its former role of \naddressing modifications to projects covered by existing, effective service agreements once \nthe Fast Energization Process is in effect,157 as Eligible Loads and Eligible Generation can \nbe studied more comprehensively through the main study process and do not need another \nseparate parallel study process.  PJM proposes to add the same Necessary Studies process \n \n153 Attachment A-2, Proposed Tariff, Part VIII, Subpart J, sections 437(A)-(B) (requiring Replacement \nGeneration Interconnection Service Requests to be made prior to the next Business Day after the close of \nDecision Point II of Cycle 01).   \n154 Bielak Decl. ¶ 14. \n155 See Tariff, Part VIII, Subpart E, section 426(C)(3). \n156 Bielak Decl. ¶¶ 15, 18.  Along those lines, PJM also intends to open a stakeholder process in the first or \nsecond quarter of 2027 to explore improvements to Surplus Interconnection Service, another parallel process \nthat has a negative impact on processing speed. \n157 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(H)(3)(a) (effective 12/31/9998)."},{"page":37,"startToken":11512,"endToken":11789,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 33 \n \n33 \nfor studying Eligible Customer-driven modifications to existing, effective Transmission \nService Agreements for changes to the characteristics of Eligible Load and Large Load to \nthe Necessary Studies process, however, as such changes require study to protect the \nTransmission System.158  \n5. \nPJM will maintain transparency of its study results \nPJM will continue to identify the system reinforcements needed to interconnect \nGenerating Facilities and provide transmission service to loads, the drivers of those \nreinforcements and their capital costs.  PJM’s studies will use a proportional impact \nmethodology, consistent with Order No. 2023.159 And PJM will post information regarding \nthe reinforcements and their drivers and capital costs at the end of each Cycle on pjm.com \nin a publicly accessible, searchable format.160  The allocation and recovery of those costs \nis in the control of the Transmission Owners because they have filing rights as to cost \nallocation, cost recovery, and rate design. \nC. \nPart XI—New Transmission Services \n1. \nInterim NITS \nConsistent with the Commission’s directive to make the new transmission services \navailable to Eligible Customers serving load with BTMG,161 PJM is proposing in Part XI, \nSubpart A to offer Interim NITS to Eligible Customers serving “Eligible Load,” which \n \n158 See Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(H)(3)(a) (effective 12/31/9998).  \n159 See Attachment A-2, Proposed Tariff, Part VIII, Subpart C, section 404.  \n160 See, e.g., Attachment A-2, Proposed Tariff, Part VIII, Subpart C, section 409(B)(2) (requiring System \nImpact Study results to be publicly available on PJM’s website).  \n161 Co-Location Order, 195 FERC ¶ 61,209, at P 91."},{"page":38,"startToken":11789,"endToken":12161,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 34 \n \n34 \nencompasses both Co-Located Load and load with BTMG.162  PJM is also making Interim \nNITS available to Large Loads.163  The Part XI, Subpart A largely adopts the terms and \nconditions proposed during the paper hearing process in Docket No. EL25-49-000,164 but \nin a streamlined, reorganized format and with certain Commission-directed changes and \nother clarifications.  The Commission generally found in the Co-Location Order that the \nInterim NITS rules PJM had proposed were just and reasonable.165 \nSection 701 describes the general nature of Interim NITS and restrictions on its \nuse.166  Interim NITS is a transmission service that allows Eligible Customers serving \nEligible Load or Large Load to utilize head room on the system as-available on an \ninterruptible basis to a specific Delivery Point while awaiting the completion of system \nupgrades necessary to provide full NITS.167  Interim NITS is an energy-only service (i.e., \nit is not capacity backed).168  Interim NITS is not available to Eligible Customers serving \nEligible Load or Large Loads with FCD or NFCD Transmission Service.169  In addition, \nInterim NITS may not be utilized by Eligible Customers to serve loads other than the \ndesignated Eligible Load or Large Load.170  Finally, PJM reserves the right to curtail \n \n162 Attachment A-1, Proposed Tariff, Part XI, Subpart A, sections 700-03; Proposed Tariff, Part I, Definitions \n– E - F (Eligible Load). \n163 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 701.1. \n164 See generally PJM Initial Brief, Attachment A (Illustrative Language for New Tariff, Part XI; Attachments \nF-3A and F-4; and Other Illustrative Tariff Revisions) (Feb. 23, 2026); PJM Reply Brief, Attachment A \n(Redlines on Reply Brief to Illustrative Language for New Tariff, Part XI; Attachments F-3A and F-4; and \nOther Illustrative Tariff Revisions). \n165 See Co-Location Order, 195 FERC ¶ 61,209, at PP 263-68, 571. \n166 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 701. \n167 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 701.1. \n168 See Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 701.2. \n169 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 701.3. \n170 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 701.4."},{"page":39,"startToken":12161,"endToken":12458,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 35 \n \n35 \nInterim NITS, consistent with Good Utility Practice, for the purpose of making upgrades, \nmodifications, or repairs to Transmission Owner or Generation Owner lines, substations, \ngenerators, or facilities or to respond to adverse system conditions.171 \nSection 702 lays out the requirements for initiating Interim NITS.172  Eligible \nCustomers may apply for Interim NITS at the same time as NITS by submitting an \nApplication pursuant to the procedures in Part VIII.173  The Transmission Service \nAgreement for Interim NITS is in the form provided in Attachment F-3A.174  Such eligible \nCustomers must also meet conditions precedent for service including complying with the \nPJM Credit Policy, executing a Transmission Service Agreement with operational \nprocedures and necessary control technologies to limit withdrawals from the system, and \ncertifying that the Eligible Customer is willing and able to limit withdrawals from the \nTransmission System for the Eligible Load when directed by Transmission Provider, and \nconstructing any facilities on the customer’s side of the Delivery Point to receive the \ndelivery of energy.175  Consistent with the Co-Location Order,176 PJM clarified that Interim \nNITS will terminate and be converted automatically to NITS once the Transmission \nProvider performs an analysis to verify the system can accommodate the firm load and \nupdates its internal systems to reflect the relevant upgrades needed to provide the requested \n \n171 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 701.5. \n172 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702. \n173 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702.1. \n174 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702.2. \n175 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702.3. \n176 Co-Location Order, 195 FERC ¶ 61,209, at P 571."},{"page":40,"startToken":12458,"endToken":12894,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 36 \n \n36 \nlevel of service on a firm basis.177  The language concerning performing an updated \nanalysis and updating the relevant internal system updates was added to clarify that the \nconversion does not happen automatically the moment upgrades are physically complete \nbut must first be reflected in PJM’s internal systems.  In addition to termination for \nconversion to NITS, Interim NITS may be terminated to the extent the Eligible Load or \nLarge Load is disqualified from receiving service pursuant to Part XI, Subpart C, section \n719.5 due to multiple failures to follow Curtailment directives or misoperation of necessary \ncontrol technologies.178  Interim NITS may also be terminated to the extent an Eligible \nCustomer is in breach of its obligations under the Transmission Service Agreement (e.g., \nfailure to update Transmission Provider regarding material changes to the Eligible Load or \nLarge Load).179  Finally, Interim NITS may be terminated on another date mutually agreed \nby the parties.180 \nConsistent with the allocation of filing rights between PJM and Transmission \nOwners,181 PJM understands the Transmission Owners have filed transmission rates for \n \n177 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702.4(a); Proposed Tariff, Attachment F-\n3A.  \n178 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702.4(b). \n179 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702.4(c). \n180 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 702.4(d). \n181 CTOA, Rate Schedule FERC No. 42; see also Atl. City Elec. Co., 190 FERC ¶ 61,109, at P 3 (2025) \n(providing history and authority for the CTOA under Pennsylvania-New Jersey-Maryland Interconnection, \n105 FERC ¶ 61,294 (2003) (“Atlantic City Settlement Order”), order on compliance, 108 FERC ¶ 61,033 \n(2004) by explaining that “[i]n the Atlantic City Settlement Order, the Commission explained that the \nsettlement agreement essentially divides filing rights between ‘rate-related filings and terms and conditions-\nrelated filings – with the PJM [Transmission Owners] filing the former and PJM the latter’”); Atl. City Elec. \nCo., 190 FERC ¶ 61,109, at P 4 (“[I]ndividual transmission owners do not have a right to file under FPA \nsection 205 to modify ‘terms and conditions of the PJM Tariff’. . . .”); Atl. City Elec. Co. v. FERC, 295 F.3d \n1, 6 (D.C. Cir. 2002) (explaining that the initial Settlement Agreement between PJM and Transmission \nOwners “established procedures for changes to rate design and other tariff terms for transmission services.  \nIt permitted the transmission owners to file changes in transmission service rate design and non-rate terms \nand conditions to the tariff under section 205.”)."},{"page":41,"startToken":12894,"endToken":13187,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 37 \n \n37 \nInterim NITS.182  In addition to such rates, Eligible Customers taking Interim NITS on \nbehalf of Eligible Load or Large Load will be assessed certain other charges that are within \nPJM’s filing authority, consistent with the charges assessed to loads taking NITS.183  \nAccordingly, PJM would assess Eligible Customers taking Interim NITS on behalf of \nEligible Load or Large Load:  \n• administrative services charges under Schedule 1A, Schedule 9, and \nSchedule 10 of the Tariff;184 \n• Ancillary Services charges in accordance with Part I, section 3;185 \n• Black Start Service charges in accordance with Tariff, Schedule 6A;186  \n• any redispatch costs as set forth in Tariff, Attachment K;187 and \n• any applicable Transmission Enhancement Charges in accordance with Tariff, \nSchedule 12.188 \n2. \nContract Demand Transmission Service \nPart XI, Subpart B, sections 708 through 711 and 714 through 715 provide the terms \nand conditions for the Contract Demand Transmission Services.189  As explained in section \n708, Contract Demand Transmission Service allows an Eligible Customer to take \ntransmission service on behalf of Eligible Load or Large Load that is willing and able to \n \n182 PJM Interconnection, L.L.C., PJM Transmission Owners’ Partial Compliance Filing, Docket No. \nER26-3537-000 (Aug. 17, 2026).  \n183 See Co-Location Order, 195 FERC ¶ 61,209, at P 573. \n184 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 703.4. \n185 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 703.4. \n186 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 703.4. \n187 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 703.2. \n188 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 703.4. \n189 Attachment A-1, Proposed Tariff, Part XI, Subpart B, sections 708-11, 714-15."},{"page":42,"startToken":13187,"endToken":13508,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 38 \n \n38 \nlimit withdrawals from the Transmission System.190  FCD Transmission Service provides \nenergy and capacity up to a specified, defined MW level.191  NFCD Transmission Service \nprovides energy procured by Transmission Provider on an as-available basis up to a \nspecified, predetermined level.192   \nTo be eligible for Contract Demand Transmission Service, any given Eligible Load \nor Large Load cannot be served by Interim NITS or NITS or have a pending Application \nfor the same.193  To prevent toggling between FCD Transmission Service and NFCD \nTransmission Service to avoid capacity costs, an Eligible Customer shall not be eligible to \ntake NFCD Transmission Service on behalf of any given portion of an Eligible Load or \nLarge Load it previously served with FCD Transmission Service for five years following \nthe effective date of the relevant Transmission Service Agreement.194  As with Interim \nNITS, Contract Demand Transmission Service may not be used for sales of energy or \ncapacity to loads other than the Eligible Load or Large Load designated in the Transmission \nService Agreement.195  Also, Transmission Provider may Curtail Contract Demand \nTransmission Service, consistent with Good Utility Practice, to make or support upgrades, \nmodifications, or maintenance to Transmission Owner or Generation Owner lines, \n \n190 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 708(a). \n191 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 708(b). \n192 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 708(b). \n193 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 709.3.  This approach is consistent with the \nCommission’s holdings that a customer cannot take NITS for only a portion of its load behind a delivery \npoint.  See PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 196 (2025). \n194 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 709.3. \n195 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 709.4."},{"page":43,"startToken":13508,"endToken":13817,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 39 \n \n39 \nsubstations, and equipment or as needed due to adverse conditions on the Transmission \nSystem.196 \nTo initiate Contract Demand Transmission Service on behalf of a designated \nEligible Load or Large Load, the Eligible Customer must apply pursuant to the procedures \nin Tariff, Part VIII.197  Note that even to the extent an entity intends to serve Eligible Load \nor Large Load entirely through Co-Located Generation and does not wish to take \nTransmission Service, the entity must still apply and take service for zero MW pursuant to \na Transmission Service Agreement to account for the provision of ancillary services.198  \nThe Transmission Service Agreement for Contract Demand Transmission Service is in the \nform provided in Attachment F-4.199   \nEligible Customers must meet the following conditions precedent to receive \nContract Demand Transmission Service:  (i) make a valid request pursuant to Part VIII; (ii) \nverify that the designated Eligible Load or Large Load has not been served by an Eligible \nCustomer taking NITS or Interim NITS or applied for such service on behalf of the load; \n(iii) the Eligible Customer has complied with the PJM Credit Policy; (iv) the Eligible \nCustomer has executed a Transmission Service Agreement in the form provided in \nAttachment F-4, which includes operational procedures and necessary control technologies \nto limit energy withdrawals; (v) the Eligible Customer is in compliance with all applicable \ntechnical requirements; (vi) the Eligible Customer constructed any facilities on its side of \nthe Delivery Point necessary to receive the delivery of energy; (vii) the Eligible Customer \n \n196 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 709.5. \n197 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 710.1. \n198 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 710.1. \n199 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 710.2."},{"page":44,"startToken":13817,"endToken":14136,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 40 \n \n40 \nhas completed any necessary certification requirements in accordance with the PJM \nManuals; (viii) the Eligible Customer has executed the PJM Governing Agreements; and \n(ix) in the case of an Eligible Load served by an Eligible Generating Facility, the Eligible \nCustomer verifies that no portion of the Eligible Generating Facility dedicated to serving \nthe Eligible Load has Capacity Interconnection Rights.200  \nContract Demand Transmission Service will generally continue without expiration, \nbut may be terminated in certain circumstances.201  First, Contract Demand Transmission \nService may be terminated to the extent an incumbent Eligible Customer is being replaced \nby a successor Eligible Customer.202  Second, an Eligible Customer may terminate FCD \nTransmission Service by providing PJM with 42 months’ notice prior to the \ncommencement of the Delivery Year.203  Third, Contract Demand Transmission Service \nmay be terminated to the extent the Eligible Load or Large Load is disqualified from \nreceiving service pursuant to Part XI, Subpart C, section 719.5 due to multiple failures to \nfollow Curtailment directives or misoperation of necessary control technologies.204  Fourth, \nthe Eligible Customer is in breach of its obligations under the Transmission Service \nAgreement (e.g., failure to update Transmission Provider regarding material changes to the \nEligible Load or Large Load).205  Fifth, Contract Demand Transmission Service may be \nterminated on another date mutually agreed by the parties.206  Sixth, NFCD Transmission \n \n200 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 710.3. \n201 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 711. \n202 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 711(a). \n203 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 711(b). \n204 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 711(c). \n205 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 711(d). \n206 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 711(e)."},{"page":45,"startToken":14136,"endToken":14442,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 41 \n \n41 \nService may be terminated when system upgrades necessary to provide FCD Transmission \nService are completed and placed in service.207 \nConsistent with the allocation of rights between PJM and Transmission Owners,208 \nPJM understands the Transmission Owners will be making a separate filing transmission \nrates for FCD Transmission Service and NFCD Transmission Service.  In addition to such \nrates, Eligible Customers will be assessed other charges Contract Demand Transmission \nService that are within PJM’s filing authority.  Accordingly, PJM will assess Eligible \nCustomers taking FCD Transmission Service on behalf of Eligible Load or Large Load:  \n• administrative services charges under Schedule 1A, Schedule 9, and Schedule \n10 of the Tariff, based on the total quantity of megawatt-hours (“MWh”) of \nFCD Transmission Service specified in the Transmission Service Agreement, \nexcept in the case of any capacity-related charges under these schedules, which \nshall be based on the Eligible Customer’s Unforced Capacity Obligation;209 \n• Ancillary Services charges, except for Regulation, based on the total quantity \nin MWhs of FCD Transmission Service specified in the Transmission Service \nAgreement in accordance with Part I, section 3;210 \n• Regulation charges based on gross demand of the Eligible Load;211 \n• Black Start Service charges based on the gross demand in accordance with \nTariff, Schedule 6A;212  \n• any redispatch costs as set forth in Tariff, Attachment K;213 and \n \n207 Attachment A-1, Proposed Tariff, Part XI, Subpart B, section 711(f). \n208 See supra note 95. \n209 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 714.5. \n210 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 714.5. \n211 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 714.5. \n212 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 714.5. \n213 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 714.3."},{"page":46,"startToken":14442,"endToken":14752,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 42 \n \n42 \n• any applicable Transmission Enhancement Charges in accordance with Tariff, \nSchedule 12.214 \nFor Eligible Customers taking NFCD Transmission Service on behalf of Eligible \nLoad or Large Load, PJM would assess:  \n• administrative services charges under Schedule 1A, Schedule 9, and Schedule \n10 of the Tariff, based on the total quantity of MWhs of reserved NFCD \nTransmission Service, except any capacity-related charges under these \nschedules will not apply;215 \n• Ancillary Services charges, except for Regulation, based on the total quantity \nin MWhs of reserved NFCD Transmission Service in accordance with Tariff, \nPart I, section 3;216 \n• To the extent the Eligible Customer does not have an effective Transmission \nService Agreement for FCD Transmission Service, Black Start Service charges \nbased on the gross demand in accordance with Tariff, Schedule 6A;217  \n• any redispatch costs as set forth in Tariff, Attachment K;218 and \n• To the extent the Eligible Customer does not have an effective Transmission \nService Agreement for FCD Transmission Service, Regulation charges based \non the gross demand of the Eligible Load or Large Load.219 \n3. \nCommon service provisions for Interim NITS and Contract Demand \nTransmission Services \nAs proposed, Tariff, Part XI, Subpart C now provides the common service \nprovisions for Part XI transmission services including requirements for control \ntechnologies, protection schemes, technical requirements, and facility construction.  \nService under Part XI is conditioned upon the Eligible Customer constructing, maintaining, \n \n214 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 714.5. \n215 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 715.4. \n216 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 715.4. \n217 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 715.4. \n218 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 715.2. \n219 Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 715.4."},{"page":47,"startToken":14752,"endToken":15062,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 43 \n \n43 \nand operating the facilities and necessary control technologies and protection systems to \ntake service and ensure that the Eligible Customer limits its withdrawals from the \nsystem.220  Those necessary control technologies may include fully redundant special \nprotection schemes in accordance with the PJM Manuals.221  Necessary control \ntechnologies and special protection schemes must be developed in accordance with the \nPJM Manuals and consistent with Transmission Owner technical requirements and may be \nmodified from time to time.222  In addition, Eligible Customers must meet the relevant \ntechnical requirements for service including the installation of necessary hardware and \nsoftware to limit energy withdrawals, provisioning an operations center and qualified \npersonnel, and demonstration of operational control.223 \nConsistent with the Commission’s directive,224 PJM revised the Curtailment \nlanguage to clarify the relative priority for the various services.225  FCD Transmission \nService will be treated as equivalent to NITS and Firm Point-to-Point Transmission \nServices for purposes of Curtailment.226  Interim NITS, NFCD Transmission Service, and \nNon-Firm Point-to-Point Service will be treated as equivalent for purposes of \nCurtailment.227  Transmission Provider will prioritize reservations for Curtailment based \non their contribution to exceedances of system limits as specified in the PJM Manuals.228  \n \n220 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 716. \n221 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 717. \n222 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 717. \n223 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 718.1. \n224 Co-Location Order, 195 FERC ¶ 61,209, at P 555. \n225 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719. \n226 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.2. \n227 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.4. \n228 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.4."},{"page":48,"startToken":15062,"endToken":15390,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 44 \n \n44 \nAs directed,229 PJM also added language to specify that Eligible Customers subject to \nCurtailment may use a Co-Located Generating Facility to serve Co-Located Load provided \nthe facility either has not obtained interconnection service yet or the facility is not a \nCapacity Resource.230  Consistent with the Co-Location Order,231 PJM added language in \nsection 719.5 and to the Part I definition of Curtailment to clarify that with respect to Tariff, \nPart XI, its Curtailment authority includes the authority to curtail Interim NITS and NFCD \nTransmission Service for capacity or reserve shortages.232 \nConsistent with the Commission’s directive,233 PJM revised the operational \npenalties for failure to follow dispatch instructions or misoperation of control \ntechnologies.234  Eligible Customers taking Interim NITS or Contract Demand \nTransmission Service are subject to operational penalties in the event that the Eligible \nCustomer’s necessary control technology or protection system scheme misoperates.235  \nAfter one instance of misoperation, the Eligible Customer will be prohibited from taking \ntransmission service or otherwise withdrawing energy from the Transmission System \npursuant to the relevant Transmission Service Agreement for a period up to 120 days from \nmisoperation, which may be shortened or extended per mutual agreement.236  The up to \n120-day pause pending evaluation of the misoperation of the necessary control technology \n \n229 Co-Location Order, 195 FERC ¶ 61,209, at P 576. \n230Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 705.2. \n231 Co-Location Order, 195 FERC ¶ 61,209, at P 551. \n232 Attachment A-1,  Proposed Tariff, Part I, section 1 (Definitions – C - D); Proposed Tariff, Part XI, Subpart \nC, section 719.5. \n233 Co-Location Order, 195 FERC ¶ 61,209, at PP 516, 523-24, 527. \n234 See Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.5. \n235 Attachment A-1, Proposed Tariff, Part XI, Subpart C, sections 719.5(a)-(b). \n236 See Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.5(b)."},{"page":49,"startToken":15390,"endToken":15741,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 45 \n \n45 \nor protection system scheme is consistent with NERC requirements for an investigation \ninto the operation of a Remedial Action Schemes (e.g., PRC-004-6 and PRC-012-02).237  \nSuch a pause in service will allow PJM (and the affected Transmission Owner(s), as \nnecessary) time to investigate, identify, and implement necessary fixes to better protect the \nTransmission System, while respecting the Eligible Customer’s desire to retain this type of \nservice based on its promised willingness to limit energy withdrawals.  In the event a \nnecessary control technology or protection system misoperates a second time, the Eligible \nCustomer’s Transmission Service Agreement for that Eligible Load shall be terminated.238  \nSimilarly, Eligible Customers that fail to respond to established Load Shedding and \nCurtailment procedures shall be prohibited from taking service under the relevant \nTransmission Service Agreement for a period of up to 120 days.239  \n4. \nPro Forma Service Agreement for Interim NITS (Attachment F-3A) \nBecause Interim NITS is by definition a temporary service that will convert into \nNITS, the pro forma service agreement is a combined Interim NITS/NITS agreement for \nEligible Customers taking Interim NITS or NITS on behalf of Eligible Loads or Large \nLoads.240  Any Eligible Customer taking these services on behalf of Eligible Loads or Large \nLoads would execute Attachment F-3A.241  In addition to the general terms carried over \n \n237 PRC-004-6 – Protection System Misoperation Identification and Correction, North American Electric \nReliability \nCorporation \n(June \n12, \n2025), \nhttps://www.nerc.com/globalassets/standards/reliability-\nstandards/prc/prc-004-6.pdf [https://perma.cc/EV9E-JYWQ]; PRC-012-2 – Remedial Action Schemes, North \nAmerican \nElectric \nReliability \nCorporation \n(June \n12, \n2025), \nhttps://www.nerc.com/globalassets/standards/reliability-standards/prc/prc-012-2.pdf \n[https://perma.cc/9KFL-HHNU]. \n238 See Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.5(b). \n239 See Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.5(a). \n240 Attachment A-1, Proposed Tariff, Part XI, Subpart A, sections 701.1, 702.4(a). \n241 Attachment A-1, Proposed Tariff, Attachment F-3A.  The existing pro forma NITS Service Agreement is \nlocated at Tariff, Attachment F-3."},{"page":50,"startToken":15741,"endToken":16057,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 46 \n \n46 \nfrom the pro forma NITS Service Agreement (Attachment F-3), PJM has added terms \nspecific to Interim NITS and serving Eligible Loads and Large Loads.  When an Eligible \nCustomer takes Interim NITS while awaiting upgrades for NITS, Attachment F-3A \nspecifies that NITS will not commence until the necessary upgrades are complete, \nTransmission Provider has performed an updated analysis to verify the Transmission \nSystem can accommodate the firm load, and the Transmission Provider has updated the \nrelevant systems pursuant to its internal procedures.242  Because PJM will have to ensure \nthe Transmission System can accommodate the specific Eligible Load or Large Load being \nserved by the Eligible Customer, Attachment F-3A requires certain details about that load \nto be specified in the Agreement.  Attachment F-3A requires the specific Eligible Load or \nLarge Load being served to be identified, the load’s gross demand to be specified, and, as \napplicable, information regarding the Eligible Generating Facility serving the load to be \nlisted, including its Maximum Facility Output.243  The Eligible Customer is also required \nto specify a Delivery Point for Interim NITS and submit a single-line diagram.244   \nBecause Interim NITS requires the Eligible Customer to be willing and able to limit \nwithdrawals from the system, Attachment F-3A includes terms to implement such \nlimitations.  First, Attachment F-3A specifies the amount of Interim NITS provided245 and \nrequires the Eligible Customer to certify that it is willing and able to limit its usage of the \nTransmission System consistent with the terms of the Agreement and when requested by \n \n242 Attachment A-1, Proposed Tariff, Attachment F-3A, sections 2.0-3.0. \n243 Attachment A-1, Proposed Tariff, Attachment F-3A. \n244 Attachment A-1, Proposed Tariff, Attachment F-3A, Specifications for Interim Regional NITS, section \n1.0; Proposed Tariff, Attachment F-3A, Schedule A. \n245 Attachment A-1, Proposed Tariff, Attachment F-3A, Specifications for Interim Regional NITS, section \n1.0."},{"page":51,"startToken":16057,"endToken":16327,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 47 \n \n47 \nthe Transmission Provider.246  The Agreement also includes a placeholder to list the \nnecessary control technologies and operational practices that will be required prior to the \ncommencement of Interim NITS.247  Finally, the agreement prohibits the Eligible Customer \nfrom making any material modifications to the load being served without the Transmission \nProvider’s prior written agreement.248  To the extent modifications to the Load Facility are \nplanned, the Agreement requires the Eligible Customer to provide PJM notice to allow \nPJM to initiate the Necessary Studies process.249  In the event PJM determines that a \nplanned modification would have a permanent material impact on the Transmission System \nor would constitute a material modification, Network Customer shall then withdraw the \nproposed modification or proceed with a new Eligible Customer for Load Request for the \nmodification.250  Finally, the Agreement provides that if an Eligible Customer fails to \ntimely inform the Transmission Provider of or obtain Transmission Provider’s written \nagreement for a material change in (i) the demand characteristics of the Load Facility; or \n(ii) the supply characteristics of the Eligible Generating Facility may constitute a breach to \nthe Agreement and the Agreement may be terminated.251 \n \n246 Attachment A-1, Proposed Tariff, Attachment F-3A, section 4.0. \n247 Attachment A-1, Proposed Tariff, Attachment F-3A, Specifications for Interim Regional NITS, sections \n4.0-5.0. \n248 Attachment A-1, Proposed Tariff, Attachment F-3A, section 4.0. \n249 Attachment A-1, Proposed Tariff, Attachment F-3A, section 4.0. \n250 Attachment A-1, Proposed Tariff, Attachment F-3A, section 4.0. \n251 Attachment A-1, Proposed Tariff, Attachment F-3A, section 4.0."},{"page":52,"startToken":16327,"endToken":16632,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 48 \n \n48 \n5. \nPro Forma Service Agreement for Contract Demand Transmission \nService (Attachment F-4) \nAttachment F-4, the pro forma agreement for Contract Demand Transmission \nService, governs both FCD and NFCD Transmission Services.252  Attachment F-4 is the \npro forma agreement for Eligible Customers taking FCD or NFCD Service on behalf of \nEligible Loads or Large Loads.253  Any Eligible Customer taking these services on behalf \nof Eligible Loads or Large Loads would execute Attachment F-4.254  In addition to the \ngeneral terms carried over from the pro forma NITS Service Agreement (Attachment F-3), \nPJM has added terms specific to Contract Demand Transmission Service and serving \nEligible Loads and Large Loads.  When an Eligible Customer takes NFCD Transmission \nService while awaiting upgrades for FCD Transmission Service, Attachment F-4 specifies \nthat FCD Transmission Service will not commence until the upgrades are complete, \nTransmission Provider has performed an updated analysis to verify the Transmission \nSystem can accommodate the firm load, and the Transmission Provider has updated the \nrelevant systems pursuant to its internal procedures.255  Like with Interim NITS, because \nPJM will have to ensure the Transmission System can accommodate the specific Eligible \nLoad or Large Load being served by the Eligible Customer, Attachment F-4 requires \ncertain details about that load to be specified in the Agreement.  Attachment F-4 requires \nthe specific Eligible Load or Large Load being served to be identified, the load’s gross \ndemand to be specified, and, as applicable, information regarding the Eligible Generating \n \n252 Attachment A-1, Proposed Tariff, Attachment F-4.   \n253 Attachment A-1, Proposed Tariff, Part XI, Subpart B, sections 708(a), 710.3(iv). \n254 Attachment A-1, Proposed Tariff, Attachment F-4; Proposed Tariff, Part XI, Subpart B, sections 708(a), \n710.3(iv).  \n255 Attachment A-1, Proposed Tariff, Attachment F-4, sections 2.0-3.0."},{"page":53,"startToken":16632,"endToken":16947,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 49 \n \n49 \nFacility serving the load to be listed, including its Maximum Facility Output.256  The \nEligible Customer is also required to specify a Delivery Point for the Contract Demand \nTransmission Service and submit a single-line diagram.257 \nBecause Contract Demand Transmission Service requires the Eligible Customer to \nlimit withdrawals from the system (as with Interim NITS), Attachment F-4 includes terms \nto implement such limitations.  First, Attachment F-4 specifies the amount of FCD \nTransmission Service and NFCD Transmission Service being provided258 and requires the \nEligible Customer to certify that it is willing and able to limit its usage of the Transmission \nSystem consistent with the terms of the Agreement and when requested by the \nTransmission Provider.259  The Agreement also includes a placeholder to list the necessary \ncontrol technologies and operational practices that will be required prior to the \ncommencement of service.260  Finally, the agreement prohibits the Eligible Customer from \nmaking any material modifications to the load being served without the Transmission \nProvider’s prior written agreement.261  To the extent modifications to the Load Facility are \nplanned, the Agreement requires the Eligible Customer to provide PJM notice to allow \nPJM to initiate the Necessary Studies process.262  In the event PJM determines that a \n \n256 Attachment A-1, Proposed Tariff, Attachment F-4, Specifications for Contract Demand Transmission \nService, sections 2.0-3.0. \n257 Attachment A-1, Proposed Tariff, Attachment F-4, Specifications for Contract Demand Transmission \nService, section 1.0; Proposed Tariff, Attachment F-4, Schedule A. \n258 Attachment A-1, Proposed Tariff, Attachment F-4, Specifications for Contract Demand Transmission \nService, section 1.0. \n259 Attachment A-1, Proposed Tariff, Attachment F-4, section 5.0. \n260Attachment A-1,  Proposed Tariff, Attachment F-4, Specifications for Contract Demand Transmission \nService, sections 4.0-5.0. \n261 Attachment A-1, Proposed Tariff, Attachment F-4, section 4.0. \n262 Attachment A-1, Proposed Tariff, Attachment F-4, section 4.0."},{"page":54,"startToken":16947,"endToken":17264,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 50 \n \n50 \nplanned modification would have a permanent material impact on the Transmission System \nor would constitute a material modification, Network Customer shall then withdraw the \nproposed modification or proceed with a new Eligible Customer for Load Request for the \nmodification.263  Finally, the Agreement provides that if an Eligible Customer fails to \ntimely inform the Transmission Provider of or obtain Transmission Provider’s written \nagreement for a material change in (i) the demand characteristics of the Load Facility; or \n(ii) the supply characteristics of the Eligible Generating Facility may constitute a breach of \nthe Agreement and the Agreement may be terminated.264 \nD. \nRe-Filing Co-Located Load Compliance Changes \nA number of proposed changes in this filing address compliance directives from \nthe Co-Location Order and were previously filed on August 17, 2026.265  PJM filed a \nmotion with the Commission earlier today seeking leave to withdraw that filing in favor of \nthis one due to the overlapping nature of many of the changes.266  A number of the proposed \nchanges from the August 17 Filing are being re-filed here.  Attachment D provides a chart \ndetailing where each directive from the June 2026 Orders is addressed in this filing.267 \n1. \nProhibition on serving Co-Located Load from existing generators \nThe Co-Location Order directed PJM to explain in its compliance filing how its \nchanges will prohibit Interconnection Customers from serving Co-Located Loads from \nnew and existing generators until all necessary Network Upgrades, control technologies \n \n263 Attachment A-1, Proposed Tariff, Attachment F-4, section 4.0. \n264 Attachment A-1, Proposed Tariff, Attachment F-4, section 4.0. \n265 See August 17 Filing. \n266 PJM Interconnection, L.L.C., Motion to Withdraw Filing and Terminate Proceeding in Deference to New \nDocket of PJM Interconnection, L.L.C., Docket No. ER26-1479-002 (Nov. 16, 2026). \n267 See generally Attachment D, Chart Mapping Order Directives to Tariff Changes."},{"page":55,"startToken":17264,"endToken":17668,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 51 \n \n51 \nand/or protection systems, and metering are complete and in service.268  This FPA section \n205 filing fulfils PJM’s compliance obligations and obviates the need for a separate \ncompliance filing by proposing to add Necessary Study references and provisions to Parts \nI, III, VI, and VII, and to direct Generation Project Developers seeking to serve Co-Located \nLoad with an existing Co-Located Generating Facility to the Necessary Study process in \nPart VIII, Subpart A, section 401(H)(3).269  In its Sixty-Day Compliance Filing, PJM \nproposed to add language to Part VIII for the Necessary Study process to preclude a Project \nDeveloper from implementing any planned modifications to its facilities until the \nNecessary Studies are completed and the amended GIA reflecting the results of such \nstudies is fully executed and effective; the Sixty-Day Compliance Filing also provided that \nservice to the Co-Located Load could not begin until “all required Network Upgrades, \nnecessary control technologies and protection systems, and metering identified as \nnecessary are complete and in service.”270  Thus, the Tariff would now require that all \nInterconnection Customers and Generation Project Developers seeking to serve Co-\nLocated Load, whether with existing or new Generating Facilities:  (1) provide advance \nwritten notice to PJM and the relevant Transmission Owner; (2) go through the Necessary \nStudy process in Part VIII of the Tariff; and (3) not begin serving Eligible Load until the \n \n268 Co-Location Order, 195 FERC ¶ 61,209, at P 285. \n269 See Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – L-M-N) (adding the definitions of \n“Necessary Study” and “Necessary Studies Agreement”); Proposed Tariff, Part III (General) (addition of \nnotice requirement); Proposed Tariff, Part VI, Subpart B, section 212 (same); Proposed Tariff, Part VII, \nSubpart A, section 301(A)(7)(c) (same).   \n270 Sixty-Day Compliance Filing, Proposed Tariff Revisions (Attachments A & B), Part VIII, Subpart A, \nsections 401(H)(3)(a), 401(H)(3)(b)(iii).  In this filing, PJM proposes to further clarify in Proposed Tariff, \nPart VIII, the Necessary Study process by amending the listing of required and necessary equipment changes \nto instead reference “the entire scope of work required under that . . . Generation Interconnection Agreement.”  \nProposed Tariff, Part VIII, Subpart A, section 401(H)(3)(d).  This ensures that all items determined to be \nnecessary and therefore captured in the amended GIA are complete before the Project Developer may begin \nserving Eligible Load."},{"page":56,"startToken":17668,"endToken":18064,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 52 \n \n52 \nentire scope of the work under their GIA as amended after the Necessary Study process is \ncomplete.  These combined revisions ensure that all these entities are treated comparably \nand the prohibition on serving Co-Located Loads before all the necessary upgrades and \nequipment changes are complete is enforced across the board.271 \n2. \nExpansion of service to “Eligible Load” for load with BTMG \nThe Co-Location Order directed PJM to expand the availability of the December \nOrder’s new transmission services to Network Customers serving load with BTMG that \nare willing and able to limit their withdrawals from the Transmission System under certain \ncircumstances.272  The Commission directed PJM to either add a definition of “Eligible \nLoad” or propose other changes to implement this directive.273  Consistent with this \ndirective, PJM is proposing to add the term Eligible Load to the Tariff to encompass both \nCo-Located Load and Load with BTMG.274  To that end, PJM is proposing to add to the \nTariff, Part I, section 1, Definitions the term “Eligible Load” defined as “Co-Located Load \nor load connected to Behind the Meter Generation.”275  Further consistent with the \nCommission’s directive to propose other Tariff changes necessary to expand the \n \n271 PJM also proposes herein formatting and language changes to the Necessary Study provisions in Part VIII, \nSubpart A, section 401(H)(3), to make clear that the Necessary Study process applies to all Project \nDevelopers that plan to make modifications to their facilities, “including but not limited to a Project \nDeveloper whose planned modifications include an Eligible Load configuration.”  Attachment A-1, Proposed \nTariff, Part VIII, Subpart A, section 401(H)(3)(a).  PJM further proposes minor, ministerial changes to Tariff, \nPart VIII to spell out the term “Generation Interconnection Agreement” and replace “PJM” with \n“Transmission Provider,” as appropriate.  See, e.g., Attachment A-1, Proposed Tariff, Part VIII, Subpart C, \nsection 408(A)(2)(e)(i)(j)(iv); Proposed Tariff, Part VIII, Subpart E, sections 414(B)(2), 414(B)(4)(c). \n272 Co-Location Order, 195 FERC ¶ 61,209, at P 91. \n273 Co-Location Order, 195 FERC ¶ 61,209, at P 91. \n274 Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – E - F) (adding the definition of “Eligible \nLoad”). \n275 Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – E - F) (adding the definition of “Eligible \nLoad”)."},{"page":57,"startToken":18064,"endToken":18595,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 53 \n \n53 \navailability of these new services, PJM is proposing to add to the term “Eligible Generating \nFacility” to the Tariff to encompass both a Co-Located Generating Facility or Retail \nBTMG.276  In addition, PJM is proposing conforming changes to replace “Co-Located \nLoad” with “Eligible Load” and “Co-Located Generator” with “Eligible Generator” and \nother clarifying changes in Tariff Part I, section 1 (Definitions),277 Part III (Network \nIntegration Transmission Service),278 Part VI (Administration and Study of New Service \nRequests),279 Part VII (Transition Cycle Generation Interconnection Procedure),280 Part \nVIII (New Rules Generation Interconnection Procedure),281 Part IX (Forms of \n \n276 “‘Eligible Load’ shall mean Co-Located Load or load connected to Behind the Meter Generation.  \n‘Eligible Generating Facility’ shall mean a Co-Located Generating Facility or Behind the Meter Generation.”  \nProposed Tariff, Part I, section 1 (Definitions – E - F) (defining “Eligible Load” and “Eligible Generating \nFacility”). \n277 Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – O - P - Q) (updating the definition of \n“Provisional Interconnection Service” to reference “Eligible Load” instead of just “Co-Located Load”). \n278 Attachment A-1, Proposed Tariff, Part III, section 28.1 (replacing “Co-Located Load” with “Eligible \nLoad”); section 29.1 (allowing customers to take NITS on behalf of “Eligible Load” instead of “Co-Located \nLoad”); Proposed Tariff, Part III, section 29.2 (replacing “Co-Located Load” with “Eligible Load” in \nApplication procedures); Proposed Tariff, Part III, section 31.6 (replacing “Co-Located Load” with “Eligible \nLoad” in annual load and resource information update). \n279 Attachment A-1, Proposed Tariff, Part VI, Subpart B, section 212 (adding language in Part VI, Subpart \nB, section 212 regarding the Necessary Study process in Part VIII for Generating Facilities to reference \nservice to Eligible Loads). \n280 Attachment A-1, Proposed Tariff, Part VII, Subpart A, section 300, Definitions E (adding the definitions \nfor “Eligible Load” and “Eligible Generating Facility”); Proposed Tariff, Part VII, Subpart A, section 300, \nDefinitions P (revising the definition of “Provisional Interconnection Service” to reference “Eligible \nGenerating Facility” and “Eligible Load”). \n281 Attachment A-1, Proposed Tariff, Part VIII, Subpart A, section 400, Definitions E (adding the definitions \nfor “Eligible Load” and “Eligible Generating Facility”); Proposed Tariff, Part VIII, Subpart A, section 400, \nDefinitions P (updating the definition of “Provisional Interconnection Service” to reference “Eligible \nGenerating Facility” and “Eligible Load”); Proposed Tariff, Part VIII, Subpart A, section 401 (revising the \nApplication requirements to allow Eligible Generating Facilities serving Eligible Load and clarifying the \nNecessary Studies process applies to Eligible Load); Proposed Tariff, Part VIII, Subpart B, section 403 \n(revising the Application rules to allow Eligible Generating Facilities serving Eligible Load); Proposed \nTariff, Part VIII, Subpart C, section 404 (updating the System Impact Studies to contemplate service to \nEligible Load); Proposed Tariff, Part VIII, Subpart C, section 406 (updating the acceleration language to \nallow acceleration of new service requests for new facilities or increases the generation capability in existing \nfacilities to serve Eligible Load); Proposed Tariff., Part VIII, Subpart C, section 408 (same); Proposed Tariff, \nPart VIII, Subpart E, section 413 (updating the language permitting service requests below the Maximum \nFacility Output for new facilities or increases the generation capability in existing facilities that will serve"},{"page":58,"startToken":18595,"endToken":19063,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 54 \n \n54 \nInterconnection-Related Agreements),282 and Part XI, Subpart A (Interim Network \nIntegration Transmission Service).283 \n3. \nElimination of new GIA requirement \nPJM previously proposed to require all Eligible Customers that intend to serve Co-\nLocated Load with a new or existing Co-Located Generating Facility to enter into a new \nGIA pursuant to Part VIII of the Tariff, which was revised to include additional details \nregarding the Necessary Studies process.284  The Co-Location Order rejected this proposal \nfor customers with existing service agreements and directed PJM to add language \nconcerning the Necessary Study process to Tariff, Parts VI and VII to allow customers with \nexisting service agreements to modify those agreements.285  Accordingly, PJM is proposing \nchanges to allow customers that obtained service agreements pursuant to Parts VI and VII \nto modify those agreements pursuant to the Necessary Study process in Part VIII.286  \n \nEligible Load); Proposed Tariff, Part VIII, Subpart E, section 414 (updating the language to permit Surplus \nInterconnection Service for Eligible Load). \n282 Attachment A-1, Proposed Tariff, Part IX, Subpart A (Form of Application and Studies Agreement), \nsection 1 (revising section 1 of the Application and Studies Agreement to collect Applicant information for \nan Eligible Generating Facility serving Eligible Load); Proposed Tariff, Part IX, Subpart A (Form of \nApplication and Studies Agreement), section 3.17 (changing “PJM” to “Transmission Provider” and \nclarifying all transmission service requests in the PJM Region are subject to the same deliverability tests); \nProposed Tariff, Part IX, Subpart B, GIA Appendices and Schedules, Schedule O (updating Schedule O to \nreplace “Eligible Load” with “Eligible Generating Facility”); Proposed Tariff, Part XI, Subpart G, Necessary \nStudies Agreement (updating the Necessary Studies Agreement to reference “Eligible Load” and “Eligible \nGenerating Facility”).  \n283Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 700 (updating references to “Co-Located \nLoad” to “Eligible Load”); Proposed Tariff, Part XI, Subpart A, section 701.1 (same); Proposed Tariff, Part \nXI, Subpart A, section 701.2 (same); Proposed Tariff, Part XI, Subpart A, section 701.3 (same); Proposed \nTariff, Part XI, Subpart A, section 702.1 (same); Proposed Tariff, Part XI, Subpart A, section 702.4 (same); \nProposed Tariff, Part XI, Subpart A, section 703 (same). \n284 See Co-Location Order, 195 FERC ¶ 61,209, at P 284; Attachment A-1, Proposed Tariff, Part VIII, Subpart \nA, section 401(H)(3). \n285 Co-Location Order, 195 FERC ¶ 61,209, at P 311. \n286 See supra note 58 concerning addition of Necessary Study language to Parts I, III, VI, and VII; \nAttachment A-1, Proposed Tariff, Part VIII, Subpart A, section 401(I).  PJM also proposes to cross-reference \nTariff, Part VIII, Subpart L, section 439, Provisional Interconnection Service, added in the Thirty-Day \nCompliance Filing, in Parts VI and VII to clarify that Provisional Interconnection Service is available to"},{"page":59,"startToken":19063,"endToken":19423,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 55 \n \n55 \nFor Interconnection Customers that utilized the Part VI process, because Part VI \ndoes not contain discrete definitions, PJM is revising the proposed definition of Co-Located \nGenerating Facility in Part I to include an existing Customer Facility that is physically \nconnected to Co-Located Load to incorporate the relevant terms from Part VI.287  As \nexplained above, to ensure that existing Interconnection Customers with effective \nInterconnection Service Agreements (“ISA”) do not serve Co-Located Load until all \nnecessary upgrades and equipment are in place,288 PJM is also adding to the Co-Located \nGenerating Facility definition a requirement to provide advance written notice to the \nTransmission Provider and Transmission Owner to initiate the Necessary Study process \npursuant to Part VIII, Subpart A, section 401(H)(3)(b) to use a Customer Facility to serve \nCo-Located Load.289  In addition, PJM is adding language to mirror this Necessary Study \nprocess requirement in Part VI, Subpart B, section 212.290  Finally, PJM has updated the \npro forma Necessary Studies Agreement to include language for Queue No., reference \nPart VI for ISAs, incorporate references to Interconnection Customers throughout, and \n \nentities that obtained Interconnection Service under those Parts.  See Attachment A-1, Proposed Tariff, Part \nI, section 1 (Definitions – O - P - Q) (updating the definition of “Provisional Interconnection Service”); \nProposed Tariff, Part VII, Subpart A, section 300, Definitions P (same); Proposed Tariff, Part VIII, Subpart \nA, section 400, Definitions P (same).  \n287 Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – C - D) (revising the definition of “Co-\nLocated Generating Facility”). \n288 Co-Location Order, 195 FERC ¶ 61,209, at P 285. \n289 Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – C - D) (adding to the definition of “Co-\nLocated Generating Facility”). \n290 Attachment A-1, Proposed Tariff, Part VI, Subpart B, section 212.  PJM also proposes to add new Tariff, \nPart VIII, Subpart A, section 401(I) to clarify that Interconnection Customers with ISAs under Tariff, Part \nVI may utilize the Part VIII Necessary Study process and will be referred to as Project Developers or \nGeneration Project Developers and their agreements referred to as GIAs when doing so."},{"page":60,"startToken":19423,"endToken":19688,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 56 \n \n56 \nreference Tariff, Attachment O, Appendix 2, section 3 in paragraph 5 concerning the \npurpose of the Necessary Studies.291 \nFor Generation Project Developers that utilized the Part VII Transition Cycle \nInterconnection Process, PJM is proposing to modify the definition of Co-Located \nGenerating Facility to include both an existing and planned Generating Facility.292  \nConsistent with the proposed changes in Part VI, PJM is adding a requirement to provide \nTransmission Provider and Transmission Owner with advance written notice to initiate the \nNecessary Study process pursuant to Part VIII, Subpart A, section 401(H)(3)(b) in the event \na Generation Project Developer with an effective GIA intends to use a Generation Facility \nto serve Co-Located Load.293  PJM is also adding this advance notice requirement for the \nNecessary Study process to Tariff, Part VII, Subpart A, section 301(A)(7)(c).294  Finally, \nPJM is proposing a definition of Co-Located Load that references the relevant terms for \nPart VII of the Tariff (i.e., Generating Facility and Project Developer).295 \n \n291 Attachment A-1, Proposed Tariff, Part IX, Subpart G, Necessary Studies Agreement. \n292 Attachment A-1, Proposed Tariff, Part VII, Subpart A, section 300, Definitions C (definition of Co-\nLocated Generating Facility). \n293 Attachment A-1, Proposed Tariff, Part VII, Subpart A, section 300, Definitions C (definition of Co-\nLocated Generating Facility). \n294 Attachment A-1, Proposed Tariff, Part VII, Subpart A, section 301(A)(7)(c); Proposed Tariff, Subpart A, \nsection 300, Definitions N. \n295 Attachment A-1, Proposed Tariff, Part VII, Subpart A, section 300, Definitions C."},{"page":61,"startToken":19688,"endToken":19986,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 57 \n \n57 \n4. \nEffective date only \nIn addition, PJM previously proposed compliance changes that were accepted in \nthe Co-Location Order without an effective date.296  Accordingly, PJM is re-filing the \nfollowing Tariff records with a proposed effective date of March 16, 2027: \n• Part I, section 1, Definitions – A-B (BTMG);297  \n• Part III, section 34.3 (Netting of Non-Retail BTMG);298 \n• Part VII, Subpart A, section 300, Definitions B (BTMG);299 \n• Part VIII, Subpart A, section 400, Definitions B (BTMG);300 and \n• Part VIII, Subpart A, section 400, Definitions N (Necessary Study).301 \nE. \nChanges to Be Addressed in Future Filings \nPJM has identified certain changes to be addressed in future filings.  PJM will need \nto amend Schedule 1 of the Operating Agreement to allocate Auction Revenue Rights to \nFCD Transmission Service customers and may need to make conforming changes to the \nRAA regarding Capacity Market and load forecast effects of the new services.  If, after \nfurther stakeholder engagement or Commission direction, it appears prudent or necessary \nto further clarify this matter in a filing, PJM will do so.  \n \n296 See, e.g., Co-Location Order, 195 FERC ¶ 61,209, at P 207 n.519; Sixty-Day Compliance Filing at 35. \n297 Attachment A-1, Proposed Tariff, Part I, section 1 (Definitions – A - B) (updating the definition of “Behind \nthe Meter Generation”); Co-Location Order, 195 FERC ¶ 61,209, at P 207 n.519. \n298 Attachment A-1, Proposed Tariff, Part III, section 34.3. \n299 Attachment A-1, Proposed Tariff, Part VII, Subpart A, section 300, Definitions B. \n300 Attachment A-1, Proposed Tariff, Part VIII, Subpart A, section 400, Definitions B. \n301 Attachment A-1, Proposed Tariff, Part VIII, Subpart A, section 400, Definitions N; Co-Location Order, \n195 FERC ¶ 61,209, at P 280 n.670."},{"page":62,"startToken":19986,"endToken":20243,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 58 \n \n58 \nOther than the form of Necessary Studies Agreement, initially filed in the \nAugust 17 Filing,302 that PJM is re-filing here because it will be needed in the interim \nperiod before the Fast Energization Process begins, PJM is not proposing to revise the \nforms of interconnection-related service agreements in Tariff, Part IX (e.g., the form of \nApplication and Studies Agreement, the GIA, the Wholesale Market Participation \nAgreement, and others) in this filing.  PJM plans to file revisions to those forms in a later, \nsupplemental filing, once the Commission has ruled on or provided guidance concerning \nthe Tariff revisions to Part VIII proposed herein.  In that supplemental filing, PJM also will \npropose other revisions to the interconnection-related service agreement in Tariff, Part IX \nto streamline the service agreement negotiation and contracting process, based on lessons \nlearned to date in the Transition Period and in Cycle 01 and on PJM’s automation efforts.  \nFinally, depending on the Commission’s rulings or guidance on the cost recovery \nprovisions the Transmission Owners are filing concurrently, PJM will need to add to the \nTariff a form of agreement for PJM to hold Project Developers’ post-commercial operation \nSecurity, as required to support the Transmission Owners’ fees charged to Project \nDevelopers.303   \nPJM is filing separately today a motion for additional abeyance so that it can make \nthese supplemental filings. \n \n302 August 17 Filing, Attachment A, Tariff, Part IX, Subpart G. \n303 See Attachment A-2, Proposed Tariff, Part VIII, Subpart D, section 411(C)."},{"page":63,"startToken":20243,"endToken":20646,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 59 \n \n59 \nIV. \nTHE COMMISSION SHOULD ACCEPT THE PROPOSED CHANGES AS \nJUST AND REASONABLE. \nA. \nThe Proposed Fast Energization Process Is Just and Reasonable and \nAdvances the Commission’s Categories for Reform in the June 2026 \nOrders \nThe Fast Energization Process is just and reasonable for four principal reasons.  \nFirst, it is designed to address and promote meaningful improvement in response to real \nchallenges facing the grid: insufficiently fast interconnection processes for load and \ngeneration, parallel and duplicative study processes, speculative requests, limited visibility \ninto the drivers of transmission upgrades, and an ongoing resource adequacy shortfall.  \nSecond, it is built on a unifying design that studies generation and load together, shortens \nthe process by half, and moves readiness and financial commitments to the front of the \nprocess to promote readiness to build.  Third, it preserves the first-ready, first-served \nprinciple from recent interconnection study process reforms (consistent with Order No. \n2023)304 and adds greater transparency and cost certainty.  Fourth, its core features track \nthe directives of the Large Load Show Cause Order.305  The Commission need not find that \nPJM’s proposal is the only reasonable approach in order to accept it, only that PJM’s \nproposal is a just and reasonable one.306 \n \n304 Improvements to Generator Interconnection Procedures and Agreements, Order No. 2023, 184 FERC \n¶ 61,054, limited order on reh’g, 185 FERC ¶ 61,063 (2023), order on reh’g & clarification, Order No. \n2023-A, 186 FERC ¶ 61,199, errata notice, 188 FERC ¶ 61,134 (2024), aff’d sub nom., Advanced Energy \nUnited v. FERC, 185 F.4th 186 (D.C. Cir. 2026). \n305 See Attachment D, Chart Mapping Order Directives to Tariff Changes, at 17-25. \n306 Cities of Bethany v. FERC, 727 F.2d 1131, 1136 (D.C. Cir. 1984) (“Cities of Bethany”); see ISO New Eng. \nInc., 114 FERC ¶ 61,315, at P 33 & n.35 (2006) (citing Pub. Serv. Co. of N.M. v. FERC, 832 F.2d 1201, 1211 \n(10th Cir. 1987); Cities of Bethany at 1136); Oxy USA, Inc. v. FERC, 64 F.3d 679, 692 (D.C. Cir. 1995) \n(citing Cities of Bethany at 1136); cf. S. Cal. Edison Co., 73 FERC ¶ 61,219, at 61,608 n.73 (1995) (“Having \nfound the Plan to be just and reasonable, there is no need to consider in any detail the alternative plans \nproposed by the Joint Protesters.” (citing Cities of Bethany at 1136))."},{"page":64,"startToken":20646,"endToken":20941,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 60 \n \n60 \nB. \nCore Features of the Fast Energization Process That Enhance the \nCurrent Cycle Process \n1. \nPJM’s current process provides only some visibility into the \ntransmission needs created by Large Loads \nUnder the current planning processes, transmission service for Large Loads is \nsubsumed within PJM’s RTEP.  System reinforcements needed to serve Large Loads are \nidentified through separate processes, including the Transmission Owners’ processes (e.g., \nAttachment M-3 and Form 715 planning processes) and PJM’s Do No Harm process, and \nare “trued up” as load interconnection projects are incorporated into the RTEP.307  PJM’s \nproposal provides more visibility into the transmission build-out driven by Large Loads so \nthat PJM can ensure sufficient transmission capability exists in the timeframe in which a \nLarge Load plans to come online.  Studying transmission service together with generation \ninterconnection will allow PJM and the Transmission Owners to be more transparent about \nthe drivers of the reinforcements required to serve Large Loads.308 \n2. \nResource Adequacy requires getting new generation online faster. \nPJM continues to need additional generating capacity to maintain reliable service \nfor the 67 million people in the PJM Region and to serve new Large Loads.  As PJM’s \nFive-Year Strategy recognizes, “in today’s environment, reliability is not possible without \nresource adequacy.”309  The 2028/2029 Base Residual Auction Report shows that the \nshortfall of capacity supply needed to meet demand, plus an adequate reserve margin, has \ngrown year over year, despite a net increase of 1,294.4 MW of Installed Capacity between \n \n307 Bielak Decl. ¶ 11. \n308 Id. \n309 Shaping a Power Change: PJM Five-Year Strategy, PJM Interconnection, L.L.C., 1 (Aug. 2026), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/special-reports/2026/20260819-shaping-a-\n… [https://perma.cc/2RBY-MPLH]."},{"page":65,"startToken":20941,"endToken":21212,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 61 \n \n61 \nthe 2027/2028 and 2028/2029 auctions.  New supply has not kept pace with rapid Large \nLoad growth.310 \nAlthough PJM has 47 GW of generation with signed agreements, many of those \nprojects are not being built or are slowed by state permitting and supply chain backlogs.  \nThe factor that PJM Planning can influence is the interconnection process.311  Speeding up \nthat process is therefore the most effective step PJM can take, because faster study results \nallow developers to shift their focus to more viable projects and may lessen or remove other \nbarriers, such as permitting and siting approvals.312 \n3. \nIncremental and parallel fixes are not enough – a singular process \nfor generation and transmission service requests yields efficiencies. \nTo facilitate the interconnection of additional generation capacity, PJM has already \nadopted the Expedited Interconnection Track, Replacement Generation Interconnection \nService, and the Reliability Resource Initiative.  These measures are beneficial but were \ndesigned largely to manage PJM’s transition from the old serial queue process to the Cycle \nprocess, and a significant volume of Generation Interconnection Requests remains.313  PJM \nseeks to avoid adding separate parallel processes for provisioning transmission service to \nEligible Load and Large Load, having experienced the complications that parallel \nprocesses can cause.  Moreover, Large Loads differ fundamentally from traditional load \ngrowth in size, pace, and concentration, and they are the only major source of load \ngrowth.314  Limiting study of transmission service for Large Loads to a separate process \n \n310 Bielak Decl. ¶ 12. \n311 Bielak Decl. ¶ 13. \n312 Bielak Decl. ¶ 15. \n313 Bielak Decl. ¶ 14. \n314 Bielak Decl. ¶ 15."},{"page":66,"startToken":21212,"endToken":21449,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 62 \n \n62 \nfrom Generation Interconnection Requests would likely lead to a sub-optimal build-out of \nthe Transmission System that would place unnecessary costs on existing loads.315 \nStudying new Generation Interconnection Requests and new Large Load \ntransmission service requests together speeds up interconnection, helps ensure that new \ngeneration is deliverable to new Large Loads, allows the costs of needed transmission \nenhancements to be determined efficiently, and allows those costs to be accurately \nallocated to the cost causers.316 \n4. \nThe Fast Energization Process is a single, unified process that \nshould be twice as fast as the current process. \nPJM proposes to consolidate Generation and Merchant Transmission \nInterconnection with Long-Term Firm and Large Load Transmission Service studies into \na singular 12-month process.  The process will take half the time of the Cycle process.317  \nIt replaces the three complete System Impact Studies of the current process with an \naccelerated screening window, consisting of two turns of system impact analysis and a \nsingle System Impact Study.318  Each turn of the screening window provides planning-level \nestimates of the system reinforcements needed for the portfolio of generation projects and \ntransmission service requests, called “Interconnection Reliability Reinforcements” \n(“IRR”).319  Each turn produces a non-binding good-faith estimate of the cost and the time \n \n315 Bielak Decl. ¶ 15. \n316 Bielak Decl. ¶ 16. \n317 Bielak Decl. ¶¶ 9, 17. \n318 Bielak Decl. ¶ 21. \n319 Bielak Decl. ¶ 21."},{"page":67,"startToken":21449,"endToken":21595,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 63 \n \n63 \nto construct the needed facilities within 60-90 calendar days.320  Figure 1 illustrates the \nnew process. \n \nFigure 1: The Fast Energization Process321 \nThe expedited screening window gives developers and customers solution feedback \nvery early, while the decision points require a demonstration of readiness to proceed.322  \n5. \nTechnology and early engagement speed the process. \nPJM will use technology to speed up project data review, power flow and dynamic \nstudies, and agreement drafting.  PJM has been vetting Tapestry, an AI-powered \ninterconnection platform, in its current process and is nearing the point at which it can trust \nthe platform’s results without parallel human verification.323  PJM is also developing a \nsuite of automation, including improvements to its modeling platform, analytics platforms \n \n320 Bielak Decl. ¶ 21. \n321 Bielak Decl. ¶ 21. \n322 Bielak Decl. ¶ 18. \n323 Bielak Decl. ¶ 19."},{"page":68,"startToken":21595,"endToken":21846,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 64 \n \n64 \nto turn around grid studies more quickly, and result interpretation and quality assurance \ntools to preserve study quality in a shorter period.324 \nThe process also includes Early Application Engagement.325  Between the Soft \nClose Date and the Application Deadline, PJM will answer Applicants’ questions, test and \nprovide feedback on their models, and help them complete their Applications.326  This \nengagement should improve the quality of Applications, allow PJM’s post-deadline review \nto be quick, reduce disputes over Application review, deficiency notices, and cure efforts, \nand produce more Applications for truly viable and ready projects.327  The improvement is \nmuch needed: at present, only five percent of Applications submitted to PJM are correct \nand complete when first submitted.328 \n6. \nStudy consolidation preserves study rigor \nFaster does not mean less rigorous.  The System Impact Study is the equivalent of \nthe Phase III System Impact Study in the current Cycle process.329  PJM will perform load \nflow, stability, and short circuit analyses across summer, winter, and light load scenarios \nand will ensure that all reliability issues are addressed and that the correct amount of \ntransmission service has been provisioned.330  Negotiation of service agreements begins \nduring the System Impact Study Phase, which further reduces the total time needed.331 \n \n324 Bielak Decl. ¶¶ 9, 19. \n325 Bielak Decl. ¶ 20. \n326 Bielak Decl. ¶ 20. \n327 Bielak Decl. ¶ 20. \n328 Bielak Decl. ¶ 20. \n329 Bielak Decl. ¶ 22. \n330 Bielak Decl. ¶ 22. \n331 Bielak Decl. ¶ 22."},{"page":69,"startToken":21846,"endToken":22135,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 65 \n \n65 \n7. \nReadiness requirements are moved to the front of the process. \nThe Fast Energization Process continues the current Cycle process’s emphasis on \nreadiness but moves many requirements into the Application rather than spreading them \nover three phases.  The financial commitments are likewise moved up in time.  Eligible \nCustomers seeking transmission service on behalf of Large Loads must enter into a \nTransmission Owner Cost Recovery Agreement to enter the process.332  Project Developers \nmust submit Readiness Deposits in full with the Application, and those deposits become at \nrisk at decision points in the Screening Phase.333  Physical changes to projects and load are \nnot allowed after Application, because they would require changes to the dynamic models \nsubmitted with the Application and the new process leaves no time to revise individual \nmodels and the cluster model.  A developer or customer wishing to change its project or \nload must withdraw and resubmit in the next Cycle.334 \nThese requirements screen out speculative projects and help ensure that projects \nthat enter an interconnection-related service agreement are truly ready to start construction, \ncomplete construction and commissioning on a timely basis, and enter service.335  They \nalso preserve the first-ready, first-served paradigm of the current Cycle process.336 \n \n332 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(A) (“To initiate an Eligible Customer \nfor Load Request, an Eligible Customer must provide to Transmission Provider the relevant Transmission \nOwner or Electric Distributor authorization for the Eligible Customer for Load Request to be studied in the \nrelevant Cycle, as well as an executed Cost Recovery Agreement with the relevant Transmission Owner.”). \n333 Bielak Decl. ¶ 23. \n334 Id. \n335 Bielak Decl. ¶ 7. \n336 Id. ¶ 17."},{"page":70,"startToken":22135,"endToken":22411,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 66 \n \n66 \n8. \nA portfolio approach to system reinforcements provides \ntransparency and certainty. \nThe Fast Energization Process moves PJM away from identifying specific upgrades \nand tying them to specific projects.  PJM instead will analyze upgrades and reinforcements \nas enabling the entire Cycle cohort of generation projects and transmission service requests.  \nThe resulting IRRs are optimized for the whole Cycle, which eliminates overlapping or \nduplicative upgrades for generation and load.  This approach also allows a fractional \namount of generating capacity to become deliverable faster and with greater certainty, \nrather than only upon completion of all required Network Upgrades.337 \nTransparency.  The Transmission Owners hold the filing rights for cost allocation \nand cost recovery and are addressing those matters in Tariff revisions filed concurrently.  \nPJM will continue to provide transparency as to required system topology, the drivers of \nthe need for the IRRs, and their capital costs.  Consistent with the Large Load Show Cause \nOrder, PJM will post this information on pjm.com in a single, accessible, searchable \nlocation.338 \nCertainty.  Because Project Developers will be responsible for a share of the total \ncost of the portfolio of IRRs, rather than for specific upgrades, optimization should reduce \nboth total cost and volatility in a developer’s cost responsibility.  If a Project Developer’s \ncost responsibility nonetheless rises above the amount determined at Decision Point II, the \nTariff now includes a certainty framework to limit exposure to the increase.339  Figure 2 \ncompares the current and new processes. \n \n337 Bielak Decl. ¶ 24. \n338 Bielak Decl. ¶ 25; Attachment A-2, Proposed Tariff, Part VIII, Subpart L, section 440(A)(2). \n339 Bielak Decl. ¶ 26."},{"page":71,"startToken":22411,"endToken":22578,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 67 \n \n67 \n \nFigure 2: Current process compared with the Fast Energization Process340  \n9. \nInterim rights allow service to begin sooner. \nBecause PJM will not tie service to completion of specific “contingent upgrades,” \nthe final service agreements will include a schedule of interim deliverability for Project \nDevelopers or a schedule of interim withdrawal rights for Eligible Customers, based on the \ncurrent Transmission System topology.341  The schedules set a minimum level of injection \nor withdrawal rights based on the available studies and anticipated Transmission System \nconditions in future years.342   PJM will then annually reassess and update the interim rights \nbased on updated system conditions (i.e., as raise the MW value if more IRRs are built or \nqueue projects withdraw).343 \n \n340 Bielak Decl. ¶ 26. \n341 Bielak Decl. ¶ 27; Attachment A-2, Proposed Tariff, Part VIII, Subpart L, section 440(A)(1). \n342 Attachment A-2, Proposed Tariff, Part VIII, Subpart L, section 440(A)(1). \n343 Bielak Decl. ¶ 27."},{"page":72,"startToken":22578,"endToken":22915,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 68 \n \n68 \nC. \nThe Fast Energization Process Is Consistent with the Large Load Show \nCause Order’s Directives. \nIn the Large Load Show Cause Order, the Commission preliminarily found that \nPJM’s Tariff appears unjust and unreasonable without certain provisions and encouraged \nPJM to address those concerns through a section 205 filing.344  The Fast Energization \nProcess addresses the opportunities as summarized below and discussed in the following \nsections.   \nLarge Load Show Cause \nOrder opportunity \nFast Energization Process feature \nStudy transmission service \nfor Eligible Customers on \nbehalf of large loads clearly \nand consistently, within 60-\n90 days345 \n \nSingle Tariff-defined process; two screening turns, each \nproducing a non-binding good-faith estimate of cost and \nconstruction time within 60-90 calendar days; a single \nSystem Impact Study346  \n \nApplication \nprocess \nwith \nreadiness requirements that \ndeter \nspeculative \nor \nduplicative requests347 \nReadiness requirements moved to the Application; \nReadiness Deposits submitted in full and at risk at \ndecision points; Cost Recovery Agreement required to \nenter; no physical changes after Application; Early \nApplication Engagement348  \n \nTransparency on Network \nUpgrade drivers and costs, \nposted in a single, accessible, \nsearchable location349  \n \nPJM will post required system topology, the drivers of \nneed, and capital costs on pjm.com in a single, \nsearchable location350  \n \nMitigate cost-shifting risk \nthrough a cost \nrecovery \nagreement351  \nTransmission Owner Cost Recovery Agreement \nrequired of Eligible Customers for Large Load requests; \nTransmission Owners are addressing cost allocation and \n \n344 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 3, 38. \n345 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 41, 63. \n346 Bielak Decl. ¶¶ 17, 21-22; Attachment A-2, Proposed Tariff, Part VIII, Subpart C, section 404. \n347 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 59. \n348 Bielak Decl. ¶¶ 7, 18, 20, 23; Attachment A-2, Proposed Tariff, Part VIII, section 401-404. \n349 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 66-67, 71-76. \n350 Bielak Decl. ¶ 25. \n351 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 77-84."},{"page":73,"startToken":22915,"endToken":23215,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 69 \n \n69 \nLarge Load Show Cause \nOrder opportunity \nFast Energization Process feature \nrecovery in their concurrent filing; Readiness Deposits \nfor Project Developers352  \n \nTransmission services \nreflecting flexible large \nloads353 \nNITS, Interim NITS, NFCD Transmission Service, \nFCD Transmission Service schedules for Eligible \nLoads and Large Loads354  \n \nGenerator interconnection \nthat accounts for electrically \nproximate large load355  \nGeneration and load studied together in one Cycle; \nIRRs optimized for the whole cohort; interim \ndeliverability schedules356  \n \n \n1. \nTimely, clear, and consistent study of transmission service for large \nloads \nOne of the Commission’s principal concerns was that PJM’s Tariff lacked \nsufficiently clear and consistent provisions on how transmission service to Eligible \nCustomers on behalf of large loads will be studied.  The Commission concluded that a \nstudy process culminating in a report with a non-binding good-faith estimate of the cost \nand time to construct needed facilities should take no more than 60-90 calendar days.357   \nThe Fast Energization Process addresses this concern by placing Large Load \ntransmission service requests in the same defined, Tariff-based process as generation and \nlong-term firm service.  Each screening turn produces a non-binding good-faith estimate \nof cost and construction time within 60-90 calendar days, and the System Impact Study \n \n352 Bielak Decl. ¶¶ 23, 25; Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401. \n353 Bielak Decl. ¶ 27. \n354 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 85-87; Attachment A-1 Proposed Tariff, Part \nXI, Subpart A, section 700; Proposed Tariff, Part XI, Subpart B, section 708. \n355 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 88-101. \n356 Bielak Decl. ¶¶ 6, 10, 16, 24, 27; Attachment A-2, Proposed Tariff, Part VIII, sections 401, 404, 440. \n357 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 41, 50-51, 63."},{"page":74,"startToken":23215,"endToken":23470,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 70 \n \n70 \nthen confirms that all reliability issues are addressed and that the correct amount of \ntransmission service is provisioned.358 \nThe Commission also recognized that the Transmission Owners may be primarily \nresponsible for load studies and stated that it does not seek to alter the allocation of rights \nand responsibilities among PJM and the Transmission Owners.359  The Fast Energization \nProcess is consistent with that statement.  It enhances PJM’s own study process, and the \nTransmission Owners are submitting their cost allocation and cost recovery revisions \nseparately, because they hold those filing rights.360 \n2. \nReadiness requirements that deter speculative requests \nThe Commission expressed concern that the Tariff fails to deter speculative or \nduplicative requests and observed that clear study procedures with readiness requirements, \nincluding meaningful milestones and financial commitments, can help ensure that requests \nare viable.361  The Fast Energization Process accomplishes this objective. It moves \nreadiness requirements and financial commitments into the Application,362 requires a \nTransmission Owner Cost Recovery Agreement from Eligible Customers seeking service \non behalf of Large Loads to enter the process,363 places Readiness Deposits at risk at \n \n358 Bielak Decl. ¶¶ 10, 21-22. \n359 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 52. \n360 Bielak Decl. ¶ 25. \n361 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 56, 59. \n362 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(D)(1)(b). \n363 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(A)."},{"page":75,"startToken":23470,"endToken":23760,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 71 \n \n71 \ndecision points,364 and bars physical changes after Application.365 Early Application \nEngagement further improves the quality of Applications from the outset.366 \n3. \nTransparency regarding upgrades and their costs \nThe Commission preliminarily found that cost transparency measures are needed \nso that stakeholders, including state regulators, can understand the Network Upgrades, and \ntheir costs, needed to serve large loads.367  It stated that this information should be posted \non PJM’s website in a single location, in an accessible and searchable format.368  PJM will \npost the required system topology, the drivers of the need for the IRRs, and their capital \ncosts on pjm.com in a single, accessible, and searchable location.369  Studying generation \nand transmission service together also makes the drivers of reinforcements more visible.370  \nFurther, the Fast Energization Process will result in changes to the Large Load Adjustment \nprocess in PJM’s load forecasting procedures, impacting the number of RTEP projects \nneeded because of Large Loads that are then cost allocated to ratepayers generally.371 \n4. \nProtection against cost shifting \nThe Commission was concerned that, absent adequate mechanisms, costs incurred \nto serve large loads that do not materialize could be shifted to other transmission customers, \nand it preliminarily found that a cost recovery agreement with a minimum contribution and \n \n364 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(2A). \n365 Attachment A-2, Proposed Tariff, Part VIII, Subpart B, section 403. \n366 Bielak Decl. ¶¶ 18, 20, 23. \n367 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 71-76.  \n368 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 66-67, 71-76. \n369 Bielak Decl. ¶ 25. \n370 Id. ¶ 11. \n371 Bielak Decl. ¶¶ 15, 24."},{"page":76,"startToken":23760,"endToken":24038,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 72 \n \n72 \nfinancial security appears necessary.372  The Fast Energization Process requires Eligible \nCustomers seeking service on behalf of Large Loads to enter into a Transmission Owner \nCost Recovery Agreement as a condition of entering the process, and it requires Project \nDevelopers to post Readiness Deposits in full with their Applications.373  Because the \nTransmission Owners hold the filing rights for cost allocation and cost recovery, they \naddress those matters in their concurrent Tariff revisions.374  The portfolio approach and \nthe certainty framework also reduce the risk of cost swings during the process.375 \nAt its core, the Fast Energization Process’s cost allocation mechanism will address \nthe cost allocation for incremental system adjustments necessary to meet reliability drivers \nand needs of the Process’s transmission service and generation project clusters.  There will \nno longer be any direct tie between an individual project (generation or transmission \nservice) and specific “upgrade facilities.”376  Instead, what will be identified in the Fast \nEnergization Process is the “percentage cost responsibility” based on a proportional impact \nmethod, consistent with Order No. 2023, as to the collective Cycle portfolio.  Armed with \nthis information, states pursuant to their retail rate authority may elect to cost allocate IRR \namong particular loads in each of their particular states.  PJM’s process therefore offers a \nmeans to “give state public utility commissions and other state regulators the information \nnecessary to allow them to understand which transmission costs are caused by which \n \n372 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 66, 77-84. \n373 Bielak Decl. ¶ 23. \n374 Id. ¶ 25. \n375 Id. ¶¶ 17, 24, 26. \n376 Bielak Decl. ¶ 23."},{"page":77,"startToken":24038,"endToken":24329,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 73 \n \n73 \ntransmission customers, so that they can sub-allocate these costs to the appropriate retail \ncustomers.”377   \n5. \nTransmission services that reflect flexible use of the system \nThe Commission preliminarily found that new transmission services should be \navailable to reflect the operational reality that some large loads are willing and able to limit \ntheir use of the Transmission System, including an interim service while Network \nUpgrades are constructed.378  The Fast Energization Process provides for interim rights in \nthe final service agreements.379  For interim deliverability, the Transmission Provider will \ndetermine a schedule of the minimum injection and withdrawal limits based on anticipated \nTransmission System conditions that will then be reassessed with an annual study.380  PJM \nestimates that it can begin provisioning these rights as proposed in 2029 after commencing \nApplication and study processes later on in 2027.381  These rights will be revised \nperiodically to increase the minimums as IRRs are completed or projects withdraw.382 \n6. \nStudying generation and transmission service requests to serve \nLarge Load together leverages technology and innovation. \nThe Commission recognized that studying new load and new generation together \ncan present system benefits, speed interconnection, and enable more accurate and cost-\neffective transmission solutions, and it asked PJM to consider how its interconnection \n \n377 Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 70. \n378 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 85-87. \n379 Attachment A-2, Proposed Tariff, Part VIII, Subpart L, section 440(A). \n380 Attachment A-2, Proposed Tariff, Part VIII, Subpart L, sections 440(A)(1)-(2). \n381 See supra Section III.B.3. \n382 Bielak Decl. ¶ 27; Proposed Tariff, Part VIII, Subpart L, section 440(A)(2)."},{"page":78,"startToken":24329,"endToken":24618,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 74 \n \n74 \nprocesses should reflect those benefits.383  The Fast Energization Process is built on that \npremise.  It studies generation, Merchant Transmission, Long-Term Firm, and Large Load \nTransmission Service requests in one Cycle.  It optimizes the IRRs for the whole Cycle \nand eliminates overlapping or duplicative upgrades for generation and load.  PJM identifies \nleveraging co-location and electrical proximity as one of the innovations of the process.384  \nThis integrated process will harness synergies in study results that reflect both transmission \nservice and generation impacts, resulting in potentially lower Network Upgrade and IRR \nneeds at early stages of the project life cycle. \nBecause of the unique characteristics of Large Load, it is essential for PJM to study \nGeneration Interconnection Requests and Large Load Transmission Service requests \ntogether through the Fast Energization Process.385  Large Loads are fundamentally different \nthan traditional categories of load; they have significantly greater energy and capacity \ndemands, these demands grow quickly, and the demand Large Loads are more \ngeographically concentrated than from traditional loads.386  Given these characteristics, the \nprovision of new transmission service—on a firm basis—to Large Loads generally requires \ntransmission enhancements or expansions.  Large Loads are causing much of the load \ngrowth in the PJM Region and generation development is struggling to keep up,387 which \n \n383 Large Load Show Cause Order, 195 FERC ¶ 61,211, at PP 88-91, 95-101. \n384 Bielak Decl. ¶¶ 6, 10, 16, 24. \n385 Bielak Decl. ¶ 16.  \n386 Bielak Decl. ¶ 15; see also PJM’s concurrently-submitted Section 205 filing relating to ride-through, other \noperational requirements, and the annual transmission services report and the related exhibits attached \nthereto, which is incorporated by reference into this filing.  \n387 Bielak Decl. ¶¶ 12-13, 15."},{"page":79,"startToken":24618,"endToken":24890,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 75 \n \n75 \nposes unique challenges for the Transmission System.388  PJM’s current approach of \nevaluating interconnecting generation and providing transmission service to Large Load \nthrough distinct processes,389 makes it difficult to optimally build out the Transmission \nSystem considering the new challenges posed by Large Load.390 \nThrough the Fast Energization Process, PJM will holistically study the \nTransmission System impacts of generation and Large Load and optimize transmission \nenhancements that serve both simultaneously.391  The efficiencies from this combined \nstudy process will speed up generation interconnection and ensure that generation is \ndeliverable to new Large Loads, PJM selects Transmission System upgrades efficiently, \nand the causers of Transmission System upgrades pay for the costs.392  Ultimately, this is \na just and reasonable approach for evaluating how the transmission system needs to be \nupdated to accommodate the transmission service needs of Large Loads in an efficient and \ncost effective manner. \n7. \nPJM’s proposal respects existing commercial arrangements and \nprovides for a clear transition from the existing process to the Fast \nEnergization Process. \nIn the interim period before the Fast Energization Process commences in full, \nPJM’s proposed revisions to Tariff, Part VIII, Subpart A, section 401 set forth which \ntransmission service requests will proceed under the existing planning regime and which \n \n388 See Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 58 (“[I]ntegrating large loads poses specific \nchallenges to transmission system operation given their size, operational behavior, and unique potential to \nimpact the transmission system.”). \n389 Bielak Decl. ¶¶ 11, 13-14. \n390 Bielak Decl. ¶ 15.  \n391 Bielak Decl. ¶ 16. \n392 Bielak Decl. ¶ 16."},{"page":80,"startToken":24890,"endToken":25228,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 76 \n \n76 \nservice requests will proceed under the Fast Energization Process.393  This framework \nprovides transparency to the market as to what must be done, and by when.  It respects \nexisting commercial arrangements and affords a 13-month runway for arrangements in \npotential development but not yet finalized.  Eligible Customers have more than \n13-months’ notice to “complete[] the applicable . . . retail load interconnection study” to \nbe treated under legacy constructs, or be processed under the new Fast Energization \nProcess.394   \nPJM specifically proposes a January 1, 2028 date for “completion” to accommodate \nthe 2028 load forecast.  Setting a January 1, 2028 date ensures that the planning done under \nthe status quo process is included in Large Load Adjustments submitted to PJM and thus \nproperly reflected in the load forecast.395  The framework is also just and reasonable \nbecause “completion” is defined in terms of two objective criteria:  one technical (retail \nload study completion date) and one legal (date of execution of required agreements by all \napplicable parties).  Thus, under this framework, whether something has been “completed” \nis plainly understood, thus offering parties a path and timeline to develop plans.   \nPJM’s proposal also enhances transparency consistent with the Commission’s \nstated goals.396  Those customers seeking transmission service on behalf of Large Loads \nmust submit (or have others submit on their behalf) the information necessary to populate \nthe Large Load Registry no later than 30 calendar days after the retail load interconnection \n \n393 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(A). \n394 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(A). \n395 Resource Adequacy Planning, PJM Manual 19:  Load Forecasting and Analysis, PJM Interconnection, \nL.L.C., § 3 (rev. 39, June 30, 2026), https://www.pjm.com/-/media/DotCom/documents/manuals/m19.pdf \n[https://perma.cc/4M4A-UD9N]; id. § 3.1 (“The forecast is . . . released prior to each Planning Period, \ntypically in January.”).   \n396 See, e.g., Large Load Show Cause Order, 195 FERC ¶ 61,211, at P 76."},{"page":81,"startToken":25228,"endToken":25553,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 77 \n \n77 \nstudy is deemed “complete.”397  This requirement promotes timely and accurate disclosure \nto those parties with access to the Registry of all new Large Load requests prior to even \ncoming into service.  States, PJM, and other relevant stakeholders can inform decisions \nbased upon these timely data submittals.  Further, stakeholders can then follow the study \nresults for such requests, including the costs eventually allocated to them. \nBecause of the value in ensuring planning under the existing process is reflected in \nthe 2028 load forecast, the framework also provides for a streamlined and expedited dispute \nresolution framework to drive prompt clarity for Eligible Customers, PJM, and others about \nwhich requests will proceed under the Fast Energization Process.398  If Tariff-established \ndeadlines and information for initiating Alternative Dispute Resolution and seeking \nCommission relief are not honored, or if litigation is timely commenced and resolved, then \nEligible Customers submitting service requests will know that they will proceed under the \nFast Energization Process without delay, which will reduce the risk that the 2028 load \nforecast report is delayed.   \nD. \nThe New Transmission Services Proposed in Part XI are Just and \nReasonable. \nPJM has proposed to implement the three new transmission services as directed by \nthe Commission.  PJM’s proposed implementation of these new services is just and \nreasonable.  PJM is proposing to make Interim NITS, FCD Transmission Service, and \nNFCD Transmission Service available to any Eligible Customer taking service on behalf \n \n397 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(A). See also RAA, Schedule \n11,B.1 (accepted in PJM Interconnection, L.L.C., 197 FERC ¶ 61,019, at P 48, filed on compliance in PJM \nInterconnection L.L.C., Thirty-Day Compliance Filing to the Commission’s October 9, 2026 Order on PJM’s \nLarge Load Definition and Large Load Registry, Docket No. ER26-3515-002 (Nov. 9, 2026). \n398 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, section 401(A)."},{"page":82,"startToken":25553,"endToken":25871,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 78 \n \n78 \nof an Eligible Load or Large Load.399  Because these services require an Eligible Customer \nto be willing and able to limit withdrawals from the Transmission System, PJM has \nproposed reasonable terms and conditions specific to these services.  To ensure the \nreliability of the Transmission System, Eligible Customers taking these services will be \nrequired to meet technical requirements demonstrating their ability to limit their \nwithdrawals as a condition precedent.400  As part of these technical requirements, Eligible \nCustomers must have necessary control technologies to limit their withdrawals from the \nTransmission System as specified in their Transmission Service Agreement, which may \ninclude protection schemes where appropriate.401  The Transmission Service Agreement \nwill also specify any necessary operating procedures.402  Eligible Customers will also be \nrequired to demonstrate operational control to comply with instructions to reduce \nwithdrawals from the system within five minutes when directed to do so.403  Consistent \nwith the Commission’s directive,404 to the extent an Eligible Customer fails to follow a \nCurtailment instruction or the necessary control technologies misoperate, PJM is proposing \na 120-day pause in service after the first instance, and to terminate the relevant \nTransmission Service Agreement after the second instance.405  Finally, PJM will be \n \n399 See Attachment A-1, Proposed Tariff, Part XI, Subpart A, section 700; Proposed Tariff, Part XI, Subpart \nB, section 708. \n400 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 718. \n401 Attachment A-1, Proposed Tariff, Part XI, Subpart C, sections 717, 718.1. \n402 Attachment A-1, Proposed Tariff, Attachment F-3A, Specifications for Interim Regional NITS, section \n5.0; Proposed Tariff, Attachment F-4, Specifications for Contract Demand Transmission Service, section 5.0. \n403 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 718.1. \n404 Co-Location Order, 195 FERC ¶ 61,209, at PP 515, 519.  \n405 Attachment A-1, Proposed Tariff, Part XI, Subpart C, section 719.5."},{"page":83,"startToken":25871,"endToken":26228,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 79 \n \n79 \naddressing ride-through requirements for Large Computational Load and other operational \nrequirements for such loads in a separate filing being submitted today.  \nE. \nPJM’s Proposed Changes to NITS are Just and Reasonable. \nConsistent with the Commission’s directives, PJM has proposed just and \nreasonable revisions to the terms and conditions for NITS to ensure that Large Load is \nappropriately studied for transmission service and accounted for in PJM’s transmission \nplanning processes.406  PJM is proposing to quantify the current level of NITS being \nprovided to Large Loads using the Large Load Registry.407  When approving the Large \nLoad Registry, the Commission recognized that it would “provide PJM with the \ninformation necessary to address the operational impacts of Large Loads on the PJM \ntransmission system.”408  The proposal will therefore allow PJM to establish a baseline \nregarding the current level of NITS being provided to Network Customers serving Large \nLoads.  PJM would then require an Eligible Customer to submit an application for any \nincrease above the existing level of NITS for Large Loads.409  To that end,  PJM is \nproposing to strike the language in Tariff, Part III, section 31.6 that suggests an Application \nwould not be required for changes reflected in these annual updates.410  Striking this \n \n406 See supra Section III.A.  \n407 Attachment A-1, Proposed Tariff, Part III, General (“The amount of Regional Network Integration \nTransmission Service provisioned to Network Customers for serving Large Loads are at levels specified in \nan effective Service Agreement or, if not specified therein, as reflected on the Large Load Registry per the \nterms of the Reliability Assurance Agreement, Schedule 11.B.1”). \n408 PJM Interconnection, L.L.C., 197 FERC ¶ 61,019, at P 48.  \n409 Attachment A-2, Proposed Tariff, Part VIII, Subpart A, sections 400, Definitions E (defining Eligible \nCustomer for Load Request as “a request by an Eligible Customer seeking Network Integration Transmission \nService or Transmission Service on behalf of an Eligible Load or Large Load”); Attachment A-2, Proposed \nTariff, Part VIII, Subpart C, sections 404(E). \n410 Attachment A-1, Proposed Tariff, Part III, section 31.6."},{"page":84,"startToken":26228,"endToken":26540,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 80 \n \n80 \nlanguage clarifies PJM’s proposal to require Large Loads that seek to grow above existing \nservice levels to submit an Application to be studied through the Fast Energization Process.  \nFurther, regarding BTMG, the Commission directed PJM to “create a materiality \nthreshold that allows Network Customers to net from their Network Load up to 50 MW of \nload served by using BTMG at a single electrical location.”411  Consistent with that \ndirective, PJM proposes revisions to Part III, section 34.2 and Schedule 8 of the RAA to \nimplement the 50 MW netting limit effective December 18, 2025, unless an exemption \napplies.412  PJM also proposes three exclusions to the 50 MW netting limit, as directed by \nthe Commission.  \nFirst, the Commission directed PJM establish a transition period of three years for \nNetwork Customers currently using PJM’s existing retail BTMG netting rules.413  PJM \ntherefore proposes to exempt existing Retail BTMG that was used to serve load as of \nDecember 18, 2025 (i.e., the date of the December Order) from the BTMG netting limit \nduring a three-year transition period.414  \nSecond, the Commission directed PJM to propose Tariff revisions to grant legacy \ntreatment to entities with existing contracts for the specific purpose of effectuating a \nBTMG arrangement for the current term remaining under the existing contract. 415  PJM \ntherefore proposes to exempt Retail BTMG owned or contracted for as of December 18, \n2025 to continue netting without the limit for the remaining term of the contract \n \n411 Co-Location Order, 195 FERC ¶ 61,209, at P 220.  \n412 Attachment A-1, Proposed Tariff, Part III, section 34.2; Proposed Tariff, RAA, Schedule 8. \n413 December Order, 193 FERC ¶ 61,217, at P 223. \n414 Attachment A-1, Proposed Tariff, Part III, section 34.2(C). \n415 December Order, 193 FERC ¶ 61,217, at P 224."},{"page":85,"startToken":26540,"endToken":26843,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 81 \n \n81 \neffectuating the BTMG arrangement.416  The Commission approved a three-year transition \nperiod and provisions granting legacy treatment in the Co-Location Order, as applied to \nPJM’s previously proposed BTMG netting proposal.417 \nThird, the Commission directed PJM to include a process to exempt Cogeneration \nFacilities from its BTMG netting rules “if they demonstrate that they are integrated with \nload such that, when their generating facility trips offline, the load follows.”418  Consistent \nwith this directive, PJM is proposing to exempt Cogeneration Facilities from its netting \nrules, subject to certain requirements to ensure the Cogeneration Facility is integrated with \nthe retail load it serves such that if the Cogeneration Facility trips offline the retail load \nfollows,419 including potential audits for compliance with these requirements.420 \nTo be eligible for the existing contractual arrangement or Cogeneration \nexemptions, PJM is proposing to require that the Large Load be on the Large Load Registry \nand the Retail BTMG be registered to allow PJM to account for the limit for settlement and \nbilling purposes.421  To that end, PJM is also proposing revisions to RAA, Schedule 8 to \nensure the netting limits are reflected in the Obligation Peak Load calculation.422  Taken \ntogether, these changes enhance PJM visibility into operating Retail BTMG in the region \nfor planning purposes, while respecting existing commercial arrangements. \n \n416 Attachment A-1, Proposed Tariff, Part III, section 34.2(D). \n417 Co-Location Order, 195 FERC ¶ 61,209, at PP 232-33.  \n418 Co-Location Order, 195 FERC ¶ 61,209, at P 240. \n419 Attachment A-1, Proposed Tariff, Part III, sections 34.2(E)(a)-(e). \n420 Attachment A-1, Proposed Tariff, Part III, section 34.2(F). \n421 Attachment A-1, Proposed Tariff, Part III, sections 34.2(D)-(E). \n422 Attachment A-1, Proposed RAA, Schedule 8."},{"page":86,"startToken":26843,"endToken":27149,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 82 \n \n82 \nV. \nEFFECTIVE DATE \nPJM requests that the Commission accept the proposed revisions in Parts I, III, VI, \nVII, IX, XI, Attachment F-3, Attachment F-3A, Attachment F-4, and parts of Part VIII to \nthe Tariff to become effective March 16, 2027, which is not less than 60 days, nor more \nthan 120 days, prior to the submission of this filing.423  For those Part VIII revisions \nassociated with the Fast Energization Process rather than compliance with the Co-Location \nOrder (for which PJM requests a March 16, 2027 effective date), PJM requests an indefinite \neffective date of 12/31/9998, to allow PJM to make those provisions effective when the \ncurrent Cycle, Cycle 01, reaches a sufficiently advanced stage so the next Cycle may begin.  \nThat point will be the next Business Day after the close of Decision Point II of Cycle 01, \nwhich PJM anticipates will occur in late November 2027.424  PJM will submit a compliance \nfiling to provide the Commission with the effective date of Part VIII once that date is \nknown. \nPJM does not believe any waivers of the Commission’s Regulations are needed to \npermit its filing to become effective as proposed.  In addition, to the extent the Commission \ndetermines that any other waivers are required, PJM respectfully requests the Commission \ngrant such waivers as are necessary in order that the Tariff and RAA revisions may be \nmade effective as proposed. \nVI. \nCONSENT TO SEVERANCE OF ISSUES \nPJM consents to the Commission’s exercise of authority to sever the Proposed \nTariff and RAA language, as needed and permitted under the FPA and NRG Power \n \n423 18 C.F.R. § 35.3(a)(1).  \n424 Planning, PJM Interconnection, L.L.C., Cycle Timeline (Oct. 23, 2026), https://www.pjm.com/planning \n[https://perma.cc/J283-5CFS]."},{"page":87,"startToken":27149,"endToken":27523,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 83 \n \n83 \nMarketing.425  Under FPA section 205, the Commission is in a “passive and reactive role” \nthat requires it to accept or reject a utility’s proposed rate scheme.426  The Commission is \nprohibited from imposing modifications that “result in an ‘entirely different rate design’ \nthan the utility’s original proposal or the utility's prior rate scheme.”427  However, the \nCommission has some authority to propose modifications to a utility’s proposal if the utility \nconsents to the modifications.428  The Commission has used this authority to sever discrete \nportions of a utility’s proposed rate scheme, approving certain portions and rejecting \nothers.429  By contrast, in NRG Power Marketing, the United States Court of Appeals for \nthe District of Columbia determined that the Commission improperly modified PJM’s \nproposed rate scheme where the Commission’s modifications “went in the opposite \ndirection” and “followed a ‘completely different strategy’ than PJM’s proposal.”430  In that \ncircumstance, the Commission’s modifications violated section 205, even with PJM’s \nconsent, because the Commission proposed an “entirely different rate design” that market \nparticipants did not have adequate notice of or opportunity to comment on.431  \nIf it deems necessary, PJM consents to the Commission exercising authority to \nsever each element of the Tariff and RAA revisions proposed herein.  PJM’s Proposed \nTariff and RAA revisions are not an integrated package that must be viewed as a whole \n \n425 See NRG Power Mktg., LLC, 862 F.3d 108. \n426 Hecate Energy LLC v. FERC, 126 F.4th 660, 667 (D.C. Cir. 2025) (quoting Advanced Energy Mgmt. All. \nv. FERC, 860 F.3d 656, 662 (D.C. Cir. 2017)). \n427 NRG Power Mktg., 862 F.3d at 115 (quoting W. Res., Inc. v. FERC, 9 F.3d 1568, 1578 (D.C. Cir. 1993)).  \n428 NRG Power Mktg., 862 F.3d at 115-16.  \n429 See, e.g., PJM Interconnection, L.L.C., 197 FERC ¶ 61,019, at PP 13-15; Pub. Serv. Co. of Colo., 94 \nFERC ¶ 61,135, at PP 28, 56 (2026). \n430 NRG Power Mktg., 862 F.3d at 116 (quoting W. Res., Inc., 9 F.3d at 1579). \n431 NRG Power Mktg., 862 F.3d at 116 (quoting W. Res., Inc., 9 F.3d at 1578)."},{"page":88,"startToken":27523,"endToken":27814,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 84 \n \n84 \nand accepted together;432 instead, each element of PJM’s proposal individually advances \nPJM’s overarching objective to comply with the June 2026 Orders and to safely and \nreliably integrate Large Loads and Co-Located Loads with the Transmission System.  \nTherefore, the Commission will not go “in the opposite direction” or deploy “a completely \ndifferent strategy” by severing certain elements of PJM’s proposal.433  Stakeholders will \nhave the opportunity to comment in this proceeding on all individual elements of PJM’s \nproposal that could be severed, eliminating any prior notice concerns.  Further, through \nthis pre-emptive grant of authority pursuant to which the Commission may sever each \nelement of the proposal, stakeholders are on notice of potential changes to the proposal as \nfiled and will have the opportunity to comment as they feel necessary and appropriate. \nAlthough PJM consents to make each element of the proposed revisions to the \nTariff and RAA severable, PJM has demonstrated that each element of its proposal is just \nand reasonable.  Notwithstanding PJM’s grant of authority to sever, PJM urges the \nCommission to accept all revisions as proposed so that PJM may commence compliance \nwith the directives of the June 2026 Orders and begin preparations for the Fast Energization \nProcess as quickly as possible.  \nVII. \nDOCUMENTS ENCLOSED \n \nIn addition to this transmittal letter, PJM encloses the following: \n1. \nAttachment A-1: Marked March 16, 2027 Effective Date Proposed Tariff \nRevisions; \n \n432 See PJM Interconnection, L.L.C., 197 FERC ¶ 61,019, at P 15 (refusing to sever certain elements of PJM’s \nproposal, despite PJM providing consent to sever, because those elements “represent an integrated package \nthat must be viewed as a whole”). \n433 NRG Power Mktg., 862 F.3d at 116."},{"page":89,"startToken":27814,"endToken":28062,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 85 \n \n85 \n2. \nAttachment B-1: Marked Indefinite Effective Date Proposed Tariff \nRevisions; \n3. \nAttachment A-2:   Clean March 16, 2027 Effective Date Proposed Tariff \nRevisions;  \n4. \nAttachment B-2: Clean Indefinite Effective Date Proposed Tariff \nRevisions; \n5. \nAttachment C: \nDeclaration of Donald Bielak, P.E.; and \n6. \nAttachment D: \nChart Mapping Order Directives to Tariff Changes.  \nVIII. CORRESPONDENCE AND COMMUNICATIONS \n \nCorrespondence and communications with respect to this filing should be sent to, \nand PJM requests the Secretary to include on the official service list, the following:434 \nMark J. Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nNorristown, PA  19403-2429 \n610-666-4707 \nmark.stanisz@pjm.com    \n \nWendy B. Warren \nRuth M. Porter \nAlexander L. Peterson \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n202-393-1200  \nwarren@wrightlaw.com \nporter@wrightlaw.com \npeterson@wrightlaw.com \nChristopher B. Holt  \nManaging Counsel \nPJM Interconnection, L.L.C.  \n2750 Monroe Blvd, \nAudubon, PA  19403-2429 \n610-666-2368 \nchristopher.holt@pjm.com  \n \n \nIX. \nSERVICE \n \nPJM has served a copy of this filing on all PJM Members and on the affected state \nutility regulatory commissions in the PJM Region by posting this filing electronically.  In \n \n434 To the extent necessary, PJM requests waiver of Rule 203(b)(3) of the Commission’s Rules of Practice \nand Procedure, 18 C.F.R. § 385.203(b)(3), to permit all of the persons listed to be placed on the official \nservice list for this proceeding."},{"page":90,"startToken":28062,"endToken":28203,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 86 \n \n86 \naccordance with the Commission’s regulations,435  PJM will post a copy of this filing to \nthe Commission filings section on its internet site, https://pjm.com/library/filing-order, and \nwill send an email on the same date as this filing to all PJM Members and all state utility \nregulatory commissions in the PJM Region,436 alerting them that this filing has been made \nby PJM and is available by following such link.  If the document is not immediately \navailable by using the referenced link, the document will be available through the \nreferenced link within 24 hours of the filing. \n \n435 See 18 C.F.R. §§ 35.2(e) & 385.2010(f)(3). \n436 PJM already maintains, updates, and regularly uses email lists for all PJM Members and affected state \ncommissions."},{"page":91,"startToken":28203,"endToken":28369,"text":"Honorable Debbie-Anne A. Reese, Secretary  \nNovember 16, 2026 \nPage 87 \n \n87 \nX. \nCONCLUSION \n \nPJM respectfully requests that the Commission:  (i) accept the proposed revisions \nto its Tariff and the RAA to effectuate PJM’s new Fast Energization Process to study \ngeneration and load together in a one-year process and offer new transmission services to \nCo-Located Load, BTMG, and flexible Large Load; and (ii) deem the Large Load Show \nCause Order’s FPA section 206 aspect closed. \nRespectfully submitted, \n/s/ Wendy B. Warren \n \nMark J. Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nNorristown, PA  19403-2429 \n610-666-4707 \nmark.stanisz@pjm.com    \n \nChristopher B. Holt  \nManaging General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nAudubon, PA  19403-2429 \n610-666-2368 \nchristopher.holt@pjm.com \n \n       Wendy B. Warren \nRuth M. Porter \nAlexander L. Peterson \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n202-393-1200 \nwarren@wrightlaw.com \nporter@wrightlaw.com \npeterson@wrightlaw.com \n \n \nCounsel for PJM Interconnection, L.L.C. \nNovember 16, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":0,"startToken":0,"endToken":124},{"p":2,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":3,"endAt":1395,"startToken":124,"endToken":418},{"p":3,"at":1395,"title":"IV. THE COMMISSION SHOULD ACCEPT THE PROPOSED CHANGES","method":"printed heading","endPage":3,"endAt":1553,"startToken":418,"endToken":431},{"p":3,"at":1553,"title":"A. The Proposed Fast Energization Process Is Just and Reasonable","method":"printed heading","endPage":3,"endAt":1788,"startToken":431,"endToken":454},{"p":3,"at":1788,"title":"B. Core Features of the Fast Energization Process That Enhance the","method":"printed heading","endPage":4,"endAt":492,"startToken":454,"endToken":587},{"p":4,"at":492,"title":"C. The Fast Energization Process Is Consistent with the Large Load","method":"printed heading","endPage":4,"endAt":1634,"startToken":587,"endToken":689},{"p":4,"at":1634,"title":"D. The New Transmission Services Proposed in Part XI are Just and","method":"printed heading","endPage":11,"endAt":76,"startToken":689,"endToken":3226},{"p":11,"at":76,"title":"I. INTRODUCTION","method":"printed heading","endPage":11,"endAt":80,"startToken":3226,"endToken":3227},{"p":11,"at":80,"title":"INTRODUCTION","method":"printed heading","endPage":14,"endAt":1093,"startToken":3227,"endToken":4487},{"p":14,"at":1093,"title":"II. BACKGROUND","method":"printed heading","endPage":14,"endAt":1098,"startToken":4487,"endToken":4488},{"p":14,"at":1098,"title":"BACKGROUND","method":"printed heading","endPage":16,"endAt":630,"startToken":4488,"endToken":5023},{"p":16,"at":630,"title":"B. Compliance Filings and Paper Hearing Procedure","method":"printed heading","endPage":18,"endAt":224,"startToken":5023,"endToken":5550},{"p":18,"at":224,"title":"C. June 2026 Orders","method":"printed heading","endPage":20,"endAt":1084,"startToken":5550,"endToken":6405},{"p":20,"at":1084,"title":"D. Partial Extension and Partial Compliance Filing","method":"printed heading","endPage":22,"endAt":78,"startToken":6405,"endToken":6808},{"p":22,"at":78,"title":"E. PJM’s Stakeholder Engagement Process","method":"printed heading","endPage":26,"endAt":78,"startToken":6808,"endToken":8056},{"p":26,"at":78,"title":"III. OVERVIEW OF PROPOSED CHANGES","method":"printed heading","endPage":26,"endAt":114,"startToken":8056,"endToken":8061},{"p":26,"at":114,"title":"A. Part III—NITS","method":"printed heading","endPage":31,"endAt":196,"startToken":8061,"endToken":9630},{"p":31,"at":196,"title":"B. Part VIII—Fast Energization Process","method":"printed heading","endPage":37,"endAt":1088,"startToken":9630,"endToken":11672},{"p":37,"at":1088,"title":"C. Part XI—New Transmission Services","method":"printed heading","endPage":43,"endAt":1345,"startToken":11672,"endToken":13718},{"p":43,"at":1345,"title":"Attachment F-4, which includes operational procedures and necessary control technologies","method":"printed heading","endPage":52,"endAt":170,"startToken":13718,"endToken":16350},{"p":52,"at":170,"title":"Attachment F-4, the pro forma agreement for Contract Demand Transmission","method":"printed heading","endPage":54,"endAt":759,"startToken":16350,"endToken":17058},{"p":54,"at":759,"title":"D. Re-Filing Co-Located Load Compliance Changes","method":"printed heading","endPage":58,"endAt":2823,"startToken":17058,"endToken":19017},{"p":58,"at":2823,"title":"Attachment A-1, Proposed Tariff, Part VIII, Subpart A, section 401(I). PJM also proposes to cross-reference","method":"printed heading","endPage":61,"endAt":660,"startToken":19017,"endToken":19789},{"p":61,"at":660,"title":"E. Changes to Be Addressed in Future Filings","method":"printed heading","endPage":63,"endAt":78,"startToken":19789,"endToken":20254},{"p":63,"at":78,"title":"IV. THE COMMISSION SHOULD ACCEPT THE PROPOSED CHANGES AS","method":"printed heading","endPage":63,"endAt":159,"startToken":20254,"endToken":20266},{"p":63,"at":159,"title":"A. The Proposed Fast Energization Process Is Just and Reasonable and","method":"printed heading","endPage":64,"endAt":78,"startToken":20266,"endToken":20657},{"p":64,"at":78,"title":"B. Core Features of the Fast Energization Process That Enhance the","method":"printed heading","endPage":64,"endAt":534,"startToken":20657,"endToken":20721},{"p":64,"at":534,"title":"Attachment M-3 and Form 715 planning processes) and PJM’s Do No Harm process, and","method":"printed heading","endPage":72,"endAt":78,"startToken":20721,"endToken":22589},{"p":72,"at":78,"title":"C. The Fast Energization Process Is Consistent with the Large Load Show","method":"printed heading","endPage":81,"endAt":1267,"startToken":22589,"endToken":25412},{"p":81,"at":1267,"title":"D. The New Transmission Services Proposed in Part XI are Just and","method":"printed heading","endPage":83,"endAt":241,"startToken":25412,"endToken":25903},{"p":83,"at":241,"title":"E. PJM’s Proposed Changes to NITS are Just and Reasonable.","method":"printed heading","endPage":86,"endAt":78,"startToken":25903,"endToken":26854},{"p":86,"at":78,"title":"V. EFFECTIVE DATE","method":"printed heading","endPage":86,"endAt":1476,"startToken":26854,"endToken":27087},{"p":86,"at":1476,"title":"VI. CONSENT TO SEVERANCE OF ISSUES","method":"printed heading","endPage":88,"endAt":1422,"startToken":27087,"endToken":27738},{"p":88,"at":1422,"title":"VII. DOCUMENTS ENCLOSED","method":"printed heading","endPage":88,"endAt":1523,"startToken":27738,"endToken":27752},{"p":88,"at":1523,"title":"Attachment A-1: Marked March 16, 2027 Effective Date Proposed Tariff","method":"printed heading","endPage":89,"endAt":82,"startToken":27752,"endToken":27826},{"p":89,"at":82,"title":"Attachment B-1: Marked Indefinite Effective Date Proposed Tariff","method":"printed heading","endPage":89,"endAt":164,"startToken":27826,"endToken":27836},{"p":89,"at":164,"title":"Attachment A-2: Clean March 16, 2027 Effective Date Proposed Tariff","method":"printed heading","endPage":89,"endAt":252,"startToken":27836,"endToken":27848},{"p":89,"at":252,"title":"Attachment B-2: Clean Indefinite Effective Date Proposed Tariff","method":"printed heading","endPage":89,"endAt":333,"startToken":27848,"endToken":27858},{"p":89,"at":333,"title":"Attachment C:","method":"printed heading","endPage":89,"endAt":393,"startToken":27858,"endToken":27868},{"p":89,"at":393,"title":"Attachment D:","method":"printed heading","endPage":89,"endAt":460,"startToken":27868,"endToken":27877},{"p":89,"at":460,"title":"VIII. CORRESPONDENCE AND COMMUNICATIONS","method":"printed heading","endPage":89,"endAt":1218,"startToken":27877,"endToken":27983},{"p":89,"at":1218,"title":"IX. SERVICE","method":"printed heading","endPage":91,"endAt":78,"startToken":27983,"endToken":28214},{"p":91,"at":78,"title":"X. CONCLUSION","method":"printed heading","endPage":91,"endAt":82,"startToken":28214,"endToken":28215},{"p":91,"at":82,"title":"CONCLUSION","method":"printed heading","endPage":91,"endAt":1147,"startToken":28215,"endToken":28369}]}