{"document":{"slug":"rec-20261119-5243","title":"Revisions to Add Price Adaptive Load Service","issued":"2026-11-19","accession":"20261119-5243","docket":"ER27-578-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"tariff filing","file":"sources/filings/text/20261119-5243_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5243","tier":"record","sha256":"fd746390ce38150a129e6d3cedafdaa59f663094d589efd750b37dedce33c3cc","pages":44,"tokens":16839,"emptyPages":[],"textThemes":["flex","study","colo","cost"]},"pages":[{"page":1,"startToken":0,"endToken":375,"text":"November 19, 2026 \n \nThe Honorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, D.C.  20426 \n \nRe: \nSouthwest Power Pool, Inc., Docket No. ER27-____-000 \nSubmission of Tariff Revisions to Add the Price Adaptive Load Service; \nRelated to Docket No. EL26-68-000 \n \nDear Secretary Reese:  \n \n \nPursuant to Section 205 of the Federal Power Act (“FPA”), 16 U.S.C. § 824d, \nand Section 35.13 of the Federal Energy Regulatory Commission’s (“Commission”) \nRegulations, 18 C.F.R. § 35.13, Southwest Power Pool, Inc. (\"SPP\"), as authorized by \nits independent Board of Directors, submits revisions to its Open Access Transmission \nTariff (“Tariff”)1 to establish Price Adaptive Load Service (“PALS”)2, a non-firm \ntransmission service paired with a new market participation model that enables a Price \nAdaptive Load (“PAL”)3 to participate as fully dispatchable demand in both the Day-\nAhead Market and Real-Time Balancing Market (“RTBM”). SPP submits this filing \nunder Section 205, as the Commission encouraged, in response to the Commission’s \nJune 18, 2026, order instituting a proceeding under FPA Section 206 in Docket No. \nEL26-68-000 (“Show Cause Order”).4 As explained in Section III.B.10, this filing \nresolves the Show Cause Order’s directive that SPP explain whether its Tariff remains \n \n1  \nSouthwest Power Pool, Inc., Open Access Transmission Tariff, Sixth Revised Volume \nNo. 1.  References in this filing to \"Tariff\" refer to the version of SPP’s Tariff currently \nin effect. \"Proposed Tariff\" refers to a version reflecting the revisions proposed in this \nfiling. All capitalized terms not otherwise defined in this filing shall have the \ndefinitions assigned by the Tariff. \n2  \nProposed Tariff, Part I, Section 1, Definition of Price Adaptive Load Service (“A type \nof transmission service available to serve a Price Adaptive Load at a delivery point, in \nwhole or in part,  as described in Attachment BG and Part VIII of the Tariff.”).  \n3  \nProposed Tariff, Part I, Section 1, Definition of Price Adaptive Load (“A commercial \nor industrial load, or a portion of a commercial or industrial load, at a delivery point \nthat is eligible to connect to the Transmission System and receive PALS as defined in \nAttachment BG and Part VIII of the Tariff.”).\" \n4  \nSw. Power Pool, Inc., 195 FERC ¶ 61,213 (2026)."},{"page":2,"startToken":375,"endToken":792,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 2 \n \njust and reasonable without a non-firm contract demand transmission service for \nEligible Customers taking service on behalf of flexible large loads and Eligible Load. \n \nSPP requests that the Commission issue an order in this docket as soon as \npracticable, but not later than February 17, 2027, which is approximately 90 days after \nsubmission of this filing. SPP requests an effective date of “12/31/9998”5 for the Tariff \nRecords submitted in this filing to allow SPP staff to develop, test, and implement the \nnecessary software changes. SPP will submit a filing with the Commission specifying \na precise effective date prior to implementation. SPP will work as quickly as practicable \nto technologically implement the Tariff revisions proposed herein. As of the date of \nthis filing, implementation is targeted for the second quarter of 2028. \n \nAs discussed in Section VI below, SPP respectfully requests waiver of the 120-\nday prior-notice limitation in Section 35.3(a)(1) of the Commission’s regulations.6    \n   \nI. \nSUMMARY OF FILING \nThe Show Cause Order commended SPP’s “bold and proactive steps” to \nintegrate large loads. It recognized that SPP’s High Impact Large Load (“HILL”) \nprocess already provides an enhanced study framework for Eligible Customers taking \ntransmission service on behalf of large loads.7 The Commission nonetheless \npreliminarily found that “SPP’s Tariff appears to be unjust and unreasonable because \nit does not include transmission services that reflect Eligible Customers taking \ntransmission service on behalf of flexible large loads that are willing and able to limit \ntheir use of the transmission system under certain conditions.”8  The Commission \ndirected:   \n \nSPP should explain whether the Tariff remains just and \nreasonable without the transmission services described by the \nCommission in the [PJM Interconnection, L.L.C. (“PJM”)] Co-\nLocation Order[9], with regional variation as appropriate, being \navailable to Eligible Customers taking transmission service on \nbehalf of Eligible Load, or propose appropriate Tariff revisions. \n \n5  \nSee, e.g., Implementation Guide for Electronic Filing of Parts 35, 154, 284, 300, and \n341 Tariff Filings at 10 (Nov. 14, 2016) (“If the effective date is not known at the time \nof the filing, such as the effective date is contingent on FERC approval . . . the date of \n12/31/9998 must be used.”).   \n6  \n18 C.F.R. § 35.3(a)(1). \n7  \nShow Cause Order at P 2. \n8  \nShow Cause Order at P 86. \n9  \nPJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (“PJM Co-Location Order”)."},{"page":3,"startToken":792,"endToken":1223,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 3 \n \nSpecifically, SPP should explain whether the Tariff remains just \nand reasonable without (1) an interim non-firm network \ntransmission service while Network Upgrades are being \nconstructed (i.e., interim NITS) and (2) permanent firm and non-\nfirm contract demand transmission services (transmission \nservice up to a specified MW quantity, i.e., the contract level, on \na firm or non-firm basis).10 \n \nWith this filing, SPP is proposing the addition of PALS to the Tariff to address \nthe Commission’s specific concern that the Tariff “does not include transmission \nservices that reflect Eligible Customers taking transmission service on behalf of \nflexible large loads that are willing and able to limit their use of the transmission system \nunder certain conditions.” PALS is a flexible transmission service that allows \nTransmission Customers to limit their use of the Transmission System. Under PALS, \na PAL’s withdrawals are governed by the price-sensitive PAL Energy Bids11 its Market \nParticipant submits, which are subject to a uniform $25/MWh cap that protects other \ncustomers from substantially high energy prices and from utilizing resources for PALS \nloads that are otherwise intended to serve firm load. PALS is available for renewable \nterms of one to ten years and is not tied to the construction of Network Upgrades. PALS \nis SPP’s regional variation on the Non-Firm Contract Demand transmission service \ndescribed in the PJM Co-Location Order, tailored to SPP’s Integrated Marketplace and \nSPP’s transmission services. Like the Commission’s Non-Firm Contract Demand \ntransmission service, PALS limits service to a specified MW quantity (the PALS \nCapacity). It is curtailed before firm service, imposes penalties for unreserved use, \ncarries no resource adequacy obligation, and requires control technologies or protection \nsystems that keep withdrawals within approved levels. \n  \nThis filing is one part of SPP’s comprehensive response to the Show Cause \nOrder. The collective filings addressing the Show Cause Order’s remaining directives \nare identified in Section V. Section III.B.11 explains how PALS avoids disrupting \nexisting commercial arrangements, as the Show Cause Order requires. \n \nII. \nBACKGROUND \nA. \nThe HILL Process Filings \n \nThe need and ideas that form the basis for SPP’s proposal for PALS grew from \nSPP’s work to integrate and accommodate new large loads. The present filing is the \n \n10  \nShow Cause Order at P 83.  \n11  \nProposed Tariff, Attachment AE, Section 1.1, Definition of PAL Energy Bid (“A \nproposal by a Market Participant associated with a Price Adaptive Load to purchase a \nprice sensitive amount of Energy at a specified location and period of time in the Day-\nAhead Market or the Real-Time Balancing Market.”)."},{"page":4,"startToken":1223,"endToken":1655,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 4 \n \nthird major filing as a result of that work. The first filing occurred October 24, 2025, \nwhen SPP submitted Tariff revisions to add the HILL study process and a High Impact \nLarge Load Generation Assessment (“HILLGA”).12 The Commission accepted the \nHILL Filing on January 14, 2026, with an effective date of January 15, 2026.13 The \nCommission found that “SPP has shown that unprecedented growth in large loads in \nthe SPP region presents significant and unique operational and planning \nchallenges[,]”14 and that the “proposed HILL and HILLGA processes are a just and \nreasonable and not unduly discriminatory or preferential approach to addressing these \nchallenges, while maintaining the reliable operation of SPP’s transmission system.”15 \n \nOn February 10, 2026, SPP submitted Tariff revisions to add Conditional High \nImpact Large Load Service (“CHILLS”).16 CHILLS allows a HILL, or a portion of a \nHILL, to receive up to seven years of non-firm transmission service when firm service \nis unavailable because the Transmission Customer lacks sufficient Designated \nResources or because Network Upgrades are not yet complete. CHILLS serves as a \nbridge that allows a HILL to begin operating, when sufficient capacity is available, \nwhile it awaits firm service. The Commission accepted the provisions in a series of \norders.17 \n \nThis PALS filing is SPP’s third filing stemming from its initiative to integrate \nand accommodate new large loads. PALS is a novel approach to non-firm transmission \nservice intended to serve loads that do not seek a bridge to firm service but have a \nbusiness case for a non-firm transmission product. Unlike CHILLS, PALS is not \nlimited to HILLs and is not tied to the completion of Network Upgrades or the addition \nof Designated Resources. Instead, PALS is designed for flexible, price-sensitive loads. \nPALS does not require supporting Resources, will not cause Network Upgrades to be \nidentified or constructed, and uses a rate design based on the rates for hourly Non-Firm \nPoint-To-Point Transmission Service. \n \n \n \n12  \nSubmission of Tariff Revisions to Add the High Impact Large Load Processes and \nHigh Impact Large Load Generation Assessment of Southwest Power Pool, Inc., \nDocket No. ER26-247-000 (October 24, 2025) (“HILL Filing”). \n \n13  \nSw. Power Pool, Inc., 194 FERC ¶ 61,031 (2026) (“HILL/HILLGA Order”). \n14  \nHILL/HILLGA Order at P 60. \n15  \nId. \n16  \nSubmission of Tariff Revisions to Add Conditional High Impact Large Load Service \nof Southwest Power Pool, Inc., Docket No. ER26-1323-000 (February 10, 2026). \n17  \nSw. Power Pool, Inc., 195 FERC ¶ 61,196 (2026); Sw. Power Pool, Inc., Letter Order, \nDocket No. ER26-1323-002 (Oct. 26, 2026)."},{"page":5,"startToken":1655,"endToken":2013,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 5 \n \nB. \nShow Cause Order in Docket No. EL26-68 \n \nIn the Show Cause Order, the Commission adopted SPP’s HILL definition as \nits definition of “large load.”18 It then preliminarily found that the Tariff appears unjust \nand unreasonable in four categories. The Commission directed SPP and the \nTransmission Owners either to show cause why the Tariff remains just and reasonable \nor to explain what changes would remedy the identified concerns.19 The Commission \nstrongly encouraged SPP to address these issues through FPA Section 205 filings.20 \n \nThe Commission also noted that “SPP’s PALS proposal is currently under \ndevelopment in its stakeholder process, and we encourage SPP to consider whether \nPALS would address our concern….”21  The Commission also explained that Eligible \nCustomers that are willing and able to limit their use of the transmission system should \nbe able to choose a transmission service that aligns their charges with the benefits they \nreceive.22 \n \nSPP submitted an informational report on July 20, 2026, describing the status \nof PALS and SPP's other large load initiatives.23 On August 3, 2026, SPP and certain \nTransmission Owners moved to hold the Section 206 proceeding in abeyance through \nNovember 20, 2026, to allow SPP to complete its stakeholder process, and identified \nPALS as one of the Section 205 filings SPP would submit in response.24 This filing \nfulfills that commitment. SPP is concurrently submitting additional FPA Section 205 \nfilings that address the Commission’s remaining concerns, as identified in Section V \nbelow.  \n \nC.  \nStakeholder Engagement and Approval \n \nStarting in late 2025, SPP staff began working on the PALS proposal. SPP met \nwith SPP stakeholder groups over thirty separate times to discuss PALS proposal and \nfor the ultimate approval of the proposed Tariff revisions presented herein.  \n \n18  \nShow Cause Order at n.2. \n19  \nId. at P 3. \n20  \nId. at P 32. \n21  \nId. at P 84. \n22  \nId. at PP 83-84, 86-87. \n23  \nInformational Report of Southwest Power Pool, Inc., Docket No. EL26-68-000 (July \n20, 2026). \n24  \nJoint Movants’ Amended Motion to Hold Section 206 Proceeding in Abeyance, Docket \nNo. EL26-68-000 (August 3, 2026)."},{"page":6,"startToken":2013,"endToken":2360,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 6 \n \n \n The proposed Tariff revisions were reviewed and approved through the SPP’s \nrobust stakeholder process, including meetings of the: Market Working Group \n(“MWG”) on August 18, 2026;25 Operating Reliability Working Group (“ORWG”) on \nSeptember 2, 2026;26 Supply Adequacy Working Group (“SAWG”) on September 23, \n2026;27 Regional Tariff Working Group (“RTWG”) on September 24, 2026;28 and the \n \n25  \nSee MWG Minutes, dated August 18-19, 2026, at Agenda Item 11 posted at: \nhttps://www.spp.org/documents/77583/mwg%20minutes%2020260818-19.pdf. The \nMWG develops and oversees policies and procedures related to the Market Protocols \nthat define SPP’s wholesale markets, including energy and operating reserve, \ncongestion management, congestion hedging, demand response and market power \nmitigation. The MWG proposes changes to the SPP Tariff and other governing \ndocuments to implement suggested market changes. \n26  \nSee ORWG Meeting Minutes, dated September 2, 2026, at Agenda Item 7 posted at: \nhttps://www.spp.org/documents/77750/orwg%20meeting%20minutes%2020260902.\npdf. The ORWG develops and oversees policies and procedures related to the reliable \nand secure operation of the Bulk Electric System within SPP’s Reliability Coordinator, \nBalancing Authority and Reserve Sharing Group footprints. The ORWG ensures these \noperating policies are consistent with North American Electric Reliability Corporation \nand regional reliability standards. \n27  \nSee SAWG Meeting Minutes, dated September 23, 2026, at Agenda Item 4 posted at: \nhttps://www.spp.org/documents/78101/sawg%20meeting%20minutes%2020260923-\n24.pdf. The SAWG develops and oversees policies and procedures related to reliable \nsupply adequacy within the SPP footprint. This includes ensuring that these policies \nand procedures meet the compliance obligations of North American Electric Reliability \nCorporation reliability standards.  \n28  \nSee  RTWG Minutes, dated September 24, 2026, at Agenda Item 9b posted at: \nhttps://www.spp.org/documents/77942/rtwg%20meeting%20minutes%2020260924.p\ndf. The RTWG develops, implements and oversees SPP’s Open Access Transmission \nTariff. The RTWG provides input on regulatory or implementation issues not \nspecifically covered by the tariff and issues where there may be conflicting or differing \ninterpretations of the tariff."},{"page":7,"startToken":2360,"endToken":2783,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 7 \n \nTransmission Working Group (\"TWG\")29 and Economic Studies Working Group \n(“ESWG”)30 on September 30, 2026.31  \n \nThe proposed revisions were approved by the Markets and Operations Policy \nCommittee (“MOPC”) on October 13, 2026,32 and the SPP Board of Directors on \nNovember 17, 2026.33 \n \nThe Cost Allocation Working Group (“CAWG”) on October 1, 2026, 34 and the \nRSC on November 16,  2026,35 approved changes to SPP’s Open Access Transmission \nTariff  Business Practices, Business Practice 8100, related to these Tariff revisions. \n \n29  \nThe TWG develops and oversees regional and interregional transmission planning \nprocesses, including generator interconnection and long-term transmission service \nstudy processes. The TWG reviews proposed transmission interconnections and \ncoordinates transmission planning activities to develop SPP’s Integrated Transmission \nPlan and Transmission Expansion Plan.  \n30  \nThe ESWG advises and assists SPP staff in determining the appropriate data, planning \nmethods and processes for developing and evaluating economic transmission \nexpansion options for the SPP region.     \n31  \nSee ESWG & TWG Joint Meeting Minutes, dated September 30, 2026, at Agenda Item \n3 posted at: \n https://www.spp.org/documents/77985/joint%20eswg-\ntwg%20meeting%20minutes%2020260930-1001.pdf.  \n32  \nSee MOPC Meeting Minutes, dated October 13-14, 2026, at Agenda Item 3.e posted \nat: https://www.spp.org/spp-documents-filings/?id=532303. The MOPC consists of a \nrepresentative officer or employee from each SPP Member and reports to the SPP \nBoard of Directors. Its responsibilities include recommending modifications to the \nTariff. See Southwest Power Pool, Inc., Bylaws, First Revised Volume No. 4 \n(\"Bylaws\") at Section 6.1.  \n33  \nSee Board of Directors & Members Committee Meeting Materials, dated November \n17, 2026, at Agenda Item 3.2.4 and 7.1 posted at: \n  https://www.spp.org/spp-\ndocuments-filings/?id=18449. The meeting minutes will be posted that this location \nwhen they become available. \n \n34 \nSee CAWG Meeting Minutes, dated October 1, 2026, at Agenda Item 8 posted at: \nhttps://www.spp.org/documents/77976/cawg%20minutes%2020261001.pdf. \nThe \nCAWG reports to the Regional State Committee (“RSC”) and assists the RSC in \naddressing matters for which the RSC has primary responsibility as defined in Section \n7.2 of the SPP Bylaws. In addition, the CAWG assists the RSC in addressing any other \nissues as requested by the RSC.  \n35  \nSee RSC Meeting Materials, dated November 16, 2026, at Agenda Item 6.D posted at:  \nhttps://www.spp.org/spp-documents-filings/?id=20623. The meeting minutes will be \nposted at this location when they become available. The RSC provides collective state"},{"page":8,"startToken":2783,"endToken":3211,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 8 \n \n \nWhile SPP recognizes that stakeholder approval does not by itself cause a filing \nto be just and reasonable, SPP requests that the Commission extend appropriate \ndeference to the wishes of SPP’s stakeholders, consistent with Commission \nprecedent.36 \n \nIII. \nDESCRIPTION OF AND JUSTIFICATION FOR PROPOSED TARIFF \nREVISIONS  \n \nA. \nOverview \n \nDuring the development of the CHILLS, there was stakeholder desire for a \nlong-term transmission service product that would provide flexibility in how and when \ntransmission customers could use the SPP Transmission System. CHILLS, although a \nnon-firm, long-term transmission service product, requires the Transmission Customer \nto obtain and pay for transmission service based on a MW amount of reserved \ntransmission capacity. SPP and its stakeholders developed the PALS to allow loads, \nnot just HILLs, to obtain a long-term, non-firm dispatchable load service and \n \nregulatory agency input on matters of regional importance related to the development \nand operation of bulk electric transmission. The SPP RSC is comprised of retail \nregulatory commissioners from agencies in Arkansas, Arizona, Colorado, Iowa, \nKansas, Louisiana, Minnesota, Missouri, Montana, Nebraska, New Mexico, North \nDakota, Oklahoma, South Dakota, Texas, Utah and Wyoming. The RSC’s approved \nthe following motion: “The Regional State Committee approves the revisions to \nBusiness Practice 8100 proposed in RR791 - Price Adaptive Load Service. The \nRegional State Committee recommends the Board of Directors support policies to \nreliably maximize utilization of the transmission system and consider the \nrecommendation of the Cost Allocation Working Group relating to RR791 - Price \nAdaptive Load Service.” \n36   \nThe Commission has previously recognized that provisions approved through regional \ntransmission organization stakeholder processes are due deference. See Sw. Power \nPool, Inc., 127 FERC ¶ 61,283, at P 33 (2009) (noting that the Commission “accord[s] \nan appropriate degree of deference to RTO stakeholder processes”); New Eng. Power \nPool, 105 FERC ¶ 61,300, at P 34 (2003) (Commission approval of transmission cost \nallocation proposal based upon an extensive and thorough stakeholder process); Policy \nStatement Regarding Regional Transmission Groups, 1991-1996 FERC Stats. & \nRegs., Regs. Preambles ¶ 30,976, at 30,872 (1993) (the Commission will afford the \nappropriate degree of deference to the stakeholder approval process). The \nCommission’s deference to RTO stakeholder processes has been upheld by the courts. \nSee Pub. Serv. Comm’n of Wis. v. FERC, 545 F.3d 1058, 1062-63 (D.C. Cir. 2008) \n(noting that the Commission often gives weight to RTO proposals that reflect the \nposition of the majority of the RTO’s stakeholders) (quoting Am. Elec. Power Serv. \nCorp. v. Midwest Indep. Transmission Sys. Operator, Inc., 122 FERC ¶ 61,083, at P \n172 (2008))."},{"page":9,"startToken":3211,"endToken":3646,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 9 \n \nwithdrawal based on the real-time pricing. PALS will allow Transmission Customers \nthe ability to utilize non-firm transmission service designed for price-sensitive loads to \npay for service on a per MW basis based on actual usage and not based on the reserved \ncapacity amount. \n \nTo establish the rates, terms, and conditions of PALS, SPP proposes a new Part \nVIII of the Tariff (Sections 54 through 61), a new Schedule 16, and a new Attachment \nBG, which contains the study process for PALS, a Sample Request For a Price \nAdaptive Load Delivery Point Initial Assessment, a pro forma PALS Service \nAgreement (\"PALSA\"), and a pro forma PALS Operating Agreement. SPP also \nproposes revisions to Attachment AE to establish the PAL market participation model, \nand numerous conforming revisions throughout the Tariff. \n \nSPP proposes new definitions for PAL, PALS, PALS Capacity, PALS \nOperating Agreement, PAL Upper Operating Tolerance, PALS Usage, and PALS \nUsage Limit. Similar to CHILL and CHILLS, PALS is the transmission service, and a \nPAL is the load that takes the service. The PALS Capacity is the maximum amount of \nEnergy SPP agrees to transmit, the PALS Usage is the amount delivered, and the PALS \nUsage Limit reflects the four different paths possible for limiting withdrawals by PALs.  \n \nPALS is designed to accommodate flexible, price-sensitive loads that are \nwilling to withdraw from the Transmission System only when the transmission \ncapacity is available. PALS is a new transmission service product, similar to CHILLS, \nthat will help expedite the connection of new loads on the Transmission System. As \ndescribed and justified below, the PALS proposal is just and reasonable and not unduly \ndiscriminatory or preferential. \n \nB. \nPrice Adaptive Load Service \n \n1. General Terms and Conditions of PALS37 \n \n \nTo provide the rates, terms, and conditions of this new type of long-term non-\nfirm transmission service, SPP proposes a new Part VIII of the Tariff, a new Schedule \n16, and a new Attachment BG.38 PALS is the transfer of energy to designated Point(s) \nof Delivery to serve the PAL of a Transmission Customer or a Network Customer.39 \nPALS is “as available” transmission service that will be provided by SPP using the \ntransfer capability that is in excess of the capability needed to serve Native Load \n \n37  \nThis section is intended to provide a general overview of the Tariff revisions proposed \nin this filing. Each requirement or characteristic of PALS discussed in this section is \ndiscussed in detail in subsequent sections. \n38  \nProposed Tariff, Part VIII, Sections 54-61, Schedule 16, and Attachment BG. \n39  \nProposed Tariff, Part VIII, Preamble."},{"page":10,"startToken":3646,"endToken":4049,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 10 \n \nCustomers,40 Network Customers, other Transmission Customers taking Long-Term \nService and Short-Term Firm Point-To-Point Transmission Service,41 CHILLS, and \ncustomers under other transmission tariffs or agreements taking network or Firm Point-\nto-Point Transmission Service42 from the Transmission Owner(s).43 A Transmission \nCustomer seeking PALS will take conditional transmission service based on the excess \ncapacity available on the current topology of the Transmission System to serve the \nPAL. \n \nUnder Part VIII of the Proposed Tariff, PALS will be available for a minimum \nterm of one (1) year and a maximum term of ten (10) years.44 This term will provide \nPALS customers with significant flexibility based on their needs, but will also allow \nSPP to ensure that the changing topology of the SPP Transmission System can reliably \naccommodate the PALS request after ten (10) years. After the termination of PALS, \nTransmission Customers cannot withdraw energy from the Transmission System for \nthe PAL without obtaining firm transmission service under other processes in the Tariff \nor unless a renewed term is granted by SPP under Attachment BG.45 If the PALS \ncustomer does not use the PALS for a period of one (1) year, SPP has the ability to \nterminate the service.46  \n \n \n40  \nTariff, Part I, Section 1, Definition of Native Load Customers (“The wholesale and \nretail power customers of the Transmission Owner(s) on whose behalf the \nTransmission Owner(s), by statute, franchise, regulatory requirement, or contract, has \n(have) undertaken an obligation to construct or operate the Transmission Owner's(s') \nsystem(s) to meet the reliable electric needs of such customers.  In addition, Native \nLoad Customers also may include the customers of the Federal Government on whose \nbehalf the Government, by policy, statute, regulatory requirement, or contract, delivers \nFederal capacity and energy to meet all or a portion of the reliable electric needs of \nsuch customers.”) \n41  \nTariff Part I, Section 1, Definition of Short-Term Point-To-Point Transmission Service \n(“Firm Point-To-Point Transmission Service under Part II of the Tariff with a term of \nless than one year.”). \n42  \nTariff, Part I, Section 1, Definition of Firm Point-to-Point Transmission Service \n(“Transmission Service under this Tariff that is reserved and/or scheduled between \nspecified Points of Receipt and Delivery pursuant to Part II of this Tariff.”). \n43  \nProposed Tariff, Part VIII, Section 54.2. \n44  \nProposed Tariff, Part VIII, Section 54.1. \n45  \nId. \n46  \nId."},{"page":11,"startToken":4049,"endToken":4461,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 11 \n \nThrough the execution of a PALSA, Transmission Customers accept PALS \nwith full realization that such service is subject to availability and to Curtailment47 or \nInterruption48 on a non-discriminatory basis in the event the Transmission System is \nconstrained, under any situation that threatens reliability or other unforeseen \nconditions.49 The Proposed Tariff also requires the Transmission Customer to fully \nrespond to a Load Shedding50 or Curtailment directive for the PAL delivery point \nlimited by the average Setpoint Instruction51 plus the PAL Upper Operating \nTolerance52.53 In the event the Transmission System is constrained or under Emergency \nConditions, all firm transmission service and CHILLS will have higher priority than \nany PALS.54 PALS will have equal priority to hourly Non-Firm Point-To-Point \nTransmission Service.55 The priority of PALS appropriately ranks behind all firm \nservice and CHILLS because PALS  is  non-firm transmission service and PALS is  not \na bridge to a long-term firm transmission service like CHILLS. Transmission \nCustomers with firm service are responsible for the costs of any needed Network \nUpgrades and required to have Resources that support that service, unlike PALS. The \nequal priority of PALS and hourly Non-Firm Point-To-Point Transmission Service is \n \n47  \nTariff, Part I, Section 1, Definition of Curtailment (“A reduction in firm or non-firm \ntransmission service in response to a transmission capacity shortage as a result of \nsystem reliability conditions.”). \n48  \nTariff, Part I, Section 1, Definition of Interruption (“A reduction in non-firm \ntransmission service due to economic reasons pursuant to Section 14.7.”). \n49  \nProposed Tariff, Part VIII, Section 58.1. \n50  \nProposed Tariff, Part I, Section 1, Definition of Load Shedding (“The systematic \nreduction of system demand by temporarily decreasing load in response to \nTransmission System or area capacity shortages, system instability, or voltage control \nconsiderations under Part III, Part VII, or Part VIII of the Tariff.”). \n51  \nProposed Tariff, Attachment AE, Section 1.1, Definition of Setpoint Instruction (“The \nReal-Time desired Megawatt output signal calculated for a specific Resource or Price \nAdaptive Load by SPP’s control system for a specified period.”). \n52  \nProposed Tariff, Attachment AE, Section 1.1, Definition of PAL Upper Operating \nTolerance (“The Megawatt range of a Price Adaptive Load’s withdrawal above its \naverage Setpoint Instruction over the Dispatch Interval within which it will not be \nsubject to charges associated with deviating from its Setpoint Instruction”). \n53  \nProposed Tariff, Part VIII, Section 58. \n54  \nProposed Tariff, Part VIII, Section 54.2. \n55  \nId."},{"page":12,"startToken":4461,"endToken":4903,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 12 \n \nappropriate because PALS Usage56 is billed on hourly increments similar to hourly \nNon-Firm Point-To-Point Transmission Service capacity. \n \n \nAlthough Network Upgrades will not be identified for construction to establish \na delivery point for the sole purpose of PALS, the Transmission Customer and Host \nTransmission Owner may still be required to ensure construction of facilities that \nenable the provision of PALS. The determination of such upgrades will be determined \nin the PAL Connection Study (“PALCS”) under Attachment BG,57 with the costs for \nsuch facilities being directly assigned to the PALS customer.  Further, the Transmission \nCustomer is responsible for constructing, maintaining, and operating facilities on its \nside of the delivery point for SPP to reliably deliver energy from the Transmission \nSystem to the PAL delivery point.58  \n \nTransmission Customers will also take PALS under the Tariff with the \nknowledge that PALS is not available for resale, redirection, reassignment, or transfer \nof service.59 PALS is provided at the fixed location on the Transmission System that \nwas studied. Therefore, redirection is not appropriate. Furthermore, resale and \nreassignment apply only to Point-To-Point Transmission Service60 and therefore will \nnot apply to PALS. Lastly, since PALS is available only to entities entitled to serve \nretail electric load under state regulatory authority, resale, and reassignment are not \nneeded for these types of Transmission Customers. \n \n \nSection 54.4 of the Proposed Tariff provides that the Transmission Customer \nmust not withdraw energy from the Transmission System at the PAL delivery point in \nexcess of  PALS Usage Limit.61 The Transmission Customer will be billed for its PALS \nUsage under the terms of Schedules 11 and 16 of the Tariff62 and will be subject to \n \n56  \nProposed Tariff, Part I, Section 1, Definition of PALS Usage (“Amount of kilowatts \ndelivered at the PALS delivery point provided pursuant to Part VIII of the Tariff.”). \n57  \nProposed Tariff, Attachment BG, Section 3.1. \n58  \nProposed Tariff, Part VIII, Sections 57.4 and 60.1. \n59  \nProposed Tariff, Part VIII, Section 54.5. \n60  \nTariff, Part I, Section 1, Definition of Point-To-Point Transmission Service (“The \nreservation and transmission of capacity and energy on either a firm or non-firm basis \nfrom the Point(s) of Receipt to the Point(s) of Delivery under Part II of the Tariff.”). \n61  \nProposed Tariff, Part I, Section 1, Definition of PALS Usage Limit (“For any five-\nminute interval within an hour, the lowest of the following: (1) the applicable average \nSetpoint Instruction plus the PAL Upper Operating Tolerance; (2) the PALS Capacity; \n(3) the Curtailment limit; or (4) the Interruption limit.”) \n62  \nProposed Tariff, Part VIII, Section 54.4."},{"page":13,"startToken":4903,"endToken":5326,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 13 \n \nadditional unreserved use charges under Schedules 8 and 11 for any period when the \nadditional service exceeds its PALS Usage Limit.63 Schedule 8 is used for this purpose \nbecause Schedule 16 applies only hourly and monthly rates, with the latter used solely \nfor the purpose of capping the monthly charge under Section 2 of Schedule 16.  In order \nfor PALS to have as strong a disincentive against unreserved use of the Transmission \nSystem as currently applies to Non-Firm Point-To-Point Transmission Service, the \nSchedule 8 rates are utilized to apply the daily, weekly, and monthly rates of that \nservice schedule. This is appropriate because the hourly rates under Schedule 16 are \nidentical to the hourly rates under Schedule 8. Finally, Transmission Customers taking \nPALS will be responsible for any real power losses,64 as set forth in Appendix 1 to \nAttachment M65 of the Tariff, for the PALS Usage amount, which is inclusive of any \nload exceeding the PALS Usage Limit.66  \n \n2. \nObtaining PALS67 \n \nA Transmission Customer requesting PALS must submit an application, \nincluding all information required pursuant to the SPP Credit Policy set out in \nAttachment X.68 PALS applications should be submitted by entering the information \nlisted in Section 57.1 of Part VIII of the Proposed Tariff on SPP’s Open Access Same-\nTime Information System (“OASIS”).69  \n \n \n63  \nId. \n64  \nProposed Tariff, Part VIII, Section 55.3; see also Proposed Tariff, Attachment M, \nSection VI (Transmission Loss Determination – Price Adaptive Load Service). \n65  \nTariff, Attachment M. Attachment M describes the loss compensation procedure used \nto quantify real power losses for which the Transmission Customer or Network \nCustomer is responsible when taking service under the Tariff.  Appendix 1 to \nAttachment M is a schedule showing the real power loss factors for the provision of \ntransmission service across each Zone on the Transmission System.   \n66  \nProposed Tariff, Part VIII, Section 55.3. \n67  \nSee generally, Proposed Tariff, Part VIII; see also Proposed Tariff, Part VIII, Section \n56.1 (outlining the conditions required of Transmission Customers taking PALS). \n68  \nProposed Tariff, Part VIII. Section 57.1. \n69  \nTariff, Part I, Section 1, Definition of Open Access Same-Time Information System \n(OASIS) (“The information system and Internet location where the Transmission \nProvider posts the information required by 18 C.F.R. § 37 of the Commission's \nregulations, and where the Transmission Provider may also post the information \nrequired to be posted on its Internet website by 18 C.F.R. § 358 of the Commission’s \nregulations.”)."},{"page":14,"startToken":5326,"endToken":5655,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 14 \n \nWhen a Transmission Customer applies for PALS, it must specify the amount \nof PALS Capacity for the term of service (one (1) to ten (10) years).70 To evaluate a \nrequest for PALS, SPP requires the Transmission Customer to submit information \nregarding all of its existing loads and Resources that are currently receiving firm \ntransmission service.71 This information enables SPP to fully assess impacts to the \nTransmission System associated with granting PALS to an existing Transmission \nCustomer. \n \nA Transmission Customer must also provide timely written notice of material \nchanges in any information provided in its application relating to the PALS, its \ntransmission system, or other aspects of its facilities or operations affecting SPP’s \nability to provide reliable service.72 This information will enable SPP to continue \nplanning for safe and reliable transmission service.  \n \nThe time requirements for submitting and evaluating PALS requests are set out \nin Attachment P of the Tariff, as for other transmission service.73 SPP will respond to \nall Completed Applications as soon as practicable and on a non-discriminatory basis, \nincluding applications from a Transmission Owner’s own merchant function.74 \n \n3.  \nPALS Study Processes \n \n \nAttachment BG outlines the study processes required for a PAL delivery point \nto be connected to the Transmission System. To establish or modify a PAL delivery \npoint pursuant to Attachment BG, the Transmission Customer must request, in writing, \na PAL Delivery Point Limitations Assessment (“PDPLA”).75 The request must contain \nthe information included in “Sample Request For a Price Adaptive Load Delivery Point \nInitial Assessment” attached as Addendum 1 to Attachment BG of the Proposed \nTariff.76 \n \n \n70  \nProposed Tariff, Part VIII, Sections 54.1 and 57.1(vi). \n71  \nProposed Tariff, Part VIII, Section 57.1. \n72  \nProposed Tariff, Part VIII, Section 55.2. \n73 \nProposed Tariff, Part VIII, Section 57.2. \n74 \nProposed Tariff, Part VIII, Section 57.5. \n75  \nProposed Tariff, Attachment BG, Section 1.0.   \n76  \nId."},{"page":15,"startToken":5655,"endToken":6023,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 15 \n \n \nAttachment BG makes clear that a Transmission Customer may not make a \nrequest for PALS for Critical Loads, as defined in Attachment AE of the Tariff.77 If the \nPALS delivery point qualifies as a HILL, the delivery point must also satisfy the HILL \nrequirements outlined in Attachment BA of this Tariff.78 CHILLS and PALS cannot be \ntaken at the same delivery point.79 \n \n \n \nRequirements related to the Host Transmission Owner’s performance of the \nPALCS are outlined in Section 3.1 of Attachment BG of the Proposed Tariff. The \nprocedures, deposits, and timelines of the PALCS in Attachment BG are consistent \nwith the load connection studies outlined in Attachments AQ, AX, BA, and BC.80  \n \nUnder the PALCS agreement, the Host Transmission Owner may require an \nadvance deposit equal to the estimated study cost or $10,000, whichever is less.81 \nBefore SPP performs the PDPLA, the Transmission Customer or Network Customer \nmust execute a PDPLA agreement. That agreement commits it to pay a $2,000 non-\nrefundable application fee, adjusted every three years for inflation using the Consumer \nPrice Index for All Urban Consumers, plus the actual cost of the PDPLA.82 A scoping \ncall among the customer, SPP, and the Host Transmission Owner will be held within \nten (10) Calendar Days after the executed agreements and any required deposit are \nreceived.83 The application fee and inflation adjustment is consistent with other \ntransmission service study processes. \n \n \nPursuant to proposed Attachment BG, SPP will perform an assessment of the \nimpact of the requested delivery point configuration change on the Transmission \nSystem and, if requested by the Transmission Customer, will provide information \ndetailing the limitations of the Transmission System in supporting any PAL.84 SPP will \nsend a study report to the Transmission Customer and Host Transmission Owner within \nninety (90) Calendar Days of all parties (SPP, Host Transmission Owner, and the \n \n77  \nId. at Section 2.0. \n78  \nId. \n79  \nId. \n80  \nSee Tariff, Attachments AQ, AX, BA, and BC. \n81 \nProposed Tariff, Attachment BG, Section 3.1. \n82 \nProposed Tariff, Attachment BG, Section 3.2. \n83 \nId. \n84  \nProposed Tariff, Attachment BG, Section 3.2."},{"page":16,"startToken":6023,"endToken":6374,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 16 \n \nTransmission Customer) agreeing to study assumptions, unless a reason is given by \nSPP for the delay in providing the study report.85  \n \nPDPLA study results are valid for one (1) year after the study report is \ndelivered, or for a shorter period if the Host Transmission Owner’s PALCS agreement \nrequires it. SPP will close the PDPLA billing period within thirty (30) Calendar Days \nafter the last study report is delivered.86 Setting an expiration date ensures that a \nPALSA is based on a reasonably current assessment of the Transmission System. The \nTransmission Customer and the Host Transmission Owner must agree in writing on \neach party’s responsibility for engineering, design, construction, and cost of the \nfacilities identified in the PALCS.87 \n \n4. \nResults of PALS Study Process \n \nAfter SPP completes the PALS study process outlined in Attachment BG, SPP \nwill determine the PALS Capacity that will be granted for the PALS.88 If SPP \ndetermines that there will not be adequate transfer capability to satisfy the full amount \nof requested PALS Capacity due to considerations on the Transmission System or any \nthird-party systems, SPP will offer the portion of the requested PALS Capacity that can \nbe accommodated without addition of any network facilities.89   \n \nSPP and the Transmission Owner will not be responsible for making \narrangements for any necessary engineering, permitting, or construction of \ntransmission or distribution facilities on the system(s) of any other third-party entity or \nfor obtaining any regulatory approval for such facilities.90 Nonetheless, SPP and the \naffected Transmission Owner(s) will undertake reasonable efforts to assist the \nTransmission Customer in obtaining such arrangements, including providing required \ninformation or data pursuant to Good Utility Practice.91 \n \nThe costs of constructing, operating, maintaining, or retiring a PALS delivery \npoint, other than any required Network Upgrades, will be recovered under the Tariff, \n \n85  \nId. \n86 \nProposed Tariff, Attachment BG, Section 3.3. \n87 \nProposed Tariff, Attachment BG, Section 4.0. \n88  \nProposed Tariff, Part VIII, Section 57.7. \n89  \nId. \n90  \nProposed Tariff, Part VIII, Section 59.1. \n91  \nId."},{"page":17,"startToken":6374,"endToken":6760,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 17 \n \nincluding Attachment BG, and Commission policy.92 If a design changes because \nfacilities cannot be sited or constructed as proposed, or if new statutory or regulatory \nrequirements or other circumstances beyond SPP’s or the Transmission Owner’s \ncontrol significantly affect costs, a revised good faith estimate is required.93 These \nprovisions mirror the corresponding provisions for CHILLS in Part VII, Sections 49.2 \nand 49.3 of the Tariff. \n \n5. \nPAL Service Agreement \n \n \nAs part of this filing, SPP is proposing a new pro forma service agreement for \nPALS, which is attached as Addendum 2 of Attachment BG to the Proposed Tariff.94 \nThe PALSA is modeled after the current Non-Firm Point-To-Point Transmission \nService Agreement (Attachment B)95 and the Network Integration Transmission \nService (“NITS”)96 Agreement (Attachment F).97 The PALSA includes language that \nis similar to the Attachment B and Attachment F service agreements, such as: (1) the \nparties’ names; (2) a statement that the Transmission Customer completed an \napplication pursuant to the Tariff requirements; (3) a statement that an authorized agent \nhas requested PALS; (4) a statement that the authorized agent agrees to take PALS \nsubject to the provisions of the Tariff; (5) the delivery points of the PALS and the \nlocation of the load; (6) applicable Tariff-authorized transmission and ancillary service \ncharges; and (7) requirements for power losses.98 Unlike other service agreements for \nfirm transmission service, the PALSA provides that the Transmission Customer will \nreceive the delivery of energy subject to availability and to Curtailment, Interruption, \nor load shed under the terms of the Tariff, including Section 58 of Part VIII and \nAttachment BG of the Proposed Tariff.99 Section 11.0 of the PALSA also requires the \nTransmission Customer to have control technologies and/or protection systems, while \nmay include a special protection scheme, to keep withdrawals within the PALS Usage \n \n92 \nProposed Tariff, Part VIII, Section 59.2. \n93 \nProposed Tariff, Part VIII, Section 59.3. \n94  \nProposed Tariff, Attachment BG, Addendum 2. \n95  \nTariff, Attachment B. \n96  \nTariff, Part I, Section 1, Definition of Network Integration Transmission Service (“The \ntransmission service provided under Part III of the Tariff.”). \n97  \nTariff, Attachment F. \n98  \nProposed Tariff, Attachment BG, Addendum 2. \n99  \nProposed Tariff, Attachment BG, Addendum 2, Section 6.0."},{"page":18,"startToken":6760,"endToken":7183,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 18 \n \nLimit, Curtailment limit, and Interruption limit.100 This requirement is consistent with \nthe Show Cause Order.101 The PALSA contains an appendix that provides information \nregarding PAL delivery points and the amount of PALS Capacity studied.102 \n \n \nThe PALSA outlines the rights and responsibilities of the parties and specifies \nwhich Tariff sections apply to the Transmission Customer for SPP’s provision of \nenergy at the PALS delivery point. Importantly, Section 17.0 of the PALSA requires \nthat each PAL have a separate metered quantity, apart from any firm load served at the \nsame point of delivery, and that any generation located at the same point of delivery \nwill be metered separately from the PAL and separately from any firm load at the same \npoint of delivery. The separately metered quantities are necessary as PALS is neither \nNITS nor Point-To-Point Transmission Service and must be billed differently and \ndistinctly from other transmission service taken at the same delivery point. Although \nTransmission Customers are required to take the same type of transmission service at \nthe same point of delivery, providing PALS at potentially the same location as other \nservice is necessary to accommodate the unique needs of large loads for a new type of \nnon-firm, conditional transmission service.  \n \nSection 17.0 also describes how Transmission Customers will be charged in \ninstances where both Network Load and PALS load are located at the same point of \ndelivery as Behind-The-Meter Generation. Section 17.0 states: \n \nFor instances where both Network Load and PALS load are \nlocated at the same point of delivery with Behind-The-Meter \nGeneration, as defined in Attachment AE of the Tariff, the \nNetwork Load must be adjusted to (1) add the hourly output \nof any Behind-The-Meter Generation that is located on the \nNetwork Load side of the Network Integration Transmission \nService (“NITS”) meter and is not behind a PALS meter, and \n(2) subtract the positive (inflow, or PALS load) or negative \n(outflow) amount registered on any PALS meter located \nbehind the NITS meter.103   \n \nThis provision accounts for Behind-The-Meter Generation so that all generation \nand load are properly reflected in transmission settlements and no load reported for \nNITS is netted.  The Network Load amount will be adjusted to add the MW amount of \n \n100  \nProposed Tariff, Part VIII, Section 56.1(g); Attachment BG, Addendum 2, Section \n11.0. \n101  \nShow Cause Order at PP 83, 87. \n102  \nProposed Tariff, Attachment BG, Addendum 2, Appendix 1. \n103  \nProposed Tariff, Attachment BG, Addendum 2, Section 17.0."},{"page":19,"startToken":7183,"endToken":7497,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 19 \n \nBehind-The-Meter Generation that is displacing Network Load.104  This treatment is \nconsistent with SPP’s existing practice of no netting Behind-The-Meter Generation in \ndetermining NITS charges. It also makes PALS available to Eligible Customers serving \nload with Behind-The-Meter Generation, a category of Eligible Load identified in the \nShow Cause Order.105 \n \nAfter SPP provides the PDPLA study report to the Transmission Customer and \ndetermines that the customer is eligible to receive PALS, the Transmission Customer \nmay request that SPP update or provide a new PALSA106 for the studied PAL delivery \npoint. After SPP and the Transmission Customer execute the PALSA, SPP will submit \nthe PALSA to the Commission in compliance with applicable Commission \nregulations.107 Concurrently with the submittal of the PALSA, a transmission service \nrequest will be entered into SPP's OASIS to reflect necessary service and the PALS \nCapacity levels for billing purposes.108 \n \nThe PALSA also addresses termination. Service ends at the end of the term \nstated in the agreement, or earlier if the Tariff is terminated, the customer requests \ntermination, or other transmission service is established for the PAL. SPP may \nterminate the PALSA if PALS is not used for one (1) year. After termination, the \ncustomer may not take capacity above the level of any other transmission service it \nholds at the delivery point.109 The PALSA may not be assigned, resold, or transferred, \nconsistent with Part VIII, Section 54.5 of the Tariff.110 It also requires the customer to \ntake Ancillary Services under Schedules 1, 1-A1, and 2 through 6.111 \n \n \n \n104  \nId. \n105  \nShow Cause Order at n.140. \n106  \nProposed Tariff, Attachment BG, Addendum 2. \n107  \nProposed Tariff, Attachment BG, Section 5.0.  \n108  \nId. \n109 \nProposed Tariff, Attachment BG, Addendum 2, Section 9.0. \n110 \nId. at Section 14.0. \n111 \nId. at Section 20.0."},{"page":20,"startToken":7497,"endToken":7868,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 20 \n \n6. \nPALS Operating Agreement \n \n \nThe PALS Operating Agreement,112 in Addendum 3 to Attachment BG, is \nsubstantially similar to the pro forma Operating Agreement for CHILLS (“CHILLS \nOperating Agreement”) in Addendum 2 to Attachment BA of the Tariff).113 Similar to \nthe CHILLS Operating Agreement, the PALS Operating Agreement outlines the terms \nand conditions under which SPP, the Host Transmission Owner, and the Transmission \nCustomer will coordinate, describes how the Host Transmission Owner and the \nTransmission Customer will operate their respective systems, and specifies the \nequipment that will be installed and operated.114 The PALS Operating Agreement is \nnecessary for coordination among SPP, the Transmission Customer, and the Host \nTransmission Owner to ensure the safe and reliable operation of the Transmission \nSystem.  \n \n7. \nAdditional Provisions Under Part VIII of the Proposed Tariff  \n \n \nPrior to the SPP providing the PALS Service Commencement Date,115 SPP, the \naffected Transmission Owner(s), and the Transmission Customer, or a third party, must \ncomplete installation of all equipment specified under the PALS Operating Agreement \nconsistent with Good Utility Practice and any additional requirements reasonably and \nconsistently imposed to ensure the reliable operation of the Transmission System.116 \nSPP and the affected Transmission Owner(s) are required to exercise reasonable \nefforts, in coordination with the Transmission Customer, to complete such \narrangements as soon as practicable, taking into consideration the Service \nCommencement Date.117 \n \n \n112  \nProposed Tariff, Part I, Section 1, Definition of PALS Operating Agreement (“An \nexecuted agreement that contains the terms and conditions under which the \nTransmission Customer or Network Customer will operate its facilities and the \ntechnical and operational matters associated with the implementation of PALS under \nPart VIII of the Tariff.”). \n113  \nCompare Proposed Tariff, Attachment BG, Addendum 3 with Tariff, Attachment BA, \nAddendum 2. \n114  \nProposed Tariff, Attachment BG, Addendum 3. \n115  \nTariff, Part I, Section 1, Definition of Service Commencement Date (“The date the \nTransmission Provider begins to provide service pursuant to the terms of an executed \nService Agreement, or the date the Transmission Provider begins to provide service in \naccordance with Section 15.3 or Section 29.1 under the Tariff.”). \n116  \nProposed Tariff, Part VIII, Section 57.3. \n117  \nId."},{"page":21,"startToken":7868,"endToken":8250,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 21 \n \nSPP or its agent must have access to the metering data needed for measurement \nand billing under the PALSA.118 Unless otherwise agreed, the customer must maintain \na power factor within the range SPP specifies in consultation with the Transmission \nOwners, as set out in the PALS Operating Agreement.119 \n \n8. \nLoad Shedding and Curtailments related to PALS \n \n \nAs previously stated, PALS is subject to Curtailment on a non-discriminatory \nbasis in the event the Transmission System is constrained or under Emergency \nConditions.120 SPP reserves the right to curtail (or cause to be curtailed), in whole or in \npart, PALS for any reliability conditions that threaten to impair or degrade the \nreliability of the Transmission System or the systems directly or indirectly \ninterconnected with the Transmission System.121 Prior to the PALS Service \nCommencement Date, SPP, in coordination with the affected Transmission Owner(s) \nand the Transmission Customer, will establish Load Shedding and Curtailment \nprocesses pursuant to the PALS Operating Agreement, as described above, with the \nobjective of responding when an Emergency Condition or other unforeseen condition \nthreatens to impair or degrade the reliability of the Transmission System or systems \ninterconnected with the Transmission System.122 The parties, including the affected \nTransmission Owner(s), will implement Load Shedding and Curtailment processes \nduring any period when SPP determines that such system conditions exist and actions \nare necessary to alleviate said conditions.123 SPP will notify all affected Transmission \nCustomers and Transmission Owners of any scheduled Curtailment in a timely manner \nor as soon as practical in instances when it is impractical to provide advance notice.124 \n \n \nAdditionally, during any period when SPP determines that a transmission \nconstraint exists on the Transmission System, and such constraint may impair the \nreliability of the Transmission System, SPP will take whatever actions, consistent with \nGood Utility Practice and Attachment BG of the Proposed Tariff, that are reasonably \nnecessary to maintain the reliability of the Transmission System.125 To the extent SPP \n \n118 \nProposed Tariff, Part VIII, Section 60.2. \n119 \nProposed Tariff, Part VIII, Section 60.3. \n120  \nProposed Tariff, Part VIII, Section 54.2. \n121  \nProposed Tariff, Part VIII, Section 58.1. \n122  \nId. \n123  \nId. \n124  \nId. \n125  \nProposed Tariff, Part VIII, Section 58.2."},{"page":22,"startToken":8250,"endToken":8598,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 22 \n \ndetermines that the reliability of the Transmission System can be maintained by \ncurtailing a PAL, SPP will initiate procedures consistent with the PALS Operating \nAgreement to curtail PALS as described in Attachment AE.126 \n \nWhen SPP implements least-cost redispatch to relieve a transmission constraint, \nall Transmission Customers and Network Customers, including PALS customers, pay \ntheir share of redispatch costs through settlement of the Energy and Operating Reserve \nMarkets under Attachment AE.127 If SPP determines that deliveries must be curtailed, \nthe parties will curtail them in accordance with the PALS Operating Agreement.128 \n \n \nTo the extent that a system contingency exists on the Transmission System and \nSPP determines that it is necessary for the affected Transmission Owner(s) and \nTransmission Customers to shed load, the parties must shed load in accordance with \nthe procedures of the PALS Operating Agreement.129 \n \n \nIf the Transmission Customer fails to fully respond to established Load \nShedding and Curtailment procedures or to cease or reduce service in response to a \ndirective by SPP, the Transmission Customer will pay any applicable charges and the \npenalty as described in Section 54.4 of Part VIII of the Proposed Tariff and as discussed \nin further detail below.130  \n  \n9. \nRates for PALS, Failure to Curtail PALS, and Exceedance of \nPALS Capacity \n \n \nBecause PALS charges, while similar to those for hourly Non-Firm Point-To-\nPoint Transmission Service, differ from other transmission charges in the Tariff, SPP \nproposes a new schedule, Schedule 16, to outline charges related to PALS.131 The \nTransmission Customer must compensate SPP for the PALS up to the monthly sum of \nthe applicable charges outlined in Schedule 16, in addition to any other applicable \ncharges specified in the Tariff.132 Specifically, the Transmission Customer must pay \n \n126  \nId. \n127 \nProposed Tariff, Part VIII, Section 58.3. \n128 \nProposed Tariff, Part VIII, Section 58.4. \n129  \nProposed Tariff, Part VIII, Section 58.5. \n130  \nProposed Tariff, Part VIII, Section 58.6. \n131  \nProposed Tariff, Schedule 16. \n132  \nId.; see also Proposed Tariff, Part VIII, Section 61."},{"page":23,"startToken":8598,"endToken":8976,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 23 \n \nthe zonal rate (per kilowatt) based upon the Zone133 where the PAL is located.134 The \nzonal rate will be the hourly rate applicable to Non-Firm Point-To-Point Transmission \nService for the specific on-peak or off-peak hour of the PALS Usage.135 For each hour, \nthe hourly charge will be calculated using kilowatts of the PALS Usage, subject to other \nprovisions in Schedule 16.136   \n \nThe application of hourly Non-Firm Point-To-Point Transmission Service rates \nis appropriate because it addresses the expected dynamic use of the Transmission \nSystem by the PAL. Charging the rate applicable to the specific on-peak or off-peak \nhour for the PALS Usage appropriately aligns with the Transmission Customer’s \nauthorization to utilize the Transmission System in each hour. Capping the monthly \nPALS charge at the monthly Non-Firm Point-To-Point Transmission Service rate \nmultiplied by the maximum hourly PALS Usage in that month further aligns PALS \nwith Non-Firm Point-To-Point Transmission Service.137 \n \nPALS customers also pay the Base Plan Zonal Charge, Subregional Charge, \nand Region-wide Charge under Schedule 11. Each is assessed hourly at the applicable \nNon-Firm Point-To-Point Transmission Service rate for the specific on-peak or off-\npeak hour of PALS Usage.138 Each of these charges is capped for the month at the \napplicable monthly rate multiplied by the maximum hourly PALS Usage in that month, \nwhich matches the cap on the Schedule 16 transmission charge.139 Schedule 11 \nrevenues from PALS are credited against Transmission Owners’ annual transmission \n \n133  \nTariff, Part I, Section 1, Definition of Zone (“The geographic area of the facilities of a \nTransmission Owner or a specific combination of Transmission Owners as specified \nin Schedules 7, 8, and 9.”).  \n134  \nProposed Tariff, Schedule 16, Section 1. \n135  \nId. \n136  \nId. \n137  \nTariff, Part I, Section 1, Definition of Non-Firm Point-To-Point Transmission Service \n(“Point-To-Point Transmission Service under the Tariff that is reserved and scheduled \non an as-available basis and is subject to Curtailment or Interruption as set forth in \nSection 14.7 under Part II of this Tariff.  Non-Firm Point-To-Point Transmission \nService is available on a stand-alone basis for periods ranging from one hour to one \nmonth.”). \n138 \nProposed Tariff, Schedule 11, Section VI; Schedule 16, Section 7. \n139 \nProposed Tariff, Schedule 16, Section 7."},{"page":24,"startToken":8976,"endToken":9384,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 24 \n \nrevenue requirements in the same way as Point-To-Point Transmission Service and \nCHILLS revenues.140 \n \nIf the Transmission Customer exceeds its PALS Usage Limit at any delivery \npoint, the Transmission Customer must pay, in addition to the charges for all of the \nPALS Usage, one-hundred percent (100%) of the Non-Firm Point-To-Point \nTransmission Service charges under Schedules 8 and 11 for the period when the \nadditional service was used, as detailed in Proposed Section 54.4.141 SPP will \ncompensate the Transmission Owners for service and allocate penalty revenues in the \nmanner as described in Section 54.4 of the Proposed Tariff.142 The application of \nSchedule 8 and Schedule 11 charges is appropriate because unreserved use at a PALS \ndelivery point will be monitored and charged at a time granularity similar to Non-Firm \nPoint-To-Point Transmission Service. An excess of one (1) hour or less will be billed \nat the charge for weekday deliveries.143 Repeated daily use of unreserved capacity \nwithin a seven-day period will increase the duration of the period to a weekly duration \nand multiple instances of unreserved use during more than one seven-day period during \na calendar month will increase the duration of the period to a month.144  \n \nTransmission Customers taking PALS will be responsible for any real power \nlosses.145 The delivery loss factors are set forth in Appendix 1 to Attachment M of the \nTariff146 and will be applied to the PALS Usage amount, including any load exceeding \nthe PALS Usage Limit.147 This reflects the fact that PALS is served and metered at the \ndelivery point of the load, similar in this regard to Network Load.  \n \nThe treatment of PALS unreserved use under these Proposed Tariff provisions \naligns with the treatment of Non-Firm Point-To-Point Transmission Service unreserved \nuse. Revenues received for unreserved use of the Transmission System will be \ndistributed pursuant to the provisions of Section 54.4 of Part VIII of the Proposed \n \n140 \nProposed Tariff, Schedule 11, Section II.A. \n141  \nProposed Tariff, Part VIII, Section 54.4. \n142  \nProposed Tariff, Part VIII, Section 58.6. \n143  \nProposed Tariff, Part VIII, Section 54.4. \n144  \nProposed Tariff, Part VIII, Section 54.4. \n145  \nProposed Tariff, Part VIII. Section 55.3; see also Proposed Tariff, Attachment M, \nSection VI. \n146  \nTariff, Attachment M, Appendix 1. \n147  \nProposed Tariff, Part VIII. Section 55.3; see also Proposed Tariff, Attachment M, \nSection VI."},{"page":25,"startToken":9384,"endToken":9771,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 25 \n \nTariff. Consistent with other unreserved use charges outlined in the Tariff, the \nTransmission Customer receiving PALS must purchase losses pursuant to Section 55.3 \nof the Proposed Tariff for amounts exceeding the PALS Usage Limit.148 These \nunreserved use charges reflect that the PAL is to use only the PALS Capacity that was \nstudied through the transmission service process described in Attachment BG and is to \nappropriately respond to Curtailment or Load Shedding directives from SPP. \n \n \nProposed Schedule 16 also outlines other charges that are applicable to PALS \nwhich are consistent with similar charges applicable to other transmission service \ntypes, such as Redispatch Costs specified in Attachment K and applicable Wholesale \nDistribution Service Charges.149 \n \n10. \nPALS Satisfies the Show Cause Order’s Non-Firm Contract \nDemand Directive, With Appropriate Regional Variation \n \n \nThe Show Cause Order directed SPP to explain “whether the Tariff remains just \nand reasonable without (1) an interim non-firm network transmission service while \nNetwork Upgrades are being constructed (i.e., interim NITS) and (2) permanent firm \nand non-firm contract demand transmission services (transmission service up to a \nspecified MW quantity, i.e., the contract level, on a firm or non-firm basis).”150  PALS \nresponds to the non-firm element of the second part of that directive. It establishes a \nnon-firm service that serves the same purpose as the non-firm contract demand (“Non-\nFirm Contract Demand”) transmission service the Commission required of PJM, with \nregional variations appropriate to SPP. SPP addresses interim NITS and firm contract \ndemand service in the separate filings identified in Section V. \n \n \nIn the PJM Co-Location Order, the Commission “establish[ed] a new Non-Firm \nContract Demand transmission service to be offered to Eligible Customers taking \nservice on behalf of Co-Located Loads.”151 The following are requirements the \nCommission established for the Non-Firm Contract Demand service: \n \n• “We find that the new Non-Firm Contract Demand transmission service must \nbe available during normal operations and curtailed during emergency \noperations (i.e., it will be curtailed before existing firm transmission services \nand the new Firm Contract Demand Transmission Service).”152 \n \n148  \nProposed Tariff, Part VIII, Sections 54.4 and 55.3. \n149  \nProposed Tariff, Schedule 16, Sections 3 and 6. \n150  \nShow Cause Order at P 83. \n151  \nPJM Co-Location Order at P 214. \n152  \nId. at 215."},{"page":26,"startToken":9771,"endToken":10166,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 26 \n \n• “Reservations under this service would be available only when there is available \ntransmission capacity, similar to existing non-firm transmission service options \nin the Tariff.”153 \n• “Reservations for this service shall be available for terms ranging from one hour \nto one month, consistent with the terms available for Non-Firm PTPS in the \nPJM Tariff.”154 \n• “[S]hould the Eligible Customer taking the Non-Firm Contract Demand \ntransmission service on behalf of the Co-Located Load make unreserved use of \nthe transmission system by withdrawing energy in excess of its transmission \nservice reservation, PJM must apply a penalty rate in such circumstances.”155 \n• “The new Non-Firm Contract Demand transmission service will not include a \ncharge for generation capacity. Because it is non-firm transmission service, \nPJM will not have an obligation to serve Eligible Customers taking this new \nNon-Firm Contract Demand transmission service on behalf of Co-Located \nLoads; thus, unlike Network Load, Co-Located Loads on whose behalf Eligible \nCustomers are taking Non-Firm Contract Demand transmission service would \nnot be considered for resource adequacy planning purposes.”156 \n \nSimilar to the Non-Firm Contract Demand, the PALs will be available during \nnormal operation and will be curtailed during emergency operations. Also, PALS will \nbe as-available, similar to hourly Non-Firm Point-to-Point Transmission Service \navailable in the Tariff. PALS customers will also be charged for any unreserved use of \nthe transmission system, including above the PALS capacity or failure to not curtail \nwhen directed by SPP. Lastly, PALS will not be required to bring any supported \ngeneration to support load and as such the load will not be included in any SPP resource \nadequacy planning process.  \n \nUnlike Non-Firm Contract Demand, PALS is not a reserved capacity \ntransmission product. PALS is flexible to allow the PALS customer to withdraw from \nthe Transmission System, on an as-available basis, and only pay when it withdraws, \ninstead of paying for the reservation. The PALS is billed only on an hourly basis when \nthe Transmission Customer takes the service, but the PALS charges will be capped at \nthe monthly Point-To-Point Transmission Service price.  \n \nThe Show Cause Order expressly contemplated “regional variation as \nappropriate.” PALS gives Eligible Customers serving flexible loads a non-firm \ntransmission service up to a specified MW quantity (the PALS Capacity). It therefore \n \n153  \nId. \n154  \nId. \n155  \nId. at 217. \n156  \nPJM Co-Location Order at P 218."},{"page":27,"startToken":10166,"endToken":10549,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 27 \n \nsupplies the service the Commission found lacking in the Tariff, adapted to SPP’s \nmarket design. With PALS in place, the Tariff is just and reasonable with respect to \nnon-firm contract demand service.  \n \nAs described in SPP’s responsive filing in EL26-68-000, SPP’s Tariff remains \njust and reasonable without the remaining transmission service products outlined in the \nPJM Co-Location Order, either because existing or concurrently proposed Tariff \nprovisions provide comparable service or because regional differences warrant a \ndifferent approach. \n \n \n11. \nPALS Will Not Disrupt Existing Commercial Arrangements \n \nThe Show Cause Order directs that any Section 205 filing explain how the \nproposal will avoid disrupting existing commercial arrangements and identify a \nreasonable effective date that accommodates them.157 PALS satisfies this requirement. \nPALS is a new, voluntary service option. It does not modify any existing service \nagreement, transmission service reservation, or pending study request, and it does not \nalter the terms of existing transmission service processes (i.e. NITS, Point-To-Point \nTransmission Service, CHILLS, HILLS). No existing customer is required to convert \nto PALS, and Eligible Customers with agreements nearing completion are free to \nproceed under existing Tariff process. Because PALS is an as-available service with \npriority equal to hourly Non-Firm Point-To-Point Transmission Service, it does not \nreduce the Available Transfer Capability available to firm customers or CHILLS. As \ndiscussed in Section VI, PALS will apply prospectively once SPP implements the \nnecessary system changes, currently targeted for the second quarter of 2028. \n \nC. \nSPP Integrated Marketplace Requirement for PALS \n \n1. PALS Integrated Marketplace Overview \n \nPALS combines a new form of non-firm transmission service with a new \nframework for dispatchable load participation in SPP’s Integrated Marketplace. To \nreflect the price sensitivity and operational flexibility that distinguish PALs from \nconventional load, SPP proposes revisions to Attachment AE that allow PALs to submit \na different form of Energy Bids and to receive Dispatch Instructions. The proposed \nmarket rules also establish appropriate bidding parameters, operating limits, settlement \nrequirements, and consequences for deviations from SPP’s instructions. \n \nCurrently, in the Integrated Marketplace, all load (except for CHILLs) to be \nserved by the market uses the same processes. In the Day-Ahead Market, the Market \nParticipants submit the MW quantity and location of physical load through use of \n \n157  \nShow Cause Order at P 32."},{"page":28,"startToken":10549,"endToken":10998,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 28 \n \nDemand Bids158 and can also submit Virtual Energy Bids.159 These Demand Bids and \nVirtual Energy Bids may be fixed or price sensitive. After the Day-Ahead Market, SPP \nuses a load forecast to determine the amount of load to be served for the Reliability \nUnit Commitment (“RUC”) processes and the RTBM.160 Because SPP uses a forecast \nfor the RUC processes and the RTBM, there is currently not a way for market processes \nto distinguish between non-firm loads based on price sensitivity, as there is in the Day-\nAhead Market. In order for price-sensitive loads to have that price-sensitivity reflected \nin the RTBM, they must register and participate as Demand Response and must also \nreserve firm transmission service.  \n \nPALs are distinct from Demand Response. Unlike PALs, Demand Response is \nprovided by loads with existing firm service that voluntarily curtail energy withdrawals \nand relinquish their previously contracted firm right to consume energy. Such \nparticipation is contingent upon meeting applicable program requirements, including \nconfirmation of Resource Adequacy where required. PALS, like CHILLS, is not a firm \nservice. PALs will pay different transmission rates, will not have transmission built to \nserve them, and do not require adequate Resources to serve them on a firm basis. Unlike \nDemand Response, compensating PALs for reducing withdrawals that they have no \nfirm right to take would pay them for forgoing service they never purchased.  \n \n2. PALS Energy Bids \n \nSPP proposes to define the PAL Energy Bid Curve as Megawatt and dollars per \nMegawatt-hour with up to ten (10) price/quantity pairs.161 These are the same \nlimitations on Energy Offer Curves and Demand Bid Curves used in the Day-Ahead \nMarket.  This allows PALs the ability to economically participate in the market and to \nreflect their flexibility via the PAL Energy Bid Curve submitted. \n \nFor PALS, SPP proposes to allow PALs to enter PAL Energy Bids and have \nthat price sensitivity function in both the Day-Ahead Market and the RTBM. PAL \nEnergy Bids include the following parameters:  (1) PAL Energy Bid Curve, (2) \n \n158  \nTariff, Attachment AE, Section 1.1, Definition of Demand Bid (“A proposal by a \nMarket Participant associated with a physical load to purchase a fixed or price sensitive \namount of Energy at a specified location and period of time in the Day-Ahead \nMarket.”). \n159  \nTariff, Attachment AE, Section 1.1, Definition of Virtual Energy Bid (“A proposal by \na Market Participant to purchase Energy at a specified price, Settlement Location and \nperiod of time in the Day-Ahead Market that is not associated with a physical load.”). \n160  \nTariff, Attachment AE, Section 3.1.2(1). \n161  \nProposed Tariff, Attachment AE, Section 1.1."},{"page":29,"startToken":10998,"endToken":11449,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 29 \n \nWithdrawal Ramp Rate,162  (3) Maximum Daily Withdrawal,163 (4) Maximum \nWithdrawal Limit,164 (5) RTBM Maximum Withdrawal Limit165 (RTBM only), and (6) \nIntra-Interval Maximum Withdrawal Limit166 (RTBM only).167 These inputs in the new \nSection 4.3.4 of Attachment AE give SPP insight into the behavior and abilities of the \nPAL in a way that will allow SPP to economically dispatch it.  \n \nA bid cap is necessary because PALs differ from other loads served by the \nTransmission System. PALs do not directly fund Network Upgrades or bring \nsupporting Resources, and the Transmission System is not planned or expanded to \nserve them. Absent a bid cap, however, the market optimization would treat PAL \nEnergy Bids like any other demand. When PAL withdrawals cause a transmission \nconstraint to bind in a given interval, the optimization could redispatch Resources \naround that constraint, potentially at significant cost, to keep serving the PAL. The cost \nof that redispatch shows up as congestion and raises Locational Marginal Prices \n(“LMP”) for firm loads that are responsible for directly assigned costs related to \nNetwork Upgrades needed to establish the transmission service. A bid cap prevents this \nby limiting PAL withdrawals when LMPs exceed the established cap, so PALs \nconsume energy only when the system can serve them while containing the costs to \nfirm load customers. In this respect, PALS is most comparable to Non-Firm Point-To-\nPoint Transmission Service, which is also as-available, does not directly fund Network \nUpgrades, and upon which PALS rates are based. Non-Firm Point-To-Point \n \n162  \nProposed Tariff, Attachment AE, Section 1.1, Definition of Withdrawal Ramp Rate \n(“A Bid parameter for PALs consisting of a curve specifying the maximum \nMW/minute ramp rates used for dispatching the PAL in the direction of increasing \nwithdrawal.”). \n163  \nProposed Tariff, Attachment AE, Section 1.1, Definition of Maximum Daily \nWithdrawal (“A daily parameter for PALs specifying the maximum total withdrawal \nacross an Operating Day in Megawatt hours.”). \n164  \nProposed Tariff, Attachment AE, Section 1.1, Definition of Maximum Withdrawal \nLimit (“A Bid parameter for Price Adaptive Load specifying the maximum Megawatt \nquantity a Price Adaptive Load is willing to consume in a specific Operating Hour.”). \n165  \nProposed Tariff, Attachment AE, Section 1.1, Definition of RTBM Maximum \nWithdrawal Limit (“A Real-Time Bid parameter for a Price Adaptive Load that \nestablishes the maximum withdrawal dispatch in the RTBM for a specific Dispatch \nInterval.”). \n166  \nProposed Tariff, Attachment AE, Section 1.1, Definition of Intra-Interval Maximum \nWithdrawal Limit (“A continuously updateable Bid for PALS parameter specifying the \nReal-Time maximum withdrawal MW limit used in the calculation of the Setpoint \nInstruction.”). \n167  \nProposed Tariff, Attachment AE, Section 4.3.4."},{"page":30,"startToken":11449,"endToken":11889,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 30 \n \nTransmission Service, however, is granted only when SPP determines that transmission \ncapacity is available, which limits its effect on LMPs. Because PALs are instead \ndispatched economically by the market, the bid cap serves a comparable function, \nallowing SPP to realize the operational and efficiency benefits of flexible load \nparticipation while protecting other loads from the costs of serving load without \nsupporting transmission or generation.  \n \nSPP proposes to cap the high end of PAL Energy Bid Curves at $25/MWh.168 \nAs discussed below, SPP selected this level based on simulations of PAL participation \nunder a range of bid caps and on stakeholders' preference for an initially conservative \nbid cap. \n \nThe proposed fixed $25 bid cap is just and reasonable. Because PALs represent \na new load participation model in the Integrated Marketplace, no historical operational \nexperience or market data currently exists to support a more dynamic or formula-based \napproach. Under these circumstances, a fixed bid cap provides transparency, certainty,  \nand administrative simplicity as SPP integrates PALs into market operations and gains \nexperience with their performance and impacts. \n \nTo ensure the bid cap remains appropriate over time, SPP will review the bid \ncap, at minimum, annually.169 As operational experience and market data become \navailable, SPP will evaluate whether modifications to the bid cap are warranted, \nincluding the potential adoption of a formula-based methodology in the future. \n \nSPP bases its proposed $25 bid cap on simulation information that balances \nseveral different interests. SPP sought to balance protection of load from high LMPs, \nprotect reliability, increase transmission revenues, prevent excessive wear from \nResource start-ups, limit utilization of emissions permit constrained or duration limited \nresources, more fully use available wind generation, reduce make whole payments, and \nallow PALs to have a load factor that allows them to be viable. Using historical SPP \nmarket data, SPP compared a base case with no PALs against scenarios in which PALs \nparticipated under fixed bid caps ranging from $20 to $35.170  \n \nThe simulation results indicate that a $25 bid cap captures the system benefits \nof PAL participation while limiting the impact on other customers. For example, the \n \n168  \nProposed Tariff, Attachment AE, Section 4.3.4.1. \n169  \nSee Revision Request 791, Proposed Market Protocols, Section 4.2.3.4.1, available at: \nhttps://www.spp.org/spp-documents-filings/?id=21069. \n170  \nThe simulations modeled 10 PALs, each 200 MW, at Settlement Locations with \nhistorically low LMPs. Each simulation covered seven consecutive days (the 10th \nthrough the 16th) of every other month beginning in February 2025, or 42 days in total, \nto capture seasonal and weekday/weekend dynamics."},{"page":31,"startToken":11889,"endToken":12395,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 31 \n \nadditional wind generation dispatched in the RTBM relative to the base case increased \nfrom the $20 to the $25 scenario but did not increase further at higher bid caps. Gas-\nfired Resource start-ups also declined relative to the base case, with most of the \nreduction occurring at or below the $25 bid cap. At the same time, a $25 bid cap allows \nmeaningful PAL participation. Raising the cap from $20 to $25 increased the PAL load \nfactor in the RTBM from 45 percent to 60 percent, the largest increase of any step \nstudied, which supports the viability of PALs as a service. In contrast, price impacts to \nother customers rose more quickly above $25: the average RTBM LMP increased by \n$0.20/MWh between the $20 and $25 scenarios, but by $0.80/MWh between the $25 \nand $30 scenarios. Taken together, these results indicate that a $25 bid cap strikes a \njust and reasonable balance among the interests described above. \n \nThe proposed $25 bid cap is also not unduly discriminatory. It applies uniformly \nto every PAL, and PALs are not similarly situated to loads that are not subject to it. \nFirm loads must be supported by accredited capacity and receive firm service; CHILLs \nmust have supporting generation in commercial operation. PALs have no Resource \nAdequacy obligation and are added without supporting generation. All else equal, \nadding load without adding supply raises LMPs for existing customers. The cap \nconfines PAL withdrawals to the highly price-elastic portion of SPP's supply curve, \nwhere added demand has the least price impact. \n \nPALS represents a different approach to non-firm load than CHILLS and is \ndesigned for loads with price-flexibility central to their business case. CHILLS is a \nbridge to firm service, so the approach to when to reduce service to CHILLs is more \nreliability centered. The approach to PALS is a capped economically centered approach \nwith additional limits for reliability.  \n \n3. Dispatch, Settlement, and Uninstructed Load Deviation \n \nSPP will use the PAL Energy Bids to issue Dispatch Instructions for the PAL. \nIf the LMP at the PAL Settlement Location is above $25, then the PAL will receive \nDispatch Instructions for a 0 MW withdrawal. Under other conditions, the PAL may \nbe instructed to withdraw some or all of the MW up to their Maximum Withdrawal \nLimit, depending on its PAL Energy Bid Curve. In the Integrated Marketplace, PALs \nthat are outside of their Operating Tolerance may be assessed an Uninstructed Load \nDeviation (“ULD”)171 charge, as well as be assessed RUC make whole payment \ndistribution. ULD charges and RUC make whole payment distribution are market \ncharges, and work within the market. Separately, because PALS is a transmission \nservice, a PAL that withdraws more than its PALS Usage Limit, including during a \n \n171  \nProposed Tariff, Attachment AE, Section 1.1, Definition of Uninstructed Load \nDeviation (“The Megawatt quantity by which a PAL’s Reported Load in a Dispatch \nInterval deviates from the instruction issued by the local transmission operator or \nTransmission Provider.”)."},{"page":32,"startToken":12395,"endToken":12896,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 32 \n \nCurtailment, will be assessed unreserved use charges, as discussed in Section III.B.9 \nabove.  \n \nPALs are subject to ULD charges for any Dispatch Interval in which their \nwithdrawal falls outside the PAL Upper Operating Tolerance or PAL Lower Operating \nTolerance172.173 The PAL Upper Operating Tolerance is based on the greater of the \nPAL’s Dispatch Instruction for the current Dispatch Interval and its Dispatch \nInstruction for the previous Dispatch Interval.174 The PAL Lower Operating Tolerance \nis based on the PAL’s RTBM Maximum Withdrawal Limit. If the applicable value is \nfifty (50) MW or less, the tolerance is 10 percent of that value; if it exceeds fifty (50) \nMW, the tolerance is 5 percent of that value, with a 5 MW floor and a 20 MW ceiling.175 \nThese operating tolerances use the same percentages, MW breakpoints, floor, and \nceiling that apply to Resources, applied to values specific to the PAL participation \nmodel. As with Resources, the tolerances balance a PAL's ability to precisely follow \nits Dispatch Instructions against the need to reduce uncertainty in balancing the system. \nBecause the PAL Upper Operating Tolerance is based on the PAL's Dispatch \nInstructions, a PAL's allowable withdrawal is measured relative to its dispatch, so when \nSPP dispatches a PAL down, the withdrawal permitted within tolerance decreases \naccordingly. This ensures the tolerance accommodates limited deviations from dispatch \nand cannot be used to sustain withdrawals the market has not dispatched.  \n \nThe penalty for ULD is intended to provide a significant deterrent for failing to \noperate within the established operating tolerance. Over-withdrawal will be charged at \na bounded LMP (floored at $50/MWh and capped at $2,000/MWh) multiplied by a \ndeviation factor that increases from 2.0 to 5.0 as the deviation outside of the operating \ntolerance grows relative to PALS Capacity; under-withdrawal is charged at the absolute \nvalue of the LMP.176 The lower bound is intended to maintain the deterrence factor \nduring low, or even negative, LMPs.177 The upper bound is equal to the hard cap on \nEnergy Offers that can set LMP.178  \n \nThe value of the deviation factor is calculated as the ULD MW quantity for a \nDispatch Interval divided by the PALS Capacity, and that result is then multiplied by \n \n172  \nProposed Tariff, Attachment AE, Section 1.1, Definition of PAL Lower Operating \nTolerance (“The Megawatt range of a Price Adaptive Load’s withdrawal below its \naverage Setpoint Instruction over the Dispatch Interval within which it will not be \nsubject to charges associated with deviating from its Setpoint Instruction.”). \n173  \nProposed Tariff, Attachment AE, Sections 6.7.1 and 6.7.3. \n174  \nProposed Tariff, Attachment AE, Section 6.7.3(1)(a). \n175  \nProposed Tariff, Attachment AE, Section 6.7.3(1)(b). \n176  \nProposed Tariff, Attachment AE, Section 8.6.49. \n177  \nProposed Tariff, Attachment AE, Section 8.6.49(1)(b)(i). \n178  \nProposed Tariff, Attachment AE, Section 8.6.49(1)(b)(iii)."},{"page":33,"startToken":12896,"endToken":13360,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 33 \n \n100. If the result of the calculation is: (1) less than or equal to twenty five percent \n(25%), a deviation factor of 2.0 will apply; or (2) greater than twenty-five 25%, but less \nthan or equal to fifty percent (50%), a deviation factor of 3.0 will apply; or (3) greater \nthan fifty (50%), but less than or equal to seventy-five percent, a deviation factor of 4.0 \nwill apply; or (4) greater than seventy-five (75%), a deviation factor of 5.0 will apply. \nThe result is a range of penalty values from $100/MWh to $10,000 MWh. Using an \nLMP-based driver ensures that the ULD charge is proportional to the locational value \nof the energy being withdrawn and reflects underlying market scarcity, with higher \nLMPs resulting in higher charges. \n \nULD charges are credited to other Asset Owners on a load ratio share basis, \nexcluding Asset Owners charged ULD.179 It is just and reasonable and not unduly \ndiscriminatory to exclude Asset Owners charged ULD as it would dilute the deterrence \nimpact of the charge to give some of the money back to the Asset Owners who are \npaying the charge. Distribution of ULD charges will help compensate other loads for \nincreased LMPs and these charges give PALs a strong financial incentive to follow \ndispatch and ensure that other Market Participants do not bear the cost of PAL \ndeviations. Because PALS is a transmission service, failure to curtail when directed \nmay constitute a Tariff violation, which carries additional penalties that incent PALs to \nfollow SPP’s instructions.  \n \n \nSPP also proposes to assign RUC make whole payment distribution for PALs \nthat incur ULD. When Resources are committed after the Day-Ahead Market, they are \nprovided a RUC make whole payment if they do not cover the costs submitted in their \nOffer through the market. RUC make whole payment distribution funds RUC make \nwhole payments, assigning a proportionate share of the total RUC make whole \npayments to Asset Owners that drive the need for RUC make whole payments. SPP \nproposes to assign RUC make whole payment MW in three possible instances for \nPALs. \n \nFirst, SPP proposes to assign RUC make whole payment distribution deviation \nMW to ULD MW if the PAL operated outside of its operating tolerances.180 This \nprovision assigns a share of RUC make whole payment distribution for PALs that are \nnot following their Dispatch Instructions. Doing so is just and reasonable and not \nunduly discriminatory because a PAL that does not follow its economic dispatch is not \noperating consistent with the least-cost operation of the market, which increases costs \nto the market. \n \n \n \n \n \n179  \nProposed Tariff, Attachment AE, Section 8.6.50. \n180  \nProposed Tariff, Attachment AE, Section 8.6.7(A)(2)(i)."},{"page":34,"startToken":13360,"endToken":13723,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 34 \n \nSecond, SPP proposes to assign RUC make whole payment distribution to the:  \n \npositive difference between the PAL Day-Ahead Market cleared \nwithdrawal quantity and the RTBM Maximum Withdrawal \nLimit, provided that: (i) [t]he PAL’s RTBM Maximum \nWithdrawal Limit is less than the PAL’s Maximum Withdrawal \nLimit used in the Day-Ahead Market by more than the PAL \nLower Operating Tolerance calculated in Section 6.7.3 of [] \nAttachment AE; (ii) [t]he RTBM Maximum Withdrawal Limit is \nless than the Day-Ahead Market cleared withdrawal amount; and \n(iii) [t]he  PAL received a Dispatch Instruction greater than or \nequal to the RTBM Maximum Withdrawal for at least one \nDispatch Interval in the hour.181 \n \nThird, SPP proposes to assign RUC make whole payment distribution: \n \nFor PALs that cleared withdrawals in the Day-Ahead Market \nand that experienced a Setpoint Instruction decrease caused by \nthe application of their Intra‑Interval Maximum Withdrawal \nLimit, the absolute value of the difference between the PAL’s \nactual withdrawal and the PAL’s economic operating point.  The \nPAL’s economic operating point is the MW withdrawal where \nthe cost on the PAL’s current Dispatch Interval Energy Bid \ncurve first exceeds the Real-Time DLMP for that PAL.182 \n \nThese changes assign RUC make whole payment distribution for MWs where \na parameter of the PAL Energy Bid causes the PAL to deviate in Real-Time from the \neconomically optimal point. These changes are just and reasonable and not unduly \ndiscriminatory as they assign a share of RUC make whole payments to Asset Owners \nwhose PAL Energy Bids are causing deviations that contribute to differences in Real-\nTime from the Day-Ahead Market. \n \nSPP’s proposal is a just and reasonable approach that creates a significant \nfinancial penalty for non-compliance under similar conditions to those already in the \nSPP Tariff. When PALs do not follow their dispatch, they can increase LMPs for other \nparticipants and negatively impact reliability. SPP anticipates a similar approach to \ncalculating charges for CHILLs that do not follow instructions to reduce load. \n \n \n \n \n \n181  \nProposed Tariff, Attachment AE, Section 8.6.7(A)(2)(j). \n182  \nProposed Tariff, Attachment AE, Section 8.6.7(A)(2)(k)."},{"page":35,"startToken":13723,"endToken":14186,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 35 \n \n4. Other Tariff Provisions \n \nIn addition, PALs must submit real-time telemetry and five-minute revenue-\nquality meter data for the PAL.183  \n \nTo ensure accurate settlement of both transmission and market charges, SPP \nproposes to require that PALs register at a load Settlement Location that contains only \nPAL load, and that PAL Meter Data Submittal Locations not be aggregated with those \nof non-PAL load.184 Because many settlement calculations are performed at the \nSettlement Location level and PALs are settled differently than other loads, PAL load \nmust be kept separate at that level. In addition, multiple PAL Meter Data Submittal \nLocations may be aggregated into a single PAL Settlement Location only if the PALs \nare at the same physical and electrically equivalent point on the Transmission \nSystem.185 Because PALs are dispatched and may be subject to penalties for failing to \nfollow Dispatch Instructions, they are more similarly situated to Resources than to other \nloads. Dispatch and the application of ULD both require location-specific LMPs and \nmetering to be correctly reflected in the market and settled. \n \nSPP's Tariff revisions clarify which requirements govern when a PAL also \nmeets the definition of a HILL. For ramp rates, the PAL requirements supersede the \nHILL requirements, which removes any ambiguity and avoids applying two sets of \nramp limits to the same load.186 PAL is given precedence because it is the more \nspecialized participation model, with its own ramp rate requirements. Similarly, a PAL \nthat is also a HILL is exempt from the Non-Conforming Load forecast requirements.187 \nBecause PALs are dispatched by the market and excluded from SPP's load forecasts, \nthe information SPP needs is already provided through the PAL's bid parameters. \n \nIn the execution of the Security Constrained Unit Commitment (“SCUC”) \nprocess that is part of the RUC processes, the market clearing engine minimizes \ncommitment cost and not production cost as the Day-Ahead Market SCUC does. \nTherefore, in the RUC processes, the incremental benefits from meeting PAL Energy \nBids are not considered just as the Incremental Energy Offers above minimum for \nResources are not considered.188 The effect of this provision is to reduce the ability of \nPAL Real-Time Energy Bids to drive RUC commitment decisions. This provision does \nnot apply to the Day-Ahead Market or the Security Constrained Economic Dispatch. \nThis provision is consistent with the greater reliability emphasis for RUC processes.  \n \n183  \nProposed Tariff, Attachment AE, Section 2.26. \n184  \nProposed Tariff, Attachment AE, Section 2.2(3). \n185  \nProposed Tariff, Attachment AE, Section 2.2(3). \n186  \nProposed Tariff, Attachment AE, Sections 2.22(4); 2.26(2)(c). \n187  \nProposed Tariff, Attachment AE, Section 2.22(1). \n188  \nProposed Tariff, Attachment AE, Sections 5.2.2(1); 6.1.2(1)."},{"page":36,"startToken":14186,"endToken":14478,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 36 \n \n \nFinally, SPP proposes a number of conforming changes to Attachment AE to \naccommodate the existence of PAL Energy Bids in market processes.  This includes \nadditions to inputs (including limits on PALs consistent with the ability to curtail for \nany reliability conditions that threaten to impair or degrade the reliability of the \nTransmission System or the systems directly or indirectly interconnected with the \nTransmission System), execution, results, and pricing for various market processes. \nSPP clarifies that PALs are not included in a load deviation charge exemption for \nEmergency Conditions, as PALs receive Dispatch Instructions and are differently \nsituated from other loads.  \n \nThese provisions are just and reasonable and not unduly discriminatory as they \nare needed for SPP to include the right information for PALs in its market processes \nand to settle PALs correctly. \n \nIV. \nADDITIONAL TARIFF REVISIONS \n \n \nThe majority of Proposed Tariff revisions are outlined above. SPP proposes the \nfollowing revisions, not specifically discussed above, to the Tariff to effectuate the \naddition of the PALS.  \n \n1. \nPart I, Section 1 (Definitions) \n \n \nSPP proposes the following changes to the definitions in the main body of the \nTariff.189  \n \nFirst, SPP adds the definition for Part VIII of the Tariff to reference Sections \n54 through 61 pertaining to PALS in conjunction with the applicable Common Service \nProvisions of Part I and appropriate Schedules and Attachments. \n \nSecond, SPP adds a reference to Part VIII of the Tariff to the following \ndefinitions: Load Shedding, Point(s) of Delivery, Point(s) of Receipt, Transmission \nCustomer, and Transmission System. \n \nThird, SPP proposes to add references to Dispatch Instruction and Setpoint \nInstruction to point to the defined terms within Attachment AE of the Tariff. \n \n \n \n189  \nSee generally Tariff, Part I."},{"page":37,"startToken":14478,"endToken":14845,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 37 \n \n \nFourth, SPP adds the following sentence in the definition of Resource: “A \nResource does not include load participating as a Price Adaptive Load, or a Reliability \nRegistered Demand Response Program as defined in Attachment AA of this Tariff190.” \n \n2. \nPart III (Network Integration Transmission Service) \n \n \nSPP proposes revisions to Sections 34.1, 34.2, and 34.3 of  Part III of the Tariff \ndescribing the Monthly Demand Charge to incorporate references to new Schedule 16 \nrevenue. \n \n \n \n3. \nSchedules \n \nSPP proposes revisions to Schedules 1, 1-A, 11, and 12 of the Tariff to \nincorporate references to PALS.191 SPP also proposes a revision to Schedule 1-A of the \nTariff to specifically state that billing determinants for PALS are as provided in \nSchedule 16.192 Schedule 2 is modified to specify that Transmission Customers and \nNetwork Customers taking PALS will be assessed Schedule 2 charges for each kilowatt \nof service in a manner consistent with Schedule 16.193 In addition, SPP proposes \nrevisions to Schedule 11 to provide that Transmission and Network Customers taking \nPALS will be assessed Base Plan Zonal Charges, Subregional Charges, and Region-\nwide Charges for each kilowatt of service in a manner consistent with Schedule 16.194  \nSPP also adds a new Section VI to Schedule 11, setting out the Base Plan Zonal Charge, \nRegion-wide Charge, and Subregional Charge for PALS, and revises Section II.A to \ncredit PALS revenue received under Section VI.195 \n \n4. \nAttachment H \n \nAttachment H of the Tariff outlines the Annual Transmission Revenue \nRequirement for NITS. SPP proposes revisions to Attachment H to incorporate \nreferences to revenues under new Schedule 16.196 \n \n \n190  \n“Reliability Registered Demand Response Program” is a newly defined term pending \nbefore the Commission in Docket No. ER26-2249. If the Commission does not accept \nthe filing in Docket No. ER26-2249, SPP will make a clean-up filing with the \nCommission to appropriately change this definition of “Resource”.  \n191  \nSee generally Proposed Tariff, Schedules 1, 1-A, 11, and 12. \n192  \nProposed Tariff, Schedule 1-A. \n193  \nProposed Tariff, Schedule 2. \n194  \nProposed Tariff, Schedule 11. \n195 \nProposed Tariff, Schedule 11, Sections II.A and VI. \n196  \nProposed Tariff, Attachment H."},{"page":38,"startToken":14845,"endToken":15141,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 38 \n \n5. \nAttachment L \n \nAttachment L, Section II.C currently outlines the distribution of Point-To-Point \nTransmission Service revenues associated with the Zonal Annual Transmission \nRevenue Requirements. SPP proposes adding PALS to this section so the PALS \nrevenue under Schedule 16 will be distributed in proportion to the owner-specific Zonal \nAnnual Transmission Revenue Requirements in the Zone where the service is \ndelivered.197 In addition, SPP revises Section III.A of Attachment L to add references \nto PALS.198 \n \n6. \nAttachment M \n \nSPP adds Section VI to Attachment M, providing that the Transmission \nCustomer or Network Customer is responsible for real power losses associated with \nPALS under Schedule 16, and that losses associated with settlement in the Integrated \nMarketplace are accounted for under Attachment AE.199 \n \n7. \nAttachment O \n \nAttachment O, Section I provides an overview of SPP’s transmission planning \nprocess. SPP proposes a revision to this section to include a reference to the Attachment \nBG process as proposed in this filing.200  \n \n8. \nAttachment T \n \nAttachment T includes the rate sheets for Point-To-Point Transmission Service \nfor all applicable Transmission Owners.201 SPP proposes to add references to Schedule \n16 revenues in each of the separate rate sheets.202 These proposed changes are \nnecessary to appropriately adjust the Point-To-Point Transmission Service rates for any \nrevenues received for Schedule 16 charges. \n \n9. \nAttachment AE \n  \n \nSPP proposes revisions to Section 1.1 of Attachment AE to modify and add \ndefinitions:203 \n \n197  \nProposed Tariff, Attachment L, Section II.C. \n198  \nProposed Tariff, Attachment L, Section III.A. \n199 \nProposed Tariff, Attachment M, Section VI. \n200  \nProposed Tariff, Attachment O, Section I. \n201  \nTariff, Attachment T. \n202  \nProposed Tariff, Attachment T. \n203  \nSee generally Proposed Tariff, Attachment AE, Section 1.1."},{"page":39,"startToken":15141,"endToken":15432,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 39 \n \n \n \n \na. \nSPP adds a reference to PAL Energy Bid in the definition of Bid. \n \nb. \nSPP modifies the Demand Bid defined term to include the \nsentence: “Demand Bids do not include PAL Energy Bids.” \n \nc. \nSPP adds a reference to PAL in the definition of Dispatch \nInstruction. \n \nd. \nSPP revises the definition of Operating Tolerance to add \nreferences to PAL and ULD:  \n“The Megawatt range of a Resource’s or Price Adaptive Load’s \nactual output above and below its average Setpoint Instruction \nover the Dispatch Interval within which it will not be subject to \ncharges associated with Uninstructed Resource Deviation or \nUninstructed Load Deviation.” \n \ne. \nSPP adds new definitions PAL, PALS, and PALS Capacity to \nrefer to the defined term in Part I of the Tariff. \n \nf. \nSPP adds new defined terms PAL Energy Bid, PAL Energy Bid \nCurve, PAL Lower Operating Tolerance, and PAL Upper \nOperating Tolerance, as described in Section III.C above. \n \ng. \nSPP revises the definition of Setpoint Instruction to include \nPrice Adaptive Loads. \n \nh. \nSPP adds new defined term Uninstructed Load Deviation \nAdjusted Real-Time Load Ratio Share: “The Real-Time Load \nRatio Share that excludes all withdrawal MWs for each Asset \nOwner that has a ULD charge.” \n \n \nSPP proposes the following revisions to various sections of Attachment AE: \n \na. \nSection 2.2(2) is revised to add a reference to PAL in several \nlocations.204 \n \nb. \nSection 2.11.1 is revised to specify that Billable Metered Load \nassociated with a PAL will be excluded from the calculation of \na Market Participant’s maximum hourly Billable Metered \nLoad.205 \n \n204  \nProposed Tariff, Attachment AE, Section 2.2(2). \n205  \nProposed Tariff, Attachment AE, Section 2.11.1(A)(1)."},{"page":40,"startToken":15432,"endToken":15788,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 40 \n \n \nc. \nSection 4.3 is revised to reference PAL Energy Bids. SPP also \nspecifies that PAL Energy Bids may only be submitted at load \nSettlement Locations where a PAL is registered.206 \n \nd. \nSections 5.1.1, 5.2.1, 6.1.1, and 6.2.1.1 are revised to add \nreferences to PAL Energy Bids and to include Transmission \nProvider limits on the ability to provide PALS in the list of \ninputs.207 \n \ne. \nSPP adds references to PAL Energy Bids in Section 5.1.2.208 \n \nf. \nSection 5.1.3 is revised to add cleared PAL Energy Bids to the \nlist of Day-Ahead market results.209 \n \ng. \nSPP adds a reference to PAL’s Maximum Withdrawal Limit in \nSections 5.2.2 and 6.1.2.210 \n \nh. \nSections 6.2.1.2 is revised to add a reference to RTBM \nMaximum Withdrawal Limits (for PALs only) and to include \nTransmission Provider limits on the ability to provide PALS in \nthe list of inputs.211 \n \ni. \nSPP removes the word “Resource” in regards to Dispatch \nInstructions in Section 6.2.2 because PALs will also follow \nDispatch Instructions.212 In Section 6.2.3, SPP modifies \nsubsection (1)(a) to state “Dispatch Instructions for Resources \nand PALs.”213 \n \nj. \nSection 6.3 is revised to add references to PAL, and to specify \nthat for PALs, the RTBM Dispatch Instruction will be replaced \nwith the Intra-Interval Maximum Withdrawal Limit value \nsubmitted pursuant to Section 4.3.4(6) of Attachment AE, when \n \n206  \nProposed Tariff, Attachment AE, Section 4.3. \n207  \nProposed Tariff, Attachment AE, Sections 5.1.1; 5.2.1; 6.1.1; 6.2.1.1. \n208  \nProposed Tariff, Attachment AE, Section 5.1.2. \n209  \nProposed Tariff, Attachment AE, Section 5.1.3. \n210  \nProposed Tariff, Attachment AE, Section 5.2.2(3)(b); 6.1.2(3)(b). \n211  \nProposed Tariff, Attachment AE, Section 6.2.1.2. \n212  \nProposed Tariff, Attachment AE, Section 6.2.2(2). \n213  \nProposed Tariff, Attachment AE, Section 6.2.3(1)(a)."},{"page":41,"startToken":15788,"endToken":16086,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 41 \n \nthe Intra-Interval Maximum Withdrawal Limit constrains the \nRTBM Dispatch Instruction.214 \n \nk. \nSection 6.4.1.2 is revised to specify that PALs will be excluded \nfrom load deviation exemptions.215 \n \nl. \nSections 8.5.1, 8.5.25, and 8.6.1 are revised to add a reference to \ncleared PAL Energy Bids.216 \n \nm. \nSection 8.5.10 is revised to add a reference to cleared PAL \nEnergy Bids, and to clarify that Export Interchange Transaction \nBids and Virtual Energy Bids are cleared.217 \n \n10. \nAttachment AG \n \n \nSection 4.2 of Attachment AG of the Tariff specifies the data and information \nthat the Market Monitor will review and analyze. SPP adds PAL curtailments and PAL \nEnergy Bids to the list.218 \n \n \n \n11. \nAttachment BA \n \n \nSPP proposes revisions to Section 1 of Attachment BA of the Tariff to add \nreferences to Attachment BC, Attachment BG, and Part VIII of the Tariff.219 SPP also \nadds references to Attachment BG and Part VIII of the Tariff throughout Section 2 of \nAttachment BA.220 Finally, SPP specifies that the HILL Delivery Point Study \n(“HDPS”), if requested by the Transmission Customer or Network Customer, will \ninclude information detailing the limitations of the Transmission System in supporting \nany PAL that may be requested.221 \n \n \n214  \nProposed Tariff, Attachment AE, Section 6.3(1)(a). \n215  \nProposed Tariff, Attachment AE, Section 6.4.1.2. \n216  \nProposed Tariff, Attachment AE, Section 8.5.1; 8.5.25; 8.6.1. \n217  \nProposed Tariff, Attachment AE, Section 8.5.10(2). \n218  \nProposed Tariff, Attachment AG, Section 4.2. \n219  \nProposed Tariff, Attachment BA, Section 1. \n220  \nProposed Tariff, Attachment BA, Section 2. \n221  \nProposed Tariff, Attachment BA, Section 2.1.3.4."},{"page":42,"startToken":16086,"endToken":16399,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 42 \n \nV. \nSHOW CAUSE ORDER DIRECTIVES ADDRESSED IN SEPARATE \nFILINGS \nThis filing does not address the remaining Show Cause Order directives. SPP \nis addressing them as follows:  \n \n• the Large Load Safe Harbor Revisions, filed in Docket No. ER27-577-\n000;  \n• the HILL Transmission Service Revisions and the Non-Transmission \nFacility Revisions in Docket No. ER27-559-000; and \n• \nSPP’s response to the Show Cause Order in Docket No. EL26-68-000, \nwhich addresses, among other things, transmission and ancillary service \nrates for co-located load. \n \n \nSPP respectfully requests that the Commission consider this filing together with \nthe above filings as SPP’s response to the Show Cause Order. \n \nVI. \nEFFECTIVE DATE AND REQUEST FOR WAIVER \n \n \nSPP is requesting an effective date of “12/31/9998” for the Tariff Records \nincluded with this filing. The expected effective date of the Tariff revisions included \nherein is currently in the second quarter of 2028, which is more than 120 days after \nfiling. Therefore, SPP requests waiver of the Commission’s notice requirements.222  \nGood cause exists for the proposed revisions to be effective in the second quarter of \n2028 in accordance with the Commission’s waiver of notice requirement codified in \nSection 35.11 of the Commission’s regulations223 because SPP will need a number of \nmonths to develop, test, and implement the software system changes for the Tariff \nrevisions proposed herein. The length of time needed for the software changes is \nprimarily driven by the markets and settlements changes. SPP requests the Commission \nissue an order by February 17, 2027, to allow SPP sufficient time to make the necessary \nsoftware changes prior to implementation. The requested effective date also \naccommodates existing commercial arrangements, as discussed in Section III.B.11, \nbecause PALS applies prospectively and does not alter any existing agreement. \n \n \n \n222  \n18 C.F.R. § 35.3(a)(1). \n223  \n18 C.F.R. § 35.11."},{"page":43,"startToken":16399,"endToken":16717,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 43 \n \nVII. \nADDITIONAL INFORMATION \n \nA. \nDocuments submitted with this filing: \n \nIn addition to this Transmittal Letter, SPP provides with this filing Clean \nand Redlined Tariff revisions under the Sixth Revised Volume No. 1.224 \n \nB. \nService: \n \nSPP has electronically served a copy of this filing on all its Members, \nTransmission Customers and Market Participants. A complete copy of \nthis filing will be posted on the SPP web site, www.spp.org, and is also \nbeing served on all affected state commissions. \n \nC. \nRequisite agreements: \n \nThere are none.  \n \nD. \nCommunications \nCorrespondence and communications with respect to this filing should \nbe sent to, and SPP requests the Secretary to include on the official \nservice list, the following:225 \n \nEmon O. Mahony \nSenior Attorney \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR 72223 \nTelephone: (501) 482-2506 \nemahony@spp.org \n \nChristopher M. Nolen \nAssociate General Counsel \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR 72223 \nTelephone: (501) 614-3200 \ncnolen@spp.org  \n \n224  \n1 Definitions D, 1 Definitions L, and Attachment BA, Section 2 attached to this filing \ncontain language in italics being included in the Large Load Safe Harbor Revisions \nand/or the HILL Transmission Service Revisions and the Non-Transmission Facility \nRevisions. In addition, certain other tariff records contained in this filing include \nlanguage in italics indicating revisions pending before the Commission in the \nfollowing proceedings: Docket Nos. ER26-2249, ER26-3720, ER27-313, and ER27-\n432. In the event that revisions in any of these proceedings are not accepted by the \nCommission, SPP commits to submit a clean-up filing to remove the language from \nthe Tariff. \n225  \nPursuant to Commission Rule 101(e), 18 C.F.R. § 385.101(e), SPP requests waiver of \nRule 203(b)(3), 18 C.F.R. § 385.203(b)(3), in order to permit more than two persons \nto be included on the service list."},{"page":44,"startToken":16717,"endToken":16839,"text":"The Honorable Debbie-Anne A. Reese \nNovember 19, 2026 \nPage 44 \n \nJustin A. Hinton \nSenior Attorney \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR 72223 \nTelephone: (501) 482-2468 \njhinton@spp.org \n \n \nVIII. CONCLUSION \n \n \nFor all of the foregoing reasons, SPP respectfully requests that the Commission- \nissue an order accepting the Tariff revisions proposed herein as soon as practicable but \nnot later than February 17, 2027. SPP will submit a filing with the Commission \nspecifying a precise effective date when that date is known and not less than seven days \nbefore that date. \n \nRespectfully submitted, \n \n/s/ Justin A. Hinton \nJustin A. Hinton \nEmon O. Mahony \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR  72223-4936 \n  \nAttorneys for  \nSouthwest Power Pool, Inc."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1088,"startToken":0,"endToken":546},{"p":2,"at":1088,"title":"I. SUMMARY OF FILING","method":"printed heading","endPage":3,"endAt":2279,"startToken":546,"endToken":1129},{"p":3,"at":2279,"title":"II. BACKGROUND","method":"printed heading","endPage":3,"endAt":2296,"startToken":1129,"endToken":1131},{"p":3,"at":2296,"title":"A. The HILL Process Filings","method":"printed heading","endPage":5,"endAt":65,"startToken":1131,"endToken":1665},{"p":5,"at":65,"title":"B. Show Cause Order in Docket No. EL26-68","method":"printed heading","endPage":5,"endAt":1636,"startToken":1665,"endToken":1910},{"p":5,"at":1636,"title":"C. Stakeholder Engagement and Approval","method":"printed heading","endPage":8,"endAt":320,"startToken":1910,"endToken":2830},{"p":8,"at":320,"title":"III. DESCRIPTION OF AND JUSTIFICATION FOR PROPOSED TARIFF","method":"printed heading","endPage":8,"endAt":394,"startToken":2830,"endToken":2839},{"p":8,"at":394,"title":"A. Overview","method":"printed heading","endPage":9,"endAt":1813,"startToken":2839,"endToken":3492},{"p":9,"at":1813,"title":"B. Price Adaptive Load Service","method":"printed heading","endPage":27,"endAt":1763,"startToken":3492,"endToken":10414},{"p":27,"at":1763,"title":"C. SPP Integrated Marketplace Requirement for PALS","method":"printed heading","endPage":36,"endAt":962,"startToken":10414,"endToken":14328},{"p":36,"at":962,"title":"IV. ADDITIONAL TARIFF REVISIONS","method":"printed heading","endPage":37,"endAt":1553,"startToken":14328,"endToken":14726},{"p":37,"at":1553,"title":"Attachment H","method":"printed heading","endPage":38,"endAt":70,"startToken":14726,"endToken":14856},{"p":38,"at":70,"title":"Attachment L","method":"printed heading","endPage":38,"endAt":592,"startToken":14856,"endToken":14933},{"p":38,"at":592,"title":"Attachment M","method":"printed heading","endPage":38,"endAt":908,"startToken":14933,"endToken":14980},{"p":38,"at":908,"title":"Attachment O","method":"printed heading","endPage":38,"endAt":1142,"startToken":14980,"endToken":15017},{"p":38,"at":1142,"title":"Attachment T","method":"printed heading","endPage":42,"endAt":66,"startToken":15017,"endToken":16096},{"p":42,"at":66,"title":"V. SHOW CAUSE ORDER DIRECTIVES ADDRESSED IN SEPARATE","method":"printed heading","endPage":42,"endAt":760,"startToken":16096,"endToken":16195},{"p":42,"at":760,"title":"VI. EFFECTIVE DATE AND REQUEST FOR WAIVER","method":"printed heading","endPage":43,"endAt":66,"startToken":16195,"endToken":16409},{"p":43,"at":66,"title":"VII. ADDITIONAL INFORMATION","method":"printed heading","endPage":43,"endAt":98,"startToken":16409,"endToken":16412},{"p":43,"at":98,"title":"A. Documents submitted with this filing:","method":"printed heading","endPage":43,"endAt":294,"startToken":16412,"endToken":16442},{"p":43,"at":294,"title":"B. Service:","method":"printed heading","endPage":43,"endAt":576,"startToken":16442,"endToken":16489},{"p":43,"at":576,"title":"C. Requisite agreements:","method":"printed heading","endPage":43,"endAt":625,"startToken":16489,"endToken":16495},{"p":43,"at":625,"title":"D. Communications","method":"printed heading","endPage":44,"endAt":219,"startToken":16495,"endToken":16749},{"p":44,"at":219,"title":"VIII. CONCLUSION","method":"printed heading","endPage":44,"endAt":808,"startToken":16749,"endToken":16839}]}
