Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1204)

## Summary

Limits EPA's section 404(c) veto to the period between a complete application and permit issuance. ([p. 124, line 1 to p. 124, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124)) Extends nationwide permits from 5 to 10 years and lets the Corps modify them mid-term. ([p. 125, line 2 to p. 125, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125)) Requires the Corps to keep nationwide permits 12, 14, 43, 57 and 58 for projects filling under 2 acres. ([p. 126, line 6 to p. 126, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=126)) Filling under 2 acres of navigable waters counts as a minimal adverse effect. ([p. 125, line 19 to p. 125, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125)) Reissuing a nationwide permit needs no Endangered Species Act consultation, only a programmatic environmental assessment under NEPA, and no National Historic Preservation Act consultation, so long as the permit does not loosen preconstruction requirements. ([p. 128, line 4 to p. 128, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=128))

## Key points

- No section 404(c) veto before an application or after a permit issues ([p. 124, line 4 to p. 124, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124))
- Nationwide permits last 10 years ([p. 125, line 2 to p. 125, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125))
- Under 2 acres of fill is a minimal effect by statute ([p. 125, line 19 to p. 125, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125))
- No ESA or NHPA consultation to reissue a nationwide permit that keeps its preconstruction requirements ([p. 128, line 7 to p. 128, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=128))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **National Association of Home Builders** (Industry; supports): Home builders expect larger Nationwide Permit acreage thresholds and 10-year Clean Water Act permit terms to bring clarity and consistency.
  > including an increase in acreage thresholds under the Clean Water Act’s (CWA) Nationwide Permit program along with extending the statutory timeframe from five to 10 years for the CWA permit programs.
  [NAHB, 2026-10-01](https://www.nahb.org/news-and-economics/press-releases/2026/10/nahb-applauds-bipartisan-american-affordability-and-jobs-act). On the bill text at [p. 123, line 3 to p. 123, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123).
- **Center for Biological Diversity** (Environmental groups; opposes): The narrowed EPA veto would have made it impossible to stop projects like Pebble Mine.
  > You would never be able to stop Pebble Mine in the future because of the changes made today
  [The Hill, 2026-10-01](https://thehill.com/policy/energy-environment/6124792-bipartisan-permitting-reform-data-centers-energy-projects/). On the bill text at [p. 123, line 19 to p. 123, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123).
- **Pacific Legal Foundation** (Think tanks; supports): Limiting EPA's Section 404(c) veto to the pre-permit window would end preemptive and retroactive vetoes and give projects certainty.
  > really gives the EPA administrator more or less carte blanche to cancel projects
  [The Hill, 2026-10-01](https://thehill.com/policy/energy-environment/6124792-bipartisan-permitting-reform-data-centers-energy-projects/). On the bill text at [p. 123, line 19 to p. 123, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123).
- **NRDC** (Environmental groups; opposes): Limiting EPA's Section 404(c) veto curtails the authority used to protect Bristol Bay from the Pebble Mine.
  > I was deeply saddened to see that the permitting bill proposes curtailing the authority that allowed Bristol Bay to be protected.
  [NRDC (blog), 2026-10-02](https://www.nrdc.org/bio/christy-goldfuss/hard-questions-permitting-bill). On the bill text at [p. 123, line 19 to p. 123, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123).
- **Heatmap** (Reporting; explains): EPA's Section 404(c) veto would be limited to the window before the Corps issues the permit, so a post-permit veto like the Spruce mine would be barred.
  > That means a Section 404 veto post-permit would have been off the table.
  [Heatmap, 2026-10-05](https://heatmap.news/politics/baaja-executive-actions). On the bill text at [p. 123, line 19 to p. 123, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123).
- **Southern Environmental Law Center** (Environmental groups; opposes): SELC says the bill's statute of limitations and limits on state, tribal and local water authority would reduce communities' ability to challenge energy projects such as gas pipelines.
  > Restricts the ability of states, tribes, and local communities to protect local waterways and drinking water supplies threatened by large energy projects, like gas pipelines.
  [SELC press release, 2026-09-30](https://www.selc.org/?p=44520). On the bill text at [p. 68, line 1 to p. 68, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=68).

## Selected statutory quotes

> shall consider any effects of a discharge of dredged or fill material into less than 2 acres of navigable waters to be a minimal adverse environmental effect.

[p. 125, line 19 to p. 125, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125)

Fills under 2 acres count as minimal by statute.

> no consultation with a Federal agency pursuant to section 7(a)(2) of that Act (16 U.S.C. 1536(a)(2)) is required

[p. 127, line 20 to p. 127, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127)

Reissuing a nationwide permit needs no Endangered Species Act consultation.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

EPA may veto a disposal site at any time, including after a permit issues (Mingo Logan v. EPA, D.C. Circuit, 2013). Nationwide permits run 5 years. A 2020 district court ruling held that reissuing Nationwide Permit 12 required Endangered Species Act consultation.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 123, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 1)

(a) REDUCING PERMITTING UNCERTAINTY.—

[p. 123, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 2)

(1) IN GENERAL.—Section 404(c) of the Federal Water Pollution Control Act (33 U.S.C. 1344(c)) is amended—

[p. 123, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 3)

(A) by striking “(c) The Administrator” and inserting the following:

[p. 123, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 1)

“(c) SPECIFICATION OR USE OF DEFINED AREA.—

[p. 123, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 2)

“(1) IN GENERAL.—The Administrator”;

[p. 123, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 3)

(B) in paragraph (1) (as so designated), by inserting “during the period described in paragraph (2) and” before “after notice and opportunity for public hearings”; and

[p. 123, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 3)

(C) by adding at the end the following:

[p. 123, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 2)

“(2) PERIOD OF PROHIBITION.—The period during which the Administrator may prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, or deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, under paragraph (1)—

[p. 124, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 3)

“(A) begins on the date on which an applicant submits a complete application under this section; and

[p. 124, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 3)

“(B) ends on the date on which the Secretary issues the permit.”.

[p. 124, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 2)

(2) APPLICABILITY.—The amendments made by paragraph (1) shall apply to a permit application submitted under section 404 of the Federal Water Pollution Control Act (33 U.S.C. 1344) after the date of enactment of this Act.

[p. 124, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 1)

(b) NATIONWIDE PERMITTING IMPROVEMENT.—Section 404(e) of the Federal Water Pollution Control Act (33 U.S.C. 1344(e)) is amended—

[p. 124, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 2)

(1) by striking “(e)(1) In carrying” and inserting the following:

[p. 124, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 1)

“(e) GENERAL PERMITS ON STATE, REGIONAL, OR NATIONWIDE BASIS.—

[p. 124, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 2)

“(1) PERMITS AUTHORIZED.—In carrying”;

[p. 124, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 2)

(2) in paragraph (2)—

[p. 124, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 3)

(A) by striking “(2) No general” and inserting the following:

[p. 124, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 2)

“(2) TERM.—

[p. 124, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=124) (indent level 3)

“(A) IN GENERAL.—No general”;

[p. 125, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 3)

(B) in subparagraph (A) (as so designated), by striking “five years” and inserting “10 years”; and

[p. 125, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 3)

(C) by adding at the end the following:

[p. 125, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 3)

“(B) TIMING OF MODIFICATION.—The Secretary may modify a general permit pursuant to subparagraph (A) during the term of the general permit or during the renewal of the general permit.”; and

[p. 125, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 2)

(3) by adding at the end the following:

[p. 125, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 2)

“(3) CONSIDERATIONS.—In determining the environmental effects of an activity under paragraph (1) or (2), the Secretary—

[p. 125, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 3)

“(A) shall consider only the effects on compliance with water quality requirements (as defined in section 401(h)) of any discharge of dredged or fill material resulting from the activity; and

[p. 125, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 3)

“(B) shall consider any effects of a discharge of dredged or fill material into less than 2 acres of navigable waters to be a minimal adverse environmental effect.

[p. 125, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 2)

“(4) NATIONWIDE PERMITS FOR ACTIVITIES.—

[p. 125, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=125) (indent level 3)

“(A) GENERAL PERMITS AUTHORIZED.— Notwithstanding any other provision of this section, the Secretary shall maintain general permits on a nationwide basis for activities described in subparagraph (B).

[p. 126, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=126) (indent level 3)

“(B) ACTIVITIES DESCRIBED.—An activity referred to in subparagraph (A) is an activity—

[p. 126, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=126) (indent level 4)

“(i) authorized under Nationwide Permit 12, Nationwide Permit 14, Nationwide Permit 43, Nationwide Permit 57, or Nationwide Permit 58, as those nationwide permits are described in and reissued pursuant to the final rule of the Corps of Engineers entitled ‘Reissuance and Modification of Nationwide Permits’ (91 Fed. Reg. 768 (January 8, 2026)); and

[p. 126, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=126) (indent level 4)

“(ii) that results in a discharge of dredged or fill material into less than 2 acres of navigable waters for each single and complete project (as defined in section 330.2 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this paragraph), including a single and complete linear project and a single and complete non-linear project (as those terms are defined in the final rule of the Corps of Engineers entitled ‘Reissuance and Modification of Nationwide Permits’ (91 Fed. Reg. 768 (January 8, 2026))).

[p. 127, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 3)

“(C) RETENTION OF GENERAL AND INDIVIDUAL PERMITTING AUTHORITY.—Nothing in this paragraph prohibits the Secretary from issuing—

[p. 127, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 4)

“(i) general permits on a regional or State basis; or

[p. 127, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 4)

“(ii) individual permits for linear infrastructure projects.

[p. 127, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 2)

“(5) REISSUANCE OF NATIONWIDE PERMITS.—

[p. 127, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 3)

“(A) IN GENERAL.—Subject to subparagraph (B), in determining whether to reissue a general permit issued on a nationwide basis under this subsection—

[p. 127, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 4)

“(i) no consultation with an applicable State pursuant to section 6(a) of the Endangered Species Act of 1973 (16 U.S.C. 1535(a)) is required;

[p. 127, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 4)

“(ii) no consultation with a Federal agency pursuant to section 7(a)(2) of that Act (16 U.S.C. 1536(a)(2)) is required;

[p. 127, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=127) (indent level 4)

“(iii) the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) shall be satisfied by preparing a programmatic environmental assessment with respect to the general permit; and

[p. 128, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=128) (indent level 4)

“(iv) no consultation under section 306108 of title 54, United States Code, is required.

[p. 128, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=128) (indent level 3)

“(B) REQUIREMENT.—Clauses (i) through (iv) of subparagraph (A) shall only apply to a general permit being reissued pursuant to that subparagraph if the general permit does not—

[p. 128, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=128) (indent level 4)

“(i) narrow or eliminate preconstruction requirements; or

[p. 128, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=128) (indent level 4)

“(ii) raise the threshold for such preconstruction requirements.”.