# Sec. 1401. Maintaining Federal authorizations or permits for projects with non-Federal sponsors

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1401)

## Summary

For projects with non-federal sponsors, a federal agency may not revoke, suspend, amend, or otherwise interfere with a federal authorization in effect on or after September 16, 2026. ([p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159))

There are five exceptions. ([p. 159, line 20 to p. 159, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159)) A court can order the action. ([p. 159, line 20 to p. 159, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159)) The holder can have materially breached the permit or the law, or obtained the permit by fraud. ([p. 159, line 23 to p. 160, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159)) The action can be needed to prevent specific, urgent, substantial and proximate harm to life, property, national security or defense, based on new information not considered in the original review. ([p. 160, line 6 to p. 160, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160)) Or the holder can ask for it. ([p. 160, line 13 to p. 160, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160))

Agencies must give written notice with the statutory authority and evidence. ([p. 160, line 24 to p. 161, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160)) The sponsor can sue in district court, where the agency carries the burden by clear and convincing evidence and classified information is reviewed in camera. ([p. 162, line 4 to p. 162, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=162)) A winning sponsor gets the permit reinstated and an injunction against repeat interference without a court order. ([p. 163, line 8 to p. 163, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=163)) The sponsor also gets attorney fees, delay costs, and an additional 25 to 50 percent of all project costs incurred. ([p. 163, line 23 to p. 164, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=163)) Awards are paid from the Judgment Fund without appropriation. ([p. 165, line 18 to p. 165, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165))

Where a stop-work order issued within the year before enactment was enjoined, the same judge keeps jurisdiction. ([p. 165, line 13 to p. 165, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165))

## Key points

- No permit revocation absent a court order, breach, fraud, new-information emergency, or the holder's request ([p. 159, line 20 to p. 159, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159))
- Burden on the government by clear and convincing evidence ([p. 162, line 4 to p. 162, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=162))
- Damages of 25 to 50 percent of costs incurred, plus fees and delay costs, from the Judgment Fund ([p. 164, line 3 to p. 164, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164))
- Where a stop-work order from the year before enactment was enjoined, the same judge hears any new attempt ([p. 165, line 1 to p. 165, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165))
- Cutoff date of September 16, 2026 for permits in effect ([p. 159, line 14 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **E2** (Clean energy industry; mixed): Permitting reform must end the administration's clean-energy permit blocks to matter for supply and prices.
  > That also must include ending the administration's clean energy permit blocks, which are keeping gigawatts of the cheapest power off the grid as prices rise for everyone.
  [PV Tech, 2026-10-01](https://www.pv-tech.org/us-planning-reform-bill-gets-mixed-response-from-clean-energy-groups/).
- **Sierra Club** (Environmental groups; concerns): Without enforceable protection against the administration's blocks, the bill cannot guarantee wind and solar get built.
  > this bill cannot guarantee that more wind and solar projects will actually get built as long as the Trump administration continues to block them at every turn.
  [PV Tech, 2026-10-01](https://www.pv-tech.org/us-planning-reform-bill-gets-mixed-response-from-clean-energy-groups/).
- **Beveridge & Diamond** (Lawyers and legal scholars; explains): Post-approval reversal limits address a problem that has grown with changes of administration.
  > The bill's "Project Certainty" title would restrict post-approval agency reversals—a concept traditionally understood but that has increasingly become an issue with changes in political administrations.
  [Mondaq (Beveridge & Diamond), 2026-10-02](https://www.mondaq.com/unitedstates/environmental-law/1850440/senate-permitting-bill-would-reshape-environmental-permitting-and-reviews). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Bipartisan Policy Center** (Think tanks; explains): Losing a permit-revocation case would cost the government money from the Judgment Fund, not just a reversal.
  > The result is that an agency’s loss in court would carry damages, not just reversal.
  [Bipartisan Policy Center, 2026-10-02](https://bipartisanpolicy.org/explainer/explaining-the-senate-permitting-bill-the-bipartisan-american-affordability-and-jobs-act). On the bill text at [p. 164, line 3 to p. 164, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164).
- **King & Spalding** (Lawyers and legal scholars; mixed): Permit-certainty limits bind both the current administration's holds on wind and solar and a future administration's attempts to unwind oil and gas approvals.
  > These protections cut both ways. They would constrain the Trump administration's holds on wind and solar approvals, and they would equally constrain a future administration seeking to unwind oil and gas approvals.
  [King & Spalding, 2026-10-02](https://www.kslaw.com/Insights/Articles/The-Senate-Permitting-Deal-What-It-Would-Change-and-What-to-Do-Now). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **McGuireWoods** (Lawyers and legal scholars; explains): A permittee whose approval is pulled could recover a large share of project costs from the Judgment Fund.
  > A court could also award 25% to 50% of the sponsor's total project costs not otherwise recovered, paid from the federal Judgment Fund.
  [McGuireWoods, 2026-10-02](https://www.mcguirewoods.com/client-resources/alerts/2026/10/bipartisan-american-affordability-and-jobs-act-of-2026-proposes-sweeping-reform-for-energy-and-infrastructure-projects/). On the bill text at [p. 164, line 3 to p. 164, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164).
- **Foundation for American Innovation** (Think tanks; mixed): The certainty provisions are novel and depend on how courts enforce them, but together make mass targeting of disfavored projects much harder.
  > These provisions would not guarantee that every project gets approved, but they would make politically motivated obstruction much harder to sustain
  [Daily Caller News Foundation, 2026-10-03](https://dailycaller.com/2026/10/03/kevin-cramer-senate-permitting-bill-class-energy-projects-fines-capito-lee-heinrich-whitehouse).
- **TC Energy** (Industry; supports): The framework improves permitting certainty for gas pipelines as well as renewables.
  > improves permitting certainty for all forms of energy, from renewables to natural gas.
  [Daily Caller News Foundation, 2026-10-03](https://dailycaller.com/2026/10/03/kevin-cramer-senate-permitting-bill-class-energy-projects-fines-capito-lee-heinrich-whitehouse).
- **Travis Annatoyn (former Interior deputy solicitor)** (Lawyers and legal scholars; mixed): The permit-certainty language is aimed at recent executive-branch reversals, but an agency can still test or violate it and leave the developer to sue.
  > The agencies can still inadvertently or deliberately choose to press on the limits of that prohibition — you know, test it or even violate it outright
  [Heatmap, 2026-10-05](https://heatmap.news/politics/baaja-executive-actions). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Travis Annatoyn (former Interior deputy solicitor)** (Lawyers and legal scholars; mixed): Whether the protection covers oil and gas leases is unsettled because 'lease' is missing from the definition but a catch-all clause exists; courts would decide.
  > I imagine if something like this gets passed, someone will make the argument that it includes leases
  [Heatmap, 2026-10-05](https://heatmap.news/politics/baaja-executive-actions). On the bill text at [p. 159, line 2 to p. 159, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Travis Annatoyn (former Interior deputy solicitor)** (Lawyers and legal scholars; explains): The certainty provisions are written against the last decade of executive revocations of permits, in both directions.
  > This bill is clearly looking backwards at five to 10 years of case studies in how an executive branch can delay or revoke permits, and it is targeted at those case studies
  [Heatmap, 2026-10-05](https://heatmap.news/politics/baaja-executive-actions).
- **Western Environmental Law Center** (Environmental groups; opposes): Locking in Trump-era approvals would push data center and fossil developers to rush and hoard leases and permits ahead of a future administration.
  > which is going to create an incentive for all these data centers and fossil fuel companies to rush through a process, hoard leases, permits and authorizations, and then basically tell a future administration to go fly a kite.
  [Heatmap, 2026-10-05](https://heatmap.news/politics/baaja-executive-actions). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Foley Hoag** (Lawyers and legal scholars; explains): The permit-certainty section would bar agencies from revoking or suspending authorizations in effect on or after Sept. 16, 2026, including offshore wind construction and operations plans, subject to listed exceptions and a clear-and-convincing burden on the agency.
  > The protection would not be absolute. Agencies could still act under a court order; for a material breach or violation of law; for fraud or misrepresentation; at the holder's request
  [Foley Hoag Energy & Climate Counsel, 2026-10-23](https://foleyhoag.com/news-and-insights/blogs/energy-and-climate-counsel/2026/october/baaja-blast-a-second-wind-certainty-cables-and-cost-allocation-for-offshore-wind-under-the-senat/). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Heatmap News** (Reporting; mixed): The permit-certainty ban exempts actions required by court order, so it is unresolved whether a court granting a remand motion would trigger the exception or give developers a damages claim.
  > The restriction exempts cases where "the agency is required to take such action by order of a court."
  [Heatmap News (The Fight), 2026-10-16](https://heatmap.news/plus/the-fight/hotspots/the-trump-administration-is-still-messing-with-offshore-wind-farms). On the bill text at [p. 159, line 20 to p. 159, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Oil Change International** (Environmental groups; opposes): The group reads the permit certainty sections as letting corporations sue agencies over actions that would reduce the use of federally permitted projects, covering existing permits as well as new ones.
  > This doesn’t just apply to projects permitted after the bill passes, but all projects with any kind of federal permit.
  [Oil Change International, 2026-10-26](https://oilchange.org/blogs/the-proposed-u-s-infrastructure-permitting-reform-bill-would-be-a-disaster-for-communities-and-for-climate-action/). On the bill text at [p. 167, line 14 to p. 167, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=167).
- **The Wilderness Society** (Environmental groups; opposes): The group says Section 1401 would keep in place permits for mining and drilling projects on public landscapes such as the Greater Chaco region, even where a permit was approved unlawfully.
  > This section bans future administrations from taking any action on permitted projects on public lands, even when permits were approved unlawfully, except under extremely limited circumstances.
  [The Wilderness Society, 2026-10-15](https://www.wilderness.org/articles/blog/6-threats-public-lands-bipartisan-american-affordability-and-jobs-act). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Earthjustice** (Environmental groups; concerns): The guide notes that the narrow exceptions to the permit lock-in do not cover a future administration concluding that a prior administration issued a permit in violation of federal law.
  > none cover a situation in which a future administration concludes that a prior administration violated federal law in issuing a given permit or authorization.
  [Earthjustice, 2026-10-26](https://earthjustice.org/feature/bipartisan-american-affordability-and-jobs-act-2026-impact-guide). On the bill text at [p. 159, line 20 to p. 159, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Center for Western Priorities** (Environmental groups; opposes): The group says that under the lock-in standard the wind and solar cancellations would stand while future approvals for data centers, drilling and nuclear projects would be nearly impossible to undo.
  > Trump’s wind and solar cancellations would stand, while the data centers, drilling, and nuclear projects Interior Secretary Doug Burgum approves over the next two years would be nearly impossible for a future administration to undo.
  [Center for Western Priorities, 2026-10-23](https://westernpriorities.org/2026/10/doj-moves-to-kill-offshore-wind-permits-as-congress-weighs-permitting-bill/). On the bill text at [p. 162, line 5 to p. 162, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=162).
- **Theodore Roosevelt Conservation Partnership** (Environmental groups; concerns): TRCP says the permit certainty language as drafted locks in place nearly any permit a federal agency issues, which limits adaptive management for fish and wildlife.
  > as drafted the language effectively locks in place nearly any permit issued by a federal agency.
  [Theodore Roosevelt Conservation Partnership, 2026-10-23](https://www.trcp.org/2026/10/23/what-the-senates-permitting-bill-could-mean-for-hunters-and-anglers/). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Aaron Weiss** (Environmental groups; opposes): Weiss says that when a court sends an environmental review back, construction continues and Section 1401 bars the agency from changing the permit, and challengers get 150 days to sue.
  > Challengers also get just 150 days to sue.
  [Common Dreams, 2026-10-22](https://www.commondreams.org/news/senate-permitting-bill). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).
- **Grist** (Reporting; explains): Grist sums up the bill as weakening some environmental laws, speeding agency deadlines and making approved projects harder to cancel.
  > The bill does this by weakening some of the nation’s bedrock environmental laws, speeding up the timeline for government agencies to issue permits, and making it harder to cancel projects that have already gotten federal approval.
  [Grist, 2026-10-08](https://grist.org/politics/permitting-reform-baaja-climate-debate-clean-energy-fossil-fuels/). On the bill text at [p. 159, line 12 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159).

## Selected statutory quotes

> a Federal department or agency shall not take any new action that would revoke, rescind, withdraw, terminate, suspend, amend, or alter a Federal authorization or permit in effect on or after September 16, 2026

[p. 159, line 11 to p. 159, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159)

The bar on revoking or altering an issued permit.

> costs in an amount equal to not less than 25 percent and not more than 50 percent of the total of all costs incurred by the non-Federal project sponsor or holder of the Federal authorization or permit in connection with the project

[p. 164, line 3 to p. 164, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164)

A winning sponsor recovers 25 to 50 percent of project costs.

> If, within 1 year prior to the date of enactment of this Act, a Federal Agency has issued a stop-work order that would interfere with or prevent the construction or operation at full capacity of a project and said order has been enjoined by a court of competent jurisdiction

[p. 165, line 1 to p. 165, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165)

A stop-work order enjoined in the year before enactment stays with the same judge.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New. Agencies today can suspend or revoke leases and permits under each statute and the permit's own terms, subject to APA review with the burden on the challenger.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024; this title responds to 2025 and 2026 events.

### SPEED Act (House-passed H.R. 4776)

The SPEED Act (sec. 2(b)) had a shorter version of this rule inside NEPA: the same five exceptions, a clear-and-convincing standard 'as appropriate and where feasible', and APA review in the court of appeals. It had no damages and no cutoff date, and its section 4 exempted any agency action the administration had moved to reconsider since January 20, 2025, which covered the offshore wind approvals then under review. The Senate bill has no such exemption, covers permits in effect on or after September 16, 2026, shifts the burden of proof to the agency, adds money damages, and keeps the same judge on projects whose stop-work orders were already enjoined.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 158, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158) (indent level 1)

(a) DEFINITION OF FEDERAL AUTHORIZATION OR PERMIT.—The term “Federal authorization or permit” means an authorization, permit, record of decision, right-of-way, finding of no significant impact, verification, extension, construction and operations plan, biological opinion, incidental take statement, concurrence, or any other approval or order that is necessary, including any determination by a Federal department or agency that additional authorizations or permits are not necessary, for the construction or operation at full capacity of a project.

[p. 159, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159) (indent level 1)

(b) MAINTENANCE OF AUTHORIZATIONS AND PERMITS.—

[p. 159, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159) (indent level 2)

(1) IN GENERAL.—For projects or actions with non-Federal sponsors or holders of a Federal authorization or permit, a Federal department or agency shall not take any new action that would revoke, rescind, withdraw, terminate, suspend, amend, or alter a Federal authorization or permit in effect on or after September 16, 2026, or take any other action to interfere with or prevent the construction or operation at full capacity of a project that has secured all necessary Federal authorizations and permits, unless—

[p. 159, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159) (indent level 3)

(A) the Federal agency is required to take such action by order of a court of competent jurisdiction;

[p. 159, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=159) (indent level 3)

(B) the holder of the Federal authorization or permit has materially breached the terms of the Federal authorization or permit or otherwise violated applicable law;

[p. 160, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160) (indent level 3)

(C) the Federal authorization or permit was obtained through fraud, intentional concealment, or material misrepresentation;

[p. 160, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160) (indent level 3)

(D) such action is necessary to prevent specific, urgent, substantial, and proximate harm or damage to life, property, national security, or defense that is based on new information that was not considered in the underlying environmental review process or final agency action for the Federal authorization or permit; or

[p. 160, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160) (indent level 3)

(E) the Federal agency has received a request from the holder of the Federal authorization or permit or the non-Federal project sponsor to take such action.

[p. 160, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160) (indent level 2)

(2) REQUIREMENT.—If a Federal agency takes an action under paragraph (1) in response to a matter described in subparagraph (D) of that paragraph, the action shall be reasonably limited only to so much as is necessary to remedy the specific issue the action is intended to address.

[p. 160, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=160) (indent level 2)

(3) NOTICE.—Before a Federal agency takes an action under paragraph (1), the Federal agency shall notify the non-Federal project sponsor or holder of the Federal authorization or permit, in writing, of such action, including by—

[p. 161, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=161) (indent level 3)

(A) providing a detailed explanation of the action;

[p. 161, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=161) (indent level 3)

(B) identifying the statutory authority relied on for the action; and

[p. 161, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=161) (indent level 3)

(C) providing the evidence supporting the action.

[p. 161, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=161) (indent level 2)

(4) JUDICIAL REVIEW.—

[p. 161, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=161) (indent level 3)

(A) VENUE.—Unless another provision of law provides for direct review in a court of appeals of the United States, a non-Federal project sponsor or holder of a Federal authorization or permit seeking judicial review of an action taken by a Federal agency under paragraph (1) may obtain review of such action in a United States district court in which the project is at least partially located.

[p. 161, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=161) (indent level 3)

(B) STANDARD OF REVIEW.—In reviewing an action taken by a Federal agency under paragraph (1) under subchapter II of chapter 5 and chapter 7 of title 5, United States Code (commonly known as the “Administrative Procedure Act”) or any other provision of law, the reviewing court shall, notwithstanding subchapter II of chapter 5 and chapter 7 of title 5, United States Code (commonly known as the “Administrative Procedure Act”) or any other provision of law, place the burden of proof on the Federal agency to demonstrate by clear and convincing evidence that 1 or more of the matters described in subparagraphs (A) through (E) of that paragraph applies.

[p. 162, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=162) (indent level 3)

(C) REVIEW OF CLASSIFIED INFORMATION.— If any portion of the information that is a basis for the agency action being reviewed under this paragraph is classified or otherwise protected from public disclosure under Federal law, the head of the Federal department or agency shall submit that portion of the information to the applicable court under seal or in camera, and the applicable court shall review and refer to that portion of the information in accordance with applicable procedures governing classified or protected information.

[p. 162, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=162) (indent level 3)

(D) RELIEF.—If, at the conclusion of its review of an action taken by a Federal agency under paragraph (1), the court concludes that the Federal agency has not met its burden under subparagraph (B), the non-Federal project sponsor or holder of the Federal authorization or permit shall be entitled to—

[p. 163, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=163) (indent level 4)

(i) the reinstatement of the Federal authorization or permit and the termination of any action by the Federal agency preventing the construction or operation of the project;

[p. 163, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=163) (indent level 4)

(ii) injunctive relief preventing a Federal agency from taking any new action that would revoke, rescind, withdraw, terminate, suspend, amend, or alter a previously granted Federal authorization or permit or take any other action to interfere with or prevent the construction or operation at full capacity of a project without first obtaining a court order to that effect from the same judge (assuming that judge continues to sit in the same district) that heard the original matter;

[p. 163, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=163) (indent level 4)

(iii) reasonable attorney fees and costs of litigation, as the court determines appropriate;

[p. 163, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=163) (indent level 4)

(iv) any costs associated with the applicable delay in the construction or operation of the project, as the court determines appropriate; and

[p. 164, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164) (indent level 4)

(v) costs in an amount equal to not less than 25 percent and not more than 50 percent of the total of all costs incurred by the non-Federal project sponsor or holder of the Federal authorization or permit in connection with the project as of the date of the action and not otherwise recovered under clause (iii) or (iv), including costs of development, permitting, land acquisition, financing, engineering, procurement, and construction of the project, which amount shall be determined by the court by taking into consideration—

[p. 164, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164) (indent level 5)

(I) the degree to which the Federal interference in the project occurred due to bad faith;

[p. 164, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164) (indent level 5)

(II) the degree to which there exists a pattern of similar Federal interference in other projects; and

[p. 164, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=164) (indent level 5)

(III) the actual degree of economic harm to the project sponsor or operator.

[p. 165, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165) (indent level 3)

(E) SPECIAL RULE.—If, within 1 year prior to the date of enactment of this Act, a Federal Agency has issued a stop-work order that would interfere with or prevent the construction or operation at full capacity of a project and said order has been enjoined by a court of competent jurisdiction, then, if a Federal agency takes any new action that would revoke, rescind, withdraw, terminate, suspend, amend, or alter a previously granted Federal authorization or permit or take any other action to interfere with or prevent the construction or operation at full capacity of said project, the same judge (assuming that judge continues to sit in the same district) that heard the original matter shall have jurisdiction to hear a complaint or motion under this section.

[p. 165, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165) (indent level 3)

(F) SOURCE OF FUNDS.—Amounts awarded under subparagraph (D)—

[p. 165, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165) (indent level 4)

(i) shall be paid from the fund described in section 1304 of title 31, United States Code; and

[p. 165, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=165) (indent level 4)

(ii) shall not be subject to the availability of appropriations.

[p. 166, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=166) (indent level 3)

(G) LIMITATION ON JURISDICTION.—Notwithstanding sections 1346 and 1491 of title 28, United States Code, the United States Court of Federal Claims shall not have jurisdiction over any claim for, or in respect to, this section—

[p. 166, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=166) (indent level 4)

(i) during the consideration of a petition for relief under this section; and

[p. 166, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=166) (indent level 4)

(ii) in perpetuity if relief is granted under subparagraph (D).