# Sec. 2104. Improvements relating to local transmission planning and development

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2104)

## Summary

Adds Federal Power Act section 226. ([p. 218, line 16 to p. 218, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=218)) One or more states may refer a utility to FERC for an investigation of its local transmission planning. ([p. 220, line 6 to p. 220, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220)) FERC forms an investigative team with up to 3 state appointees. ([p. 221, line 14 to p. 221, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221))

The team may find that the utility's process is not selecting the more efficient or cost-effective local projects, or is crowding out regional planning. ([p. 222, line 1 to p. 222, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=222)) FERC may then order process changes or cut the utility's return on equity on local projects. ([p. 222, line 22 to p. 223, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=222)) Further remedies are removing the presumption of prudence or fining the utility. ([p. 223, line 4 to p. 223, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223)) A fine, paid to the referring state, can reach $5 million for each local facility developed or energized from 60 days before the referral that FERC finds imprudent and harmful to that state's customers. ([p. 223, line 20 to p. 223, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223))

## Key points

- States can trigger FERC investigations of local transmission spending ([p. 220, line 6 to p. 220, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220))
- Remedies include lower return on equity and fines up to $5 million per facility ([p. 223, line 7 to p. 223, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **King & Spalding** (Lawyers and legal scholars; explains): Incumbent utilities face a new state-initiated FERC review of local transmission spending with financial penalties.
  > A state could refer a utility's local transmission spending to FERC, which could respond with fines, loss of the presumption of prudence, or a reduced return on equity.
  [King & Spalding, 2026-10-02](https://www.kslaw.com/Insights/Articles/The-Senate-Permitting-Deal-What-It-Would-Change-and-What-to-Do-Now). On the bill text at [p. 223, line 1 to p. 223, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223).
- **Niskanen Center** (Think tanks; supports): State referrals to FERC would curb utilities from labeling regional projects local to avoid oversight.
  > BAAJA would allow states to ask FERC to review projects to prevent utilities from exploiting such loopholes and levy penalties on violators.
  [Niskanen Center, 2026-10-02](https://www.niskanencenter.org/the-bipartisan-american-affordability-and-jobs-act-of-2026-4-ways-the-new-permitting-package-gets-transmission-policy-right/). On the bill text at [p. 223, line 1 to p. 223, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223).
- **Oklahoma Gas & Electric** (Industry; opposes): The utility says the state referral process in 2104 would put local planning decisions, which state commissions have overseen, under federal investigation and federal penalties.
  > Although a referral would be initiated by a state, the result would be to place local planning decisions, which have historically been overseen by state commissions, under federal investigation and federal penalties.
  [Energy and Policy Institute, 2026-10-20](https://energyandpolicy.org/oge-baaja-transmission-reforms-lobbying/). On the bill text at [p. 220, line 6 to p. 220, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220).

## Selected statutory quotes

> A fine, payable to the referring State, of up to $5,000,000 for each local transmission facility

[p. 223, line 7 to p. 223, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223)

Fines of up to $5 million per facility, paid to the state.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Local projects that a utility plans for itself get little federal or state review.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 218, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=218) (indent level 0)

Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section 2103) is amended by adding at the end the following:

[p. 218, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=218) (indent level 0)

“SEC. 226. OVERSIGHT OF LOCAL TRANSMISSION PLANNING AND DEVELOPMENT.

[p. 218, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=218) (indent level 1)

“(a) DEFINITIONS.—In this section:

[p. 218, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=218) (indent level 2)

“(1) COMMISSION.—The term ‘Commission’ means the Federal Energy Regulatory Commission.

[p. 219, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=219) (indent level 2)

“(2) LOCAL TRANSMISSION FACILITY.—The term ‘local transmission facility’ means an electric transmission facility—

[p. 219, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=219) (indent level 3)

“(A) that is located entirely within the service territory of a single public utility; and

[p. 219, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=219) (indent level 3)

“(B) the cost of which is recovered entirely from transmission customers within that service territory.

[p. 219, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=219) (indent level 2)

“(3) REFERRING STATE.— The term ‘referring State’ means 1 or more States making a referral under subsection (b).

[p. 219, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=219) (indent level 2)

“(4) REGIONAL TRANSMISSION FACILITY.—The term ‘regional transmission facility’ means an electric transmission facility the cost of which is recovered from transmission customers located within more than 1 service territory but within a single transmission planning region.

[p. 219, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=219) (indent level 2)

“(5) TRANSMISSION PLANNING REGION.—The term ‘transmission planning region’ means a region for which the Commission determines that electric transmission planning is appropriate, such as a region established in accordance with Order No. 1000 of the Commission, entitled ‘Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities’ (76 Fed. Reg. 49842 (August 11, 2011)).

[p. 220, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220) (indent level 1)

“(b) STATE REFERRAL AUTHORITY.—

[p. 220, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220) (indent level 2)

“(1) IN GENERAL.—Not later than 1 year after the date of enactment of this section, the Commission shall, by rule, establish procedures by which 1 or more States may refer a public utility to the Commission for an investigation into the processes used by the public utility for planning and developing local transmission facilities.

[p. 220, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220) (indent level 2)

“(2) REQUIREMENTS.—A referral under paragraph (1) shall include, at a minimum—

[p. 220, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220) (indent level 3)

“(A) a description of the 1 or more processes used by the public utility for local transmission planning and development about which the referring State is concerned;

[p. 220, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220) (indent level 3)

“(B) a description of the harm that those processes may be causing to wholesale or retail electric customers within the referring State; and

[p. 220, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=220) (indent level 3)

“(C) a description of the efforts that the referring State has taken to resolve its concerns about the identified local transmission planning and development processes prior to referral to the Commission.

[p. 221, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 1)

“(c) COMMISSION ACTION TO EXERCISE OVERSIGHT OF LOCAL TRANSMISSION PLANNING AND DEVELOPMENT.—

[p. 221, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 2)

“(1) IN GENERAL.—On receipt of a referral under subsection (b) from a referring State, the Commission shall—

[p. 221, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 3)

“(A) notice for initial public comment the initiation of an investigation; and

[p. 221, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 3)

“(B) concurrently with that notice, certify an investigative team to be composed of—

[p. 221, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 4)

“(i) 1 or more individuals from the Office of Enforcement and Regulatory Accounting of the Commission; and

[p. 221, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 4)

“(ii) up to 3 representatives appointed by the referring State.

[p. 221, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 2)

“(2) AUTHORITY OF INVESTIGATIVE TEAM.— An investigative team certified under paragraph (1)(B) shall have all investigative authorities that would be available to the Commission or Commission staff in proceedings under or relating to the authority of the Commission under section 222.

[p. 221, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=221) (indent level 2)

“(3) PRELIMINARY FINDINGS REPORT.—If an investigative team certified under paragraph (1)(B) concludes that the processes used by a public utility for planning and developing local transmission facilities are not resulting in the selection of the more efficient or cost-effective local transmission facilities or that those processes are interfering with the processes of the relevant transmission planning region for planning and developing regional transmission facilities, the investigative team shall issue a preliminary findings report to the Commission explaining that conclusion and recommending a remedy.

[p. 222, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=222) (indent level 2)

“(4) COMMISSION RESPONSE TO REPORT.—

[p. 222, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=222) (indent level 3)

“(A) NOTICE AND COMMENT.—On receipt of a preliminary findings report under paragraph (3), the Commission shall notice the report for comment.

[p. 222, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=222) (indent level 3)

“(B) ORDER.—After reviewing the record, including any comments received under subparagraph (A), the Commission shall issue an order taking any such action as would be available to the Commission in a proceeding under section 222 that the Commission determines to be appropriate, which may include 1 or more of the following remedies:

[p. 222, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=222) (indent level 4)

“(i) Requiring changes to the processes used by the applicable public utility for planning local transmission facilities.

[p. 223, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 4)

“(ii) Reducing the return on equity of the public utility with respect to local transmission facilities.

[p. 223, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 4)

“(iii) Eliminating the presumption of prudence for local transmission facilities planned or developed by the public utility.

[p. 223, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 4)

“(iv) A fine, payable to the referring State, of up to $5,000,000 for each local transmission facility—

[p. 223, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 5)

“(I) that was developed or energized during the period beginning 60 days before the referral under subsection (b) and ending on the date on which the order under this subparagraph is issued; and

[p. 223, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 5)

“(II) the development or energizing of which the Commissions determines—

[p. 223, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 6)

“(aa) was imprudent; and

[p. 223, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 6)

“(bb) caused financial harm to wholesale or retail electric customers within the referring State.

[p. 223, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=223) (indent level 4)

“(v) Any other appropriate remedy.

[p. 224, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224) (indent level 1)

“(d) SAVINGS PROVISION.—Nothing in this section limits or impairs any authority of the Commission under any other provision of law.”.