# Sec. 2105. Prohibition of right of first refusal

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2105)

## Summary

Bans any federal right of first refusal for transmission facilities selected in a regional or interregional plan for cost allocation, overriding any FERC rule or order to the contrary. ([p. 224, line 11 to p. 224, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224))

## Key points

- Incumbent utilities get no federal first claim on regionally planned lines; competitive developers can bid ([p. 224, line 11 to p. 224, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **King & Spalding** (Lawyers and legal scholars; explains): The bill removes federal rights of first refusal for regionally selected transmission projects but leaves state ROFR laws intact.
  > The Bill would bar federal rights of first refusal for regionally selected projects, while leaving state laws in place.
  [King & Spalding, 2026-10-02](https://www.kslaw.com/Insights/Articles/The-Senate-Permitting-Deal-What-It-Would-Change-and-What-to-Do-Now). On the bill text at [p. 224, line 11 to p. 224, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224).
- **Niskanen Center** (Think tanks; supports): The bill codifies the prohibition on federal rights of first refusal for regionally planned lines and extends it to interregional lines.
  > The BAAJA would codify the prohibition on federal ROFRs for regionally planned lines and extend that prohibition to lines included in an interregional plan.
  [Niskanen Center, 2026-10-02](https://www.niskanencenter.org/the-bipartisan-american-affordability-and-jobs-act-of-2026-4-ways-the-new-permitting-package-gets-transmission-policy-right/). On the bill text at [p. 224, line 11 to p. 224, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224).
- **Oklahoma Gas & Electric** (Industry; opposes): The utility tells Senate offices it opposes ending federal or state right of first refusal protections, which Section 2105 would prohibit for regionally selected lines.
  > OG&E also says that it “strongly opposes eliminating federal or state ROFR [right of first refusal] protections.”
  [Energy and Policy Institute, 2026-10-20](https://energyandpolicy.org/oge-baaja-transmission-reforms-lobbying/). On the bill text at [p. 224, line 11 to p. 224, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224).

## Selected statutory quotes

> a Federal right of first refusal is prohibited with respect to a transmission facility selected in a regional or interregional transmission plan for the purposes of cost allocation.

[p. 224, line 11 to p. 224, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224)

The ban on a federal right of first refusal.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Order No. 1000 removed federal rights of first refusal; Order No. 1920 restored a conditional one for some upgrades. State right-of-first-refusal laws are untouched.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 224, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224) (indent level 0)

Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section 2104) is amended by adding at the end the following:

[p. 224, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224) (indent level 0)

“SEC. 227. PROHIBITION OF RIGHT OF FIRST REFUSAL.

[p. 224, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=224) (indent level 1)

“Notwithstanding any rule or order of the Federal Energy Regulatory Commission in effect as of the date of enactment of this section, a Federal right of first refusal is prohibited with respect to a transmission facility selected in a regional or interregional transmission plan for the purposes of cost allocation.”.