# Sec. 2109. Advanced transmission technologies

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2109)

## Summary

Requires FERC to make public utilities use advanced transmission technologies, including best-available conductors, dynamic line rating, power flow control and topology optimization, in new and upgraded lines, with a presumption that the cost is prudent. ([p. 261, line 13 to p. 261, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261)) FERC issues a rule within 1 year requiring recurring benefit-cost evaluations; when benefits exceed costs the utility must deploy on FERC's timeline or face a penalty such as a lower return on equity. ([p. 262, line 8 to p. 262, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262))

## Key points

- Mandatory use of grid-enhancing technologies when benefits exceed costs ([p. 263, line 16 to p. 263, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=263))
- Presumption of prudence for their cost ([p. 261, line 23 to p. 261, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261))
- Return-on-equity penalty for not deploying ([p. 264, line 19 to p. 264, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=264))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **Niskanen Center** (Think tanks; supports): Utilities would have to study and then use advanced transmission technologies where they help, correcting low-return incentives.
  > The BAAJA tackles the misaligned incentives plaguing ATTs by requiring utilities to study and share publicly where ATTs can be used, and then use them in those locations.
  [Niskanen Center, 2026-10-02](https://www.niskanencenter.org/the-bipartisan-american-affordability-and-jobs-act-of-2026-4-ways-the-new-permitting-package-gets-transmission-policy-right/). On the bill text at [p. 263, line 13 to p. 263, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=263).

## Selected statutory quotes

> the Commission shall require that public utilities use advanced transmission technologies, including best-available transmission conductors, when carrying out covered projects.

[p. 261, line 13 to p. 261, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261)

Utilities must use advanced transmission technologies.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

FERC Order No. 1920 requires regions to consider four such technologies; nothing compels deployment.

### EPRA 2024 (reported S. 4753)

EPRA 2024 allowed advanced conductors in backstop projects but had no deployment mandate.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 260, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 1)

(a) IN GENERAL.—Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section 2108(d)) is amended by adding at the end the following:

[p. 260, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 0)

“SEC. 231. USE OF ADVANCED TRANSMISSION TECHNOLOGIES.

[p. 260, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 1)

“(a) DEFINITIONS.—In this section:

[p. 260, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 2)

“(1) ADVANCED TRANSMISSION TECHNOLOGY.— The term ‘advanced transmission technology’ has the meaning given the term in section 1223(a) of the Energy Policy Act of 2005 (42 U.S.C. 16422(a)).

[p. 260, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 2)

“(2) BEST-AVAILABLE TRANSMISSION CONDUCTOR.— The term ‘best-available transmission conductor’ means a transmission conductor that, as determined by the Commission—

[p. 260, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 3)

“(A) provides the greatest feasible and commercially available energy-carrying capacity at a given voltage level;

[p. 260, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 3)

“(B) provides the highest feasible and commercially available electrical efficiency at that voltage level; and

[p. 260, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=260) (indent level 3)

“(C) provides the greatest available level of mechanical performance, including mitigating thermal sag at the maximum rated transmission-carrying capacity of the applicable transmission facility.

[p. 261, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261) (indent level 2)

“(3) COMMISSION.—The term ‘Commission’ means the Federal Energy Regulatory Commission.

[p. 261, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261) (indent level 2)

“(4) COVERED PROJECT.—The term ‘covered project’ means the construction of a new transmission facility, or the modification, upgrade, replacement, or reconductoring of an existing transmission facility, subject to the jurisdiction of the Commission under section 201(b).

[p. 261, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261) (indent level 1)

“(b) USE OF ADVANCED TRANSMISSION TECHNOLOGIES.— In exercising its authority under sections 205 and 206, the Commission shall require that public utilities use advanced transmission technologies, including best-available transmission conductors, when carrying out covered projects.

[p. 261, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261) (indent level 1)

“(c) PRESUMPTION OF PRUDENCE FOR ADVANCED TRANSMISSION TECHNOLOGIES.—In any filing seeking to recover the cost of an advanced transmission technology for a covered project, and in any proceeding to determine whether that cost may be recovered through rates, the Commission shall presume that—

[p. 261, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=261) (indent level 2)

“(1) the use of an advanced transmission technology is a prudent practice; and

[p. 262, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262) (indent level 2)

“(2) the costs associated with the use of an advanced transmission technology are just and reasonable.

[p. 262, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262) (indent level 1)

“(d) APPLICABILITY.—The requirements of this section apply only to public utilities and only with respect to covered projects.

[p. 262, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262) (indent level 1)

“(e) RULEMAKING.—

[p. 262, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262) (indent level 2)

“(1) IN GENERAL.—Not later than 1 year after the date of enactment of this section, the Commission shall issue an order or rule to implement this section.

[p. 262, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262) (indent level 2)

“(2) REQUIREMENTS.—In issuing an order or rule under paragraph (1), the Commission shall—

[p. 262, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262) (indent level 3)

“(A) require that public utilities conduct, on Commission-established timelines, recurring evaluations—

[p. 262, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=262) (indent level 4)

“(i) to determine whether the benefits associated with deploying advanced transmission technologies through 1 or more covered projects, including benefits to the current transmission system of the applicable public utility, outweigh the costs (such that the applicable benefit-cost ratio is greater than 1);

[p. 263, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=263) (indent level 4)

“(ii) that include a least-cost analysis with respect to the transmission system of the applicable public utility; and

[p. 263, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=263) (indent level 4)

“(iii) that evaluate whether the costs for which recovery is sought reflect due care to minimize the total cost of the applicable covered projects;

[p. 263, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=263) (indent level 3)

“(B) require public utilities to conduct, on Commission-established timelines, recurring evaluations to consider planning and construction timelines for new transmission assets and risks and impacts of potential delays;

[p. 263, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=263) (indent level 3)

“(C) require that, if the benefits of 1 or more advanced transmission technologies outweigh the costs (such that the applicable benefit-cost ratio is greater than 1), the applicable public utility shall deploy the advanced transmission technologies on a timeline determined by the Commission;

[p. 263, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=263) (indent level 3)

“(D) require that decisions on whether to implement advanced transmission technologies based on the recurring evaluations under subparagraphs (A) and (B) are reported to the Commission, in a manner determined by the Commission;

[p. 264, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=264) (indent level 3)

“(E) in consultation with the Secretary of Energy, establish a methodology for determining whether a transmission conductor is a best-available transmission conductor for purposes of this section;

[p. 264, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=264) (indent level 3)

“(F) ensure that the methodology established under subparagraph (E) is consistent with the criteria described in clauses (i) through (iii) of subparagraph (A);

[p. 264, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=264) (indent level 3)

“(G) provide for periodic review and updating of the methodology established under subparagraph (E) not less frequently than annually to reflect improvements in technology, materials, and system performance; and

[p. 264, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=264) (indent level 3)

“(H) determine a penalty for any public utility that fails to deploy the relevant advanced transmission technologies when the applicable benefit-cost ratio is greater than 1 in a timeframe determined by the Commission, including a reduction of the effective return on equity for the transmission system of the public utility.”.

[p. 264, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=264) (indent level 1)

(b) DEFINITION OF ADVANCED TRANSMISSION TECHNOLOGY.—Section 1223(a) of the Energy Policy Act of 2005 (42 U.S.C. 16422(a)) is amended—

[p. 265, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 2)

(1) in paragraph (18), by striking “and” at the end;

[p. 265, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 2)

(2) by redesignating paragraph (19) as paragraph (23); and

[p. 265, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 2)

(3) by inserting after paragraph (18) the following:

[p. 265, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 2)

“(19) dynamic line rating;

[p. 265, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 2)

“(20) advanced power flow control;

[p. 265, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 2)

“(21) transmission topology optimization;

[p. 265, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 2)

“(22) high-performance conductors; and”.