# Sec. 2110. Expediting generator interconnection queues

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2110)

## Summary

Directs FERC to start a rulemaking within 1 year requiring transmission providers to share and use computing technologies, including AI and automation, to process interconnection requests faster, and to revisit the rule every 4 years. ([p. 265, line 13 to p. 265, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265))

## Key points

- AI and automation in interconnection queue studies ([p. 265, line 21 to p. 265, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **Institute for Progress** (Think tanks; supports): Section 2110 directs FERC to start a rulemaking on automated interconnection queue review, leaving the details to the commission.
  > Section 2110 of BAAJA requires FERC to initiate rulemaking to facilitate automated interconnection queue review for large-generator interconnection.
  [Institute for Progress, 2026-10-12](https://ifp.org/how-the-permit). On the bill text at [p. 265, line 21 to p. 265, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265).

## Selected statutory quotes

> to require public utility transmission providers to share and employ, as appropriate, queue management practices with respect to the use of computing technologies, including artificial intelligence, machine learning, and automation

[p. 265, line 18 to p. 265, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265)

The instruction to automate interconnection studies.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 265, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=265) (indent level 1)

(a) IN GENERAL.—Not later than 1 year after the date of enactment of this Act, the Federal Energy Regulatory Commission shall initiate a rulemaking to revise the pro forma Large Generator Interconnection Procedures promulgated pursuant to section 35.28(f) of title 18, Code of Federal Regulations (or a successor regulation), to require public utility transmission providers to share and employ, as appropriate, queue management practices with respect to the use of computing technologies, including artificial intelligence, machine learning, and automation, in evaluating and processing interconnection requests, in order to expedite study results with respect to those requests.

[p. 266, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 1)

(b) REQUIREMENT.—The Federal Energy Regulatory Commission shall reopen the rulemaking under subsection (a) not less frequently than once every 4 years to determine whether additional steps are required to ensure that public utility transmission providers are adequately deploying advanced computing technologies.