# Sec. 2111. Grid data access

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2111)

## Summary

Adds Federal Power Act section 232. ([p. 266, line 11 to p. 266, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266)) Transmission providers must hold the data needed for interconnection and facilities studies and may demand it from any bulk-power system user, owner or operator, who must respond in 15 days in a usable format. ([p. 268, line 20 to p. 268, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268)) Confidentiality rules can shape access but cannot be used to withhold data. ([p. 270, line 3 to p. 270, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270)) Violations are treated as reliability matters. ([p. 270, line 12 to p. 270, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270)) FERC and the Energy Department publish, within 1 year, a reference specification for fully automated interconnection studies. ([p. 271, line 23 to p. 272, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=271))

## Key points

- 15-day deadline to hand over grid study data ([p. 268, line 21 to p. 268, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268))
- Reference specification for fully automated interconnection studies ([p. 272, line 1 to p. 272, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=272))

## Selected statutory quotes

> may not be used to withhold grid data if access can be provided consistent with those requirements.

[p. 270, line 3 to p. 270, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270)

Confidentiality rules cannot be used to withhold grid data.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 266, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 1)

(a) IN GENERAL.—Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section 2109(a)) is amended by adding at the end the following:

[p. 266, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 0)

“SEC. 232. GRID DATA ACCESS.

[p. 266, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 1)

“(a) DEFINITIONS.—In this section:

[p. 266, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 2)

“(1) BULK-POWER SYSTEM.—The term ‘bulk-power system’ has the meaning given the term in section 215(a).

[p. 266, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 2)

“(2) COMMISSION.—The term ‘Commission’ means the Federal Energy Regulatory Commission.

[p. 266, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 2)

“(3) COVERED STUDY.—The term ‘covered study’ means a generation or load interconnection study, facilities study, feasibility study, or affected-system study required under a tariff on file with the Commission.

[p. 266, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 2)

“(4) GRID DATA.—

[p. 266, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=266) (indent level 3)

“(A) IN GENERAL.—The term ‘grid data’ means data, in any format, reasonably necessary for a covered study, including models, assumptions, forecasts, facility data, operating data, and other study inputs.

[p. 267, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=267) (indent level 3)

“(B) INCLUSIONS.—The term ‘grid data’ includes any data category identified by the Commission, in consultation with the Secretary of Energy, the Electric Reliability Organization (as defined in section 215(a)), transmission providers, National Laboratories (as defined in section 2 of the Energy Policy Act of 2005 (42 U.S.C. 15801)), and entities with automated grid-study software experience, for purposes of this section.

[p. 267, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=267) (indent level 2)

“(5) TRANSMISSION PROVIDER.—

[p. 267, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=267) (indent level 3)

“(A) IN GENERAL.—The term ‘transmission provider’ means a public utility, Regional Transmission Organization, Independent System Operator, or other entity administering an open access transmission tariff.

[p. 267, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=267) (indent level 3)

“(B) EXCLUSION.—The term ‘transmission provider’ does not include an exempt transmitting utility (as defined in section 225(a)) that does not voluntarily subject itself to Commission jurisdiction for the purposes of this section.

[p. 268, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268) (indent level 1)

“(b) GRID DATA DUTIES.—

[p. 268, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268) (indent level 2)

“(1) DATA SUFFICIENCY.—Each transmission provider shall obtain, assemble, maintain, and use the grid data regarding its transmission system that is necessary for the transmission provider to conduct covered studies.

[p. 268, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268) (indent level 2)

“(2) SECURE DATA USE.—A transmission provider may designate a person or tool assisting the transmission provider in a covered study as its representative for the purpose of making any requests in accordance with paragraph (3), subject to paragraph (6).

[p. 268, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268) (indent level 2)

“(3) DATA REQUESTS.—

[p. 268, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268) (indent level 3)

“(A) IN GENERAL.—A transmission provider may request the grid data necessary to complete a covered study from any relevant user, owner, or operator of the bulk-power system that possesses or controls such data.

[p. 268, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268) (indent level 3)

“(B) REQUIREMENT.—Subject to subparagraph (C), any person from whom grid data is requested under subparagraph (A) shall provide requested grid data not later than 15 days after receiving the request.

[p. 268, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=268) (indent level 3)

“(C) ALTERNATIVE TIMELINE.—The Commission may establish, by data category, alternative timelines for providing grid data in response to a request under subparagraph (A).

[p. 269, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=269) (indent level 2)

“(4) DATA INTEROPERABILITY.—Grid data maintained pursuant to paragraph (1) and provided pursuant to paragraph (3) shall be provided in a format that is usable or convertible by the requesting party with no impact on the scope or level of granularity in which the data is maintained or used, including by direct data transfer, application programming interface access, or secure compute-over-data access.

[p. 269, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=269) (indent level 2)

“(5) DATA CURRENCY.—Each person providing grid data under paragraph (3) shall—

[p. 269, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=269) (indent level 3)

“(A) provide accurate, complete, and current grid data; and

[p. 269, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=269) (indent level 3)

“(B) report, on Commission-established timelines, any material changes needed to maintain the accuracy of the grid data or any related models or studies, including covered studies.

[p. 269, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=269) (indent level 2)

“(6) DATA SAFEGUARDS.—

[p. 269, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=269) (indent level 3)

“(A) IN GENERAL.—Grid data under this section shall be handled under applicable law and Commission-approved confidentiality and data security requirements.

[p. 270, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270) (indent level 3)

“(B) MANNER OF ACCESS.—The requirements described in subparagraph (A) may govern the manner of access to grid data, but may not be used to withhold grid data if access can be provided consistent with those requirements.

[p. 270, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270) (indent level 2)

“(7) COST RECOVERY.—A public utility or transmission provider may file rates, charges, or tariffs pursuant to section 205 to recover the costs of complying with this section.

[p. 270, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270) (indent level 1)

“(c) ENFORCEMENT.—

[p. 270, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270) (indent level 2)

“(1) RELIABILITY AND PENALTIES.—Failure to comply with the duties under subsection (b) shall be considered a matter affecting the reliable operation of the bulk-power system under section 215, and noncompliance by a public utility shall be subject to section 316A.

[p. 270, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270) (indent level 2)

“(2) COMPLIANCE ORDERS.—The Commission may, by order, require compliance with this section by any person required to provide or make available grid data under this section.

[p. 270, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=270) (indent level 2)

“(3) EXPEDITED COMPLAINT.—Not later than 60 days after a complaint alleging a violation of this section is filed, the Commission shall, if the Commission determines that a violation has occurred, issue an order requiring compliance, including interim relief needed to prevent unreasonable delay in a covered study.

[p. 271, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=271) (indent level 1)

“(d) IMPLEMENTATION.—

[p. 271, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=271) (indent level 2)

“(1) IN GENERAL.—The Commission may issue such rules or orders, including pursuant to section 206, as are necessary to carry out this section.

[p. 271, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=271) (indent level 2)

“(2) REQUIREMENT.—The Commission shall issue at least 1 rule or order described in paragraph (1) not later than 1 year after the date of enactment of this section.”.

[p. 271, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=271) (indent level 1)

(b) AUTOMATED STUDY REFERENCE SPECIFICATION.—

[p. 271, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=271) (indent level 2)

(1) PUBLICATION.—Not later than 1 year after the date of enactment of this Act, the Federal Energy Regulatory Commission and the Secretary of Energy, in consultation with the Electric Reliability Organization (as defined in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a))), transmission providers (as defined in section 232(a) of that Act), National Laboratories (as defined in section 2 of the Energy Policy Act of 2005 (42 U.S.C. 15801)), and entities with automated grid-study software experience, shall publish a reference specification identifying the data categories, formats or conversion standards, update frequencies, and validation standards needed to enable full automation of interconnection studies, including system impact studies, without supplemental data requests during the study.

[p. 272, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=272) (indent level 2)

(2) EFFECT.—This section, including the pendency of publication of the reference specification described in paragraph (1), shall not delay, limit, or narrow the application of section 232 of the Federal Power Act.

[p. 272, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=272) (indent level 2)

(3) UPDATES.—The Federal Energy Regulatory Commission may update the reference specification published under paragraph (1) through a noticed proceeding not more frequently than once every 3 years.