# Sec. 2115. Conforming amendments; savings provision

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2115)

## Summary

Conforming cross-references in the Federal Power Act and a savings clause: nothing in the transmission title gives FERC authority over retail electricity sales or local distribution. ([p. 280, line 18 to p. 280, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280))

## Key points

- No new FERC authority over retail sales or local distribution ([p. 280, line 18 to p. 280, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280))

## Selected statutory quotes

> Nothing in this title or an amendment made by this title grants authority to the Federal Energy Regulatory Commission under the Federal Power Act (16 U.S.C. 791a et seq.) over sales of electric energy at retail or the local distribution of electricity.

[p. 280, line 17 to p. 280, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280)

FERC gains no authority over retail sales or local distribution.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Technical.

### EPRA 2024 (reported S. 4753)

EPRA 2024 had a comparable savings clause.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 280, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 1)

(a) CONFORMING AMENDMENTS.—Section 201 of the Federal Power Act (16 U.S.C. 824) is amended—

[p. 280, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 2)

(1) in subsection (b)(2)—

[p. 280, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 3)

(A) in the first sentence, by striking “and 222” and inserting “222, 225, 226, 226A, 227, 228, 229, 230, 231, 232, and 233”; and

[p. 280, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 3)

(B) in the second sentence, by striking “or 222” and inserting “222, 225, 226, 226A, 227, 228, 229, 230, 231, 232, or 233”; and

[p. 280, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 2)

(2) in subsection (e)—

[p. 280, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 3)

(A) by striking “206(f),”; and

[p. 280, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 3)

(B) by striking “or 222” and inserting “222, 225, 226, 226A, 227, 228, 229, 230, 231, 232, or 233”.

[p. 280, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=280) (indent level 1)

(b) SAVINGS PROVISION.—Nothing in this title or an amendment made by this title grants authority to the Federal Energy Regulatory Commission under the Federal Power Act (16 U.S.C. 791a et seq.) over sales of electric energy at retail or the local distribution of electricity.

