# Sec. 2215. Hardrock mining mill sites

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2215)

## Summary

Lets a hardrock mine operator locate as many mill sites on public land as are reasonably necessary for waste rock, tailings and other operations. ([p. 308, line 7 to p. 308, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308)) Each mill site covers up to 5 acres and sits under an approved plan of operations. ([p. 308, line 16 to p. 308, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308)) The operator pays a $400 annual fee per site. ([p. 311, line 9 to p. 311, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311)) Mill sites convey no mineral rights and cannot be patented. ([p. 308, line 14 to p. 308, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308)) Hardrock minerals on acquired federal lands become leasable. ([p. 314, line 17 to p. 314, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314)) Mill site fees and those lease receipts go to a new Abandoned Hardrock Mine Fund for cleanup. ([p. 315, line 9 to p. 315, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=315))

## Key points

- A mine operator may locate as many 5-acre mill sites as its plan of operations needs ([p. 308, line 1 to p. 308, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308))
- $400 per mill site per year, paid into an abandoned mine cleanup fund ([p. 311, line 12 to p. 311, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **Earthworks** (Environmental groups; opposes): The mining title goes beyond a technical Rosemont fix and would hand miners public land for waste dumps, roads, pipelines and power lines.
  > a nearly unlimited amount of public lands for their waste dumps, for their roads, for their pipelines, for their transmission lines, and for any other purpose that would be reasonably incident to mining.
  [Heatmap, 2026-10-02](https://heatmap.news/politics/baaja-mining-waste). On the bill text at [p. 306, line 7 to p. 306, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306).
- **National Mining Association** (Industry; supports): The association describes the permitting process as mired in duplication, endless litigation and uncertainty.
  > mired in duplication, endless litigation and uncertainty
  [Heatmap, 2026-10-02](https://heatmap.news/politics/baaja-mining-waste).
- **Zero Emission Transportation Association** (Clean energy industry; supports): The mill-site fix removes legal uncertainty that discourages domestic minerals investment.
  > It needed to be clarified in order to remove uncertainty. It's hard enough to invest in mineral production in the United States
  [Heatmap, 2026-10-02](https://heatmap.news/politics/baaja-mining-waste). On the bill text at [p. 306, line 7 to p. 306, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306).

## Selected statutory quotes

> locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations

[p. 308, line 7 to p. 308, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308)

An operator may locate as many mill sites as its operations need.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Mill sites are capped at 5 acres each on non-mineral land. The Ninth Circuit held in 2022 (the Rosemont case) that waste rock cannot be stored on claims that lack a valuable mineral deposit.

### EPRA 2024 (reported S. 4753)

Carried over from EPRA 2024 (sec. 210, hardrock mining mill sites), including the cleanup fund.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act; the House passed a separate Mining Regulatory Clarity Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 306, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306) (indent level 1)

(a) MULTIPLE MILL SITES.—Section 2337 of the Revised Statutes (30 U.S.C. 42) is amended by adding at the end the following:

[p. 306, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306) (indent level 1)

“(c) ADDITIONAL MILL SITES.—

[p. 306, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306) (indent level 2)

“(1) DEFINITIONS.—In this subsection:

[p. 306, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306) (indent level 3)

“(A) MILL SITE.—The term ‘mill site’ means a location of public land that is reasonably necessary for waste rock or tailings disposal or other operations reasonably incident to mineral development on, or production from land included in a plan of operations.

[p. 306, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306) (indent level 3)

“(B) OPERATIONS; OPERATOR.—The terms ‘operations’ and ‘operator’ have the meanings given those terms in section 3809.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection).

[p. 306, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=306) (indent level 3)

“(C) PLAN OF OPERATIONS.—The term ‘plan of operations’ means a plan of operations that an operator must submit and the Secretary of the Interior or the Secretary of Agriculture, as applicable, must approve before an operator may begin operations, in accordance with, as applicable—

[p. 307, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=307) (indent level 4)

“(i) subpart 3809 of part 3800 of title 43, Code of Federal Regulations (or successor regulations establishing application and approval requirements); and

[p. 307, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=307) (indent level 4)

“(ii) part 228 of title 36, Code of Federal Regulations (or successor regulations establishing application and approval requirements).

[p. 307, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=307) (indent level 3)

“(D) PUBLIC LAND.—The term ‘public land’ means land owned by the United States that is open to location under sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.), including—

[p. 307, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=307) (indent level 4)

“(i) land that is mineral-in-character (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection));

[p. 307, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=307) (indent level 4)

“(ii) nonmineral land (as defined in section 3830.5 of title 43, Code of Federal Regulations (as in effect on the date of enactment of this subsection)); and

[p. 307, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=307) (indent level 4)

“(iii) land where the mineral character has not been determined.

[p. 308, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308) (indent level 2)

“(2) AUTHORIZATION.—Notwithstanding subsections (a) and (b), where public land is needed by the proprietor of a lode or placer claim for operations in connection with any lode or placer claim within the proposed plan of operations, the proprietor may—

[p. 308, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308) (indent level 3)

“(A) locate and include within the plan of operations as many mill site claims under this subsection as are reasonably necessary for its operations; and

[p. 308, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308) (indent level 3)

“(B) use or occupy public land in accordance with an approved plan of operations.

[p. 308, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308) (indent level 2)

“(3) MILL SITES CONVEY NO MINERAL RIGHTS.—A mill site under this subsection does not convey mineral rights to the locator.

[p. 308, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308) (indent level 2)

“(4) SIZE OF MILL SITES.—A location of a single mill site under this subsection shall not exceed 5 acres.

[p. 308, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308) (indent level 2)

“(5) MILL SITE AND LODE OR PLACER CLAIMS ON SAME TRACTS OF PUBLIC LAND.—A mill site may be located under this subsection on a tract of public land on which the claimant or operator maintains a previously located lode or placer claim.

[p. 308, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=308) (indent level 2)

“(6) EFFECT ON MINING CLAIMS.—The location of a mill site under this subsection shall not affect the validity of any lode or placer claim, or any rights associated with such a claim.

[p. 309, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 2)

“(7) PATENTING.—A mill site under this section shall not be eligible for patenting.

[p. 309, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 2)

“(8) SAVINGS PROVISIONS.—Nothing in this subsection—

[p. 309, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 3)

“(A) diminishes any right (including a right of entry, use, or occupancy) of a claimant;

[p. 309, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 3)

“(B) creates or increases any right (including a right of exploration, entry, use, or occupancy) of a claimant on land that is not open to location under the general mining laws;

[p. 309, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 3)

“(C) modifies any provision of law or any prior administrative action withdrawing land from location or entry;

[p. 309, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 3)

“(D) limits the right of the Federal Government to regulate mining and mining-related activities (including requiring claim validity examinations to establish the discovery of a valuable mineral deposit) in areas withdrawn from mining, including under—

[p. 309, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 4)

“(i) the general mining laws;

[p. 309, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=309) (indent level 4)

“(ii) the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.);

[p. 310, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 4)

“(iii) the Wilderness Act (16 U.S.C. 1131 et seq.);

[p. 310, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 4)

“(iv) sections 100731 through 100737 of title 54, United States Code;

[p. 310, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 4)

“(v) the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.);

[p. 310, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 4)

“(vi) division A of subtitle III of title 54, United States Code (commonly referred to as the ‘National Historic Preservation Act’); or

[p. 310, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 4)

“(vii) section 4 of the Act of July 23, 1955 (commonly known as the ‘Surface Resources Act of 1955’) (69 Stat. 368, chapter 375; 30 U.S.C. 612);

[p. 310, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 3)

“(E) restores any right (including a right of entry, use, or occupancy, or right to conduct operations) of a claimant that—

[p. 310, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 4)

“(i) existed prior to the date on which the land was closed to, or withdrawn from, location under the general mining laws; and

[p. 310, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=310) (indent level 4)

“(ii) that has been extinguished by such closure or withdrawal; or

[p. 311, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 3)

“(F) modifies section 404 of division E of the Consolidated Appropriations Act, 2024 (Public Law 118–42).”.

[p. 311, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 1)

(b) CLAIM MAINTENANCE FEE FOR ADDITIONAL MILL SITES.—Section 10101(a)(1) of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C. 28f(a)(1)) is amended, in the first sentence, by inserting “, except the holders of each mill site located under subsection (c) of section 2337 of the Revised Statutes (30 U.S.C. 42) shall pay to the Secretary of the Interior, on or before September 1 of each year, to the extent provided in advance in appropriations Acts, a claim maintenance fee of $400 per site” after “respectively”.

[p. 311, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 1)

(c) APPLICATION OF MINERAL LEASING ACT FOR ACQUIRED LANDS TO HARDROCK MINERALS.—

[p. 311, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 2)

(1) HARDROCK MINERALS.—Section 2 of the Mineral Leasing Act for Acquired Lands (30 U.S.C. 351) is amended—

[p. 311, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 3)

(A) in the sixth sentence, by striking “The term” and all that follows through “embrace” and inserting the following:

[p. 311, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 2)

“(5) OIL.—The term ‘oil’ means”;

[p. 311, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 3)

(B) in the fifth sentence, by striking “ ‘Lease’ ” and inserting the following:

[p. 311, line 25](https://pranava0x0.github.io/permittingreform/bill.pdf#page=311) (indent level 2)

“(3) LEASE.—The term ‘lease’ ”;

[p. 312, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 3)

(C) by striking the fourth sentence and inserting the following:

[p. 312, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 2)

“(4) MINERAL LEASING LAWS.—The term ‘mineral leasing laws’ means—

[p. 312, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 3)

“(A) the Mineral Leasing Act (30 U.S.C. 181 et seq.);

[p. 312, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 3)

“(B) the Act of April 17, 1926 (44 Stat. 301, chapter 158; 30 U.S.C. 271 et seq.);

[p. 312, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 3)

“(C) the Act of February 7, 1927 (44 Stat. 1057, chapter 66; 30 U.S.C. 281 et seq.); and

[p. 312, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 3)

“(D) all Acts amendatory or supplementary to any of the Acts described in subparagraphs (A) through (C).”;

[p. 312, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 3)

(D) in the third sentence, by striking “ ‘Secretary’ ” and inserting the following:

[p. 312, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 2)

“(6) SECRETARY.—The term ‘Secretary’ ”;

[p. 312, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 3)

(E) in the second sentence—

[p. 312, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=312) (indent level 4)

(i) by striking “(36 Stat.” and all that follows through the period at the end and inserting “(commonly known as the ‘Weeks Law’) (36 Stat. 961, chapter 186; 16 U.S.C. 552 et seq.).”; and

[p. 313, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 4)

(ii) by striking “ ‘Acquired lands’ or ‘lands acquired by the United States’ include” and inserting the following:

[p. 313, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 2)

“(1) ACQUIRED LANDS; LANDS ACQUIRED BY THE UNITED STATES.—The terms ‘acquired lands’ and ‘lands acquired by the United States’ mean”;

[p. 313, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 3)

(F) in the first sentence, by striking “As used in this Act ‘United States’ ” and inserting the following: “In this Act:

[p. 313, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 2)

“(7) UNITED STATES.—The term ‘United States’ ”;

[p. 313, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 3)

(G) by moving the paragraphs so as to appear in numerical order; and

[p. 313, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 3)

(H) by inserting after paragraph (1) (as so designated) the following:

[p. 313, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 2)

“(2) HARDROCK MINERAL.—

[p. 313, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 3)

“(A) IN GENERAL.—The term ‘hardrock mineral’ includes deposits of—

[p. 313, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 4)

“(i) minerals found in sedimentary or other rocks;

[p. 313, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 4)

“(ii) base metals;

[p. 313, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 4)

“(iii) precious metals;

[p. 313, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 4)

“(iv) industrial minerals; and

[p. 313, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=313) (indent level 4)

“(v) precious and semi-precious gemstones.

[p. 314, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 3)

“(B) EXCLUSIONS.—The term ‘hardrock mineral’ does not include deposits of—

[p. 314, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(i) coal;

[p. 314, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(ii) oil;

[p. 314, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(iii) oil shale;

[p. 314, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(iv) gas;

[p. 314, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(v) sodium;

[p. 314, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(vi) potassium;

[p. 314, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(vii) sulfur; or

[p. 314, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 4)

“(viii) mineral materials subject to disposition under the Act of July 31, 1947 (commonly known as the ‘Materials Act of 1947’) (61 Stat. 681, chapter 406; 30 U.S.C. 601 et seq.).”.

[p. 314, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 2)

(2) DEPOSITS SUBJECT TO LEASE.—Section 3 of the Mineral Leasing Act for Acquired Lands (30 U.S.C. 352) is amended, in the first sentence, by striking “and sulfur” and inserting “sulfur, and hardrock minerals”.

[p. 314, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 1)

(d) ABANDONED HARDROCK MINE FUND.—

[p. 314, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=314) (indent level 2)

(1) ESTABLISHMENT.—There is established in the Treasury of the United States a separate account, to be known as the “Abandoned Hardrock Mine Fund” (referred to in this subsection as the “Fund”).

[p. 315, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=315) (indent level 2)

(2) SOURCE OF DEPOSITS.—

[p. 315, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=315) (indent level 3)

(A) IN GENERAL.—Any amounts collected by the Secretary of the Interior pursuant to the claim maintenance fee under section 10101(a)(1) of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C. 28f(a)(1)) on mill sites located under subsection (c) of section 2337 of the Revised Statutes (30 U.S.C. 42) shall be deposited into the Fund.

[p. 315, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=315) (indent level 3)

(B) HARDROCK MINERALS.—Section 6(a) of the Mineral Leasing Act for Acquired Lands (30 U.S.C. 355(a)) is amended by adding at the end the following: “Beginning on the date of enactment of the Bipartisan American Affordability and Jobs Act of 2026, any receipts derived from leases of hardrock minerals pursuant to section 3 that would otherwise be paid into the Treasury shall be deposited into the Abandoned Hardrock Mine Fund established by section 205(d) of the Bipartisan American Affordability and Jobs Act of 2026.”.

[p. 315, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=315) (indent level 2)

(3) USE.—The Secretary of the Interior may make expenditures from amounts available in the Fund, without further appropriations or fiscal year limitation, only to carry out section 40704 of the Infrastructure Investment and Jobs Act (30 U.S.C. 1245).

[p. 316, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 2)

(4) ALLOCATION OF FUNDS.—Amounts made available under paragraph (3)—

[p. 316, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 3)

(A) shall be allocated in accordance with section 40704(e)(1) of the Infrastructure Investment and Jobs Act (30 U.S.C. 1245(e)(1));

[p. 316, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 3)

(B) may be transferred in accordance with section 40704(e)(2) of that Act (30 U.S.C. 1245(e)(2)); and

[p. 316, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 3)

(C) may be used for the administration of the Fund and section 40704 of the Infrastructure Investment and Jobs Act (30 U.S.C. 1245) in amounts not to exceed 5 percent of amounts deposited into the Fund.

[p. 316, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 1)

(e) CLERICAL AMENDMENTS.—Section 10101 of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C. 28f) is amended—

[p. 316, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 2)

(1) by striking “the Mining Law of 1872 (30 U.S.C. 28–28e)” each place it appears and inserting “sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)”;

[p. 316, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 2)

(2) in subsection (a)—

[p. 316, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=316) (indent level 3)

(A) in paragraph (1)—

[p. 317, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 4)

(i) in the second sentence, by striking “Such claim maintenance fee” and inserting the following:

[p. 317, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 3)

“(B) FEE.—The claim maintenance fee under subparagraph (A)”; and

[p. 317, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 4)

(ii) in the first sentence, by striking “The holder of” and inserting the following:

[p. 317, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 3)

“(A) IN GENERAL.—The holder of”; and

[p. 317, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 3)

(B) in paragraph (2)—

[p. 317, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 4)

(i) in the second sentence—

[p. 317, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 5)

(I) by striking “the Mining Law of 1872 (30 U.S.C. 28 to 28e)” and inserting “sections 2319 through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)”; and

[p. 317, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 5)

(II) by striking “Such claim maintenance fee” and inserting the following:

[p. 317, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 3)

“(B) FEE.—The claim maintenance fee under subparagraph (A)”; and

[p. 317, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 4)

(ii) in the first sentence, by striking “The holder of” and inserting the following:

[p. 317, line 25](https://pranava0x0.github.io/permittingreform/bill.pdf#page=317) (indent level 3)

“(A) IN GENERAL.—The holder of”; and

[p. 318, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 2)

(3) in subsection (b)—

[p. 318, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 3)

(A) in the second sentence, by striking “The location fee” and inserting the following:

[p. 318, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 2)

“(2) FEE.—The location fee”; and

[p. 318, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 3)

(B) in the first sentence, by striking “The claim main tenance fee” and inserting the following:

[p. 318, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 2)

“(1) IN GENERAL.—The claim maintenance fee”.