# Sec. 2225. No Federal permit required for geothermal activities on certain land

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2225)

## Summary

No federal drilling permit for geothermal exploration and production on non-federal surface where the United States owns less than 50 percent of the subsurface geothermal estate, if the operator files its state permit with Interior. ([p. 338, line 20 to p. 338, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=338)) Indian lands are excluded; royalties are unchanged. ([p. 340, line 1 to p. 340, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340))

## Key points

- State permits suffice for geothermal wells with a minority federal interest ([p. 338, line 20 to p. 338, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=338))

## Selected statutory quotes

> The Secretary shall not require an operator to obtain a Federal drilling permit for geothermal exploration and production activities conducted on a non-Federal surface estate

[p. 338, line 20 to p. 338, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=338)

No federal drilling permit on non-federal surface with a minority federal interest.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

A federal permit is required.

### EPRA 2024 (reported S. 4753)

Parallel to EPRA 2024's oil and gas provision; the geothermal version is new.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 338, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=338) (indent level 0)

The Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) (as amended by section 2221) is amended by adding at the end the following:

[p. 338, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=338) (indent level 0)

“SEC. 31. NO FEDERAL PERMIT REQUIRED FOR GEOTHERMAL ACTIVITIES ON CERTAIN LAND.

[p. 338, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=338) (indent level 1)

“(a) EXPLORATION AND PRODUCTION ACTIVITIES.— The Secretary shall not require an operator to obtain a Federal drilling permit for geothermal exploration and production activities conducted on a non-Federal surface estate, provided that—

[p. 338, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=338) (indent level 2)

“(1) the United States holds an ownership interest of less than 50 percent of the subsurface geothermal estate to be accessed by the proposed action; and

[p. 339, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=339) (indent level 2)

“(2) the operator submits to the Secretary a State permit to conduct geothermal exploration and production activities on the non-Federal surface estate.

[p. 339, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=339) (indent level 1)

“(b) NOTIFICATION.—For each State permit to drill or drilling plan that would impact or extract oil and gas owned by the Federal Government—

[p. 339, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=339) (indent level 2)

“(1) each lessee of Federal minerals in the unit, or designee of a lessee, shall—

[p. 339, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=339) (indent level 3)

“(A) notify the Secretary of the submission of a State application for a permit to drill or drilling plan on submission of the application; and

[p. 339, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=339) (indent level 3)

“(B) provide a copy of the application described in subparagraph (A) to the Secretary not later than 5 days after the date on which the permit or plan is submitted; and

[p. 339, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=339) (indent level 2)

“(2) each lessee, designee of a lessee, or applicable State shall notify the Secretary of the approved State permit to drill or drilling plan not later than 45 days after the date on which the permit or plan is approved.

[p. 340, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 1)

“(c) NONAPPLICABILITY TO INDIAN LAND.—Subsection (a) shall not apply to—

[p. 340, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 2)

“(1) any land located within the boundaries of an Indian reservation, pueblo, or rancheria; or

[p. 340, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 2)

“(2) any land not located within the boundaries of an Indian reservation, pueblo, or rancheria, the title to which is held—

[p. 340, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 3)

“(A) in trust by the United States for the benefit of an Indian Tribe or an individual Indian;

[p. 340, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 3)

“(B) by an Indian Tribe or an individual Indian, subject to restriction against alienation under laws of the United States; or

[p. 340, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 3)

“(C) by a dependent Indian community.

[p. 340, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 1)

“(d) EFFECT.—

[p. 340, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 2)

“(1) IN GENERAL.—Nothing in this section shall affect the amount of royalties due to the United States under this Act from the production of electricity using geothermal resources (other than direct use of geothermal resources) or the production of any byproducts.

[p. 340, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=340) (indent level 2)

“(2) ONSITE REVIEWS AND INSPECTIONS.—The Secretary may conduct onsite reviews and inspections to ensure proper accountability, measurement, and reporting of the production described in subsection (a), and payment of royalties.”.

