# Sec. 2226. Effect of pending civil actions on processing applications relating to geothermal leasing

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2226)

## Summary

Requires Interior to keep processing geothermal permits, sundry notices and rights-of-way under a valid lease despite pending litigation. ([p. 341, line 22 to p. 342, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=341)) Interior must decide within 60 days of completing legal requirements. ([p. 342, line 5 to p. 342, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=342)) The duty ends if a court has vacated or enjoined the lease or permit. ([p. 342, line 1 to p. 342, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=342))

## Key points

- Litigation alone does not pause geothermal permitting ([p. 341, line 22 to p. 341, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=341))

## Selected statutory quotes

> approve and issue, or deny, each such application not later than 60 days after completing all requirements under applicable Federal laws

[p. 342, line 5 to p. 342, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=342)

Applications are decided within 60 days even while a lawsuit is pending.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Agencies sometimes pause processing while suits are pending.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 341, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=341) (indent level 0)

Section 4 of the Geothermal Steam Act of 1970 (30 U.S.C. 1003) (as amended by section 2223(b)) is amended by adding at the end the following:

[p. 341, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=341) (indent level 4)

“(i) EFFECT OF PENDING CIVIL ACTIONS ON PROCESSING APPLICATIONS RELATING TO GEOTHERMAL LEASING.—

[p. 341, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=341) (indent level 2)

“(1) DEFINITION OF AUTHORIZATION.—In this subsection, the term ‘authorization’ means any license, permit, approval, finding, determination, or other administrative decision issued by a Federal agency, or any interagency consultation, that is required or authorized under Federal law (including regulations) in order to site, construct, reconstruct, or commence operation of a geothermal project administered by a Federal agency.

[p. 341, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=341) (indent level 2)

“(2) REQUIREMENT TO PROCESS APPLICATIONS.— Notwithstanding any pending civil action that affects an application for a geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or any other authorization under a valid existing geothermal lease, the Secretary shall, unless a Federal court vacates or provides injunctive relief for the applicable geothermal lease, geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or other authorization, approve and issue, or deny, each such application not later than 60 days after completing all requirements under applicable Federal laws (including regulations), including the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and division A of subtitle III of title 54, United States Code.

[p. 342, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=342) (indent level 2)

“(3) NO NEW AUTHORITY FOR FEDERAL COURTS.—Nothing in this subsection modifies any existing authority of a Federal court to vacate or provide injunctive relief for a geothermal lease, geothermal drilling permit, sundry notice, notice to proceed, right-of-way, or other authorization.”.