# Sec. 2227. Cost recovery from geothermal leasing, permitting, and inspections

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2227)

## Summary

Lets Interior charge geothermal applicants and lessees for the cost of processing and inspections through September 30, 2033, with hardship reductions, and requires a report within 5 years. ([p. 343, line 1 to p. 343, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343))

## Key points

- Geothermal cost recovery through fiscal year 2033 ([p. 343, line 1 to p. 343, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343))

## Selected statutory quotes

> the Secretary may require an applicant for, or holder of, a geothermal lease to reimburse the United States for all reasonable administrative and other costs

[p. 343, line 4 to p. 343, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343)

Interior may charge applicants for processing costs.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New authority.

### EPRA 2024 (reported S. 4753)

EPRA 2024 (sec. 208(d)) told Interior to write cost recovery rules within 180 days. This bill grants the authority directly, with a 2033 sunset.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 342, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=342) (indent level 1)

(a) IN GENERAL.—Section 6 of the Geothermal Steam Act of 1970 (30 U.S.C. 1005) is amended by adding at the end the following:

[p. 342, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=342) (indent level 1)

“(j) COST RECOVERY.—

[p. 343, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343) (indent level 2)

“(1) IN GENERAL.—During the period beginning on the date of enactment of the Bipartisan American Affordability and Jobs Act of 2026 and ending on September 30, 2033, the Secretary may require an applicant for, or holder of, a geothermal lease to reimburse the United States for all reasonable administrative and other costs incurred by the United States from—

[p. 343, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343) (indent level 3)

“(A) processing the application for the geothermal lease, including any application for an operations plan, geothermal drilling permit, utilization plan, site license, facility construction permit, commercial use permit, and any other approval associated with a geothermal lease; and

[p. 343, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343) (indent level 3)

“(B) inspecting and monitoring—

[p. 343, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343) (indent level 4)

“(i) geophysical exploration activities;

[p. 343, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343) (indent level 4)

“(ii) the drilling, plugging, or abandonment of wells; and

[p. 343, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343) (indent level 4)

“(iii) the construction, operation, termination, or reclamation of any well site or facility for the utilization of geothermal resources pursuant to the geothermal lease.

[p. 343, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=343) (indent level 2)

“(2) FACTOR FOR CONSIDERATION.—In determining whether to require reimbursement under paragraph (1), the Secretary shall take into consideration whether there is in existence a cooperative cost-share agreement between the United States and the holder of a geothermal lease.

[p. 344, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=344) (indent level 2)

“(3) ADJUSTMENTS.—The Secretary may reduce the amount required to be reimbursed under paragraph (1) if the Secretary determines that—

[p. 344, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=344) (indent level 3)

“(A) full reimbursement would impose on the applicant an economic hardship; or

[p. 344, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=344) (indent level 3)

“(B) a less-than-full reimbursement is necessary to promote the greatest use of geothermal resources.

[p. 344, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=344) (indent level 2)

“(4) USE.—The amounts reimbursed under this subsection shall be—

[p. 344, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=344) (indent level 3)

“(A) credited to the currently applicable appropriation, account, or fund of the Department of the Interior as discretionary offsetting collections; and

[p. 344, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=344) (indent level 3)

“(B) available only to the extent provided in advance in appropriations Acts for—

[p. 344, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=344) (indent level 4)

“(i) processing applications for geothermal leases, including any applications for operations plans, geothermal drilling permits, utilization plans, site licenses, facility construction permits, commercial use permits, and any other approval associated with geothermal leases; and

[p. 345, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=345) (indent level 4)

“(ii) inspecting and monitoring—

[p. 345, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=345) (indent level 5)

“(I) geophysical exploration activities;

[p. 345, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=345) (indent level 5)

“(II) the drilling, plugging, or abandonment of wells; and

[p. 345, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=345) (indent level 5)

“(III) the construction, operation, termination, or reclamation of any well site or facility for the utilization of geothermal resources pursuant to geothermal leases.”.

[p. 345, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=345) (indent level 1)

(b) REPORT.—

[p. 345, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=345) (indent level 2)

(1) IN GENERAL.—Not later than 5 years after the date of enactment of this Act, the Secretary of the Interior, in consultation with representatives of the geothermal industry and other stakeholders, shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Natural Resources of the House of Representatives, and make publicly available on the website of the Department of the Interior, a report that includes—

[p. 345, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=345) (indent level 3)

(A) an assessment of how the amendment made by subsection (a) affected the geothermal program of the Bureau of Land Management;

[p. 346, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=346) (indent level 3)

(B) any recommendations for reauthorization of subsection (j) of section 6 of the Geothermal Steam Act of 1970 (30 U.S.C. 1005) (as added by subsection (a)); and

[p. 346, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=346) (indent level 3)

(C) any other recommendations for updates to—

[p. 346, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=346) (indent level 4)

(i) subsection (j) of section 6 of the Geothermal Steam Act of 1970 (30 U.S.C. 1005) (as so added); or

[p. 346, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=346) (indent level 4)

(ii) the geothermal program of the Bureau of Land Management.

[p. 346, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=346) (indent level 2)

(2) CONSIDERATIONS.—In developing the report under paragraph (1), the Secretary of the Interior shall solicit facts or information from representatives of the geothermal industry and other stakeholders.

