# Sec. 2234. Micro hydrokinetic energy projects

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2234)

## Summary

Creates an expedited FERC license of 10 to 20 years for micro hydrokinetic projects of 5 megawatts or less. ([p. 358, line 21 to p. 358, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358)) Qualifying projects are wave, tidal, current and free-flowing river turbines with no impoundment. ([p. 358, line 15 to p. 358, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358)) FERC takes final action within 1 year of the application, with categorical exclusions for low-disturbance activities. ([p. 360, line 1 to p. 360, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=360))

## Key points

- One-year licensing for hydrokinetic projects up to 5 MW ([p. 358, line 21 to p. 358, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358))

## Selected statutory quotes

> The Commission shall take final action on an application for a license under this section not later than 1 year after the date on which the application is filed

[p. 360, line 1 to p. 360, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=360)

A one-year license decision for small hydrokinetic projects.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Such projects use the general licensing or pilot project processes.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 358, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 0)

Part I of the Federal Power Act (16 U.S.C. 792 et seq.) is amended by adding at the end the following:

[p. 358, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 0)

“SEC. 37. LICENSING OF MICRO HYDROKINETIC ENERGY PROJECTS.

[p. 358, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 1)

“(a) DEFINITION OF MICRO HYDROKINETIC ENERGY PROJECT.—In this section, the term ‘micro hydrokinetic energy project’—

[p. 358, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 2)

“(1) means a project that—

[p. 358, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 3)

“(A) has an installed capacity of not more than 5 megawatts; and

[p. 358, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 3)

“(B) converts to electric energy the hydrokinetic energy from a generator driven by a turbine from—

[p. 358, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 4)

“(i) waves, tides, or currents in oceans, estuaries, or tidal areas; or

[p. 358, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 4)

“(ii) free flowing water in rivers, lakes, streams, or man-made channels; and

[p. 358, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 2)

“(2) does not include a project that impounds water to generate electricity.

[p. 358, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 1)

“(b) AUTHORIZATION.—The Commission may issue a license in accordance with this section for a term of not less than 10, and not more than 20, years for the construction, operation, and maintenance of project works for a micro hydrokinetic energy project.

[p. 358, line 26](https://pranava0x0.github.io/permittingreform/bill.pdf#page=358) (indent level 1)

“(c) EXPEDITED LICENSING PROCESS.—

[p. 359, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=359) (indent level 2)

“(1) NOTIFICATION OF INTENT.—

[p. 359, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=359) (indent level 3)

“(A) FILING OF NOTIFICATION.—An applicant for a license under this section shall commence the licensing process by filing a notification of intent with the Commission.

[p. 359, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=359) (indent level 3)

“(B) EXISTING LICENSE DEADLINE.—Notwithstanding section 15(b)(1), an applicant for a license under this section shall file a notification of intent under subparagraph (A) not later than 2 years before the expiration of an existing license, if applicable.

[p. 359, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=359) (indent level 2)

“(2) FILING OF APPLICATION.—

[p. 359, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=359) (indent level 3)

“(A) IN GENERAL.—Except as provided in subparagraph (B), an applicant for a license under this section shall submit to the Commission an application not later than 1 year after the date on which the applicant files a notification of intent under paragraph (1).

[p. 359, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=359) (indent level 3)

“(B) EXISTING LICENSE DEADLINE.—Notwithstanding section 15(c)(1), an applicant for a license under this section shall file an application with the Commission not later than 1 year before the date of expiration of the term of an existing license, if applicable.

[p. 360, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=360) (indent level 2)

“(3) DEADLINE FOR ISSUANCE.—The Commission shall take final action on an application for a license under this section not later than 1 year after the date on which the application is filed under paragraph (2).

[p. 360, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=360) (indent level 2)

“(4) SCHEDULE FOR FINAL ACTION.—To the extent reasonably practicable, the Commission and any applicable conditioning or permitting agencies shall establish, with respect to each micro hydrokinetic energy project that is the subject of a notification of intent to apply for a license under this section, a joint schedule that permits the timely completion of decisions required to be made with respect to, and the timely issuance of, authorizations required under Federal law by the Commission and the conditioning or permitting agencies, subject to the requirement that any joint schedule established under this paragraph shall comply with the deadline for final action established under paragraph (3).

[p. 360, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=360) (indent level 1)

“(d) REGULATIONS.—

[p. 360, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=360) (indent level 2)

“(1) IN GENERAL.—Not later than 180 days after the date of enactment of this section, the Commission shall promulgate regulations to implement this section in a manner that expedites the deployment of micro hydrokinetic energy projects while ensuring the safe operation of the micro hydrokinetic energy project in compliance with applicable Federal and State laws.

[p. 361, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=361) (indent level 2)

“(2) INCLUSION.—The regulations promulgated under paragraph (1) shall provide for the use of 1 or more categorical exclusions, including allowing for extraordinary circumstances under which the categorical exclusion shall not be available, under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) for low disturbance activities necessary for micro hydrokinetic energy projects.

[p. 361, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=361) (indent level 1)

“(e) REPORT TO CONGRESS.—The Commission shall submit to Congress a report describing the impacts of the micro hydrokinetic energy projects licensed under this section on the environment, the economy, and the reliability and affordability of electricity not later than the earlier of—

[p. 361, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=361) (indent level 2)

“(1) the date that is 5 years after the date of enactment of this section; and

[p. 361, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=361) (indent level 2)

“(2) the date on which the first 50 micro hydrokinetic energy projects licensed under this section have been operational for not less than 1 year.

[p. 361, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=361) (indent level 1)

“(f) SAVINGS CLAUSE.—Nothing in this section affects any authority of the Commission, at the election of an applicant, to license the construction, operation, and maintenance of project works for a micro hydrokinetic energy project under any other provision of this part.”.

