EL26-67-000 · 2026-07-15 · Relentless Energy Systems LLC
Comments of Relentless Energy Systems LLC providing technical evidence and Xyce netlists demonstrating Geometric Phase Isolation, a Grid Enhancing Technology, for passive hardware-level VAR-offloading at Point-of-Load
Back to sections and commentaryPDF page 1
1
Security Level: PUBLIC
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION
Re: Large Load Interconnection, Co-Located Resources, and Grid Enhancing
Technologies
Docket Nos. EL26-67-000, EL26-68-000, EL26-69-000, EL26-70-000, EL26-71-000,
EL26-72-000, EL25-49-002, and AD10-12-017
SUBMISSION OF TECHNICAL EVIDENCE: GEOMETRIC PHASE ISOLATION (GPI) FOR
PASSIVE HARDWARE LEVEL VAR OFFLOADING
To: Debbie-Anne Reese,
Secretary Federal Energy Regulatory Commission
888 First Street, N.E.
Washington, D.C. 20426
Dear Secretary Reese,
Relentless Energy Systems LLC respectfully submits the enclosed technical evidence
and Xyce netlists and results to assist regional transmission organizations and the
Commission in mitigating the infrastructure impacts of large loads in support of the
Commission’s ongoing Show Cause orders. This filing provides comprehensive
analytical data, solver-verified models, and engineering specifications for a novel
Grid Enhancing Technology (GET) directly applicable to the large load interconnection
constraints and transmission congestion issues driven by the unprecedented national
growth of high-density loads.
This submission details Geometric Phase Isolation (GPI), a passive five‑dimensional
LCFVR parallel resonant manifold engineered to physically offload magnetizing VARs
at the Point of Load. The attached evidence demonstrates that GPI provides Xyce
PDF page 2
2
solver verified hardware‑level VAR offloading through an internally circulating
reactive payload that maintains strict First Law thermodynamic parity. By preventing
upstream VAR propagation and its associated thermal transit constraints, the GPI
manifold materially increases available interconnection capacity without requiring new
transmission rights‑of‑way.
The following three (3) groups of documents are included in this public eFiling for
technical review by Commission engineering staff:
• GPI_Master_Netlist Capacitance Variance Sweep (5 Netlists)
- GPI_Master-20%_Netlist.txt
- GPI_Master-10%_Netlist.txt
- GPI_Master_Netlist.txt
- GPI_Master+10%_Netlist.txt
- GPI_Master+20%_Netlist.txt
- GPI_Composite_Dashboard.pdf
•
RR-GPI_5D-LCFVR_Resilient-Resonance Sweep (1 Netlist)
- RR-GPI_5D-LCFVR_Resilient-Resonance_Netlist.txt
- RR-5D-LCFVR-GPI-ResilientResonance-Graph-Table.pdf
•
Non‑Provisional Patent Application No. 19/546,421
-
SPECIFICATION.pdf
-
DRAWINGS.pdf
PDF page 3
3
This filing is submitted unencrypted and without restriction into the public docket to
support rigorous technical evaluation of GPI as a viable, scalable Grid Enhancing
Technology. The submission complies with 18 CFR §§ 385.2001–2005 and is filed
electronically through FERC’s eFiling system.
Respectfully submitted,
/s/ Benjamin Donovan Blackketter
Benjamin Donovan Blackketter Founder,
ben@relentlessenergy.systems
Relentless Energy Systems LLC
relentlessenergy.systems
740.252.6922
Relentless Energy Systems LLC – Northwest Registered Agent
6545 Market Ave. North, STE 100
Canton, Stark County, OH 44721
United States
Date: July 14, 2026