The filing record
The June orders, the responses and the documents behind them. Follow a section to the words on the page.
205 archived originals · 182 PDFs · Download the inventory
Who said what: testimony, filings and reporting by issue · Coverage and missing originals
Inside PJM’s filings
Browse the record
2026 FERC reliability technical conference: integrating large loads
- Reliability Technical Conference Comments from PJM Interconnection, L.L.C. (Christopher Pilong, Panel 1)AD26-8-000 · 2026-10-21 · 12 cited readings
- Third Supplemental Notice of Commissioner-Led Technical Conference: 2026 Reliability Technical Conference, October 21, 2026 (agenda; Panel 1 on integrating large loads)AD26-8-000 · 2026-10-15 · 4 cited readings
CAISO filings
- Answer of Corporate Energy Buyers Association in Support of California Independent System Operator Corporation's et al. 08/03/2026 et al. Motion for AbeyanceEL26-71-000 · 2026-08-07 · source text
- CAISO requests more time to answer the June 18 show cause orderEL26-71-000 · 2026-08-03 · source text
- Conditional Motion for Abeyance on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California,EL26-71-000 · 2026-08-03 · source text
- Motion to Hold Filing Obligation in Abeyance of DCR Transmission, L.L.CEL26-71-000 · 2026-08-03 · source text
- Motion to Rescind Show Cause Order as applied to Western Area Power AdministrationEL26-71-000 · 2026-08-03 · source text
- Request for Abeyance of Southern California Edison Company, et al. in response to the Order issued on 06/18/2026EL26-71-000 · 2026-08-03 · source text
- Motion to Rescind Show Cause Order on behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, CaliforniaEL26-71-000 · 2026-07-31 · source text
- CAISO reports on resource adequacy and large-load proposalsEL26-71-000 · 2026-07-20 · 4 cited readings
Congressional testimony
- Senate oversight of FERC: testimony and questions for the recordS. Hrg. 119-494 · 2026-07-22 · source text
Duke Energy Carolinas network service agreement and large-load shortfall payments
- Order Accepting Proposed Tariff Revisions (Duke Energy Carolinas pro forma NITSA, ER26-2691-000 and -001)ER26-2691-000 · 2026-10-09 · 8 cited readings
Exelon complaint seeking a prompt PJM capacity auction
- Complaint Requesting Fast Track Processing of Exelon Corporation (prompt capacity auction from the 2030/31 Delivery Year)EL27-11-000 · 2026-11-03 · 17 cited readings
ISO-NE filings
- Answer of the New England States Committee on Electricity in Response to Joint Motion for Abeyance filed by ISO New England, Inc. et alEL26-72-000 · 2026-08-07 · source text
- ISO-NE requests more time to answer the June 18 show cause orderEL26-72-000 · 2026-08-03 · source text
- ISO-NE reports on resource adequacy and large-load proposalsEL26-72-000 · 2026-07-20 · 3 cited readings
- Errata to the Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting the caption re ISO New England Inc. et alEL26-72-000 · 2026-07-09 · source text
- Vermont Electric Cooperative, Inc. submits Request for Issuance of an Errata re the Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et alEL26-72-000 · 2026-06-22 · source text
June 18 orders
- CAISO show cause orderEL26-71-000 · 2026-06-18 · source text
- ISO-NE show cause orderEL26-72-000 · 2026-06-18 · source text
- MISO show cause orderEL26-70-000 · 2026-06-18 · source text
- NYISO show cause orderEL26-69-000 · 2026-06-18 · source text
- PJM co-location rehearing orderEL25-49-002 · 2026-06-18 · source text
- PJM show cause orderEL26-67-000 · 2026-06-18 · source text
- SPP show cause orderEL26-68-000 · 2026-06-18 · source text
MISO Large Load Addition Resource Study (LARS)
- MISO Answer to Comments and Protests on the Large Load Addition Resource StudyER27-25-000 · 2026-11-09 · 1 cited readings
- Comments of Alliant Energy Corporate Services, Inc. and Consumers Energy Company in Support of MISO's Proposed Tariff RevisionsER27-25-000 · 2026-10-23 · 2 cited readings
- Comments of DTE Electric CompanyER27-25-000 · 2026-10-23 · 3 cited readings
- Comments of the Arkansas Public Service Commission in Support of MISO ApplicationER27-25-000 · 2026-10-23 · 1 cited readings
- Comments on Behalf of the Southern Regulators (Mississippi and Louisiana PSCs) in Support of MISO ApplicationER27-25-000 · 2026-10-23 · 3 cited readings
- Joint Protest of the Iowa Office of the Consumer Advocate, the Citizens Utility Boards of Michigan, Illinois, Wisconsin and Minnesota, Citizens Action Coalition of Indiana, the Michigan and Illinois Attorneys General, and the Minnesota Department of CommerceER27-25-000 · 2026-10-23 · 7 cited readings
- Limited Protest of Bloom Energy CorporationER27-25-000 · 2026-10-23 · 4 cited readings
- Limited Protest of Google LLCER27-25-000 · 2026-10-23 · 8 cited readings
- Protest and Request for Clarification of the American Clean Power Association and Southern Renewable Energy AssociationER27-25-000 · 2026-10-23 · 10 cited readings
- Protest of Clean Energy Advocates and Community OrganizationsER27-25-000 · 2026-10-23 · 12 cited readings
- Protest of the Solar Energy Industries Association and Advanced Energy UnitedER27-25-000 · 2026-10-23 · 6 cited readings
- Supporting Comments of the Entergy Operating Companies and Cleco Power LLCER27-25-000 · 2026-10-23 · 4 cited readings
- Midcontinent Independent System Operator, Inc.'s Large Load Addition Resource Study Process (transmittal letter; requested effective date December 2, 2026)ER27-25-000 · 2026-10-02 · 22 cited readings
MISO filings
- Motion for Leave to Answer and Answer of the Data Center Coalition re the 10/13/2026 Answer of Midcontinent Independent System Operator, Inc. et alER26-3650-000 · 2026-11-03 · source text
- Motion for Leave to Answer and Answer of Central Municipal Power Agency Services, et al. to Midcontinent Independent System Operator, Inc.’s 10/13/2026 Motion for Leave to Answer and AnswerER26-3650-000 · 2026-10-28 · source text
- Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the Comments and Protests re the proposal to establish Interconnection Reliability Requirements for Large LoadsER26-3650-000 · 2026-10-13 · source text
- FERC requests information about MISO’s zero-injection agreementER26-3552-000 · 2026-10-09 · source text
- Motion for Leave to Answer and Answer of Community Organizations and Clean Energy Advocates to Midcontinent Independent System Operator, Inc.’s 09/23/2026 AnswerER26-3552-000 · 2026-10-08 · source text
- Motion for Leave to Answer and Answer of Coalition of MISO Transmission Customers et al. to the Joint Protest of the Sierra Club et alER26-3650-000 · 2026-10-02 · source text
- Comments of Jessica Kivell asking the Commission to keep transparency, cost responsibility, reliable planning, and protection of existing customers at the center of the proceedingEL26-70-000 · 2026-10-01 · source text
- FERC_Public_Comment.pdfEL26-70-000 · 2026-10-01 · source text
- Motion to Intervene and Comments of Central Municipal Power Agency/Services et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filingER26-3650-000 · 2026-09-18 · source text
- Motion to Intervene and Comments of the Data Center Coalition re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filingER26-3650-000 · 2026-09-18 · source text
- Protest of Iowa Office of Consumer Advocate et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filingER26-3650-000 · 2026-09-18 · source text
- Protest of Mississippi Public Service Commission et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filingER26-3650-000 · 2026-09-18 · source text
- Protest of Sierra Club et al. re Midcontinent Independent System Operator, Inc.'s 08/28/2026 filingER26-3650-000 · 2026-09-18 · source text
- Motion for Acceptance of Late-Filed Comments and Comments in Conditional Support of the Organization of MISO States, Inc. re Midcontinent Independent System Operator, Inc.’s proposed tariff revisionsER26-3552-000 · 2026-09-11 · source text
- Comments of U.S. House of Representatives Victoria Spartz requesting independent federal review of the energy generation, grid resiliency, transmission, water-resource, and consumer-cost implications etcEL26-70-000 · 2026-09-10 · source text
- Motion to Intervene and Comments of Consumers Energy Company re the 08/18/2026 filing by Midcontinent Independent System Operator, IncER26-3552-000 · 2026-09-08 · source text
- Protest of Community Collaboration on Climate Change, et al. re the Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection AgreementER26-3552-000 · 2026-09-08 · source text
- Answer of Mississippi Public Service Commission et al. in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026ER26-3552-000 · 2026-09-03 · source text
- Answer of Southern Regulators in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026ER26-3552-000 · 2026-09-02 · source text
- MISO proposes interconnection reliability requirements for large loadsER26-3650-000 · 2026-08-28 · 4 cited readings
- Tab A - IRR Tariff Redline.pdfER26-3650-000 · 2026-08-28 · source text
- Tab B - IRR Tariff Clean.pdfER26-3650-000 · 2026-08-28 · source text
- Tab C - Testimony of BeiBei Li.pdfER26-3650-000 · 2026-08-28 · source text
- MISO proposes a zero-injection generator interconnection agreementER26-3552-000 · 2026-08-18 · 3 cited readings
- Tab A - Marked Tariff Sheets.pdfER26-3552-000 · 2026-08-18 · source text
- Tab B - Clean Tariff Sheets.pdfER26-3552-000 · 2026-08-18 · source text
- Tab C - Testimony of Marc Keyser.pdfER26-3552-000 · 2026-08-18 · source text
- Tab D - Redline ZGIA to pro forma GIA.pdfER26-3552-000 · 2026-08-18 · source text
- Comments of the Organization of MISO States, Inc. on the Informational Report of the Midcontinent Independent System Operator, Inc. filed on 07/20/2026EL26-70-000 · 2026-08-14 · source text
- Comments of Sparkfund on Midcontinent Independent System Operator Inc.’s Informational Report filed on 07/20/2026EL26-70-000 · 2026-08-12 · source text
- Answer of American Municipal Power, Inc. in Response to the Motion to Hold Abeyance filed by Midcontinent Independent System Operator, Inc. et alEL26-70-000 · 2026-08-07 · source text
- Answer of Corporate Energy Buyers Association in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion for AbeyanceEL26-70-000 · 2026-08-07 · source text
- Answer of the Organization of MISO States, Inc. in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion to Hold Proceeding in AbeyanceEL26-70-000 · 2026-08-07 · source text
- MISO requests more time to answer the June 18 show cause orderEL26-70-000 · 2026-08-03 · source text
- Motion of Wabash Valley Power Association, Inc. for Request for Issuance of an Errata of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power ActEL26-70-000 · 2026-07-28 · source text
- MISO reports on resource adequacy and large-load proposalsEL26-70-000 · 2026-07-20 · 3 cited readings
- Comments of Debra Ann Ostroski providing documented correspondence with American Transmission Company re the alternative transmission evaluation for the Large Load Show Cause ProceedingEL26-70-000 · 2026-06-24 · source text
NYISO filings
- Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of LS Power Grid New York Corporation I and New York Transco LLCEL26-69-000 · 2026-08-03 · source text
- NYISO requests more time to answer the June 18 show cause orderEL26-69-000 · 2026-08-03 · source text
- Request for Abeyance of the New York Transmission Owners and Request for Expedited Commission Action and Shortened Comment PeriodEL26-69-000 · 2026-08-03 · source text
- NYISO reports on resource adequacy and large-load proposalsEL26-69-000 · 2026-07-20 · 4 cited readings
PJM Large Load definition, Registry and Interim Resource Adequacy Service
- Combined Notice of Filings #1ER26-3515-002 · 2026-11-10 · 1 cited readings
- FERC rendition of the electronically filed tariff recordsER26-3515-002 · 2026-11-09 · source text
- Request for Rehearing to Promote Transparency for Ohio ConsumersER26-3515-001 · 2026-11-09 · 1 cited readings
- Thirty-Day Compliance Filing on PJM’s Large Load Definition and Large Load RegistryER26-3515-002 · 2026-11-09 · 10 cited readings
- Order accepting PJM's Large Load definition and Large Load Registry and rejecting the Interim Resource Adequacy Service, BYONC and VRR-curve revisionsER26-3515-000 · 2026-10-09 · 29 cited readings
PJM Reliability Backstop Procurement
- Attachment A -Marked TariffER27-454-000 · 2026-11-09 · 4 cited readings
- Attachment B- Clean Tariff RevisionsER27-454-000 · 2026-11-09 · 11 cited readings
- Attachment C - Gwen Kelly AffidavitER27-454-000 · 2026-11-09 · 6 cited readings
- Attachment D - Danielle Croop AffidavitER27-454-000 · 2026-11-09 · 3 cited readings
- FERC rendition of the electronically filed tariff recordsER27-454-000 · 2026-11-09 · source text
- Proposed Amendments to the Reliability Backstop Procurement; Request for WaiverER27-454-000 · 2026-11-09 · 21 cited readings
- Combined Notice of Filings #1, November 2, 2026: ER27-330-000 and -001 comment date 5 pm ET November 30, 2026ER27-330-000 · 2026-11-02 · 2 cited readings
- PJM Interconnection, L.L.C., Proposed Amendments to the Reliability Backstop Procurement (transmittal letter; comments requested by November 30, 2026)ER27-330-000 · 2026-10-29 · 18 cited readings
- Notice Addressing Motion to Hold Proceeding in Abeyance: EL26-108 initial briefs moved to January 11, 2027 and reply briefs to January 26, 2027ER26-3380-000 · 2026-10-23 · 3 cited readings
- Notice Establishing Answer Period on PJM's motion for abeyance (answers due 5:00 pm Eastern Time, October 21, 2026)ER26-3380-000 · 2026-10-16 · 1 cited readings
- Motion for Abeyance of PJM Interconnection, L.L.C. (ER26-3380-000 and EL26-108-000), holding the backstop paper hearing pending a new section 205 filingER26-3380-000 · 2026-10-12 · 2 cited readings
- U.S. Department of Energy notice of intervention and statement of position supporting the September 29, 2026 backstop orderER26-3380-000 · 2026-10-07 · 7 cited readings
- Order accepting PJM's Reliability Backstop Procurement, suspending it to February 28, 2027, and establishing further proceduresER26-3380-000 · 2026-09-29 · 24 cited readings
PJM co-location compliance
- Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the limited protests of its August 17, 2026 compliance filing (EL25-49 and ER26-1479)EL25-49-000 · 2026-10-14 · 15 cited readings
- PJM partial compliance filing in response to the June 18, 2026 order on rehearing in EL25-49-002 et al.ER26-1479-002 · 2026-08-17 · 10 cited readings
- PJM Transmission Owners' partial compliance filing implementing the Interim NITS rateER26-3537-000 · 2026-08-17 · 3 cited readings
- Notice of Extension of Time granting PJM and the Indicated PJM Transmission Owners 90 days, to November 16, 2026EL25-49-002 · 2026-08-14 · 4 cited readings
PJM filings
- Rep. Victoria Spartz asks FERC and DOE to condition approvals and protect ratepayersEL26-67-000 · 2026-11-05 · 4 cited readings
- Att A- Corrected Transmittal (Clean).pdfER27-330-001 · 2026-10-30 · source text
- Att B- Corrected Transmittal (Marked).pdfER27-330-001 · 2026-10-30 · source text
- PJM corrects its October backstop transmittal letterER27-330-001 · 2026-10-30 · source text
- Comments of U.S. House of Representatives Committee on Energy and Commerce Ranking Member Frank Pallone, Jr. urging FERC to make important improvements, approve amended proposals, etc. re energy costs from data centers,ER26-3380-000 · 2026-09-28 · source text
- Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM Interconnection, L.L.C. to the Answer of PJM Interconnection, L.L.C. filed on 09/10/2026ER26-3380-000 · 2026-09-25 · source text
- PJM answers comments and protests about interim resource adequacy serviceER26-3515-000 · 2026-09-23 · source text
- Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to Comments and Protests re the 07/31/2026 revised Open Access Transmission Tariff filing et alER26-3380-000 · 2026-09-10 · source text
- Comments of the Pennsylvania Public Utility Commission to the Proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry to address System ReliabilityER26-3515-000 · 2026-09-03 · source text
- Motion to Intervene and Protest of the Data Center Coalition to PJM Interconnection, L.L.C.’s proposal to establish Interim Resource Adequacy Service and a Large Load RegistryER26-3515-000 · 2026-09-03 · source text
- PJM states request clarification or separate consideration of the interim service proposalER26-3515-000 · 2026-09-03 · source text
- Protest and Comments of Joint Consumer Advocates on the 08/13/2026 filing by PJM Interconnection, L.L.CER26-3515-000 · 2026-09-03 · source text
- Answer of the Pennsylvania Public Utility Commission in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filingER26-3515-000 · 2026-09-01 · source text
- Motion for Extension of Time of the Organization of PJM States, Inc. to submit comments in response to PJM Interconnection, L.L.C.'s 08/13/2026 proposalER26-3515-000 · 2026-08-28 · source text
- Comments of PJM Industrial Customer Coalition on PJM Interconnection, L.L.C.’s Reliability Backstop Procurement ProposalER26-3380-000 · 2026-08-21 · source text
- Comments of Public Service Commission of West Virginia in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposalER26-3380-000 · 2026-08-21 · source text
- Comments of the Data Center Coalition in response to PJM Interconnection, L.L.C.’s 07/31/2026 proposed tariff filing to establish the Reliability Backstop ProcurementER26-3380-000 · 2026-08-21 · source text
- Comments of the Organization of PJM States, Inc. in support of PJM Interconnection, L.L.C.’s 07/31/2026 filingER26-3380-000 · 2026-08-21 · source text
- Limited Protest of Sierra Club et al. to one aspect of PJM Interconnection, LLC’s proposed Reliability Backstop ProcurementER26-3380-000 · 2026-08-21 · source text
- Protest of the Independent Market Monitor for PJM re PJM Interconnection, LLC's 07/31/2026 proposed Reliability Backstop Procurement filingER26-3380-000 · 2026-08-21 · source text
- Protest of the Pennsylvania Office of Consumer Advocate to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposalER26-3380-000 · 2026-08-21 · source text
- Protest, Motion to Reject, and Alternative Request for the Imposition of Conditions of Delaware Division of the Public Advocate et alER26-3380-000 · 2026-08-21 · source text
- The Ohio Consumers' Counsel submits Protest and Request for Rejection of Filing or in the Alternative for Evidentiary Hearings and/or Settlement Proceedings re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filingER26-3380-000 · 2026-08-21 · source text
- Comments of the Illinois Commerce Commission in support of PJM Interconnection, L.L.C.’s 07/31/2026 filingER26-3380-000 · 2026-08-19 · source text
- PJM Interconnection, L.L.C. submits tariff filing per : Supplemental Filing of Croop Affidavit in ER26-3380 to be effective N/AER26-3380-000 · 2026-08-14 · source text
- Attachment A- Marked Tariff 4919-3670-8807 v.1.pdfER26-3515-000 · 2026-08-13 · source text
- Attachment B- Clean Tariff 4930-8837-2935 v.2.pdfER26-3515-000 · 2026-08-13 · source text
- Attachment C IRAS - Pilong Affifdavit .pdfER26-3515-000 · 2026-08-13 · source text
- PJM proposes a large-load registry, interim service and bring-your-own capacityER26-3515-000 · 2026-08-13 · 4 cited readings
- Answer of Corporate Energy Buyers Association in support of PJM Interconnection, L.L.C.'s et al. 07/28/2026 Motion for AbeyanceEL26-67-000 · 2026-08-07 · source text
- Answer of Constellation Energy Generation, LLC in response to Transmission Owner's 07/20/2026 Request for ClarificationEL26-67-000 · 2026-08-04 · source text
- Answer in Support of the PJM Industrial Customer Coalition to the Motions for Extension and Abeyance by PJM Interconnection, L.L.CEL26-67-000 · 2026-08-03 · source text
- Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C.'s Motion for AbeyanceEL26-67-000 · 2026-08-03 · source text
- Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of Silver Run Electric, LLCEL26-67-000 · 2026-08-03 · source text
- Attachment A - Marked Tariff Records.pdfER26-3380-000 · 2026-07-31 · source text
- Attachment B - Clean Tariff Records.pdfER26-3380-000 · 2026-07-31 · source text
- Attachment C - Croop Affidavit.pdfER26-3380-000 · 2026-07-31 · source text
- Attachment D - Kelly Affidavit.pdfER26-3380-000 · 2026-07-31 · source text
- PJM proposes its first reliability backstop procurementER26-3380-000 · 2026-07-31 · 5 cited readings
- Motion for Abeyance of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment PeriodEL26-67-000 · 2026-07-28 · source text
- PJM requests more time to answer the June 18 show cause orderEL26-67-000 · 2026-07-28 · source text
- Wabash Valley Power Association, Inc. submits Request for Issuance of an Errata to the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power ActEL26-67-000 · 2026-07-28 · source text
- Motion to Rescind Show Cause Order of Allegheny Electric Cooperative, IncEL26-67-000 · 2026-07-22 · source text
- Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 OrderEL26-67-001 · 2026-07-20 · source text
- PJM reports on resource adequacy and large-load proposalsEL26-67-000 · 2026-07-20 · 5 cited readings
- The Indicated PJM Transmission Owners submit Request for Clarification, or in the Alternative, Rehearing of the 06/18/2026 OrderEL26-67-001 · 2026-07-20 · source text
- The Maryland Office of People's Counsel, et al. submit Request for Rehearing of the 06/18/2026 OrderEL26-67-001 · 2026-07-17 · source text
- The Pennsylvania Office of Consumer Advocate submits Request for Clarification or, in the alternative, Rehearing of the 06/18/2026 OrderEL26-67-001 · 2026-07-17 · source text
- Motion to Intervene and Comments of Evan Pierce re the large-load interconnection tariff provisionsEL26-67-000 · 2026-07-09 · source text
- Comments of Maven Solutions on the Commission's Show Cause Order regarding large-load interconnection tariff provisionsEL26-67-000 · 2026-07-08 · source text
- Comments of Maven Solutions on the Show Cause Order regarding Civic Bankability Rating Standard to FERC's Five Reform CategoriesEL26-67-000 · 2026-07-08 · source text
PJM governance and stakeholder reform vote
- PJM informational filing on the September 30, 2026 Members Committee vote on governance term sheetsAD26-7-000 · 2026-09-30 · 3 cited readings
PJM stakeholder record
- Special Members Committee agenda, Nov 5, 2026 (as of Oct 29)PJM stakeholder record · 2026-10-29 · source text
- MC Legal Report: Summary of Significant Filings, Legal Activity and Commission and Court Orders (Sep 14 to Oct 16, 2026)PJM stakeholder record · 2026-10-28 · source text
- Members Committee agenda, Oct 28, 2026 (as of Oct 28)PJM stakeholder record · 2026-10-28 · source text
- Letter to the PJM Board of Managers on PJM's large-load show cause responsePJM stakeholder record · 2026-10-02 · source text
PJM, NYISO, MISO, CAISO, ISO-NE filings
PJM, SPP, NYISO, MISO, CAISO, ISO-NE filings
- Comments of the National Congress of American Indians urging FERC for a Moratorium on Hyperscale Data Center Approvals Pending Comprehensive Grid Reliability and Ratepayer Impact AssessmentsEL26-67-000 · 2026-10-26 · source text
- Comments of the Natural Gas Supply Association on the Informational Reports re Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., et alEL26-67-000 · 2026-08-10 · source text
- Comments of Relentless Energy Systems LLC providing technical evidence and Xyce netlists demonstrating Geometric Phase Isolation, a Grid Enhancing Technology, for passive hardware-level VAR-offloading at Point-of-LoadEL26-67-000 · 2026-07-15 · source text
- DRAWINGS.pdfEL26-67-000 · 2026-07-15 · source text
- GPI_Composite_Dashboard.pdfEL26-67-000 · 2026-07-15 · source text
- RR-5D-LCFVR-GPI-ResilientResonance-Graph-Table.pdfEL26-67-000 · 2026-07-15 · source text
- SPECIFICATION.pdfEL26-67-000 · 2026-07-15 · source text
- Second Supplemental Technical Comment of L.M. Marlowe on the Frequency-Response Absorption Standard and Coupling-Discrimination ProtocolEL26-67-000 · 2026-07-09 · source text
- Motion of L.M. Marlowe for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement JudgeEL26-67-000 · 2026-07-08 · source text
- Motion to Intervene and Initial Comments of Global Capacity Alliance in response to FERC's 06/18/2026 Show Cause OrderEL26-67-000 · 2026-07-08 · source text
- Supplemental Technical Comment of L.M. Marlowe on the integration of large, high-density electric loads and the associated reliability, observability, and cost-allocation methodologies under consideration by the CommissionEL26-67-000 · 2026-07-08 · source text
Rehearing of FERC's PJM Reliability Backstop Procurement order
- Request for Rehearing and Clarification of Constellation Energy Generation, LLCER26-3380-001 · 2026-10-29 · 10 cited readings
- Request for Rehearing and Clarification or Alternative Request for Rehearing of Northern Virginia Electric Cooperative, Inc.ER26-3380-001 · 2026-10-29 · 12 cited readings
- Request for Rehearing of FirstEnergy Service CompanyER26-3380-001 · 2026-10-29 · 10 cited readings
- Request for Rehearing of the Indicated PJM Transmission Owners of the September 29, 2026 backstop order (TO exit amendment)ER26-3380-001 · 2026-10-29 · 5 cited readings
- Request for Rehearing of the Joint Consumer Advocates (DE, DC, IL CUB, IL AG, MD, NJ) of the September 29, 2026 backstop orderER26-3380-001 · 2026-10-29 · 9 cited readings
- Request for Rehearing to Protect Consumers from Excessive Transmission Rates by Office of the Ohio Consumers' CounselER26-3380-001 · 2026-10-29 · 10 cited readings
- Request for Clarification and Alternative Request for Rehearing of American Municipal Power, Inc.ER26-3380-001 · 2026-10-13 · 3 cited readings
SPP filings
- Clean8543-8e690f19-d23f-4f93-8bbe-f1d8db8928e2.pdfER27-432-001 · 2026-11-10 · source text
- Marked8543-c98d2db8-21b1-4bff-8977-95b41bb9803c.pdfER27-432-001 · 2026-11-10 · source text
- SPP corrects the Upper Missouri rate sheet for conditional large-load serviceER27-432-001 · 2026-11-10 · 3 cited readings
- Clean8536-7e21cab7-1b8e-4b1a-925e-3a1d8da6d4fc.pdfER27-432-000 · 2026-11-06 · source text
- Marked8536-632c41b6-f9bd-419c-a455-959e8e8e7314.pdfER27-432-000 · 2026-11-06 · source text
- SPP proposes conditional large-load service revenue credits for its western zonesER27-432-000 · 2026-11-06 · 2 cited readings
- Answer of Corporate Energy Buyers Association in Support of the Amended Motion for Abeyance filed on 08/03/2026 by Southwest Power Pool, Inc. et alEL26-68-000 · 2026-08-07 · source text
- Comments of the Public Service Commission of the State of Missouri in support of Southwest Power Pool, Inc.'s et al. request for abeyance filed 08/03/2026EL26-68-000 · 2026-08-07 · source text
- Comments of the Southwest Power Pool Regional State Committee in support of Southwest Power Pool, Inc.’s request for an extension of time until 11/20/2026 to respond to the FERC's 06/18/2026 Order to Show CauseEL26-68-000 · 2026-08-07 · source text
- Amended Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in AbeyanceEL26-68-000 · 2026-08-03 · source text
- SPP requests more time to answer the June 18 show cause orderEL26-68-000 · 2026-08-03 · source text
- Answer of Southwest Power Pool, Inc. in opposition to Motion for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge of L.M. MarloweEL26-68-000 · 2026-07-22 · source text
- SPP reports on resource adequacy and large-load proposalsEL26-68-000 · 2026-07-20 · 4 cited readings
- Answer of Southwest Power Pool Transmission Owner Group to L.M. Marlowe's 07/08/2026 Motion for Settlement ProceduresEL26-68-000 · 2026-07-15 · source text
SPP, CAISO filings
Six large-load show-cause orders, one per RTO/ISO
- Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 CAISO show-cause orderEL26-71-001 · 2026-09-21 · 3 cited readings
- Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 ISO-NE show-cause orderEL26-72-001 · 2026-09-21 · 3 cited readings
- Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 MISO show-cause orderEL26-70-001 · 2026-09-21 · 3 cited readings
- Order dismissing Eolian's request for rehearing and clarification of the June 18, 2026 NYISO show-cause orderEL26-69-001 · 2026-09-21 · 3 cited readings
- Order dismissing requests for rehearing and clarification of the June 18, 2026 PJM show-cause orderEL26-67-001 · 2026-09-21 · 7 cited readings
- Letter order granting the ISO-NE and PTO Administrative Committee joint abeyance motionEL26-72-000 · 2026-08-14 · 4 cited readings
- Letter order granting the MISO and MISO Transmission Owners abeyance motion over American Municipal Power's oppositionEL26-70-000 · 2026-08-14 · 7 cited readings
- Letter order granting the NYISO, New York Transmission Owners and Non-Incumbent Transmission Owners abeyance motionsEL26-69-000 · 2026-08-14 · 4 cited readings
- Letter order granting the PJM, Indicated PJM Transmission Owners and Silver Run Electric abeyance motionsEL26-67-000 · 2026-08-14 · 4 cited readings
- Letter order granting the SPP Joint Movants' abeyance motion for 95 days, to November 20, 2026EL26-68-000 · 2026-08-14 · 6 cited readings
- Order Granting Rescission and Abeyance Requests (rescinds the order as to the Six Cities and WAPA)EL26-71-000 · 2026-08-14 · 7 cited readings
- Errata correcting the caption and footnote 11 of 195 FERC ¶ 61,212 (Wabash Valley Power Association)EL26-70-000 · 2026-08-13 · 2 cited readings
- Errata correcting the caption and footnote 13 of 195 FERC ¶ 61,211 (Allegheny Electric Cooperative, Wabash Valley Power Association)EL26-67-000 · 2026-08-13 · 2 cited readings
- Answer of Morongo Transmission LLC: no tariff amendment required, a non-load-serving participating transmission ownerEL26-71-000 · 2026-08-12 · 3 cited readings