FERC requests information about MISO’s zero-injection agreement
Read topic-matched comments in ER26-3552
Topics in the text: Connecting load and generation · Reliability and curtailment · Filing procedure
Responses and related views
No section-specific public response is linked for this document.
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
MISO also proposes that a ZG Resource may participate in MISO’s markets and resource adequacy construct, subject to the limitation that its participation is limited to serving, and being credited for serving, the load associated with the ZG Resource (ZG Associated Load).Read this passage Filed comments: Connecting load and generation
Footnotes
Word notes · Topic match: Connecting load and generation
X (190.0.0), § 3.2.5.1 (The Product); id., app. 19 (31.0.0), art. 4.1.4.1 (The Product). [fn:20] Id., § 3.11 (Additional Requirements for Interconnection Requests Seeking ZG Interconnection Service). [fn:21] Id., §§ 3.11.2 (Evaluation Process for ZG Interconnection Service Interconnection…Read this passage Filed comments: Connecting load and generation