NYISO reports on resource adequacy and large-load proposals
Topics in the text: Reliability and curtailment · Cost allocation · Connecting load and generation
What the document says
Load forecasting · PDF pp. 2–4
Why the New York City need changed
An updated demand forecast removed a previously identified actionable New York City need. NYISO still saw longer-term risk from retirements, load growth and dependence on imports.
the baseline actionable reliability need was no longer observed PDF p. 3
Interconnection · PDF pp. 4–9
A queue position does not guarantee a power plant
NYISO says faster queue studies cannot resolve the siting, financing and supply-chain obstacles that decide whether a project is actually built.
factors outside the NYISO’s interconnection process significantly impact whether a project is constructed PDF p. 6
Reliability studies · PDF pp. 9–12
A faster study for an identified reliability need
NYISO proposed limiting a faster study path to generators needed for an identified reliability problem so the regular cluster queue could continue.
a separate accelerated interconnection study path for generators needed to address reliability needs PDF p. 11
Market incentives · PDF pp. 12–14
Reserves for forecast errors
NYISO was considering buying reserves explicitly for uncertainty in net load and intermittent generation in both day-ahead and real-time markets.
to procure reserves for forecast uncertainty in net load and intermittent generation PDF p. 13
Responses and related views
No section-specific public response is linked for this document.
Source sections
Printed headings where available; page ranges otherwise. Open a heading to read the original passage.
- Opening text
- I. Background
- Background
- II. Resource Adequacy of the NYISO System, Measures to Address Resource
- A. NYISO’s Current Planning for Resource Adequacy
- B. NYISO’s Existing Processes to Attract and Retain Resources
- C. Potential Reforms under Consideration that Would Support Resource
- III. Communications
- IV. Conclusion
- Conclusion