ER27-25-000 · 2026-10-23 · Iowa OCA and 8 consumer advocates
Joint Protest of the Iowa Office of the Consumer Advocate, the Citizens Utility Boards of Michigan, Illinois, Wisconsin and Minnesota, Citizens Action Coalition of Indiana, the Michigan and Illinois Attorneys General, and the Minnesota Department of Commerce
Topics in the text: Connecting load and generation · Registry access · Cost allocation
What the document says
PDF p. 9
Generation must connect in the load's Local Resource Zone, which can span several states.
Neither MISO Witness Drake nor the Transmittal Letter explain how the LARS proposal mitigates the electrical impact of LARS Associated Load and generation facilities being spaced potentially hundreds of miles apart PDF p. 9
Upgrades for violations seen in the load study, or in both studies, go to zonal load.
Unlike the violations observed only in the generation study, the LARS Process assigns the cost of network upgrades to address violations observed in the transmission studies and observed in both the transmission study and the generation study to Baseline Reliability PDF p. 6
LARS puts upgrade costs of load-caused violations on zonal ratepayers instead of the pair.
The LARS proposal does not adequately assign costs to the cost causers, and MISO has not yet fully developed a cost allocation proposal for LARS load and PDF p. 6
FERC cannot find LARS just and reasonable without MISO's unfiled cost-shifting agreement.
The Commission should require MISO to address cost-shifting in all of its Section 205 filings and in all of its direct responses to the Section 206 Show Cause Order. PDF p. 4
PDF p. 10
LARS is a permanent, uncapped fast lane untethered to any identified resource adequacy need.
The Joint Protestors are concerned that LARS, similar to ERAS, will enable queue jumping. PDF p. 10
Same-LRZ pairing is not the two-substation test the Show Cause Order described.
The Joint Protestors respectfully urge the Commission to require MISO to establish a reasonable distance of "electrically proximate" PDF p. 9
PDF p. 3
Consumer advocates object to exempting about 30 GW of existing large load from reliability rules.
In total, MISO is proposing to fully or partially exempt approximately 30 gigawatts of existing load from the Large Load Interconnection Reliability Requirements. PDF p. 3
Responses and related views
MISO would proceed before the rest of the cost protections are approved
Midcontinent Independent System Operator · Direct response
MISO said the study should go ahead before related cost-recovery reforms were complete. It promised to incorporate those protections once FERC accepted them and cited other existing tariff mechanisms.
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Registry access
JOINT PROTEST The Joint Protestors submit this Joint Protest regarding the proposed tariff revisions filed by the Midcontinent Independent System Operator, Inc. (“MISO”) regarding the Large Load 2 Additional Resource Study Process (“LARS Process”) with the Commission in the above- captioned…
II. Cost-Shifting Should be Addressed Across MISO’s Section 205 Filings and in the
printed heading · Topic match: Registry access
In a future submission, Joint Protestors may ask FERC to take action under Section 206 to address that need by (i) finding that the lack of funding provisions for consumer advocate offices renders MISO’s Tariff unjust and unreasonable and unduly discriminatory, and (ii) establishing a mechanism in…
III. The LARS Process Lacks Transparency on Costs and Allows Cost-Shifting of
printed heading · Topic match: Connecting load and generation
The LARS Process Lacks Transparency on Costs and Allows Cost-Shifting of Network Upgrades MISO proposes to add a new GIP Section 3.12.4 to describe the studies that will take place for LARS generation projects.11 With respect to mitigations or network upgrades to address violations observed during…
A. The generator will be responsible for any constraints unique to the
printed heading · Topic match: Connecting load and generation
If a GIP defers or displaces a BRP, then the costs of the GIP up to the costs of the deferred or displaced BRP shall be allocated consistent with the cost allocation for the BRP.14 The LARS Process does not assign the cost of all network upgrades to the cost-causer.
IV. The LARS Process Fails to Address the Commission’s Show Cause Order’s
printed heading · Topic match: Connecting load and generation
The LARS Process Fails to Address the Commission’s Show Cause Order’s Requirement to be “Electrically Proximate” MISO proposes LARS as load and generation pairs, interconnecting within the same Local Resource Zone (LRZ).16 MISO LRZ’s are physically large, with LRZ 1 spanning from Montana to…
A. MISO’s LARS proposal provides the Tariff structure necessary to enable
printed heading · Topic match: Connecting load and generation
MISO’s LARS proposal provides the Tariff structure necessary to enable an Interconnection Customer to serve an electrically proximate load as the LARS Associated Load must be located within the same LRZ.
V. MISO Fails to Explain How LARS is Not a Queue-Jumping Proposal
printed heading · Topic match: Connecting load and generation
The Show Cause Order explicitly asks MISO to show, in their FPA Section 205 filing, how they will “avoid disrupting existing commercial arrangements.”29 MISO has not shown how the LARS filing will avoid such disruptions to the existing DPP queue, and will avoid being unjust and unreasonable, or…
Easler Attorney Iowa Attorney General Office of the Consumer Advocate 1375 East Court Avenue Des Moines, IA 50319 jennifer.easler@oca.iowa.gov For the Iowa Office of the Consumer Advocate /s/ Sydnie Lieb Sydnie Lieb Assistant Commissioner of Regulatory Affairs, Energy Resources Division Minnesota…