EL26-70-000 · 2026-06-24 · Individual No Affiliation

Comments of Debra Ann Ostroski providing documented correspondence with American Transmission Company re the alternative transmission evaluation for the Large Load Show Cause Proceeding

A Wisconsin resident files emails with American Transmission Company as evidence that incumbents avoid evaluating reconductoring and other upgrades as cheaper alternatives to a $350 million greenfield line.

Asks FERC to: Add the attached correspondence to the record in the MISO show cause docket.

Answers the order. Public comment in the MISO docket tying a local project dispute to the E-8 directive to evaluate alternative transmission technologies in transmission service studies.

E-8 MISO: Alternative transmission technologies (P 119, p. 74)

Key points

  1. The commenter ties the filing to the June 18 orders directing evaluation of alternative transmission technologies.
    the Commission's June 18, 2026 orders directing RTOs to evaluate alternative transmission technologies and upgrades to accommodate large loads PDF p. 1
  2. The commenter asked ATC to evaluate reconductoring instead of the $350 million Viridon WISE line and says ATC did not answer.
    the incumbent utility refused to provide an answer and deflected the inquiry to the greenfield developer. PDF p. 1
  3. The commenter presents the emails as evidence that cheaper grid-enhancing options go unevaluated.
    incumbent utilities and developers in the MISO footprint are actively avoiding the evaluation of cost-effective Grid-Enhancing Technologies and existing line upgrades PDF p. 1

Read topic-matched comments in EL26-70

Topics in the text: Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Page 1

page range · Topic match: Cost allocation

As a local concerned citizen regarding the Viridon WISE project in Wisconsin, I formally asked ATC to evaluate upgrading their existing infrastructure (such as reconductoring) as a cheaper, ratepayer-protective alternative to Viridon's $350 million greenfield transmission line.
Read this passage Filed comments: Cost allocation