ER27-330-001 · 2026-11-12 · PJM Interconnection, L.L.C.
PJM moves to withdraw its October backstop filing in favor of ER27-454
Back to sections and commentaryPDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
PJM Interconnection, L.L.C.
)
Docket Nos. ER27-330-000
)
ER27-330-001
MOTION TO WITHDRAW FILING AND TERMINATE PROCEEDING
IN DEFERENCE TO NEW DOCKET NO. ER27-454-000
Pursuant to Rule 212 of the Federal Energy Regulatory Commission’s
(“Commission”) Rules of Practice and Procedures,1 and section 35.17(a) of the
Commission Rules and Regulations,2 PJM Interconnection, L.L.C. (“PJM”) moves to
withdraw its October 29, 2026 filing in this proceeding,3 and its related October 30, 2026
amendment,4 in which PJM proposed revisions to the PJM Open Access Transmission
Tariff (“Tariff”), pursuant to Federal Power Act (“FPA”) section 205,5 to update the
Reliability Backstop Procurement (“RBP”) rules to address, inter alia, issues identified in
the Commission’s September 29 Order.6 PJM has resubmitted these same Tariff revisions
in Docket No. ER27-454-000.7
1 18 C.F.R. § 385.212.
2 18 C.F.R. § 35.17.
3 PJM Interconnection, L.L.C., Proposed Amendments to the Reliability Backstop Procurement Motion for
Extended, 32-Day Comment Period Request for Waiver of Tariff Attachment DD, Section 16.2 Requirement
to Investigate Capacity Shortfall, Docket No. ER27-330-000 (Oct. 29, 2026) (“October 29 Filing”).
4 PJM Interconnection, L.L.C., Proposed Amendments to the Reliability Backstop Procurement Motion for
Extended, 32-Day Comment Period Request for Waiver of Tariff Attachment DD, Sections 16.2 and 16.3,
Docket No. ER27-330-001 (Oct. 30, 2026) (“October 30 Filing”).
5 16 U.S.C. § 825d.
6 PJM Interconnection, L.L.C., 196 FERC ¶ 61,245 (2026) (“September 29 Order”).
7 See PJM Interconnection, L.L.C., Proposed Amendments to the Reliability Backstop Procurement Motion
for Extended, 32-Day Comment Period Request for Waiver of Tariff Attachment DD, Sections 16.2 and 16.3,
Docket No. ER27-454-000 (Nov. 9, 2026) (“November 9 RBP Filing”).PDF page 2
2
Good cause exists to grant this motion. The Commission’s regulations permit a
public utility to withdraw a pending rate filing that “has not become effective and upon
which no Commission or delegated order has been issued.”8 That is the case here.
While the October 29 initial filing and October 30 amendment were submitted as a
new, independent proposal under FPA section 205, PJM inadvertently used eTariff filing
codes applicable to compliance filings and not eTariff filing code 10 applicable to the
initiation of a new proceeding under section 205. PJM understands that an eTariff filing
code 10 is necessary to facilitate the Commission’s orderly review and processing of
proposals for new Tariff revisions under FPA section 205.
To correct PJM’s clerical error and facilitate the Commission’s review of PJM’s
proposed updates to the RBP rules, PJM re-submitted in Docket No. ER27-454-000 the
same eTariff records proposed in the October 29 Filing, effective January 29, 2027, and
February 28, 2027, as requested. To be clear, the re-submittal was driven by the sole
purpose of making the ministerial revision to the metadata.9 Such refiling to correct the
metadata does not in any way affect the substance of the October 29 Filing. Accordingly,
this docket is no longer necessary, as the same Tariff revisions have been properly filed in
Docket No. ER27-454-000.10
8 18 C.F.R. § 35.17(a).
9 In Docket No. ER27-454-000, PJM also has requested a waiver of 18 C.F.R. § 35.17(d) so that PJM may
revise the RBP rules the Commission accepted but suspended in the September 29 Order. See November 9
RBP Filing, Transmittal Letter at 4 n.13.
10 As noted in this motion, PJM seeks to withdraw both the October 29 Filing and the October 30 Filing.
However, the eTariff system erroneously causes validation error code 124 (“Associated Filing for this
Withdraw filing cannot be withdrawn”) associated with withdrawing the October 29 Filing, despite the fact
that Rule 35.17(a) permits such a withdrawal. As a result, PJM requests that the Commission manually reject
the tariff records submitted as part of the October 29 Filing.
PDF page 3
3
PJM notes that the Commission established the same comment and intervention
deadline of November 30, 2026, for the submittal in Docket No. ER27-454-000 as the
Commission had previously established for the revisions in these proceedings.11 As such,
no party will be harmed by the termination of this docket and addressing the same proposal
in new Docket No. ER27-454-000.
For the reasons stated above, PJM requests that the Commission grant this motion
to withdraw and terminate the docket.
Respectfully submitted,
/s/ Ryan J. Collins
Craig Glazer
Vice President – Federal Government Policy
PJM Interconnection, L.L.C.
1200 G Street, NW, Suite 600
Washington, D.C. 20005
(202) 423-4743
craig.glazer@pjm.com
Chenchao Lu
Associate General Counsel
PJM Interconnection, L.L.C.
2750 Monroe Boulevard
Audubon, PA 19403
(610) 666-2255
chenchao.lu@pjm.com
Ryan J. Collins
Wright & Talisman, P.C.
1200 G Street, NW, Suite 600
Washington, D.C. 20005
(202) 393-1200
collins@wrightlaw.com
Counsel for
PJM Interconnection, L.L.C.
November 12, 2026
11 Wild Springs Solar, LLC, Combined Notice of Filings #1, Docket Nos. ER17-1394-017, et al. (Nov. 10,
2026).PDF page 4
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each
person designated on the official service list compiled by the Secretary in this proceeding.
Dated at Washington, D.C., this 12th day of November 2026.
/s/ Ryan J. Collins
Ryan J. Collins
Wright & Talisman, P.C.
1200 G Street, NW, Suite 600
Washington, D.C. 20005
(202) 393-1200
collins@wrightlaw.com
Attorney for PJM Interconnection,
L.L.C.