ER27-330-000 · 2026-11-02 · FERC

Combined Notice of Filings #1, November 2, 2026: ER27-330-000 and -001 comment date 5 pm ET November 30, 2026

FERC's November 2, 2026 combined notice of filings lists PJM's ER27-330-000 reliability backstop amendments and its ER27-330-001 errata, with a comment date of November 30, 2026 for both.

Parallel proceeding. Sets the comment date for PJM's ER27-330 backstop amendments, the capacity adequacy filing that runs beside the E-7 show cause proceeding.

E-7 PJM: 30-day report on serving large loads with adequate generation (p. 8)

Key points

  1. The notice lists ER27-330-000, PJM's proposed Reliability Backstop Procurement amendments in ER26-3380, filed October 29, 2026.
    Proposed Amendments to the Reliability Backstop Procurement in ER26-3380 to be effective 1/15/2027. Source text
  2. The errata filing ER27-330-001 was filed October 30, 2026 and carries the same November 30 comment date.
    Errata to Correct Metadata and Waiver Request in RBP Compliance Filing to be effective 1/29/2027. Source text

Topics in the text: Filing procedure

What the document says

Unpaginated filing

FERC notices PJM's refiling in ER27-330, comments due 5 pm ET November 30, 2026.

Compliance filing: Proposed Amendments to the Reliability Backstop Procurement in ER26-3380 to be effective 1/15/2027. Source text

Unpaginated filing

FERC notices PJM's refiling in ER27-330, comments due 5 pm ET November 30, 2026.

Comment Date: 5 pm ET 11/30/26 Source text

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Document text

document text · Topic match: Filing procedure

For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or OPP@ferc.gov.
Read this passage