Individual No Affiliation
PJM Should Address Maximum Net Withdrawal as Part of Any Framework for Generation Serving Electrically Proximate or Large Co-Located Load. PDF p. 3
These passages match a topic and a request or argument in the same sentence. A filing can quote another party. Read its page before attributing a position.
PJM Should Address Maximum Net Withdrawal as Part of Any Framework for Generation Serving Electrically Proximate or Large Co-Located Load. PDF p. 3
The Commission's five reform categories, addressed with the specific reforms recommended in Section VII, would materially strengthen PJM's tariff posture on cost causation, transparency, co-location governance, transmission service class design, and generation study reciprocity. PDF p. 13
The Commission's five reform categories, addressed with the specific reforms recommended in Section VII, would materially strengthen PJM's tariff posture on cost causation, transparency, co-location governance, transmission service class design, and generation study reciprocity. PDF p. 13
Doing so ensures that the integration of large, flexible loads supports grid visibility, protects regional ratepayers, and unlocks privately funded reliability infrastructure. PDF p. 3
Should RTOs wish to pursue FTM-Netting, stakeholder engagement can focus on 3 key areas: • Scarcity Yield & Coordinated Curtailment: Standardizing the technical parameters and response time for a facility to execute a controlled curtailment to onsite backup generation. PDF p. 3
● Grid reliability and impact assessment: The FERC must require rigorous, independent, and conflict-free assessments of how these facilities impact regional resource adequacy and transmission congestion, ensuring transparent economic analysis of the true costs required to support their operations. PDF p. 2