Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

Interactive tracker · November 7 substitute and amendments · Agent index · Full text and analysis · Tracker JSON

Sec. 1101. Purposes; procedure; savings provision

Rewrites NEPA's opening section. Adds a statement that NEPA prescribes a procedure for considering and informing the public about the reasonably foreseeable environmental effects of major federal actions. Under that statement, the procedure produces an informational document. Also adds a savings clause that NEPA mandates no particular outcome.

Text and cited analysis · PDF page 4

Sec. 1102. Definitions

Moves NEPA's definitions from section 111 to a new section 3 and expands them. New terms include agency chief environmental review and permitting officers, eNEPA technologies, key permitting agencies, a 20-page record of stakeholder engagement, record of decision, and statement of purpose and need. The bill lists 14 kinds of action that are not major federal actions and so fall outside NEPA. A project whose only federal involvement is a loan or loan guarantee is out. So are routine administrative actions under $10 million, and repair or replacement of lifeline infrastructure that adds no more than 20 percent capacity. The list also excludes geothermal observation test projects. Transmission upgrades under new Federal Power Act section 216A(b) and covered Natural Gas Act pipeline work are excluded too. Actions another agency already evaluated are excluded, as are Army Corps continuing-authority or environmental-infrastructure projects with a federal share of $50 million or less.

Text and cited analysis · PDF page 5

Sec. 1103. Implementing procedures

Requires every federal agency to update its NEPA regulations, procedures and policies within 180 days of enactment, directs the CEQ Chairman to standardize agency procedures, and lets the Chairman give technical assistance.

Text and cited analysis · PDF page 25

Sec. 1104. Cooperation of agencies; reports; availability of information; recommendations; international and national coordination of efforts

Conforming edits to NEPA section 102(2): agencies must develop methods consistent with data and technology standards for eNEPA technologies, and 'responsible official' becomes 'lead agency'.

Text and cited analysis · PDF page 26

Sec. 1105. Procedure for determination of level of review

Expands when an agency can skip an environmental document. An agency may apply one or a combination of categorical exclusions, but may not stack the same size-based exclusion repeatedly. A categorical exclusion Congress created is also available to the agency. The agency may treat a state or tribal environmental review, or compliance with another federal law, as serving NEPA's function. A project sponsor can ask the lead agency to stop an environmental assessment and go straight to an environmental impact statement. If the lead agency decides no environmental document is needed, no other agency may prepare one.

Text and cited analysis · PDF page 28

Sec. 1106. Timely and unified Federal reviews

Rewrites NEPA section 107, the core of the review process. Environmental assessments are due in 1 year and environmental impact statements in 2 years, measured from the earlier of the agency's determination or its notice that the application is complete. A record of decision follows a final EIS within 45 days. Agencies in the review must decide all authorizations within 90 days, and agencies outside it within 120 days. Lead agency designation gets a clock, with the CEQ Chairman resolving disputes within 21 days by a final, unreviewable decision. The Chairman can also order a resolution of interagency disputes, and that order counts as full compliance with any interagency consultation obligation under federal law. The lead agency must drop any alternative that does not meet the purpose and need or the goals of a non-federal sponsor. Agencies need not consider science published after the notice of intent. Public scoping comment periods run 45 to 60 days, or 75 with the sponsor's consent. If an agency defies a Chairman's dispute order and a deadline is missed, then after 30 days its permitting officers and senior executives must spend at least half their workweek on the overdue review. Once any deadline is 60 days overdue, the agency head may not travel more than 25 miles from the duty station until the document or permit issues. The Secretary of Defense is exempt. Project sponsors can sue over missed deadlines. The court must rule within 120 days and can order a decision within 60 days.

Text and cited analysis · PDF page 31

Sec. 1107. Programmatic environmental document

Doubles the shelf life of programmatic environmental documents from 5 years to 10 years before an agency must reevaluate them.

Text and cited analysis · PDF page 61

Sec. 1108. Use of categorical exclusions by other agencies

Requires every agency to report all its categorical exclusions to CEQ within 30 days and each new one within 7 days; CEQ keeps a public register on its website. An agency may adopt another agency's exclusion after consulting it and documenting the adoption.

Text and cited analysis · PDF page 62

Sec. 1109. Applications for authorizations

Sets an application clock: within 60 days, an agency must say whether an application is complete. Within another 60 days, the agency must tell the sponsor whether the action is excluded from NEPA. The agency must also say whether the action needs an environmental assessment or gets a notice of intent for an EIS. Applicants must submit a list of all known permits, a record of stakeholder engagement, and a statement of purpose and need.

Text and cited analysis · PDF page 64

Sec. 1110. Judicial review

Adds a judicial review section to NEPA. Suits challenging an authorization on NEPA grounds must be filed within 150 days. The party must allege an actual or imminent injury amounting to direct harm. Where a comment period was offered, the party must also have filed a sufficiently detailed comment. The federal court of appeals for the circuit where the project sits gets original and exclusive jurisdiction, with random judge assignment. If a court finds a NEPA violation, the only remedy is remand without vacatur or injunction, with a fix deadline of no more than 180 days. The permit stays in effect and the project can proceed during the remand. A preliminary injunction is available only for a likely violation of a law other than NEPA or the National Historic Preservation Act. Courts must give substantial deference to agencies on the scope and content of environmental documents. No NEPA suit may be brought over an action on tribal trust lands unless the tribe itself sues or effects reach beyond trust lands. No suit may rest on an omission from the list described in section 3(22)(B) of NEPA as amended.

Text and cited analysis · PDF page 67

Sec. 1121. Council on Environmental Quality

Replaces NEPA section 209 with an eNEPA technology mandate. Within 60 days, CEQ must publish data standards for permitting data. CEQ must publish guidance on minimum functional requirements (automated project screening, case management, GIS tools, AI-assisted comment analysis, administrative-record tools) within 120 days. Agencies must begin implementing within 180 days. CEQ and the key permitting agencies build an ePermit unified interagency data system and a public authorization portal hosted by GSA. A pilot is due within a year and the system by December 1, 2028, 'to the maximum extent practicable'. Congress gets access to the data, fine-tuning procedures and prompt configurations agencies create or adapt for AI tools, but not proprietary or general pre-training materials. CEQ also sets outcome-based performance measures for agencies and staff. Authorizes $5 million a year for NEPA.

Text and cited analysis · PDF page 74

Sec. 1131. Definitions

Definitions for the permitting tracker subtitle. A 'transparency project' is any action that needs an EIS, or an environmental assessment still unfinished 13 months past its deadline.

Text and cited analysis · PDF page 96

Sec. 1132. Environmental Review and Permitting Tracker

Requires CEQ, with GSA, to run a public Environmental Review and Permitting Tracker listing every EIS project within 14 days of its notice of intent. Each entry lists the location, purpose and need, and sponsor and agency contacts. Quarterly schedule-compliance status, which explains every slip and who caused it, and litigation status are also posted.

Text and cited analysis · PDF page 97

Sec. 1133. Permitting Improvement Fund

Creates a Permitting Improvement Fund at Treasury that CEQ can transfer to permitting agencies for detailees, training, project managers, standardized processes, and public engagement. Authorizes $20 million a year for fiscal years 2027 through 2033.

Text and cited analysis · PDF page 101

Sec. 1201. Water quality criteria

Requires EPA to use notice-and-comment rulemaking when it develops Clean Water Act water quality criteria. Challenges to those criteria and to any definition of 'waters of the United States' go directly to the federal courts of appeals.

Text and cited analysis · PDF page 102

Sec. 1202. Clean Water Act permitting and State certification

Rewrites Clean Water Act section 401 state certification. Certification is limited to water quality requirements. A state may deny only on clear and convincing evidence that no condition could make the project comply, and may impose only conditions that are necessary, least burdensome, and consistent with the federal permit. The process gets a prefiling meeting, a defined complete application, and a 3-day receipt acknowledgment. A 90-day completeness notice and a review period of up to 1 year follow. The period can be extended only if the applicant asks in writing and the certifying authority agrees in writing. Silence is a waiver. Denials must name the specific water quality requirement violated. On judicial review the burden of proof falls on the state by clear and convincing evidence. For interstate gas pipelines and bulk-power transmission lines, certification covers only direct point source discharges and must be decided within 9 months.

Text and cited analysis · PDF page 103

Sec. 1203. Permit term for NPDES permits

Extends the maximum term of state-issued NPDES discharge permits from 5 years to 10 years.

Text and cited analysis · PDF page 123

Sec. 1204. Permits for dredged or fill material

Limits EPA's section 404(c) veto to the period between a complete application and permit issuance. Extends nationwide permits from 5 to 10 years and lets the Corps modify them mid-term. Requires the Corps to keep nationwide permits 12, 14, 43, 57 and 58 for projects filling under 2 acres. Filling under 2 acres of navigable waters counts as a minimal adverse effect. Reissuing a nationwide permit needs no Endangered Species Act consultation, only a programmatic environmental assessment under NEPA, and no National Historic Preservation Act consultation, so long as the permit does not loosen preconstruction requirements.

Text and cited analysis · PDF page 123

Sec. 1205. Judicial review timeline clarity

Adds a 150-day statute of limitations for challenges to section 404 permits, general permits, verifications and state program approvals. Where a draft was published with at least 30 days for comment, a plaintiff must have commented on the issue. Remedies are limited to remand, with vacatur or injunction available only on a finding of imminent and substantial danger to health or the environment. Remand deadlines are capped at 180 days.

Text and cited analysis · PDF page 128

Sec. 1301. Definitions

Defines 'best scientific and commercial data available' in the Endangered Species Act as all relevant, objective information at the time of the action, including models that account for error and are applied without policy presumptions.

Text and cited analysis · PDF page 133

Sec. 1302. Timeline for Section 7 consultations

Shortens ESA section 7 formal consultation from 90 to 60 days, and the applicant-consent extension from 150 to 100 days. If consultation stretches past 145 days without the applicant's written consent, the applicant may sue under the APA for agency action unlawfully withheld. Consultation on any project with a NEPA document must finish by the NEPA deadline, unless the Secretary grants an extension for extraordinary circumstances.

Text and cited analysis · PDF page 134

Sec. 1303. Projects in the operational right-of-way

Exempts highway and transit projects in an existing operational right-of-way that are categorically excluded from NEPA under MAP-21 section 1316 from ESA section 7 consultation and conferencing.

Text and cited analysis · PDF page 136

Sec. 1304. State assumption of consultation responsibilities

Creates ESA section 7A letting the Interior Secretary assign section 7 consultation duties to a state, by written agreement, for projects entirely inside the state. Interior must propose a rule within 270 days. States must show legal, financial and staffing capacity, waive sovereign immunity, accept federal court jurisdiction, keep public-records laws comparable to FOIA, and meet the same deadlines as the Secretary. Interior audits annually for 4 years, can terminate after a 120-day cure period, and applicants may still choose federal consultation. Interior's failure to act on an application within 180 days counts as a failure to act under the NEPA sanctions section.

Text and cited analysis · PDF page 137

Sec. 1305. Judicial review

Lets any person seek review of a biological opinion in the D.C. Circuit within 150 days after it is made public.

Text and cited analysis · PDF page 154

Sec. 1306. Listing determinations

Requires the Secretary to accept and integrate state-collected data in listing and delisting decisions when it meets the best-available-data standard.

Text and cited analysis · PDF page 155

Sec. 1307. Authorization of appropriations

Authorizes $150 million a year for fiscal years 2027 through 2031 for Endangered Species Act section 7 consultation and for state participation in the program under section 7A.

Text and cited analysis · PDF page 155

Sec. 1308. National Fish and Wildlife Foundation Coastal State Fund

Creates a National Fish and Wildlife Foundation Coastal State Fund granting money to coastal states for coastal resource and natural infrastructure programs. The money is allocated 70 percent equally among coastal states and 15 percent by tidal shoreline. Another 15 percent is allocated by coastal population density, and no state gets more than 5 percent. Authorizes $50 million a year for fiscal years 2028 through 2032.

Text and cited analysis · PDF page 156

Sec. 1401. Maintaining Federal authorizations or permits for projects with non-Federal sponsors

For projects with non-federal sponsors, a federal agency may not revoke, suspend, amend, or otherwise interfere with a federal authorization in effect on or after September 16, 2026. There are five exceptions. A court can order the action. The holder can have materially breached the permit or the law, or obtained the permit by fraud. The action can be needed to prevent specific, urgent, substantial and proximate harm to life, property, national security or defense, based on new information not considered in the original review. Or the holder can ask for it. Agencies must give written notice with the statutory authority and evidence. The sponsor can sue in district court, where the agency carries the burden by clear and convincing evidence and classified information is reviewed in camera. A winning sponsor gets the permit reinstated and an injunction against repeat interference without a court order. The sponsor also gets attorney fees, delay costs, and an additional 25 to 50 percent of all project costs incurred. Awards are paid from the Judgment Fund without appropriation. Where a stop-work order issued within the year before enactment was enjoined, the same judge keeps jurisdiction.

Text and cited analysis · PDF page 158

Sec. 1402. Ensuring fairness for specific types of covered projects

Creates a cause of action for applicants in 46 named energy project types, plus any similar type a court certifies. The list runs from onshore and offshore wind, solar and storage to coal, gas, oil, nuclear, geothermal, transmission, pipelines, mining, hydrogen, hydropower, LNG and carbon storage. The applicant must show a 'pattern of disparate treatment': an intentional, statistically demonstrated rise in denials or delays for that project type, compared with the prior 5 years. The pattern must last 180 days after enactment for permits without a NEPA document, or 280 days for those with one. Executive orders and official statements showing bias count as supporting evidence. The government must produce raw statistics for the year of the suit and the 5 years before it, or face an adverse inference. Permits for these projects that need no NEPA document must be decided within 1 year of a complete application. Remedies are an injunction, fees, economic damages, and 50 to 100 percent of the expected construction cost, paid from the Judgment Fund. The applicant must finish the project or repay. Class actions are barred, and suits cannot be filed until 180 or 280 days after enactment.

Text and cited analysis · PDF page 166

Sec. 1403. Avoiding unreasonable delays in permitting

Gives applicants for permits that need no environmental document a right to sue in district court when the 1-year deadline in section 1402(c) is missed. The agency is excused if it proves the delay was caused by a disaster, a national emergency, fraud, withheld information, or a lapse in appropriations of more than 14 days. Courts decide within 120 days and can order a decision within 60 days.

Text and cited analysis · PDF page 182

Sec. 2101. Transmission permitting

Overhauls FERC's backstop siting authority under Federal Power Act section 216. FERC must issue a construction or modification permit for an interstate line of 230 kilovolts or more, or an advanced-conductor line at a voltage FERC sets, when it makes the required findings. The line no longer has to sit in a national interest corridor designated by the Energy Department. The state's clock for deciding now starts on the date the application is filed with the state. FERC must find the line is in the public interest, protects or benefits consumers, and improves reliability. For lines of 345 kilovolts or more the developer may file at FERC at the same time as at the state. FERC must take landowner input, consider the state record, and give a 45-day comment period. Costs go only to customers who benefit, in line with cost causation, and customers with no or trivial benefit cannot be charged involuntarily. Clean Water Act section 401 certifications and other state approvals under federal law become 'Federal authorizations' coordinated by FERC as lead agency (Interior for offshore), with challenges heard in the courts of appeals. ERCOT is excluded.

Text and cited analysis · PDF page 185

Sec. 2102. Reconductoring and other activities in existing rights-of-way

Adds Federal Power Act section 216A: work that maintains or increases grid capacity inside an existing right-of-way is categorically excluded from NEPA. Covered work includes reconductoring, higher operating voltage, added circuits, advanced transmission technologies, added storage at an existing facility, and a parallel circuit. Work under section 216A is also not a major federal action and not an undertaking under the National Historic Preservation Act. The bill also amends Natural Gas Act section 7 for repair, replacement, looping, compression and capacity-enhancement of interstate gas pipelines. That work is not a major federal action or a historic-preservation undertaking when it stays inside an existing right-of-way or previously reviewed footprint.

Text and cited analysis · PDF page 200

Sec. 2103. Transmission planning

Adds Federal Power Act sections 224 and 225. The Energy Department studies transmission constraints and congestion every 3 years and may identify constrained geographic areas. FERC must issue a rule within 180 days requiring every planning region to file a regional planning process and joint interregional processes with its neighbors within 2 years, updated every 4 years. The processes must use common assumptions, a fixed list of six benefits, and selection criteria of improved reliability, consumer benefit and public interest. Costs are allocated to beneficiaries roughly commensurate with benefits. Compliance with the FERC planning orders published on June 11, 2024, December 6, 2024 and April 28, 2025 (Order 1920 and its two rehearing orders) counts as compliance for regional planning. A project selected in a regional or interregional plan is deemed to meet most of the findings for a FERC backstop permit. Approving a planning process is not a major federal action under NEPA.

Text and cited analysis · PDF page 205

Sec. 2104. Improvements relating to local transmission planning and development

Adds Federal Power Act section 226. One or more states may refer a utility to FERC for an investigation of its local transmission planning. FERC forms an investigative team with up to 3 state appointees. The team may find that the utility's process is not selecting the more efficient or cost-effective local projects, or is crowding out regional planning. FERC may then order process changes or cut the utility's return on equity on local projects. Further remedies are removing the presumption of prudence or fining the utility. A fine, paid to the referring state, can reach $5 million for each local facility developed or energized from 60 days before the referral that FERC finds imprudent and harmful to that state's customers.

Text and cited analysis · PDF page 218

Sec. 2105. Prohibition of right of first refusal

Bans any federal right of first refusal for transmission facilities selected in a regional or interregional plan for cost allocation, overriding any FERC rule or order to the contrary.

Text and cited analysis · PDF page 224

Sec. 2106. Consolidated planning process

Requires FERC, within 18 months, to make each planning region file a consolidated interconnection and transmission planning process that looks 20 years ahead. The process publishes fuel-neutral planned interconnection locations with a fixed per-megawatt cost. A cluster study in the process has one decision point and nonrefundable security to deter speculative projects. Regions file within 2 years and update every 2 years.

Text and cited analysis · PDF page 224

Sec. 2107. Ratepayer protection

Congress finds it is not just and reasonable to charge data center, AI and cryptocurrency loads less than the embedded and incremental cost of the transmission they need. FERC must revise its 1994 transmission pricing policy within 270 days, propose a rule 270 days after that, and finish within a further year. New Federal Power Act section 228 covers data center loads of 20 megawatts or more. None of the incremental cost of serving them (generation, transmission, distribution) may be recovered from other customers. Recovery continues even if the data center leaves, and utilities must collect financial assurance before building upgrades. States may charge these loads more than cost and credit the surplus to other ratepayers. They may run open seasons that award service by ratepayer benefit, whatever the queue order. They may require the load to bring new generation, require curtailable service, and treat data centers less favorably than other industrial customers. The section applies to loads interconnecting after enactment.

Text and cited analysis · PDF page 226

Sec. 2108. Dispatchable energy systems market access

Opens wholesale markets to aggregations of customer-sited batteries, fuel cells and generators that can respond within 15 minutes (5 kilowatts minimum per device, 100 kilowatts per aggregation). After 18 months, grid operator rules that block them are unjust and unreasonable. Grid operators file compliance tariffs within 180 days. Unless state law or the state regulator provides otherwise, distribution utilities in organized markets must interconnect these resources; for public power utilities and other section 201(f) entities the requirement is voluntary. They must also accept wholesale metering data. A device paid by a state retail program cannot be paid twice for the same service; FERC orders disgorgement and can impose penalties of up to 3 times the amount for each day it was knowingly kept. The Energy Department runs a voluntary streamlined local permitting program for rooftop solar, batteries and vehicle chargers, with $20 million a year authorized for fiscal years 2026 through 2031.

Text and cited analysis · PDF page 240

Sec. 2109. Advanced transmission technologies

Requires FERC to make public utilities use advanced transmission technologies, including best-available conductors, dynamic line rating, power flow control and topology optimization, in new and upgraded lines, with a presumption that the cost is prudent. FERC issues a rule within 1 year requiring recurring benefit-cost evaluations; when benefits exceed costs the utility must deploy on FERC's timeline or face a penalty such as a lower return on equity.

Text and cited analysis · PDF page 260

Sec. 2110. Expediting generator interconnection queues

Directs FERC to start a rulemaking within 1 year requiring transmission providers to share and use computing technologies, including AI and automation, to process interconnection requests faster, and to revisit the rule every 4 years.

Text and cited analysis · PDF page 265

Sec. 2111. Grid data access

Adds Federal Power Act section 232. Transmission providers must hold the data needed for interconnection and facilities studies and may demand it from any bulk-power system user, owner or operator, who must respond in 15 days in a usable format. Confidentiality rules can shape access but cannot be used to withhold data. Violations are treated as reliability matters. FERC and the Energy Department publish, within 1 year, a reference specification for fully automated interconnection studies.

Text and cited analysis · PDF page 266

Sec. 2112. Power marketing administrations

Lets the federal power marketing agencies set pay outside the federal schedule, benchmarked to consumer-owned utilities in their interconnection, to fix hiring and retention problems.

Text and cited analysis · PDF page 272

Sec. 2113. FERC fee assessments

Requires FERC to review every 5 years whether its fees and charges are enough to handle its workload promptly and report to Congress.

Text and cited analysis · PDF page 278

Sec. 2114. Collection of data on computational load entities

Directs the Energy Information Administration to revise Form 861 to collect electricity load from data center entities (AI, cloud, cryptocurrency) at least 90 days before the first April 1 after enactment.

Text and cited analysis · PDF page 279

Sec. 2115. Conforming amendments; savings provision

Conforming cross-references in the Federal Power Act and a savings clause: nothing in the transmission title gives FERC authority over retail electricity sales or local distribution.

Text and cited analysis · PDF page 280

Sec. 2201. Accelerating claims

A 150-day statute of limitations applies to any lawsuit challenging a federal agency's grant or denial of an authorization. The limit covers authorizations for an energy, carbon dioxide, mineral or wildfire fuel-reduction project. A shorter limit set by the underlying law applies instead. Covered authorizations include leases, drilling permits, rights-of-way, mining plans, Endangered Species Act statements and permits, and forest restoration approvals. Agencies must publish the decision within 3 days. Courts must expedite the case, and a remand cannot give the agency more than 180 days unless the law requires longer. Agencies must tell the project sponsor about any suit within 30 days.

Text and cited analysis · PDF page 280

Sec. 2211. Permitting compliance on non-Federal land

Removes the federal drilling permit requirement for oil and gas wells on non-federal surface land. The exemption applies where the federal government owns less than half the minerals in the drilling unit. Wells whose wellbore only enters or passes through federal minerals are exempt too. Lessees notify Interior of state permits. Interior cannot require bonds, mitigation or reclamation approval on that non-federal land. Royalties are unchanged; Indian lands are excluded.

Text and cited analysis · PDF page 286

Sec. 2212. Rights-of-way across Indian land

Lets an Indian tribe grant rights-of-way across its own tribal land without Interior Department approval, if the grant follows a tribal regulation that Interior has approved. The tribal regulation must include an environmental review with public comment. Interior has 180 days to approve or disapprove, and its approval is not subject to NEPA, the National Historic Preservation Act or the Endangered Species Act.

Text and cited analysis · PDF page 290

Sec. 2213. Accelerating renewable energy permitting

Interior or the Forest Service must tell an eligible-project applicant within 30 days whether its right-of-way application is complete. If an EIS is needed, the agency has 90 days after finding the application complete to issue a notice of intent. Within 30 days after a complete application is submitted, it must issue any required cost-recovery agreement and grant, deny or defer the application. Deferral requires notice of remaining steps and agency timelines. Within 180 days, both departments must develop or adopt categorical exclusions for listed low-disturbance renewable activities, with extraordinary-circumstances exceptions. The list includes previously analyzed disturbances under 5 acres, certain repeat activities, small solar projects, surveys and meteorological towers. BLM must issue standard renewable review standards within 2 years.

Text and cited analysis · PDF page 298

Sec. 2214. Electric grid projects

Directs Interior and Agriculture to adopt, within 180 days, categorical exclusions for placing power lines in approved corridors. Another exclusion covers upgrades and reconductoring of existing lines in existing rights-of-way or on previously disturbed land. A third exclusion covers battery storage on previously disturbed land.

Text and cited analysis · PDF page 304

Sec. 2215. Hardrock mining mill sites

Lets a hardrock mine operator locate as many mill sites on public land as are reasonably necessary for waste rock, tailings and other operations. Each mill site covers up to 5 acres and sits under an approved plan of operations. The operator pays a $400 annual fee per site. Mill sites convey no mineral rights and cannot be patented. Hardrock minerals on acquired federal lands become leasable. Mill site fees and those lease receipts go to a new Abandoned Hardrock Mine Fund for cleanup.

Text and cited analysis · PDF page 306

Sec. 2221. Geothermal observation test projects

Requires a categorical exclusion within 1 year for geothermal observation test wells on existing leases that disturb no more than 10 acres, use no permanent roads, and finish within a year. Casual-use activities need only 30 days' notice and are not major federal actions.

Text and cited analysis · PDF page 318

Sec. 2222. Geothermal royalties

Calculates the reduced early-years geothermal royalty per generating facility, starting from each facility's in-service date, so a second plant on an old lease gets its own 10-year lower-royalty period.

Text and cited analysis · PDF page 325

Sec. 2223. Geothermal leasing reform

Requires geothermal lease sales every year instead of every 2 years, with a replacement sale in the same year if one is cancelled, and sets 30-day completeness and 30-day decision deadlines for geothermal drilling permits.

Text and cited analysis · PDF page 329

Sec. 2224. Geothermal ombudsman and permitting task force

Creates a Geothermal Ombudsman and a Geothermal Permitting Task Force inside BLM within 60 days. The Ombudsman resolves disputes between field offices and applicants and may assign staff to help other offices complete geothermal authorizations. The Ombudsman may also pay retention allowances of up to 25 percent of basic pay.

Text and cited analysis · PDF page 332

Sec. 2225. No Federal permit required for geothermal activities on certain land

No federal drilling permit for geothermal exploration and production on non-federal surface where the United States owns less than 50 percent of the subsurface geothermal estate, if the operator files its state permit with Interior. Indian lands are excluded; royalties are unchanged.

Text and cited analysis · PDF page 338

Sec. 2226. Effect of pending civil actions on processing applications relating to geothermal leasing

Requires Interior to keep processing geothermal permits, sundry notices and rights-of-way under a valid lease despite pending litigation. Interior must decide within 60 days of completing legal requirements. The duty ends if a court has vacated or enjoined the lease or permit.

Text and cited analysis · PDF page 341

Sec. 2227. Cost recovery from geothermal leasing, permitting, and inspections

Lets Interior charge geothermal applicants and lessees for the cost of processing and inspections through September 30, 2033, with hardship reductions, and requires a report within 5 years.

Text and cited analysis · PDF page 342

Sec. 2228. Publication of Gold Book for geothermal operations on Federal land

Directs Interior to identify standard geothermal procedures within 1 year and then publish, within 270 days, an updated and renamed 'Gold Book' of surface operating standards that covers geothermal, reviewed every 5 years.

Text and cited analysis · PDF page 346

Sec. 2229. NEPA Review

Rewrites section 390 of the Energy Policy Act of 2005. The oil and gas activities listed in section 390(b) of the Energy Policy Act of 2005 are declared not to be major federal actions at all, rather than categorical exclusions. Geothermal is added to two of them, and a new item covers geothermal power lines of up to 20 miles in a corridor approved within the past 10 years. One listed item's look-back goes from 5 to 10 years, and geothermal gets a new item for power lines up to 20 miles in a corridor approved within 10 years. Drilling permits for these activities carry no NEPA requirements.

Text and cited analysis · PDF page 349

Sec. 2231. Identifying and removing market barriers to hydropower

FERC, with the Energy Department, reports to Congress within 270 days on market barriers to hydropower and pumped storage. The report also covers how to pay hydropower for the grid services it provides. FERC prepares the report after a technical conference and public comment.

Text and cited analysis · PDF page 351

Sec. 2232. Certain conditions on issuance of licenses

Limits the mandatory conditions federal land agencies can attach to a hydropower license under Federal Power Act section 4(e) to those 'reasonably related to the effects of the project'.

Text and cited analysis · PDF page 354

Sec. 2233. Hydropower maintenance and temporary adjustments

Bars FERC from requiring license amendments for routine hydropower maintenance, repair or replacement, or for temporary operating variances caused by events outside the licensee's control. FERC must propose a rule within 90 days and finish within a further 180 days defining which alterations are substantial enough to need approval. Dam safety authority is preserved.

Text and cited analysis · PDF page 354

Sec. 2234. Micro hydrokinetic energy projects

Creates an expedited FERC license of 10 to 20 years for micro hydrokinetic projects of 5 megawatts or less. Qualifying projects are wave, tidal, current and free-flowing river turbines with no impoundment. FERC takes final action within 1 year of the application, with categorical exclusions for low-disturbance activities.

Text and cited analysis · PDF page 358

Sec. 2241. Federal Energy Regulatory Commission staffing

Widens FERC's special pay authority to economic and legal positions and strikes paragraph (6) of the same subsection.

Text and cited analysis · PDF page 362

Sec. 2242. Northwest Power and Conservation Council

Amends the cap on Bonneville's funding of the Northwest Power and Conservation Council, section 4(c)(10)(B) of the Northwest Power Act, by adding the words 'since the date of enactment' of this bill.

Text and cited analysis · PDF page 362

Sec. 2243. Federal Energy Regulatory Commission personnel safety

Lets FERC authorize its employees to perform law enforcement duties to protect the Chairman and Commissioners.

Text and cited analysis · PDF page 363

Sec. 2251. Offshore energy

Amends the offshore renewable energy section of the Outer Continental Shelf Lands Act. Interior's duty changes from 'prevention of interference with reasonable uses' of the ocean to 'prevention of unreasonable interference with other uses'. Interior, in consultation with the Secretary of Commerce, may grant rights-of-way for electric transmission through national marine sanctuaries, with sanctuary permits lasting as long as the right-of-way. The Inflation Reduction Act's link between offshore wind leasing and oil and gas lease sales is preserved.

Text and cited analysis · PDF page 363

Sec. 2252. Offshore energy transmission

Directs Interior and Energy to identify preferred routes for offshore transmission cables within 2 years and review them every 3 years. Interior is the lead agency for offshore transmission permitting, and a final rule is required within 2 years. Offshore transmission rights-of-way may be issued competitively or noncompetitively by Interior.

Text and cited analysis · PDF page 365

Sec. 2301. Historic preservation

Rewrites section 106 of the National Historic Preservation Act. An 'adverse effect' must be reasonably foreseeable and must directly alter a historic property. Temporary alterations are excluded. Visual, atmospheric and audible effects are excluded unless they directly and significantly diminish the property. An 'undertaking' excludes projects whose only federal tie is a loan, guarantee or grant, the non-federal parts of a project, minor repairs, permit renewals and post-approval operations. The process gets deadlines: 30 days to decide whether a project is an undertaking and 60 days for the agency's report. A determination or an agreement on the adverse effects follows within 90 days of the report. Advisory Council comments take 45 days, and the final decision takes 30 days. Consultation must be finished by the time the NEPA document is completed, unless the Secretary grants an extension for extraordinary circumstances. State and tribal preservation officers who do not respond in 30 days are passed over, and the agency may decide in its sole discretion that other considerations outweigh preservation. Courts give substantial deference and may only remand without vacatur or injunction; a preliminary injunction is available only for a likely violation of another law. Claims go to the courts of appeals, within 150 days, from parties who commented and suffered direct harm. A suit over a missed consultation deadline goes to a court where the project is located. Non-signatories cannot challenge programmatic agreements. State and tribal programs are evaluated every 2 years and lose grants if they miss consultation timelines.

Text and cited analysis · PDF page 372

Sec. 2302. Funding for the Historic Preservation Fund; use and availability; grants for Tribal Historic Preservation officers; additional funding

Authorizes $200 million a year for deposit in the Historic Preservation Fund for fiscal years 2027 through 2036. Deposits become available the next fiscal year without a further appropriation. Creates a $20 million-a-year grant program (fiscal years 2027 through 2030) for tribal historic preservation officers. The grants build online databases of records and of properties of traditional religious or cultural importance. Protections against disclosing sensitive site locations are included.

Text and cited analysis · PDF page 414